Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
WESTERN RAILWAY
LAW BOOK 2017-18
( JUNE 2017 )
Page No.
From To
1 Summary of Alloted Funds - Plan Head Wise I -
2 Distribution of outlays for the Works under Board, GM & DRM's Power II IV
3 PH 16 - Traffic Facilities - Yard Remodelling & Others 1 3
4 PH 17 - Computerisation 3 5
5 PH 29 - Road Safety Works- Level Crossings 6 12
6 PH 30 - Road Safety Works- Road Over/Under Bridges 12 29
7 PH 31 - Track Renewals 29 49
8 PH 32 - Bridge Works 49 52
9 PH 33 - Signalling & Telecommunication Works 53 59
10 PH 36 - Other Electrical Works 60 61
11 PH 37 - Traction Distribution Works 61 64
12 PH 42 - Workshop - Including Production Units 64 65
13 PH 51 - Staff Quarters 66 67
14 PH 52 - Amenities for Staff 68 71
15 PH 53 - Passenger and Other Railway Users' Ameniites 71 75
16 PH 64 - Other Specified Works 75 78
17 PH 65 - Training/HRD - -
18 Summary 79 -
I N D E X
Sr. Particulars
Page No. : I
( Figures in thousands of Rs. )
Sr.No. Plan Heads Cap. DRF DF(1) DF(2) DF(3) DF(4) S.Fund RRSK Total
1 16- Traffic Facilities 18180 2532 1000 21000 800 43512
2 17- Computerisation 40000 3800 43800
3 29- Road Safety Works - Level Crossings 160000 160000
4 30- Road Safety Works - ROB/RUB 614957 614957
5 31- Track Renewals 1000800 1000800
6 32- Bridge Works 80000 80000
7 33- Signalling & Telecommunication Works 4800 260000 264800
8 36- Other Electrical Works 31505 2766 23100 57371
9 37- Traction Distribution Works 116289 116289
10 42- Workshop - Including Production Units 10690 20730 19531 16000 66951
11 51- Staff Quarters 21399 51397 72796
12 52- Amenities for Staff 15000 30300 63500 108800
13 53- Passenger Amenity 149843 302792 452635
14 64- Other Specified Works 154200 9700 5500 20300 189700
15 65- Trainning/HRD 407899 407899
Total 224269 336007 307592 476899 63597 0 0 2271946 3680310
WESTERN RAILWAY
Assets - Acquisition, Construction and Replacement for 2017-18
PLAN HEAD WISE SUMMARY OF ALLOTTED FUNDS WITH ALLOCATIONS( Works costing below Rs. 2.5 crores )
(Figures in thousands of Rs.)
Itemised Works Reserve
1 16- Traffic Facilities Cap. 18180 1000 15210 1970 DRF 2532 500 1232 800 DF(1)DF(3) 20000 1979 12161 2360 600 300 200 700 200 1500 RRSKTotal 40712 2979 27371 4330 600 800 200 1932 1000 1500
2 17- Computerisation DRF 20000 17854 2146 DF(1) 800 5 795 Total 20800 5 17854 2941
3 29- RSW-LC Gates RRSK 150000 61499 72234 13170 1000 2097
4 30- RSW-ROB/RUB RRSK * * 556857 556857
5 31- Track Renewal RRSK 350000 85000 261000 1000 3000
6 32- Bridge Works RRSK * * 75000 21200 53800
7 33- Signal & Telecom Works Cap. 4800 1250 2 3548 RRSK 200000 19000 167749 6251 500 2500 500 500 500 2500 Total 204800 20250 167751 9799 500 2500 500 500 500 2500
8 36- Other Electrical Works DRF * * 24005 20845 1326 54 1198 582 DF(3) * * 2766 407 509 1850 RRSK * * 23100 11106 11994 Total 49871 31951 13727 54 509 1850 1198 582
9 37- Traction Distribution Works RRSK * * 53091 19419 21049 546 6022 2856 1910 1289
10 42- Workshop Cap. 690 100 590 DRF 20730 18988 1503 239 DF(3) 17531 13099 2733 1699 RRSK 16000 10000 6000 Total 54951 23099 27821 1503 1699 829
11 51- Staff Quarters Cap. 20399 4225 16174 DRF 48397 2000 46397 Total 68796 6225 62571
12 52- Amenities for Staff Cap. 14000 8701 4689 600 10 DRF 27300 10100 16700 500 DF(2) 62500 16000 39800 4700 1000 1000 Total 103800 34801 56500 9889 1000 1000 600 10
13 53- Passenger Amenity DRF 130087 31245 755 45000 4500 11000 13000 13500 11087 DF(1) 242527 119346 10654 30500 19000 27000 12000 12000 12027 Total 372614 150591 11409 75500 23500 38000 25000 25500 23114
14 64- Other Specified Works Cap. 153200 140000 13200 DRF 8700 700 7330 300 270 100 DF(2) 5500 4299 701 500 DF(3) 19300 1600 15300 1500 250 250 200 200 Total 186700 146599 23331 13500 1500 1020 350 200 200
15 65- Other Specified Works DF(2) 407899 407899
Grand Total 2695891 453027 1512457 475040 87821 32185 45907 28921 28798 30906 829
* * New works fund is transferred to Works in progress
LB 2017-18 : WORKS IN PROGRESS
Distribution of outlays for the Works under Board's Power, GM's Power and DRM's Power
Sr No. Planhead Alocation Total Provision Under Board's Power
Under GM's Power Under DRM BCT
Under DRM BRC
Under DRM RTM
Under DRM ADI
Under DRM RJT
Under DRM BVP
Under CWM/PLW
Page No. II
(Figures in thousands of Rs.)
Itemised Works Reserve
1 16- Traffic Facilities Cap.DRFDF(1) 1000 250 150 150 150 150 150 DF(3) 1000 900 100 RRSK 800 800 Total 2800 900 1150 150 150 150 150 150
2 17- Computerisation DRF 20000 19035 965 DF(1) 3000 3000 Total 23000 19035 3965
3 29- RSW-LC Gates RRSK 10000 3500 4750 250 500 500 250 250
4 30- RSW-ROB/RUB RRSK * * 58100 53545 4555
5 31- Track Renewal RRSK 650800 800 650000
6 32- Bridge Works RRSK * * 5000 1000 3500 500
7 33- Signal & Telecom Works Cap.RRSK 60000 51500 2000 1500 1500 1500 1000 1000 Total 60000 51500 2000 1500 1500 1500 1000 1000
8 36- Other Electrical Works DRF * * 7500 4000 500 500 500 500 500 500 500 DF(3) * *RRSK * *Total * * 7500 4000 500 500 500 500 500 500 500
9 37- Traction Distribution Works RRSK 63198 3000 45081 4919 4198 2000 2000 2000
10 42- Workshop Cap. 10000 10000 DRFDF(3) 2000 2000 RRSKTotal 12000 2000 10000
11 51- Staff Quarters Cap. 1000 1000 DRF 3000 2900 100 Total 4000 2900 1100
12 52- Amenities for Staff Cap. 1000 1000 DRF 3000 2000 940 10 10 10 10 10 10 DF(2) 1000 800 140 10 10 10 10 10 10 Total 5000 2800 2080 20 20 20 20 20 20
13 53- Passenger Amenity DRF 19756 1 4800 3300 3299 3300 2500 2556 DF(1) 60265 16000 8000 7500 6500 6500 6700 4500 4565 Total 80021 16001 8000 12300 9800 9799 10000 7000 7121
14 64- Other Specified Works Cap. 1000 1000 DRF 1000 940 10 10 10 10 10 10 DF(2)DF(3) 1000 800 140 10 10 10 10 10 10 Total 3000 800 2080 20 20 20 20 20 20
15 65- Trainning/HRD DF(2)
Grand Total 984419 12400 847962 43599 19188 14240 14489 14690 8940 8911
* * New works fund is transferred to Works in progress
Under CWM/PLW
LB 2017-18 : NEW WORKS
Distribution of outlays for the Works under Board's Power, GM's Power and DRM's Power
Sr No. Planhead Alocation Total Provision Under Board's Power
Under GM's Power Under DRM BCT
Under DRM BRC
Under DRM RTM
Under DRM ADI
Under DRM RJT
Under DRM BVP
Page No. III
( Figures in thousands of Rs. )
Itemised Works Reserve
1 16 - Traffic Facility 43512 2979 28271 5480 750 950 350 2082 1150 1500
2 17 - computerisation 43800 5 36889 6906
3 29 - RSW - LC Gates 160000 61499 75734 17920 1000 250 2597 500 250 250
4 30 - RSW - ROB/RUB 614957 610402 4555
5 31 - Track Renewals 1000800 85800 911000 1000 3000
6 32 - Bridge Works 80000 22200 57300 500
7 33 - Signalling & Telecom. Works 264800 20250 219251 9799 2500 4000 2000 2000 1500 3500
8 36 - Other Electrical Works 57371 35951 13727 554 500 1009 2350 500 1698 1082
9 37 - Other Traction Works 116289 22419 66130 5465 10220 4856 3910 3289
10 42 - Workshops 66951 23099 29821 11503 1699 829
11 51 - Staff Quarters 72796 6225 65471 1100
12 52 - Amenities For Staff 108800 37601 56500 11969 1020 1020 20 20 620 30
13 53 - Passenger Amenity 452635 166592 19409 87800 33300 47799 35000 32500 30235
14 64 - Other Specified Works 189700 147399 23331 15580 1520 1040 370 220 20 220
14 65 - Trainning / HRD 407899 407899
Grand Total 3680310 465427 2360419 518639 107009 46425 60396 43611 37738 39817 829
Under GM's Power Under DRM BCTPlanhead Under
DRM BRCUnder
DRM RTMUnder
DRM ADIUnder
DRM RJTUnder
DRM BVPUnder
CWM/PLW
LB 2017-18 : GRAND SUMMARY
Page No. IV
Distribution of outlays for the Works under Board's Power, GM's Power and DRM's Power (Works in Progress and New Works)
Sr No. Total Provision Under Board's Power
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 1
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
A - Works in Progress
Mumbai1 Bandra Terminus - Provision of shunting neck at DF(3) 1,06,90 37,06 17,50 52,34
south of coaching yard.
2 Boisar - Provision of OHE wiring for 400 m towards Cap. 91,42 .. 20,00 71,42
Tarapur siding to avoid main line blocking
3 Dadar Junction - Providing entry and exit from Cap. 70,86 8,15 50,00 12,71
south side
4 Lower parel-Removal of trap point and provision of DF(3) 96,91 26,25 15,00 55,66
dead end.
5 Churchgate - Construction of Guards & Motorman DF(3) 1,26,66 1,17,49 10 9,07
lobby. (BCT/S/09-10)
6 Bhestan:- Providing new foot over bridge. DF(3) 1,29,39 1,16,60 4,00 8,79
Vadodara7 Vadodara:-Shfting of Running Room from BRCY to DF(3) 30,71 .. 1,00 29,71
BRCP
8 Anand:-Direct Placement and Removal at goods Shed Cap. 97,95 69,36 28,59 ..
Ratlam9 Ujjain-Direct reception / dispatch facility from DF(3) 97,90 48,93 10,00 38,97
line No. 10 (pilgrim plateform No. 8) by providingreception and dispatch signal towards BPL.
Ahmedabad10 Kankariya Goods shed :- Provision of CC approach DF(3) 89,87 81,04 1 8,82
road between out ward PF no.3 and cover goods shedPF.
11 Shirva- Provision of one interlocked cross over Cap. 89,44 16,11 1,00 72,33
between goods line No. 1 & 2 and Down main line.
12 Provision of IBS between Gandhidham Block Cabin to Cap. 1,91,60 .. 10,00 1,81,60
Adipur on both UP and DN line. The IBS should beplanned in such a way that this will bifurcate theblock section almost into half. No gradient whichwill effect the stalling of train to be there in
13 Provision of Intermediate Block stop signal DF(3) 2,74,67 2,54,88 19,79 ..
between Ambli road – Sanand – Ambli road section(Both up and down lines).IBS to be planned in suchlocation on both the lines which will bifurcatethe block section almost halve.No such gradients
14 Ahmedabad BG- Repair of PIT line no 4 catwalk and DF(3) 88,80 38,71 10,00 40,09
pillars and hydrant main water pipe line +charging and precooling points needs replacementas corroded badly at ADI BG pit lines.
15.01.16.16.2.50.001
15.01.16.12.2.13.001
15.01.16.15.3.50.001
15.03.16.10.3.52.002
15.06.16.16.3.55.001
15.06.16.15.3.55.001
15.05.16.15.6.54.001
15.01.16.14.3.50.001
15.01.16.15.3.50.002
TRAFFIC FACILITIES
15.03.16.14.3.52.001
15.03.16.15.3.52.002
15.03.16.15.6.52.001
15.03.16.15.3.52.001
15.03.16.09.3.52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 2
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Rajkot15 Navlakhi :- Provision of Hepper key transmitters Cap. 32,56 9,28 2,50 20,78
at Navlakhi.
16 OKHA:- conversion of non running line 04 into DF(3) 85,73 1,52 25,00 59,21
running line by provision of cross over from mainline to shunting neck
17 Hapa :- Improvement in C&W yard facility at Hapa. DF(3) 32,05 15,72 5,00 11,33
18 Okha :- Stabling line along side of pit line. Cap. 99,01 98,31 1 69
(RJT/U/1-12)
19 Rajkot : - Improvement in existing Goods Yard to DF(3) 91,11 64,08 3,00 24,03
make fit for reception and dispatch ofPassenger trains.(Main Line of Goods Yard)
20 Bhaktinagar - Yard remodeling for providing DF(3) 63,09 .. 31,00 32,09
universal simultaneous reception facility at
21 Rajkot - Okha Section - Yard remodeling for Cap. 63,45 .. 50,00 13,45
providing universal simultaneous receptionfacility at MDPR and track work for providingadditional platform at KMBL.
Mumbai22 Works costing below DRM's Power DF(3) 6,00 .. 6,00 ..
Vadodara23 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
DF(3) 3,00 .. 3,00 ..
Ratlam24 Works costing below DRM's Power DF(3) 2,00 .. 2,00 ..
Ahmedabad25 Works costing below DRM's Power DRF 12,32 .. 12,32 ..
DF(3) 7,00 .. 7,00 ..
Rajkot26 Works costing below DRM's Power DRF 8,00 .. 8,00 ..
DF(3) 2,00 .. 2,00 ..
Bhavnagar27 Works costing below DRM's Power DF(3) 15,00 .. 15,00 ..
TOTAL-WORKS IN PROGRESS Cap. .. .. 1,62,10 ..
DRF .. .. 25,32 ..
DF(3) .. .. 1,76,40 ..
B - New Works
Ratlam28 Indore-Shifting of Lobby to new Location. DF(3) 16,65 .. 4,50 12,15
Ahmedabad29 Ahmedabad :- Improvement of lighting of BG yard by DF(3) 22,82 .. 4,50 18,32
providing high mast at.
Mumbai30 Works costing below DRM's Power DF(1) 1,50 .. 1,50 ..
15.01.16.17.3.50.001
15.03.16.17.3.00.999
15.06.16.17.3.00.999
15.05.16.17.3.00.999
15.01.16.17.3.00.999
15.04.16.17.3.00.999
15.02.16.17.3.00.999
15.05.16.17.3.54.001
15.04.16.15.3.53.002
15.04.16.11.3.53.001
15.04.16.12.3.53.001
15.04.16.16.6.53.001
15.04.16.16.6.53.002
15.03.16.17.3.00.999
TRAFFIC FACILITIES
15.04.16.15.3.53.001
15.04.16.14.3.53.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 3
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Vadodara31 Works costing below DRM's Power DF(1) 1,50 .. 1,50 ..
Ratlam32 Works costing below DRM's Power DF(1) 1,50 .. 1,50 ..
Ahmedabad33 Works costing below DRM's Power DF(1) 1,50 .. 1,50 ..
Rajkot34 Works costing below DRM's Power DF(1) 1,50 .. 1,50 ..
TOTAL-NEW WORKS DF(1) .. .. 7,50 ..
DF(3) .. .. 9,00 ..
TOTAL-Traffic Facilities Cap. .. .. 1,62,10 ..
DRF .. .. 25,32 ..
DF(1) .. .. 7,50 ..
DF(3) .. .. 1,85,40 ..
A - Works in Progress
Headquarter35 Replacement of 32 SMC at 28 suburban stations DRF 28,18 .. 10 28,08
36 Western Railway:- Replacement of PRS ticket DRF 21,15 21,11 .. 4
printer at various locations.
37 Western Railway:- Replacement of 180 high speed DRF 37,37 32,29 5,08 ..
UTS ticket printer.
38 Western Railway:- Replacement of 155 nos. LCD dumb DRF 44,71 .. 40,50 4,21
terminals with keyboard at various PRS locations(phase 1).
39 Western Railway:- Replacement of 26 Heavy Duty DRF 42,22 35,91 6,31 ..
Chart (Line Matrix) printers at various chartingPRS locations.
40 Western Railway:- Replacement of 84 PRS report DRF 8,79 7,19 1,60 ..
printers at various locations.
41 Western Railway - Replacement of 82 nos. LCD dumb DRF 14,26 .. 14,26 ..
terminals with keyboards against existingterminal/keyboards at various PRS location
42 Western Railway - Replacement of 88 nos. Terminal DRF 30,13 .. 30,13 ..
Servers
43 Western Railway - Replacement of 414 nos. UTS DRF 48,08 .. 48,08 ..
Ticket Printers
44 Replacement of CMS equipments of WR DRF 18,65 8,07 10,58 ..
45 Replacement of Datacom Equipment of FOIS DRF 39,92 .. 10 39,82
46 Replacement of Datacom equipment for FOIS at 10 DRF 22,71 .. 10 22,61
locations
15.00.17.13.6.12.002
15.00.17.14.3.12.001
15.00.17.16.3.12.001
15.00.17.16.3.12.002
15.00.17.16.3.12.005
15.00.17.16.3.12.004
15.00.17.16.3.12.003
15.00.17.13.6.12.001
15.04.16.17.3.00.999
COMPUTERISATION
15.00.17.12.3.12.005
15.00.17.15.3.12.002
15.00.17.15.3.12.005
15.00.17.15.3.12.004
TRAFFIC FACILITIES
15.06.16.17.3.00.999
15.05.16.17.3.00.999
15.01.16.17.3.00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 4
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
47 Ahmedabad and Ratlam Divisions:- Converting 9.6 DRF 31,79 .. 1 31,78
Kbps and MUX based PRS locations with 2Mbps IPbased connectivity.
48 Replacement of over aged Datacom Equipment near of DRF 47,26 .. 1 47,25
more than 8 year old installed at FOIS locationover Western Railway
Mumbai49 Provision of 86 terminal servers DF(1) 35,00 22,91 1 12,08
50 Provision of 93 switches. DF(1) 29,00 21,20 1 7,79
51 Provision of 65 LAN extenders. DF(1) 10,00 7,31 1 2,68
52 Provision of 5, 2 MBPS routers. DF(1) 6,00 4,40 1 1,59
53 Provision of PC based charting. DF(1) 10,93 .. 1 10,92
54 Replacement of 1 No. fast report printers. DRF 79 .. 1 78
55 Mumbai Division:- Replacement of existing out DRF 50,00 25,02 10 24,88
dated computers & printers along with furniture ofEngineering department.
56 Replacement of equipments for FOIS Terminals – DRF 10,50 9,39 1 1,10
Procurement of Computers, printers andperipherals.
57 Mumbai Division-Replacement of over aged UPS on DRF 47,08 .. 10 46,98
age cum condition basis
Vadodara58 Vadodara Division:-Replacement of FOIS and TMS DRF 13,32 6,47 1 6,84
computer system on BRC Division.
59 Vadodara Division: Replacement of over aged UPS of DRF 34,58 .. 10 34,48
PRS/UTS installations at various stations.
60 Vadodara division:-Replacement of over aged Crew DRF 4,36 .. 3,48 88
Management System (CMS) Equipment at Vadodara,Vadodara yard and Godhra crew lobbies.
Ratlam61 Ratlam Division-Replacement of FOIS(TMS) equipment DRF 23,48 4,56 15,00 3,92
at various TMS Locations in Ratlam Divsion.
62 Ratlam Division -Replacement of UPS for UTS and DRF 41,96 .. 10 41,86
PRS on age cum condition basis.
63 Ratlam Division-Replacement of over aged CMS DRF 4,51 .. 2,51 2,00
equipment at Ratlam, Ujjain and Indore Crewlobbies.
Ahmedabad64 Ahemdabad Division - Replacement of equipments for DRF 14,91 11,85 1 3,05
FOIS Terminals – Procurement of Computers,printers and peripherals.
15.05.17.16.3.54.001
15.05.17.16.3.54.002
15.01.17.10.3.12.001
15.03.17.10.3.12.003
15.03.17.16.3.52.001
15.06.17.13.6.12.001
15.06.17.16.3.55.002
15.06.17.16.3.55.001
15.05.17.14.3.12.001
15.03.17.07.2.12.004
15.03.17.07.2.12.002
15.03.17.07.2.12.001
15.03.17.08.2.12.003
15.03.17.08.3.12.002
15.03.17.10.3.52.001
COMPUTERISATION15.00.17.15.3.12.003
15.00.17.15.3.12.001
15.03.17.07.2.12.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 5
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
65 Ahemdabad Division - Replacement of equipments for DRF 27,51 18,90 1 8,60
FOIS Terminals – Procurement of Computers,printers and peripherals.
66 Ahmedabad Division:- Replacement of UPS of various DRF 42,37 .. 10 42,27
capacity at various locations on Age cum conditionbasis.
Rajkot67 Rajkot Division - Procurement of 41 Nos. of PCs & DRF 19,20 12,04 1 7,15
38 Nos. Printers on replacement account forOperating Department.
68 Rajkot Division - Procurement of 04 computers with DRF 2,38 1,58 1 79
UPS and printers on replacement account forCOIS/ICMS system.
69 Rajkot : Providing Compurasied system in wards of DRF 3,79 3,61 1 17
Divisional Hospital at.
70 Rajkot Division : Proposal for replacement of DRF 41,49 .. 10 41,39
online UPS for PRS/UTS/FOIS/ATVM
Bhavnagar71 Bhavnagar Division -Proposal for personal computer DRF 3,07 .. 1 3,06
sets and UPS for FOIS work on replacement account.
TOTAL-WORKS IN PROGRESS DRF .. .. 1,78,54 ..
DF(1) .. .. 5 ..
B - New Works
Headquarter72 Western Railway - Replacement of 35 nos of Heavy DRF 61,03 .. 61,03 ..
Duty Chart (Line Matrix) Printers at Charting PRSLocations
73 Western Railway - Raplacement of 318 nos. PRS DRF 24,62 .. 24,62 ..
Ticket Printers at various PRS Locations
74 Western Railway - Replacement of 36 nos. Report DRF 3,76 .. 3,76 ..
Printers at PRS locations
Mumbai75 Western Railway-Replacemnt of 220 nos. high speed DRF 49,18 .. 40,00 9,18
uts ticket printers at UTS lcoations
76 Mumbai Division -Replacement/ Renewal of Hardware DRF 30,94 .. 30,94 ..
Equipments of Crew Management System at BDTS, BL,UDN & NDB Crew Lobbies .
Vadodara77 Vadodara Division-Replacement of old UPS of DRF 39,27 .. 30,00 9,27
PRS/UTS and PRS cum UTS installations at variousstations in Vadodara division.
TOTAL-NEW WORKS DRF .. .. 1,90,35 ..
TOTAL-Computerisation DRF .. .. 3,68,89 ..
DF(1) .. .. 5 ..
15.00.17.17.3.12.001
15.00.17.17.3.12.003
15.03.17.17.3.12.002
15.03.17.17.3.52.001
15.06.17.17.3.55.001
15.04.17.13.6.12.001
15.04.17.14.3.12.001
15.04.17.14.3.12.002
15.04.17.16.3.53.001
15.02.17.13.6.12.001
15.00.17.17.3.12.002
COMPUTERISATION15.01.17.14.3.12.001
15.01.17.16.3.50.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 6
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
A - Works in Progress
Headquarter78 Western Raiilway:-Providing Automatic Banner Flag S.Fund .. .. .. ..
at Manned non interlocked Level X-ings on Mumbai, RRSK 1,79,66 .. 1,79,66 ..
Vadodara, Ratlam, Ahmedabad, Rajkot and BhavnagarDivision of Western Railway. Total 931 Nos. ofLevel X-ings.
Mumbai79 Udhna-Jalgaon section: Providing 2nd whistle S.Fund .. .. .. ..
boards under ADEN/VYA and ADEN/NDB. RRSK 16,23 .. 2 16,21
80 Bhilad- Valsad :- Provision of IPS at 10 LC gates S.Fund .. .. .. ..
RRSK 1,80,01 .. 1,00,00 80,01
81 Virar-Surat Section:- Improvement of LC gates by S.Fund .. .. .. ..
replacement of new PRC sleepers on various L.C. RRSK 50,27 .. 1,00 49,27
and paver block etc. under ADEN/DRD section.(BCT/S/09-10)
83 Virar-Surat Section:- Rebuilding of gate lodge, S.Fund 15,29 15,29 .. ..
providing gang tool room &providing toilet with RRSK 82,26 .. 1,00 81,26
sock pit etc. under various L.C Under ADEN DRD.(BCT/U/10-11)
85 Virar-Surat Section:- Rebuilding of gate lodge, S.Fund 15,29 6,89 .. 8,40
providing gang tool room & providing toilet with RRSK 81,01 .. 10 80,91
sock pit etc. under various L.C Under ADEN ST .(BCT/U/10-11)
87 Udhna-Jalgaon Section:- Interlocking of LC No. 5. S.Fund 79,21 78,51 .. 70
(BCT/U/11-12) RRSK 4,42 .. 4,42 ..
89 Udhna-Jalgaon Section:- Interlocking of LC No. 28. S.Fund 83,29 78,51 .. 4,78
(BCT/U/11-12) RRSK 34 .. 34 ..
91 Udhna-Jalgaon Section:- Interlocking of LC No. 40. S.Fund 79,21 79,21 .. ..
(BCT/U/11-12) RRSK 4,42 .. 50 3,92
93 Udhna-Jalgaon Section:- Interlocking of LC No. 54. S.Fund 83,45 78,42 .. 5,03
(BCT/U/11-12) RRSK 18 .. 18 ..
95 Udhna-Jalgaon Section:- Interlocking of LC No. 56. S.Fund 83,29 83,29 .. ..
(BCT/U/11-12) RRSK 34 .. 34 ..
97 Udhna-Jalgaon Section:- Interlocking of LC No. 86. S.Fund 83,45 83,45 .. ..
(BCT/U/11-12) RRSK 18 .. 18 ..
98 Virar-Surat section: Upgradation and S.Fund .. .. .. ..
reclassification of 8 Nos LCs (52, 65, 70, 82, 88, RRSK 1,15,44 .. 10 1,15,34
103, 105)
100 UDN-JL Sec. Upgradation and reclassification of S.Fund 20,56 20,56 .. ..
LC's nos. 136,137,142,153. RRSK 58,54 .. 25,00 33,54
15.03.29.12.3.52.006
15.03.29.12.3.52.004
15.03.29.11.3.52.004
15.03.29.11.3.52.002
15.03.29.11.3.52.003
15.03.29.11.3.52.005
15.03.29.11.3.52.006
15.03.29.11.3.52.007
15.00.29.16.2.55.001
15.03.29.15.3.52.001
15.03.29.16.2.52.001
15.03.29.09.3.52.005
15.03.29.10.3.52.015
15.03.29.10.3.52.014
ROAD SAFETY - LEVEL CROSSINGS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 7
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
101 Provision of Auto Changeover panels at 50 Auto S.Fund .. .. .. ..
Relay Huts at LC gates in VR-ST section RRSK 62,70 .. 16,09 46,61
103 Virar-Surat section: Provision of IPS at 4 Relay S.Fund 84 84 .. ..
Huts in Valsad-Bilimora section of Mumbai RRSK 76,26 .. 61,00 15,26
Division.
104 Vaitarna- Bhilad :- Provision of TVSS & Isolation S.Fund .. .. .. ..
transformer in Power supply arrangement for RRSK 47,65 .. 30,00 17,65
signalling equipments at 23 LC gates.
Vadodara105 Vadodara Division:-Vadodara-Godhra S.Fund 1,69,88 1,69,88 .. ..
Section:-Elimination of Level X-ing No. 30 at Km. RRSK 59,97 .. 59,97 ..
444/0-2, 43 at Km. 459/41-42 & LC No. 45 at Km.460/25-27 by providing diversion road.
107 Vadodara Division:-Provision of 2nd whistle Boards S.Fund 52,53 52,53 .. ..
on various unmanned Level X-ings on Vadodara RRSK 18,32 .. 5,42 12,90
Division (Total 430 Level X-ings
109 Vadodara-Utran Section (NG):- Electrification of S.Fund 45,06 45,06 .. ..
LC gates (52 Nos.) . (ELE/S/09-10) RRSK 14,86 .. 1 14,85
110 Surat - Vadodara Section - Replacement of S.Fund 87,82 87,82 .. ..
mechanical lifting barriers / wing gates into RRSK 44,18 .. 8,21 35,97
electrically operated lifting barrier gates.
