PROJECT DEFINITION REPORT PRESENTATION by McFarland Marceau Architects April 2014

KSE Pres Staff PAC Update

  • Upload
    cknw980

  • View
    26

  • Download
    1

Embed Size (px)

DESCRIPTION

seismic report

Citation preview

Page 1: KSE Pres Staff PAC Update

PROJECT DEFINITION REPORT PRESENTATIONby

McFarland Marceau ArchitectsApril 2014

Page 2: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU2

BACKGROUND1

N

A R C H I T E C T S L T D

MCFARLAND MARCEAU Sir Charles Kingsford-Smith Elementary

site site

site site

Sir Charles Kingsford SmithElementary School6901 Elliot Street

2013-08-21 10:12 AM6901 Elliott St, Vancouver, BC V5S 2N1, Canada - Google Maps

Page 1 of 2https://maps.google.com/

To see all the details that are visible on thescreen, use the "Print" link next to the map.

SCHOOL LOCATION

N

Page 3: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU3

BACKGROUND1

N

A R C H I T E C T S L T D

MCFARLAND MARCEAU Sir Charles Kingsford-Smith Elementary

site site

Data Quality not Guaranteed

catchment streets clean 2

Mar 18, 2014 16:03400M

VICTORIA - FRASERVIEW

Flemming Kingsford Smith

Douglas

Tecumseh

Weir

Waiverley

Cook

Oppenheimer

Waiverley

Kingsford SmithElementary

49th st

41st st

uplands dr

knig

ht s

t

vict

oria

dr

vivi

an s

t

kerr

st

se marine dr

kingsway

N

SCHOOL CATCHMENT

nominal capacity existing replacement

40K + 375E 60K + 325E

enrolment 367

school programs Learning Support Program - Communications (Spec Ed)

Community School Team

Out of school Time Programming (run by Community School Team)

childcare programs before /after school care - Spare Time Challenge Club

Page 4: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU4

DESCRIPTION OF KINGSFORD-SMITH SCHOOL FACILITIES2

feetmeters

2000600

c l a

r e

n d

o n

s t

c l a

r e

n d

o n

s t

e l l

i o

t s

t r e

e t

e 5 4 t h a v e n u e

e 5 3 t h a v e

e 5 3 t h a v e

e 5 2 n d a v e

e 5 1 s t a v e

BLOCK 1

H1

all weather play field

grassed play area

parkingBLOCK 2

M

BLOCK 3

H2

pavedplay area

0m 50 75 100

N

A R C H I T E C T S L T D

MCFARLAND MARCEAU Sir Charles Kingsford-Smith Elementary

site site

site site

NAERIAL SITE PLAN

Page 5: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU5

DESCRIPTION OF KINGSFORD-SMITH SCHOOL FACILITIES2

N

A R C H I T E C T S L T D

MCFARLAND MARCEAU Sir Charles Kingsford-Smith Elementary

architecture

architecture

ground floor planupper floor plan

Block

1Block

1

Block

2

Block

3Block

3

covered playarea

ground floor planupper floor plan

roof area

roof area

SCHOOL COMPONENTS

N

Block 1: H1entry hall, classrooms, library, kindergarten, staff room, washrooms

Block 2: Madministration, health, kitchen, main mechanical & electrical service rooms, change room

Block 3: H2gymnasium, change rooms, stage, multi-purpose room

Page 6: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU6

DESCRIPTION OF KINGSFORD-SMITH SCHOOL FACILITIES2

CLASSROOM BLOCK - WEST ELEVATION

WEST ELEVATION - GLAZING SYSTEM

Page 7: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU7

DESCRIPTION OF KINGSFORD-SMITH SCHOOL FACILITIES2

CLASSROOM - TYPICAL

LIBRARY

Page 8: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU8

DESCRIPTION OF KINGSFORD-SMITH SCHOOL FACILITIES2

MULTI-PURPOSE ROOM

GYMNASIUM

KITCHEN

Page 9: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU9

MINSTRY OF EDUCATION SEISMIC MITIGATION PROGRAM3

INTENT

1. The primary objective of the Seismic Mitigation Program is to achieve a life-safety standard for schools by minimizing the probability of local structural collapse as a result of a seismic event.

