32
L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 60mil HDPE ASBUILT RIVERDALE, MB COMPLETED 08NOV18

L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

 

 

 

 

 

    

L8031  

RM OF RIVERDALE LAGOON SECONDARY CELL 1 60mil HDPE AS‐BUILT 

 RIVERDALE, MB 

 COMPLETED 08‐NOV‐18 

 

Page 2: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

DWG TITLE:

CLIENT:

TITAN ENVIRONMENTAL CONTAINMENT LTD.

DWG NO.:

REV. NO.:

PROJ. NO.:

DATE:

DRAWN BY:

REV. BY:

SCALE:

NTS

EA

NOT APPROVED FOR CONSTRUCTION

DWG TITLE:

CLIENT:

LM

LEGEND:

DWG TITLE:HDPE AS-BUILT SECONDARY CELL1

CLIENT:

TITAN ENVIRONMENTAL CONTAINMENT LTD.

DWG NO.:

REV. NO.:

002

000

PROJ. NO.:

DATE:

DRAWN BY:

REV. BY:

SCALE:

NTS

EA

NOT APPROVED FOR CONSTRUCTION

DWG TITLE:

CLIENT:

LM

LEGEND:

SLOPE TRANSITION

CREST/ TIE-IN

Report any discrepancies to Titan Environmental Containment Ltd.Do not

scale dimensions from drawing. Do not modify drawing, re-use it, or use it

for purposes other than those intended at the time of its preparation

without prior written permission from Titan Environmental Containment Ltd.

Final Panel Locations to be installed at the descretion of the TITAN field

Superintendant as see fit to existing site conditions..

