27
Laguna Division Conservation Area Conservation Area Colorado River Citizens Forum Yuma, AZ March 7, 2012

Laguna Division Conservation AreaConservation Area

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Laguna Division Conservation AreaConservation Area

Laguna Division Conservation AreaConservation Area

Colorado River Citizens ForumYuma, AZ

March 7, 2012

Page 2: Laguna Division Conservation AreaConservation Area

Presentation Outline• MSCP Background

Presentation Outlineg

• Project Introduction• Current Design Concept and ConstructionCurrent Design Concept and Construction

Components• Future Schedule• Questions

Page 3: Laguna Division Conservation AreaConservation Area

Lower Colorado River M lti S i C ti PMulti-Species Conservation Program

– 50-Years of ESA and CESA (f CA P ti )CESA (for CA Parties)

– Balance LCR use with native species habitat conservation

– Minimize impact to current and future water / power operations

– Provide basis for incidental take authorizations

Page 4: Laguna Division Conservation AreaConservation Area

Lower Colorado River M lti S i C ti P

26 COVERED SPECIES

Multi-Species Conservation Program

– 6 T&E species • 2 birds, 1 reptile, 3 fish

20 other species– 20 other species• 4 mammals, 10 birds, 2

reptiles, 1 fish, 1 insect, 2 l t2 plants

– 5 “evaluation species”5 evaluation species• 3 mammals, 2 reptiles

Page 5: Laguna Division Conservation AreaConservation Area

Lower Colorado River M lti S i C ti PMulti-Species Conservation Program

• PROGRAM COMPONENTS

• Native Fish Augmentation

• Species and Habitat Research

• System-wide Monitoring

• Existing Species Habitat MaintenanceExisting Species Habitat Maintenance

• Conservation Area Development & Mgmt

Page 6: Laguna Division Conservation AreaConservation Area

Laguna Division Conservation AreaLaguna Division Conservation Area ...

Reach 7 ___ , ____ _

Page 7: Laguna Division Conservation AreaConservation Area

Project Design• Irrigation delivered through the Gila

Sluiceway Gate• Habitat Targets

– Open Water/Marsh: 50 – 100 ac – Cottonwood/Willow: >200 ac– Upland(mesquite): <500 ac

P id h d l t t• Provide hydrology to support habitats for 50 years or more

• No detrimental effect on existing Mittry Lake or Old River ChannelMittry Lake or Old River Channel Habitats

• Minimize impacts to existing operations (sluicing, dredge disposal, water delivery, etc.)

• Minimize both initial construction and long-term operating costs

Page 8: Laguna Division Conservation AreaConservation Area

Target HabitatsTarget HabitatsOpen Water/Marsh: 50 – 100 ac

Upland (Mesquite): <500 acCottonwood/Willow: >200 ac

Page 9: Laguna Division Conservation AreaConservation Area

LDCA Target SpeciesCalifornia black rail

Yuma clapper rail

Southwestern willow flycatcher

Yellow billed cuckoo

Yuma hispid cotton rat

Colorado River cotton rat

Western least bittern

Page 10: Laguna Division Conservation AreaConservation Area

__________________ ___.....__ __________________________ ~------------~--------- ------- --_ __.........._____.------ --- - - -- - - - -- - -- - -- - - - -

0

MSCP Laguna Restoration Reach 1 Concept Drawing Date: 8/18/09

Page 11: Laguna Division Conservation AreaConservation Area

Scale: , •• 240' ~

-...:::-- -------"M"'S:<eC::;P~L':'a:tq:=u'fn'ia:-:R;;:e~s;:t.;,o:=ra='t""i:::;o""n---:--::::= .-.- 1 •• "'.....,_ --- Rea eli 1 Resto ration o.u-:912CW9 cr ., tw ,.... J60' -