2. Identify the least capital cost option to achieve the above for the Kingsford Smith student population

DIRECTIONS

1. A Project Definition Report (PDR) must identify the least capital cost option that meets the ministry program intent

2. Improvements eligible for ministry funding are limited to structure and life safety upgrades

3. The ministry will not provide funding for on-site temporary accommodation (i.e. portables) during construction

Page 10: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU10

METHODOLOGY4

METHODOLOGY

1. Review of previous studies

2. Detailed analysis of 2012 Seismic Project Identification Reports (SPIRs)

3. Identify scopes incomplete or missing in SPIRs

4. Engagement with staff, PAC and students

5. Identification of options

Page 11: KSE Pres Staff PAC Update

11A R C H I T E C T S L T D

MCFARLAND MARCEAU

METHODOLOGY4

ground floor plan

upper floor plan

all pumice block walls to be steel stud strong back bracedwith painted GWB and base

1

1

all pumice block walls in washrooms to be braced with HSS, painted

2

3

exposed reinforced cast concrete buttress wall 1250x300x67006 required on west elevationarchitectural finish

3

4

exposed reinforced cast concrete buttress wall 2700x400x67002 required on south elevationarchitectural finish

4

1

pumice block walls (existing)

replacement ceiling included in SPIRsteel stud strong back wall bracing

HSS horizontal / vertical bracing

affected ceiling area NOT included in SPIR

wall paint only included in SPIRcondensation hazard, thermal bridge -furring, insulation and interior boardingrequired

all millowrk in storage rooms must be resized, cut to fit - not included in SPIR

matching 60 yr old celing tile not viable - no ceiling tile work included in SPIR for classroomsat a minimum, replace ceiling between beams typical where strong back bracing is used

2

modifying urinals not viable -urinals, drains and sleeves cast into

floor and cannot be salvaged:replacement required where strong

back bracing is used

re + re of wash basins not included in SPIR and not viable -replacement required

stoage room at each stair arecontructed with pumice block -seismic upgrade not included in SPIRpumice block requires movement

joint at u/s of 2nd floor slab -needs 1hr firestopping at exits:not included in SPIRelsewhere in corridor, smoke separation required:not included in SPIR

reinforced concrete walls

steel stud bracing system interferes with 22 interior doors that will require relocation:replace affected doors with new PSF doors and frames w/ accessible hardware

9836 9756 9756 9756 9756

6355

1620

5affected areas from seismic bracing of pumice block walls 2014 jan 29

N

A R C H I T E C T S L T D

MCFARLAND MARCEAU Sir Charles Kingsford-Smith Elementary

architecture

Page 12: KSE Pres Staff PAC Update

12A R C H I T E C T S L T D

MCFARLAND MARCEAU

METHODOLOGY4

SYSTEMSYSTEMSYSTEMSYSTEMSYSTEMSYSTEM

PAST EVALUATIONSPAST EVALUATIONSPAST EVALUATIONS CURRENT PDR EVALUATIONCURRENT PDR EVALUATIONCURRENT PDR EVALUATIONCURRENT PDR EVALUATIONCURRENT PDR EVALUATIONCURRENT PDR EVALUATION

