Land Development Process 07/03/22 Carma Calgary Land 2007 1

Land Development Process 10/6/2014Carma Calgary Land 20071

Embed Size (px)

Citation preview

Page 1: Land Development Process 10/6/2014Carma Calgary Land 20071

Land Development Process

04/11/23 Carma Calgary Land 2007 1

Page 2: Land Development Process 10/6/2014Carma Calgary Land 20071

Introduction

• General Overview of – Responsibility– Processes • Planning, Acquisition, Engineering

• Goals• Please ask questions!!

04/11/23 Carma Calgary Land 2007 2

Page 3: Land Development Process 10/6/2014Carma Calgary Land 20071

04/11/23 Carma Calgary Land 2007 3

Pre-Acquisition Pre-Acquisition Situational Situational AnalysisAnalysis

Property InvestigationsThe Market

Situation

The LegalSituation

The PolicySituation

The PhysicalSituation

The FinancialSituation

Option 1

Option 2

Option 3

Page 4: Land Development Process 10/6/2014Carma Calgary Land 20071

Land Acquisition• Market Research and Needs Assessment driven from

Strategic Plan• Site Selection and Pro Forma• Offers to Purchase (Carma prepared) / Purchase and Sale

Agreements (Lawyer to Lawyer)• Due Diligence – Typically 45-90 days (Engineering, Geotech,

Traffic, Planning, Environmental, Pro Forma, Leases etc.)• Land Purchased and Transferred• Lease Agreements (Farming, utilities, cell towers etc.)

transferred.

04/11/23 Carma Calgary Land 2007 4

Page 5: Land Development Process 10/6/2014Carma Calgary Land 20071

The Acquisition Phase

• Financial Pro-forma– Financial modeling to determine value of land

based upon: • Sales expectations include both timing and price• Cost estimates including timing and price• Risk / Return based upon industry or corporate

expectations.

04/11/23 Carma Calgary Land 2007 5

Page 6: Land Development Process 10/6/2014Carma Calgary Land 20071

04/11/23 Carma Calgary Land 2007 6

Pro-forma – discounted cash flow Pro-forma – discounted cash flow methodmethod

Page 7: Land Development Process 10/6/2014Carma Calgary Land 20071

Phases of Land Development

• Pre-acquisition • Acquisition• Questions ????• Planning and Approvals• Physical Development• Marketing and Sales

04/11/23 Carma Calgary Land 2007 7

Page 8: Land Development Process 10/6/2014Carma Calgary Land 20071

Planning and Approvals Process• Regional Policy Plans – (City Document) but background typically

supplied by landowners. • Area Structure Plan (ASP) Preparation (City Document)• Outline Plan and Land Use (Developer Application) – Typically 6-

14 months depending on size and complexity of application.

• Negotiations• CPAG Detailed Team Review conditions of approval• CPC (Calgary Planning Commission) approval• City Council approval• Celebrate!!

04/11/23 Carma Calgary Land 2007 8

Page 9: Land Development Process 10/6/2014Carma Calgary Land 20071

Policy Levels

04/11/23 Carma Calgary Land 2007 9

The Provincial Level

The Municipal Level

The Sector Level

The Community Level

The Sub-Community to Subdivision Level

Page 10: Land Development Process 10/6/2014Carma Calgary Land 20071

04/11/23 Carma Calgary Land 2007 10

Page 11: Land Development Process 10/6/2014Carma Calgary Land 20071

Sales and Marketing Strategic

Page 12: Land Development Process 10/6/2014Carma Calgary Land 20071

Physical Development

Internal Production/Sales Planning

• Sales Continuity and Phasing Plan from Business Plan• Preliminary Lotting Plan Approval for Individual Phases• Finalize Lotting Plan• Engineering Program

04/11/23 Carma Calgary Land 2007 12

Page 13: Land Development Process 10/6/2014Carma Calgary Land 20071

Engineering Process• Preliminary Engineering and Landscape Design submission• Preparation of Cost Estimates and Tenders• Preparation of Phase Indemnity Agreement and Bonding by

Developer• Request Standard Development Agreement “Special Clauses”• Preparation of Tentative Subdivision Plan and Submission to City

for Approval• Review Tentative Plan CPAG (Corporate Planning Applications

Group) conditions of approval• Architectural Controls Development Permit (if required• Shallow Utility Design and Approval• Final Engineering and Landscape Design Submission to City for

Approval

04/11/23 Carma Calgary Land 2007 13

Page 14: Land Development Process 10/6/2014Carma Calgary Land 20071

Engineering Process • Preparation and Award of Carma Project Approval – Internal Carma

Approval • Site Grading • Preparation of Legal Documents and Submission to City.• Submit Final Subdivision “Linens” for Submission to City for final approval.• Submission of City approved linens to Land Titles for registration• Final Addressing approved by City• Underground Utility Permission and Installation• Builders Packages (legal survey, urw, building grade plans, surface info plan)• Obtain Building Permits (after testing and Fire Marshal Clearance)

04/11/23 Carma Calgary Land 2007 14

Page 15: Land Development Process 10/6/2014Carma Calgary Land 20071

Servicing • Rough Grading• Underground Utility Permission and Installation• Obtain Building Permits (after testing and Fire Marshal Clearance)• Builders Packages (legal survey, urw, building grade plans, surface info

plan)• Sale of Lots to Builders • Grade Slips Issued to Builders• Surface Approval from City• Concrete Surface Improvements• Asphalt Surface Improvements• Installation of Shallow Utilities and Energizing (can occur prior to surface

improvements)• Landscaping

04/11/23 Carma Calgary Land 2007 15

Page 16: Land Development Process 10/6/2014Carma Calgary Land 20071

Sales and Marketing Tactical

Page 17: Land Development Process 10/6/2014Carma Calgary Land 20071

CCC/FAC Process• CCC inspection conducted by City and Developer representive after

construction• Some CCC inspections can be self inspected by Consultant

(underground) and submitted for approval.• Issuance of CCC triggers start date of warranty period• Warranty Periods

– Underground – 1 freeze/thaw cycle– Surface – 2 freeze/thaw cycles (minimum 75% buildout of phase required to

issue FAC)– Landscaping – 1 year– End of warranty period – inspection conducted, maintenance performed

(concrete, toplift asphalt, etc.)– FAC issued– Bond reduced or returned when final as builts submitted and approved by City.

04/11/23 Carma Calgary Land 2007 17

Page 18: Land Development Process 10/6/2014Carma Calgary Land 20071

Phases of Land Development• Pre-acquisition • Acquisition• Questions ????• Planning and Approvals• Physical Development

04/11/23 Carma Calgary Land 2007 18