L.A. Lopez Hernandez

Route Goward and Septum 16 shielding increase

LS1 Committee - 21st - 20 September 2013

Page 2: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

• The shieIding increase of the PS over Route Goward passage and over Straight Section 16 was proposed by RP, recommended by the PSRWG, presented at the IEFC and endorsed by the management

• The cost of the intervention has been included in the PS‐LIU budget

Page 3: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

RP presentation from 59th IEFC (S. Damjanovic)

The extra-concrete shielding requiredfollowing HSE recommendationswas ~ + 180 cms.

Route Goward

Page 4: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Proposed solution: Concrete slab 2 m thick

Piling wall protecting the tunnel from the load of the road

Page 5: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Works carried out:

-Earthworks -Temporary road to give limited access to the center of the ring during the construction works -Piles -Concrete slab 2 m thick -New road ~ 100 m long, including retaining walls, backfilling, modification of the existing networks, etc

Schedule:

Currently: -Road open -Works finished on schedule

Page 6: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Temporary road

Retaining wallPiling works

Some pictures of the works:

Page 7: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Slab reinforcement

Formwork for the slab

Biocofra

Page 8: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Concreting

Road works

Backfilling

Page 9: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

RP presentation from 61st IEFC (S. Damjanovic)

The extra-concrete shielding requiredfollowing HSE recommendationshas been converted in earth shieldingNew max ground level: 442.6 m (means between +1.2 and +3.4 m over the existing level)

Straight Section 16

Page 10: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Requested: - Additionnal depth of earth of between 1.2m and 3.4m depending of the area

Constraints: - Existing structures not strong enough to take the additional load- Area with a very complex geometry (PS, Linac 2&3, Leir, TT2, . .) - Works must have no influence or impact on the existing structures

Page 11: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Feasibility studies:

Page 12: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Proposed solution : -A new load-bearing structure taking the weight of the additional earth and redirecting it into the bedrock underneath.

-The structure consists of a 1.10 m thick reinforced concrete slab and the additional depth of backfill will be placed directly on the slab.

-The slab rests on drilled piles, or secant piles in areas subject to particularly heavy loads

-In the places where the existing tunnels are made of large masses of concrete, the slab rests on intermittent supports on the tunnel roof

Page 13: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Bird’s eye view of the new slab:

Page 14: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

- To protect the existing structures, the transfer slab must guarantee that even after long-term deformation the load-bearing relief structure does not under any circumstances come to rest on the existing structures.

- To this end, the slab will rest on a biodegradable honeycomb cardboard formwork that can be dissolved with water. This procedure guarantees that, once water has been injected to dissolve the cardboard, a void of 10 cm remains after concreting, which is more than enough to allow for the long-term deformation of the slab

Page 15: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Biocofra:

Page 16: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Slab deformation:

51 mm

56 mm

Page 17: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Schedule

Currently: -Piles finished-Concreting works starting

Page 18: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Worksite installations:

Parking route Gowardshared with CV

Concrete batching plant

Temporary spoil dump

Access to building 561 (RP)

«Passage pieton» closed

Page 19: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

L.A. Lopez Hernandez 19

Monitoring of the existing structures -Photographic survey of the structures

-Camera inspection of the drains ~ 300m

-Vibration measurements during piling works

LS1 Committee - 21st

- Maximum particle velocity for historical buildings < 2 mm / s

- Max value recorded: 1.19 mm/s on sensor 2

- 3D modeling of the (shielding + existing structures +ground) for prediction of displacements

Page 20: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Some pictures of the works:

Page 21: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013

Thank you for your attention