112 Vadodara Division:- Interlocking of LC gates S.Fund 1,26,21 1,26,21 .. ..
having ATVU more than 25000 at LC No.8, 32, 83, RRSK 13,79 .. 2,00 11,79
86, 28 (5 LCs). (S&T/S/10-11)
114 Vadodara-Anand Section:- Replacement of mechanical S.Fund 88,03 88,03 .. ..
lifting barrier/ wing gates into electrically RRSK 21,99 .. 5,00 16,99
operated lifting barrier (7 gates). (S&T/S/10-11)
116 Nadiad-Anand Section:- Replacement of mechanical S.Fund 62,73 62,73 .. ..
lifting barrier/ wing gates into electrically RRSK 47,29 .. 10,00 37,29
operated lifting barrier (7 gates). (S&T/S/10-11)
118 Vadodara-Godhra Section:- Replacement of S.Fund 60,07 60,07 .. ..
mechanical lifting barrier/ wing gates into RRSK 49,95 .. 5,00 44,95
electrically operated lifting barrier (7 gates).(S&T/S/10-11)
120 Kanjari Boriyavi Jn.-Mahemdabad Section:- S.Fund 88,07 88,07 .. ..
Provision of battery back up for relays through RRSK 11,80 .. 3,00 8,80
IPS at 9 LC gate relay huts.(S&T/U/11-12)
122 Gothan-Geratpur Section:- Provision of battery S.Fund 98,25 98,25 .. ..
back up for relays through IPS at 9 LC gate relay RRSK 1,62 .. 1,61 1
huts. (BRC/U/11-12)
124 Vadodara Division: Replacement of Mechanical S.Fund 73,16 73,16 .. ..
lifting barrier into Electrical lifting barrier(6 RRSK 15,15 .. 8,00 7,15
Nos)
15.06.29.10.3.55.001
15.06.29.10.3.55.006
15.06.29.11.3.55.005
15.06.29.11.3.55.004
15.06.29.12.3.55.017
15.06.29.13.2.55.001
15.06.29.15.3.55.001
15.06.29.09.3.55.004
15.06.29.10.2.55.001
15.06.29.10.3.55.003
15.06.29.10.3.55.005
ROAD SAFETY - LEVEL CROSSINGS15.03.29.12.3.52.001
15.03.29.14.3.52.001
15.03.29.16.3.52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 8
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
126 Provision of approach warning at interlocked LC S.Fund 39,03 39,03 .. ..
gates on Vadodara-Godhra and Anand-Godhra Sections RRSK 54,73 .. 5 54,68
of Vadodara Division.
127 Provision of selective calling facility at LC S.Fund .. .. .. ..
gates in BRC - GDA section RRSK 88,00 .. 9 87,91
129 Vadodara Division:-Upgradation and S.Fund 43,78 43,78 .. ..
reclassification of 8 Nos. of Level X-ings on RRSK 47,75 .. 15,92 31,83
ST-BRC Section LC No. 182, 189, 232 & 233 andBRC-GER Section LC No. 239, 246, 255 & 260) (Total8 Nos. of level X-ings)
131 Vadodara Division:-Upgradation and S.Fund 23,88 23,88 .. ..
reclassification of 8 Nos. of Level X-ings. Level RRSK 70,23 .. 50,00 20,23
X-ing No. 264, 265, 269, 278, 285, 286, 295 & 300on BRC-GER Section.
133 Provision of Sliding boom at 33 LC gates in S.Fund 51,29 51,29 .. ..
Vadodara-Godhra-Anand section of Vadodara RRSK 26,99 .. 8,00 18,99
Division.
134 Surat- Geratpur Section: Replacement of overaged S.Fund .. .. .. ..
batteries of Integrated Power supply system at LC RRSK 89,22 .. 56,00 33,22
gates.
Ratlam136 Ratlam Division - UJN-BPL Section-- Interlocking S.Fund 31,65 31,65 .. ..
of LC 110 Km. 217/ 22-24 in PUD-BQE section RRSK 17,44 .. 17,44 ..
137 Ratlam-Chanderiya Section - Interlocking of level S.Fund 1,29,90 83,80 .. 46,10
crossing gates (2 Nos.)Provision of Electrical RRSK 46,10 .. 27,25 18,85
lifting barriers.2. Supply and installation ofRTU.3. Supply and installation of CLS Signal unitsfor gate signal.4. Supply and installation of CT
138 Ujjain-Bhopal section- Interlocking of Level S.Fund .. .. .. ..
crossing no. 109 at Km.214/08-10 ,LC no.33at RRSK 2,09,09 .. 1,50,00 59,09
Km.62/26-28 .
140 Ratlam Division-Providing lever locking device at S.Fund 35,63 35,63 .. ..
LCs. (RTM/S/08-09) RRSK 23,24 .. 3,00 20,24
142 Godhra-Nagda Section-Improvement to various LCs S.Fund 1,02,42 1,02,42 .. ..
by providing pavers block, approach road & rumble RRSK 16,05 6,00 10,05 ..
strips. (RTM/S/09-10)
144 Ujjain-Bhopal Section- up gradation of LC No. 79 S.Fund 74,44 74,44 .. ..
Km 157/21-23 (A to Spl.), Lc no. 85 Km. RRSK 17,14 .. 2,00 15,14
170/10-12.(A to SPL). (RTM/U/10-11)
146 Vadodara-Nagda Section:- Providing gate lodges at S.Fund 11,83 11,83 .. ..
interlocked gates having elevated ground frames. RRSK 63,77 .. 15,00 48,77
(RTM/U/10-11)
15.05.29.10.3.54.020
15.05.29.12.6.54.001
15.05.29.15.2.54.001
15.05.29.16.2.54.001
15.05.29.08.3.54.004
15.05.29.09.3.54.002
15.05.29.10.3.54.018
15.06.29.12.3.55.012
15.06.29.12.3.55.003
15.06.29.12.3.55.013
15.06.29.12.3.55.015
15.06.29.12.3.55.016
15.06.29.16.3.55.001
ROAD SAFETY - LEVEL CROSSINGS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 9
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
148 Ujjain-Bhopal Section:- Up gradation of Level S.Fund 77,80 77,80 .. ..
crossing No. 113 Km 223/11-13 (C to A.), Lc no. RRSK 19,48 .. 2,00 17,48
114 Km. 226/17-19.(C to A). (RTM/U/10-11)
150 Ratlam Division:- Interlocking of LC No. BCW in S.Fund 53,65 53,65 .. ..
CAN-RTM section & LC No. 31 in IND-UJN section. RRSK 6,20 .. 2,30 3,90
152 Ratlam-Neemach Section:- Removing Signaling S.Fund 56,42 56,42 .. ..
deficiencies at 20 interlocked LC Gates. RRSK 39,79 .. 39,78 1
(RTM/U/11-12)
154 Ujjain-Bhopal Section:- Removing Signaling S.Fund 88,89 88,89 .. ..
deficiencies at 21 interlocked LC Gates. RRSK 7,95 .. 7,94 1
(RTM/U/11-12)
156 Chanderiya-Ratlam Section:- Provision of Remote S.Fund 48,64 48,64 .. ..
Terminal Units at OSL interlocked LC gates in RRSK 9,25 .. 9,25 ..
Ratlam division.(RTM/U/11-12)
158 RTM Div.-- Provision of solar street lights at LC S.Fund 5,75 5,75 .. ..
Gates and Replacement of AT RRSK 33,79 .. 8 33,71
Cable at some of Interlocked LC Gates
160 MHOW- Khandwa Section:- Providing RCC retaining S.Fund 68,46 4,56 .. 63,90
wall (210 Rm) on approaches in accident prone LC RRSK 63,90 .. 30,00 33,90
No. 266, 268 & 270.
162 GDA-NAD Sec:- Upgradation of Lc Nos.34, 63 and 87. S.Fund 17,21 17,21 .. ..
RRSK 57,82 .. 20,00 37,82
164 NAD -UJN -MKC Section- Up gradation of LC No. 9 S.Fund 61,80 61,80 .. ..
('B1' to 'A' Class), 38 ('C' to 'A' Class and LC RRSK 15,71 .. 15,71 ..
No.52 ('A' to 'Spl' Class)
166 NMH-RTM Section- Up gradation of LC No. 151 S.Fund 1,02,47 75,06 .. 27,41
(B2C' to 'A' Class), 152 ('A' to 'Spl' Class and RRSK 27,41 .. 5,00 22,41
LC No.157('C' to 'B2' Class)
168 Godhra-Nagda-Ujjainand Indore-Ujjain S.Fund 73,13 73,13 .. ..
section--Provision of Stand By Transmission system RRSK 2,00 .. 6 1,94
for the slot from LC to panel for WSL Gates and LCGate Closed indication to Cabin / ASM at OSL LC onRTM Division
170 RTM division :- Providing fibre reinforced pre S.Fund 3,47 3,47 .. ..
cast RCC blocks at 20Lc GDA-RTM,NAD-UJN& RRSK 81,48 .. 1 81,47
IDU,UJN-FTD-UJN,RTM-KNW section.
172 Ratlam Division - Interlocking of LC 162 Km. 313/ S.Fund 49,15 49,15 .. ..
01-02 in DLD-KCNR and LC 98 Km. 203/ 07-08 SMP- RRSK 43,55 .. 43,35 20
GRF section.
174 Nagda-Ujjain-Bhopal Section-Provision of power S.Fund 60,35 60,35 .. ..
operated Lifting barriers at interlocked LC gates RRSK 32,68 .. 30,68 2,00
in out side station Limit.
15.05.29.12.3.54.026
15.05.29.12.3.54.023
15.05.29.12.6.54.002
15.05.29.14.6.54.001
15.05.29.11.3.54.001
15.05.29.12.3.54.016
15.05.29.12.3.54.015
15.05.29.12.3.54.024
15.05.29.12.3.54.019
15.05.29.12.3.54.021
ROAD SAFETY - LEVEL CROSSINGS15.05.29.10.3.54.016
15.05.29.10.3.54.013
15.05.29.11.3.54.003
15.05.29.11.3.54.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 10
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
176 Ratlam Division-Provision of sliding booms at S.Fund 54,80 54,80 .. ..
interlocked LC Gate Prone to Damage by Road RRSK 33,18 .. 1 33,17
Traffic.
178 Godhra-Nagda, Ratlam-Chanderia and Indore Dewas S.Fund 59,00 59,00 .. ..
Section-Provision of power operated lifting RRSK 33,97 .. 33,96 1
barriers atinterlocked LC gates in OSL.
180 Ratlam Division-Providing Lever Locking S.Fund 28,96 28,96 .. ..
device,safety chains and Shed over Winch on RRSK 13,81 .. 10,05 3,76
variuos LC's.Nagda-Bhoplal, Indore-Dewas-Ujjainand Dewas-Maksi Section.
Ahmedabad182 Ahmedabad Division:- Providing 2nd whistle board S.Fund 62,75 62,75 .. ..
at unmanned LCs. RRSK 6,02 .. 5,00 1,02
183 Ahmedabad Division:-Interlocking of LC gate No.6 & S.Fund .. .. .. ..
9 on Gandhidham - New Bhuj Section. RRSK 1,21,17 .. 25,00 96,17
185 Ahmedabad Division:- Manning of LC No.15 KM 17/ S.Fund 82,60 82,60 .. ..
2-3 on KLL-KTRD-RUJ Section, LC No 16 at Km 16/4-5 RRSK 6,27 .. 6,27 ..
on MSH-VG Section & LC No 21at Km 21/10-22/1MSH-PTN Section. (ADI/S/09-10)
187 Ahmedabad division- Replacement of old mechanical S.Fund 46,02 46,02 .. ..
lifting barrier by electric operated lifting RRSK 5,37 .. 5,37 ..
barrier on age cum condition basis.
Rajkot189 Rajkot Division:- Provision of battery back up for S.Fund 6,02 6,02 .. ..
relays through IPS at LC gates in Wankaner (Ex) - RRSK 53,07 .. 40 52,67
Navalakhi - Dahisara - Vavaniya section and inVG-SUNR section. (RJT/U/11-12)
191 RJT DIV - Closing of LCs by interconnectivity in S.Fund 95,27 95,27 .. ..
the jurisdiction of DEN(E)-RJT. RRSK 50 .. 6 44
193 Rajkot Division : Provision of CLS at 3 S.Fund 32,77 32,77 .. ..
Interlocked OSL LC gates in RJT-HAPA section in RRSK 61,08 .. 6,08 55,00
connection of PI works already sanction. Ie LC128,136 & 147.
195 Rajkot Division : Provision of Approach Warning S.Fund 34,17 34,17 .. ..
System for Interlocked LC gate.ie Viramgam-OKHA RRSK 41,09 .. 8 41,01
section including branch
197 Rajkot Division - Providing WSL boards on unmanned S.Fund 24,49 24,49 .. ..
LCs. RRSK 1 .. 1 ..
Bhavnagar198 Bhavnagar Division: Providing 2nd Whistle Board at S.Fund .. .. .. ..
unmanned level crossings (Non PRCL Section) RRSK 65,89 .. 65,88 1
200 KJV-VSW Section (MG):- Providing CC Block on level S.Fund 8,27 8,27 .. ..
crossings gates (30 nos.). (BVP/S/08-09) RRSK 27,96 .. 95 27,01
15.02.29.08.3.51.008
15.04.29.11.3.53.004
15.04.29.12.3.53.010
15.04.29.12.3.13.011
15.04.29.12.3.53.001
15.04.29.15.3.53.001
15.02.29.15.3.51.001
15.05.29.14.6.54.003
15.05.29.15.3.54.002
15.01.29.15.3.50.001
15.01.29.16.2.50.001
15.01.29.09.3.50.004
15.01.29.12.3.50.002
ROAD SAFETY - LEVEL CROSSINGS15.05.29.14.6.54.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 11
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
201 Bhavnagar Division - Removal of defeciencies and S.Fund 39,40 39,40 .. ..
providing Paver Blocks with speed breakers / RRSK 1,80,10 .. 64,90 1,15,20
Rumble Strips on 219 LCs.
203 ADEN-Botad Sub-division:- Manning of unmanned S.Fund 24,02 24,02 .. ..
level crossings 24,Km 26/7-8 between GG - SEJ and RRSK 24,77 .. 5 24,72
159/X at km 172/8-9 between SAPR - BTD.(BVP/S/09-10)
205 ADEN-Junagadh Sub Division:- Manning of unmanned S.Fund 20,50 20,50 .. ..
level crossings 105/C, km 146/7-8 between KSD - RRSK 13,20 .. 9 13,11
MLHA and 126/C, km 179/3-4 between ADE VRL .(BVP/S/09-10)
207 Bhavnagar Division:- Providing approach road S.Fund 4,91 4,91 .. ..
between two unmanned level crossings situated RRSK 32,48 .. 6 32,42
within 01 Km for diversion of traffic and closingone (LC 3 &4, 5 & 6, 7 & 8, 9 & 10, 12 & 13, 16 &15, 36 & 37 ,43 & 44 Khijadiya - Veraval and LC 26
209 Bhavnagar Division:- Interlocking of LC gate No 11 S.Fund 32,08 32,08 .. ..
C' Class (Engg) between Dhasa-Damnagar on RRSK 22,34 .. 10,00 12,34
Dhasa-Rajula Jn. Section.(S&T/U/11-12)
211 Rajula Jn.-Mahuva Sec:-Interlocking and S.Fund 28,21 28,21 .. ..
upgradation of LC gate No 129 'C' Class (Engg). RRSK 16,11 .. 4,00 12,11
212 BVP Divn.: Upgradation & Reclassification of 3 S.Fund .. .. .. ..
Nos LC's ( KNLS - PBR - 63, 68, JLR - WSJ - 67) RRSK 61,48 .. 10,00 51,48
Mumbai213 Works costing below DRM's Power RRSK 10,00 .. 10,00 ..
Ratlam214 Works costing below DRM's Power RRSK 20,97 .. 20,97 ..
TOTAL-WORKS IN PROGRESS RRSK .. .. 13,68,30 ..
B - New Works
Vadodara215 Manning of Unmanned Level X-ings on BG of Vadodara RRSK 99,88 .. 5,00 94,88
Division (Total 4 LCs)LC No.63(AKV-RAJ),10(VSI-DB) & 22,72 (DB-CTD).
216 Vadodara Division - Providing watering RRSK 1,08,26 .. 5,00 1,03,26
arrangements on various manned Level X-ings.
Ratlam217 Inodre-Ujjain-Dewas Section: Interlocking of LC RRSK 82,47 .. 5,00 77,47
gate No. 13 at KM 16/29-17/01 of Ratlam Division.
218 Ratlam-Chanderiya section: Interlocking of LC Gate RRSK 90,86 .. 5,00 85,86
No. 165 at KM 317/06-09 of Ratlam Division.
Ahmedabad219 Ahmedabad Division:- Manning of unmanned Level RRSK 1,40,51 .. 5,00 1,35,51
crossings on BG Section (4 Nos. LCs) underjurisdiction of DEN(N)ADI
15.06.29.17.3.55.002
15.05.29.17.3.54.001
15.05.29.17.3.54.002
15.01.29.17.3.50.006
15.02.29.11.3.51.001
15.02.29.12.3.51.001
15.02.29.12.3.51.002
15.03.29.17.3.00.999
15.05.29.17.3.00.999
15.06.29.17.3.55.001
ROAD SAFETY - LEVEL CROSSINGS15.02.29.09.2.51.001
15.02.29.09.3.51.001
15.02.29.09.3.51.003
15.02.29.10.3.51.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 12
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
220 Viramgam-Samakhiyali Section:- Manning of unmanned RRSK 69,72 .. 5,00 64,72
Level crossings on BG Section (2 Nos. LCs)
221 Viramgam-Samakhiyali Section:- Manning of unmanned RRSK 69,72 .. 5,00 64,72
Level crossing No, 40 & LC No. 56 on BG Section (2Nos. LCs)
Vadodara222 Works costing below DRM's Power RRSK 2,50 .. 2,50 ..
Ratlam223 Works costing below DRM's Power RRSK 5,00 .. 5,00 ..
Ahmedabad224 Works costing below DRM's Power RRSK 5,00 .. 5,00 ..
Rajkot225 Works costing below DRM's Power RRSK 2,50 .. 2,50 ..
Bhavnagar226 Works costing below DRM's Power RRSK 2,50 .. 2,50 ..
TOTAL-NEW WORKS RRSK .. .. 52,50 ..
TOTAL-Road Safety - Level RRSK .. .. 14,20,80 ..
Crossings
A - Works in Progress
Mumbai227 Virar-Surat Section- Supplying & fabricating of S.Fund .. .. .. ..
R.H girder of length up to 20.40 m with temp. RRSK 2,46,81 .. 1,00,00 1,46,81
support of max. permissible speed up to 50 kmph.
229 Udhna - Jalgaon section: Providing Subway in lieu S.Fund 48,58 48,58 .. ..
of LC 66 RRSK 1,97,88 .. 75,00 1,22,88
231 Udhna - Jalgaon section: Providing Subway in lieu S.Fund 13,36 13,36 .. ..
of LC 100 RRSK 2,33,10 .. 1,00,00 1,33,10
232 Udhna - Jalgaon section: Providing Subway in lieu S.Fund .. .. .. ..
of LC 101 (manned) RRSK 2,46,46 .. 1,00,00 1,46,46
233 Churchgate - Virar - section Providing protection S.Fund .. .. .. ..
screen plates on various FOB's& ROB's RRSK 1,83,24 .. 1,00,00 83,24
234 Udvada-Pardi:- Road over bridge in lieu of LC No. S.Fund .. .. .. ..
87. (BCT/U/09-10) RRSK 7,10,28 .. 1 7,10,27
EBR(Dep) 11,40,43 .. .. 11,40,43
236 Virar-Surat:- Road over bridge in lieu of LC No. S.Fund 50,00 .. .. 50,00
101 (near Doongri). (BCT/U/09-10) RRSK 3,73,74 .. 2,00,00 1,73,74
EBR(Dep) 18,07,74 .. .. 18,07,74
238 UDN-JL(Sec):Providing normal limited height subway S.Fund 2,16,12 2,16,12 .. ..
in lieu of LC No 154 RRSK 13,82 .. 13,82 ..
15.03.30.09.3.30.001
15.03.30.09.3.30.002
15.03.30.12.3.52.001
ROAD SAFETY - ROB/RUB
15.03.30.16.3.52.001
15.03.30.15.3.52.004
15.03.30.15.3.52.002
15.03.30.15.3.52.001
15.03.30.15.3.52.003
15.01.29.17.3.50.005
15.06.29.17.3.00.999
15.05.29.17.3.00.999
15.01.29.17.3.00.999
15.04.29.17.3.00.999
15.02.29.17.3.00.999
ROAD SAFETY - LEVEL CROSSINGS15.01.29.17.3.50.007
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 13
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Vadodara240 Vadodara-Godhra Section:-Elimination of existing S.Fund 2,22,56 2,22,56 .. ..
Level X-ing No. 10 at Km. 409/22-24 by provision RRSK 2,84 .. 2,84 ..
of Road under Bridge (RUB)
241 Vadodara-Godhra Section:-Elimnation of level X-ing S.Fund .. .. .. ..
No. 24 at km. 438/3-5 between stations RRSK 2,29,87 .. 1,25,00 1,04,87
Champaner-Bakrol by providing Road Under Bridge.(RUB)
242 Vadodara-Godhra Section:-Elimnation of level X-ing S.Fund .. .. .. ..
No. 34 at km. 448/1-3 between stations RRSK 2,32,19 .. 1,27,00 1,05,19
Derol-Kharsaliya by providing Road Under Bridge.(RUB)
243 Surat-Vadodara Section:-Elimination of level X-ing S.Fund .. .. .. ..
No. 148 at km. 274/14-16 between stations RRSK 2,47,64 .. 1 2,47,63
Kosad-Gothangam by providing Road Under Bridge.(RUB)
244 Surat-Vadodara Section:-Elimination of level X-ing S.Fund .. .. .. ..
No. 194 at km. 347/20-22 between stations RRSK 2,40,64 .. 1 2,40,63
Varnama-Palej by providing Road Under Bridge.(RUB)
245 Surat-Vadodara Section:-Elimination of level X-ing S.Fund .. .. .. ..
No. 196 at km. 349/16-18 between stations RRSK 2,36,60 .. 1 2,36,59
Varnama-Palej by providing Road Under Bridge.(RUB)
246 Surat-Vadodara Section:-Elimination of level X-ing S.Fund .. .. .. ..
No. 200 at km. 354/4-8 between stations RRSK 2,38,88 .. 1 2,38,87
Palej-Lakodara by providing Road Under Bridge.(RUB).
247 Surat-Vadodara Section:-Elimination of level X-ing S.Fund .. .. .. ..
No. 203 at km. 356/26-30 between stations RRSK 2,40,15 .. 1 2,40,14
Palej-Lakodara by providing Road Under Bridge.(RUB).
248 Surat-Vadodara Section:-Elimination of level X-ing S.Fund .. .. .. ..
No. 204 at km. 357/20-22 in Lakodara station yard RRSK 2,38,11 .. 1 2,38,10
by providing Road Under Bridge. (RUB).
249 Surat-Vadodara Section:-Elimination of level X-ing S.Fund .. .. .. ..
No. 214 at km. 369/18-20 between stations RRSK 2,38,13 .. 1 2,38,12
Miyagam-Kashipura by providing Road UnderBridge(RUB).
250 Surat-Vadodara Section:-Elimination of level X-ing S.Fund .. .. .. ..
No. 216 at km. 372/24-26 between stations RRSK 2,37,98 .. 1 2,37,97
Miyagam-Kashipura by providing Road UnderBridge(RUB).
251 Surat-Vadodara Section:-Elimination of level X-ing S.Fund .. .. .. ..
No. 217 at km. 373/25-27 between stations RRSK 2,49,68 .. 1,60,00 89,68
Miyagam-Kashipura by providing Road UnderBridge(RUB).
15.06.30.16.3.55.008
15.06.30.16.3.55.009
15.06.30.16.3.55.010
15.06.30.16.3.55.011
15.06.30.16.3.55.003
15.06.30.16.3.55.002
15.06.30.16.3.55.004
15.06.30.16.3.55.005
15.06.30.16.3.55.006
15.06.30.16.3.55.007
ROAD SAFETY - ROB/RUB
15.06.30.14.6.55.001
15.06.30.16.3.55.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 14
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
252 Surat-Vadodara Section:-Elimination of level X-ing S.Fund .. .. .. ..
No. 221 at km. 379/16-18 between stations RRSK 2,40,37 .. 1,31,00 1,09,37
Itola-Varnama by providing Road Under Bridge(RUB).
253 Surat-Vadodara Section:-Elimination of level X-ing S.Fund .. .. .. ..
No. 224 at km. 382/20-22 between stations RRSK 2,33,34 .. 1,30,00 1,03,34
Varnama-Makarpura by providing Road UnderBridge(RUB).
254 Vasad-Kathana Section:-Elimnation of level X-ing S.Fund .. .. .. ..
No. 24 at km. 23/7-8 between stations RRSK 1,64,23 .. 1,00,00 64,23
Vasad-Bochasan by providing Road Under Bridge.(RUB)
255 Vasad-Kathana Section:-Elimnation of level X-ing S.Fund .. .. .. ..
No. 32 at km. 29/9-30/0 between stations RRSK 1,64,23 .. 1,00,00 64,23
Bochasan-Kathana by providing Road Under Bridge.(RUB)
256 Vasad-Kathana Section:-Elimnation of level X-ing S.Fund .. .. .. ..
No. 42 at km. 37/7-8 between stations RRSK 1,64,23 .. 1,00,00 64,23
Bochasan-Kathana by providing Road Under Bridge.(RUB)
257 Dabhoi-Chhotaudepur Section:-Elimnation of level S.Fund .. .. .. ..
X-ing No. 28 at km.38.973 between stations RRSK 1,55,84 .. 1 1,55,83
Dabhoi-Chhuchhapura by providing Road UnderBridge. (RUB)
258 Dabhoi-Chhotaudepur Section:-Elimnation of level S.Fund .. .. .. ..
X-ing No. 29 at km.40.421 between stations RRSK 1,55,72 .. 1 1,55,71
Dabhoi-Chhuchhapura by providing Road UnderBridge. (RUB)
259 Ankleshwar-Rajpipla Section:-Elimnation of level S.Fund .. .. .. ..
X-ing No. 59 at km.48/9-49/0 between stations RRSK 1,63,56 .. 1,00,00 63,56
Jaghadiya-Rajpipla by providing Road Under Bridge.(RUB)
260 Dabhoi-Chhotaudepur Section:-Elimnation of level S.Fund .. .. .. ..
X-ing No. 35 at km.46.419 between stations RRSK 1,55,91 .. 1 1,55,90
Dabhoi-Chhuchhapura by providing Road UnderBridge. (RUB)
261 Dabhoi-Chhotaudepur Section:-Elimnation of level S.Fund .. .. .. ..
X-ing No. 26 at km.36.553 between stations RRSK 1,55,80 .. 1 1,55,79
Dabhoi-Chhuchhapura by providing Road UnderBridge. (RUB)
Ratlam263 Chanderiya-Ratlam Section-Providing Subways to S.Fund 1,41,03 28,61 .. 1,12,42
Eliminate Unmanned LC No.142. RRSK 1,12,42 .. 50,00 62,42
264 Chanderiya-Ratlam Section-Providing Subways to S.Fund .. .. .. ..
eliminate unmanned LC No.160. RRSK 2,29,66 .. 1,40,00 89,66
15.06.30.16.3.55.016
15.06.30.16.3.55.020
15.06.30.16.3.55.021
15.05.30.15.3.54.001
15.05.30.15.3.54.006
15.06.30.16.3.55.013
15.06.30.16.3.55.017
15.06.30.16.3.55.018
15.06.30.16.3.55.019
15.06.30.16.3.55.014
15.06.30.16.3.55.015
ROAD SAFETY - ROB/RUB15.06.30.16.3.55.012
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 15
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
265 Ratlam - Khandwa Section-Providing Subways to S.Fund .. .. .. ..
Eliminate unmanned LC.No. 235. RRSK 1,97,62 .. 50,00 1,47,62
266 Ratlam-Khandwa Section-Providing subways to S.Fund .. .. .. ..
Eliminate unmanned LC No. 229. RRSK 1,97,62 .. 50,00 1,47,62
267 Ratlam-Khandwa section-Providing Subways to S.Fund .. .. .. ..
Eliminate Unmanned LC. No.228. RRSK 1,97,62 .. 50,00 1,47,62
269 Chanderiya - Ratlam section-Providing Subways to S.Fund 1,41,21 21,73 .. 1,19,48
Eliminate Unmanned LC. No. 107 RRSK 1,19,48 .. 50,00 69,48
271 Chanderiya - Ratlam Sec:- Providing height gauge S.Fund 28,51 .. .. 28,51
at bridge approaches to protect bridge from road RRSK 28,51 .. 7,94 20,57
users.
272 Nimach - Ratlam section :- Providing Subway to S.Fund .. .. .. ..
eliminate Un-manned LC No. 167 at Km 321/13-14 RRSK 2,19,49 .. 80,00 1,39,49
273 Chanderiya - Ratlam section - Construction of 2 S.Fund .. .. .. ..
lane RUB in lieu of LC no. 177 km: 341/6 - 7 near RRSK 1,27,00 .. .. 1,27,00
Jaora yard EBR(Dep) 1,27,00 .. .. 1,27,00
275 Ujain-Bhopal Section:- Providing limited height S.Fund 1,39,81 1,39,81 .. ..
subway to eliiminate LC No. 99 at km. 196/00-02 RRSK 59 .. 1 58
between BKTL-SHE at unmanned LC. (RTM/U/11-12)
277 Nagda-Ujjain Section:- Providing limited height S.Fund 1,44,16 1,44,16 .. ..
subway to eliiminate LC No. 16 at km. 33/30-42/2 RRSK 1 .. 1 ..
between PSO-ASL at unmanned LC. (RTM/U/11-12)
279 Nagda-Ujjain Section:- Providing limited height S.Fund 1,43,98 1,43,98 .. ..
subway to eliiminate LC No. 17X at km. 36/26-28 at RRSK 1 .. 1 ..
unmanned LC. (RTM/U/11-12)
281 Ujjain-Bhopal Section:- Providing limited height S.Fund 1,40,81 1,40,81 .. ..
subway to eliiminate LC No. 97 at km. 192/24-26 at RRSK 59 .. 1 58
unmanned LC. (RTM/U/11-12)
283 Godhra-Nagda Section:- Providing limited height S.Fund 1,26,49 1,26,49 .. ..
subway to eliiminate LC No. 47 at km. 584/24-26 RRSK 16,51 .. 1 16,50
between DHD and BIO stations. (RTM/U/11-12)
285 Godhra-Nagda Section:- Providing limited height S.Fund 1,28,32 1,28,32 .. ..
subway to eliiminate LC No. 52 at km. 555/14-16 RRSK 16,68 .. 1 16,67
between BIO and ANAS stations. (RTM/U/11-12)
287 Godhra-Nagda Section:- Providing limited height S.Fund 85,53 85,53 .. ..
subway to eliiminate LC No. 56 at km. 563/10-12 RRSK 84,47 .. 60,00 24,47
between ANAS and NRH stations. (RTM/U/11-12)
289 Godhra-Nagda Section:- Providing limited height S.Fund 1,14,44 1,14,44 .. ..
subway to eliiminate LC No. 58 at km. 570/10-12 RRSK 28,56 .. 1 28,55
between ANAS and MGN stations. (RTM/U/11-12)
15.05.30.11.3.54.002
15.05.30.11.3.54.003
15.05.30.11.3.54.004
15.05.30.15.2.54.001
15.05.30.11.3.54.007
15.05.30.11.3.54.005
15.05.30.11.3.54.006
15.05.30.11.3.54.008
15.05.30.11.3.54.001
15.05.30.15.3.54.003
15.05.30.15.3.54.002
15.05.30.15.3.54.007
15.05.30.15.3.54.008
15.05.30.15.3.54.004
15.05.30.16.3.54.001
ROAD SAFETY - ROB/RUB
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 16
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
291 GDA-NAD Section-Provision of Limited use sub way S.Fund 89,18 89,18 .. ..
to eliminate L. C. No. 50 at Km 552/16-18 between RRSK 28,20 .. 28,20 ..
