Aide Memoire – [March 4, 2016]
1
LAO PEOPLE’S DEMOCRATIC REPUBLIC
AIDE MEMOIRE
Implementation Support Mission for the Customs and Trade Facilitation Project
(P101750 IDA Grant H4030-LA/H8430-LA)
February 8-12, 2016 in Vientiane
KEY PROJECT INFORMATION Project Number P101750 Board approval date June 17, 2008
Project closing date June 30, 2017 Disbursement as of February
2016
US$ 8.6 million
Total Grant Amount US$12.5 million Grant number H4030-LA/H8430-LA
I. INTRODUCTION
1. A World Bank Group team carried out a project implementation support mission for the
Customs and Trade Facilitation Project (CTFP) in Vientiane Capital during the period February 8-
12, 2016.
2. The key mission objectives were to: review implementation performance and quality of
activity outputs of the project, including pace of disbursements and the likelihood of achieving
development objectives and results before the scheduled closing date June 30, 2017; assess the
implications of the funding gap (due to SDR losses) that may have an adverse impact on overall
project implementation; review progress and the quality of implementation of Customs Automation
Support (Component A) and Organizational Development (Component B) for Lao Customs
Department (LCD); obtain project progress data and update the result framework indicators; and
take stock of Lao Customs Department’s initiative to improve law enforcement and anti-smuggling
on illegal trade of wildlife and timber.
3. The team would like to express its sincere thanks to Dr. Athsaphangthong Siphandone
(Director General, LCD) and Mr. Bounpaseuth Sikounlabout (Deputy Director General, LCD) for
their guidance and cooperation during the mission. The mission would also like to express its thanks
to Lao Customs staff at Thanaleng Customs Checkpoint, Lao-Thai Friendship Bridge 1 Customs
Checkpoint and the Project Implementation Unit for their support.
4. This Aide Memoire details the mission findings and agreed next steps related to
implementation of all activities in CTFP. According to the World Bank's Access to Information
Policy, Aide Memoires are to be publicly disclosed unless otherwise indicated by counterparts. The
disclosure of the Aide Memoire was discussed and agreed to during the mission with LCD
representatives.
II. OVERALL IMPLEMENTATION STATUS AND MANAGEMENT PRIORITIES
5. Implementation Status. The overall progress of project implementation is on track and remains
“Satisfactory” to meet the Project Development Objective (PDO). As of February 11, 2016, the
overall project disbursement stands at 69% for the total grant US$12.5 million; of which the
additional financing grant US$6.5 million has reached a disbursement level of 43%. LCD completed
all agreed actions identified during the last mission in August 2015, and made good progress of
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Aide Memoire – [March 4, 2016]
2
delivering key project outputs. The ASYCUDA 1 World is now in operation at 21 customs
checkpoints nationwide, and is reported to be functioning in a reliable and stable manner in
facilitating almost 99 percent of formal trade in Lao PDR. The key functions including automated
selectivity system, revenue reconciliation and trade statistics are in live operation. Customs
operational procedures have been standardized at all major border checkpoints. As part of the
disaster recovery efforts and business continuity plans, LCD completed the establishment of the
Disaster Recovery Center (DRC) at Thanaleng Customs Checkpoint with a fast fiber-optic link to
Customs HQ. The first set of back-up ASYCUDA World server equipment has already been
relocated in the DRC. LCD completed the installation of the first lot of back-up generators in six
locations that have high volumes of trade but are vulnerable to power outages. The back-up
generators are in place to ensure that the ASYCUDA World kiosk, customs clearance facilities can
be operated without disruption to service the trading community. Some areas in rural and
mountainous regions are more vulnerable to electrical outage due to the poor transmission grid and
seasonal climate condition. Prior to the generator upgrade the duration of a typical electrical outage
was reported at around 2-3 hours with a frequency of about 2-3 times a month2.
6. Additional good progress has been made in capacity building and customs modernization since
the previous mission in August 2015. LCD completed all procurement actions agreed during the
previous mission by the end of November 2015. All large technical assistance packages including
customs capacity enhancement program and the customs training center development have already
commenced. Initial work has centered on establishing the required counterpart team to work with
the various component experts and on discussing specific activities, deliverables, and timeframes
for each component of the assignment. The inception phase of these assignments has now been
completed and the overall work program has been discussed and agreed with LCD management.
Inception reports on customs training center development program (CS-8) and customs capacity
enhancement program (CS-12) were delivered on time and are of good quality, acceptable to the Lao
Customs Department. The inception phase for customs legal support and Time Release Study (TRS)
has now commenced.
7. Management Attention. Important project challenges include performance of key contractors
and contract management issues. The mission highlighted serious concerns over limited progress of
ASYCUDA World support and maintenance. The considerable delay with poor and unpredictable
performance of the UN Agency—United Nations Conference on Trade and Development
(UNCTAD) - pose serious threats to the reliability and sustainability of the ASYCUDA World
implemented by Lao Customs. Such delays in required support represent a significant continuing
operational and technical risk to the reliability of the ASYCUDA World. Operationally, this is an
untenable situation for LCD and potentially threatens the movement of goods (imports and exports)
across Lao PDR’s borders. Technically, the ASYCUDA World has several dependencies on the
system upgrade to resolve a number of bugs and improve overall stability. Noting that this project
will be closed by June 30, 2017, the mission recommends that LCD ensures an effective and efficient
management of contractors with attention to output quality and delivery. The high quality and timely
delivery of outputs are crucial for the project to achieve its PDO. In respect to addressing the above
challenges and concerns, the mission agreed with LCD on a series of follow-up actions listed in
ANNEX 3.
1ASYCUDA refers to Automated SYstem for CUstoms DAta, developed and managed by UNCTAD. 2 World Bank Enterprise Survey in Lao PDR (2012)
Aide Memoire – [March 4, 2016]
3
III. STATUS OF PROJECT COMPONENTS
8. The Customs and Trade Facilitation Project (CTFP) is financed by the International
Development Association (IDA) with a total grant of US$ 12.5 million, of which US$6 million
(effective on October 20, 2008 and closed in December 31, 2013) and an additional financing of
US$6.5 million (effective on May 28, 2013 and will close on June 30, 2017). CTFP is implemented
by Lao PDR Customs Department of the Ministry of Finance. The PDO is to facilitate trade by
improving the efficiency and effectiveness of customs administration and simplifying customs
procedures to eliminate duplication and redundancy, reduce transactions costs and time to clear
goods, and increase transparency and accountability. CTFP has two components: (a) Automation
support (including implementation of ASYCUDA World); and, (b) Organizational development
(including customs modernization support).
