LAGUNA/LBNO WP4: secondary beam line status report. LAGUNA/LBNO DS meeting / December 2012. M. Calviani , P. Velten , A. Ferrari, I. Efthymiopoulos, C. Lazaridis (CERN) + M. Zito , V. Galymov (CEA), A. Rubbia, S. Murphy, S. Di Luise (ETHZ). Organization of the WG and activities. - PowerPoint PPT Presentation
Citation preview
LAGUNA/LBNO WP4: secondary beam line status
report
M. Calviani, P. Velten, A. Ferrari, I. Efthymiopoulos, C. Lazaridis (CERN)+ M. Zito, V. Galymov (CEA), A. Rubbia, S. Murphy, S. Di Luise (ETHZ)
LAGUNA/LBNO DS meeting / December 2012
2 M. Calviani -- LAGUNA/LBNO DS General Meeting
Organization of the WG and activities
Focused (for the moment) on: Agreement on the main physics parameters (ok now!) Optimization of beam/target optimization Configurations of horn Muons in the ND and configuration of the decay pipe
CERN-oriented meetings held on a ~monthly basis to discuss the activities within the sub-WG Steering the activities on the LAGUNA/LBNO
secondary beam line Participation to external members working on
some aspects of the beam line in other institutes Important input from the experiment!
17th December 2012
3 M. Calviani -- LAGUNA/LBNO DS General Meeting
Target-horn distance and horn current optimization
17th December 2012
4 M. Calviani -- LAGUNA/LBNO DS General Meeting
Horn-reflector distance and reflector current
optimization
17th December 2012
5 M. Calviani -- LAGUNA/LBNO DS General Meeting
17th December 2012
6 M. Calviani -- LAGUNA/LBNO DS General Meeting
17th December 2012
7 M. Calviani -- LAGUNA/LBNO DS General Meeting
nm fluence in ND/FD
dTH=0 cm / IH=220 kA
dHR=6 m / IR=275 kA
17th December 2012
8 M. Calviani -- LAGUNA/LBNO DS General Meeting
17th December 2012
9 M. Calviani -- LAGUNA/LBNO DS General Meeting
m± fluence with passive shielding
17th December 2012
10 M. Calviani -- LAGUNA/LBNO DS General Meeting
m± fluence with active toroidal shielding
17th December 2012
with 29 Tm bending power
11 M. Calviani -- LAGUNA/LBNO DS General Meeting
m±
17th December 2012
12 M. Calviani -- LAGUNA/LBNO DS General Meeting
Conclusions
Much work to do still…!
17th December 2012