Bordi & ANAS stations.
293 GDA-NAD Section-Provision of Limited use sub way S.Fund 1,36,49 1,36,49 .. ..
to eliminate L. C. No. 73 at Km 613/22-24 between RRSK 18,31 .. 1 18,30
AGR & BMI stations.
295 IDU section- povidinglimited height subway to S.Fund 1,89,76 1,89,76 .. ..
eliminateManned Lc no.48 at Km.65/16-66/01 RRSK 10,46 .. 2,99 7,47
betweenMGG&LMNR stations.
297 INDORE- DEWAS-UJJAIN section:- Providing Limited S.Fund 1,37,02 1,37,02 .. ..
height Subway to eliminiate unmanned LC no. 15 RRSK 58,00 .. 6,00 52,00
at. Km. 19/9-10 between KADCHA-NARANGIPURstations.
299 INDORE-DEWAS-UJJAIN section :- Providing Limited S.Fund 1,13,32 1,13,32 .. ..
height Subway to eliminiate LC no. 9 at. Km. RRSK 4,38 .. 1 4,37
10/14-15 between UJJAIN-KADCHA stations.
301 INDORE-DEWAs-UJJAIN sectio n:- Providing Limited S.Fund 92,28 92,28 .. ..
height Subway to eliminiate LC no. 18 between RRSK 8,00 .. 1 7,99
KDHA-NRGR at Km. 23/5-6.
302 INDORE-DEWAS-UJJAIN section:- Providing Limited S.Fund 1,53,38 1,53,38 .. ..
height Subway to eliminiate unmanned LC no. 12 at. RRSK .. .. .. ..
Km. 14/17-15/1 between UJJAIN-KADCHAstation.
304 CNA - RTM - KNW section :- Providing Limited S.Fund 1,60,90 1,60,90 .. ..
height Subway in lieu of Unmanned LC no. 155 & 239 RRSK 38,50 .. 2,00 36,50
at Km. 299/8 - 9 & 480/9 - 10 at-
305 Ratlam Division-Providing Limited Hieght Subway of S.Fund .. .. .. ..
4.00 M (Width) x 3.00 M (Height) (Internal RRSK 1,47,67 .. 10,00 1,37,67
dimension) precast R.C.C. M-35 box in liue ofUnmanned LC No. 194 & 195 at Km 382/8-9 & 384/6-7between RTM-NGW section.
306 Ratlam Division- Providing Limited Hieght Subway S.Fund .. .. .. ..
of 4.00 M (Width) x 3.00 M (Height) (Internal RRSK 2,27,10 .. 3,56 2,23,54
dimension) precast R.C.C. M-35 box in liue ofUnmanned LC No. 200 & 201 at (Km 399/8-9) & (Km401/9-10) between NGW-RNJ section.
307 Providing Limited Hieght Subway of 4.00 M (Width) S.Fund .. .. .. ..
x 3.00 M (Height) (Internal dimension) precast RRSK 2,16,76 .. 1 2,16,75
R.C.C. M-35 box in liue of Unmanned LC No. 205 &211 at Km 408/1-2 & Km 424/11-12 &betweenRNJ-BNG and BNG-GPX section.
308 Ratlam Division:- Providing Limited Height S.Fund .. .. .. ..
Sub-ways(3.66 x 4.00 m) in lieu of Unmanned RRSK 1,65,12 .. 1 1,65,11
Level crossing No.213/C , Km 428/9-10 betweenBarnagar -Gautampura Station.
15.05.30.12.3.54.011
15.05.30.12.3.54.010
15.05.30.12.3.54.012
15.05.30.12.3.54.013
15.05.30.12.3.54.001
15.05.30.12.3.54.002
15.05.30.12.3.54.004
15.05.30.12.3.54.005
15.05.30.12.3.54.008
15.05.30.12.3.54.006
ROAD SAFETY - ROB/RUB15.05.30.12.3.54.003
15.05.30.12.3.54.007
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 17
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
309 Ratlam Division:- Providing Limited Height S.Fund .. .. .. ..
Sub-ways(3.66 x 4.00 m) in lieu of Unmanned RRSK 1,65,12 .. 50,00 1,15,12
Level crossing No. 220/C , Km 442/3-4 betweenGautampura- Fatehabad Station.
310 Ratlam Division:- Providing Limited Height S.Fund .. .. .. ..
Sub-ways(3.66 x 4.00 m) in lieu of Unmanned RRSK 1,65,12 .. 50,00 1,15,12
Level crossing No. 221/C , Km 444/3-4 betweenGautampura- Fatehabad Station.
311 Ratlam Division:- Providing Limited Height S.Fund .. .. .. ..
Sub-ways(3.66 x 4.00 m) in lieu of Unmanned RRSK 1,65,12 .. 50,00 1,15,12
Level crossing No. 224/C , Km 450/2-3 betweenGautampura- Fatehabad Station.
313 Chittaurgarh-Kota section ;Providing Sub-way S.Fund 1,18,54 27,03 .. 91,51
(RUB) to eliminate LC No. 121 Km: 155/11-12 RRSK 91,51 .. 2,00 89,51
Bet: CNA-BSSL in Ratlam Division of Westernrailway at.
315 Chanderiya - Ratlam Section -Providing Sub-way to S.Fund 1,95,12 23,40 .. 1,71,72
eliminate LC No. - 127 (U/M) Between NMH - HKL RRSK 1,71,72 .. 80,00 91,72
station in Ratlam Division of western railway at.
316 Chanderiya - Ratlam section :- Providing Subway to S.Fund .. .. .. ..
eliminate Un-manned LC No. 132 Km 257/11 - 12 . RRSK 2,29,66 .. 1,40,00 89,66
317 Chanderiya - Ratlam section :- Providing Subway to S.Fund .. .. .. ..
eliminate Un-manned LC No. 135 Km 264/02 - 03. RRSK 2,29,66 .. 1,40,00 89,66
318 Chanderiya - Ratlam section :- Providing Subway to S.Fund .. .. .. ..
eliminate Un-manned LC No. 136 Km 265/09 - 10 RRSK 2,29,66 .. 1,50,00 79,66
between HKL - MLG stations at
319 Ujjain-Bhopal section :- Providing Subway to S.Fund .. .. .. ..
eliminate Un-manned LC No. 42 Km 81/09-11 in RRSK 2,40,52 .. 60,00 1,80,52
between Tajpur-Tarana station at.
320 Ujjain-Bhopal section :- Providing Subway to S.Fund .. .. .. ..
eliminate Un-manned LC No. 48 Km 90/10-12 in RRSK 2,49,63 .. 50,00 1,99,63
between Tarana-Maksi station at.
321 Ujjain-Bhopal section :- Providing Subway to S.Fund .. .. .. ..
eliminate Un-manned LC No. 49 Km 91/20-22 in RRSK 2,48,86 .. 50,00 1,98,86
between Tarana-Maksi station at.
322 Chanderiya-Ratlam section :- Providing Subway to S.Fund .. .. .. ..
eliminate Un-manned LC No. 111 Km 227/05-06 in RRSK 2,35,76 .. 60,00 1,75,76
between Jawad Road-Bisalwas Kalan station at.
323 Chanderiya-Ratalam Section :- Providing Subway to S.Fund .. .. .. ..
eliminate Unmanned LC No. 189 Km 368/01-02 in RRSK 2,26,74 .. 60,00 1,66,74
between Namli-Dhosawas station at.
324 Chanderiya-Ratlam Section :- Providing Subway to S.Fund .. .. .. ..
eliminate Unmanned LC No. 169 Km 327/08-09 in RRSK 2,15,70 .. 60,00 1,55,70
between Dhodhar-Jaora station at.
15.05.30.16.3.54.008
15.05.30.16.3.54.004
15.05.30.16.3.54.005
15.05.30.16.3.54.009
15.05.30.16.3.54.010
15.05.30.16.3.54.012
15.05.30.16.3.54.007
15.05.30.12.3.54.015
15.05.30.12.3.54.009
15.05.30.13.3.54.002
15.05.30.15.3.54.005
15.05.30.16.3.54.002
15.05.30.16.3.54.003
ROAD SAFETY - ROB/RUB15.05.30.12.3.54.014
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 18
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
325 Indore-Dewas-Ujjain Section :- Providing Subway to S.Fund .. .. .. ..
eliminate Unmanned LC No.39 Km 55/15-17in between RRSK 2,21,40 .. 40,00 1,81,40
Barlai - Mangliya Gaon station at.
326 Indore-Dewas-Ujjain Section :- Providing Subway to S.Fund .. .. .. ..
eliminate Unmanned LC No.43 Km 59/19-21 in between RRSK 2,20,95 .. 40,00 1,80,95
Barlai - Mangliya Gaon station at.
Ahmedabad328 VG-SIOB section:-Proposal for extra work of RUB S.Fund 57,72 57,72 .. ..
for doubling new track in addition to existing RUB RRSK 36,04 .. 36,04 ..
work at LC No. 11C for single existing track onVG-SIOB section.
330 VG-SIOB section :- Proposal for extra work of RUB S.Fund 65,99 65,99 .. ..
for doubling new track in addition to existing RRSK 13,93 .. 2,00 11,93
RUB work at LC No. 116 on VG-SIOB section forexisting track.
332 Proposal for extra work of RUB for doubling new S.Fund 58,90 58,90 .. ..
track in addition to existing RUB work at LC No. RRSK 10,92 .. 2,00 8,92
89 for existing track on VG-SIOB section
334 Proposal for extra work of RUB for doubling new S.Fund 56,44 56,44 .. ..
track in addition to existing RUB work at LC No. RRSK 13,38 .. 2,00 11,38
114 for existing track on VG-SIOB section.
336 Elimination of LC No. 16A at Km. 517/08-09on S.Fund 1,00 1,00 .. ..
ADI-VG Section by providing RUB for Dedicated RRSK 2,21,86 .. 1 2,21,85
freight corrdor. EBR(Dep) .. .. .. ..
337 Elimination of LC No. 16 at Km. 517/01-02on ADI-VG S.Fund .. .. .. ..
Section by providing RUB for Dedicated freight RRSK 1,55,99 .. 1,55,99 ..
corrdor.
339 Elimination of LC No. 18 at Km. 520/0-1 on ADI-VG S.Fund 1,00 1,00 .. ..
Section by providing RUB for Dedicated freight RRSK 1,54,99 .. 1 1,54,98
corrdor. EBR(Dep) .. .. .. ..
341 Elimination of LC No. 19 at Km. 521/0-1 on ADI-VG S.Fund 77,56 77,56 .. ..
Section by providing RUB for Dedicated freight RRSK 1,20,35 .. 1,00,00 20,35
corrdor. EBR(Dep) .. .. .. ..
343 Elimination of LC No. 20 at Km. 521/5-6 on ADI-VG S.Fund 35 35 .. ..
Section by providing RUB for Dedicated freight RRSK 1,55,64 .. 1,55,64 ..
corrdor. EBR(Dep) .. .. .. ..
345 Elimination of LC No. 21 at Km. 523/01-02 on S.Fund 1,00 1,00 .. ..
ADI-VG Section by providing RUB for Dedicated RRSK 17,97,83 .. 1,75,00 16,22,83
freight corrdor. EBR(Dep) .. .. .. ..
346 Chandlodiya-Khodiyar section:-Elimination of level S.Fund .. .. .. ..
crossing No.1 at km 507/8-9 by providing subway RRSK 2,43,06 .. 20,00 2,23,06
within Railway land boundary
15.01.30.13.3.50.010
15.01.30.13.3.50.003
15.01.30.16.3.50.001
15.01.30.15.3.50.006
15.01.30.15.3.50.004
15.01.30.13.3.50.005
15.01.30.13.3.50.007
15.01.30.13.3.50.008
15.01.30.13.3.50.009
ROAD SAFETY - ROB/RUB15.05.30.16.3.54.013
15.05.30.16.3.54.014
15.01.30.15.3.50.005
15.01.30.15.3.50.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 19
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Rajkot347 Rajkot Division – Providing Limited Height Subway S.Fund .. .. .. ..
on LC No. 79 to eliminate unmanned Level Crossing. RRSK 1,59,12 .. 60,00 99,12
349 Surendranagar - Rajkot Section :Elimination of S.Fund 60,57 60,57 .. ..
unmanned LC by providing Limited Height Subway on RRSK 1,00,00 .. 60,00 40,00
LC No. 111.
350 Viramgam-Okha section- Provision of Limited Hight S.Fund .. .. .. ..
Subway on Unmanned LC No. 96. RRSK 1,70,19 .. 50,00 1,20,19
351 Viramgam-Okha section- Provision of Limited Hight S.Fund .. .. .. ..
Subway on Unmanned LC No. 225. RRSK 1,71,29 .. 1 1,71,28
352 Viramgam-Okha section- Provision of Limited Hight S.Fund .. .. .. ..
Subway on Unmanned LC No.160. RRSK 1,51,41 .. 1 1,51,40
353 Viramgam-Okha section:-Provision of Limited Hight S.Fund .. .. .. ..
Subway on Unmanned LC No. 161. RRSK 1,49,42 .. 1 1,49,41
354 Viramgam-Okha section-Provision of Limited Hight S.Fund .. .. .. ..
Subway on Unmanned LC No. 245. RRSK 1,43,77 .. 50,00 93,77
355 Viramgam-Okha section - Provision of Limited Hight S.Fund .. .. .. ..
Subway on Unmanned LC No.253. RRSK 1,64,47 .. 50,00 1,14,47
356 Viramgam-Okha Section- Provision of Limited Hight S.Fund .. .. .. ..
Subway on Unmanned LC No. 70. RRSK 2,04,29 .. 50,00 1,54,29
357 Viramgam-Okha section- Provision of Limited Hight S.Fund .. .. .. ..
Subway on Unmanned LC No. 75. RRSK 2,16,16 .. 50,00 1,66,16
358 Surendranagar-Dhrangadhra section jn. (bg & mg):- S.Fund .. .. .. ..
Provision of Limited Height Subway on Unmanned LC RRSK 1,71,29 .. 1 1,71,28
No.11.
359 Viramgam-Okha section-Provision of Limited Hight S.Fund .. .. .. ..
Subway on Unmanned LC No.184. RRSK 1,65,41 .. 50,00 1,15,41
360 Bileshwar & Rajkot.:- Pro of LHS by providing RCC S.Fund .. .. .. ..
Box (1x5.5x4.5m)to eliminate LC No 116 'C' class RRSK 2,07,76 .. 50,00 1,57,76
Engg U/M.
361 Okhamadhi and Gorinja :- Provision of limited S.Fund .. .. .. ..
height sub way on LC No. 281 at Km 950/1-2 . RRSK 1,76,52 .. 1 1,76,51
362 Okhamadhi and Gorinja :- Provision of limited S.Fund .. .. .. ..
height sub way on LC No. 283 at Km 952/7-8. RRSK 1,76,52 .. 1 1,76,51
Bhavnagar363 Construction of Limited Height Sub Way to S.Fund 2,22,44 2,22,44 .. ..
elimination of Level crossing (LC No. 32 & 36 on RRSK .. .. .. ..
Kanalus -Porbandar section)
365 Construction of Limited Height Sub Way to S.Fund 99,65 99,65 .. ..
elimination of Level crossing (LC No. 17 & 22 on RRSK 1,35,21 .. 1,00,35 34,86
Kanalus -Porbandar section)
15.04.30.16.3.53.012
15.02.30.13.3.51.009
15.02.30.13.3.51.010
15.04.30.16.3.53.009
15.04.30.16.3.53.001
15.04.30.16.3.53.002
15.04.30.16.3.53.003
15.04.30.16.3.53.011
15.04.30.16.3.53.013
15.04.30.16.3.53.004
15.04.30.16.3.53.005
15.04.30.16.3.53.006
15.04.30.16.3.53.010
15.04.30.16.3.53.007
15.04.30.16.3.53.008
ROAD SAFETY - ROB/RUB
15.04.30.15.3.53.002
15.04.30.15.3.53.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 20
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
367 Construction of Limited Height Sub Way to S.Fund 1,69,74 1,69,74 .. ..
elimination of Level crossing (LC No. 37 & 42 on RRSK 49,65 .. 30,26 19,39
Kanalus -Porbandar section)
369 Construction of Limited Height Sub Way to S.Fund 97,20 97,20 .. ..
elimination of Level crossing (LC No. 43 & 45 on RRSK 1,32,45 .. 1,02,80 29,65
Kanalus -Porbandar section)
371 Construction of Limited Height Sub Way to S.Fund 1,02,62 1,02,62 .. ..
elimination of Level crossing (LC No. 59 & 71 on RRSK 1,34,46 .. 97,38 37,08
Kanalus -Porbandar section)
372 Construction of Limited Height Sub Way to S.Fund .. .. .. ..
elimination of Level crossing (LC No. 81 & 79 on RRSK 1,83,97 .. 1,60,00 23,97
Jetalsar - Wansjaliya section)
374 Construction of Sub Way to elimination of Level S.Fund 1,75,83 1,75,83 .. ..
crossing (LC No. 91 & 85 on Jetalsar - Wansjaliya RRSK 83,98 .. 24,17 59,81
section)
376 Construction of Limited Height Sub Way to S.Fund 1,11,50 1,11,50 .. ..
elimination of Level crossing (LC No. 97 & 109 on RRSK 1,13,99 .. 88,50 25,49
Jetalsar - Wansjaliya section)
378 Construction of Sub Way to elimination of Level S.Fund 1,24,95 1,24,95 .. ..
crossing (LC No. 112 & 114 on Jetalsar - RRSK 1,09,55 .. 75,05 34,50
Wansjaliya section)
380 Construction of Limited Height Sub Way to S.Fund 66,29 66,29 .. ..
elimination of Level crossing (LC No. 51 on RRSK 1,51,41 .. 1,33,71 17,70
Kanalus- Porbandar & 116 on Jetalsar - Wansjaliyasection)
382 Construction of Limited Height Sub Way to S.Fund 92,76 92,76 .. ..
elimination of Level crossing (LC No. 94 & 96 on RRSK 1,43,90 .. 1,00,00 43,90
Jetalsar - Wansjaliya section)
384 Construction of Limited Height Sub Way to S.Fund 35,54 35,54 .. ..
elimination of Level crossing ( LC No. 18 & 105 on RRSK 1,83,50 .. 1,00,00 83,50
RAJKOT - SOMNATH section )
TOTAL-WORKS IN PROGRESS RRSK .. .. 55,68,57 ..
B - New Works
Vadodara385 Dabhoi-Chhotaudepur (BG) Section:-Elimination RRSK 1,57,13 .. 50,00 1,07,13
Level X-ings No. 88 between Tejgadh-Puniyavat byproviding Road Under Bridge.
386 Surat-Vadodara Section:-Elimination of level X-ing RRSK 2,42,37 .. 3 2,42,34
No. 185 at km. 335/7-9 between stationsChavaj-Nabipur by providing Road UnderBridge(RUB).
387 Surat-Vadodara Section:-Elimination of level X-ing RRSK 2,45,54 .. 3 2,45,51
No. 182 at km. 331/5-7 between stationsChavaj-Nabipur by providing Road UnderBridge(RUB).
15.02.30.13.3.51.008
15.02.30.13.3.51.001
15.06.30.17.3.55.023
15.06.30.17.3.55.010
15.06.30.17.3.55.011
15.02.30.13.3.51.002
15.02.30.13.3.51.003
15.02.30.13.3.51.004
15.02.30.13.3.51.005
15.02.30.13.3.51.006
15.02.30.13.3.51.007
ROAD SAFETY - ROB/RUB15.02.30.13.3.51.011
15.02.30.13.3.51.012
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 21
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
388 Surat-Vadodara Section:-Elimination of level X-ing RRSK 2,42,37 .. 3 2,42,34
No. 201 at km. 354/30-32 between stationsPalej-Lakodra by providing Road Under Bridge(RUB).
389 Vadodara-Geratpur Section:-Elimination of level RRSK 2,42,68 .. 50,00 1,92,68
X-ing No. 284 at km. 459/34-02 between stationsGothaj-Mahemdavad by providing Road UnderBridge(RUB).
390 Surat-Vadodara Section:-Elimination of level X-ing RRSK 2,49,93 .. 3 2,49,90
No. 232 at km. 391/16-18 between stationsMakarpura-Vishwamitri by providing Road UnderBridge(RUB).
391 Surat-Vadodara Section:-Elimination of level X-ing RRSK 2,48,10 .. 3 2,48,07
No. 169 at km. 313/12-14 between stationsPanoli-Ankleshwar by providing Road UnderBridge(RUB).
392 Vadodara-Godhra Section:-Elimnation of level X-ing RRSK 2,44,91 .. 3 2,44,88
No. 13 at km. 414/16-18 between stationsPilol-Samlaya by providing Road Under Bridge.(RUB)
393 Vadodara-Godhra Section:-Elimnation of level X-ing RRSK 2,44,40 .. 3 2,44,37
No. 36 at km. 454/1-3 between stationsDerol-Kharsaliya by providing Road Under Bridge.(RUB)
394 Vadodara-Geratpur Section:-Elimination of level RRSK 2,42,41 .. 3 2,42,38
X-ing No. 257 at km. 426/18-20 between stationsVadod-Anand by providing Road Under Bridge(RUB).
395 Vadodara-Geratpur Section:-Elimination of level RRSK 2,41,80 .. 3 2,41,77
X-ing No. 267 at km. 441/16-18 between stationsKanjari Boriyavi-Utarsanda by providing Road UnderBridge(RUB).
396 Vadodara-Godhra Section:-Elimnation of level X-ing RRSK 2,46,66 .. 3 2,46,63
No. 19 at km. 427/18-20 between stationsSamlaya-Champaner Road by providing Road UnderBridge.
397 Vadodara-Godhra Section:-Elimnation of level X-ing RRSK 2,45,87 .. 44,00 2,01,87
No. 12 at km. 413/14-16 between stationsPilol-Samlaya by providing Road Under Bridge.
398 Vadodara-Godhra Section:-Elimnation of level X-ing RRSK 2,47,66 .. 3 2,47,63
No. 16 at km. 419/16-18 between stationsPilol-Samlaya by providing Road Under Bridge.
399 Vadodara-Godhra Section:-Elimnation of level X-ing RRSK 2,45,56 .. 3 2,45,53
No. 15 at km. 416/20-22 between stationsPilol-Samlaya by providing Road Under Bridge.
15.06.30.17.3.55.019
15.06.30.17.3.55.021
15.06.30.17.3.55.001
15.06.30.17.3.55.002
15.06.30.17.3.55.003
15.06.30.17.3.55.004
15.06.30.17.3.55.012
15.06.30.17.3.55.013
15.06.30.17.3.55.016
15.06.30.17.3.55.017
15.06.30.17.3.55.018
15.06.30.17.3.55.020
ROAD SAFETY - ROB/RUB
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 22
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
400 Vadodara-Godhra Section:-Elimnation of level X-ing RRSK 2,47,71 .. 44,00 2,03,71
No. 18 at km. 424/12-14 between stationsSamlaya-Champaner rd by providing Road UnderBridge.
401 Vadodara-Godhra Section:-Elimnation of level X-ing RRSK 2,46,90 .. 3 2,46,87
No. 29 at km. 443/14-16 between stationsBakrol-Derol by providing Road Under Bridge.(RUB)
402 Vadodara-Godhra Section:-Elimnation of level X-ing RRSK 2,43,90 .. 3 2,43,87
No. 35 at km. 452/18-20 between stationsDerol-Kharsaliya by providing Road Under Bridge.(RUB)
403 Vadodara-Godhra Section:-Elimnation of level X-ing RRSK 2,44,91 .. 3 2,44,88
No. 48 at km. 465/12-14 between stationsKharsaliya-Godhra by providing Road Under Bridge.(RUB)
404 Vadodara-Godhra Section:-Elimnation of level X-ing RRSK 2,44,91 .. 3 2,44,88
No. 49 at km. 466/4-6 between stationsKharsaliya-Godhra by providing Road UnderBridge.(RUB)
405 Vadodara-Godhra Section:-Elimnation of level X-ing RRSK 2,40,61 .. 3 2,40,58
No. 44W at km. 460/20-22 between stationsKharsaliya-Godhra by providing Road UnderBridge.(RUB)
406 Vadodara-Godhra Section:-Elimnation of level X-ing RRSK 2,39,40 .. 3 2,39,37
No. 44E at km. 460/13-15 between stationsKharsaliya-Godhra by providing Road UnderBridge.(RUB)
407 Nadiad-Modasa Section:-Elimnation of level X-ing RRSK 1,55,40 .. 44,00 1,11,40
No. 55 at km. 44/1-2 between stationsNadiad-Kapadvanj by providing Road Under Bridge.(RUB)
408 Ankleshwar-Rajpipla Section:-Elimnation of level RRSK 1,55,24 .. 3 1,55,21
X-ing No.60 at km.50/4-5 between stationsJaghadiya-Rajpipla by providing Road Under Bridge.(RUB)
Ratlam409 Godhara - Ratlam section :- Providing Subway to RRSK 2,49,55 .. 3 2,49,52
eliminate manned LC No. 6x Km 473/16-18 near KIZYard at
410 Godhara - Ratlam section :- Providing Subway to RRSK 2,49,62 .. 3 2,49,59
eliminate manned LC No. 8 Km 475/08-10 b/w KIZ-CCLat.
411 Godhara - Ratlam section :- Providing Subway to RRSK 2,48,89 .. 3 2,48,86
eliminate manned LC No. 11 Km 479/14-16 b/wKIZ-CCL at.
15.05.30.17.3.54.006
15.06.30.17.3.55.015
15.06.30.17.3.55.022
15.06.30.17.3.55.006
15.06.30.17.3.55.008
15.05.30.17.3.54.002
15.05.30.17.3.54.005
ROAD SAFETY - ROB/RUB15.06.30.17.3.55.005
15.06.30.17.3.55.007
15.06.30.17.3.55.009
15.06.30.17.3.55.014
15.06.30.17.3.55.024
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 23
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
412 Godhara - Ratlam section :- Providing Subway to RRSK 2,49,91 .. 3 2,49,88
eliminate manned LC No. 12 Km 480/12-14 near CCLYard at
413 Godhara - Ratlam section :- Providing Subway to RRSK 2,49,70 .. 3 2,49,67
eliminate manned LC No. 13 Km 482/10-12 b/wCCL-SAT station at.
414 Godhara - Ratlam section :- Providing Subway to RRSK 2,49,55 .. 3 2,49,52
eliminate manned LC No. 29 Km 503/10-12 b/wPPD-LMK at.
415 Godhara-Ratlam section-Providing Subway to RRSK 2,49,23 .. 3 2,49,20
eliminate manned LC No. 39x Km 526/40-42 BetweenUSRA-JKT Station.
416 Godhara-Ratlam section-Providing Subway to RRSK 2,48,34 .. 3 2,48,31
eliminate manned LC No.62 Km 581/08-10 BetweenMGN-THDR Station.
417 Godhara-Ratlam section-Providing Subway to RRSK 2,49,69 .. 3 2,49,66
eliminate manned LC No.64 Km 584/22-24 BetweenTHDR-BJG Station.
418 Ratlam-Nagda section-Providing Subway to eliminate RRSK 2,48,61 .. 3 2,48,58
manned LC No.86 Km 662/04-06 Between RTM 'E'- BODStation.
419 Ratlam-Nagda section-Providing Subway to eliminate RRSK 2,49,29 .. 3 2,49,26
manned LC No.89 Km 667/07-08 Between BOD-RNHStation.
420 Nagda-Ujjain section-Providing Subway to eliminate RRSK 2,48,81 .. 3 2,48,78
manned LC No.12 Km 25/26-28 Between UNL-PSOStation.
421 Nagda-Ujjain section-Providing Subway to eliminate RRSK 2,49,01 .. 3 2,48,98
manned LC No.15 Km 31/18-20 Between PSO-ASLStation.
422 Indore-Dewas-Ujjain section-Providing Subway to RRSK 2,49,12 .. 3 2,49,09
eliminate manned LC No.22 Km 29/09-10 BetweenKDHA-NRGR Station.
423 Maksi-Dewas section-Providing Subway to eliminate RRSK 2,31,57 .. 3 2,31,54
manned LC No.03 Km 11/20-22 Between MKC-RCJStation.
424 Maksi-Dewas section-Providing Subway to eliminate RRSK 2,31,56 .. 3 2,31,53
manned LC No.06 Km 19/06-08 Between RCJ-DWXStation.
425 Ujjain-Bhopal Section-Providing Subway to RRSK 2,38,78 .. 3 2,38,75
eliminate manned LC No.64 Km 123/02-04 BetweenBCH-KSH Station.