Component A: Automation Support (including Implementation of ASYCUDA World)
9. ASYCUDA World Implementation, Support and Maintenance. The support and
maintenance contract with UNCTAD was signed in March 2015 and an inception mission was
carried out by UNCTAD in early June 2015. LCD has identified 25 specific support and maintenance
activities that need to be undertaken by UNCTAD as part of the agreement. After considerable delays
and ongoing negotiations between LCD and UNCTAD, a work plan to resolve these issues and
upgrade the ASYCUDA World system to the most current release was agreed in August 2015. The
upgrade was scheduled to be completed by Q3 2015 (September). While UNCTAD began to work
on the test environment, the work was neither completed satisfactorily nor was it moved over to a
production footing. After repeated requests from LCD, UNCTAD further committed to sending their
technical resource person to Vientiane Capital from February 9 – 23, 2016 to resolve outstanding
issues as well as to upgrade the production environment to the latest release of the ASYCUDA World.
This site visit by UNCTAD’s Technical expert was unexpectedly cancelled by UNCTAD on
February 5, 2016. LCD informed the mission that they were concerned that UNCTAD was not
meeting the terms of the ASYCUDA World support and maintenance agreement, and that this
represents a significant continuing risk to the operation and reliability of the system. With the
exception of the single inception mission, all other activities and milestones that were agreed and
documented in the agreement have not been carried out or met. This is an untenable situation for
LCD and potentially threatens the movement of goods (import and export) across Lao’s borders.
The mission strongly urges LCD to document its concerns carefully and seek rapid resolution
with the highest levels of management in UNCTAD.
10. ASYCUDA World Upgrade. LCD informed the mission of the urgent and critical need to
upgrade the AW system to the latest release. This upgrade is expected to resolve a number of bugs
and improve overall stability. Additionally, the upgrade will provide more functional versions of
certain modules (e.g. Valuation) that LCD is anxious to implement. The upgrade is also on the
critical path for a number of other LCD activities. These dependencies are detailed as appropriate in
the following paragraphs. Of greater concern, however is the finding by the LCD IT team that the
ASYCUDA World system (both the current production system and the version to be upgraded to) is
built on Java version 6. This version has a number of documented major security vulnerabilities and
is no longer supported by Oracle. This potential security flaw is preventing LCD from offering
access to ASYCUDA World through the internet. According to LCD, UNCTAD has not confirmed
a timeframe for ASYCUDA World to upgrade to a more secure Java version 7 or 8. The mission
Aide Memoire – [March 4, 2016]
4
concurs with LCD’s concerns and recommends that LCD delay offering internet access to
ASYCUDA World until these security flaws are addressed.
11. Strategic ICT capability development. The focus of the capability development to date has
been to implement the core systems and processes that underpin the deployment of any ICT business
system in Government. This includes a properly configured and managed network, data backup and
recovery and disaster recovery measures, data security systems, virus detection and prevention. The
majority of this work has been completed and the ICT infrastructure for LCD has been stabilized
and has been operating in robust and reliable manner.
12. Disaster Recovery Center and Business Continuity. The refurbishment of the DRC in
Thanaleng Customs Checkpoint has been completed. All necessary equipment has been procured,
delivered and installed. LCD has obtained a fast fiber-optic link between Customs HQ and the DRC
site in Thanaleng Customs Checkpoint. This link has also been extended to the Customs Training
Center located approximately three kilometers away. The DRC is currently in the commissioning
phase with the final pieces of equipment being relocated from the HQ data center. The DRC is
expected to be fully operational by February 29, 2016.
13. Back-up Generators. The first lot of back-up generators were procured, delivered and
installed at 6 locations (Lao-Thai Friendship Bridge 1 Customs Checkpoint, Boten Customs
Checkpoint, Boten Warehouse, Dansavanah Customs Checkpoint, Vangtao Customs Checkpoint
and Namheuang Customs Checkpoint). A second lot of back-up generators for 9 additional sites will
be procured shortly. The supply and implementation of the second lot is expected to complete in
June 2016.
Component B: Organizational Development (including Customs Modernization Support)
14. Customs Capacity Enhancement. The LCD Customs Capacity Enhancement Program is
designed to support the implementation and further development of a range of modern approaches
to customs administration consistent with WTO 3 and WCO 4 standards. It includes six core
components: risk management and intelligence; compliance improvement and authorized economic
operators (AEO); communication and change management; performance monitoring and client
service standards; administrative appeals; and integrity and anti-corruption.
15. The consultant (QI/BIVAC) commenced work in Vientiane Capital on January 11, 2016 and
the work program is expected to be undertaken over an 18 month period. Initial work has centered
on establishing the required counterpart team to work with the various component experts and on
discussing specific activities, deliverables, and timeframes for each component of the assignment.
The inception phase of the assignment has now been completed, and the overall work program has
been discussed and agreed with LCD management. Work on the specific component inputs will
commence in late February and are expected to be completed by June 30, 2017. The LCD expressed
concerns that the expert on administrative appeals and the expert on performance monitoring and
client services standards may not be available. This may present some risks of delays in these
respective work clusters. The mission suggests that LCD clarify the availability of the two experts
so that there will not be any delay in commencement of the respective task clusters. In any
3 WTO refers to World Trade Organization in Geneva, Switzerland. 4 WCO refers to World Customs Organization in Brussel, Belgium.
Aide Memoire – [March 4, 2016]
5
circumstance, the consultant should address the concern urgently within the contract terms and
conditions, and ensure that there will be no delay in delivering the outputs of these two task clusters.
16. The mission discussed the overall scope of the program and progress to date with the LCD
team and highlighted the need for component activities to be well coordinated with the consultancy
team contracted to deliver the Customs Training Center Development program. The LCD
acknowledged the complementarily between the two assignments and confirmed that they had
emphasized the need for effective collaboration in meetings with both consultancy teams. The
mission was informed by the Training Center Development team that contacts have already been
established and both teams have agreed to meet regularly to ensure consistency in approach and
coherence in content.
17. Training Center Development. The Training center Development Program is designed to
strengthen the LCD’s human resource development capabilities. This includes activities associated
with the development of a HRD strategy; the preparation of a comprehensive training curriculum;
preparation of relevant modularized training materials; training of trainers; the selection of training
aids; and implementation and translation of selected modules of the WCO’s e-learning program.
18. The consultant (Nathan Associates) commenced work in October 2015. Initial meetings were
held with the LCD to agree on the overall work program and to establish the necessary counterpart
team. Field visits were also undertaken to the Customs Training Center and Thanaleng Customs
Checkpoint. Work on the competency framework necessary to underpin the training needs
assessment has commenced with the conduct of an eight day design and validation workshop with
participation from all key customs technical areas. The competency framework is based broadly on
the European Union (EU) customs competency framework but has been modified to better align
with LCD needs, priorities and organizational framework.