PIR 2009 SPIR 2012 VFA MMA 2013

MAJOR CONCERNSMAJOR CONCERNS CONCLUSION & RECOMMENDATIONCONCLUSION & RECOMMENDATIONCONCLUSION & RECOMMENDATION

PIR 2009 SPIR 2012 VFA MMA 2013BUILDING

CODE ISSUE

HEALTH & SAFETY ISSUE

INCLUDED IN 2012 SPIR SCOPE

ADDITIONAL SCOPE RECOMMENDED IN SEISMIC UPGRADE

PROJECT

RECOMMENDED AS NECESSARY UPGRADE

IN NEAR FUTURE

1 SITE SERVICES

2 PARKING & SITE DEVELOPMENT

3 DROP-OFF

4 FOUNDATIONS Blocks 1 & 3

5 STRUCTURE Block 1

6 STRUCTURE Block 2

7 STRUCTURE Block 3

8 ENVELOPE

9 EXTERIOR FINISHES

10 EXTERIOR DOORS AND WINDOWS

11 INTERIOR FINISHES

12 INTERIOR DOORS

13 MILLWORK

14 MECHANICAL: HEATING & VENTILATION

15 MECHANICAL: PLUMBING

16 ELECTRICAL: MAIN SERVICE

17 ELECTRICAL: DISTRIBUTION

18 ELECTRICAL: LIGHTING

19 COMMUNICATION AND SECURITY

20 NON-STRUCTURAL SEISMIC RESTRAINT

21 ACCESSIBILITY

22 FIRE PROTECTION

﹗ ✔

✔ ✔

✔ ✔

﹗ ﹗ ✔

﹗ ﹗ ✔ ✔

✔ ✔

﹗ ﹗ ✔ ✔

✔ ✔

﹗ ﹗ ✔ ✔

﹗ ✔

﹗ ﹗ ✔

﹗ ✔ ✔

﹗ ✔

﹗ ✔

﹗ ﹗ ✔

TABLE 2 - OVERVIEW OF SYSTEMS, PAST EVALUATIONS AND CURRENT PDR EVALUATION - SUMMARY

Not evaluatedDeficient, major upgrade or replacement requiredSystem @ end of serviceable life, upgrade or replacement recommendedSome upgrades requiredNo improvement required

Page 13: KSE Pres Staff PAC Update

13A R C H I T E C T S L T D

MCFARLAND MARCEAU

METHODOLOGY4Engagement with Staff, PAC and Students

Page 14: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU14

METHODOLOGY4

Engagement led to establishment of 6 planning principles:

1. safety: create a safe & secure school for all users

2. learning spaces: create a satisfactory learning and teaching environment

3. school as community: strengthen and welcome community connections

4. connections to the community: create strong connections with community

5. connections to the outdoors: create strong connections between indoor & outdoor spaces

6. health and sustainable environment: provide for healthy & sustainable environment, including fresh air, natural light and sustainable systems

Page 15: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU15

OPTION ANALYSIS5

TEST SPIR ASSUMPTIONS & COSTS and INVESTIGATE 3 CONCEPTUAL OPTIONS

OPTION 1: Seismic Retrofit of existing building1. Seismic retrofit

a. structural seismic retrofit as per SPIRs (Ausenco 2012)b. structural seismic retrofit necessary but not included in SPIRsc. non-structural seismic work not included in SPIRs

2. Life Safety systemsa. non-seismic structural deficiencies (over stressing of structure due to

gravity loads)b. exiting and fire safety (fire separations & sprinklers)c. accessibility: personal care room and elevator

3. Possible educational enhancements through synergies of seismic work scopea. can spaces be modified as a result of seismic work?

OPTION 2: Partial Replacement1. Retrofit part(s) of the existing school and building a new addition

a. save blocks 2 and 3 and build new classroom wing on north side of gym?,

OPTION 3: Replacement school1. Construct new replacement school to current codes

115 east 8th avenue, Vancouver, BC V5T 1R8 t: 604.733.1115 www.mmal.ca page 2 of 2

INVESTIGATE OPTIONS

Page 16: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU16

OPTION ANALYSIS5

N

A R C H I T E C T S L T D

MCFARLAND MARCEAU Sir Charles Kingsford-Smith Elementary

option

e l l

i o

t s

t r e

e t

e 5 4 t h a v e n u e

e 5 3 t h a v e

e 5 2 n d a v e

e 5 3 t h a v e

e 5 1 s t a v e

c l a

r e

n d

o n

s

t

4330 m1 2

1 st

orey

2 st

orey

kindergarten (2nd flr)