15.05.30.17.3.54.013
15.05.30.17.3.54.014
15.05.30.17.3.54.016
15.05.30.17.3.54.018
15.05.30.17.3.54.003
15.05.30.17.3.54.004
15.05.30.17.3.54.015
15.05.30.17.3.54.017
15.05.30.17.3.54.011
15.05.30.17.3.54.012
ROAD SAFETY - ROB/RUB15.05.30.17.3.54.007
15.05.30.17.3.54.008
15.05.30.17.3.54.009
15.05.30.17.3.54.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 24
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
426 Ujjain-Bhopal Section-Providing Subway to RRSK 2,49,53 .. 3 2,49,50
eliminate manned LC No.73 Km 146/08-10 BetweenAKD-SJP Station.
Ahmedabad427 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,40,20 .. 3 2,40,17
No. 15 at Km 391/10-11 manned level crossings byproviding RUB on route of Gauge Conversion.
428 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,42,08 .. 3 2,42,05
No. 22 at Km 384/4-5 manned level crossings byproviding RUB on route of Gauge Conversion.
429 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,39,94 .. 3 2,39,91
No. 31 at Km 374/9-10 manned level crossings byproviding RUB on route of Gauge Conversion.
430 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,39,94 .. 3 2,39,91
No. 33 at Km 371/7-8 manned level crossings byproviding RUB on route of Gauge Conversion.
431 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,39,94 .. 3 2,39,91
No. 37 at Km 367/7-8 manned level crossings byproviding RUB on route of Gauge Conversion.
432 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,39,94 .. 3 2,39,91
No. 56 at Km 352/9-10 manned level crossings byproviding RUB on route of Gauge Conversion.
433 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,39,94 .. 3 2,39,91
No. 66 at Km 341/7-8 manned level crossings byproviding RUB on route of Gauge Conversion.
434 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,39,94 .. 3 2,39,91
No. 69 at Km 337/9-338/0 manned level crossings byproviding RUB on route of Gauge Conversion.
435 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,39,94 .. 3 2,39,91
No.70 at Km 336/7-8 manned level crossings byproviding RUB on route of Gauge Conversion.
436 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,39,94 .. 3 2,39,91
No. 76 at Km 330/5-6 manned level crossings byproviding RUB on route of Gauge Conversion.
437 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,39,94 .. 3 2,39,91
No.78 at Km 326/1-327/0 manned level crossings byproviding RUB on route of Gauge Conversion.
438 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,39,94 .. 3 2,39,91
No.79 at Km 325/4-5 manned level crossings byproviding RUB on route of Gauge Conversion.
439 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,39,94 .. 3 2,39,91
No.80 at Km 324/3-4 manned level crossings byproviding RUB on route of Gauge Conversion.
15.01.30.17.3.30.018
15.01.30.17.3.30.012
15.01.30.17.3.30.013
15.01.30.17.3.30.014
15.01.30.17.3.30.015
15.01.30.17.3.30.016
15.01.30.17.3.30.017
15.01.30.17.3.30.006
15.01.30.17.3.30.007
15.01.30.17.3.30.008
15.01.30.17.3.30.009
15.01.30.17.3.30.010
15.01.30.17.3.30.011
ROAD SAFETY - ROB/RUB15.05.30.17.3.54.010
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 25
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
440 Ahmedabad-Himmatnagar Section:- Elimination of LC RRSK 2,39,94 .. 3 2,39,91
No.27 at Km 380/5-6 manned level crossings byproviding RUB on route of Gauge Conversion.
441 Mahesana-Patan Section:- Elimination of LC No.11 RRSK 2,39,94 .. 3 2,39,91
at Km 12/7-8 unmanned level crossings by providingRUB.
442 Ahmedabad-Palanpur section:- Elimination of LC No RRSK 2,39,94 .. 3 2,39,91
233 at Km 761/9-762/0 manned level crossings byproviding RUB.
443 Ahmedabad-Palanpur section:- Elimination of LC No RRSK 2,39,94 .. 3 2,39,91
229 at Km 754/4-5 manned level crossings byproviding RUB.
444 Ahmedabad-Palanpur section:- Elimination of LC No RRSK 2,39,94 .. 3 2,39,91
234 at Km 764/6-7 manned level crossings byproviding RUB.
445 Ahmedabad-Palanpur section:- Elimination of LC No RRSK 2,39,94 .. 3 2,39,91
235 at Km 766/6-7 manned level crossings byproviding RUB.
Rajkot446 Dahinsara -Maliya :- Provision of limited height RRSK 1,14,25 .. 3 1,14,22
sub way on U/M LC No. 13 at Km 8/4-5 bet.Dahinsara -Maliya station..
447 Dahinsara -Maliya :- Provision of limited height RRSK 1,14,05 .. 3 1,14,02
sub way on U/M LC No. 15 at Km 10/2-3 betDahinsara -Maliya station.
448 Dahinsara -Maliya :- Provision of limited height RRSK 1,12,93 .. 3 1,12,90
sub way on U/M LC No.21 at Km 16/3-4 betDahinsara -Maliya station.
449 Dahinsara -Maliya .:- Provision of limited height RRSK 1,14,15 .. 3 1,14,12
sub way on U/M LC No.20 at Km 16/0-1 betDahinsara -Maliya station.
450 Wankaner - Navlakhi :- Provision of limited RRSK 1,12,93 .. 3 1,12,90
height sub way on U/M LC No. 10 at Km 7/9 -8/0 bet Wankaner & Navlakhi station.
451 Surendranagar- Dhrangdhra section .:- Provision of RRSK 1,12,93 .. 3 1,12,90
limited height sub way on U/M LC No. 9 at Km 8/3-4 bet Surendranagar- Dhrangdhra section .
452 Surendranagar - Dhrangdhra :- Provision of limited RRSK 1,14,25 .. 3 1,14,22
height sub way on U/M LC No. 15 at Km 17/2-3 in Surendranagar- Dhrangdhra section .
453 Surendranagar - Dhrangdhra :- Provision of limited RRSK 1,15,04 .. 3 1,15,01
height sub way on U/M LC No. 25 at Km 28/9 -29/0 in Surendranagar- Dhrangdhra section .
15.04.30.17.3.53.011
15.04.30.17.3.53.012
15.04.30.17.3.53.016
15.04.30.17.3.53.018
15.01.30.17.3.50.004
15.01.30.17.3.50.005
15.04.30.17.3.53.004
15.04.30.17.3.53.049
15.04.30.17.3.53.007
15.04.30.17.3.53.008
ROAD SAFETY - ROB/RUB15.01.30.17.3.30.019
15.01.30.17.3.50.001
15.01.30.17.3.50.002
15.01.30.17.3.50.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 26
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
454 Vani Road - Sabli Road :- Provision of limited RRSK 1,94,57 .. 3 1,94,54
height sub way on U/M LC No. 8 at Km 573/4-5 in Viramgam - Okha section.
455 Lunsariya - Wankaner :- Provision of limited RRSK 1,94,57 .. 3 1,94,54
height sub way on U/M LC No. 92 at Km 698/1-2 in Viramgam - Okha section.
456 Kankot - Khorana :- Provision of limited height RRSK 1,94,57 .. 3 1,94,54
sub way on U/M LC No. 108 at Km 722/6-7 in Viramgam - Okha section.
457 Jaliyadevani -Jamvanthali :- Provision of limited RRSK 1,96,49 .. 3 1,96,46
height sub way on U/M LC No. 162 at Km 790/8-9 bet Jaliyadevani and Jamvanthali stations
458 Jamvanthali - Aliyavada :- Provision of limited RRSK 1,96,49 .. 3 1,96,46
height sub way on U/M LC No. 169 at Km 797/7-8 bet Jamvanthali and Aliyavada stations.
459 Aliyavada - Hapa :- Provision of limited height RRSK 1,96,31 .. 3 1,96,28
sub way on U/M LC No. 180at Km 810/9-811/0 bet Aliyavada and Hapa station.
460 Aliyavada - Hapa :- Provision of limited height RRSK 1,94,57 .. 3 1,94,54
sub way on U/M LC No. 183at Km 813/5-6 bet Aliyavada and Hapa station.
461 Modpur-Khambhaliya .:- Provision of limited height RRSK 1,96,49 .. 3 1,96,46
sub way on U/M LC No. 226 at Km 865/3-4 betModpur and Khambhaliya station.
462 Modpur - Khambhaliya.:- Provision of limited RRSK 1,96,49 .. 3 1,96,46
height sub way on U/M LC No. 228 at Km 871/1-2 bet Modpur and Khambhaliya station.
463 Khambhaliya - Bhatel :- Provision of limited RRSK 1,96,49 .. 3 1,96,46
height sub way on U/M LC No. 244 at Km 896/6-7 bet Khambhaliya and Bhatel stations
464 Modpur & Khambhaliya .:- Provision of limited RRSK 2,02,83 .. 50,00 1,52,83
height sub way on LC No. 229 at Km 873/2-3 betModpur & Khambhaliya station.
465 Modpur & Khambhaliya - Provision of limited height RRSK 2,02,83 .. 50,00 1,52,83
sub way on LC No. 230 at Km 875/6-7 bet Modpur &Khambhaliya station.
466 Khambhaliya- Bhatel :- Provision of limited height RRSK 2,02,83 .. 50,00 1,52,83
sub way on LC No. 246 at Km 898/9-899/0 bet Khambhaliya and Bhatel station.
467 Dwarka - Bhimrana .:- Provision of limited height RRSK 2,02,83 .. 50,00 1,52,83
sub way on LC No. 298 at Km 976/8-9 bet Dwarka &Bhimrana station.
15.04.30.17.3.53.048
15.04.30.17.3.53.006
15.04.30.17.3.53.009
15.04.30.17.3.53.010
15.04.30.17.3.53.043
15.04.30.17.3.53.045
15.04.30.17.3.53.046
15.04.30.17.3.53.030
15.04.30.17.3.53.035
15.04.30.17.3.53.001
15.04.30.17.3.53.002
15.04.30.17.3.53.003
15.04.30.17.3.53.005
ROAD SAFETY - ROB/RUB15.04.30.17.3.53.024
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 27
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
468 Chamaraj- Digsar:- Provision of limited height sub RRSK 1,67,47 .. 3 1,67,44
way on U/M LC No. 43 at Km 634/0-1 bet Chamarajand Digsar stations
469 Chamaraj - Digsar :- Provision of limited height RRSK 1,69,00 .. 3 1,68,97
sub way on U/M LC No. 44 at Km 634/9-635/0 bet Chamaraj and Digsar stations
470 Digsar - Muli Road :- Provision of limited height RRSK 1,67,47 .. 3 1,67,44
sub way on U/M LC No. 52 at Km 643/6-7 bet Digsar and Muli Road stations
471 Digsar - Muli Road :- Provision of limited height RRSK 1,67,47 .. 3 1,67,44
sub way on U/M LC No. 54 at Km 646/3-4 bet Digsar and Muli Road stations
472 Muli Road - Ramparda - Provision of limited height RRSK 1,67,47 .. 3 1,67,44
sub way on U/M LC No. 56 at Km 649/7-8 bet MuliRoad - Ramparda stations
473 Lakhabaval - Pipli :- Provision of limited height RRSK 1,67,47 .. 3 1,67,44
sub way on U/M LC No. 210 at Km 840/1-2 betLakhabaval - Pipli station.
474 Lakhabawal - Pipli : Provision of limited height RRSK 1,67,36 .. 3 1,67,33
sub way on U/M LC No. 214 at Km 845/3-4 bet :Lakhabaval and Pipli.
475 Sindhavadar yard.:- Provision of limited height RRSK 1,94,93 .. 3 1,94,90
sub way on LC No. 101 at Km 713/6-7
476 Kankot - Khorana :- Provision of limited height RRSK 1,94,93 .. 3 1,94,90
sub way on LC No. 109 at Km 723/4-5 .
477 Kankot- Khorana:- Provision of limited height sub RRSK 1,94,93 .. 3 1,94,90
way on LC No. 110 at Km 725/9 - 726/0.
478 Jaliyadevani - Jamwanthali :- Provision of limited RRSK 2,02,83 .. 3 2,02,80
height sub way on LC No. 164 at Km 794/6-7 .
479 Aliyavada - Hapa :- Provision of limited height RRSK 2,02,83 .. 3 2,02,80
sub way on LC No. 182 at Km 812/8-9 ..
480 Hapa - Jamnagar:- Provision of limited height sub RRSK 2,02,83 .. 50,00 1,52,83
way on LC No. 190 at Km 821/1-2 .
481 Hapa- Jamnagar :- Provision of limited height sub RRSK 2,02,83 .. 3 2,02,80
way on LC No. 191 at Km 822/0-1.
482 Lilapur Road - Kesariya Road :- Provision of RRSK 1,94,93 .. 3 1,94,90
limited height sub way on LC No. 20 at Km594/5-6.
483 Modpur - Khambhaliya:- Provision of limited height RRSK 2,02,83 .. 3 2,02,80
sub way on LC No. 227 at Km 866/6-7.
15.04.30.17.3.53.017
15.04.30.17.3.53.019
15.04.30.17.3.53.020
15.04.30.17.3.53.021
15.04.30.17.3.53.050
15.04.30.17.3.53.027
15.04.30.17.3.53.044
15.04.30.17.3.53.047
15.04.30.17.3.53.042
15.04.30.17.3.53.013
15.04.30.17.3.53.014
15.04.30.17.3.53.015
ROAD SAFETY - ROB/RUB15.04.30.17.3.53.038
15.04.30.17.3.53.039
15.04.30.17.3.53.040
15.04.30.17.3.53.041
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 28
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
484 Khambhaliya yard.:- Provision of limited height RRSK 2,02,83 .. 3 2,02,80
sub way on LC No. 234 at Km 881/6-7 .
485 Makansar - Morvi :- Provision of limited height RRSK 1,13,22 .. 3 1,13,19
sub way on LC No. 25 at Km 23/8-9.
486 Bala road - Surendranagar :- Provision of limited RRSK 1,94,93 .. 50,00 1,44,93
height sub way on LC No. 36 at Km 623/4-5 betBALAROAD and Surendranagar startions .
487 Lakhamachi Yard:- Provision of limited height sub RRSK 1,94,93 .. 3 1,94,90
way on LC No. 76 at Km 679/3-4 .
488 Chanol - Hadmatiya:- Provision of limited height RRSK 1,94,93 .. 3 1,94,90
sub way on LC No. 152 at Km 777/2-3.
489 Jamwanthali- Aliyavada:- Provision of limited RRSK 1,94,93 .. 3 1,94,90
height sub way on LC No. 171 at Km 798/4-5.
490 Jamwanthali- Aliyavada:- Provision of limited RRSK 1,94,93 .. 3 1,94,90
height sub way on LC No. 174 at Km 801/0-1.
491 Lakhabawal-Pipli:- Provision of limited height sub RRSK 1,94,93 .. 3 1,94,90
way on LC No. 213 at Km 844/5-6.
492 Bhatiya -Okhamadhi:- Provision of limited height RRSK 1,94,93 .. 3 1,94,90
sub way on LC No. 271 at Km 930/3-4.
493 Bhatiya -Okhamadhi:- Provision of limited height RRSK 1,94,93 .. 3 1,94,90
sub way on LC No. 272 at Km 933/5-6.
494 Bhatiya -Okhamadhi:- Provision of limited height RRSK 1,94,93 .. 3 1,94,90
sub way on LC No. 275 at Km 940/3-4.
495 Dwarka-Bhimrana:- Provision of limited height sub RRSK 1,94,93 .. 3 1,94,90
way on LC No. 296 at Km 973/7-8.
Bhavnagar496 Dhola - Bhavnagar Section: Providing Sub-way on RRSK 2,25,76 .. 3 2,25,73
Manned LC No. 205/X ( Twin RCC Box of 4.0m x5.00m)
497 Rajkot - Jetalsar Section: Providing Sub-way on RRSK 2,49,90 .. 3 2,49,87
Manned LC No. 35 ( Twin RCC Box of 4.0m x 5.00m)
498 Rajkot - Jetalsar Section: Providing Sub-way on RRSK 2,44,57 .. 3 2,44,54
Manned LC No. 13 (Twin RCC Box of 4.0m x 5.00m)
499 Kanalus - Porbandar Section: Providing Sub-way on RRSK 2,47,56 .. 3 2,47,53
Manned LC No. 24 ( Twin RCC Box of 4.0m x 5.00m)
500 Kanalus - Porbandar Section: Providing Sub-way on RRSK 2,43,64 .. 3 2,43,61
Manned LC No. 31 ( Twin RCC Box of 4.0m x 5.00m)
501 Kanalus - Porbandar Section: Providing Sub-way on RRSK 2,45,61 .. 3 2,45,58
Manned LC No. 57 ( Twin RCC Box of 4.0m x 5.00m)15.02.30.17.3.51.004
15.04.30.17.3.53.037
15.02.30.17.3.51.001
15.02.30.17.3.51.009
15.02.30.17.3.51.002
15.02.30.17.3.51.013
15.02.30.17.3.51.003
15.04.30.17.3.53.023
15.04.30.17.3.53.025
15.04.30.17.3.53.026
15.04.30.17.3.53.029
15.04.30.17.3.53.033
15.04.30.17.3.53.036
ROAD SAFETY - ROB/RUB15.04.30.17.3.53.028
15.04.30.17.3.53.031
15.04.30.17.3.53.032
15.04.30.17.3.53.034
15.04.30.17.3.53.022
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 29
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
502 Jetalsar-Wansjaliya Section: Providing Sub-way on RRSK 2,47,56 .. 3 2,47,53
Manned LC No. 68 ( Twin RCC Box of 4.0m x 5.00m)
503 Jetalsar-Wansjaliya Section: Providing Sub-way on RRSK 2,46,92 .. 3 2,46,89
Manned LC No. 106X ( Twin RCC Box of 4.0m x 5.00m)
504 Rajkot - Jetalsar Section: Providing Sub-way on RRSK 2,49,09 .. 3 2,49,06
Manned LC No. 36 (RCC Box of 4.0m x 5.00m)
505 Rajkot - Jetalsar Section: Providing Sub-way on RRSK 2,07,01 .. 3 2,06,98
Un-Manned LC No. 39 ( RCC Box of 4.0m x 5.00m)
506 Rajkot - Jetalsar Section: Providing Sub-way on RRSK 2,49,90 .. 3 2,49,87
Manned LC No. 50 ( Twin RCC Box of 4.0m x 5.00m)
507 Rajkot - Jetalsar Section: Providing Sub-way on RRSK 2,49,54 .. 3 2,49,51
Manned LC No. 14 ( Twin RCC Box of 4.0m x 5.00m)
508 Rajkot – Jetalsar section: Improvement to Drainage RRSK 2,01,41 .. 3 2,01,38
system of Subway at 8 level crossings (LC No. 18,52, 54, 55, 56, 40, 41, 44)
509 Jetalsar jn.~~Wansjaliya jn section: Improvement RRSK 2,05,72 .. 3 2,05,69
to Drainage system of Subway at 6 level crossing(LC No. 64,,74, 97,109,112,114)
510 Kanalus ~ Porbandar section: Improvement to RRSK 1,32,61 .. 3 1,32,58
Drainage system of Subway at 6 level crossings(LC No. 17,22,59,27, 51& 116)
TOTAL-NEW WORKS RRSK .. .. 5,35,45 ..
TOTAL-Road Safety - ROB/RUB RRSK .. .. 61,04,02 ..
A - Works in Progress
Mumbai512 Virar-Surat Sec. Casual renewal of eutectic weld DRF 90,90 90,90 .. ..
rails in various location in SSE(P.way) PLG RRSK 26,91 .. 1,00 25,91
Section (Approx. 1.0km). SRSF 1 16,00 .. .. 16,00
514 Udhna-Jalgaon section:- TSR = 0.703 kms.on major DRF 40,14 40,14 .. ..
Bridge no- 374. (BCT/U/10-11) RRSK 38,34 .. 30,00 8,34
SRSF 1 20,00 .. .. 20,00
516 Udhna-Jalgaon section:- Providing complete set of DRF 74,16 74,16 .. ..
SEJs. (BCT/U/10-11) RRSK 85,63 .. 10,00 75,63
518 Udhna-Jalgaon Section:- Replacment of curved DRF 1,02,73 1,02,73 .. ..
switches = 126 Nos.under ADEN/E/Nandurbar. RRSK 13,81 .. 13,81 ..
(BCT/U/10-11)
520 Udhna-Jalgaon Section. Replacment of curved DRF 52,54 52,54 .. ..
switches = 126 Nos.under ADEN/W/Nandurbar. RRSK 46,46 .. 15,00 31,46
(BCT/U/10-11)
15.03.31.15.3.52.069
15.03.31.10.3.52.032
15.03.31.10.3.52.019
15.03.31.10.3.52.023
15.03.31.10.3.52.014
15.02.30.17.3.51.007
15.02.30.17.3.51.008
15.02.30.17.3.51.010
15.02.30.17.3.51.011
15.02.30.17.3.51.012
TRACK RENEWALS
ROAD SAFETY - ROB/RUB15.02.30.17.3.51.005
15.02.30.17.3.51.006
15.02.30.17.3.51.014
15.02.30.17.3.51.015
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 30
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
522 Virar-Surat section:Replacement of CMSC = 30 Nos DRF 55,44 55,44 .. ..
in the jurisdiction of ADEN/Dahanu Road and RRSK 35,90 .. 35,90 ..
ADEN/Surat section. (BCT/U/10-11) SRSF 1 2,00 .. .. 2,00
524 Virar-Surat Section:- Replacement of GRSP in the DRF 18,71 18,71 .. ..
jurisdiction of ADEN/Dahanu Road and ADEN/Suarat RRSK 45,83 .. 45,83 ..
section. (BCT/U/10-11) SRSF 1 2,00 .. .. 2,00
526 Virar-Surat Section:- Casual renewal of channel DRF 1,57,41 1,57,41 .. ..
sleeper fittings. RRSK 1,85,72 .. 14,13 1,71,59
Complete Track Renewal
527 Churchgate- Virar Section. (A) CTR(S&P)=2.20 DRF 1,77,21 1,77,21 .. ..
kms.(B)TRR(P)=0.70 kms. (A) of existing 60kg(SH) RRSK 1,47,30 .. 1,00 1,46,30
on PRC with 60kg (SH) on new PRC @ M+7 in BCT mainPF 1 to 5 =2.20( B) P) of exitg 60kg 90UTS on PRCby 60kg 90UTS LWR on new PRC/6 fr. km 5.00 - 5.4
Complete Track Renewal
529 VR ST section: CTR(P) by 60 kg 90 UTS rail and PRC DRF 35,90 35,90 .. ..
sleepers @ 1660 Nos/Km in yards(manual) between km RRSK 13,82 .. 1,00 12,82
67.935 to 68.221 = 0.286 km DN Line. SRSF 1 2,00 .. .. 2,00
R. 2,93
Complete Track Renewal
531 VR ST section: CTR(P) by 60 kg 90 UTS rail and PRC DRF 63,21 63,21 .. ..
sleepers @ 1660 Nos/Km in yards between km 76.480 RRSK 11,53 .. 1,00 10,53
to 76.90=0.420 km DN Line. SRSF 1 5,50 .. .. 5,50
R. 46
Through Rail Renewal
533 Udhna-Jalgaon section.:- Casual renewal of rails DRF 31,65 31,65 .. ..
under SSE(Pway) Vyara RRSK 66,79 .. 51,23 15,56
Through Rail Renewal
535 Churchgate-Virar Section:- Casual renewal of 60 Kg DRF 1,34,34 1,34,34 .. ..
rails under SSE (P. Way) Dadar RRSK 10,00 .. 10,00 ..
Through Rail Renewal
536 Virar - Surat :- Renewal of rails at fracture DRF .. .. .. ..
prone locations RRSK 99,38 .. 10,00 89,38
Through Rail Renewal
538 Udhna-Jalgaon . Casual renewal of rails under DRF 31,65 31,65 .. ..
SSE(P.Way)Nandurbar. Total 1.20 kms. RRSK 82,47 .. 65,91 16,56
Through Rail Renewal
540 Virar-Surat: Casual renewal of Eutectic weld rails DRF 41,64 41,64 .. ..
in SSE(P-way) Vapi section. RRSK 22,88 .. 1,00 21,88
SRSF 1 11,00 .. .. 11,00
Through Rail Renewal
542 Churchgate-Virar section :-Casual renewal of 60 Kg DRF 1,34,34 1,34,34 .. ..
rails under SSE(P.Way) Andheri RRSK 10,00 .. 10,00 ..
Through Rail Renewal
544 Virar-Surat section- Casual renewal of rails due DRF 1,15,65 28,20 .. 87,45
to eutectic welds under the jurisdiction of SSE(p. RRSK 1,00 .. 1,00 ..
way) Vapi section. SRSF 1 5,00 .. .. 5,00
15.03.31.13.3.52.013
15.03.31.14.3.52.004
15.03.31.16.3.52.011
15.03.31.16.6.52.005
15.03.31.14.3.52.005
15.03.31.15.3.52.066
15.03.31.16.3.52.012
15.03.31.10.3.52.053
15.03.31.10.3.52.043
15.03.31.11.3.52.030
15.03.31.09.2.52.002
15.03.31.13.6.52.001
15.03.31.13.6.52.002
TRACK RENEWALS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 31
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Through Rail Renewal
546 Udhna-Jalgaon. Casual renewal of rails under DRF 33,25 33,25 .. ..
SSE/P.way/Amalner. Total 1.20 kms. RRSK 79,88 .. 1,20 78,68
Through Rail Renewal
548 Churchgate-Virar Section:-Casual renewal of 60 Kg DRF 93,86 93,86 .. ..
rails under SSE (P. Way) Borivali RRSK 6,10 .. 3,05 3,05
Through Rail Renewal
550 Udhna Jalgaon .:-Casual renewal of rails under DRF 34,66 34,66 .. ..
ADEN-Vyara. Total 1.280 kms. RRSK 99,93 .. 1,20 98,73
Through Rail Renewal
552 Churchgate-Virar Section:-Casual renewal of 60 Kg DRF 93,86 93,86 .. ..
rails under SSE (P. Way) Bhayander RRSK 5,83 .. 2,90 2,93
Through Rail Renewal
554 Virar-Surat UP line:- Casual renewal of rails DRF 37,40 10,75 .. 26,65
from 143.00 to 143.530 = 0.53 Km RRSK 5,61 .. 1,00 4,61
Through Rail Renewal
556 Virar-Surat UP line :- Casual renewal of rails DRF 59,67 26,84 .. 32,83
from Km.202/01 to Km.202/29 =0.839 kms. RRSK 8,42 .. 1,00 7,42
Through Rail Renewal
557 Virar-Surat section:-. Casual renewal of rails and DRF .. .. .. ..
fastenings under sections of SSE(P.way) Palghar RRSK 70,01 .. 20,00 50,01
& Dahanu Road under AEN-Dahanu Road SRSF 1 20,00 .. .. 20,00
Through Rail Renewal
558 Virar-Surat section:- Casual renewal of rails and DRF .. .. .. ..
fastenings under the section of SSE(P.way), Vapi & RRSK 94,01 .. 20,00 74,01
Valsad under AEN-Valsad SRSF 1 5,00 .. .. 5,00
Through Rail Renewal
559 Virar-Surat Section:- Casual renewal of rails and DRF .. .. .. ..
fastenings under the section of SSE(P.way), RRSK 84,01 .. 20,00 64,01
Navsari & Surat under AEN-Surat SRSF 1 6,00 .. .. 6,00
Through Rail Renewal
560 Udhna-Jalgaon:-Casual renewal of rails under DRF .. .. .. ..
SSE(Pway)Vyara & Navapur under ADEN-Vyara RRSK 90,12 .. 1,46 88,66
Through Rail Renewal
561 Churchgate - Virar section: - Replacement of DRF .. .. .. ..
existing lever box by new spring point lever box RRSK 37,98 .. 18,91 19,07
with pull rod
Through Rail Renewal
563 Churchgate-Virar Section: - Replacement of DRF 1,05,49 1,05,49 .. ..
scabbed/ defective 60 kg rails under SSE (P. Way) RRSK 10,00 .. 10,00 ..
Dadar Section. SRSF 1 19,67 .. .. 19,67
Through Rail Renewal
565 Churchgate-Virar Section: - Replacement of DRF 1,05,49 1,05,49 .. ..
scabbed/ defective 60 kg rails under SSE (P. Way) RRSK 10,00 .. 10,00 ..
Andheri Section. SRSF 1 19,67 .. .. 19,67
15.03.31.16.3.52.001
15.03.31.16.3.52.004
15.03.31.16.3.52.007
15.03.31.13.3.52.009
15.03.31.13.3.52.017
15.03.31.16.3.52.010
15.03.31.16.3.52.013
15.03.31.16.3.52.016
15.03.31.16.3.52.003
TRACK RENEWALS
15.03.31.14.3.52.003
15.03.31.16.3.52.014
15.03.31.14.3.52.002
15.03.31.16.3.52.015
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 32
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Through Rail Renewal
567 Churchgate-Virar Section: - Replacement of DRF 1,34,34 1,34,34 .. ..
scabbed/ defective 60 kg rails under SSE (P. Way) RRSK 10,00 .. 10,00 ..
Borivali Section. SRSF 1 20,00 .. .. 20,00
Through Rail Renewal
569 Churchgate-Virar Section: - Replacement of DRF 1,05,49 1,05,49 .. ..
scabbed/ defective 60 kg rails under SSE (P. Way) RRSK 10,00 .. 10,00 ..