RM of Riverdale Lagoon

08-NOV-18

L8031

RM OF RIVERDALE

LAGOON SECONDARY CELL 1

Page 3: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

PANEL PLACEMENT LOG

DATE

LEN

GTH

WID

TH

DD/MMM/YY

01/11/2018 P1 97815 375 22.3

01/11/2018 P2 97826 375 22.3

01/11/2018 P3 97801 375 22.3

01/11/2018 P4 97814 375 22.3

01/11/2018 P5 97812 375 22.3

01/11/2018 P6 97821 375 22.3

01/11/2018 P7 97804 375 22.3

01/11/2018 P8 97828 375 22.3

01/11/2018 P9 97831 375 22.3

01/11/2018 P10 97827 375 22.3

01/11/2018 P11 97808 375 22.3

01/11/2018 P12 97529 375 22.3

01/11/2018 P13 97823 375 22.3

01/11/2018 P14 97809 375 22.3

01/11/2018 P15 97530 375 22.3

01/11/2018 P16 97531 375 22.3

01/11/2018 P17 97532 375 22.3

02/11/2018 P18 97543 375 22.3

02/11/2018 P19 97535 375 22.3

02/11/2018 P20 97540 375 22.3

02/11/2018 P21 97527 375 22.3

02/11/2018 P22 97550 375 22.3

02/11/2018 P23 97551 375 22.3

02/11/2018 P24 97539 375 22.3

02/11/2018 P25 97549 375 22.3

02/11/2018 P26 97548 375 22.3

02/11/2018 P27 97533 375 22.3

02/11/2018 P28 97534 375 22.3

02/11/2018 P29 97544 375 22.3

02/11/2018 P30 97537 375 22.3

03/11/2018 P31 97536 375 22.3

03/11/2018 P32 97538 375 22.3

03/11/2018 P33 97515 375 22.3

03/11/2018 P34 97542 375 22.3

03/11/2018 P35 97510 375 22.3

03/11/2018 P36 97514 375 22.3

03/11/2018 P37 97523 375 22.3

03/11/2018 P38 97546 375 22.3

03/11/2018 P39 97521 375 22.3

03/11/2018 P40 97512 375 22.3

Product Type: 60 mls smoothProject Name: Riverdale Lagoon Secondary Cell 1

ROLL

NUM

BER

CO

MM

ENTS

FEETPAN

EL N

UMBE

R

Page 4: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

PANEL PLACEMENT LOG

DATE

LEN

GTH

WID

TH

DD/MMM/YY

Product Type: 60 mls smoothProject Name: Riverdale Lagoon Secondary Cell 1

ROLL

NUM

BER

CO

MM

ENTS

FEETPAN

EL N

UMBE

R

03/11/2018 P41 97525 375 22.3

03/11/2018 P42 97525 142 22.3

03/11/2018 P43 97523 142 22.3

03/11/2018 P44 97546 91 22.3

03/11/2018 P45 97514 142 22.3

03/11/2018 P46 97512 142 22.3

03/11/2018 P47 97521 91 22.3

03/11/2018 P48 97521 138 22.3

03/11/2018 P49 97510 143 22.3

03/11/2018 P50 97536 87 22.3

04/11/2018 P51 97536 145 22.3

04/11/2018 P52 97809 142 22.3

04/11/2018 P53 97823 80 22.3

04/11/2018 P54 97542 141 22.3

04/11/2018 P55 97542 139 22.3

04/11/2018 P56 97532 87 22.3

04/11/2018 P57 97538 145 22.3

04/11/2018 P58 97527 142 22.3

04/11/2018 P59 97551 77 22.3

04/11/2018 P60 97534 142 22.3

04/11/2018 P61 97549 135 22.3

04/11/2018 P62 97548 89 22.3

04/11/2018 P63 97533 143 22.3

04/11/2018 P64 97539 140 22.3

04/11/2018 P65 97540 83 22.3

04/11/2018 P66 97531 142 22.3

04/11/2018 P67 97550 140 22.3

04/11/2018 P68 97529 86 22.3

04/11/2018 P69 97543 143 22.3

04/11/2018 P70 97537 142 22.3

04/11/2018 P71 97537 84 22.3

04/11/2018 P72 97526 375 22.3

04/11/2018 P73 97526 150 22.3

04/11/2018 P74 97521 43 11

04/11/2018 P75 97521 35 11

04/11/2018 P76 97526 146 22.3

04/11/2018 P77 97808 64 22.3

04/11/2018 P78 97808 30 22.3

04/11/2018 P79 97808 19 12

04/11/2018 P80 97808 20 22.3

04/11/2018 P81 97823 43 22.3

Page 5: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

PANEL PLACEMENT LOG

DATE

LEN

GTH

WID

TH

DD/MMM/YY

Product Type: 60 mls smoothProject Name: Riverdale Lagoon Secondary Cell 1

ROLL

NUM

BER

CO

MM

ENTS

FEETPAN

EL N

UMBE

R

04/11/2018 P82 97532 59 22.3

04/11/2018 P83 97546 59 22.3

04/11/2018 P84 97536 59 22.3

04/11/2018 P85 97551 59 22.3

04/11/2018 P86 97548 59 22.3

04/11/2018 P87 97540 59 22.3

04/11/2018 P88 97529 59 22.3

04/11/2018 P89 97529 59 22.3

04/11/2018 P90 97529 59 22.3

04/11/2018 P91 97799 59 22.3

04/11/2018 P92 97799 59 22.3

04/11/2018 P93 97799 59 22.3

04/11/2018 P94 97827 40 22.3

04/11/2018 P95 97827 9 3

04/11/2018 P96 97827 7 3

04/11/2018 P97 97799 36 22.3

04/11/2018 P98 97799 61 22.3

04/11/2018 P99 97827 62 22.3

04/11/2018 P100 97812 35 22.3

04/11/2018 P101 97812 28 22.3

04/11/2018 P102 97812 48 22.3

04/11/2018 P103 97810 60 22.3

04/11/2018 P104 97814 60 22.3

04/11/2018 P105 97814 60 22.3

04/11/2018 P106 97815 60 22.3

04/11/2018 P107 97815 60 22.3

04/11/2018 P108 97826 60 22.3

04/11/2018 P109 97826 60 22.3

04/11/2018 P110 97826 60 22.3

04/11/2018 P111 97821 60 22.3

04/11/2018 P112 97821 60 22.3

04/11/2018 P113 97804 60 22.3

04/11/2018 P114 97804 60 22.3

04/11/2018 P115 97828 55 22.3

04/11/2018 P116 97831 33 22.3

04/11/2018 P117 97804 36 22.3

04/11/2018 P118 97804 58 22.3

Page 6: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

WEDGE SEAM LOG

WEL

D DA

TE

SEA

M L

ENG

TH

TEST

DA

TE

DD/MMM/YY AM PM FEET DD/MMM/YY

P1xP2 01/11/2018 11:33 DM 42 375.00 03/11/2018 45 45 PASS CP

P2xP3 01/11/2018 11:41 KH 32 375.00 01/11/2018 42 42 PASS CP

P3xP4 01/11/2018 12:00 DT 41 375.00 03/11/2018 40 40 PASS CP

P4xP5 01/11/2018 1:33 DM 42 375.00 01/11/2018 46 45 PASS CP

P5xP6 01/11/2018 1:51 KH 32 375.00 01/11/2018 49 49 PASS CP

P6xP7 01/11/2018 2:06 DT 41 375.00 01/11/2018 48 48 PASS CP

P7xP8 01/11/2018 2:23 DM 42 375.00 01/11/2018 49 49 PASS CP

P8xP9 01/11/2018 2:53 KH 32 375.00 01/11/2018 48 48 PASS CP

P9xP10 01/11/2018 3:17 DT 41 375.00 03/11/2018 40 40 PASS CP

P10xP11 01/11/2018 3:20 DM 42 375.00 01/11/2018 40 40 PASS CP

P11xP12 01/11/2018 3:35 KH 32 375.00 01/11/2018 40 40 PASS CP

P12xP13 01/11/2018 4:55 DT 41 375.00 01/11/2018 45 45 PASS CP

P13xP14 01/11/2018 4:40 DM 42 375.00 01/11/2018 45 45 PASS CP

P14xP15 01/11/2018 5:20 KH 32 375.00 03/11/2018 40 40 PASS CP

P15xP16 01/11/2018 5:35 DM 42 375.00 03/11/2018 40 40 PASS CP

P16xP17 01/11/2018 6:00 DT 41 375.00 02/11/2018 45 45 PASS CP

P17xP18 02/11/2018 2:45 DM 42 375.00 02/11/2018 40 45 PASS CP

P18xP19 02/11/2018 2:57 DT 41 375.00 02/11/2018 46 46 PASS CP

P19xP20 02/11/2018 3:03 AS 9 375.00 02/11/2018 40 40 PASS CP

P20xP21 02/11/2018 3:25 KH 32 375.00 02/11/2018 47 47 PASS CP

P21xP22 02/11/2018 3:49 DM 42 375.00 02/11/2018 50 50 PASS CP

P22xP23 02/11/2018 3:54 AS 9 375.00 02/11/2018 52 52 PASS CP

P23xP24 02/11/2018 4:35 DT 41 375.00 02/11/2018 42 42 PASS CP

P24xP25 02/11/2018 5:01 KH 32 375.00 02/11/2018 40 40 PASS CP

P25xP26 02/11/2018 5:19 DM 42 375.00 02/11/2018 50 50 PASS CP

P26xP27 02/11/2018 5:53 AS 9 375.00 03/11/2018 50 50 PASS CP

P27xP28 02/11/2018 6:05 DT 41 375.00 03/11/2018 47 47 PASS CP

P28xP29 02/11/2018 6:20 KH 32 375.00 03/11/2018 47 47 PASS CP

P29xP30 02/11/2018 6:25 DM 42 375.00 03/11/2018 49 47 PASS CP

P30xP31 03/11/2018 3:05 DT 27 375.00 03/11/2018 48 48 PASS CP

P31xP32 03/11/2018 3:16 KH 32 375.00 03/11/2018 45 44 PASS CP

P32xP33 03/11/2018 3:23 DM 42 375.00 03/11/2018 43 43 PASS CP

P33xP34 03/11/2018 3:32 AS 9 375.00 03/11/2018 46 46 PASS CP

P34xP35 03/11/2018 3:55 DT 27 375.00 03/11/2018 48 48 PASS CP

P35xP36 03/11/2018 3:56 KH 32 375.00 03/11/2018 40 40 PASS CP

P36xP37 03/11/2018 4:10 DM 32 375.00 03/11/2018 47 47 PASS CP

P37xP38 03/11/2018 4:20 AS 9 375.00 03/11/2018 41 41 PASS CP

P38xP39 03/11/2018 4:46 DT 27 375.00 03/11/2018 48 48 PASS CP

Product Type: 60 mls smooth

STA

RT P

SI

FIN

ISH

PSI

AIR TEST INFORMATIONSEAM LOG

BETW

EEN

PA

NEL

S

TEST

RES

ULTS

QC

TEC

HNIC

IAN

TIME

OF

DAY

TEC

HNIC

IAN

WED

GE

#

Project Name: Riverdale Lagoon Secondary Cell 1

Page 7: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

WEDGE SEAM LOG

WEL

D DA

TE

SEA

M L

ENG

TH

TEST

DA

TE

DD/MMM/YY AM PM FEET DD/MMM/YY

Product Type: 60 mls smooth

STA

RT P

SI

FIN

ISH

PSI