19. Work has now commenced on identifying any gaps between the agreed competency
framework and existing competency levels. This work will, in turn, inform the work on curriculum
design and training material preparation. It will also assist in identifying the most appropriate
delivery approaches. Once prepared, the curriculum and course materials will be reviewed by the
LCD and approved prior to commencing the training of trainers.
20. In discussion with the consultant the mission was informed that the assignment experienced
some initial delays as a result of the time taken for the LCD to formally identify members of the
counterpart team and to agree on the specific work program. The consultant also highlighted the
impact of recent organizational changes associated with implementation of the Ministerial Decision
No. 1765/MOF, dated on June 3, 2015. The latter has led to some degree of uncertainty on specific
organizational roles and individual position requirements. Both issues are expected to result in some
slippage in the expected delivery timeline of individual assignment components. In particular, the
delivery of the training needs analysis will be delayed by one month to February 20, 2016 and the
delivery of the human resource development strategy to late March. These delays on intermediate
deliverables are not, however, expected to impact on the delivery timetable for the training
curriculum, training materials and training of trainers.
21. The LCD acknowledged that there were some early delays during the inception phase of the
assignment but that these issues had largely been resolved and that day to day contact between the
consultants and LCD staff has now improved. They also noted that the workshop had been very well
received by participants and that progress on the competency framework was now on track. They
Aide Memoire – [March 4, 2016]
6
also recognized that the Ministerial Decision No. 1765/MOF had created a degree of uncertainty
amongst staff but stressed that it was unlikely to result in major differences in the overall knowledge
and skill requirements of LCD staff. The mission stressed that it was important for LCD staff to
work closely with the consultants to ensure requests for information were addressed promptly and
that the consultant’s time was used effectively. The mission therefore recommends that the LCD
consider assigning a suitably senior official on a full time basis to take day to day responsibility
for all LCD training related activities including managing the work program of the consultants.
22. Customs legal advisor. The inception mission for the consultant legal advisor was held from
25 January – 8 February during which time the consultant met with key LCD personnel and obtained
copies of all relevant legal texts. The focus of the consultant’s work will be on assessing the gap
between the current legal framework and the requirements of the WCO Revised Kyoto Convention
(RKC) on the Harmonization and Simplification of Customs Procedures, the WTO Trade
Facilitation Agreement, and relevant ASEAN customs commitments. Early analysis undertaken by
the LCD suggests that a significant amount of revision will be required to the legal framework. The
assignment covers a ten month time period with monthly progress reports and a final report due at
the end of October 2016. The consultant’s inception report is due in April 2016.
23. Time Release Study. The consultant (EMC) has now been engaged to undertake Time Release
Studies (TRS) in 2016 and 2017. The mission met with the consultancy team to discuss the proposed
methodology and study timetable. Based on the current schedule, the 2016 TRS will be launched
by the Deputy Director General of the LDC on February 18, 2016 with data collection activities
expected to be undertaken between March 20, 2016 and May 30, 2016. A draft report will be
prepared by mid-July 2016 and a final accepted report to be delivered to the LCD by mid-August
2016. In meetings with LCD personnel the mission stressed the importance of moving quickly to
launch the 2016 TRS in order to ensure sufficient time between the 2016 and 2017 surveys. The
surveys provide data necessary for monitoring project performance in meeting PDOs and will
contribute to the overall evaluation of project results. LCD officials acknowledged the importance
of the surveys and indicated their full commitment to supporting the consultancy team during their
data collection activities.
24. Customs Valuation Support Database. As reported in the last Implementation Support
Mission Aide Memoire, the LCD has postponed a decision on the valuation support database until
such time as they assess the enhanced functionality available through the latest version of the
ASYCUDA World system. This cannot be tested until such time as the new version is installed. This
was initially scheduled to be implemented by UNCTAD in October 2015 but the LCD was advised
that due to unforeseen circumstance the visit has had to be delayed until February 9 – 23, 2016.
UNCTAD have since advised that they cannot meet this revised timetable and are yet to confirm the
timing of the implementation visit.
25. Lao PDR National Single Window implementation. During the visit the mission and LCD
staff visited the office of the Lao National Single Window (LNSW) concessionaire, Bureau Veritas
(BV) to view a demonstration of the system currently under development. BV advised that Ministry
of Industry and Commerce (MOIC) had selected the licensing process associated with imported
motor vehicles as a pilot. Following successful testing the pilot is currently underway and feedback
to date from public and private sector users has been positive. While the pilot is focused on only one
specific license, the basic functionality demonstrated will apply, with slight modifications, to all
licenses and permits ultimately offered by the system. The approach taken by BV is broadly in line
with the proposed functionality described in the WB-financed LNSW Blueprint developed in 2013.
Aide Memoire – [March 4, 2016]
7
The BV team advised the mission that a joint venture company was established in September 2015
with shares of 30% to the Lao PDR Government and 70% to BV. The company will operate the
LNSW system with fees and any dividends shared in line with the ownership ratios. The company
board will include the Vice Minister of Finance, the Director General of the LCD (MOF), and the
Director General of the Department of Imports and Exports—DIMEX (MOIC).
26. While development of the LNSW is progressing broadly according to the agreed timetable,
full and effective deployment will depend heavily on achieving full interoperability with the
ASYCUDA World. The mission understands the new version of the ASYCUDA World, once
installed (see above) should facilitate connection to the LNSW. Securing the necessary
interoperability will require close coordination between BV and UNCTAD. The BV team agreed to
keep the Bank team briefed on developments and will share relevant information and materials as
they are developed. Once fully operational the LNSW system will provide traders with a single
gateway to submit process and clear all regulatory requirements associated with import, export and
transit activities.
27. Progress on LCD’ initiative to improve law enforcement and anti-smuggling operation.
During the visit the mission met with the Deputy Executive Director of the Environmental Protection
Fund (EPF) to discuss progress on approval of the LCD sub-project proposal for assistance under
the second Lao PDR Environmental and Social Project (LENS-II) to strengthen the LCD’s anti-
smuggling capacity of illegal wildlife trade. The mission was informed that while the important role
played by Customs in combating wildlife and timber smuggling was acknowledged by all, members
of the Technical Committee had raised concerns about the size of the grant requested under the
proposal and specifically the procurement of an ICT system that they believe may fall outside of the
scope of the grant facility. The Deputy Executive Director recommended that the LCD review the
proposal with a view to restructuring the proposed activities into two separate but closely interrelated
phases. Under such an approach, Phase I would support the critically important technical assistance
and advisory elements of the project and Phase II could potentially support procurement of the ICT
system. It was felt such an approach would be more likely to receive support from the entire technical
Committee and would allow time for a thorough examination of specific ICT support requirements.