Bhayander Section. SRSF 1 19,67 .. .. 19,67
Through Sleeper Renewal
571 Virar-Surat Sec. TSR(P) 220.563 to 221.250 = 0.69 DRF 1,00 1,00 .. ..
km & 221.313 to 222.180 = 0.87 Total TSR(P) = RRSK 87,96 .. 1,00 86,96
1.56km on UP Line. SRSF 1 22 .. .. 22
R. 11,67
Through Sleeper Renewal
572 Bilimora - Waghai ( NG section ) - Through DRF 88,10 88,10 .. ..
Sleeper Renewal(s) of the existing on wooden RRSK 14,24 .. 14,23 1
sleepers with ST / CST-9 sleepers ( SH ) at 1310 R. 17,87
Nos/ Kms. Dencity including deep screening &recoupment of ballast to 150 mm - a) From km
Through Sleeper Renewal
574 VR-ST section: TSR(P) of existing 52kg PRC DRF 35,00 35,00 .. ..
sleepers at 1540 Nos/km with 60kg PRC sleepers at RRSK 51,68 .. 1,00 50,68
1660 Nos/km including deep screening and SRSF 1 4,50 .. .. 4,50
recoupment of ballast to 300mm (i) Km 70.87- Km R. 13,33
71.705=0.835 km DN line.(ii) Km 74.89- Km
Through Sleeper Renewal
576 VR-ST section: TSR(P) of existing 52kg PRC DRF 34,88 34,88 .. ..
sleepers at 1540 Nos/km with 60kg PRC sleepers at RRSK 43,17 .. 1,00 42,17
1660 Nos/km including deep screening and SRSF 1 1,00 .. .. 1,00
recoupment of ballast to 300mm (i) Km 75.480- Km R. 8,75
76.48: Total 1.00 km DN line
Points & Crossings
578 Virar-Surat:-TTR of one Diamonds crossing at NVS DRF 1,00 1,00 .. ..
RRSK 46,81 .. 1,00 45,81
SRSF 1 2,00 .. .. 2,00
Points & Crossings
580 Virar-Surat:- TTR of one diamonds at Vapi (Point DRF 68,68 12,00 .. 56,68
no 108) RRSK 1,00 .. 1,00 ..
SRSF 1 2,00 .. .. 2,00
Points & Crossings
582 Udhna-Jalgaon:-. TTR of 6 P&Cs on wooden sleeper DRF 94,41 94,41 .. ..
layout by PRC sleeper layout in NDB yard RRSK 48,49 .. 4,00 44,49
R. 6,81
Points & Crossings
584 Virar-Surat. :-Replacement of Trap points laid on DRF 81,09 81,09 .. ..
wooden sleepers layouts with trap points on PRC RRSK 23,33 .. 1,00 22,33
sleepers layout under ADEN-DRD . (Total 15 Sets) SRSF 1 2,00 .. .. 2,00
Points & Crossings
586 Virar-Surat. :-Replacement of Trap points laid on DRF 72,67 45,62 .. 27,05
wooden sleepers layouts with new trap points on RRSK 19,32 .. 1,00 18,32
PRC sleepers layout under ADEN-ST . (Total 15 SRSF 1 2,00 .. .. 2,00
Sets) R. ..
15.03.31.13.3.52.026
15.03.31.13.3.52.023
15.03.31.13.3.52.024
15.03.31.14.3.52.001
15.03.31.11.2.52.001
15.03.31.13.6.52.003
15.03.31.13.6.52.005
15.03.31.13.3.52.025
15.03.31.13.3.52.027
TRACK RENEWALS
15.03.31.16.3.52.008
15.03.31.16.3.52.009
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 33
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Others
587 Churchgate -Virar Section:- Renewal of fittings of DRF .. .. .. ..
channel sleepers RRSK 40,45 .. 20,15 20,30
Others
588 Virar-Surat section:- Replacement of wooden DRF .. .. .. ..
sleepers on bridge no.445 by steel RRSK 39,76 .. 30,00 9,76
channel/composite sleeper. SRSF 1 3,00 .. .. 3,00
Others
590 Churchgate-Virar Section: Casual renewal of PSC DRF 47,78 47,78 .. ..
sleepers RRSK 83,70 .. 41,70 42,00
SRSF 1 10,00 .. .. 10,00
Others
591 Virar Surat section: Replacement of steel channel DRF .. .. .. ..
sleeper fittings RRSK 86,70 .. 10,00 76,70
SRSF 1 10,00 .. .. 10,00
Others
592 Udhna-Jalgaon: Through Channel sleeper fitting DRF .. .. .. ..
Renewals RRSK 76,63 .. 50,00 26,63
SRSF 1 20,00 .. .. 20,00
Others
594 Churchgate-Virar - Replacement of existing 60 Kg DRF 44,72 44,72 .. ..
switches by new switches RRSK 78,91 .. 39,30 39,61
SRSF 1 10,00 .. .. 10,00
Others
596 Churchgate-Virar section : - Rehabilitation of DRF .. .. .. ..
track machine siding at Jogeshwari (AT). RRSK 74,66 .. 16,05 58,61
SRSF 1 10,00 .. .. 10,00
R. 5,00
Others
597 Virar - Surat - TSEJ - 85 Sets RRSK 2,31,10 .. 20,00 2,11,10
Others
599 Churchgate-Virar:-Replacement of Existing SEJs DRF 36,00 36,00 .. ..
RRSK 87,66 .. 43,66 44,00
SRSF 1 10,00 .. .. 10,00
Others
601 Virar-Surat:Replacement of SEJ (52kg/60kg) by DRF 37,64 37,64 .. ..
improved SEJ in AEN/BL section. RRSK 84,14 .. 1,00 83,14
SRSF 1 11,00 .. .. 11,00
Others
603 Virar-Surat: Replacement of Glued joints DRF 53,28 53,28 .. ..
(52kg/60kg) by in-situ glued joints in SE(P-way)BL RRSK 61,97 .. 1,00 60,97
section. SRSF 1 6,00 .. .. 6,00
Others
605 Udhna-Jalgaon section: Replacement of Glued joints DRF 36,00 36,00 .. ..
(52kg/60kg) by in-situ glued joints in ADEN-VYA RRSK 89,00 .. 25,00 64,00
and AEN-NDB section
Others
607 Virar-Surat section: Renewal of defective welds DRF 37,64 37,64 .. ..
RRSK 46,67 .. 1,00 45,67
SRSF 1 11,00 .. .. 11,00
15.03.31.15.3.52.068
15.03.31.15.3.52.064
15.03.31.15.3.52.071
15.03.31.15.3.52.070
15.03.31.15.3.52.065
15.03.31.15.3.52.074
15.03.31.15.3.52.075
15.03.31.15.3.52.076
15.03.31.15.3.52.067
15.03.31.16.3.52.018
15.03.31.16.2.52.001
TRACK RENEWALS
15.03.31.16.3.52.002
15.03.31.16.3.52.017
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 34
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Others
609 Virar-Surat Sec. Rehabilitation of existing track DRF 36,00 36,00 .. ..
machine stabling lines and its allied facilities RRSK 84,63 .. 10,00 74,63
SRSF 1 10,00 .. .. 10,00
Others
610 Udhana - Jalgoan section TFR = 26.72 kms. bet. RRSK 1,80,43 45,52 4,00 1,30,91
225.08 - 251.80.
Vadodara612 Vadodara Division:-Casual Renewal of defective DRF 2,56 2,56 .. ..
rails and rails on turnouts with 60 Kg (90 UTS) RRSK 71,72 .. 6,00 65,72
rails on Up & Dn Main lines between Surat-Bharuch. SRSF 1 19,32 19,32 .. ..
614 Vadodara Division:-Casual Renewal of defective DRF 3,79 3,79 .. ..
rails and rails on turnouts with 60 Kg (90 UTS) RRSK 70,99 .. 6,00 64,99
rails on Up & Dn Main lines between SRSF 1 18,82 18,82 .. ..
Bharuch-Miyagam.
616 Vadodara Division:Casual renewal of existing DRF 69,67 69,67 .. ..
broken and unserviceable 60kg PRC sleepers at RRSK 19,27 .. 10,00 9,27
isolated location between Bharuch-Miyagam on Up & SRSF 1 45,70 .. .. 45,70
Dn line under ADEN(N)Bharuch 3000 Nos.
618 Godhra & Nadiad-Rehabilitation of Allied DRF .. .. .. ..
Facilities in Track Machine Siding. RRSK 90,45 .. 20,00 70,45
R. 2,10
620 Itola:-Rehabilitation of existing track machine DRF 66,33 65,36 .. 97
stabling line and its allied facilities RRSK 13,98 .. 13,00 98
SRSF 1 25 .. .. 25
Complete Track Renewal
622 Godhra-Nagda:-CTR of 52Kg rails laid on wooden DRF 84,12 84,12 .. ..
sleepers/blocks on CC apron by new 60Kg (90 UTS) RRSK 3,24 .. 3,00 24
rails on PRC sleepers 1660 Nos./Km.with 300mm R. 6,70
clean ballast cushion on Line No. 4 at GodhraYard. Total length 0.65 Kms.
Through Rail Renewal
624 Surat-Miyagam Section :-Casual Renewal of rails DRF 12 .. .. 12
under SSE(P. Way)Utran & SSE(P.Way)(S)-Bharuch. RRSK 94,35 .. 20,00 74,35
under AEN(S)Bharuch
Through Rail Renewal
625 Surat-Miyagam Section :-Casual Renewal of rails DRF .. .. .. ..
in section of SSE(P. Way)(N)-Bharuch under RRSK 94,43 .. 20,00 74,43
ADEN(N)Bharuch.
Through Rail Renewal
626 Vadodara-Geratpur Section:-Casual Renewal of rails DRF .. .. .. ..
under jurisdiction of Sr. DEN(N)-BRC. RRSK 94,27 .. 15,00 79,27
Through Rail Renewal
628 Anand-Godhra Section:-Casual Renewal of rails DRF 46,82 46,77 .. 5
under SSE(P. Way)-Sevaliya. RRSK 47,38 .. 20,00 27,38
Through Sleeper Renewal
629 Vadodara-Geratpur Section:-Correcting channel DRF .. .. .. ..
sleepers spacing on Bridge No. 624 on Up line and RRSK 76,81 .. 40,00 36,81
TFR of channel sleeper fittings
15.06.31.16.3.55.003
15.06.31.15.3.55.059
15.06.31.13.3.55.028
15.06.31.16.3.55.005
15.06.31.16.3.55.006
15.06.31.16.3.55.004
15.06.31.16.3.55.007
15.03.31.15.3.52.081
15.03.31.10.2.52.001
15.06.31.15.3.55.061
15.06.31.15.3.55.062
15.06.31.15.3.55.052
15.06.31.16.3.55.009
TRACK RENEWALS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 35
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Ballast
630 Anand - Khambhat - TBR - 5.66 Kms. DRF 11 11 .. ..
RRSK 72,96 .. 20,00 52,96
R. 31,88
Ballast
632 Vadodara Division:-Surat-Godhra Section (Up DRF 1,15 1,15 .. ..
line):-Deep Screening and recoupment of ballast to RRSK 66,94 .. 20,00 46,94
the existing standard of 300mm from Km. 384.00 toKm. 390.00 Total TBR 6.00 Kms.
Ballast
634 Vadodara Division:-Surat-Godhra Section (Up DRF 9,96 9,96 .. ..
line):-Deep Screening and recoupment of ballast to RRSK 46,78 .. 21,00 25,78
the existing standard of 300mm from Km. 390.00 toKm. 395.00 Total TBR 5.00 Kms.
Points & Crossings
636 Surat-Godhra section:- TTR of 4 P&Cs (2 at Bharuch DRF 81,79 81,79 .. ..
& 2 at Palej) on wooden/ST sleepers by PRC and RRSK 15,57 .. 14,00 1,57
casual renewal of sleepers for one Km SRSF 1 28,81 .. .. 28,81
R. 2,96
Points & Crossings
638 Vadodara Division:- Casual renewal of broken and DRF 10,77 10,77 .. ..
cracked sleeper of Points and Xing under the RRSK 62,89 .. 10,00 52,89
jurisdiction of DEN(S)BRC SRSF 1 20,35 20,35 .. ..
Others
639 Surat-Miyagam :- TFR of fittings of channel DRF .. .. .. ..
sleepers on Important bridges No. 502 (UP&DN) RRSK 2,00,99 .. 80,00 1,20,99
Others
641 Vadodara Division:-Casual Renewal of Sleeper No. DRF 9,23 9,23 .. ..
64 to 76 of Points and X-ings under the RRSK 55,20 .. 5,00 50,20
jurisdiction of Sr. DEN(N)-BRC on SRSF 1 29,58 29,58 .. ..
Vadodara-Geratpur Section.
Others
642 Anand-Godhra Section:-Renewal of 16 Nos. SEJs, 9 DRF .. .. .. ..
Nos. 1 in 12 crossings & 4 Nos. 1 in 12 switches RRSK 99,91 .. 15,00 84,91
under SSE(P. Way)-Sevaliya.
Others
644 Vadodara Division:-Replacement of existing channel DRF 85,76 85,76 .. ..
sleepers with new channel sleepers on Bridge No. RRSK 10,00 .. 10,00 ..
32-B/DN, 40-B/UP, 49-A/Up & DN, 53-A/ Up & Dn.Total 472 Nos. of channel sleepers onVadodara-Godhra Section.
Others
646 Vadodara Division:- Rectification of badlayout in DRF 72,83 66,18 .. 6,65
Godhra yard to prevent accidents RRSK 26,69 .. 5,00 21,69
Ratlam647 Ratlam Division- Removal of 2 PSRs on Nagda-Bhopal DRF .. .. .. ..
sections RRSK 1,30,08 .. 50,00 80,08
SRSF 1 35,85 .. .. 35,85
15.05.31.16.2.54.004
15.06.31.15.3.55.050
15.06.31.16.2.55.002
15.06.31.15.3.55.060
15.06.31.16.3.55.008
15.06.31.15.3.55.055
15.06.31.12.6.55.001
TRACK RENEWALS
15.06.31.16.2.55.001
15.06.31.12.3.55.026
15.06.31.12.3.55.027
15.06.31.14.3.55.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 36
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
649 Godhra- Nagda Sec:- Elimination of bad lay out by DRF 13,02 1,09 .. 11,93
easement of curve at point No. 194 ( Loco yard RRSK 77,72 .. 5,00 72,72
Ratlam) , by shifting of point No. 206 and 208 at R. ..
MGN Yard, by Shifting of X-over 206 & 207 at MGNyard and by providing 1:8.5 t/ out at PCN Yard
651 Ujjain-Maksi & IDU Section:- Deep screening of DRF 30,00 30,00 .. ..
turn outs in different location of various yards-( RRSK 20,00 .. 10,00 10,00
1 in 12 - 43, 1 in 8 1/2 -22 & derailing SRSF 1 .. .. .. ..
switches-2).
653 Sehore- Rehabilitation of Machine stabling siding, DRF 3,89 .. .. 3,89
shed and Rest Room at. RRSK 92,13 .. 10,00 82,13
R. 1,77
Complete Track Renewal
654 Nagda-Bhopal - CTR(S) - 1.34Km in Ujjain Yard DRF 76 .. .. 76
RRSK 1,04,94 .. 40,00 64,94
SRSF 1 50,56 .. .. 50,56
R. 8,19
Through Rail Renewal
656 Godhra-Nagda Section:- Casual Rail renewal of DRF 60,00 60,00 .. ..
rails in AEN(S) Dahod section RRSK 29,22 .. 10,00 19,22
Through Rail Renewal
658 Godhra- Nagda Section:- Casual Rail renewal of DRF 50,00 50,00 .. ..
rails in AEN(E) Ratlam's section RRSK 45,24 .. 10,00 35,24
Through Rail Renewal
659 Nagda-Maksi Section:- Casual Rail renewal of rails DRF .. .. .. ..
in ADEN(W)Ujjain's jurisdiction. RRSK 39,60 .. 10,00 29,60
SRSF 1 60,00 .. .. 60,00
Through Rail Renewal
661 Indore-Dewas-Ujjain Section:- Casual Rail renewal DRF 98,97 98,97 .. ..
with 60 (kg) 90 UTS rails in ADEN -West section. RRSK 1,00 .. 1,00 ..
SRSF 1 .. .. .. ..
Through Rail Renewal
662 Chanderiya - Nimach section :- TRR (P) on Major DRF 1,31,03 1,23,05 .. 7,98
bridge No. 491, 229, 232, 256, 271 & 272 Total RRSK 1,10 .. 1,00 10
1.728 Km
Through Rail Renewal
663 Chanderiya - Nimach - TRR (S) - 1.55 Km DRF .. .. .. ..
RRSK 50,69 .. 27,00 23,69
SRSF 1 50,00 .. .. 50,00
Through Rail Renewal
665 Tajpur station:- :- Rehabilitation of existing DRF 18,25 18,25 .. ..
track machine stabling line and its allied RRSK 61,67 .. 27,21 34,46
facilities SRSF 1 18,35 .. .. 18,35
R. ..
Through Sleeper Renewal
667 Chittourgarh and Shambhupura C Yard - TSR (S) DRF .. .. .. ..
1.36Km RRSK 46,90 .. 25,00 21,90
R. 8,31
Through Sleeper Renewal
669 Nagda-Ujjain section - Through sleeper renewal (P) DRF 34,23 34,23 .. ..
with 60Kg PRC sleepers Up line from54.00 km to RRSK 30,99 .. 1,00 29,99
54.98 km. SRSF 1 14,31 .. .. 14,31
R. 29
15.05.31.15.3.54.080
15.05.31.16.3.54.001
15.05.31.15.3.54.063
15.05.31.16.3.54.004
15.05.31.16.3.54.002
15.05.31.16.3.54.003
15.05.31.15.3.54.069
15.05.31.14.2.54.001
15.05.31.16.2.54.003
TRACK RENEWALS15.05.31.15.3.54.075
15.05.31.11.3.54.017
15.05.31.16.3.54.006
15.05.31.16.2.54.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 37
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Points & Crossings
671 Chanderia - Ratlam Section - Deep screening of DRF 79 .. .. 79
Points & X-ings of main line and yard's at- RRSK 61,89 .. 30,00 31,89
R. 37,08
Points & Crossings
673 Godhra-Nagda Sec:- Casual renewal of old PRC DRF 2,11 2,11 .. ..
layout sleepers of points and X-ings. RRSK 39,03 .. 6,00 33,03
SRSF 1 2,11 .. .. 2,11
Points & Crossings
675 Chanderia-Ratlam section - Casual Renewal of CMS DRF 34 .. .. 34
crossings (1:12) RRSK 48,30 .. 15,00 33,30
Points & Crossings
676 Godhra -Nagda Section:- Relaxation of PSR from 55 DRF .. .. .. ..
KMPH to 100 KMPH at RTM A cabin, RRSK 1,22,40 .. 10,00 1,12,40
Points & Crossings
678 Nagda-Bhopal & Indore-Dewas-Ujjain sections:- DRF 3,97 3,97 .. ..
Elimination of Bad layout at Akodia ( 101-102 RRSK 69,29 .. 15,00 54,29
X-over),Baktal(119-120 X-over)Phanda ,(115-116 X- SRSF 1 .. .. .. ..
over)& Bakanian Bhaunri (BQE( 139-140 X-over)MKC R. 18,57
&DWX .
Others
680 Godhra-Nagda section:- Renewal of fittings of DRF 4,12 4,12 .. ..
channel sleepers, Riubber pads of points and RRSK 86,94 .. 45,00 41,94
crossings and other fittings.
Others
681 Nagda-Bhopal TFR of rubber pads 98.12 Km. DRF 99,40 59,23 .. 40,17
RRSK 65,45 .. 50,00 15,45
Others
683 Ratlam Division :- Casual Renewal of curved SEJ's. DRF 4,11 .. .. 4,11
RRSK 93,65 .. 10,00 83,65
Others
684 Godhra-Nagda Sec:- Renewal of fittings of steel DRF .. .. .. ..
channel sleepers of various bridges. RRSK 43,97 .. 30,00 13,97
SRSF 1 9,23 .. .. 9,23
Others
685 Indore-Dewas-Ujjain :- TWR Km.0 to 43.65 Km DRF 50,36 50,36 .. ..
RRSK 52,75 .. 40,00 12,75
SRSF 1 70,79 .. .. 70,79
Others
686 Mhow - Sanawad (MG) Sec. :- Supplying and fixing DRF .. .. .. ..
of new Galvanized Steel channel sleeper with all RRSK 34,65 .. 15,00 19,65
fitting and fixture under SSE (P. Way) Mhow and SRSF 1 14,96 .. .. 14,96
KNW section (366 Nos.)
Others
688 Nagda-Bhopal, Indore-Dewas-Ujjain & Dewas-Maksi DRF 12,24 12,24 .. ..
section -Casual Renewal of 52KG Switches ( 1:12& RRSK 74,16 .. 15,00 59,16
1in 8 1/2)Under jurisdiction of DEN(S) RTM. SRSF 1 8,15 8,15 .. ..
Others
690 Chanderia-Ratlam section - Casual Renewal of DRF 32,48 32,48 .. ..
Switches ( 1:12 & 1in 8 1/2) RRSK 63,76 .. 15,00 48,76
SRSF 1 32,48 .. .. 32,48
15.05.31.15.3.54.068
15.05.31.13.2.54.001
15.05.31.15.3.54.079
15.05.31.15.3.54.066
15.05.31.15.3.54.073
15.05.31.15.3.54.074
15.05.31.16.2.54.001
15.05.31.15.3.54.076
15.05.31.14.3.54.001
15.05.31.15.2.54.001
15.05.31.16.3.54.005
TRACK RENEWALS
15.05.31.15.3.54.081
15.05.31.15.3.54.065
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 38
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Others
692 Nagda-Bhopal, Indore-Dewas-Ujjain & Dewas-Maksi DRF 4,09 4,09 .. ..
section-Casual Renewal of 52KG Crossings ( 1:12& RRSK 90,70 .. 15,00 75,70
1in 8 1/2)Under jurisdiction of Den(S) RTM. SRSF 1 4,09 .. .. 4,09
Others
693 Godhra- Nagda Section :- Casual renewal of glued DRF .. .. .. ..
joints, SEJ's and provision of SEJ's in curves in RRSK 68,21 .. 15,00 53,21
ADEN (E) RTM section. SRSF 1 16,85 .. .. 16,85
Others
694 Godhra- Nagda Section :- Casual renewal of glued DRF .. .. .. ..
joints, SEJ's and provision of SEJ's in curves in RRSK 55,84 .. 15,00 40,84
ADEN (S) DHD section. SRSF 1 29,22 .. .. 29,22
Others
696 Chanderiya - Ratlam section: Casual renewal of DRF 43,82 .. .. 43,82
Glued joints (52kg) in ADEN-NMH section. RRSK 42,72 .. 15,00 27,72
Others
698 Nagda-Bhopal Section. :- Supplying and fixing of DRF 37,46 37,46 .. ..
new Insulated fittings for steel Channel sleepers RRSK 59,25 .. 15,00 44,25
on different bridges SRSF 1 2,92 .. .. 2,92
Others
700 Indore Yard :- Elimination of bad lay out by DRF .. .. .. ..
easement of curve and shifting of turnout RRSK 31,69 .. 10,00 21,69
SRSF 1 65 .. .. 65
R. 6,69
Others
702 Godhra-Nagda section-Casual Renewal of Switches ( DRF 11,12 11,12 .. ..
1:12& 1in 8 1/2) RRSK 81,01 .. 15,00 66,01
Others
703 Indore-Dewas -Ujjain Section : - WFT=14.00kms. DRF 94,64 94,64 .. ..
Formation Treatment using blaxial Geo - Grid from RRSK 1,51,97 .. 20,00 1,31,97
km 27/0 - 32/0, 35/0-36/0,44/0 - 48/1 and59/0 -63/0 =14.00 kms.
Others
705 TAN-Providing stabling siding for track DRF 48,76 48,76 .. ..
machine.(173 RM). (RTM/U/09-10) RRSK 15,57 .. 15,00 57
Others
707 Nagda-Bhopal:- .-Development of ballast siding at DRF 16,47 16,00 .. 47
Ujjain including top wiring. RRSK 41,96 .. 15,00 26,96
Others
709 GDA-NAD Sec.:- Casual renewal of Channel Sleeper & DRF 99,41 99,41 .. ..
Fittings in ADEN(S)-DHD Section. RRSK 1,00 .. 1,00 ..
SRSF 1 15,22 .. .. 15,22
Others
710 Chanderia - Nimach section: Removal of permanent DRF .. .. .. ..
speed restrictions at two locations between RRSK 54,59 .. 50,00 4,59
Nimbarera and Jawad road stations. SRSF 1 4,91 .. .. 4,91
15.05.31.15.3.54.082
15.05.31.09.2.54.002
15.05.31.09.3.54.018
15.05.31.11.3.54.021
15.05.31.12.3.54.002
15.05.31.15.6.54.001
15.05.31.15.3.54.067
15.05.31.15.3.54.070
15.05.31.15.3.54.072
15.05.31.15.3.54.078
15.05.31.13.3.54.020
15.05.31.15.3.54.077
TRACK RENEWALS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 39
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Ahmedabad712 Jhund-Kharagoda: TTR -5 sets DRF 40,00 40,00 .. ..
RRSK 20,83 .. 7,00 13,83
SRSF 1 30,00 30,00 .. ..
R. 3,17
714 Samakhiyali - Gandhidham section DN line - TRR of DRF 70,00 70,00 .. ..
Bhimasar entry from GIM side with new 52Kg rails. RRSK 24,33 .. 20,00 4,33
SRSF 1 .. .. .. ..
715 Khodiyar-Palanpur Section:- TFR of steel channel DRF .. .. .. ..
sleepers on major bridges RRSK 90,68 .. 57,55 33,13
R. ..
716 Viramgam- Samakhiyali : Casual renewal of channel DRF .. .. .. ..
sleeper of Br No 161 RRSK 66,69 .. 18,00 48,69
717 Palanpur-Mahesana section:- TWR 38.50 km RRSK 1,87,87 .. 1 1,87,86
719 Ahmedabad-Viramgam-Samakhiali section:- TTR of 5 DRF 82,43 82,43 .. ..
sets of 1 in 8.5 and 1 set 1 in 12 P&Cs on RRSK 7,36 .. 7,36 ..
wooden/ST layout by PRC lay out. SRSF 1 14,72 .. .. 14,72
R. 1,71
721 Ahmedabad division:- TTR(P) of 6 Nos 1 in 8.5 P&Cs DRF 74,06 72,29 .. 1,77
on 90R/52 Kg rails laid on wooden/ST layout by RRSK 5,73 .. 5,73 ..
52/60 Kg rail on PRC lay out in the jurisdiction SRSF 1 23 .. .. 23
of CPWI DHG and CPWI VG. R. 7,00
722 Ratnal:- Rehabilitation of existing track machine DRF .. .. .. ..
stabling line and its allied facilities RRSK 88,75 .. 15,00 73,75
R. ..
724 Ahmedabad-TRR(S) of 52Kg. rails laid on PRC DRF 63,76 30,00 .. 33,76
sleepers at M+7 density with 52Kg rails (SH) in RRSK 5,45 .. 5,45 ..
ADI yard PF line No 2 & 7. Total TRR=1.1 Km
726 Through Weld Renewal in Ahmedabad-Geratpur DRF 24,43 24,43 .. ..
Section. RRSK 52,90 .. 15,00 37,90
728 Through Bridge Timber Renewal- Replacement of DRF 71,08 71,08 .. ..
existing wooden sleeper with new galvanized steel RRSK 10,00 .. 10,00 ..
channel sleepers with all fittings and fixtures onHMT-KDBM(MG section) of DEN(N)’s jurisdiction(total Nos 372).
730 Replacement of Glued joint & SEJs with web DRF 10,42 10,00 .. 42
stiffener on age cum condition basis in the RRSK 65,76 .. 18,53 47,23
section of Sr. DEN (NW)-ADI
732 Renewal of Scissors Crossover in ADI Yard DRF 59,69 59,69 .. ..
RRSK 39,22 .. 28,00 11,22
Complete Track Renewal
733 Samakhiyali - Gandhidham - CTR (P) - 1.089 Km DRF .. .. .. ..
RRSK 1,55,15 .. 67,54 87,61
SRSF 1 12,00 .. .. 12,00
R. 6,66
Complete Track Renewal
734 Palanpur:- Rehabilitation of TMC siding along with DRF .. .. .. ..
Ramp, approach road, pathway, watering facility & RRSK 97,60 .. 28,00 69,60
electrical works.