AIR TEST INFORMATIONSEAM LOG

BETW

EEN

PA

NEL

S

TEST

RES

ULTS

QC

TEC

HNIC

IAN

TIME

OF

DAY

TEC

HNIC

IAN

WED

GE

#

Project Name: Riverdale Lagoon Secondary Cell 1

P39xP40 03/11/2018 4:45 KH 32 375.00 03/11/2018 40 40 PASS CP

P40xP41 03/11/2018 5:00 DM 42 375.00 03/11/2018 40 40 PASS CP

P41xP42 03/11/2018 5:23 DT 27 142.00 03/11/2018 45 45 PASS CP

P42xP43 03/11/2018 5:33 DT 27 142.00 03/11/2018 40 40 PASS CP

P43xP44 03/11/2018 5:30 DM 42 91.00 03/11/2018 40 40 PASS CP

P41xP43 03/11/2018 5:33 DT 27 142.00 03/11/2018 40 40 PASS CP

P41xP44 03/11/2018 5:33 DT 27 91.00 03/11/2018 40 40 PASS CP

P42xP45 03/11/2018 6:05 AS 9 142.00 03/11/2018 40 40 PASS CP

P45xP46 03/11/2018 5:52 DM 42 142.00 03/11/2018 40 40 PASS CP

P46xP47 03/11/2018 6:02 DM 42 91.00 03/11/2018 40 40 PASS CP

P46xP43 03/11/2018 6:05 AS 9 142.00 03/11/2018 40 40 PASS CP

P46xP44 03/11/2018 6:05 AS 9 91.00 03/11/2018 40 40 PASS CP

P47xP44 03/11/2018 6:05 AS 9 91.00 03/11/2018 40 40 PASS CP

P50xP47 03/11/2018 6:30 DT 27 87.00 03/11/2018 40 40 PASS CP

P49xP45 03/11/2018 6:30 DT 27 142.00 03/11/2018 40 40 PASS CP

P48xP47 03/11/2018 6:20 DM 42 91.00 03/11/2018 40 40 PASS CP

P48xP45 03/11/2018 6:30 DT 27 138.00 03/11/2018 40 40 PASS CP

P49xP46 03/11/2018 6:30 DT 27 142.00 03/11/2018 40 40 PASS CP

P50xP46 03/11/2018 6:30 DT 27 87.00 03/11/2018 40 40 PASS CP

P48XP49 03/11/2018 6:03 DM 42 138.00 03/11/2018 40 40 PASS CP

P49XP50 03/11/2018 6:09 DM 42 87.00 03/11/2018 50 50 PASS CP

P51xP52 04/11/2018 9:38 DT 27 142.00 04/11/2018 45 45 PASS CP

P52xP53 04/11/2018 9:42 DM 42 80.00 04/11/2018 46 46 PASS CP

P50xP53 04/11/2018 9:41 AS 9 80.00 04/11/2018 47 47 PASS CP

P50xP52 04/11/2018 9:41 AS 9 87.00 04/11/2018 47 47 PASS CP

P49xP52 04/11/2018 9:41 AS 9 142.00 04/11/2018 47 47 PASS CP

P51xP49 04/11/2018 9:41 AS 9 143.00 04/11/2018 47 47 PASS CP

P51xP48 04/11/2018 9:41 AS 9 87.00 04/11/2018 47 47 PASS CP

P54xP55 04/11/2018 9:58 DT 27 139.00 04/11/2018 51 51 PASS CP

P55xP56 04/11/2018 10:00 DM 42 87.00 04/11/2018 51 51 PASS CP

P56xP53 04/11/2018 10:08 DT 27 80.00 04/11/2018 40 40 PASS CP

P56xP52 04/11/2018 10:08 DT 27 87.00 04/11/2018 40 40 PASS CP

P55xP52 04/11/2018 10:08 DT 27 139.00 04/11/2018 40 40 PASS CP

P54xP51 04/11/2018 10:08 DT 27 141.00 04/11/2018 40 40 PASS CP

P55xP51 04/11/2018 10:08 DT 27 139.00 04/11/2018 40 40 PASS CP

P57xP58 04/11/2018 10:19 KH 32 142.00 04/11/2018 50 50 PASS CP

P58xP59 04/11/2018 10:22 DM 42 77.00 04/11/2018 50 50 PASS CP

P59xP56 04/11/2018 10:27 AS 9 77.00 04/11/2018 48 48 PASS CP

Page 8: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

WEDGE SEAM LOG

WEL

D DA

TE

SEA

M L

ENG

TH

TEST

DA

TE

DD/MMM/YY AM PM FEET DD/MMM/YY

Product Type: 60 mls smooth

STA

RT P

SI

FIN

ISH

PSI

AIR TEST INFORMATIONSEAM LOG

BETW

EEN

PA

NEL

S

TEST

RES

ULTS

QC

TEC

HNIC

IAN

TIME

OF

DAY

TEC

HNIC

IAN

WED

GE

#

Project Name: Riverdale Lagoon Secondary Cell 1

P58xP56 04/11/2018 10:27 AS 9 87.00 04/11/2018 48 48 PASS CP

P58xP55 04/11/2018 10:27 AS 9 139.00 04/11/2018 48 48 PASS CP

P57xP55 04/11/2018 10:27 AS 9 139.00 04/11/2018 48 48 PASS CP

P57xP54 04/11/2018 10:27 AS 9 141.00 04/11/2018 48 48 PASS CP

P60xP61 04/11/2018 10:38 KH 32 135.00 04/11/2018 50 50 PASS CP

P61xP62 04/11/2018 10:41 DM 42 89.00 04/11/2018 49 49 PASS CP

P62xP59 04/11/2018 10:45 DM 42 77.00 04/11/2018 55 55 PASS CP

P62xP58 04/11/2018 10:45 DM 42 89.00 04/11/2018 55 55 PASS CP

P61xP58 04/11/2018 10:45 DM 42 135.00 04/11/2018 55 55 PASS CP

P60xP57 04/11/2018 10:45 DM 42 142.00 04/11/2018 55 55 PASS CP

P61xP57 04/11/2018 10:45 DM 42 135.00 04/11/2018 55 55 PASS CP

P63xP64 04/11/2018 10:58 KH 27 140.00 04/11/2018 41 41 PASS CP

P64xP65 04/11/2018 11:03 DT 27 83.00 04/11/2018 50 50 PASS CP

P65xP62 04/11/2018 11:07 AS 9 83.00 04/11/2018 50 50 PASS CP

P63xP60 04/11/2018 11:07 AS 9 142.00 04/11/2018 50 50 PASS CP

P64xP61 04/11/2018 11:07 AS 9 135.00 04/11/2018 50 50 PASS CP

P61xP65 04/11/2018 11:07 AS 9 83.00 04/11/2018 50 50 PASS CP

P66xP67 04/11/2018 11:20 KH 32 140.00 04/11/2018 52 52 PASS CP

P67xP68 04/11/2018 11:21 DT 27 86.00 04/11/2018 49 49 PASS CP

P68xP65 04/11/2018 11:27 DT 27 83.00 04/11/2018 50 50 PASS CP

P68xP64 04/11/2018 11:27 DT 27 86.00 04/11/2018 50 50 PASS CP

P67xP64 04/11/2018 11:27 DT 27 140.00 04/11/2018 50 50 PASS CP

P67xP63 04/11/2018 11:27 DT 27 140.00 04/11/2018 50 50 PASS CP

P66xP63 04/11/2018 11:27 DT 27 142.00 04/11/2018 50 50 PASS CP

P69xP70 04/11/2018 11:42 KH 32 142.00 04/11/2018 54 54 PASS CP

P70xP71 04/11/2018 11:48 KH 32 84.00 04/11/2018 41 41 PASS CP

P71xP68 04/11/2018 11:46 AS 9 84.00 04/11/2018 41 41 PASS CP

P70xP68 04/11/2018 11:46 AS 9 86.00 04/11/2018 41 41 PASS CP

P70xP67 04/11/2018 11:46 AS 9 140.00 04/11/2018 41 41 PASS CP

P69xP67 04/11/2018 11:46 AS 9 140.00 04/11/2018 41 41 PASS CP

P69xP66 04/11/2018 11:46 AS 9 142.00 04/11/2018 41 41 PASS CP

P69xP72 04/11/2018 1:15 DM 42 143.00 04/11/2018 56 56 PASS CP

P70xP72 04/11/2018 1:15 DM 42 142.00 04/11/2018 56 56 PASS CP

P71xP72 04/11/2018 1:15 DM 42 84.00 04/11/2018 56 56 PASS CP

P75xP76 04/11/2018 1:57 KH 32 35.00 04/11/2018 47 47 PASS CP

P73xP74 04/11/2018 1:58 DT 27 43.00 04/11/2018 51 51 PASS CP

P74xP75 04/11/2018 2:01 DT 27 35.00 04/11/2018 55 55 PASS CP

P73xP72 04/11/2018 2:04 KH 32 150.00 04/11/2018 58 58 PASS CP

Page 9: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

WEDGE SEAM LOG

WEL

D DA

TE

SEA

M L

ENG

TH

TEST

DA

TE

DD/MMM/YY AM PM FEET DD/MMM/YY

Product Type: 60 mls smooth

STA

RT P

SI

FIN

ISH

PSI

AIR TEST INFORMATIONSEAM LOG

BETW

EEN

PA

NEL

S

TEST

RES

ULTS

QC

TEC

HNIC

IAN

TIME

OF

DAY

TEC

HNIC

IAN

WED

GE

#

Project Name: Riverdale Lagoon Secondary Cell 1

P74xP72 04/11/2018 2:04 KH 32 43.00 04/11/2018 58 58 PASS CP

P75xP72 04/11/2018 2:04 KH 32 35.00 04/11/2018 58 58 PASS CP

P76xP72 04/11/2018 2:04 KH 32 146.00 04/11/2018 58 58 PASS CP

P76xP77 04/11/2018 2:05 DT 27 64.00 04/11/2018 44 44 PASS CP

P77xP78 04/11/2018 2:09 DM 42 30.00 04/11/2018 51 51 PASS CP

P78xP79 04/11/2018 4:27 DM 42 19.00 04/11/2018 50 50 PASS CP

P79xP80 04/11/2018 2:18 DM 42 19.00 04/11/2018 50 50 PASS CP

P80xP81 04/11/2018 2:21 DT 27 20.00 04/11/2018 50 50 PASS CP

P81xP82 04/11/2018 2:25 DM 42 43.00 04/11/2018 45 45 PASS CP

P82xP83 04/11/2018 2:31 DT 27 59.00 04/11/2018 45 45 PASS CP

P83xP84 04/11/2018 2:35 DM 42 59.00 04/11/2018 51 51 PASS CP

P84xP85 04/11/2018 2:41 DT 27 59.00 04/11/2018 51 51 PASS CP

P85xP86 04/11/2018 2:43 DM 42 59.00 04/11/2018 55 55 PASS CP

P86xP87 04/11/2018 2:50 DT 27 59.00 04/11/2018 50 50 PASS CP

P87xP88 04/11/2018 2:53 DM 42 59.00 04/11/2018 45 45 PASS CP

P88xP89 04/11/2018 2:58 DT 27 59.00 04/11/2018 45 45 PASS CP

P89xP90 04/11/2018 3:01 DM 42 59.00 04/11/2018 45 45 PASS CP

P90xP91 04/11/2018 3:05 DT 27 59.00 04/11/2018 50 50 PASS CP

P91xP92 04/11/2018 3:09 DM 42 59.00 04/11/2018 50 50 PASS CP

P92xP93 04/11/2018 3:23 DM 42 59.00 04/11/2018 46 46 PASS CP

P93xP94 04/11/2018 3:27 DT 27 40.00 04/11/2018 45 45 PASS CP

P94xP95 04/11/2018 3:30 DM 42 9.00 04/11/2018 48 48 PASS CP

P95xP96 04/11/2018 3:27 DM 42 7.00 04/11/2018 46 46 PASS CP

P96xP97 04/11/2018 3:28 DM 42 7.00 04/11/2018 46 46 PASS CP

P97xP98 04/11/2018 3:19 KH 32 36.00 04/11/2018 50 50 PASS CP

P98xP73 04/11/2018 3:10 KH 32 61.00 04/11/2018 47 47 PASS CP

P99xP100 04/11/2018 4:47 DT 27 35.00 04/11/2018 43 43 PASS CP

