24
9/7/2012 MBS UU

Lahore Metro Bus System

  • Upload
    bebe

  • View
    164

  • Download
    1

Embed Size (px)

DESCRIPTION

Lahore Metro Bus System. Dr Nasir Javed CEO: The Urban Unit Pakistan. MBS Lahore is still in the phase of execution and hence most of the presentation is either Planning or future Please criticize & Advise as well. City Lahore. - PowerPoint PPT Presentation

Citation preview

Page 1: Lahore Metro Bus System

9/7/2012 MBS UU

Page 2: Lahore Metro Bus System

Lahore Metro Bus System

Dr Nasir JavedCEO: The Urban Unit

Pakistan

9/7/2012 MBS UU

Page 3: Lahore Metro Bus System

MBS Lahore is still in the phase of execution and hence most of the presentation is either Planning or

future

Please criticize & Advise as well

9/7/2012 MBS UU

Page 4: Lahore Metro Bus System

City Lahore

The capital of Punjab, a city of around 9m, with a growth rate of around 3%

9/7/2012 MBS UU

Page 5: Lahore Metro Bus System

Vision

• The Vision is to provide the city of Lahore with a high quality Public Transport System, with a road based mass transit system, in the medium term.

9/7/2012 MBS UU

Page 6: Lahore Metro Bus System

Basics

• Estimated Project Cost ~ Rs. 30 Billion• Total Length 32 km (Elevated portion – 8.5

km)• Median Side BRT with one each lane each

direction• Level Boarding for Passenger from Station• Commercial Speed of 25 Km/h & reliability

of service

Page 7: Lahore Metro Bus System

Length

• The Route (Green Corridor) is 32km long, running south to north across the city, on one of the four primary arteries of the city

9/7/2012 MBS UU

Page 8: Lahore Metro Bus System

Dedicated Route all along, except 8 traffic intersections

9/7/2012 MBS UU

Page 9: Lahore Metro Bus System

Elevated Portion

Around 7 km is elevated, which is because of the constraints on widening the Road9/7/2012 MBS UU

Page 10: Lahore Metro Bus System

Stations•These are on the sides of the Route

•3 platforms on each side

•Sliding Doors

9/7/2012 MBS UU

Page 11: Lahore Metro Bus System

9/7/2012 MBS UU

Page 12: Lahore Metro Bus System

BRT Station layout

STOP BAR

RUBBER PADDED SURFACE

PLATFORM AREA

2.5m WIDE COLOURED PAVEMENT PORTION FOR LATERAL GUIDANCE

AREA FOR TURNSTILES

Page 13: Lahore Metro Bus System

Pedestrian Bridge & Access to Station & ticketing booth

9/7/2012 MBS UU

Page 14: Lahore Metro Bus System

ARTICULATED BUS (Green Line)

Page 15: Lahore Metro Bus System

Capacity

It is designed to carry around 18,000 passengers per hour per

direction

9/7/2012 MBS UU

Page 16: Lahore Metro Bus System

E Ticketing

• We are introducing e ticketing , but only limited to the MBS for the time being

9/7/2012 MBS UU

Page 17: Lahore Metro Bus System

ITS• There are 11 traffic signals on the route that is

at grade

• These signals are being upgraded to make these Intelligent, providing Bus priority and managing allied traffic as well.

• Control Center is being set up

9/7/2012 MBS UU

Page 18: Lahore Metro Bus System

Command & Control Center

9/7/2012 MBS UU

Page 19: Lahore Metro Bus System

Overall Route Network-Network Integration

Present Future

Transfer facilities

Feeder Bus

Main Road/Trunk/BRT

Ring Road and Sub Urban Bus

Three Types of Bus Operation/Routes with fare integration

Page 20: Lahore Metro Bus System

Communication Strategy

9/7/2012 MBS UU

Page 21: Lahore Metro Bus System

That makes Land acquisition easy

9/7/2012 MBS UU

Page 22: Lahore Metro Bus System

Institutional Development Metro Bus Authority

Page 23: Lahore Metro Bus System

Thank you9/7/2012 MBS UU

Page 24: Lahore Metro Bus System

9/7/2012 MBS UU