15.01.31.12.3.50.009
15.01.31.12.3.50.017
15.01.31.16.2.50.001
15.01.31.16.3.50.003
15.01.31.13.3.50.019
15.01.31.13.3.50.021
15.01.31.15.3.50.054
15.01.31.13.3.50.024
15.01.31.11.3.50.025
15.01.31.12.3.50.018
TRACK RENEWALS
15.01.31.14.3.50.006
15.01.31.15.3.50.051
15.01.31.16.3.50.001
15.01.31.16.3.50.002
15.01.31.15.2.50.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 40
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Through Rail Renewal
735 Mahesana - Palanpur - TRR (P) = 1.727 Km DRF .. .. .. ..
RRSK 1,26,82 .. 41,00 85,82
SRSF 1 20,00 .. .. 20,00
Through Rail Renewal
737 Jhund- Samakhiyali : TRR (P) of existing 52 Kg 90 DRF 1,22 .. .. 1,22
UTS rail laid on PRC sleeper at 1660 density with RRSK 98,16 .. 43,00 55,16
new 60 Kg 90UTS rail at Km 639.260 to 640.360 betGSY-CUL on JN-SIOB section Total TRR 1.1 Km
Through Rail Renewal
738 Geratpur- Ahmedabad - TRR(P) - 2.00 of UP goods DRF .. .. .. ..
by pass line RRSK 1,72,15 .. 35,00 1,37,15
SRSF 1 6,01 .. .. 6,01
Through Rail Renewal
740 Viramgam-Samakhiyali Section : TSR (P) 60 Kg of Km DRF .. .. .. ..
606.2 to 607.100 total 0.9 Km with renewal of RRSK 58,98 .. 20,00 38,98
channel sleeper fitting of Br No 53 . R. 5,93
Through Rail Renewal
741 Jhund-Samakhiyali sect.:Removal of PSR at Km DRF .. .. .. ..
707/03 to 708/0 RRSK 95,35 .. 27,00 68,35
Through Sleeper Renewal
742 Gandhidham yard:- TSR(P)5.157 Km of existing CST-9 DRF 1,92,71 1,92,71 .. ..
sleepers with PSC sleepers @1660 nos/Km RRSK 1,45 .. 6,45 -500
SRSF 1 5,00 .. .. 5,00
Points & Crossings
744 Ahmedabad division:- TTR of one P&C at Kharaghoda DRF 38,08 38,08 .. ..
and five trap points at Jhund, Kkodiyar & RRSK 11,91 .. 6,00 5,91
Ahmedabad yards on wooden/ST sleeper by PRC layout R. 4,88
Points & Crossings
745 Ahmedabad-Palanpur & Kalol to Ranuj :- TTR of DRF 5,37 .. .. 5,37
diamond crossings at Mahesana & Katosan Yards = 2 RRSK 1,10,95 .. 55,50 55,45
Nos. R. 10,87
Points & Crossings
746 Ahmedabad - Palanpur section : - TTR = 10 Nos. (CS DRF 12,00 12,00 .. ..
- 10 Nos. + CMS - 10 Nos.)TBR 5.00 kms. & TFR RRSK 96,11 .. 10,00 86,11
5.00 kms. SRSF 1 50,00 .. .. 50,00
R. 32,96
Points & Crossings
747 Samakhiali - Gandhidham - Kandlaport :- RRSK 1,17,02 .. 46,77 70,25
TTR(CS+CMS) 27 Nos (60kg 1 in 12 = 26 & 1 in 8½ = SRSF 1 50,00 .. .. 50,00
1 Nos.)
Points & Crossings
748 Through Switch renewal 52 Kg (P) 1 in 8.5 and 1 in DRF .. .. .. ..
12 in the jurisdiction of DEN(N)ADI RRSK 91,47 .. 20,00 71,47
Points & Crossings
750 Ahmedabad Division :Through crossing renewal 52 kg DRF 3,47 .. .. 3,47
(P) in the jurisduction of SrDEN(W) ADI. RRSK 48,16 .. 14,00 34,16
15.01.31.15.2.50.001
15.01.31.15.2.50.005
15.01.31.15.2.50.006
15.01.31.15.3.50.043
15.01.31.15.3.50.049
15.01.31.15.3.50.050
15.01.31.16.2.50.003
15.01.31.15.3.50.052
15.01.31.15.3.50.047
15.01.31.10.2.50.005
15.01.31.14.3.50.005
TRACK RENEWALS
15.01.31.16.2.50.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 41
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Others
751 Through Fitting Renewal on Jhund -Samakhiali DRF 68,36 68,36 .. ..
section Total = TFR 31.40 Kms. RRSK 1,55,82 .. 20,00 1,35,82
Others
752 Through Fitting Renewal from km 769.900 to 795.910 DRF 1,09,09 1,09,09 .. ..
on Samakhiali - Gandhidham section Total = TFR RRSK 35,90 .. 15,65 20,25
26.01 Kms. SRSF 20,00 .. .. 20,00
Others
754 Palanpur-Gandhidham section:- Providing facilities DRF 17,44 17,44 .. ..
for track machine siding at Gandhidham & Bhildi RRSK 49,38 .. 20,00 29,38
SRSF 1 .. .. .. ..
Others
756 Mehasana- Viramgam-Samakhiali:- Providing DRF 31,30 31,30 .. ..
facilties for track machine sidings at Mehasana, RRSK 84,34 .. 20,00 64,34
Dharangadhara & Halvad SRSF 1 .. .. .. ..
Others
757 Ahmedabad-Viramgam-Samakhiali & Ahmedabad- DRF 61,69 61,69 .. ..
Mehasana sections:- TBTR of wooden sleepers by RRSK 1,03,70 .. 13,85 89,85
H-beam sleepers 579 Nos.. SRSF 1 .. .. .. ..
Others
758 Ahmedabad- Palanpur Section :- TFR of only Rubber DRF 3,42 3,42 .. ..
Pads - 95.50 Km RRSK 1,57,01 .. 70,00 87,01
Others
759 Viramgam - Samakhiali section : - TFR 21.57 Km DRF 12,32 12,32 .. ..
RRSK 1,67,29 .. 46,00 1,21,29
Others
761 Ahmedabad -Mehsana : (MG) TBTR Replacement of DRF 2,67 2,67 .. ..
BG/MG bridge timbers by steel channel sleepers bet RRSK 64,67 .. 18,00 46,67
Khodiyar -Ahmedabad .. SRSF 1 .. .. .. ..
Others
762 Palanpur-Mahesana Section:- TFR of only Rubber DRF .. .. .. ..
Pads - 55.00 Km RRSK 92,41 .. 25,87 66,54
Rajkot764 Wankaner - Rajkot Section; TRR(P) on major bridges DRF 12,10 12,10 .. ..
& its approaches. RRSK 74,05 .. 5,00 69,05
SRSF 1 10,00 .. .. 10,00
766 Rajkot Division ; Casual Renewal of rails on DRF 6,46 4,46 .. 2,00
various locations under DEN (East & West) Rajkot's RRSK 82,73 .. 5,00 77,73
jurisdiction. SRSF 1 10,00 .. .. 10,00
768 Rajkot Division : Replacement of Channel sleepers DRF 2,19 2,18 .. 1
and fittings. RRSK 93,86 .. 62,00 31,86
770 Rajkot Division ; Casual Renewal of Switches under DRF 5,00 5,00 .. ..
DEN (East) RJT's jurisdiction Total 25 Nos. RRSK 95,27 .. 20,00 75,27
772 Rajkot Division ; Casual Renewal of switches under DRF 10,04 2,51 .. 7,53
DEN (West) RJT's jurisdiction Total 25 Nos. RRSK 87,13 .. 20,00 67,13
SRSF 1 .. .. .. ..
15.04.31.15.3.53.040
15.04.31.15.3.53.044
15.01.31.15.2.50.003
15.00.31.16.3.50.001
15.01.31.15.3.50.053
15.04.31.15.3.53.041
15.04.31.15.3.53.042
15.04.31.16.3.53.006
15.01.31.12.2.50.001
15.01.31.12.2.50.002
15.01.31.14.3.50.003
15.01.31.14.3.50.001
15.01.31.15.2.50.002
15.01.31.15.2.50.007
TRACK RENEWALS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 42
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
774 Rajkot Division ; Casual Renewal of crossings DRF 4,76 4,17 .. 59
under DEN (East) RJT's jurisdiction Total 23 Nos. RRSK 31,24 .. 20,00 11,24
776 Rajkot Division ; Casual Renewal of crossings DRF 5,04 3,54 .. 1,50
under DEN (West) RJT's jurisdiction Total 46 Nos. RRSK 67,05 .. 25,00 42,05
R. ..
778 Rajkot Division ; Casual Renewal of SEJs under DEN DRF 8,85 7,23 .. 1,62
(East) RJT's jurisdiction Total 38Nos. RRSK 88,04 .. 6,00 82,04
780 Rajkot Division- Casual renewal of glued joints DRF 13,56 13,56 .. ..
under DEN (East) RJT's jurisdiction Total 186 Nos. RRSK 70,93 .. 15,00 55,93
782 Rajkot Division; Casual Renewal of glued joints DRF 28,99 28,99 .. ..
under DEN (West) RJT's jurisdiction Total 178 Nos. RRSK 40,40 .. 22,00 18,40
SRSF 1 8,43 .. .. 8,43
784 Rajkot Division- Rehabilitation of existing track DRF 45,00 45,00 .. ..
machine stabling line and its allied facilities at RRSK 30,97 .. 30,00 97
Dwakara, Khambaliya & Hadmatiya
Through Rail Renewal
786 Rajkot Division ; Casual Renewal of rails under DRF 36,41 -990 .. 46,31
DEN (East ) Rajkot RRSK 58,86 .. 20,00 38,86
Through Rail Renewal
788 Rajkot Division ; Casual Renewal of rails under DRF 54,57 37,01 .. 17,56
DEN (West ) Rajkot's jurisdiction RRSK 40,70 .. 20,00 20,70
Through Rail Renewal
790 Kanalus- Okha section; TRR(P) of existing corroded DRF 3,12 3,12 .. ..
rails from Km 982.45 to 983.70 total 1.25 Kms. RRSK 96,11 .. 20,00 76,11
between Bhimrana and Okha stations.
Points & Crossings
792 Rajkot Division ; Casual Renewal of Switches and DRF 58,98 58,98 .. ..
Crossings under DEN (W) RJT's jurisdiction. RRSK 64,09 .. 20,00 44,09
Points & Crossings
794 Rajkot Division ; Casual Renewal of Switches and DRF 6 6 .. ..
Crossings under DEN (E) RJT's jurisdiction. RRSK 99,07 .. 20,00 79,07
Others
796 Rajkot Division ; Casual Renewal of SEJs under DEN DRF 2,10 54 .. 1,56
(W) RJT's jurisdiction Total 33 Nos. RRSK 70,86 .. 20,00 50,86
SRSF 1 11,18 .. .. 11,18
Others
798 Creating of necessary facilities for Machine DRF 21,28 21,28 .. ..
Maintenance of track in Rajkot Division costing RRSK 77,51 .. 50,00 27,51
Rs. 98.79 Lakhs. (RJT/U/09-10)
Bhavnagar799 Bhavnagar Division: Casual renewal of SEJ (Non RRSK 94,38 .. 15,00 79,38
PRCL BG section).
800 Bhavnagar Division : Through Fitting renewal on RRSK 81,35 .. 25,00 56,35
RLA-MHV section
15.04.31.16.3.53.004
15.04.31.16.3.53.001
15.04.31.15.3.53.038
15.04.31.09.3.53.001
15.02.31.15.3.51.025
15.02.31.15.3.51.023
15.04.31.15.3.53.039
15.04.31.15.3.53.046
15.04.31.15.3.53.047
15.04.31.16.3.53.003
15.04.31.16.3.53.005
15.04.31.16.3.53.002
TRACK RENEWALS15.04.31.15.3.53.043
15.04.31.15.3.53.045
15.04.31.15.3.53.037
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 43
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
801 Bhavnagar Division - Casual renewal of defective RRSK 90,21 .. 25,00 65,21
weld at verious locations (Non-PRCL Sections)
Complete Track Renewal
802 Khijadiya-Veraval (MG) - TRR(S) - 1.80 KM RRSK 1,18,60 .. 20,00 98,60
Through Rail Renewal
804 Bhavnagar Terminus : Through Rail Renewal -1.6 TKm RRSK 95,46 .. 25,00 70,46
of Pit line at SRSF 1 1,43 1,43 .. ..
Through Rail Renewal
806 Rajkot-Veeraval section:- TRR(S) 0.70 Km on pit DRF 37,71 37,71 .. ..
line RRSK 6,91 .. 6,91 ..
SRSF 1 .. .. .. ..
Ballast
807 Talala-Veraval (MG section) :- TBR 10 Kms RRSK 1,11,44 .. 25,00 86,44
R. 65,91
Points & Crossings
808 Dhari - Visavadar Section (MG) : - TTR 06 Nos. RRSK 87,30 .. 20,00 67,30
R. 12,55
Points & Crossings
809 Kanalus-Porbandar Section: TTR (DS)05 Nos RRSK 39,22 .. 20,00 19,22
R. 6,71
Points & Crossings
810 Bhavnagar Division: Casual renewal of CMS RRSK 91,85 .. 20,00 71,85
crossings (Non PRCL BG section)
Others
812 Mahuva: Rehabilitation of existing track machine RRSK 58,12 21 16,00 41,91
stabling line and its allied facilities at . SRSF 1 21 .. .. 21
R. ..
Others
813 Bhavnagar Division :- Casual Renueval of Track BG RRSK 92,59 .. 27,00 65,59
section.
Others
814 Wansjaliya :- Rehabilitation of existing track RRSK 1,42,01 21 27,00 1,14,80
machine stabling line and its allied facilities R. 6,56
Others
815 Bhavnagar Division :- Casual Renueval of Track MG RRSK 95,81 .. 27,00 68,81
Section.
Ratlam816 Works costing below DRM's Power RRSK 10,00 .. 10,00 ..
Bhavnagar817 Works costing below DRM's Power RRSK 30,00 .. 30,00 ..
TOTAL-WORKS IN PROGRESS RRSK .. .. 35,00,00 ..
15.02.31.15.3.51.028
15.05.31.17.3.00.999
15.02.31.17.3.00.999
15.02.31.16.3.51.002
15.02.31.16.3.51.001
15.02.31.15.3.51.024
15.02.31.16.3.51.003
15.02.31.15.3.51.022
15.02.31.15.3.51.026
TRACK RENEWALS15.02.31.15.3.51.021
15.02.31.16.2.51.001
15.02.31.15.3.51.027
15.02.31.13.3.51.001
15.02.31.15.2.51.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 44
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
B - New Works
Through Rail Renewal
Headquarter818 Miyagam-Godhra :- TRR(P) 2.066 Km on isolated RRSK 2,04,91 .. 50,00 1,54,91
locations on GMT basis.
Through Rail Renewal
Mumbai819 Churchgate-Virar : - Casual Renewal of 60 Kg rails RRSK 2,47,96 .. 1,80,00 67,96
under SSE (P. Way) Dadar
Through Rail Renewal
820 Churchgate-Virar : - Casual Renewal of 60 Kg rails RRSK 2,47,96 .. 1,80,00 67,96
under SSE (P. Way) Andheri.
Through Rail Renewal
821 Churchgate-Virar :-Casual renewal of 60 Kg rails RRSK 2,47,96 .. 1,80,00 67,96
under SSE (P. Way) Borivali
Through Rail Renewal
822 Virar - Surat :-. Casual renewal of 60kg rails RRSK 2,47,96 .. 1,80,00 67,96
under ADEN, Dahanu Road.
Through Rail Renewal
823 Virar - Surat:- Casual renewal of 60kg rails under RRSK 2,47,96 .. 1,80,00 67,96
the section of ADEN, Valsad.
Through Rail Renewal
824 Virar - Surat :- Casual renewal of rails in RRSK 2,38,04 .. 1,80,00 58,04
fracture prone areas under ADEN Valsad
Through Rail Renewal
825 Virar - Surat :- Casual renewal of 60kg rails RRSK 2,47,96 .. 1,80,00 67,96
under the section of ADEN, Surat.
Through Rail Renewal
826 Udhna-Jalgaon:- Casual renewal of rails under RRSK 2,47,96 .. 1,80,00 67,96
ADEN-Vyara
Through Rail Renewal
827 Udhna - Jalgaon : Casual renewal of rails under RRSK 2,47,96 .. 1,80,00 67,96
ADEN-Nandurbar
Through Sleeper Renewal
828 Virar-Surat:- Casual renewal of existing broken RRSK 2,41,86 .. 80,00 1,61,86
PSC sleepers on turnout by new PSC sleepers
Points & Crossings
829 Churchgate Virar:- Casual Renewal of existing RRSK 2,13,41 .. 80,00 1,33,41
broken PSC sleepers on turnouts by new PSCsleepers.
Others
830 Churchgate-Virar: - Replacement of 60Kg CMS RRSK 2,33,70 .. 80,00 1,53,70
crossing, SEJ & Glued joints
15.03.31.17.3.52.046
15.03.31.17.3.52.052
15.03.31.17.3.52.047
15.03.31.17.3.52.050
15.03.31.17.3.52.060
15.03.31.17.3.52.056
15.03.31.17.3.52.057
15.03.31.17.3.52.054
15.03.31.17.3.52.058
15.03.31.17.3.52.049
15.00.31.17.3.55.001
15.03.31.17.3.52.055
15.03.31.17.3.52.059
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 45
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Others
831 Churchgate - Virar:- Casual renewal of channel RRSK 85,20 .. 80,00 5,20
sleepers
Others
832 Virar - Surat :- Casual renewal of unservisable RRSK 2,47,94 .. 80,00 1,67,94
steel channel sleepers
Others
833 Udhna-Jalgaon :Casual renewal of steel channel RRSK 2,37,25 .. 80,00 1,57,25
sleeper fittings and repalcement pf pathway
Through Rail Renewal
Vadodara834 Surat-Miyagam :- TRR(P) 1.990 Kms on isolated RRSK 1,97,38 .. 1,80,00 17,38
locations on GMT basis.
Through Rail Renewal
835 Miyagam-Godhra :- TRR(P) on isolated locations RRSK 1,07,22 .. 80,00 27,22
1.081 Km on GMT basis.
Through Rail Renewal
836 Miyagam-Godhra :- TRR(P) 1.959 Km on isolated RRSK 1,94,30 .. 80,00 1,14,30
locations on GMT basis.
Through Rail Renewal
837 Vadodara-Geratpur :- TRR(P) on isolated locations RRSK 30,75 .. 20,00 10,75
0.310 Km on GMT basis.
Through Rail Renewal
838 Vadodara:-TRR(S) for Line No. 3 & Line No. 8 due RRSK 1,22,47 .. 80,00 42,47
to corrosion and liner bite.
Points & Crossings
839 Miyagam-Godhra:- Renewal of 11 Nos of 60 Kg 1 in RRSK 1,68,01 .. 80,00 88,01
8.5 Crossings & 33 Nos 60 Kg SEJs on GMT basis.
Points & Crossings
840 Vadodara division:-Casual renewal of PSC sleepers RRSK 2,27,63 .. 80,00 1,47,63
in points and crossings
Others
841 Vadodara-Geratpur:-Renewal of existing 52 Kg RRSK 1,51,45 .. 80,00 71,45
switches by 60 Kg switches (24 Sets) in variousstation yards.
Others
842 Miyagam-Godhra:-Renewal of 120 Nos. Glued Joints RRSK 1,45,54 .. 80,00 65,54
under jurisdiction of SSE(P. Way)-BRGY on GMTbasis..
Others
843 Miyagam-Godhra:-Renewal of 60 kg Glued Joints (126 RRSK 1,52,81 .. 80,00 72,81
Nos) under SSE(P.way)-GDA on GMT basis.
15.06.31.17.3.55.060
15.06.31.17.3.55.054
15.06.31.17.3.55.059
15.06.31.17.3.55.055
15.06.31.17.3.55.057
15.06.31.17.3.55.056
15.03.31.17.3.52.053
15.03.31.17.3.52.048
15.06.31.17.3.55.048
15.06.31.17.3.55.046
15.06.31.17.3.55.047
15.06.31.17.3.55.049
TRACK RENEWALS
15.03.31.17.3.52.051
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 46
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Others
844 Miyagam-Godhra:-Renewal of 200 Nos. 60kg Glued RRSK 2,42,56 .. 80,00 1,62,56
Joints under jurisdiction of SSE(P. Way)-BRCP onGMT basis.
Others
845 Vadodara-Geratpur:-Deep Screening of 19 Sets of 1 RRSK 51,91 .. 30,00 21,91
in 12 and 7 sets of 1 in 8.5 turnouts under R. 1,59,57
jurisdiction of SSE(P.Way)-II-Anand.
Others
846 Vadodara-Geratpur:-Deep Screening of 18 sets 1 in RRSK 36,33 .. 20,00 16,33
12 Turnouts under SSE(P.Way)-I-ANND R. 1,10,85
Others
847 Vadodara-Geratpur:-Deep Screening of 26 Sets of 1 RRSK 54,41 .. 40,00 14,41
in 12 and 1 set of 1 in 8.5 turnout under R. 1,66,19
SSE(P.Way)-Mahemdavad.
Others
848 Anand-Godhra (S/L) Section:-Deep Screening of 30 RRSK 60,54 .. 30,00 30,54
Sets of 1 in 12 Turnouts in various station yards. R. 1,84,74
Ratlam849 Godhra-Nagda Section:-TFR = 20.73Km. RRSK 1,92,14 .. 3,00 1,89,14
Complete Track Renewal
850 Nagda-Bhopal :- CTR(P) DN Km.112.537 to 113.67 = RRSK 1,91,74 .. 80,00 1,11,74
1.133Km R. 12,92
Complete Track Renewal
851 Nagda-Bhopal Section :- CTR(P) DN Km.86.25-86.95, RRSK 2,12,04 .. 80,00 1,32,04
Km.96.35-96.593, Km.96.69-97.00 Total=1.253Km) R. 14,29
Complete Track Renewal
852 Nagda-Bhopal :- CTR(P) DN Km. 230.8-231.27 & RRSK 2,12,38 .. 80,00 1,32,38
Km.231.316-232.10 Total=1.255Km R. 14,31
Complete Track Renewal
853 Nagda-Bhopal:- CTR(P) DN Km.110.82-111.13, RRSK 2,11,54 .. 80,00 1,31,54
Km.111.455-112.183 & Km.112.325-112.537 Total R. 14,26
1.25Km
Complete Track Renewal
854 Nagda-Bhopa :- CTR(P) DN Km.108.16-10926 & RRSK 2,03,08 .. 80,00 1,23,08
Km.109.52-109.62 Total=1.2Km R. 13,69
Complete Track Renewal
855 Nagda-Bhopal :- CTR(P) DN Km.109.62-110.82=1.20Km RRSK 2,03,08 .. 80,00 1,23,08
R. 13,69
Complete Track Renewal
856 Indore-Dewas-Ujjain:- Laxmibainagar - CTR (S) - RRSK 2,09,85 .. 80,00 1,29,85
0.695 Km, TRR (S) - 1.40 Km and TSR (P) - 0.60 Km R. 8,00
Through Rail Renewal
857 Mangal Mahudi- Morwani DN line :- TRR(P) -2.405 RRSK 2,38,54 .. 1,80,00 58,54
Km.
15.05.31.17.3.54.053
15.05.31.17.3.54.047
15.05.31.17.3.54.060
15.05.31.17.2.54.001
15.05.31.17.3.54.056
15.05.31.17.3.54.057
15.05.31.17.3.54.058
15.05.31.17.3.54.054
15.05.31.17.3.54.051
TRACK RENEWALS
15.06.31.17.3.55.058
15.06.31.17.3.55.050
15.06.31.17.3.55.052
15.06.31.17.3.55.053
15.06.31.17.3.55.051
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 47
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Through Rail Renewal
858 Dahod- Ratlam DN line :- TRR(P) -2.461 Km. RRSK 2,44,09 .. 1,80,00 64,09
Through Rail Renewal
859 Godhra-Nagda UP & DN lines :- TRR(P)2.385 Km RRSK 2,36,55 .. 80,00 1,56,55
Through Rail Renewal
860 Nagda-Bhopal :- TRR(P) DN Km.197.50-198.50. Total RRSK 99,18 .. 80,00 19,18
1 Km on GMT basis.
Through Rail Renewal
861 Nagda-Bhopal TRR(P) UP Km.205.70-207.30. Total RRSK 1,58,69 .. 1,20,00 38,69
1.60Km (GMT basis)
Through Rail Renewal
862 Nagda-Bhopal:- TRR(P) DN Km.193.50-195.50=2.00Km RRSK 1,98,37 .. 80,00 1,18,37
on GMT Basis.
Through Rail Renewal
863 Nagda-Bhopal:- TRR(P) DN Km.195.50-197.50. Total RRSK 1,98,37 .. 80,00 1,18,37
2.00Km on GMT basis
Others
864 Neemuch - Ratlam: - TWR 12.00 Km RRSK 2,33,37 .. 80,00 1,53,37
Ahmedabad865 Mahesana -Palanpur section:- TRR on approaches of RRSK 94,82 .. 80,00 14,82
points for various yards.
866 Jhund- Samakhiyali: TRR (P) Km 703.2 to 704.1 and RRSK 2,06,59 .. 1,80,00 26,59
740.3 to 741.1 Total 1.7 Km and TBR 2 Km under R. 23,31
CPWI MALB
Complete Track Renewal
867 Ahmedabad-Viramgam( DN) : CTR(P) Km 548.193 to RRSK 1,86,15 .. 80,00 1,06,15
549.293 Total 1.10Km R. 12,55
Complete Track Renewal
868 Ahmedabad-Viramgam (DN): CTR(P) Km 554.584 to RRSK 2,31,17 .. 80,00 1,51,17
555.950 Total 1.366 Km R. 15,58
Through Rail Renewal
869 Geratpur -Ahmedabad : TRR(P) 2.1 Km & TBR 6.283 RRSK 2,20,71 .. 3,00 2,17,71
Km .
Through Rail Renewal
870 Ahmedabad-Viramgam (DN) : TRR(P) Km 544.271 to RRSK 2,28,52 .. 80,00 1,48,52
546.575 Total 2.304Km
Through Rail Renewal
871 Samakhiali-Gandhidham:- TRR Km. 766 to 767.20 = RRSK 1,05,36 .. 80,00 25,36
1.20 Km
Through Rail Renewal
872 Ahmedabad (Kankariya New BG Complex): TRR (S) 0.70 RRSK 51,09 .. 20,00 31,09
km of pit line No 515.01.31.17.3.50.059
15.01.31.17.3.50.062
15.01.31.17.3.50.053
15.01.31.17.3.50.052
15.01.31.17.2.50.001
15.01.31.17.3.50.054
15.01.31.17.3.50.063
15.05.31.17.3.54.052
15.05.31.17.3.54.055
15.05.31.17.3.54.049
15.05.31.17.3.54.050
15.05.31.17.3.54.046
15.01.31.17.3.50.067
TRACK RENEWALS
15.05.31.17.3.54.059
15.05.31.17.3.54.048
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 48
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Ballast
873 Jhund-Samakhiyali :TBR Km 635.7 to 640,00 Total RRSK 1,09,82 .. 80,00 29,82
4.3 Km and Deep screening of 13 Nos 1 in 12 & 1 R. 1,36,25
No. 1 in 8.5 P&C under CPWI DHG
Ballast
874 Jhund-Samakhiyali : Deep screening of 22 Nos 1in RRSK 54,09 .. 40,00 14,09
12 & 5 Nos 1 in 8.5 P&Cs under CPWI MALB R. 1,65,88
Points & Crossings
875 Geratpur -Ahmedabad (UP): CTR(P) Km 494.458 to RRSK 1,52,64 .. 80,00 72,64
495.360 Total-0.902 Km R. 10,29
Points & Crossings
876 Geratpur -Ahmedabad -CTR(P) DN Km 494.527 to RRSK 1,77,26 .. 80,00 97,26
495.360= 0.833 Km & Ahmedabad-Mehasana R. 10,43
CTR(P&S)0.15 Km at KHD and TRR(S) 0.25 km of SBIDiesel shed.
Points & Crossings
877 Ahmedabad -Viramgam: TTR of 52kg rail sections of RRSK 1,68,57 .. 80,00 88,57
P&Cs by 60Kg rail sections R. 66,26
Points & Crossings
878 Samakhiyali - Gandhidham section - TTR (FS+CS+CMS) RRSK 1,79,30 .. 80,00 99,30
6 nos 1 in 12 and 3 nos 1 in 8.5 (52kg to 60kg) R. 59,16
Others
879 Geratpur-Ahmedabad -Viramgam: Casual renewal of RRSK 1,72,58 .. 80,00 92,58
P&C sleepers and TRR(S)0.50 Km of PF No.5 of ADI
Others
880 Viramgam-Samakhiyali : Renewal of glued joints and RRSK 1,09,35 .. 40,00 69,35
SEJ under jurisdiction of CPWI DHG..
Others
881 Samakhiyali - Gandhidham - Kandlaport - Casual RRSK 50,35 .. 20,00 30,35
renewal of 1990 line PRC sleepers
Others
882 Samakiyali - Gandhidham - TFR 10.965 km (Excluding RRSK 48,28 .. 40,00 8,28
ERC).
Complete Track Renewal
Rajkot883 Viramgam-Okha:- CTR (S) 0.50 Kms.and TRR (S) 0.83 RRSK 1,20,74 .. 80,00 40,74
Kms.at.Rajkot yard R. 3,09
Through Rail Renewal
884 Rajkot Division ; Casual Renewal of rails under RRSK 1,98,37 .. 1,80,00 18,37
DEN (East) Rajkot's jurisdiction.
Through Rail Renewal
885 Rajkot Division ; Casual Renewal of rails under RRSK 1,98,37 .. 1,80,00 18,37
DEN (West) Rajkot's jurisdiction.
15.04.31.17.3.53.019
15.04.31.17.3.53.020
15.04.31.17.3.53.018
15.01.31.17.3.50.057
15.01.31.17.3.50.061
15.01.31.17.3.50.055
15.01.31.17.3.50.058
15.01.31.17.3.50.065
15.01.31.17.3.50.064
TRACK RENEWALS
15.01.31.17.3.50.068
15.01.31.17.3.50.066
15.01.31.17.3.50.060
15.01.31.17.3.50.056
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 49
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Through Rail Renewal
886 Viramgam-Okha:- TRR (S) 0.55 Kms. on washing line RRSK 40,14 .. 40,00 14
at Okha
Through Rail Renewal
887 Wankaner-Navalakhi :- TRR (S) on line No.1&2 at. RRSK 1,67,88 .. 80,00 87,88
Navlaki
Others
888 Rajkot Division ; TFR of ERCs and Liners under DEN RRSK 2,45,77 .. 15,00 2,30,77
(East) Rajkot's jurisdiction.
Others
889 Rajkot Division ; TFR of ERCs and Liners under DEN RRSK 2,45,77 .. 15,00 2,30,77
(West) Rajkot's jurisdiction.
Bhavnagar890 Veraval Yard (MG) - TSR (S) - 1.80 Km (From 161.62 RRSK 72,13 .. 30,00 42,13
to 163.42) R. 11,12
891 Rajkot - Veraval Section. - TRR (S) 1.20 ( Main RRSK 1,57,83 .. 30,00 1,27,83
Line) TKM and TRR(P) - 0.80 TKM ( Main Line) VRLYARD (BG)
Complete Track Renewal
892 Rajkot - Veraval TRR (S) 1.475 TKM in loop lines RRSK 1,04,60 .. 2,00 1,02,60
of VRL Yard
TOTAL-NEW WORKS RRSK .. .. 65,08,00 ..
TOTAL-Track Renewals RRSK .. .. 100,08,00 ..
A - Works in Progress
Headquarter893 Providing man refuges on different open web DRF 9,80 .. .. 9,80
through type steel girder bridges as per RDSO DF(4) .. 43,00 .. -4300
DRG.No.CBS-0028 in Western Railway RRSK 76,49 .. 76,49 ..
Mumbai894 Churchgate-Virar Section: Regirdering of Bridge DRF 23,66 23,66 .. ..
No. 40 on UP THROUGH / Down THROUGH Line under RRSK 85,60 .. 40,00 45,60
ADEN (T/S) Lower Parel Section.