P100xP101 04/11/2018 4:50 DT 27 28.00 04/11/2018 47 47 PASS CP

P101xP102 04/11/2018 4:54 DT 27 28.00 04/11/2018 46 46 PASS CP

P102xP103 04/11/2018 4:59 DT 27 60.00 04/11/2018 46 46 PASS CP

P103xP104 04/11/2018 5:09 DT 27 60.00 04/11/2018 45 45 PASS CP

P104xP105 04/11/2018 5:10 AS 9 60.00 04/11/2018 45 45 PASS CP

P105xP106 04/11/2018 5:17 DT 27 60.00 04/11/2018 50 50 PASS CP

P106xP107 04/11/2018 5:23 AS 9 60.00 04/11/2018 49 49 PASS CP

P107xP108 04/11/2018 5:26 DT 27 60.00 04/11/2018 49 49 PASS CP

P108xP109 04/11/2018 5:32 AS 9 60.00 04/11/2018 49 49 PASS CP

P109xP110 04/11/2018 5:35 DT 27 60.00 04/11/2018 46 46 PASS CP

P110xP111 04/11/2018 5:42 AS 9 60.00 04/11/2018 46 46 PASS CP

Page 10: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

WEDGE SEAM LOG

WEL

D DA

TE

SEA

M L

ENG

TH

TEST

DA

TE

DD/MMM/YY AM PM FEET DD/MMM/YY

Product Type: 60 mls smooth

STA

RT P

SI

FIN

ISH

PSI

AIR TEST INFORMATIONSEAM LOG

BETW

EEN

PA

NEL

S

TEST

RES

ULTS

QC

TEC

HNIC

IAN

TIME

OF

DAY

TEC

HNIC

IAN

WED

GE

#

Project Name: Riverdale Lagoon Secondary Cell 1

P111xP112 04/11/2018 5:42 DT 27 60.00 04/11/2018 48 48 PASS CP

P112xP113 04/11/2018 5:56 DT 27 60.00 04/11/2018 48 48 PASS CP

P113xP114 04/11/2018 5:57 AS 9 60.00 04/11/2018 47 47 PASS CP

P114xP115 04/11/2018 6:03 DT 27 55.00 04/11/2018 47 47 PASS CP

P115xP116 04/11/2018 6:15 DT 27 33.00 04/11/2018 48 48 PASS CP

P116xP117 04/11/2018 6:29 DM 42 33.00 04/11/2018 45 45 PASS CP

P117xP118 04/11/2018 6:25 DT 27 36.00 04/11/2018 51 51 PASS CP

P99xP1 04/11/2018 4:35 DT 27 62.00 04/11/2018 48 48 PASS CP

P118xP1 04/11/2018 6:20 AS 9 58.00 04/11/2018 51 51 PASS CP

Page 11: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

BUTT SEAM LOG

WEL

D DA

TE

SEA

M L

ENG

TH

TEST

DA

TE

Seam Starts Between

Panels

Finishes Between

PanelsDD/MMM/YY A

M PM FEET DD/MMM/YY

1 P96xP95 P81xP77 04/11/2018 3:40 DM 42 382 04/11/2018 PASS CPP96 P95 04/11/2018 3:40 DM 42 04/11/2018 45 45 PASS CPP97 P95 04/11/2018 3:40 DM 42 04/11/2018 48 48 PASS CPP97 P94 04/11/2018 3:40 DM 42 04/11/2018 50 50 PASS CPP98 P94 04/11/2018 3:40 DM 42 04/11/2018 57 57 PASS CPP98 P93 04/11/2018 3:40 DM 42 04/11/2018 45 45 PASS CPP73 P93 04/11/2018 3:40 DM 42 04/11/2018 50 50 PASS CPP73 P92 04/11/2018 3:40 DM 42 04/11/2018 52 52 PASS CPP73 P91 04/11/2018 3:40 DM 42 04/11/2018 52 52 PASS CPP73 P90 04/11/2018 3:40 DM 42 04/11/2018 49 49 PASS CPP89 P73 04/11/2018 3:40 DM 42 04/11/2018 60 60 PASS CPP89 P74 04/11/2018 3:40 DM 42 04/11/2018 58 58 PASS CPP88 P74 04/11/2018 3:40 DM 42 04/11/2018 53 53 PASS CPP87 P74 04/11/2018 3:40 DM 42 04/11/2018 55 55 PASS CPP87 P75 04/11/2018 3:40 DM 42 04/11/2018 44 44 PASS CPP86 P75 04/11/2018 3:40 DM 42 04/11/2018 46 46 PASS CPP85 P75 04/11/2018 3:40 DM 42 04/11/2018 43 43 PASS CPP85 P76 04/11/2018 3:40 DM 42 04/11/2018 51 51 PASS CPP84 P76 04/11/2018 3:40 DM 42 04/11/2018 50 50 PASS CPP83 P76 04/11/2018 3:40 DM 42 04/11/2018 50 50 PASS CPP82 P76 04/11/2018 3:40 DM 42 04/11/2018 50 50 PASS CPP81 P76 04/11/2018 3:40 DM 42 04/11/2018 60 60 PASS CPP81 P77 04/11/2018 3:40 DM 42 04/11/2018 57 57 PASS CPP80 P77 04/11/2018 3:40 DM 42 04/11/2018 52 52 PASS CPP80 P78 04/11/2018 3:40 DM 42 04/11/2018 52 52 PASS CPP78 P78 04/11/2018 3:40 DM 42 04/11/2018 56 56 PASS CP

2 P117xP118 P99xP100 04/11/2018 6:33 DM 42 387 PASS CPP117 P118 04/11/2018 6:33 DM 42 05/11/2018 56 56 PASS CPP116 P117 04/11/2018 6:33 DM 42 05/11/2018 55 55 PASS CPP115 P117 04/11/2018 6:33 DM 42 04/11/2018 60 60 PASS CPP115 P118 04/11/2018 6:33 DM 42 04/11/2018 59 59 PASS CPP114 P118 04/11/2018 6:33 DM 42 04/11/2018 52 52 PASS CPP114 P1 04/11/2018 6:33 DM 42 04/11/2018 53 53 PASS CPP113 P1 04/11/2018 6:33 DM 42 04/11/2018 49 49 PASS CPP112 P1 04/11/2018 6:33 DM 42 04/11/2018 47 47 PASS CPP110 P1 04/11/2018 6:33 DM 42 04/11/2018 55 55 PASS CPP109 P1 04/11/2018 6:33 DM 42 04/11/2018 56 56 PASS CPP108 P1 04/11/2018 6:33 DM 42 04/11/2018 48 48 PASS CPP107 P1 04/11/2018 6:33 DM 42 04/11/2018 48 48 PASS CPP106 P1 04/11/2018 6:33 DM 42 04/11/2018 47 47 PASS CPP105 P1 04/11/2018 6:33 DM 42 04/11/2018 46 46 PASS CPP104 P1 04/11/2018 6:33 DM 42 04/11/2018 46 46 PASS CPP103 P1 04/11/2018 6:33 DM 42 04/11/2018 46 46 PASS CPP103 P99 05/11/2018 6:33 DM 42 05/11/2018 50 50 PASS CPP102 P99 05/11/2018 6:33 DM 42 05/11/2018 50 50 PASS CPP101 P100 05/11/2018 6:33 DM 42 05/11/2018 56 55 PASS CP

Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

STA

RT P

SI

FIN

ISH

PSI

TEST

RES

ULTS

BUTT

SEA

M

BUTT

SEA

M L

ETTE

R

QC

TEC

HNIC

IAN

TIME

OF

DAY

AIR TEST INFORMATIONBUTT SEAM LOG

TEC

HNIC

IAN

WED

GE

#

Page 12: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

WEDGE TRIAL LOG

Project Name:

Wedge #: 42Date:

Sheet Type:AM TEST PM TEST

Time: 11:11 AM Time: 3:30 PM

Technician: DM Technician: DM NOTES:Sheet Temp: 2 °C Sheet Temp: 2 °C

Wedge Speed: 600 m/min Wedge Speed: 600 m/min

Wedge Temp: 860 °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

Wedge #: 41Date:

Sheet Type:AM TEST PM TEST

Time: 11:11 AM Time: 3:30 PM

Technician: DT Technician: NOTES:Sheet Temp: 2 °C Sheet Temp: °C

Wedge Speed: 450 m/min Wedge Speed: m/min

Wedge Temp: 860 °C / °F Wedge Temp: °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

149151

INSIDE PEEL

129

166

127

130158

142 151136

163

FAIL

URE

TYPE

FAIL

URE

TYPE

OUTSIDE PEEL

149

ELO

NG

ATIO

NEL

ON

GA

TION

153

193

140160

180

60 mls smoothRiverdale Lagoon Secondary Cell 1 Product Type:

SHEAR PEEL

FAIL

URE

TYPE

60 mls smooth black

ELO

NG

ATIO

N

145

153

01/11/2018

FAIL

URE

TYPE

INSIDE PEEL INSIDE PEEL

133

166

128

150

SHEAR PEEL

60 mls smooth

ELO

NG

ATIO

N

01/11/20118

132

INSIDE PEEL

OUTSIDE PEEL

136

139

139

124

189

163

144

156

170

OUTSIDE PEEL OUTSIDE PEEL134 145

130

SHEAR PEEL

175

SHEAR PEEL

206180 199

Page 13: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

WEDGE TRIAL LOG

Project Name: 60 mls smoothRiverdale Lagoon Secondary Cell 1 Product Type:

Wedge #: 32Date:

Sheet Type:AM TEST PM TEST

Time: 11:30 AM Time: 3:00 PM

Technician: KH Technician: KH NOTES:Sheet Temp: 2 °C Sheet Temp: 2 °C

Wedge Speed: 520 m/min Wedge Speed: 529 m/min

Wedge Temp: 860 °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

Wedge #: 42Date:

Sheet Type: 60 mls smooth hdpe blackAM TEST PM TEST

Time: AM Time: 1:30 PM

Technician: Technician: DM NOTES:Sheet Temp: °C Sheet Temp: -3 °C

Wedge Speed: m/min Wedge Speed: 610 m/min

Wedge Temp: °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

SHEAR PEEL SHEAR PEEL

189196

OUTSIDE PEEL OUTSIDE PEEL

165149159

INSIDE PEEL INSIDE PEEL

143139156162

166

02/11/2018

ELO

NG

ATIO

N

FAIL

URE

TYPE

ELO

NG

ATIO

N

FAIL

URE

TYPE

132 172

ELO

NG

ATIO

N

FAIL

URE

TYPE

01/11/2018

SHEAR PEEL

180

SHEAR PEEL

188173 198

OUTSIDE PEEL

147

OUTSIDE PEEL

145145 159153 166

INSIDE PEEL

126

INSIDE PEEL150 177

60 mls smooth

ELO

NG

ATIO

N

FAIL

URE

TYPE

132130 154144 160

Page 14: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

WEDGE TRIAL LOG

Project Name: 60 mls smoothRiverdale Lagoon Secondary Cell 1 Product Type:

Wedge #: 41Date:

Sheet Type:AM TEST PM TEST

Time: AM Time: 1:45 PM

Technician: Technician: DT NOTES:Sheet Temp: °C Sheet Temp: -3 °C

Wedge Speed: m/min Wedge Speed: 430 m/min

Wedge Temp: °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

Wedge #: 32Date:

Sheet Type:AM TEST PM TEST

Time: AM Time: 2:18 PM

Technician: Technician: KH NOTES:Sheet Temp: °C Sheet Temp: -3 °C

Wedge Speed: m/min Wedge Speed: 470 m/min

Wedge Temp: °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

SHEAR PEEL SHEAR PEEL

189199

159

SHEAR PEEL SHEAR PEEL

177189

OUTSIDE PEEL OUTSIDE PEEL

169

INSIDE PEEL

150

132150

INSIDE PEEL INSIDE PEEL

144137129133

FAIL

URE

TYPE

159

139

ELO

NG

ATIO

N

FAIL

URE

TYPE

ELO

NG

ATIO

N

FAIL

URE

TYPE

171

02/11/2018

OUTSIDE PEEL

60 mls smooth hdpe black

ELO

NG

ATIO

N

OUTSIDE PEEL

143

159

INSIDE PEEL

02/11/201860 mls smooth hdpe black

ELO

NG

ATIO

N

FAIL

URE

TYPE

170168

Page 15: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

WEDGE TRIAL LOG

Project Name: 60 mls smoothRiverdale Lagoon Secondary Cell 1 Product Type:

Wedge #: 9Date:

Sheet Type:AM TEST PM TEST

Time: AM Time: 2:59 PM

Technician: Technician: AS NOTES:Sheet Temp: °C Sheet Temp: -3 °C

Wedge Speed: m/min Wedge Speed: 550 m/min

Wedge Temp: °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

Wedge #: 27Date:

Sheet Type:AM TEST PM TEST

Time: AM Time: 2:38 PM

Technician: Technician: DT NOTES:Sheet Temp: °C Sheet Temp: 0 °C

Wedge Speed: m/min Wedge Speed: 700 m/min

Wedge Temp: °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

OUTSIDE PEEL170

ELO

NG

ATIO

N

FAIL

URE

TYPE

SHEAR PEEL

199204

02/11/201860 mls smooth hdpe black

ELO

NG

ATIO

N

FAIL

URE

TYPE

138

INSIDE PEEL INSIDE PEEL

143143139151

SHEAR PEEL

160

03/11/201860 mls smooth hdpe black

ELO

NG

ATIO

N

FAIL

URE

TYPE

156

OUTSIDE PEEL OUTSIDE PEEL

152

163

INSIDE PEEL INSIDE PEEL129144148

SHEAR PEEL SHEAR PEEL

179195

OUTSIDE PEEL144

ELO

NG

ATIO

N

FAIL

URE

TYPE

139

147

Page 16: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

WEDGE TRIAL LOG

Project Name: 60 mls smoothRiverdale Lagoon Secondary Cell 1 Product Type:

Wedge #: 32Date:

Sheet Type:AM TEST PM TEST

Time: AM Time: 2:15 PM

Technician: Technician: KH NOTES:Sheet Temp: °C Sheet Temp: 0 °C

Wedge Speed: m/min Wedge Speed: 620 m/min

Wedge Temp: °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

Wedge #: 9Date:

Sheet Type:AM TEST PM TEST

Time: AM Time: 2:20 PM

Technician: Technician: AS NOTES:Sheet Temp: °C Sheet Temp: 0 °C

Wedge Speed: m/min Wedge Speed: 600 m/min

Wedge Temp: °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

SHEAR PEEL SHEAR PEEL

156170

INSIDE PEEL

SHEAR PEEL SHEAR PEEL

180188

OUTSIDE PEEL OUTSIDE PEEL

INSIDE PEEL INSIDE PEEL

03/11/201860 MLS SMOOTH HDPE BLACK

ELO

NG

ATIO

N

FAIL

URE

TYPE

153

FAIL

URE

TYPE

139

ELO

NG

ATIO

N

FAIL

URE

TYPE

143149

ELO

NG

ATIO

N

160148

OUTSIDE PEEL

159

152167

03/11/2018

132

INSIDE PEEL

OUTSIDE PEEL

60 MLS SMOOTH HDPE BLACK

ELO

NG

ATIO

N

FAIL

URE

TYPE

166

149153155138

148

Page 17: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

WEDGE TRIAL LOG

Project Name: 60 mls smoothRiverdale Lagoon Secondary Cell 1 Product Type:

Wedge #: DMDate:

Sheet Type:AM TEST PM TEST

Time: AM Time: 2:21 PM

Technician: Technician: DM NOTES:Sheet Temp: °C Sheet Temp: 0 °C

Wedge Speed: m/min Wedge Speed: 600 m/min

Wedge Temp: °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

Wedge #: 42Date:

Sheet Type:AM TEST PM TEST

Time: 9:16 AM Time: 1:30 PM

Technician: DM Technician: DM NOTES:Sheet Temp: 0 °C Sheet Temp: 0 °C

Wedge Speed: 600 m/min Wedge Speed: 600 m/min

Wedge Temp: 860 °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

SHEAR PEEL SHEAR PEEL

165187

187200

OUTSIDE PEEL OUTSIDE PEEL

156160165

150139

INSIDE PEEL INSIDE PEEL

129135147153

04/11/201860 MLS SMOOTH BLACK

ELO

NG

ATIO

N

FAIL

URE

TYPE

SHEAR PEEL SHEAR PEEL

189195

141

OUTSIDE PEEL OUTSIDE PEEL

139149159

INSIDE PEEL INSIDE PEEL

149156163159

133

151

139

165

03/11/2018

ELO

NG

ATIO

N

147

FAIL

URE

TYPE

FAIL

URE

TYPE

ELO

NG

ATIO

N

148

FAIL

URE

TYPE

147

187

160149

60 mls smooth black hdpe

134140144

188

ELO

NG

ATIO

N

154

133144

Page 18: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

WEDGE TRIAL LOG

Project Name: 60 mls smoothRiverdale Lagoon Secondary Cell 1 Product Type:

Wedge #: 27Date:

Sheet Type:AM TEST PM TEST

Time: 9:30 AM Time: 1:30 PM

Technician: DT Technician: DT NOTES:Sheet Temp: 0 °C Sheet Temp: 0 °C

Wedge Speed: 620 m/min Wedge Speed: 620 m/min

Wedge Temp: 860 °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

Wedge #: 32Date:

Sheet Type:AM TEST PM TEST

Time: 9:10 AM Time: 1:19 PM

Technician: KH Technician: KH NOTES:Sheet Temp: 0 °C Sheet Temp: 0 °C

Wedge Speed: 680 m/min Wedge Speed: 680 m/min

Wedge Temp: 860 °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

200

OUTSIDE PEEL OUTSIDE PEEL

139147151

INSIDE PEEL INSIDE PEEL

153156160139

190201

150

SHEAR PEEL SHEAR PEEL

199

OUTSIDE PEEL OUTSIDE PEEL

INSIDE PEEL INSIDE PEEL

04/11/201860 MLS SMOOTH BLACK

ELO

NG

ATIO

N

FAIL

URE

TYPE

ELO

NG

ATIO

N

149161

140

160

139

137

155157

164

FAIL

URE

TYPE

SHEAR PEEL SHEAR PEEL

189 199179196

FAIL

URE

TYPE

ELO

NG

ATIO

N

FAIL

URE

TYPE

157

04/11/201860 MLS SMOOTH BLACK

ELO

NG

ATIO

N

154

144151154143

156

139

160165170

166149153156

Page 19: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

WEDGE TRIAL LOG

Project Name: 60 mls smoothRiverdale Lagoon Secondary Cell 1 Product Type:

Wedge #: 9Date:

Sheet Type:AM TEST PM TEST

Time: 9:20 AM Time: 1:20 PM

Technician: AS Technician: AS NOTES:Sheet Temp: 0 °C Sheet Temp: 0 °C

Wedge Speed: 650 m/min Wedge Speed: 650 m/min

Wedge Temp: 860 °C / °F Wedge Temp: 860 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

SHEAR PEEL

180

SHEAR PEEL

189185 182

149

157 160

60 MLS SMOOTH BLACK

ELO

NG

ATIO

N

FAIL

URE

TYPE

ELO

NG

ATIO

N

FAIL

URE

TYPE

04/11/2018

OUTSIDE PEEL

149

OUTSIDE PEEL

156160 157155 154

INSIDE PEEL

154

INSIDE PEEL

149128 153156 153144

Page 20: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

EXTRUDER TRIAL LOGProject Name:

Extruder#: 21Date:

Sheet Type:AM TEST PM TEST

Time: 9:45 AM Time: 2:00 PM

Technician: DP Technician: DP NOTES:Sheet Temp: 0 °C Sheet Temp: 0 °C

Barrel/Air Temp: 480/480 °C / °F Barrel/Air Temp: 480/480 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

Extruder#: 21Date: NOTES:

Sheet Type:AM TEST PM TEST

Time: 9:30 AM Time: 1:30 PM

Technician: DP Technician: DPSheet Temp: 0 °C Sheet Temp: 0 °C

Barrel/Air Temp: 480/480 °C / °F Barrel/Air Temp: 480/480 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

