KSTR IBS BUILDING SYSTEM

KSTR - IBS Building Solution - Solar System | K-Structures€¦ ·  · 2017-10-27posite floor slab construction that built with a series of high tensile galvanized cold formed C-sections

Embed Size (px)

Citation preview

KSTR IBS BUILDING SYSTEM

KSTR IBS BUILDING SYSTEM

BUILDING YOUR FUTURE

SMARTER

KSTR IBS BUILDING SYSTEM

consists of load-bearing, none load-bearing wall system, com-posite floor slab construction that built with a series of high tensile galvanized cold formed C-sections. The total building weight can be designed lighter by half compared to conventional building.

This system minimizes the need for R.C beam, column, timber formwork, brick & plastering works; other advantages include fast paced construction, minimizing site workers, up to 3 hours fire proper-ties, excellent thermal and sound resistance, optimized design for foun-dation substructure and etc.

IBS DESIGN SOFTWARE

IBS Certified By Structural Tested By Fire Tested By

32

Semi -DDesign

54

3D FRONT VIEW

SPECIFICATIONS

STRUCTURE : KSTR IBS BUILDING SYSTEM WALL External : KStr Solid Wall Internal : KStr Dry Wall Party Wall : KStr Party Wall ROOF STRUCTURE : Lightweight Steel ROOF COVERING : Ks760D Metal Roof ROOF INSULATION : Rockwool & Aluminium Foil CEILLING : Plaster Ceilling DOOR : Flush Door ELECTRICAL WIRING : Provided BUILD UP :

921 sq.ft

76

FRONT ELEVATION

SIDE VIEW

REAR ELEVATION

GROUND FLOOR LAYOUT ROOF LAYOUT

3D REAR VIEW

98

COMPANY BACKGROUND

Kemuning Structures Sdn Bhd was incorporated in the year 2001 and is a member of Vantage Group of Companies. Manufacture facility is currently located in Bukit Kemuning, Shah Alam. Our primary core business lies in providing Quality Solutions in Steel Building System through our range of Design & Build Steel Solutions , which comprises:-

- KStr IBS Building System - KStr Wall Framing System - KStr Lightweight Roof Truss System - KStr Lightweight Shed System - KStr Metal Roof Covering System - KStr Solar Photovoltaic System - KStr Solar Mounting Structure Solutions

A series of tests have been run along with representative from UNIVERSITI SCI-ENCE MALAYSIA (USM) for KStr Wall Fram-ing System and KStr Floor Slab System.

At the end of day, all composite wall speci-mens and composite slab has show no sign of structural failure.

CONSTRUCTION SPEED COMPARISON

KStr Wall System has been passed fire test which conducted by in SIRIM MALAYSIA.

Fire certificate has been issued to KStr Wall System from JABATAN BOMBA dan PENYE-LAMAT MALAYSIA .

*Estimate based on 10 units Double Storey Houses

0

0.5

1

1.5

2

2.5

3

3.5

4

KStr IBS BuildingSystem

Conventional BuildingMethod

MO

NTH

S

FIRE TEST

STRUCTURAL TEST

2 months

4 months

1110