896 Replacement of Elastomeric Bearing on PSC-Box DRF 33,58 33,58 .. ..
Girder Bridge NO. 75UP/DN(11X48.50MTS0 Local Line RRSK 5,20 .. 4,00 1,20
between BYR-NIG Stations on CCG-VR Section inMumbai Division W.Rly
897 Churchgate - Virar Section:- Regirdering of Bridge DRF 1,35,95 1,35,95 .. ..
No. 20 on UP Through Line under Jurisdiction of RRSK 92,34 .. 30,00 62,34
ADEN(T/S) Lower Parel Section.
898 Virar-Surat Section:- Replacement & strengthening DRF 2,61,54 2,61,54 .. ..
of cracked stringer angles in Br.No. 275 and 313 RRSK 11,39 .. 3,50 7,89
and replacement of corroded bracing gussets andmetallising of flooring system of Br. No.313.(BCT/S/06-07)
15.00.32.14.6.11.001
15.03.32.15.2.52.001
15.03.32.13.3.11.002
15.03.32.15.2.52.002
15.03.32.06.2.11.003
15.04.31.17.3.53.021
15.04.31.17.3.53.022
15.02.31.17.3.51.002
15.02.31.17.3.51.001
15.02.31.17.2.51.001
BRIDGE WORKS
TRACK RENEWALS
15.04.31.17.3.53.016
15.04.31.17.3.53.017
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 50
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
899 Nallasopara - Vasai Road - Construction / DRF 2,22,26 2,22,26 .. ..
strengthening of cast iron screw piles (bridge No RRSK 2,09,21 .. 60,00 1,49,21
78) at Km. 53/6-7. (BCT/S/06-07) XEN/BR/DDR
901 Replacement of Elastomeric Bearings on PSC BOX DRF 79,78 79,78 .. ..
Girder of bridge No.73 UP/DN Local Line between RRSK 13,92 .. 9,50 4,42
BYR-NIG stns on CCG-VR section on Mumbai Division.
902 Churchgate-Virar Section:- Regirdering of Br.5 on DRF .. .. .. ..
Parcel Line under ADEN (T/S) Lower Parel Section. RRSK 47,51 .. 8,50 39,01
Vadodara904 Vadodara Division:-Replacement of rail cluster and DRF 38,89 38,89 .. ..
over aged steel girders by providing PSC/RCC slabs RRSK 59,38 .. 7,00 52,38
up to 6.10m span (Total 30 Nos. spans) underjurisdiction of Sr. DEN(N)-BRC on BRC-ADI,VDA-KTNA, ANND-CBY, KBRV-VTL & ANND-GDA Sections.
905 Vadodara Division - Replacement of existing aged DRF 72,70 72,70 .. ..
steel girders by providing 9.15 m spans PSC slabs RRSK 32,88 .. 18,50 14,38
on Br. No.537, 539, 568, 549 on Surat-GodhraSectoin and Br. No.51A on Anand-Godhra Section (Total 9 spans). (BRC/S/08-09)
906 Vadodara Division:- Replacement of bearing and DRF .. .. .. ..
rehabilitation of PSC/RCC girders. (BRC/S/09-10) RRSK 1,54,48 .. 18,50 1,35,98
908 Surat-Miyagam Section:-Replacement of Steel Girder DRF 10,77 10,77 .. ..
of Bridge No. 464 at km. 274/22-24 on Up & Dn line RRSK 31,73 .. 20,00 11,73
by provding PSC slab.
909 Surat- Vadodara Section- Replacement of corroded DRF .. .. .. ..
and perforated bracing angles, cross frames and RRSK 87,24 .. 17,01 70,23
swelled top flange plates on Br No 566 DN line(3x12.2 m),567 UP line(3x12.2m),569UP/DN(2x1x12.2m), 570UP/DN(2x1x12.2m)
910 Vadodara-Geratpur Section:-Provision of RCC box DRF .. .. .. ..
against existing damaged bridge wall & slab for RRSK 94,64 .. 18,50 76,14
Bridge No. 604, 636 & 640 of Vadodara-Geratpursection and Bridge No. 14B1 on Vasad-Kathana byslab & 49A of Anand-Khambhat Section.
Ratlam912 Maksi-Bhopal Section.-Rebuilding of of stone Slab DRF 42,47 42,47 .. ..
by RCC BOX. (Bridges No.106 span Dn RRSK 23,13 .. 23,13 ..
2X0.91m,Br.No.107span DN 2X0.91m) ( ORN-2).( TotalBridges =02Nos.)
914 Ujjain-Maksi Section.-Rebuilding of of stone Slab DRF 48,43 48,43 .. ..
by RCC BOX. ( Bridges No.43UP,44UP,45UP). ( Total RRSK 39,08 .. 39,08 ..
=03Nos.)
Ahmedabad915 Ahmedabad-Viramgam- Jhund- Kharaghoda:- DRF .. .. .. ..
Replacement of small span girder bridges with RRSK 1,99,60 .. 60,00 1,39,60
PSC/RCC slabs at Br No1Up & Dn,1 L-1,1-L4,17Dn,88Up 4,20,21,24,27,28,29,30,31,34,35 &36..total 15 bridges and 18 span
15.06.32.15.3.55.001
15.06.32.16.3.55.001
15.06.32.16.3.55.002
15.05.32.15.3.54.001
15.05.32.15.3.54.003
15.01.32.16.2.50.001
15.03.32.06.2.52.002
15.03.32.13.3.11.001
15.03.32.15.3.52.001
15.06.32.15.3.55.002
15.06.32.08.2.55.001
15.06.32.09.3.11.002
BRIDGE WORKS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 51
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
916 Planpur - Ahmedabad Section - Rebuilding of Br.No. DRF 1,47,02 16,11 .. 1,30,91
1016 at Km. 744/9-10 between DNW-JUL.
918 Mehasana - Palanpur Section - Regirdering Br. DRF 1,41,31 1,41,31 .. ..
No.945 (3x24). (ADI/S/08-09) RRSK 51,41 .. 10,00 41,41
920 Ahmedabad-Viramgam Section:- Rebuilding of Br. No. DRF 66,54 66,54 .. ..
5,7 in Viramgam- Jhund Section & Br. No. 24,29, RRSK 29,69 .. 29,69 ..
29Dn, 33Dn of Ahmedabad-Viramgam & Br. No. 38 ofJhund-Kharaghoda Section. (ADI/U/09-10)
922 Samakhiali-Gandhidham-Kandla Port Section:- DRF 11 11 .. ..
Replacement of small span girder by providing PSC RRSK 98,09 .. 44,00 54,09
slab at Br. No. 313 (6 x 3.05m) & Br. No. 277 (5 x8.23m) & 279 ( 3 x 8.23m). (ADI/U/10-11)
924 Jhund-Kharaghoda section:- Replacement of small DRF 42,77 42,77 .. ..
span girders by providing PSC slab. RRSK 28,85 .. 18,50 10,35
(Br.No.13,14,17,19A). (ADI/U/11-12
926 Samakhiali-Gandhidham Section:- Replacement of DRF 1 1 .. ..
steel girders by PSC slab of BrNo. 314(1x3.05 RRSK 94,21 .. 50,10 44,11
m)and Br.No.316(6x12.19m)(Total span 9 nos.).(ADI/U/11-12)
928 Sabarmati:- Improvement to flooring in STR shop DRF 80,18 80,18 .. ..
and other allied Engineering works. (ADI/U/11-12) RRSK 12,89 .. 10,00 2,89
929 Mahesana Yard:- Replacement small span girder by DRF .. .. .. ..
providing RCC/PSC slab on Bridge No. 962 at line RRSK 61,07 .. 20,00 41,07
No. 1, 2, 3 & 4 (BG) and line No. 1 & 2 (MG)
930 Ahmedabad Division:- Replacement of rail cluster DRF .. .. .. ..
by providing small span girder of PSC/RCC slab on RRSK 72,71 .. 28,50 44,21
16 Nos. of Bridges on KLL-KTRD-RUJ & KLL-VJF-UMNMG Section under jurisdiction of DEN(N)ADI.
931 Viramgam-Jhund Section: Rebuilding of bridge No 5 DRF .. .. .. ..
& 7 by RCC Box by dismantling existing 1x 3.05 GB RRSK 82,57 .. 28,50 54,07
932 Ahmedabad-Viramgam Section : Rebuilding of 15 (up DRF .. .. .. ..
& dn) By RCC Box 2 Nos x6.10x 1.8 M.... RRSK 98,64 .. 28,50 70,14
Rajkot934 Viramgam-Surendranagar Section:- New Bridge No. DRF 1 1 .. ..
20X (RCC Box 2x 3.05m) at Km. 587.15. RRSK 88,29 .. 20,00 68,29
(RJT/S/10-11)
936 Rajkot Division:- New Bridge No.380/A- Proposed DRF 25,53 25,53 .. ..
R.C.C. Box ( 2x6.10m RCC Box) at Km 838/0-1. RRSK 34,18 .. 8,50 25,68
(RJT/S/10-11)
TOTAL-WORKS IN PROGRESS RRSK .. .. 7,50,00 ..
15.04.32.10.3.53.002
15.04.32.10.3.53.001
15.01.32.11.3.50.008
15.01.32.11.3.50.007
15.01.32.16.3.50.004
15.01.32.16.3.50.002
15.01.32.16.3.50.003
15.01.32.16.3.50.001
BRIDGE WORKS15.01.32.10.1.30.001
15.01.32.08.3.11.001
15.01.32.09.3.50.001
15.01.32.10.3.50.001
15.01.32.11.3.50.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 52
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
B - New Works
Mumbai937 Virar - Surat :- Rehabilitation/Strengthening to DRF 70,00 .. .. 70,00
corroded and pitted top chord plate, lacing RRSK 1,50,50 .. 5,00 1,45,50
angles , flats, batten plates etc includinggussets, bulged sway bracings and top lateralbracings of OWG Steel Girger Br. No. 275 UP & DN
Ratlam938 Godhra- Nagda Sec:- Replacement of small span RRSK 1,21,85 .. 5,00 1,16,85
girder by providing RCC/ PSC slab on bridge No. 83(UP siding), 84 (UP siding), 104 ( Common loop),247( Common loop), DHD-Loco-2, DHD- Loco-3, 312(UP Loop), 291B ( RTM UP Yard), 119 DN, 83 DN, R-23
939 Godhra- Nagda Sec:- Replacement of small span RRSK 1,21,23 .. 5,00 1,16,23
girder by providing RCC/ PSC slab on bridge No.55UP, 253DN, 290D ( RTM Yard), 290G ( RTM Yard),290I ( RTM Yard)
940 Godhra jn bg-Bhopal - Providing jacking beams in RRSK 79,09 .. 5,00 74,09
major steel plate girder bridges in RatlamDivision.
941 Indore-Dewas-Ujjain Section.-Replacement of RRSK 1,78,99 .. 5,00 1,73,99
damagedPipe culvert/stone slab by providing R.C.CBox( 4Nos.Bridge No. 84,85,86 &87)
942 IDU Sec.-Replacement of damagedPipe culvert/stone RRSK 2,49,07 .. 5,00 2,44,07
slab by providing R.C.C Box( 7 Nos.Bridge No.75,76,77,79,80,81,83)
Ahmedabad943 Viramgam -Samakhiali : Rebuilding of Bridge No 162 RRSK 1,78,21 .. 5,00 1,73,21
between Surbari-Indranagar at Km 719/7-8 byproviding 2 Nos 3.68x3M (Triple) RCC BOX ....
944 Ahmedabad Division :- Replacement of small span RRSK 62,48 .. 5,00 57,48
girder by providing PSC/RCC slab of Br No 714 Up(L1 & L2)& Dn (L1 to L6) span 8 Nos x 0.91M. ofGeratpur -Ahmedabad section and Bridge No 90L-1 ofVG yard 3Nos x 6.10M of Ahmedabad- viramgam
Bhavnagar945 Ranavav- Porbander : Rehaibilitation of PFPG steel DRF 30,00 .. .. 30,00
girder BR No. 119(8x11.60+2x11.90m) at km 956/3-4 RRSK 59,38 .. 5,00 54,38
bet. RWO-PBR section , Bhavnagar Dvision
TOTAL-NEW WORKS RRSK .. .. 45,00 ..
TOTAL-Bridge Works RRSK .. .. 7,95,00 ..
15.05.32.17.3.54.001
15.05.32.17.3.54.002
15.01.32.17.2.50.001
15.01.32.17.3.50.001
15.02.32.17.3.11.001
15.03.32.17.3.11.001
15.05.32.17.2.54.001
15.05.32.17.3.54.004
15.05.32.17.3.11.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 53
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
A - Works in Progress
Mumbai947 Churchgate- Virar :- Replacement of SDH / STM-1 DRF 1,06,38 95,81 .. 10,57
equipment. RRSK 2,81 .. 2,81 ..
949 Valsad:- Replacement of over aged outdoor DRF 53,13 53,13 .. ..
Signalling gears. (BCT/U/10-11) RRSK 44,99 .. 40,00 4,99
951 Virar -Kelve Road Section:- Provision of battery DF(4) 22,28 22,28 .. ..
back up for relays through IPS at 9 Relay RRSK 96,98 .. 75,00 21,98
Huts.(BCT/U/11-12)
953 CCG-VR Section:- Casual renewal of defective and DRF 34,72 34,72 .. ..
overaged signalling cables in MEL-MRU & KHAR-VLP RRSK 61,20 .. 20,00 41,20
section of Mumbai suburban section
955 CCG-BVI :- Provision of additional AWS track DF(4) 79,97 79,97 .. ..
devices at stop marks ahead ofstarter signals of RRSK 9,99 .. 5,00 4,99
vulnerable stations in Churchgate-Borivali section
957 BVI-VR :- Provision of additional AWS track DF(4) 79,57 79,57 .. ..
devices at stop marks ahead ofstarter signals of RRSK 12,32 .. 5,00 7,32
vulnerable stations in Borivali – Virar section.
959 Palghar : Provision of High reliability digital DRF 48,81 48,81 .. ..
axle counters (HRDAC ) for frequently failing RRSK 89,38 .. 65,00 24,38
track circuits in flood prone area along withreplacement of associated signalling equipment.
961 Replacement of track circuits by DAC in rusty rail DRF 1,20,77 1,20,77 .. ..
sections in VR - DRD section RRSK 78,70 .. 75,00 3,70
963 Strengthening of Datalogger network extending DF(4) 72,89 72,89 .. ..
connectivity to HQ & field offices, generation of RRSK 21,03 .. 10,00 11,03
various reports, alarms, SMS and providingcentrallised monitoring in non suburban section ofMumbai Div
965 Replacement of automatic change over panel at DRF 51,92 51,92 .. ..
stations between VR-ST section RRSK 27,62 .. 20,00 7,62
967 Vaitarna - Valsad section :- Reliability DF(4) 8,51 8,51 .. ..
improvement by way of redundancies for track RRSK 70,84 .. 50,00 20,84
occupancy detection on Bridge portion
968 Virar-Surat Section:- Provision of Earth Leakage DF(4) .. .. .. ..
Detector at 15 stations & 34 Relay huts. RRSK 94,69 .. 35,50 59,19
970 Chuchgate - Virar :- Replcement of relays which DRF 84,72 84,72 .. ..
have outlived their designed life RRSK 9,74 .. 9,74 ..
971 Valsad: Replacement of Telephone Exchange based on DRF .. .. .. ..
IP Based technology. RRSK 40,78 .. 25,00 15,78
15.03.33.15.3.52.007
15.03.33.15.3.52.002
15.03.33.12.3.52.004
15.03.33.12.3.52.005
15.03.33.12.3.52.002
15.03.33.13.3.52.001
15.03.33.15.3.52.004
15.03.33.15.3.52.006
15.03.33.14.6.52.001
15.03.33.10.3.52.017
15.03.33.11.3.52.006
15.03.33.12.3.52.016
15.03.33.12.3.52.012
15.03.33.12.3.52.013
S & T WORKS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 54
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
973 Valsad-Surat section :- Reliability improvement by DF(4) 6,62 6,62 .. ..
way of redundancies for track occupancy detection RRSK 72,73 .. 40,00 32,73
on Bridge portion
974 Bhayandar :- Provision of MSDAC on vulnerable DF(4) .. .. .. ..
Track Circuits. RRSK 95,08 .. 40,00 55,08
975 Vaitarna - Boisar :- Reliability improvement by DF(4) .. .. .. ..
way of redundancy for track occupancy detection on RRSK 99,62 .. 40,00 59,62
bridge portion.
Vadodara976 Surat- Sayan Section: Reliability Improvement by DF(4) .. .. .. ..
way of redundancy for track occupancy at bridges RRSK 90,39 .. 60,00 30,39
978 Vadodara Division:- Replacement of Overaged DRF 7,98 7,98 .. ..
Universal Emergency Communication eqpts by VHF RRSK 21,18 .. 10,00 11,18
Sets for communication of Guard and Driver withStation Masters(BRC/U/11-12)
980 Casual renewal of defective signalling cables & DRF 59,04 59,04 .. ..
signalling gears over Vadodara division RRSK 36,43 .. 15,00 21,43
982 Vadodara Division:Replacement of CLS Shunt Signal DRF 94,17 94,17 .. ..
lamp and 'A'/'AG', SPI lamp by LED type RRSK 4,45 .. 4,00 45
984 Vadodara Division - Shifting of Starter Signal to DF(4) 37,15 37,15 .. ..
the boundary of Track circuit ahead in Itola RRSK 23,83 .. 10,00 13,83
-Ranoli & Vadodara - Godhra Section
986 Vadodara Division - Shifting of Starter Signal to DF(4) 41,49 41,49 .. ..
the boundary of Track circuit ahead in Vasad - RRSK 19,64 .. 10,00 9,64
Geratpur & Anand - Godhra Section
988 Vadodara Division: Shifting of Starter Signal to DF(4) 61,73 61,73 .. ..
the boundary of Track circuit ahead in Surat - RRSK 8,31 .. 5,00 3,31
Kashipura & Pratapnagar - Chhota Udepur Section
990 Kosamba: Provision of Multisection Digital Axle DF(4) 72,32 72,32 .. ..
Counters on vulnerable track circuits for RRSK 22,31 .. 22,00 31
improving reliability of signalling systems at
992 Provision of Multisection Digital Axle Counters DF(4) 54,94 54,94 .. ..
for improving reliability of signaling system at RRSK 37,37 .. 30,00 7,37
Ankleshwar-Bharuch section in ST-BRC section.(Phase I)
994 Provision of Multisection Digital Axle Counters DF(4) 82,31 82,31 .. ..
for improving reliability of signaling system at RRSK 17,30 .. 15,00 2,30
Nabipur- Varediya section in ST-BRC section (PhaseI)
996 Surat- Vadodara Section: Reliability Improvement DF(4) 72,51 72,51 .. ..
by way of redundancy for track occupancy at bridge RRSK 10,42 .. 10,00 42
No. 474,478,480 and 514
15.06.33.13.3.55.003
15.06.33.14.3.55.002
15.06.33.14.3.55.003
15.06.33.14.3.55.001
15.06.33.15.3.55.001
15.06.33.16.3.55.001
15.06.33.11.3.55.004
15.06.33.12.3.55.002
15.06.33.12.3.55.004
15.06.33.13.3.55.001
15.06.33.13.3.55.002
S & T WORKS15.03.33.15.3.52.009
15.03.33.16.3.52.002
15.03.33.16.3.52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 55
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
998 Panoli-Ankleswar Section :Reliability Improvement DF(4) 53,56 53,56 .. ..
by way of redundancy for track occupancy RRSK 32,74 .. 30,00 2,74
1000 Varedia-Palej Section :Reliability Improvement by DF(4) 56,70 56,70 .. ..
way of redundancy for track occupancy RRSK 29,60 .. 26,00 3,60
1001 Vadodara Division:-Provision of VOIP based control DF(4) .. .. .. ..
communication system in Vadodara-Geratpur, RRSK 50,78 .. 40,00 10,78
Vadodara-Godhra & Anand-Godhra sections.
Ratlam1003 Ratlam Division.--Shifting of S&T equipments from DRF 75,48 75,48 .. ..
existing dilapidated S&T Rooms to new location RRSK 10,54 .. 5,45 5,09
with PI System 1.Shifting of S&T equipments newS&T rooms:-Provision of new PI System for threntire Indoor replacement work Shifting of
1004 Nagda-Bhopal Section-Replacement of Existing STM-1 DRF .. .. .. ..
Equipment with STM-4 Equipment at D special Route RRSK 98,22 .. 90,00 8,22
.
1005 Ujjain-Bhopal Section: Replacement of existing LED DRF .. .. .. ..
signal of specification prior to version 2011. RRSK 66,01 .. 57,35 8,66
1007 Godhra-Kansudhi, Kansudhi-Chanchelav and DRF 67,69 67,69 .. ..
Chanchelav-Sant Road. Section-Replacement of RRSK 24,65 .. 16,00 8,65
analog axle counters for BPAC/IBS by Highreliability digital axle counters (HRDAC ) ofRatlam division.
1009 Piplod-Limkheda, Limkheda- Mangal Mahudhi, Mangal DRF 67,69 67,69 .. ..
Mahudhi-USRA, Section-Replacement of analog axle RRSK 24,65 .. 16,00 8,65
counters for BPAC/IBS by High reliability digitalaxle counters (HRDAC ) of Ratlam division.
1011 Punchpiplia-Amargarh, Bhairongarh-Raoti, DRF 57,06 57,06 .. ..
Bildi-Morwani IBS, Replacement of analog axle RRSK 39,18 .. 25,00 14,18
counters for BPAC by High reliability digital axlecounters (HRDAC) of Ratlam division.
1013 Nagda-Ujjain-Bhopal Section -Provision of High DRF 59,24 59,24 .. ..
reliability digital axle counters (HRDAC ) for RRSK 34,05 .. 25,00 9,05
frequently failing track circuits in flood pronearea along with replacement of associatedsignalling equipment at stations
1015 Ratlam-Nagda Section:- Replacement of age old DRF 1,01,35 1,01,35 .. ..
Analog Axle counters and MUX of BPAC by DAC & RRSK 4,99 .. 4,00 99
UFSBI in 2 block sections i.eRNH-KUH-BRNA.(RTM/U/111-12)
1017 Jekot-Usra, Rentiya-Jekot and DRF 64,20 64,20 .. ..
Bajranggarh-Panchpipliya sections: Replacement of RRSK 24,06 .. 20,00 4,06
analog axle counters for BPAC/IBS by Highreliability digital axle counters (HRDAC )
15.05.33.14.3.54.005
15.05.33.14.3.54.004
15.05.33.14.3.54.001
15.05.33.12.3.54.015
15.05.33.11.3.54.005
15.05.33.12.3.54.007
15.06.33.15.3.55.002
15.06.33.15.3.55.003
15.06.33.15.3.55.004
15.05.33.14.3.54.002
15.05.33.16.3.54.002
15.05.33.16.3.54.001
S & T WORKS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 56
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
1019 Nagda-Berwaniya, Asloada- Pulsoramakrawan and DRF 74,41 74,41 .. ..
Ujjain C-Pingleshwar sections: Replacement of RRSK 13,86 .. 12,00 1,86
analog axle counters for BPAC by HRDAC.
1021 Ratlam-Runkheda section: Replacement of analog DRF 61,08 61,08 .. ..
axle counters for BPAC by High Reliability Digital RRSK 29,05 .. 25,00 4,05
Axle cCounters (HRDAC) of Ratlam division.
1023 Nagda-Piploda Bagla and Nishadpura- Bairaghar: DF(4) 55,23 55,23 .. ..
Provision of High reliability digital axle RRSK 7,12 .. 7,12 ..
counters (HRDAC ) for BPAC of Ratlam Division
1025 Nagda- Bhopal, Indore -Dewas Ujjain & Chanderia DRF 98,15 98,15 .. ..
-Chittaur: Casual renewal of signaling gears & RRSK 4,28 .. 2,00 2,28
improving reliability on RATLAM Division.
1027 Godhra-Nagda section -Provision of High DRF 74,56 74,56 .. ..
reliability digital axle counters (HRDAC) for RRSK 13,73 .. 12,00 1,73
frequently failing track circuits in flood pronearea along with replacement of associatedsignaling equipment at stations
1029 Dhameda-Bordi, Bordi-Anas, Anas-Megnagar DRF 48,15 48,15 .. ..
Section-Replacement of analog axle counters for RRSK 44,19 .. 36,05 8,14
BPAC/IBS by High reliability digital axle counters(HRDAC ) of Ratlam division.
1031 Godhra-Meghnagar Section: Replacement of Old aged DRF 83,27 83,27 .. ..
BPAC Mux & Analog Axle Counter by Digital Axle RRSK 10,70 .. 2,55 8,15
counter with UFSBI
1032 Godhra-Ratlam Section:- Replacement of Defective DRF .. .. .. ..
Signalling Cables to enhance safety and RRSK 98,69 .. 14,65 84,04
reliability of S&T Gears .
1034 Ratlam division- Provision of automatic media DF(4) 33,77 33,77 .. ..
change over system suitable for UFSBI. RRSK 22,77 .. 22,77 ..
1036 Ratlam Division-Replacement of Electronic exchange DRF 18,81 18,81 .. ..
128 lines at Hospital, Diesel Shed, RRI Tower & RRSK 78,86 .. 60,00 18,86
over aged cable of local area for strengthening ofexchange network at.
1038 Ratlam-E -Bangrod-Runkheda IBS: Shifting of DRF 32,41 32,41 .. ..
indoor signalling equipment from existing RRSK 41,73 .. 35,00 6,73
dilapidate Porta cabin relay room to new locationand construction of new S&T rooms.
Ahmedabad1039 Ahmedabad Division: Provision of Solar Power Cap. 95,95 67,52 12,50 15,93
System for standby power supply arrangement at 19stations of Samakhiali-New Bhuj,Mahesana-Viramgaom & Mahesana-Patan section.
1040 Viramgam-Mahesana-Patan, Gandhinagar - Kalol DRF .. .. .. ..
section. -Replacement of old current regulators of RRSK 42,19 .. 40,00 2,19
LED signals.
15.01.33.15.2.50.001
15.01.33.12.3.50.006
15.05.33.14.3.54.003
15.05.33.15.3.54.003
15.05.33.15.3.54.005
15.05.33.15.3.54.006
15.05.33.15.3.54.008
15.05.33.15.3.54.007
S & T WORKS15.05.33.12.3.54.008
15.05.33.12.3.54.009
15.05.33.12.3.54.010
15.05.33.12.3.54.012
15.05.33.12.3.54.014
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 57
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
1042 Ahmedabad Division- Shifting of Starter Signal to DF(4) 30,95 30,95 .. ..
the boundary of the Track Circuit ahead to RRSK 4,33 .. 4,00 33
mitigate the risk in GER(Ex) –CLDY section.
1044 Ahmedabad Division- Shifting of Starter Signal to DF(4) 29,33 29,33 .. ..
the boundary of the Track Circuit ahead to RRSK 7,47 .. 5,00 2,47
mitigate the risk in SBI-KLL-GNC section.
1046 Replacement of over aged Ahmedabad exchange of DRF 43,48 43,48 .. ..
Ahmedabad Division RRSK 21,00 .. 10,00 11,00
1047 Proposal covers complete division: Replacement of DRF .. .. .. ..
101 km of cable, VG-2, DHG- 34, SBI-7, GIM-3, RRSK 87,90 .. 15,00 72,90
MSH-25, ADI-30. The estimate includes trenchingand laying along with laying materials. Supply ofcable not taken in the estimate, cable received
1049 The estimate covers replacement of neutral relay, DRF 36,50 36,50 .. ..
point group, SH group, QNN1, QNA1, QS3, QTA2 & QL1 RRSK 65,03 .. 16,00 49,03
of ADI RRI, GIM, MSH-VG, PNU-SIOB block ckt, KHD.These station relays has completed its codal life.
1051 Replacement of old version LED light unit of DRF 42,50 42,50 .. ..
SIOB-GIM-NBVJ & MSH-VG section. The estimate RRSK 39,07 .. 35,00 4,07
includes supply of main signal LED, SH LED, RouteLED and Calling signal LED. This also includes LEDECR.
Rajkot1053 Rajkot Div.: Replacement of defective signaling DRF 57,05 57,05 .. ..
cables, provision of cable at various locations. RRSK 11,90 .. 5,00 6,90
1054 Rajkot Division : Provision of High reliability Cap. 62,70 47,22 1 15,47
digital axle counters ( HRDAC) for BPAC in VG-VNRD RRSK .. .. .. ..
(2), SR-BMM,BMM-LPR ie 4 Block Section .
1055 Rajkot Division : Provision of High reliability Cap. 62,70 47,22 1 15,47
digital axle counters (HRDAC) for BPAC in Lilapur RRSK .. .. .. ..
Rd.-Kessariya Rd., Kesariya Rd.-Lakhtar,Lakhtar-Bajrangpura & Bajrangpura-Bala Road ie 4Block Sections.
1057 Rajkot Division : Shifting of Starter Signal to DF(4) 35,79 35,79 .. ..
the boundary of the Track Circuit ahead to RRSK 24,72 .. 10,00 14,72
mitigate the risk in WKR-WWA sec,SUNR, RJT BKNG &MDPR .
1059 Rajkot Division : Provision of Earth Leakage DF(4) 47,51 47,51 .. ..
Detector at 41 stations. RRSK 8,82 .. 5,00 3,82
1061 Rajkot Division: Provision of fuse alarm system at DF(4) 12,05 12,05 .. ..
Kanalus, Rajkot and Surendranagar. RRSK 6,58 .. 6,00 58
Bhavnagar1062 Bhavnagar Division: Replacement of LED signaling DRF .. .. .. ..
lighting units & ECRs on RJT-SMNH, BVC-SOA, RRSK 2,23,28 .. 1,90,00 33,28
sections & PIT, MHV Stations.