Extruder#: 21Date:05/11/2018

Sheet Type:AM TEST PM TEST

Time: 9:15 AM Time: 1:15 PM

Technician: DP Technician: DP NOTES:Sheet Temp: 1 °C Sheet Temp: 1 °C

Barrel/Air Temp: 480/480 °C / °F Barrel/Air Temp: 480/480 °C / °F

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

SHEAR SHEAR

INSIDE PEEL INSIDE PEEL

60 mls smooth hdpe black

INSIDE PEEL INSIDE PEEL

SHEAR SHEAR188 197

144

155 161

146

INSIDE PEEL

ELO

NG

ATIO

N

FAIL

URE

TYPE

200 189

200

ELO

NG

ATIO

N

FAIL

URE

TYPE

158156 161

134

198198

149138163139

ELO

NG

ATIO

N

FAIL

URE

TYPE

201

ELO

NG

ATIO

N

FAIL

URE

TYPE

160

167155146

Product Type: 60 mls smooth

04/11/2018

RIVERDALE LAGOON SECONDARY CELL 1

173

202

170

149

146

ELO

NG

ATIO

N

FAIL

URE

TYPE

ELO

NG

ATIO

N

FAIL

URE

TYPE

03/11/201860 mls smooth hdpe black

INSIDE PEEL159

60 mls smooth hdpe black

189

166

SHEAR SHEAR

158

199

165

200

Page 21: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

EXTRUSION DETAIL LOG

Project Name

Product Type:

CO

DE

TEST

DA

TE

SEE LEGEND DD/MMM/YY

R1 03/11/2018 DP E P1xP2 03/11/2018 PASS CP 150 in seam of 1x2,going south of cell

R2 03/11/2018 DP E P1xP2 03/11/2018 PASS CP 200' in seam of 1x2, going south of cell

R3 03/11/2018 DP E P3xP4 03/11/2018 PASS CP top berm, south sid of cell

R4 03/11/2018 DP E P8xP9 03/11/2018 PASS CP mid seam on floor

R5 03/11/2018 DP E P10xP11 03/11/2018 PASS CP south side on upper slope

R6 03/11/2018 DP E P13xP14 03/11/2018 PASS CP mid seam on south side

R7 03/11/2018 DP E P14xP15 03/11/2018 PASS CP top berm of slope, north side of cell

R8 03/11/2018 DP P P22xP23 03/11/2018 PASS CPR9 03/11/2018 DP P P30XP31 03/11/2018 PASS CP bottom slope, north side of seam

R10 03/11/2018 DP P P35XP36 03/11/2018 PASS CP top slope of south side

R11 03/11/2018 DP P P38XP39 03/11/2018 PASS CP 200' in seam going north

R12 03/11/2018 DP P P38XP39 03/11/2018 PASS CP 100' on floor on north side

R13 04/11/2018 DP P P65XP68 04/11/2018 PASS CP top berm of south side of cell

R14 04/11/2018 DP PT P57 04/11/2018 PASS CP mid panel of 57, 5' away from toe

R15 05/11/2018 DP PT P107 05/11/2018 PASS CP bottom floor of mid panel

R16 03/11/2018 DP PT P6 05/11/2018 PASS CP mid panel of 6, 5' away from toe

R17 03/11/2018 DP P P103 05/11/2018 PASS CP top berm

R18 03/11/2018 DP P P116 4/11/2018 PASS CP top berm

V1 4/11/2018 DP Vent Caps ( 2" vents) (P) P118 4/11/2018 PASS CP 5' from seam of 118x1

V2 4/11/2018 DP Vent Caps ( 2" vents) (P) P1 4/11/2018 PASS CP mid panel

V3 4/11/2018 DP Vent Caps ( 2" vents) (P) P4 4/11/2018 PASS CP mid panel

V4 4/11/2018 DP Vent Caps ( 2" vents) (P) P6 4/11/2018 PASS CP 5' from seam of 5x6

V5 4/11/2018 DP Vent Caps ( 2" vents) (P) P7xP8 4/11/2018 PASS CP in seam

V6 4/11/2018 DP Vent Caps ( 2" vents) (P) P9 4/11/2018 PASS CP 5' from seam of 9x10

V7 4/11/2018 DP Vent Caps ( 2" vents) (P) P11 4/11/2018 PASS CP mid panel

V8 4/11/2018 DP Vent Caps ( 2" vents) (P) P13 4/11/2018 PASS CP mid panel

V9 4/11/2018 DP Vent Caps ( 2" vents) (P) P15 4/11/2018 PASS CP 4' from seam of 14x15

V10 4/11/2018 DP Vent Caps ( 2" vents) (P) P17 4/11/2018 PASS CP 2' from seam of 16x17

V11 4/11/2018 DP Vent Caps ( 2" vents) (P) P18 4/11/2018 PASS CP 1' from seam of 18x19

V12 4/11/2018 DP Vent Caps ( 2" vents) (P) P20 4/11/2018 PASS CP 2' from seam of 20x21

TEST

TYPE

TEC

HNIC

IAN

QC

TEC

H2X2

3X1

1X1

60 mls smooth

Riverdale Lagoon Secondary Cell 1

CODE LEGEND

BO-BLOCK OFFP-PATCH

PT-PENETRATIONE-EXTRUSION BEAD

T-THREE PANEL INTERSECTION

TEST

RES

ULTS

DT-DESTRUCTIVE TEST

DETA

IL N

UMBE

R

DETA

IL D

ATE

DIM

ENSI

ON

S

2x2

2x2

2x2

LOC

ATIO

N

C-CAPSTRIP

2x2

2x2

2x2

2x2

1'

1'

1'

1'

1'

1'

1'

2X2

1X1

2X1

30x9

10X10

10X10

2x2

2x2

2x2

2x2

2x2

2x2

2x2

Page 22: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

EXTRUSION DETAIL LOG

Project Name

Product Type:

CO

DE

TEST

DA

TE

SEE LEGEND DD/MMM/YY

TEST

TYPE

TEC

HNIC

IAN

QC

TEC

H

60 mls smooth

Riverdale Lagoon Secondary Cell 1

CODE LEGEND

BO-BLOCK OFFP-PATCH

PT-PENETRATIONE-EXTRUSION BEAD

T-THREE PANEL INTERSECTION

TEST

RES

ULTS

DT-DESTRUCTIVE TEST

DETA

IL N

UMBE

R

DETA

IL D

ATE

DIM

ENSI

ON

S

LOC

ATIO

N

C-CAPSTRIP

V13 4/11/2018 DP Vent Caps ( 2" vents) (P) P22 4/11/2018 PASS CP mid panel

V14 4/11/2018 DP Vent Caps ( 2" vents) (P) P24 4/11/2018 PASS CP mid panel

V15 4/11/2018 DP Vent Caps ( 2" vents) (P) P25 4/11/2018 PASS CP 6" from seam of 25x26

V16 4/11/2018 DP Vent Caps ( 2" vents) (P) P28 4/11/2018 PASS CP 8" from seam of 27x28

V17 4/11/2018 DP Vent Caps ( 2" vents) (P) P29 4/11/2018 PASS CP 1' from seam 29x30

V18 4/11/2018 DP Vent Caps ( 2" vents) (P) P31 4/11/2018 PASS CP 6' from seam of 31x32

V19 4/11/2018 DP Vent Caps ( 2" vents) (P) P33 4/11/2018 PASS CP mid panel

V20 4/11/2018 DP Vent Caps ( 2" vents) (P) P35 4/11/2018 PASS CP 5' from seam of 34x35

V21 4/11/2018 DP Vent Caps ( 2" vents) (P) P37 4/11/2018 PASS CP 2' from seam of 36x37

V22 4/11/2018 DP Vent Caps ( 2" vents) (P) P38xP39 4/11/2018 PASS CP in seam

V23 4/11/2018 DP Vent Caps ( 2" vents) (P) P40 4/11/2018 PASS CP 3' from seam of 40x41

V24 4/11/2018 DP Vent Caps ( 2" vents) (P) P42 4/11/2018 PASS CP 4' from seam of 42x45

V25 4/11/2018 DP Vent Caps ( 2" vents) (P) P48 4/11/2018 PASS CP mid panel

V26 4/11/2018 DP Vent Caps ( 2" vents) (P) P54 4/11/2018 PASS CP 3' from seam of 51x54

V27 4/11/2018 DP Vent Caps ( 2" vents) (P) P57 4/11/2018 PASS CP 8" from seam of 57x60

V28 4/11/2018 DP Vent Caps ( 2" vents) (P) P63 4/11/2018 PASS CP 2' from seam of 63x66

V29 4/11/2018 DP Vent Caps ( 2" vents) (P) P69 4/11/2018 PASS CP 5' from seam of 69x72

V30 4/11/2018 DP Vent Caps ( 2" vents) (P) P76xP77 4/11/2018 PASS CP in seam

V31 4/11/2018 DP Vent Caps ( 2" vents) (P) P79 4/11/2018 PASS CP 2' from seam of 79x80

V32 4/11/2018 DP Vent Caps ( 2" vents) (P) P81xP82 4/11/2018 PASS CP in seam

V33 4/11/2018 DP Vent Caps ( 2" vents) (P) P83 4/11/2018 PASS CP 1' from seam of 83x84

V34 4/11/2018 DP Vent Caps ( 2" vents) (P) P85 4/11/2018 PASS CP 4' from seam of 85x86