The mission agreed to convey these recommendations on to the relevant LCD officials and offered
to contribute to redrafting the sub-proposal if the EPF recommendations are accepted. The next
meeting of the EPF Technical committee is scheduled for March 2016 which suggests the necessary
revision should be undertaken promptly.
IV. MONITORING AND EVALUATION
Project implementation remains on track in delivering key outputs and results. The PDO is focused
on improving customs efficiency and the effectiveness of customs administration by simplifying the
customs procedures and reducing the time and cost associated with customs clearance. The
automated selectivity in the Lao AW is in live operation. However, the mission was informed that
no changes were made by LCD to adjust risk profiles and risk parameters. Customs declarations that
are subject to full customs inspection remains at about 51 percent for August –December 2015,
compared to 50.4 percent for October 2014-July 2015, indicating no improvement in the level of
inspection activity since October 2014. Much of risk management based selectivity work still needs
to be further developed through the on-going work on strengthening risk management and
intelligence under the customs capacity enhancement program. Further analysis of customs
performance in terms of efficiency and effectiveness will be captured by the ongoing Time Release
Study (TRS) that was commenced in February 2016, and is expected to be completed by July 2016.
Aide Memoire – [March 4, 2016]
8
Additional measurement of customs performance and efficiency relies on the upcoming World Bank
Enterprise Survey for Lao PDR that will be completed by mid-2016.
V. FIDUCIARY ISSUES
Procurement
28. The overall procurement performance for the CTFP project is “Moderately Satisfactory”.
The detailed status of each procurement package attached in ANNEX 5. Due to the currency
depreciations, the remaining budget is not adequate to finance a number of procurement packages.
Therefore, three shopping packages and two technical assistances packages are suspended and
deleted from the procurement plan. The remaining two goods packages are still delayed from the
expected dates. The procurement post review was conducted and the findings will be provided by
February 29, 2016.
29. Procurement staffing. The project’s procurements have been carried out by a full time
national procurement consultant with the intermittent inputs from the International Procurement
Specialist. There is no government officer assigned to work for the project’s procurement after the
full time national procurement consultant was on board since December 2014. The LCD agreed that
a refresher training on procurement guidelines and procedures will be conducted for senior customs
management officers by the end of March 2016. The training aims to enhance understanding of
senior customs management officers of the LCD in procurement.
Financial Management
30. The overall financial management performance is “Moderately Satisfactory”. While most
project resources are now committed, disbursement is still low and needs to be accelerated given the
remaining time to the project closure. Upgrade of accounting software is also not yet completed.
Remaining funds need to be closely monitored.
31. Disbursement. Disbursement as of February 11, 2016 is 69%, for the total grant US$12.5
million; of which the additional financing grant US$6.5 million is disbursed at 43%. However,
disbursement is still considered low since the project only has about 17 months before project
closure. Based on Client Connection records, the mission also noted the depreciation of SDR against
USD. As of February 11, 2016, the USD equivalent of the grant amount signed is no longer US$6.5
million but only US$6.1 million. Therefore, we strongly recommend that the project team review
every quarterly the remaining funds against funds needed (expected expenditure) to implement
remaining activities to the closure of the project. Refer to sample format in ANNEX 4.
32. External audit. The mission was informed that the field work for the audit of FY14-15 is almost
completed. The auditor is still waiting for certain supporting documents for contributions made by
the government to the project. To ensure that the audit report can be submitted on time, we request
that the project team assists the auditors in following up of the supporting documents required. The
audit report and management letter are due for submission to the World Bank no later than March
31, 2016.
33. Financial reporting. Interim unaudited financial report for the quarter ended September 30 has
been submitted timely without errors. However, variance analysis needs to be improved. The latest
IFR due on February 15, 2016 was submitted on time.
Aide Memoire – [March 4, 2016]
9
VI. CONCLUSION
34. The overall progress of project implementation has been on track with an increasing
disbursement over the past several months. Significant improvements has been made since August
2015 mission by commencing all large technical assistances in customs training center development;
customs capacity enhancement program, customs legal support and time release study (TRS). The
ASYCUDA World that is running live operation in 21 customs checkpoints continues to show
reliability and experiences no disruption in customs clearances. However, the considerable delays
of the UNCTAD support and maintenance, including system upgrade, continue to post serious risks
of potential disruption and vulnerability to system security failure. The mission suggests that LCD
shall document its concerns carefully and seek rapid resolution with the highest levels of
management in UNCTAD to resolve the pending issues promptly. Other challenges are related to
LCD’s capacity to effectively and efficiently manage all signed contracts with attention to high
quality and delivery of large technical assistance outputs so that it will be able to maximize the
benefits of customs capacity enhancement and modernization. The proposed next project
implementation support mission will take place in October 2016.
Aide Memoire – [March 4, 2016]
10
ANNEX 1. List of government officials and stakeholders met during the mission
Name Position Organization
1 Dr. Athsaphangthong Siphandone Director General, Lao Customs
Department/Project Director
MOF
2 Mr. Bounpaseuth Sikounlabout Deputy Director General, Lao
Customs Department/Project Leader
MOF
3 Mr. Anousak Sisa-ad Deputy Director of ICT and Planning
Division, Lao Customs Department
MOF
4 Mr. Vongvanhpheng
Phoumsavanh
Deputy Director of Customs
Exemption Division, Lao Customs
Department
MOF
5 Mr. Phoukhong Ouanlamany Project Analyst, CTFP, Lao Customs
Department
MOF
6 Mr. KetmanySivongsa Financial Management Officer,
CTFP, Lao Customs Department
MOF
7 Ms. Lattanaphone Financial Management Assistant,
CTFP, Lao Customs Department
MOF
8 Mr. Sengphet Thanongsakd National Procurement Consultant,
CTFP, Lao Customs Department
MOF
9 Mr. Thanomsit Khaophibane Deputy Director of Legislation
Division, Customs Department
MOF
10 Mr. Singsavanh Deputy Chief of Thanaleng Customs
Checkpoint
MOF
11 Mr. Bouasone Sayasouk Deputy Chief of Lao-Thai Friendship
Bridge 1 Customs Checkpoint,
Vientiane Capital
MOF
12 Mr. Khamphong Sivilay Deputy Director of Administration
Division
MOF
13 Mr. KhamphanhSoulit Deputy Director of PCA division MOF
14 Mr. Sompasong Amphaengphai Deputy Director of Customs
Procedures and Formalities Division,
Lao Customs Department
MOF
15 Mr. Khamphanh Soulit Deputy Director of PCA division MOF
16 Mr. Sythui Philavong Deputy Director of PCA division
17 Mme. BanesatyThephavong
Director General, Import and
Export Department
MOIC
18 Mr. Frédéric Lamy BIVAC Manager QI-BIVAC
19 Mr. Michael Squirrell International ICT Advisor, ICT and
Planning Division, Lao Customs
Department
MOF
20 Mr. Michael Watts Team Leader, Customs Training
Center Development Program
Nathan
Associates Inc.