Page 12: Laguna Division Conservation AreaConservation Area

MSCP Laguna Restoration frM Phillips COMultlrHJ Reach 1 Cross Sections

Page 13: Laguna Division Conservation AreaConservation Area

F----------~D~e~e~p-W~a~te~r~M~a~rs~h------------------------~-------------O~p~e_n_w_a_t_er ______________ ~------------------D_ee~p_W __ at_e_rM __ ar_s_h ________________ F '

MSCP Laguna Restoration Scale: 1" = 120'

frM Phillips COMultlrHJ Reach 1 Cross Sections

Page 14: Laguna Division Conservation AreaConservation Area

Construction ComponentsComponents

• Water Delivery System• Headworks at Gila sluicing gates• Buried pipeline to convey water to the project area

• Site Preparation for Earthwork• Clear and bury non‐native vegetationClear and bury non native vegetation

• Earthwork• Channels provide the topography to support water 

conveyance and vegetation/ habitatU ili i i h i i i /fill d• Utilize existing topography to minimize cut/fill and maximize pulse flow irrigated area

• Reach 1 & 2 primary and secondary channels; Enhancement of historic channel

• Maintenance roads for access and firebreaks

• Water Control Structures • Manage water levels in Reaches 1 & 2, and historic 

river channel• Additional Mittry Lake turnout structure• Additional Mittry Lake turnout structure

Page 15: Laguna Division Conservation AreaConservation Area

Current Design Concept: Overview

• Water delivery via pipeline from Gila Gravity Canal sluicing gates• Water delivery via pipeline from Gila Gravity Canal sluicing gates• Operate as a managed, leveed wetland rather than a river system to

maximize limited water resourceU i ti fl h l th h j t t i i i• Use existing overflow channels through project area to minimize excavation

• Use “pulse flows” to provide irrigation to woody species• Requires water control structures to manage water levels

Page 16: Laguna Division Conservation AreaConservation Area

Water Delivery ySystem Overview

G it t d li i 100 f• Gravity system delivering 100 cfs of high quality water from the Gila sluicing gates to the wetland restoration area

• Pipeline headworks at the Gila Sluicing Gates

• 2,300-ft., 48-in. diameter pipeline

• Cross underneath the Gila Wasteway Canal with an inverted siphon

• Redundant shut off capability

Page 17: Laguna Division Conservation AreaConservation Area

Water Delivery System: Headworks

~ ~ ~ ; f EX 24 IN •• PIPE. PIP£

EXTENDS ACROSS THE GILA DIVERSION

I =;ru~E ~~~~y LAKE INL£T CANAL

L -

SCALE ,N FEET

Clltll:fei. ~ • CONSTRUCT A CONCRElE HEAO'MJRKS BAY, AS PART Of THE LAGUNA WATER OEU~Y SYSTD4, 'MTHIN THE

WESTERN-1.40ST St.UictNC BAY OF THE CILA 01\IERSION SlRUCTliRE SLUIONC WORKS. THE HEADWORKS WOULD BE DIRECn.Y INlEGRATED WITH AND WOULD ACT ItS AN EXTENSION OF THE EXISTlNG SlUICE GAlE PORT. THE EXISTING SLUICE GA. TE WOULD BE OPENED TO AU.OW WA lER TO ENTER THE HEAD WORKS BAY, 'lit! ERE THE WATER WOULD THEN PASS INTO THE INL£T OF THE WATER DEUIA::RY SYSTnl PIP£1JNE. 'MiEN SlUICING IS REQUIRED. THE NEW SLUICE GATE TO THE WATER DELIVERY PIPEUNE WOULD BE Q.OSED AND SLUIONG EVENTS WOULD BE ROUTED THROUQ-1 THE HEAOWORKS BAY 'VIA TWO, NEW SLUICE GATES WITHIN THE HEAD WORKS BAY. 'MiEN LONG-TERM WAJNTENA.NCE AND/OR INSPECTlON IS REQUIRED WITliiN THE HEAOWORKS BAY. THE EXISTlNG SLUICE GAlE COULD BE Q.OSED.