general instruction

corridors / commons

administration

gym

mech/elec/wc/storage

existing schoolarea 4330 m2

seismic upgrade existing bldg

Page 17: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU17

OPTION ANALYSIS5

N

A R C H I T E C T S L T D

MCFARLAND MARCEAU Sir Charles Kingsford-Smith Elementary

option

e l l

i o

t s

t r e

e t

e 5 4 t h a v e n u e

e 5 3 t h a v e

e 5 2 n d a v e

e 5 3 t h a v e

e 5 1 s t a v e

c l a

r e

n d

o n

s

t

2

kindergarten

general instruction

commons

administration

gym

mech/elec/wc/storage

classroom wingreconstructionarea 2088 m2

3435 m2

renovated existingarea 1347 m2

2 st

orey

1 st

orey

partial replacement

block 3retained

block 2retained

Page 18: KSE Pres Staff PAC Update

A R C H I T E C T S L T D

MCFARLAND MARCEAU18

OPTION ANALYSIS5

N

A R C H I T E C T S L T D

MCFARLAND MARCEAU Sir Charles Kingsford-Smith Elementary

option

e l l

i o

t s

t r e

e t

e 5 4 t h a v e n u e

e 5 3 t h a v e

e 5 2 n d a v e

e 5 3 t h a v e

e 5 1 s t a v e

c l a

r e

n d

o n

s

t

3435 m3 2

1 st

orey

2 st

orey

kindergarten

general instruction

commons

administration

gym

mech/elec/wc/storage

replacement schoolarea 3435 m2

replacement school

Page 19: KSE Pres Staff PAC Update

20A R C H I T E C T S L T D

MCFARLAND MARCEAU

CONCLUSIONS AND DEFINITION7

OPTION 1A

SEISMIC RETROFIT

OPTION 1B

SEISMIC RETROFIT

+ DEFERRED MAINTENANCE

OPTION 2

PARTIAL REPLACEMENT

OPTION 3

REPLACEMENT

Description Seismic + life safety + acessibility upgradeSeismic + life-safety + accessibility upgrade

+ deferred maintenanceReplacement of classroom block, complete

upgrade of admin and gym blocksComplete replacement of facilities to

Ministry of Education standards.

School capacity 40K + 375E 40K + 375E 60K + 325E 60K + 325E

School area (m²) 4,341 4,341 3,433 3,433

Estimated construction time 12-14 months 16 - 20 months 18 months 18 months

Seismic Resistance Life safety Life safety Full compliance Full compliance

Temporary AccommodationOff-site

accommodation

On-site

21 on-site portables21 on-site portables

No need for temporary accommodation except that access to off-site gym would be

required for 2-4 months.none

Capital Costs $10,120,000 $13,987,000 $24,349,000 $15,354,000 $14,275,000

Least capital costs 1 2 5 4 3

Overview of advantages and disadvantages against VSB planning and design principles

Advantages

•Upgradesstructuralsystemstoalifesafetystandard

•Improvesaccessibilityandfiresafety

•Offers1,000m²morespacethanapartialortotalreplacementbuilding(option1band3).

•Lowestcostoption

•Upgradesstructuralsystemstoalifesafetystandard

•Improvesaccessibilityandfiresafety

•Upgradesarchitectural,mechanicalandelectricalsystemstocurrentcodes

•Offers1,000m²morespacethanapartialortotalreplacementbuilding(option1band3).

•Allowsforsomereconfigurationofspacestomeet21stCenturylearningprinciples

•Upgradesallsystemstocurrentcodes

•Norelocationofstudentsnecessary

•Allowsforspacereconfigurationtoincorporate21stcenturylearningprinciples

•Addressessecurityconcernswithregardstotrafficanddrop-off.

•Allsystemswillmeetcurrentcodes

•Norelocationofstudentsnecessary

•Allowsforspacereconfigurationtoincorporate21stcenturylearningprinciples

•Addressessecurityconcernswithregardstotrafficanddrop-off.

Disadvantages

•Entailsrelocationofstudentsoff-siteforoneyear.

•Permitsonlyminimalmanipulationwithexistingspaceswhichmeansminimalopportunitiestomeet21stcenturylearningprinciples.

•Retainsanagingbuildingwithantiquatedsystems(mechanical,electricalandtechnology).

•Doesnotaddresscurrentsecurityconcernswithregardstodrop-offofstudents.

•Entailsrelocationofstudentsoff-sitefortwoyears.

•Doesnotaddresscurrentsecurityconcernswithregardstodrop-offofstudents.

•Highestcostoption

•Schoolfacilitieswillbeconsiderablysmallerincludingstorage,classroomsandmulti-purposespace

•Schoolfacilitieswillbeconsiderablysmallerincludingstorage,classroomsandmulti-purposespace

Conclusion•BasedonMinistrycirteriaforseismicupgradeprojects,theProjectTeamconcludesthatthelowestcostoptionisOption1A,withoff-sitetemporaryaccommodation.

SIR KINGSFORD-SMITH ELEMENTARY SCHOOLSEISMIC UPGRADE - PROJECT DEFINITION REPORT

OVERVIEW OF OPTIONS