21 Mr. Sean Power Senior Consultant, Emerging Markets
Consulting
EMC
Aide Memoire – [March 4, 2016]
11
22 Mr. Bernardo Contri Project Management, Emerging
Markets Consulting
EMC
23 Mr. Phoutavanh Sithammavanh Field Team Leader, Emerging
Markets Consulting
EMC
24 Ms. Manida Unkulvasapaul Consultant EPF
25 Ms. Bounphama Phothisane Deputy Executive Director EPF
26 Mr. Jean-Michel Pavy Senior Environment Specialist WB
ANNEX 2. List of Mission Team Members
1. Konesawang Nghardsaysone, Trade Economist and Task Team Leader (GTCDR)
2. Gerard McLinden, Lead Customs and Trade Facilitation Specialist (GTCDR)
3. Ramesh Siva, Lead Information Specialist (GTIDR)
4. Mombert Hoppe, Senior Trade Economist (GTCDR)
5. Siriphone Vanitsaveth, Financial Management Specialist (GGODR)
6. Souksavanh Sombounkhanh, Program Assistant (EACLF)
7. Sirirat Sirijaratwong, Procurement Specialist (GGODR), also provided remote support from
Bangkok.
8. Alina Phonvisay, Program Assistant (EACLF)
Aide Memoire – [March 4, 2016]
12
ANNEX3. Table of Agreed Actions
TABLE OF AGREED ACTIONS
Action Responsible entity Proposed
timeline Comments
Component A
1.
Document LCD’s concerns carefully and
seek rapid resolution with the highest levels
of management in UNCTAD on AW
support and maintenance activities.
LCD/MOF 1. By February
20, 2016
Ensure no impact on
the live operation and
reliability of the Lao
AW
2. Delay offering internet access to Lao AW
until the system upgrade and the security
flaws are addressed.
2. LCD/IT Team Immediately 3. Reduce exposures to
internet security
threats.
3. Complete the relocation of all backup
servers in the established DRC
LCD/IT February 29,
2016
Ensure a full and live
replication of DRC
4. NCB for the second lot of back-up
generators
LCD/Procurement
Unit
June 2016 Reduce vulnerability
and risk of disruption
by power outage.
Action Responsible entity Proposed
timeline Comments
Component B
5. Training Need Assessment Report LCD/Nathan
Associates
End February
2016
6. HRD Strategy and Implementation Plan LCD/Nathan
Associates
End March
2016
7. Assign a suitably senior official on a full
time basis to take day to day responsibility
for all LCD training related activities
including managing the work program of
the consultants
LCD End of April
2016
Ensure knowledge
transfers and
sustainability
8. Gap Assessment Report of Risk
Management and Intelligence
LCD/QI-BIVAC End of
February
2016
9. Seek clarification on availability of the
expert for performance and client services
standards (CS-12—Customs Capacity
Enhancement Program)
LCD/QI-BIVAC End of March
2016
Ensure no delays in
commencing of the
assignment.
10. Seek clarification on availability of the
expert for administrative appeals (CS-12—
Customs Capacity Enhancement Program)
LCD/QI-BIVAC End of April
2016
Ensure no delays in
commencing of the
assignment.
11. Conduct refresher procurement training for
LCD’ selection committee and
management staff
LCD/Procurement
Advisor
End of March
2016
Raise understanding of
procurement rules and
guidelines
12. Submit the revised Procurement Plan for
NOL
LCD/Procurement
Unit
End of
February
Aide Memoire – [March 4, 2016]
13
ANNEX4. Sample of remaining project fund monitoring
Category
Description
Undisbursed per
Client
Connection
(USD) as of xx
(A)
Commitment
(B)
Unliquidated
advance (C)
Undocumented
expenditure
(including UN
advance) (D)
Total
expected
expenditure
E=B+C+D
Cash and
bank
balances
(F)
Total
remaining
funds
G=A-E+F
Goods, CS,
Non-CS, IOC
& Training
Aide Memoire – [March 4, 2016]
14
ANNEX 5. Revised Procurement Plan
Lao PDR: Customs and Trade Facilitation Project-Additional Financing
I. GENERAL
1. Project information:
Country : Lao PDR
Borrower/Recipient : Ministry of Finance
Project Name : Customs and Trade Facilitation Project - Additional Financing
Project ID No : P144992
Project Implementing Agency : Lao Customs Department, Ministry of Finance
Bank’s approval date of the Procurement Plan:
( O ) : 04 April 2013
(R1) : 10 December 2013
(R2) : 19 May 2014
(R3) : 29 December 2014
(R4) : 01 April 2015
(R5) : 16 October 2015
(R6) : 16 December 2015
(R7): 11 February 2016
2. Date of General Procurement Notice: 3 May 2013
3. Period covered by this procurement plan: 18 months
II. PROCUREMENT OF GOODS and WORKS
1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to
the Guidelines for Procurement:
No. Procurement Method
Procurement
Method
Threshold
Prior
Review
Threshold
Comments
1. ICB (Goods) >= US$600,000 All
2. NCB (Goods) < US$600,000 First contract
3. Shopping (Goods) <= US$100,000
4. Direct Contracting
(Goods) - All
Where justified and subject to IDA’s prior
agreement
2. Procurement of all contracts for Goods financed wholly or partially by IDA will be carried out through the
applicable procurement methods in accordance with the thresholds in the above table and as defined against each
contract package in the procurement plan. Procurement using NCB or shopping procedures will use procedures,
set forth in the Recipient’s Decree of the Prime Minister on Government Procurement of Goods, Construction,
Maintenance and Services, 03/PM dated January 9, 2004, and the Implementing Rules and Regulations on
Government Procurement of Goods, Works, Maintenance and Services, 0861/MOF dated May 5, 2009, including
national standard bidding document with IDA’s prior concurrence, will be followed subject to the improvements
listed in the NCB-Annex to the Legal Agreement.
3. Procurement Packages with Methods and Time Schedule
1 2 3 4 5 6 7 8 9
Ref.
No.
Contract
(Description)
Estimated
Cost
(US$)
Procurement
Method
Prequali-
fication
(yes/no)
Domestic
Preference
(yes/no)
Review
by
Bank
(Prior
/ Post)
Start
Bidding
/
Selection
Process
Comments
Aide Memoire – [March 4, 2016]
15
Component A – Automation Support
G-05 Software for
the helpdesk
(A4.3.1)
20,000 Shopping No No Post (O) Dec.
2013
(R1) Apr.
2014
(R2) Jul.
2014
(R3)
Mar.