AQYANTAGfS QYfR pRE\tlCX!S CQNCEPT • THE HEADWORKS BAY CAN BE CONSlRUCTEO COtro4PlETn. Y IN THE DRY AND CONSTRUCllON WILL NOT llrolPACT

OPERATIONS Of THE GILA WAIN CANAL (I.E. NO ORAW- DO'MII REQUIRED) THE CONCEPT USES EXISTING INFRASlRUCl'URE (GATES. SLUICE PORTS. ETC.) AND DOES NOT REQUIRE BREAOiiNG THE WATER WORKS (I.E. NO CONCRETE OR DIKE BREAOiiNG). REDUCES PIPE LENGTH BY 275 F'EET AND EUMINATES THE NEED FOR A MANHOlE AND FILl[R DIAPHRAGM

ALTERNATIVE HEAD WORKS CONCEPT: PLAN ~EW & NARRAnVE

LAGUNA DIVISION CONSERVATION AREA WATER DELIVERY SYSTEM PROJECT:

HEADWORKS & OU TLET WORKS PLAN

PREUMINARY NOT FOR

CONSTRUCTION

Page 18: Laguna Division Conservation AreaConservation Area

LDCA Irrigation DeliveryLDCA Irrigation Delivery

Page 19: Laguna Division Conservation AreaConservation Area

Pipeline Installation

Page 20: Laguna Division Conservation AreaConservation Area

Pipeline Installation

Page 21: Laguna Division Conservation AreaConservation Area

LDCA Clearing ActivitiesLDCA Clearing Activities

Page 22: Laguna Division Conservation AreaConservation Area

Clearing Operations

Page 23: Laguna Division Conservation AreaConservation Area

Laguna Division Conservation Area Schedule

2011 2012 2013 2014 2015 2016 2011 2012 2013 2014 2015 2016

JAN   Clearing of Reach 2 

Reach 1& Historic: Collect and Plant Poles 

Reach 2: Collect and Plant Poles 

   JAN

Order 

Clearing of Reach 1 & Historic Channel

FEB    Marsh for Reach 2 

      FEB

MAR   

Order Marsh for Reach 1 

Reach 1:  Plant Riparian & Mesquites 

      MAR

Channel 

APR   

Test Flood Reach 1 

Reach 1:  Plant Riparian & Mesquites 

      APR

MAY   Test Flood

      MAYTest Flood Reach 2 

JUN      JUN JUL         JUL

AUG         Reach 2:  Plant Marsh 

      AUG

Reach 2:SEP   

Clearing of Reach 2 

Reach 1:  Plant Marsh 

Reach 2:  Plant Marsh 

      SEP

OCT             OCT NOV                NOV

Reach 1& Historic:  Reach 2: 

CollectDEC    Collect and Plant Poles 

Collect and Plant Poles 

  DEC

2011 2012 2013 2014 2015 2016

Page 24: Laguna Division Conservation AreaConservation Area

Base Water Level

“Pulse” Water Level

\ . . l

q):~,·· .. ··.' ..• :!)

·. ·'· .. j'U '\~ :

?

? ' I J

Page 25: Laguna Division Conservation AreaConservation Area

LDCA Access

Page 26: Laguna Division Conservation AreaConservation Area

Habitat AcreagesOPEN DEEP TRANSITION COTTONWOOD/ MESQUITE WATER MARSH ZONE/ FIRE WILLOW

BREAK I II II -

57

Reach 1 46 63 35 164 (no irrigation)

159

(irrigation)

30

Reach 2 21 24 50 234 (no irrigation)

44

(irrigation)

0

Reach 3 4 10 8 14 (no irrigation)

102

(irrigation)

11

Historic River 0 0 81 14

(no irrigation) Channel 6

(irrigation)

98

Project Totals 71 97 174 426 (no irrigation)

31 1

(irrigation)

MSCP 50-100 >200 <500 Targets

Page 27: Laguna Division Conservation AreaConservation Area

Questions?Updates available on the web ‐http://www.lcrmscp.gov/conservation/laguna.html