V35 4/11/2018 DP Vent Caps ( 2" vents) (P) P87 4/11/2018 PASS CP mid panel

V36 4/11/2018 DP Vent Caps ( 2" vents) (P) P89 4/11/2018 PASS CP 4' from seam of 88x89

V37 4/11/2018 DP Vent Caps ( 2" vents) (P) P91 4/11/2018 PASS CP 3' from seam 90x91

V38 4/11/2018 DP Vent Caps ( 2" vents) (P) P92 4/11/2018 PASS CP 2' from seam of 92x93

V39 4/11/2018 DP Vent Caps ( 2" vents) (P) P97 4/11/2018 PASS CP 8" from seam of 97x96

V40 4/11/2018 DP Vent Caps ( 2" vents) (P) P98 4/11/2018 PASS CP in seam of 98x73

V41 4/11/2018 DP Vent Caps ( 2" vents) (P) P72 4/11/2018 PASS CP 6' from seam of 72x71

V42 4/11/2018 DP Vent Caps ( 2" vents) (P) P68 4/11/2018 PASS CP 1' from seam of 71x68

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

Page 23: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

EXTRUSION DETAIL LOG

Project Name

Product Type:

CO

DE

TEST

DA

TE

SEE LEGEND DD/MMM/YY

TEST

TYPE

TEC

HNIC

IAN

QC

TEC

H

60 mls smooth

Riverdale Lagoon Secondary Cell 1

CODE LEGEND

BO-BLOCK OFFP-PATCH

PT-PENETRATIONE-EXTRUSION BEAD

T-THREE PANEL INTERSECTION

TEST

RES

ULTS

DT-DESTRUCTIVE TEST

DETA

IL N

UMBE

R

DETA

IL D

ATE

DIM

ENSI

ON

S

LOC

ATIO

N

C-CAPSTRIP

V43 4/11/2018 DP Vent Caps ( 2" vents) (P) P65 4/11/2018 PASS CP mid panel

V44 4/11/2018 DP Vent Caps ( 2" vents) (P) P62 4/11/2018 PASS CP 1' from seam of 62x59

V45 4/11/2018 DP Vent Caps ( 2" vents) (P) P56 4/11/2018 PASS CP 4' from seam of 56x53

V46 4/11/2018 DP Vent Caps ( 2" vents) (P) P50 4/11/2018 PASS CP mid panel

V47 4/11/2018 DP Vent Caps ( 2" vents) (P) P44 4/11/2018 PASS CP 3' from seam 44x47

V48 4/11/2018 DP Vent Caps ( 2" vents) (P) P41 4/11/2018 PASS CP 3' from seam of 41x40

V49 4/11/2018 DP Vent Caps ( 2" vents) (P) P39 4/11/2018 PASS CP 2' from seam of 39x38

V50 4/11/2018 DP Vent Caps ( 2" vents) (P) P37 4/11/2018 PASS CP 3' from seam of 37x36

V51 4/11/2018 DP Vent Caps ( 2" vents) (P) P35 4/11/2018 PASS CP mid panel

V52 4/11/2018 DP Vent Caps ( 2" vents) (P) P33 5/11/2018 PASS CP mid panel

V53 4/11/2018 DP Vent Caps ( 2" vents) (P) P31 5/11/2018 PASS CP 3' from seam of 31x32

V54 4/11/2018 DP Vent Caps ( 2" vents) (P) P30 5/11/2018 PASS CP in seam of 30x29

V55 4/11/2018 DP Vent Caps ( 2" vents) (P) P28 5/11/2018 PASS CP 3' from seam 28x27

V56 4/11/2018 DP Vent Caps ( 2" vents) (P) P26 5/11/2018 PASS CP mid panel

V57 4/11/2018 DP Vent Caps ( 2" vents) (P) P24 5/11/2018 PASS CP 2' from seam of 24x25

V58 4/11/2018 DP Vent Caps ( 2" vents) (P) P22 5/11/2018 PASS CP 5' from seam of 22x23

V59 4/11/2018 DP Vent Caps ( 2" vents) (P) P20 5/11/2018 PASS CP 3' from seam of 20x21

V60 4/11/2018 DP Vent Caps ( 2" vents) (P) P19 5/11/2018 PASS CP 1' away from seam of 19x18

V61 4/11/2018 DP Vent Caps ( 2" vents) (P) P17 5/11/2018 PASS CP 4' from seam of 17x16

V62 4/11/2018 DP Vent Caps ( 2" vents) (P) P15 5/11/2018 PASS CP 4' from seam of 15x14

V63 4/11/2018 DP Vent Caps ( 2" vents) (P) P13 5/11/2018 PASS CP mid panel

V64 4/11/2018 DP Vent Caps ( 2" vents) (P) P11 5/11/2018 PASS CP 3' from seam of 12x11

V65 4/11/2018 DP Vent Caps ( 2" vents) (P) P10 5/11/2018 PASS CP 10" from seam of 9x10

V66 4/11/2018 DP Vent Caps ( 2" vents) (P) P8 5/11/2018 PASS CP 3' from seam 8x7

V67 4/11/2018 DP Vent Caps ( 2" vents) (P) P6 5/11/2018 PASS CP 5' from seam 5x6

V68 4/11/2018 DP Vent Caps ( 2" vents) (P) P4 5/11/2018 PASS CP mid panel

V69 4/11/2018 DP Vent Caps ( 2" vents) (P) P2 5/11/2018 PASS CP 5' from seam 3x2

V70 4/11/2018 DP Vent Caps ( 2" vents) (P) P99 5/11/2018 PASS CP 2' from seam of 1x99

V71 4/11/2018 DP Vent Caps ( 2" vents) (P) P101 5/11/2018 PASS CP 6" away from seam of 100x101

V72 4/11/2018 DP Vent Caps ( 2" vents) (P) P103 5/11/2018 PASS CP 5' from seam of 103x104

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

2x2

Page 24: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

EXTRUSION DETAIL LOG

Project Name

Product Type:

CO

DE

TEST

DA

TE

SEE LEGEND DD/MMM/YY

TEST

TYPE

TEC

HNIC

IAN

QC

TEC

H

60 mls smooth

Riverdale Lagoon Secondary Cell 1

CODE LEGEND

BO-BLOCK OFFP-PATCH

PT-PENETRATIONE-EXTRUSION BEAD

T-THREE PANEL INTERSECTION

TEST

RES

ULTS

DT-DESTRUCTIVE TEST

DETA

IL N

UMBE

R

DETA

IL D

ATE

DIM

ENSI

ON

S

LOC

ATIO

N

C-CAPSTRIP

V73 4/11/2018 DP Vent Caps ( 2" vents) (P) P105 5/11/2018 PASS CP mid panel

V74 4/11/2018 DP Vent Caps ( 2" vents) (P) P107 5/11/2018 PASS CP 2' from seam 106x107

V75 4/11/2018 DP Vent Caps ( 2" vents) (P) P109 5/11/2018 PASS CP 8" from seam 108x109

V76 4/11/2018 DP Vent Caps ( 2" vents) (P) P110 5/11/2018 PASS CP 2' from seam 110x111

V77 4/11/2018 DP Vent Caps ( 2" vents) (P) P112 5/11/2018 PASS CP 4' from seam 112x113

V78 4/11/2018 DP Vent Caps ( 2" vents) (P) P114 5/11/2018 PASS CP mid panel

V79 4/11/2018 DP Vent Caps ( 2" vents) (P) P116 5/11/2018 PASS CP 1' from seam of 116x1172x2

2x2

2x2

2x2

2x2

2x2

2x2

Page 25: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

DESTRUCTIVE TEST LOG

Project Name: Sheet Type:

DT#: 1 DT#: 2Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CP

Date: Date:

Time: 1:34 Time: 2:28

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

DT#: 3 DT#: 4Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CP

Date: Date:

Time: 3:19 Time: 3:44

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

200%+ F.T.B. 200%+ F.T.B.

200%+ F.T.B. 200%+ F.T.B.

200%+ F.T.B. 200%+ F.T.B.

200%+ F.T.B. 200%+ F.T.B.

200%+ F.T.B. 200%+ F.T.B.