2015
(R4)
May
2015
(R5)
Nov.
2015
Deleted.
Local ICT
team will
provide an
alternative.
G-16 CCTV
equipment
(A1.4.5)
100,000 Shopping No No Post (O) Jul.
2013
(R1) Apr.
2014
(R2)
May
2014
(R3) Jun.
2015
Deleted due
to shortfall
in funding—
depreciated
SDR
G-18 Generators for
remaining
international
check points**
(A5.2.2)
250,000 NCB No No Post Dec.
2015
(R1) Jun.
2014
(R2) Oct.
2015
(R3) Jan.
2016
Component B – Organizational Development
G-12 Video
conference
facility for 5
regional offices
(B2.2.3)
30,000 Shopping No No Post (O) Feb.
2014
(R1) Jun.
2014
(R2) Jul.
2014
(R3) Jul.
2015
(R4)
Mar.
2016
Deleted due
to shortfall
in funding—
depreciated
SDR.
G-14 WCO e-
learning
material access
(B2.3)
75,000 Direct
Contracting
(*)
No No Post (O) Apr.
2014
(R1) Jun.
2014
(R2) Oct.
2014
(R3) Jun.
2015
(R4)
Nov.
2015
Consult
Mike Watts
on
prioritization
of e-learning
modules to
be selected.
Aide Memoire – [March 4, 2016]
16
(R5) Apr.
2016
Note:
(*) Direct contracting will be considered subject to request with justifications to be submitted for the
World Bank’s no objection.
(**) Government will finance civil works and minor infrastructure development costs including office
renovation/site preparation for system rollout and disaster recovery center, and training center
(O) Original
(R) Revised
NCB National Competitive Bid
III. SELECTION OF CONSULTANTS
1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the
Guidelines Selection and Employment of Consultants:
No. Selection Method Procurement
Method Threshold
Prior Review
Threshold Comments
1. QCBS, QBS (Firms) > US$100,000 >=US$100,000
2. CQS (Firms) <= US$100,000 First Contract
3. Single Source (Firms) - All Where justified and subject to
IDA’s prior agreement
4. Least Cost Selection - >= US$ 100,000 For Auditor
5. Individual Consultants - Only the fiduciary,
legal and some
long term positions
Comparison of qualifications of at
least three candidates. SSS may be
used where justified and subject to
IDA’s prior agreement
2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost
less than $100,000 equivalent per contract, may comprise entirely of national consultants in accordance with the
provisions of paragraph 2.7 of the Consultant Guidelines
3. Consultancy Assignments with Selection Methods and Time Schedule
1 2 3 4 5 6 7
Ref.
No.
Contract
(Description)
Estimated
Cost
(US$)
Selection
Method
Review
by
Bank
(Prior
/ Post)
Start Bidding
/ Selection
Process
Comments
Component B – Organizational Development
CS-
06
Customs valuation support
database development
(B1.2.2)
150,000 QBS Prior (O) May 2013
(R1) Jan.
2015
(R4) Jun.
2015
Deleted due to shortfall
in funding—
depreciated SDR. LCD
will customize and use
the valuation module in
ASYCUDA World
upon system upgrade
through support and
maintenance to be
provided by UNCTAD.
CS-
07
Risk management
software support (B1.2.3)
150,000 QBS Prior (O) Jun. 2013
(R1) Sep.
2014
Deleted due to shortfall
in funding—
depreciated SDR. LCD
continues to use and
Aide Memoire – [March 4, 2016]
17
1 2 3 4 5 6 7
Ref.
No.
Contract
(Description)
Estimated
Cost
(US$)
Selection
Method
Review
by
Bank
(Prior
/ Post)
Start Bidding
/ Selection
Process
Comments
(R2) Nov.
2014
(R3) Sep.
2015
(R4) Jan.
2016
enhances selectivity in
ASYCUDA World.
Note:
SSS Single-Source Selection
will be considered subject to request with justification to be submitted for the World Bank’s no
objection.
IC Selection of Individual Consultants
QCBS Quality and Cost-Based Selection
CQS Consultants’ Qualifications Selection
QBS Quality-Based Selection
LCS Least-Cost Selection
IV. LIST OF AWARDED AND ON-GOING CONTRACTS
The following tables list the awarded and on-going contracts, and completed contracts.
Goods and Works
Packag
e
Numbe
r
General
Descriptio
n
Estimate
d Value
Contract
Value
Proc.
Method
Review
by Bank
(Prior/Pos
t)
Date of
Contra
ct
Signed
Supplier Status
G-01
Disaster
recovery
servers,
related
hardware
and UPS
($100,000)
and Racks
($20,000)
(A5.3 &
A5.1.4)
120,000 115,319
USD NCB Post
30-Jan-
15
Khampaseu
th
Computer
Co., Ltd
goods
delivere
d
G-02
ICT
hardware
equipment
for
ASYCUD
A geo
rollout and
helpdesk
PCs
(A1.4.1,
A1.4.4 &
A1.4.6)
221,000
2.267.909.6
00 Kip
(282,324
USD)
NCB Prior 26-Sep-
14
Alice
Computer
Co., Ltd
goods
delivere
d
G-03
Network
equipment
(LAN &
184,000 840,966,000
Kip NCB Post
12-Sep-
14
NAMI
Computer
Co., Ltd
goods
deliverin
g
Aide Memoire – [March 4, 2016]
18
WAN);
network
gear
(A1.4.2 &
A1.4.3)
(104,689
USD)
G-04
Additional
licenses for
ASYCUD
A rollout
for 500
users
(A1.4.6)
50,000 113.148
Direct
Contracti
ng
Prior 17-Oct-
12
Strategy
Object
OOD of
Bulgaria
G-04
Additional
licenses for
ASYCUD
A rollout
for 500
users
(A1.4.6)
50,000 34,711
Direct
Contracti
ng
Prior 15-Jan-
16
Strategy
Object
OOD of
Bulgaria
G-05
Additional
licenses for
ASYCUD
A rollout
for 500
users
NA 113,148
Direct
Contracti
ng
Prior 17-Oct-
12
Strategy
Object
OOD of
Bulgaria
G-06
Partition
and
furniture
for disaster
recovery
setup and
LCD
training
center set
up
including
white
board,
shelves
(A5.1.1,
A5.1.2,
B2.2.1 &
B2.2.2)
95,000 706,000,000
Kip Shopping Post
1-Dec-
14
SB Lab 856
Co., Ltd.
Installin
g
complete
d
G-07
Air
Conditioner
s for DRC
and TRC
(A5.1.3 &
B2.2.3)
40,000
440,495,000
Kip
(54,720
USD)
Shopping Post 30-Apr-
2015
Cooler
Master Sole
Co., Ltd.
