PAGE - 1
Lamb of God LCMS
Schematic Design September 20, 2020
Evangelical Lutheran Church & Academy
PAGE - 2
PROGRAM REVIEW
se
ct
io
n
1
1.
PAGE - 3 LAMB OF GOD LCMS
• Gross Area: 5,220sf• Site: Develop site to accommodate entire master plan. Including Site grading, Parking Lot & Exterior Lighting, Utilities, and Signage.• Building Elements: Designed to meet city requirements and land purchase agreement requirements• Landscaping: Will meet city requirements• Sensitivity to Neighborhood: Use landscape buffers to deter any impact of parking areas, sounds, and lights to the neighborhood to the North.
Phase 1: Start by building a Minimally Viable Faciliy (MVF)
PAGE - 4 LAMB OF GOD LCMS
• Gross Area: Approximately 10,000sf• Site: Some additional grading will be required. Additional parking will be required. • Building Elements: Sanctuary space, Basement, Stairs, Elevators, and Infrastructure. Designed to meet city requirements and land purchase agreement requirements. All exterior work is finalized in this phase. • Landscaping: Will meet city requirements. Incorporate prayer garden along North Buffer yard.
Phase 2: Build a New Sanctuary & Basement
PAGE - 5 LAMB OF GOD LCMS
• Existing Gross Area: Approximately 4,500sf• Building elements: Finish existing basement with commercial kitchen & social hall.
Phase 3: Complete Basement (Add Kitchen & Social Hall)
PAGE - 6 LAMB OF GOD LCMS
• Existing Gross Area: 5,220sf• Building Elements: Remodel existing MVF space for Christian Education and potential preschool/childcare and any additional offices required.
Phase 4: Remodel MVF for Christian Education
PAGE - 7
se
ct
io
n
2
2. PROJECT SITE PLAN
PAGE - 8 LAMB OF GOD LCMS
Lot 71, NW corner of S 126th Street and HWY 370
PAGE - 9SLATE ARCHITECTURE
Mixed Use Agreement
PAGE - 10 LAMB OF GOD LCMS
Site for Lamb of God Church
S. 1
26th
st.
drop off lane
11 12 13
13
5
13
steeple
pedestrian access
PAGE - 11SLATE ARCHITECTURE
• 67 parking stalls• Landscaping to meet city requirements• Must provide turning radius for firetruck
Phase 1: Site Plan
prayer garden
phase 1
phase 2
drop off lane
12
11
1
13 13
S. 1
26th
st.
pedestrian access
steeple
11 11 11
13131311 1110 1010
PAGE - 12 LAMB OF GOD LCMS
• 174 parking stalls• Parking lot ties into additional parking to the South• Includes buildout for Phase 2• Includes prayer garden
Phase 2: Site Plan
PAGE - 13
se
ct
io
n
3
3. FLOOR PLAN
PAGE - 14 LAMB OF GOD LCMS
DescriptionArea Needed per
Program Area Provided
Multipurpose 2400 2084 200 seatsChancel 800 533Music & Media 100 --Narthex & Commons 1100 963Vestry 200 138Sacristy 200 143Pastor Office 120 121Administrative Office 120 146Photocopy/Meeting Room 150 153Kitchen 240 258Mechanical Room -- 35Vestibule -- 48Coat Closets -- 35Restrooms -- 317Total 5,430 nsf 4,974 nsf
PAGE - 15SLATE ARCHITECTURE
REF
.REF
.
2084 SF
MULTIPURPOSE ROOM105
963 SF
NARTHEX AND COMMONS100
143 SF
SACRISTY107
533 SF
CHANCEL106
258 SF
SERVING KITCHEN104
138 SF
VESTRY108
58' -
0"
8' - 0
"
20' - 0"
8' - 1
1/2
"12
' - 1
1"9'
- 7 1
/2"
146 SF
STAFF OFFICE109
121 SF
PASTOR'S OFFICE110
153 SF
MEETING ROOM111
11' -
8 1
/2"
35 SF
WATER SERV114
12' - 6"
12' -
3 1
/2"
317 SF
RR117
VESTIBULE
BAPTISMAL FONT
MUSIC
MEN'S
WOMEN'S
COATS
172 CHAIRS sta
tem
ent w
indo
w
7' - 3
"
10' - 4"
90' - 0"
up
11' - 6 1/2"
3x3
wind
ows @
4ft
aff
12' -
0"
COMMUNION RAIL
PAGE - 16
se
ct
io
n4
4. EXTERIOR DESIGN
PAGE - 17 LAMB OF GOD LCMS
PAGE - 18
se
ct
io
n
5
5. CONSTRUCTIONBUDGET
PAGE - 19 LAMB OF GOD LCMS
Rosacker & Associates, LLC1802 N 169th Plaza
Omaha, NE 68118
Budget Architect Number: 202024Printed On: 08/26/2020
8/15/2001 General Requirements 280,240.03$ 02 Existing Conditions 500.03$ 03 Concrete 49,462.98$ 04 Masonry 58,881.95$ 05 Metals 5,000.25$ 06 Wood, Plastics, and Composites 128,723.68$ 07 Thermal and Moisture Protection 42,627.14$ 08 Openings 65,523.12$ 09 Finishes 121,748.09$ 10 Specialties 9,728.57$ 11 Equipment -$ 12 Furnishings 7,430.55$ 13 Special Construction -$ 21 Fire Suppression 36,751.84$ 22 Plumbing 50,002.50$ 23 Heating, Ventilating, and A/C 75,323.77$ 26 Electrical 134,506.73$ 27 Communications -$ 28 Electronic Safety and Security -$ 31 Earthwork 30,651.54$ 32 Exterior Improvements 267,583.58$ 33 Utilities 50,002.50$ Permit 2,000.00$
Total 1,416,688.85$ Cost/Sq. Foot (Sq Ft): 5787 244.81$
Lamb of God LCMS126th & Ballpark WayPapillion, NE 68046