132140126

190

171

ELO

NG

ATIO

N

FAIL

URE

TYPE

150

129144137

127

144145

190

140

183 189

133129

135INSIDE PEEL INSIDE PEEL

177189

195

175

183 166

OUTSIDE PEEL OUTSIDE PEEL

139 149

138153151

SHEAR PEEL

166

SHEAR PEEL

180

168

01/11/2018

126

P5xP6 KH WW 32

INSIDE PEEL

OUTSIDE PEEL

SHEAR PEEL

140137

136

149125

SHEAR PEEL

185191

180

144140

INSIDE PEEL

Riverdale Cell 2

175

155

144161

151129

60 mls smooth

ELO

NG

ATIO

N

FAIL

URE

TYPE

P2xP3 KH WW 32

150

01/11/2018 01/11/2018

P3xP4 DT WW 42

ELO

NG

ATIO

N

138

163

189

161153

158

ELO

NG

ATIO

N

FAIL

URE

TYPE

180160

FAIL

URE

TYPE

OUTSIDE PEEL

01/11/2018

179

P6xP7 DT WW 41

Page 26: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

DESTRUCTIVE TEST LOG

Project Name: Sheet Type:Riverdale Cell 2 60 mls smooth

DT#: 5 DT#: 6Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CPDate: Date:Time: 4:15 Time: 4:42

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

DT#: 7 DT#: 8Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CPDate: Date:Time: 7:00 am Time: 7:27 am

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

ELO

NG

ATIO

N

FAIL

URE

TYPE

01/11/2018 01/11/2018

FAIL

URE

TYPE

02/11/2018 02/11/2018

P13xP14 DM WW 42

SHEAR PEEL164

183183

128

176

181172

150

ELO

NG

ATIO

N

FAIL

URE

TYPE

ELO

NG

ATIO

N

INSIDE PEEL INSIDE PEEL

OUTSIDE PEEL OUTSIDE PEEL

SHEAR PEEL SHEAR PEEL

INSIDE PEEL

OUTSIDE PEEL

SHEAR PEEL190

128132

130

150

133134

174

P12xP13 DT WW 41

178 182182 190

134 154180 170180 165

136 143129

127140 130

134 144

INSIDE PEEL145146

129127

OUTSIDE PEEL123

136

P8xP9 KH WW 32 P10xP11 DM WW 42

8X9

FAIL

URE

TYPE

193 179

169

141 130160 125

134143 134127 151

155 122

151145

141 131

131

171

Page 27: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

DESTRUCTIVE TEST LOG

Project Name: Sheet Type:Riverdale Cell 2 60 mls smooth

DT#: 9 DT#: 10Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CPDate: Date:Time: 8:00 am Time: 8:30

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

DT#: 11 DT#: 12Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CPDate: Date:Time: 9:00 Time: 9:23

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

ELO

NG

ATIO

N

FAIL

URE

TYPE

ELO

NG

ATIO

N

FAIL

URE

TYPE

200199

200201 204

139156 148149 149165 150

02/11/2018

P16xP17 DT WW 41 P17xP18 DM WW42

ELO

NG

ATIO

N

FAIL

URE

TYPE

ELO

NG

ATIO

N

FAIL

URE

TYPE

02/11/2018

SHEAR PEEL

169

SHEAR PEEL

175177 182168 182175 179

153 149

OUTSIDE PEEL

149

OUTSIDE PEEL

156158 160146 146144 144

SHEAR PEEL

177

SHEAR PEEL

178189 189199

139

183 190

137151 144159 143

02/11/2018

P19xP20 AS WW9 P21xP22 DM WW 42

137 146

129150OUTSIDE PEEL

129

INSIDE PEEL

143

INSIDE PEEL

125139 136151 139140 145

INSIDE PEEL

144

INSIDE PEEL

156

OUTSIDE PEEL

150150

02/11/2018

Page 28: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

DESTRUCTIVE TEST LOG

Project Name: Sheet Type:Riverdale Cell 2 60 mls smooth

DT#: 13 DT#: 14Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CPDate: Date:Time: 9:47 Time: 10:11

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

DT#: 15 DT#: 16Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CPDate: Date:Time: 10:29 Time: 1:30

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

INSIDE PEEL INSIDE PEEL

OUTSIDE PEEL

145

ELO

NG

ATIO

N

FAIL

URE

TYPE

INSIDE PEEL INSIDE PEEL

OUTSIDE PEEL OUTSIDE PEEL166

02/11/2018

189

139

SHEAR PEEL

SHEAR PEEL

153

149

ELO

NG

ATIO

N

FAIL

URE

TYPE

ELO

NG

ATIO

N

FAIL

URE

TYPE

02/11/2018

P25xP26 DM WW 42

202 192

139153 129

148149 150199 188198 190

200 200203 202

SHEAR PEEL 197

P27xP28 WW DT WW 41 P28xP29 KH WW 32

ELO

NG

ATIO

N

FAIL

URE

TYPE

OUTSIDE PEEL144 145

150180

SHEAR PEEL

180188 179190 177200 182

141

139165

02/11/2018

144 134149

144160

139153 134153 133158

02/11/2018

P24xP25 KH WW 32

143

169

158153 164160 `139

188142150 157

157

Page 29: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

DESTRUCTIVE TEST LOG

Project Name: Sheet Type:Riverdale Cell 2 60 mls smooth

DT#: 17 DT#: 18Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CPDate: Date:Time: 1:49 Time: 7:00 PM

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

DT#: 19 DT#: 20Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CPDate: Date:Time: 7:33 pm Time: 6:30 AM

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

ELO

NG

ATIO

NINSIDE PEEL

OUTSIDE PEEL

155

150 154147 152

INSIDE PEEL

OUTSIDE PEEL

SHEAR PEEL

ELO

NG

ATIO

N

P34xP35 AS WW 9

ELO

NG

ATIO

N

FAIL

URE

TYPE

200

130140 129

FAIL

URE

TYPE

177

INSIDE PEEL

OUTSIDE PEEL

149

P30xP31 DT WW 27

138

INSIDE PEEL

ELO

NG

ATIO

N

FAIL

URE

TYPE

SHEAR PEEL

03/11/2018

200

P33xP34 DM WW 42

157

153

02/11/2018

160

145133 144

125 144149 141180

SHEAR PEEL

177182

169 182191 198192 199

OUTSIDE PEEL151 147129 137

144

156143 160143 156

140 128137 122

SHEAR PEEL189 187190 198

200 190

P31xP32 AS WW 9

FAIL

URE

TYPE

143

145

03/11/2018

129

04/11/2018

146136 150

198 198

Page 30: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

DESTRUCTIVE TEST LOG

Project Name: Sheet Type:Riverdale Cell 2 60 mls smooth

DT#: 21 DT#: 22Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CPDate: Date:Time: 6:52 AM Time: 7:14 AM

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

DT#: 23 DT#: 24Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CPDate: Date:Time: 7:30 AM Time: 7:48 AM

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

INSIDE PEEL

P37xP38 DM WW 42 P38xP39 AS WW 9

FAIL

URE

TYPE

04/11/201804/11/2018

129

OUTSIDE PEEL

141133 130142

INSIDE PEEL

139

OUTSIDE PEEL

SHEAR PEEL

166

SHEAR PEEL

178175

INSIDE PEEL

141

ELO

NG

ATIO

N

FAIL

URE

TYPE

150

144

145

134 144136

140

P42xP45 AS WW 9 P48xP51 AS WW 9

ELO

NG

ATIO

N

FAIL

URE

TYPE

135

ELO

NG

ATIO

N

170

SHEAR PEEL

178

SHEAR PEEL

190

127

143

OUTSIDE PEEL

FAIL

URE

TYPE

INSIDE PEEL

147 129

OUTSIDE PEEL

152

146 144

138139

189 180

144 150

180 184179 191

ELO

NG

ATIO

N

149

150

185

139

153

176179 169

140155 127147 152

141151 133

190 188187 188

151 137

04/11/201804/11/2018

Page 31: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

DESTRUCTIVE TEST LOG

Project Name: Sheet Type:Riverdale Cell 2 60 mls smooth

DT#: 25 DT#: 26Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CPDate: Date:Time: 7:32 Time: 7:53

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

DT#: 27 DT#: 28Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CPDate: Date:Time: 8:14 Time: 8:37

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

129

ELO

NG

ATIO

N

180188

ELO

NG

ATIO

N

137

127

139

183

OUTSIDE PEEL

164

OUTSIDE PEEL

133

147 141147 150150 143

SHEAR PEEL

P78xP79 DM WW 42 P89xP90 DM WW 42

FAIL

URE

TYPE

INSIDE PEEL INSIDE PEEL155 154153

P59xP56 AS WW 9 P66xP69 AS WW 9

FAIL

URE

TYPE

FAIL

URE

TYPE

160

142

OUTSIDE PEEL

128

OUTSIDE PEEL

129135 144139 135141 146134 150

184 188

SHEAR PEEL

180

SHEAR PEEL

176175 180175 183178

INSIDE PEEL INSIDE PEEL151

ELO

NG

ATIO

N

FAIL

URE

TYPE

133 129

ELO

NG

ATIO

N129

139147

190

190

05/11/2018 05/11/2018

SHEAR PEEL183

176 179

180

130

05/11/2018

146 146150 154

05/11/2018

178177

139 140

Page 32: L8031 RM OF RIVERDALE LAGOON SECONDARY CELL 1 HDPE AS … · PANEL PLACEMENT LOG DATE LENGTH WIDTH DD/MMM/YY Project Name: Riverdale Lagoon Secondary Cell 1 Product Type: 60 mls smooth

DESTRUCTIVE TEST LOG

Project Name: Sheet Type:Riverdale Cell 2 60 mls smooth

DT#: 29 DT#: 30Between Panels: Between Panels:

QA Monitor: CP QA Monitor: CPDate: Date:Time: 8:44 Time: 9:00

200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.200%+ F.T.B. 200%+ F.T.B.

P99xP1 DT WW 27

125144

SHEAR PEEL

169

132 139

05/11/2018

166174 176187

170

129

OUTSIDE PEEL

134

OUTSIDE PEEL

129144

149 147EL

ON

GA

TION

FAIL

URE

TYPE

P118xP1 AS WW 9

FAIL

URE

TYPE

ELO

NG

ATIO

N

INSIDE PEEL

153160

INSIDE PEEL

151

138

160

SHEAR PEEL

160

131132 127129 141

180177 183

05/11/2018