Installin
g
complete
d
G-10
Generators
for 5
Internation
al check
points and
1
warehouse*
* (A5.2.1)
350,000 239,130
USD NCB Post
13-Jul-
15
NNC
Pharma
Co., Ltd
Installin
g
complete
d
Aide Memoire – [March 4, 2016]
19
G-11
Infrastructu
re
monitoring
tools
(software,
training and
installation)
(A5.4)
50,000 43,230 USD Shopping Post 16-Dec-
15
TK Support
Sole Co.;
Ltd.
G-13
IT and ICT
equipment
for LCD
training
center,
Operational
Training
(Roll out)
and CTFP
Office
30,000
553,410,000
Kip
(68,892
USD)
Shopping Post 16-Oct-
14
Khampaseu
th
Computer
Co., Ltd
goods
delivere
d
G-15
Project
Vehicles
(B6.10)
50,000 59,059 USD Shopping Post 18-Jun-
14
Chevrolet-
Lao Co.,
Ltd.
goods
delivere
d
G-19
ICT
Hardware
for
ASYCUD
A Support
(A1.3.3)
100,000 98,915 USD Shopping Post 13-Jul-
15
Khampaseu
th
Computer
Co., Ltd
Ongoing
G-020
Audio
System and
IT
Equipment
for TRC
(B2.2.6)
33,000 34,711 USD Shopping Post 16-Dec-
15
Khampaseu
th
Computer
Co., Ltd
G-22
ACCPAC
(software,
crease
accounting
code and
training)
(B6.7.1)
20,000 16,830 USD
Direct
Contracti
ng
Prior
Motive
Solutions
(Lao) Co.,
Ltd
TOTAL: 1,343,00
0 1,353,380
Consulting Services
Packa
ge
Numb
er
General
Description
Estimat
ed Value
Contra
ct
Value
Recrui
t.
Metho
d
Review
by Bank
(Prior/Pos
t)
Date of
Contra
ct
Signed
Consultant Status
CS-001
ASYCUDA
Support and
Maintenance
(A1.3.1)
266,000 266,054 SSS Prior 6-Mar-
15 UNCTAD
CS-002 International
IT Specialist 400,000 371,091 IC Prior
8-Aug-
14
Michael David
Squirrell
CS-002 International
IT Specialist 533,499 IC Prior
4-Jan-
16
Michael David
Squirrell
Aide Memoire – [March 4, 2016]
20
CS-003
Local ICT
Support
(including
help desk
establishmen
t) (A4.2)
230,000 191,119 QCBS Prior 27 May
15 NCG Sole Co., Ltd
CS-004
Survey &
Design of
Back-up
Generators
for 11
checkpoints
& LCD
50,000 20,285 IC Post 30-Apr-
14 SomsanithSadettan
CS-05
Time
Release
Studies
(B1.2.1)
100,000 133,441 CQS Prior 15-Jan-
16 EMC
CS-008
Technical
Assistance
for Customs
Training
Center
Developmen
t Program
(B2.1)
400,000 449,770 QCBS Prior 18-Sep-
15
Nathan Associates
Inc.,
CS-010
Customs
Regulation
Specialist
(B3.2)
106,000 44,400 IC Prior 17-
Nov.-14 Thongdy Soulichack
CS-012
Technical
Assistance
for Customs
Capacity
Enhancemen
t Program
(B5.1)
1,000,00
0
1,095,4
15 QCBS Prior
30-Oct-
15 QI-BIVAC
CS-
013-1
Administrati
ve Assistant 32,400 8,640 IC Post
18-Oct-
12
Bangonn
Phommachanh
CS-
013-2
Assistant to
Customs
Advisory
Team
49,600 15,180 IC Post 17-
Nov-14
Phonethipha
Sensoulintha
CS-
013-3
Finance
Assistant 38,000 9,600 IC Post
30-Sep-
14
Thipkesone
Sanasackda
resigne
d
CS-
013-3
Financial
and Admin
Assistant
(B6.2)
38,000 8,400 IC Post
08-
May-
2015
LattanaphoneVannas
ouk
replace
d
CS-014
Project
Analyst
(B6.5)
75,000 28,800 IC Post 17-Dec-
14
Phoukhong
Ouanlamany
CS-015
National
Procurement
Specialist
90,000 42,000 ICS Prior 01-Dec-
14
Sengphet
Thanongsakd
CS-016
National
Finance
Specialist
75,000 61,875 ICS Prior 23-Dec-
14 Ketmany Sivongsa
Aide Memoire – [March 4, 2016]
21
CS-017
Project
Auditor
(B6.8)
20,000 22,836 LCS Prior 25-Mar-
2015
Ernst & Young Lao
Co., Ltd.
CS-018
International
Procurement
Advisor
(B6.6.2)
120,000 104,636 IC Prior 3-Apr-
2015 Mr. Marian Nenita
CS-20
International
Legal
Advisor
(B3.1)
150,000 153,847 IC Prior 30-Oct-
15 Mr. Thomas Walsh
CS-021
Technical
Supervision
of the
Installation
of
Generators
Consultant
(A5.2.2)
8,000 6,370 SSS Prior 20-Sep-
15 Somsanith Sadettan
TOTAL: 3,248,00
0
3,196,1
67
VI. LIST OF CONTRACTS TO BE EXTENDED (CONSULTING SERVICES)
Packag
e No.
Descriptio
n Budget
Spent
to Date
Price of
Service
in the
Previou
s Period
Price of
Extensio
n
(+ 2%
approx.)
Period of
Extension
Consultant Comment
s Signe
d End
CS-010
Customs
Regulation
Specialist
(B3.2)
106,00
0 44,400 44,400 44,880
17-
Nov-
15
16-
Nov-
16
Thongdy
Soulichack
Annual
Extension
CS-
013-3
Financial
and Admin.
