25
Natural Resource Economics Amira AL-Zadjali / Balqis Jadad Economic Analysis Of Landfill Recycling

Landfill

Embed Size (px)

Citation preview

Page 1: Landfill

Natural Resource Economics

Amira AL-Zadjali / Balqis Jadad

Economic

Analysis Of

Landfill Recycling

Page 2: Landfill

Outline Introduction

Background information

Economic analysis

Financial analysis

Concluding Remarks

Page 3: Landfill

Introduction All world looking for Sustainability

Economic growth

human activity waste (problem)

Waste more than environmental capacity

need (solution)

Page 4: Landfill

Threat to Sustainability waste management :

Recycling

Reduce

Reuse

An example : US Case

• U.S. Environmental Protection Agency’s Landfill Methane Outreach Program (LMOP)

• Objective : encouraging the recovery and beneficial use of landfill gas (LFG) as an energy resource.

• (problem) (solution)

Effective and efficient

Page 5: Landfill

Problem Element and Explanation

Principal component: Methane (CH4)

Methane as (green house gas) GHG is over 20x more potent by weight than CO2.

Landfills are the third largest human-made source of methane in the United States.

Methane is more abundant in the atmosphere now than anytime in the past 400,000 years and 150% higher than in the year 1750.

Page 6: Landfill

A landfill is a location designed for the systematic long-term storage of waste under conditions that will prevent the contamination of air and water.

Landfill gas (LFG) is a by-product of the decomposition of municipal solid waste (MSW):

• 50% methane (CH4)• 50% carbon dioxide (CO2)• 1% non-methane organic compounds (NMOCs)

What is landfill ?

Page 7: Landfill

Method of LFG collection :

Vertical

Horizontal

Page 8: Landfill

Post-collection

• After collection:• Flared• Energy recovery system

• For every 1 million tons of municipal solid waste MSW:

• 0.8 megawatts (MW) of electricity• 432,000 cubic feet per day of LFG

• If uncontrolled, LFG contributes to smog and global warming, and may cause health and safety concerns

Page 9: Landfill
Page 10: Landfill

Landfill Characteristics:

Period : 1994-2014

Estimated Waste-In-Place at Closure (tons): 4,000,0001 million tons of MSW 432,000 cubic feet per day of LFG

4 million tons of MSW ?

Production of LFG/day= (4*432.000)/1= 1,728,000 cubic per day of LFG

Average Waste Acceptance (tons/yr): 200,000

Average Depth of Landfill Waste (ft): 50

Area of LFG Well field to Supply Project (acres): 80

Description of the Case Study

Page 11: Landfill

Loan Lifetime (years): 10

Interest Rate: 6.0%

General Inflation Rate: 2.5% (applied to O&M costs)

Equipment Inflation Rate: 1.0%

Discount Rate: 6.0%

Down Payment: 20.0%

Financial Assumptions

Page 12: Landfill

The first step in the evaluation process is to perform a preliminary economic feasibility assessment. In evaluation process we need to study the costs and the benefits.

If the

Costs > Benefits : Don't go ahead

Costs < Benefits : go ahead

Economic Component

Page 13: Landfill

ECONOMIC

EVALU

ATIONPROCESS

Page 14: Landfill

Decisions of Use

Privately Developed

Projects

Municipality‐Developed

Projects (maximum

profit)

Direct-use project

Privately Developed

Projects

Municipality‐Developed

Projects

Electricity project

LFG projects

Page 15: Landfill

• Capital (i.e., equipment) costs include:

• Design and engineering and administration • Permits and fees • Site preparation and installation of utilities • Equipment, equipment housing, and installation • Startup costs and working capital

• O&M cost elements include:

• Parts and materials • Labor • Utilities • Financing costs • Taxes • Administration

Cost Components

Page 16: Landfill

Direct-Use Project Revenues (privet)

Non-Direct-Use Project Revenues (social)

E.g.: reducing externality by reducing the negative effect of using non-renewable resource of energy )

Benefit Components

Page 17: Landfill

Direct-Use Project Cost

Gas compression and treatment to condition gas for the end user’s equipment.

A gas pipeline to transport LFG to the end user.

A condensate management system for removing condensate along the pipeline.

Pipeline to convey gas to project site: 1,683,165 $

Skid-mounted Filter, Compressor, and Dehydration Unit:1,096,608 $

Total Capital Costs: 2,779,773 $

O&M Costs: $128,782 (for initial year of operation)

Total cost : 5,688,328$

These financial results DO NOT include the costs associated with the LFG collection and flaring system.

Page 18: Landfill

Direct-Use Project Benefit The revenue for direct-use projects = sale of LFG to

> the end user.

but prices will vary depending on site-specific negotiations, the type of contract, and other factors.

In recent years, typical LFG prices have ranged from $4.00 to $8.00 per million British thermal units (MMBtu) or 0.38¢ to 0.75¢ per megajoule.

Direct Use Production and Sales Summary: Pipeline Length From Landfill to End User (mi): 5.0

LFG Average Utilization (million Btu/yr): 220,091 (during the life of the project)

Initial Year LFG Price ($/million Btu): 5.0

So the revenue= 220,091*5

= 1,100,455$

Page 19: Landfill

Cont…Environmental Benefits:

• cleaner air.

• renewable energy.

• economic development.

• improved public welfare and safety.

• reductions in greenhouse (global warming) gases.

Page 20: Landfill

Financing Analysis Financial Results:

Net Present Value: $7,501,924 (at year of construction)

NPV=-C+R0+ (R1/1+r)

Internal Rate of Return: 92%

( r ) when NPV=0

Net Present Value Payback (yrs): 2 (years after operation begins)

In 2 years you will cover the cost

Page 21: Landfill
Page 22: Landfill
Page 23: Landfill

Financing Approaches

Private Equity Financing

Project Finance

Municipal Bond Financing

Direct Municipal Funding

Lease Financing

Page 24: Landfill

In Oman the availability of the project

This project is not available in Oman.

Their are many assumption for not availability of the project in Oman such as:

High cost of the project.

Full oil dependant country

Page 25: Landfill

Acknowledgment

Tom Frankiewicz

Program Manager

U.S. EPA LMOP

(202) 343-9232

[email protected]