Assistant
(B6.2)
38,000 18,000 8,400 8,568
11-
May-
16
10-
May
-17
Lattanaphon
e
Vannasouk
Annual
Extension
CS-014
Project
Analyst
(B6.5)
75,000 57,600 28,800 29,376
29-
Nov-
15
28-
Nov-
16
Phoukhong
Ouanlamany
Annual
Extension
CS-015
National
Procuremen
t Specialist
(B6.6.1)
90,000 42,000 42,000 42,840
01-
Dec-
15
30-
Nov-
16
Sengphet
Thanongsak
d
Annual
Extension
CS-021
Technical
Supervision
of the
Installation
of
Generators
Consultant
(A5.2.2)
8,000 6,370 6,370 6,497
1-
Dec-
15
15-
Feb-
16
Somsanith
Sadettan
For
second
batch of
generators
TOTAL: 317,00
0
168,37
0 132,161
Aide Memoire – [March 4, 2016]
22
ANNEX 6. List of International Customs Checkpoints with live operation of the ASYCUDA World
System
Table 1. Additional Financing –Geographical Rollout of 10 checkpoints
Checkpoints Date of rollout completion Network Connection Mode
Phoukeu (Attapeu) 9-Feb-15 Fibre
Naphao (Khammouan) 11-Feb-15 Fibre
Paksan (Bolikhamsay) 18-Feb-15 Fibre
Namkan (XiengKhouang) 1-Mar-15 Fibre
Namngern (Xayabouly) 2-Mar-15 Fibre
Nongnokkhien (Champasack) 1-Apr-15 Internet 3G
Phoudou (Xayabouly) 2-Apr-15 Internet 3G
Pahang (Houaphanh) 6-May-15 Internet 3G
Banmom (Bokeo) 7-May-15 Internet 3G
Panghok (Phongsaly) 18-May-15 Internet 3G Note: Pakse and LuangPrabang Airports are not deployed with the system because of limited volume of trade.
Table 2. Original Financing – Main rollout in 11 checkpoints
and the Rollout of SmartTax System in 2015
Checkpoints Date of rollout
completion
Network
Connection
Mode
SmartTax
Rollout in
2015
Boten (LuangNamtha) 2012 Fibre Yes
Namphao (Bolikhamxay) 2012 Fibre
Friendship Bridge 1 (Vientiane
Capital) 2011 Fibre
Yes
Friendship Bridge 2 (Savannakhet) 2012 Fibre Yes
Friendship Bridge 3 (Khammuan) 2012 Fibre Yes
Friendship Bridge 4 (Bokeo) 2012 Fibre Yes
Vangtao (Champasack) 2012 Fibre Yes
Dansavanh (Savannakhet) 2012 Fibre Yes
Namheuang (Xayabouly 2012 Fibre
Namsouay (Houaphanh) 2012 Fibre
Wattay International Airport
(Vientiane Capital)
2012 Fibre
Yes
Aide Memoire – [March 4, 2016]
23
ANNEX7. Attached an update to the Result Framework
Revised Project Results Framework – Customs and Trade Facilitation Project
Project Development Objective (PDO): To facilitate trade by improving the efficiency and effectiveness of customs administration and simplifying customs procedures to eliminate
duplication and redundancy, reduce transactions costs and time to clear goods, and increase transparency and accountability.
PDO Level Results
Indicators Co
re
UOM5
Baseline
Original
Project
Start
(2009)
Progress
To Date
(2012)
Cumulative Target Values
Frequen
cy
Data
Source/
Methodolog
y
Responsibi
lity for
Data
Collection
Comments 2013 2014 2015 2016
1. Reduction in mean
import, export and
transit clearance
times for commercial
shipments by 10
percent per year.
Hours 17.9
11.2 10.1 9.1 8.2 7.4 Every 1-
2 years
Time
Release
Survey
(TRS)
LCD
Reduction in mean
time to clear imports
of 34% during 2009-
12 Actual 11.2 11.2 11.26
2. Reduction in the
number of steps to
clear commercial
shipments by 25
percent.
Number
of steps
9 / 7
(import /
export)
5 / 4 5 / 4 4 / 3 4 / 3 4 / 3
Every 1-
2 years
LCD
regulations LCD
Reduction in number
of steps to import
from 9 to 5 and to
export from 7 to 4
during 2009-12 Actual 5 / 4 5 / 4 5 / 4
3. Increase in the
ratio of
detections/inspections
by 10 percent per
year [based on
available ASYCUDA
data and reports for
the purposes of
customs control].
% N/A
1.2 1.5 1.9 2.3 2.9
Annual
ASYCUDA
management
reports
LCD
Indicator of increased
use and effectiveness
of customs risk
management and
ASYCUDA
selectivity Actual No data 0.887 0.918 0.91
5 UOM = Unit of Measurement. 6 Tracking the indicator by using the TRS2012 since no new TRS data is available. The 2016 TRS is now under way and data will be available in July 2016. 7 The ratio was calculated based on the selectivity data (October 2013-March 2014) from the Lao Customs Department 8 The ratio was calculated based on the selectivity data (Nov 2014 – July 2015) from the Lao Customs Department.
Aide Memoire – [March 4, 2016]
24
4. Increase in client
perceptions of
customs performance
and integrity as
measured by World
Bank survey results
by 25 percent.
Index 2.08
2.38 2.5 2.6 2.7 2.8 Every 2-
3 years
Logistics
Performance
Index (LPI)
WB
Sustained
improvements in
performance as
measured by the LPI.
Next LPI to be issued
in 2016 Actual 2.38 2.45 2.45
Intermediate Results and Indicators
Intermediate Results
Indicators Co
re
UOM
Baseline
Original
Project
Start
(2009)
Progress
To Date
(2012)
Target Values
Frequen
cy
Data
Source/
Methodolog
y
Responsibi
lity for
Data
Collection
Comments 2013 2014 2015 2016
Intermediate Result 1:Improved customs processes and procedures.
1. Full acceptance of
electronic data
submission for
customs declaration
procedures by the end
of 2013
Text
Not
initiated
Partially
completed
Comple
ted
Progress
reports LCD
Pilot would
be completed
by next
mission (Jan
2016)
Partiall
y
complet
ed
Partially
completed
: Pilot to
be
conducted
Intermediate Result 2: Improved ICT infrastructure which supports the implementation of the new customs processes and procedures and is sustainable and reliable.
2. Prototype
developed and
accepted by
government
Text Not
initiated Completed
Progress
reports LCD
Task completed at
AF approval
3. Accepted
prototype validated at
pilot site
Text Not
initiated Completed
Progress
reports LCD
Task completed at
AF approval
Aide Memoire – [March 4, 2016]
25
4. Prototype
replicated at
remaining checkpoint
sites
Text Not
initiated
Planned 11
check point
Completed
Progress
reports LCD
Original No. of
checkpoint to
replicate was 11. AF
finances additional
12 checkpoints.
5. Integrated ICT
system is in place by
2011, pilot completed
and reviewed by
2012, and fully
operational in all
implementation sites
by 2014.
Text Not
initiated
Original 11
checked
point
completed
Complete
d: Roll out
at 10 out
of 12
check
points
completed
Progress
reports LCD
AF covers
additional 12
sites to roll
out the
prototype.
However, the
remaining
two
checkpoint
would be
dropped from
the plan due
to its little
volume
traded.
6. Appropriate front
line staff and affected
traders trained in
advance of pilot
testing and pre
nationwide rollout.
Text Not
initiated
Original 11
checked
point
completed
Roll out at
10 out of
12 check
points
completed
Progress
reports LCD
AF covers additional
12 sites to roll out the
prototype by end of
the project