15.04.33.13.3.53.001
15.04.33.15.3.53.001
15.04.33.15.3.53.002
15.02.33.16.2.51.001
15.01.33.15.3.50.004
15.01.33.15.3.50.001
15.01.33.15.3.50.003
15.04.33.12.3.53.004
15.04.33.12.3.53.005
15.04.33.12.3.53.007
S & T WORKS15.01.33.13.3.50.002
15.01.33.13.3.50.001
15.01.33.13.3.50.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 58
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
1064 Surendranagar-Pipavav, Rajkot-Somnath & DF(4) 4,51 4,51 .. ..
Jetalsar-Wansjaliya sections:- Provision of fuse RRSK 94,08 .. 46,00 48,08
indication and monitoring system at 35 Panelinterlocked stations .
1066 Dhasa-Pipavav and Rajula-Mahuva section -Provision DF(3) 96,00 96,00 .. ..
of short haul OFC equipments. RRSK 38,39 .. 15,00 23,39
1067 Bhavnagar Division: Provision of fuse indication DF(4) .. .. .. ..
and monitoring system at 12 Panel interlocked RRSK 42,96 .. 24,00 18,96
stations (RJT-SMNH 05 stations, BVC-DLJ - 07stations) and 19 LC interlocked gates.
1069 Bhavnagar Division: Provision of Solar Power DF(4) 42,32 42,32 .. ..
System for standby power supply arrangement at RRSK 46,53 .. 13,50 33,03
BVC-DLJ (07 Stations) section and PIT station.
1070 Bhavnagar Division: Provision of failure alarm DF(4) .. .. .. ..
for track feed battery charger on BVC-DLJ & RRSK 97,89 .. 95,00 2,89
RJT-SMNH sections.
Mumbai1071 Works costing below DRM's Power RRSK 5,00 .. 5,00 ..
Vadodara1072 Works costing below DRM's Power RRSK 25,00 .. 25,00 ..
Ratlam1073 Works costing below DRM's Power RRSK 5,00 .. 5,00 ..
Ahmedabad1074 Works costing below DRM's Power RRSK 5,00 .. 5,00 ..
Rajkot1075 Works costing below DRM's Power RRSK 5,00 .. 5,00 ..
Bhavnagar1076 Works costing below DRM's Power RRSK 25,00 .. 25,00 ..
TOTAL-WORKS IN PROGRESS Cap. .. .. 12,52 ..
RRSK .. .. 19,37,49 ..
B - New Works
Headquarter1077 Western Railway - Provision of Wi-Fi connectivity RRSK 45,40 .. 5,00 40,40
of Railnet in WR HQ Office GLO Building.
Mumbai1078 Vangaon - Dahanu Road :- Prevention of blanking of RRSK 2,10,22 .. 60,00 1,50,22
signals by providing IPS at Relay huts in Autosection
1079 Virar-Dahanu raod :- Augmentation of existing AT RRSK 2,34,11 .. 50,00 1,84,11
supply at Auto relay huts in Automatic section
1080 Churchgate: Replacement of Audio System of RRSK 42,56 .. 20,00 22,56
Conference Hall.
15.03.33.17.3.52.001
15.03.33.17.3.52.004
15.05.33.17.3.00.999
15.01.33.17.3.00.999
15.04.33.17.3.00.999
15.02.33.17.3.00.999
15.00.33.17.3.13.001
15.03.33.17.3.52.002
15.02.33.12.3.51.004
15.02.33.15.3.51.001
15.02.33.15.3.51.005
15.02.33.15.3.51.004
15.03.33.17.3.00.999
15.06.33.17.3.00.999
S & T WORKS15.02.33.12.3.51.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 59
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
1081 Virar-Surat :- Provision of LED signal lamps for RRSK 52,24 .. 15,00 37,24
Shunt, 'A'/'AG', Route signals
1082 Parel Workshop: Upgradation of Railnet RRSK 37,15 .. 20,00 17,15
Connectivity at CWM PL Workshop through OpticalFiber Cable.
Vadodara1083 Vadodara Division : Replacement of over aged RRSK 1,98,70 .. 60,00 1,38,70
Batteries of Integrated Power Supply.
1084 Surat- Vadodara Section: Improvement in RRSK 2,32,15 .. 50,00 1,82,15
reliability by provision of separate IPS rooms atAuto huts.
1085 Surat- Geratpur Section: Provision of separate RRSK 1,23,96 .. 50,00 73,96
battery room at stations and LC gates.
Ratlam1086 Ratlam Division- Replacement of IPS of RRSK 2,08,20 .. 50,00 1,58,20
specification RDSO/SPN/165/2000.(at 15 Stations)
Ahmedabad1087 Ahmedabad Division- Replacement of IPS of RRSK 2,19,59 .. 50,00 1,69,59
specification RDSO/SPN/165/2000.
1088 Ahmedabad Division: Provision of fire detection & RRSK 47,15 .. 15,00 32,15
alarm system.(10 stations)
1089 Ahmedabad RRI:-Provision of Fire Suppression RRSK 56,99 .. 10,00 46,99
system.
Rajkot1090 Rajkot Division : Replacement of NBT block RRSK 2,43,06 .. 60,00 1,83,06
instrument by UFSBI block panel with BPAC in KMBL- OKHA section.
Mumbai1091 Works costing below DRM's Power RRSK 20,00 .. 20,00 ..
Vadodara1092 Works costing below DRM's Power RRSK 15,00 .. 15,00 ..
Ratlam1093 Works costing below DRM's Power RRSK 15,00 .. 15,00 ..
Ahmedabad1094 Works costing below DRM's Power RRSK 15,00 .. 15,00 ..
Rajkot1095 Works costing below DRM's Power RRSK 10,00 .. 10,00 ..
Bhavnagar1096 Works costing below DRM's Power RRSK 10,00 .. 10,00 ..
TOTAL-NEW WORKS RRSK .. .. 6,00,00 ..
TOTAL-S & T Works Cap. .. .. 12,52 ..
RRSK .. .. 25,37,49 ..
15.02.33.17.3.00.999
15.04.33.17.3.53.001
15.03.33.17.3.00.999
15.06.33.17.3.00.999
15.05.33.17.3.00.999
15.01.33.17.3.00.999
15.04.33.17.3.00.999
15.06.33.17.3.55.001
15.06.33.17.3.55.002
15.05.33.17.3.54.001
15.01.33.17.3.50.003
15.01.33.17.3.50.002
15.01.33.17.3.50.001
S & T WORKS15.03.33.17.3.52.005
15.03.33.17.3.52.003
15.06.33.17.3.55.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 60
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
A - Works in Progress
Mumbai1098 Churchgate-GLO-Replacement of overaged wiring & DRF 6,12 6,12 .. ..
switch boards in GLO office building. RRSK 60,06 .. 40,94 19,12
1100 Mumbai Division-Improvement of earthings by DRF 31,43 31,43 .. ..
provision of maintenance free earthings RRSK 48,50 .. 48,00 50
1101 Mumbai Division-Replacement of old cables on age DRF 1,33,87 .. 36,75 97,12
cum conditoion basis
1102 Churchgate-Replacement of overaged wiring & switch DRF 83,86 80,40 3,46 ..
boards in CCG station office building
Vadodara1103 Vadodara Division - Replacement of averaged, DRF 1,10,64 62,29 20,00 28,35
undersized AT cables at various places.
1104 Vadodara Division:-Replacement of HT panels, LT DRF 1,14,74 20,41 89,45 4,88
panels & Pump control panels along with allaccessories on various stations.
Ratlam1105 Ratlam Division-Replacement of worn out earths in DRF 23,04 13,24 9,80 ..
staff quarters & service buildings.
Ahmedabad1106 Ahmedabad Area:- Replacement of overaged Power DRF 20,53 20,53 .. ..
transformers of 500 KVA, 250KVA, and VCB RRSK 1,13,06 .. 1,11,06 2,00
1107 Gandhidham:- Electrical work in connection with DF(3) 56,15 51,71 4,07 37
Strengthening and improvement of HT powerdistribution system of station cubical at.
Rajkot1108 Hapa:-Replacement of Transformarof 2X300 Kva DRF 1,64,83 .. 62,25 1,02,58
capacity along with the associated HT controlgears at Hapa sub station.
1110 Okha : Provision of Dyna Drive facility at. DF(3) 16,51 .. .. 16,51
RRSK 33,60 .. 31,00 2,60
Vadodara1111 Works costing below DRM's Power DF(3) 5,09 .. 5,09 ..
Ratlam1112 Works costing below DRM's Power DF(3) 18,50 .. 18,50 ..
Rajkot1113 Works costing below DRM's Power DRF 11,98 .. 11,98 ..
Bhavnagar1114 Works costing below DRM's Power DRF 5,82 .. 5,82 ..
15.04.36.15.3.53.001
15.06.36.17.3.00.999
15.05.36.17.3.00.999
15.04.36.17.3.00.999
15.02.36.17.3.00.999
15.06.36.14.2.55.001
15.06.36.16.2.55.001
15.05.36.15.3.54.001
15.01.36.15.2.50.001
15.01.36.15.3.50.001
15.04.36.15.2.53.001
OTHER ELECTRICAL WORKS
15.03.36.15.3.52.003
15.03.36.15.3.52.002
15.03.36.16.2.52.001
15.03.36.15.3.52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 61
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
TOTAL-WORKS IN PROGRESS DRF .. .. 2,39,51 ..
DF(3) .. .. 27,66 ..
RRSK .. .. 2,31,00 ..
B - New Works
Mumbai1115 Mumbai Division- Replacement of LT power panels on DRF 1,72,34 .. 40,00 1,32,34
age cum condition basis
Vadodara1116 Vadodara Division:- Replacement of convensional Cap. 1,98,37 .. .. 1,98,37
fittings by energy efficient LED fittings atvarious stations and other energy conservationmeasures.
Ratlam1117 Ratlam Division :- Rehabilitation of street Cap. 1,56,57 .. .. 1,56,57
lighting system with replacement of Conventional street lights by Energy efficient LED Streetlights with automation .
Ahmedabad1118 Ahmedabad Division :- Replacement of conventional Cap. 1,57,11 .. .. 1,57,11
type light fittings with energy efficient lightfittings.
Mumbai1119 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
Vadodara1120 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
Ratlam1121 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
Ahmedabad1122 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
Rajkot1123 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
Bhavnagar1124 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
TOTAL-NEW WORKS DRF .. .. 70,00 ..
TOTAL-Other Electrical Works DRF .. .. 3,09,51 ..
DF(3) .. .. 27,66 ..
RRSK .. .. 2,31,00 ..
A - Works in Progress
Mumbai1126 Churchgate-Borivali section - Replacement of 22 Kv DRF 27,66 27,66 .. ..
and 2.2KV cables at different locations RRSK 26,92 .. 13,84 13,08
1127 Churchgate-Marine Lines Seciton - Replacement of DRF 1,43,34 1,43,34 .. ..
non standard OHE structures. RRSK 1,17,24 .. 42,34 74,90
15.01.36.17.3.00.999
15.04.36.17.3.00.999
15.02.36.17.3.00.999
TRACTION DISTRIBUTION WORKS
15.03.37.15.6.52.003
15.03.37.14.2.52.001
15.06.36.17.2.50.001
15.05.36.17.2.54.001
15.01.36.17.2.50.001
15.03.36.17.3.00.999
15.06.36.17.3.00.999
15.05.36.17.3.00.999
15.03.36.17.2.52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 62
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
1129 Churchgate-Borivali section - Replacement of over DRF 10,42 10,42 .. ..
aged Earthing stations RRSK 31,06 .. 28,42 2,64
1130 Virar-Surat Section-Replacement of existing DRF 33,68 .. .. 33,68
underrated 25 kV single pole and double pole RRSK 1,64,41 .. 49,59 1,14,82
isolators
1131 Virar-Surat Section: Replacement of existing over DRF .. .. .. ..
aged lightening arresters RRSK 60,04 .. 21,01 39,03
1132 Virar-Surat Section -Maintain of OHE profile by DRF 1,05,81 1,05,81 .. ..
replacement of existing worn out inspan droppers RRSK 1,44,09 .. 87,36 56,73
in connection with inputs required for running oftrains at 160 KMPH
1133 Virar-Surat Section: Replacement of existing DRF .. .. .. ..
corroded/rusted OHE termination arrangement RRSK 73,08 .. 22,09 50,99
1135 Churchgate-Virar Section - Provision of earth DF(3) 6,44 6,44 .. ..
wire(Aerial) in place of strucutre bond on RRSK 38,56 .. 12,60 25,96
platforms
Vadodara1136 Vadodara division - Augmentation of existing DRF 86,19 86,19 .. ..
transformer capacity by providing ONAF arrangement RRSK 1,08,56 .. 10,50 98,06
at BH and MPR traction sub-stations, in connectionwith raising of speed potential of OHE from 140 to160 KMPH.(Two trains in each direction)
1138 Vadodara Division-Modification of Anti-Falling DRF 15,40 15,40 .. ..
arrangement in Three Pulley type regulating RRSK 18,65 .. 6,30 12,35
equipment
1140 Vadodara Division-Replacement of 10 kVA Auxiliary DRF 21,11 21,11 .. ..
Transformer (AT) by 25 kVA AT at TSS's. RRSK 37,99 .. 16,80 21,19
1142 BRC Division-Replacement of overaged 25 kV SP DRF 39,76 39,76 .. ..
Isolator RRSK 10,25 .. 2,10 8,15
Ratlam1143 Godhra-Bhopal Section-Replacement of old/damaged DRF .. .. .. ..
feeder cables of AT or any other items connected RRSK 72,88 .. 30,75 42,13
with AT & type-I Board.
1145 Godhra-Bhopal Section-Replacement of over aged DRF 23,82 23,82 .. ..
battery according to their codal life. RRSK 26,18 .. 26,00 18
Ahmedabad1146 Gandhinagar Capital (Traction S/S) :-Provision of DF(3) .. .. .. ..
forced Air Cooling of Existing power transformer. RRSK 34,53 .. 12,40 22,13
1147 Geratpur- Gandhinagar section : Replacement of DRF .. .. .. ..
ST,BT & 9-ton insulators with composite type RRSK 53,30 .. 18,18 35,12
insulators.
15.05.37.16.3.54.002
15.01.37.16.3.50.001
15.01.37.16.3.50.002
15.03.37.16.3.52.002
15.06.37.15.2.55.001
15.06.37.16.3.55.001
15.06.37.16.3.55.002
15.06.36.12.3.55.002
15.05.37.16.3.54.001
TRACTION DISTRIBUTION WORKS15.03.37.16.3.52.001
15.03.37.15.2.52.002
15.03.37.15.6.52.002
15.03.37.15.2.52.001
15.03.37.16.3.52.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 63
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
1148 Geratpur-Gandhinagar section - Proposal for DRF .. .. .. ..
replacement of corroded 25 KV conventional RRSK 1,24,85 .. 4,40 1,20,45
cantilevers and replacement of span droppers.
Mumbai1149 Works costing below DRM's Power RRSK 60,22 .. 60,22 ..
Vadodara1150 Works costing below DRM's Power RRSK 28,56 .. 28,56 ..
Ratlam1151 Works costing below DRM's Power RRSK 19,10 .. 19,10 ..
Ahmedabad1152 Works costing below DRM's Power RRSK 12,89 .. 12,89 ..
TOTAL-WORKS IN PROGRESS RRSK .. .. 5,25,45 ..
B - New Works
Mumbai1153 Churchgate-Virar Section - Replacement of ending RRSK 95,56 .. 95,56 ..
cones of OHE.
1154 Virar-Jalgaon section : Replacement of existing RRSK 1,95,18 .. 10,00 1,85,18
leaned OHE structures
1155 Virar - Surat - Replacement of corroded steel RRSK 95,09 .. 95,09 ..
structures in polluted area.
1156 Churchgate-Borivali Section -Replacement of 22KV RRSK 2,25,24 .. 10,00 2,15,24
Circuit Breaker at different locations on age cumcondition basis .
1157 :Replacement of existing static type differential RRSK 45,07 .. 45,07 ..
relay for protection of traction transformer &Capacitor bank by Numerical differential relay atTraction sub station in Virar - Jalgaon section ofMumbai Division.
1158 Mumbai Central – Top wiring of yard for attachment RRSK 1,80,40 .. .. 1,80,40
of ‘HOG compliant Loco’ with HOG compliant rakes’of Rajdhani and August Kranti Rajdhani ExpressTrains
Vadodara1159 Vadodara division : Replacement of Rusty RRSK 1,50,88 .. 10,00 1,40,88
Cantilever Assemblies
1160 Vadodara Division-Retrieval of Critical/Leaned OHE RRSK 75,82 .. 75,82 ..
Structure
Ratlam1161 Godhra-Bhopal Section-- Replacement of overage RRSK 43,68 .. 43,68 ..
battery sets in Ratlam Division
15.03.37.17.2.52.001
15.03.37.17.3.52.003
15.03.37.17.2.52.003
15.06.37.17.2.55.001
15.06.37.17.3.55.001
15.05.37.17.3.54.001
15.06.37.17.3.00.999
15.05.37.17.3.00.999
15.01.37.17.3.00.999
15.03.37.17.3.52.001
15.03.37.17.2.52.002
15.03.37.17.3.52.002
TRACTION DISTRIBUTION WORKS15.01.37.16.2.50.001
15.03.37.17.3.00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 64
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Ahmedabad1162 Ahmedabad division : Replacement of Aluminium RRSK 95,59 .. 95,59 ..
Feeder by Copper Feeder in Ahmedabad division.
Mumbai1163 Works costing below DRM's Power RRSK 41,98 .. 41,98 ..
Vadodara1164 Works costing below DRM's Power RRSK 20,00 .. 20,00 ..
Ratlam1165 Works costing below DRM's Power RRSK 20,00 .. 20,00 ..
Ahmedabad1166 Works costing below DRM's Power RRSK 20,00 .. 20,00 ..
TOTAL-NEW WORKS RRSK .. .. 5,82,79 ..
TOTAL-Traction Distribution RRSK .. .. 11,08,24 ..
Works
A - Works in Progress
Mumbai1167 PAREL WORKSHOP Improvement to storm water drainageDF(3) 2,22,41 85,00 1,22,00 15,41
system and water pipe line to prevent water RRSK 20,00 .. 20,00 ..
logging and contamination of drinking water.
1168 Valsad:- Providing one pit line & associated sick DF(3) 49,06 40,07 8,99 ..
line facilities. (BCT/S/06-07) RRSK 80,00 .. 80,00 ..
1169 Lower Parel:- Replacement and laying of LT cables DRF 47,90 38,87 6,37 2,66
of different sizes as per schedule of rate andscope of work. (BCT/U/11-12)
1170 BCT (CFO Yard)-Provision of CC Apron on washing DF(3) 99,59 .. 14,71 84,88
lines
Ratlam1171 Ratlam (D/Shed):- Rebuilding of heavily cracked DRF 1,38,51 95,84 39,85 2,82
and leaky administrative building. (RTM/S/09-10)
1172 Dahod (workshop):- Replacement of Old corroded DRF 65,17 38,88 14,65 11,64
steel member of structure and painting of allsteel structure to prevent rusting. (RTM/U/10-11)
1173 Ratlam Diesel Shed - Dust free Axle box Cap. 28,21 25,86 1,00 1,35
overhauling and under frame component overhaulingroom
1174 Ratlam (D/Shed)-Rebuilding of Heavily cracked and DRF 99,01 .. 99,01 ..
leaky Diesel training Hostel building.
Ahmedabad1175 ADI (BG):- Repair to cat walks of washing cum DRF 97,36 66,47 30,00 89
inspection pit lines with portal lightings.
15.05.42.10.3.54.004
15.05.42.15.3.54.001
15.05.42.16.3.54.001
15.01.42.12.3.50.002
WORKSHOPS INCLUDING PUS
15.03.42.11.1.52.001
15.03.42.06.2.52.001
15.03.42.11.3.52.002
15.03.42.12.3.52.003
15.05.42.09.3.54.003
TRACTION DISTRIBUTION WORKS
15.01.37.17.3.50.001
15.03.37.17.3.00.999
15.06.37.17.3.00.999
15.05.37.17.3.00.999
15.01.37.17.3.00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 65
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
1177 Ahmedabad - Augmentation to BG pit line at ADI DF(3) 36,76 .. 6,76 30,00
area RRSK 60,00 .. 60,00 ..
Lower Parel Workshop1178 Lower Parel Workshop - MPCB compliance : Provision DF(3) 16,32 5,77 5,86 4,69
of ETP
Mumbai1179 Works costing below DRM's Power DF(3) 16,99 .. 16,99 ..
Lower Parel Workshop1180 Works costing below DRM's Power Cap. 5,90 .. 5,90 ..
DRF 2,39 .. 2,39 ..
TOTAL-WORKS IN PROGRESS Cap. .. .. 6,90 ..
DRF .. .. 1,92,27 ..
DF(3) .. .. 1,75,31 ..
RRSK .. .. 1,60,00 ..
B - New Works
Mumbai1181 Surat - Expansion of Mechanised laundry DF(3) 66,03 .. 5,00 61,03
1182 Bandra Terminus- Construction of RCC Compressor DF(3) 46,28 .. 5,00 41,28
Room & Hall with Kitchen at Coaching Depot BDTS.
Ratlam1183 Ratlam Division-Provision of Rolling in/out HUT DF(3) 49,99 .. 5,00 44,99
and Rolling IN/out light at Indore,Mhow,Ratlam,Ujjain, Chittorgarh, Shambhupura.
Ahmedabad1184 Vatva(Diesel shed)-Improvement of pit line No. 6 DF(3) 65,00 .. 5,00 60,00
with both side approaches and Replacement ofcement sheets with FRP sheets at diesel shedVatva..
1185 Ahmedabad new complex yard- Repair and DRF 2,11,81 .. .. 2,11,81
rehabilitation of pit line no. 3 & 4 crackedpillars, broken catwalk, damaged pathway.
Bhavnagar1186 Porbandar-Rehabilitation of pit line and water DRF 1,58,20 .. .. 1,58,20
pipe line at pit line .
TOTAL-NEW WORKS DF(3) .. .. 20,00 ..
TOTAL-Workshops including PUs Cap. .. .. 6,90 ..
DRF .. .. 1,92,27 ..
DF(3) .. .. 1,95,31 ..
RRSK .. .. 1,60,00 ..
15.01.42.17.3.50.001
15.01.42.17.2.50.001
15.02.42.17.2.51.001
15.10.42.14.3.74.001
15.03.42.17.3.00.999
15.10.42.17.3.00.999
15.03.42.17.3.52.001
15.03.42.17.3.52.002
15.05.42.17.3.54.001
WORKSHOPS INCLUDING PUS15.01.42.12.3.50.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 66
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
A - Works in Progress
Mumbai1187 Jogeshwari (East):- Providing 8 units type-II Cap. 90,63 .. 50,00 40,63
quarters.
1188 Udhna - Jalgaon Section (Corporate Welfare Plan) - DRF 1,50,23 1,21,04 20,00 9,19
Rebuilding of 17 units type-II quarters.
1189 Virar-Surat section:- Providing 12 units type II DRF 1,35,12 1,18,40 10,00 6,72
quarters in lieu of earlier demolished unsafequarter No 25/L at Udhna.
1190 Valsad :- Providing one Type-IV quarters for DRF 27,96 .. 20,00 7,96
principal RPF training center on replacementaccount.
Vadodara1191 Miyagam-karjan:-Providing 8 Units Type II staff DRF 85,67 .. 80,00 5,67
quarters in lieu of abandoned staff quarters.
1192 Bharuch:- Providing 8 unit Type II quartes in lieu DRF 93,66 72,19 20,00 1,47
of existing abandoned staff quarters of Block No.E/106 on replacement account.
1193 Ankleshwar :- Providing 15 units type-II for DRF 1,18,92 83,27 20,00 15,65
gangmen in lieu of Gang chawl No. E/34.(BRC/U/09-10)
1194 Vadodara Division:- Providing 7 units type-III and Cap. 1,38,84 1,15,35 5,00 18,49
3 units type-IV quarters for supervisors.(BRC/U/09-10)
1195 Vadodara Division:-Providing new 8 Units Type II DRF 86,90 56,90 30,00 ..
quarters in lieu of abandoned staff quarters blockNo. E/90 at Bharuch Railway station.
1196 Anand:-Providing 7 Units Type III quarters for Cap. 95,36 .. 30,00 65,36
Supervisory staff
Ratlam1197 CNA-NMH Section:- Shifting of abandoned mid Cap. 94,00 93,26 74 ..
section gang chawl No. 28 at Chanderia Station.(RTM/U/11-12)
1198 GDA-NAD Sec:- Providing 8 unit type III quarters Cap. 74,68 40,66 16,00 18,02
for PWS at THDR, BJG, CCL, SAT, LMK, MAM, JKT &KUH stations.
1199 Indore - Providing 10 units Type -II quarters DRF 99,37 41,68 50,00 7,69
(multistoried) in lieu of abandoned quarters.
15.06.51.14.3.55.001
15.06.51.16.3.55.001
15.05.51.11.3.54.001
15.05.51.13.3.54.001
15.05.51.14.3.54.001
15.03.51.12.3.52.001
15.03.51.16.3.52.001
15.06.51.16.3.55.002
15.06.51.15.3.55.001
15.06.51.09.3.55.001
15.06.51.09.3.55.002
STAFF QUARTERS
15.03.51.15.3.52.001
15.03.51.10.2.52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 67
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
1200 Ratlam - Providing 4 UNIT Type-IV quarters. Cap. 93,57 53,80 30,00 9,77
1201 SEHORE-Providing Type IV quarters 1 Unit,Type Cap. 86,05 58,02 10,00 18,03
III-2 Units and Type II-2 Units for EngineeringStaff.
Ahmedabad1202 Detroj:- Providing 8 unit type-II quarters in lieu DRF 93,41 24,69 60,00 8,72
of sub standard quarters.
1203 Ahmedabad - Construction of 4 type V and 4 type IV Cap. 2,00,62 1,49,05 42,25 9,32
quarters for officers.
1204 GIM-Providing 10 units type II Qrts on replacement DRF 1,00,49 .. 75,97 24,52
account in lieu of SARVA colony.
Rajkot1205 Than - Replacement of non-standard type I quarters DRF 89,87 58,13 20,00 11,74
by type II standard quarters.(10 units)
1206 Lakhtar – Replacement of 08 unit type-II Qtrs at DRF 78,38 .. 78,00 38
Bhavnagar1207 Bhavnagar Para: Transit accommodation for Cap. 90,34 .. 20,00 70,34
officers, 04 Units.
TOTAL-WORKS IN PROGRESS Cap. .. .. 2,03,99 ..
DRF .. .. 4,83,97 ..
B - New Works
Mumbai1208 Umbergaon:- Providing 7 units type-II quarters for DRF 98,13 .. 5,00 93,13
essential staff in lieu of condemned quarters.
Vadodara1209 Palej:-Providing 8 Units Type II staff quarters in DRF 79,51 .. 9,00 70,51
lieu of abandoned staff quarters.
1210 Ankleshwar:-Providing 10 unit Type II staff DRF 1,01,61 .. 5,00 96,61
quarters for RPF staff in lieu of abandoned Type-Istaff quarters.
Ratlam1211 Ratlam -Godhra Section :- Providing 06 units Type DRF 85,95 .. 5,00 80,95
II Quarters in lieu of old non standarddilapidated gang staff quarters at Roati station.
Ahmedabad1212 Gandhidham - Providing 8 units Type-II quarters in DRF 94,81 .. 5,00 89,81
lieu of sub-standard quarters.(On replacementaccount)
TOTAL-NEW WORKS DRF .. .. 29,00 ..
TOTAL-Staff Quarters Cap. .. .. 2,03,99 ..
DRF .. .. 5,12,97 ..
15.01.51.17.3.50.001
15.04.51.16.3.53.001
15.02.51.16.3.51.001
15.03.51.17.3.52.001
15.06.51.17.3.55.002
15.06.51.17.3.55.001
15.05.51.17.3.54.001
15.05.51.15.3.54.002
15.05.51.15.3.54.001
15.01.51.15.3.50.001
15.01.51.10.2.30.001
15.01.51.12.3.30.001
15.04.51.14.3.53.001
STAFF QUARTERS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 68
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
A - Works in Progress
Headquarter1213 Vadodara and Ratlam Division - Rewiring of staff DF(2) 1,50,00 78,37 50,00 21,63
quarters
Mumbai1214 Jagjivan Ram Hospital ( BCT)-procurement of semi DRF 37,42 .. 36,00 1,42
electric bed with mattress.
1215 Mumbai central - Proposed two additional floor on DF(2) 2,15,28 .. 30,00 1,85,28
Parichar Sadan to enhance accommodation for thepatient's relatives.
1216 Bandra(East & West) Colony - Structural repairs to DF(2) 1,34,86 .. 60,00 74,86
staff quarters by replastering,ceilingrepair,column and beam repair and drainage line.
1217 Valsad (ZMC):- Provision of basic staff amenities DF(2) 95,17 37,62 20,00 37,55
by providing Tiffin Room, Flooring, Roofing andreplacement of dilapidated health affecting ACsheet by PPGI sheets including replacement ofwindows.
1218 Virar-Surat Section - Corporate Welfare plan - DRF 1,57,54 1,42,59 14,00 95
Improvements to quarters, latrines, bathrooms,kitchen, court-yard, verandas, re-roofing, decadewood work raising of floors, Augmentation of watersupply.
1219 Dahanu road:- Improvement to sub-standard quarter DF(2) 57,29 27,35 1,00 28,94
type I. (BCT/S/08-09)
1220 Malad:- Segregation of domestic water suply to DF(2) 31,33 12,39 1,00 17,94
colony and distribution system improvement.(BCT/S/08-09)
1221 Udhna-Jalgaon Section:- Providing bathroom DF(2) 44,72 23,40 15,00 6,32
facilities in 60 type I qtrs at AEN/E/NDB.(BCT/U/09-10)
1222 Santacruz (East) – Improvement to water supply by DRF 81,15 50,16 25,00 5,99
construction of 80,000 lit. Capacity undergroundtank with pump room in lieu of underground tank.(BCT/U/11-12)
1223 Matunga :- Providing 2.25 lakhs OH tank to DF(2) 1,00,60 .. 80,00 20,60
rationalise water supply
1224 Nandurbar : Providing RCC overhead /Under ground DF(2) 1,06,11 .. 80,00 26,11
water storage tank in lieu of old dilapidatedsteel tank
15.03.52.15.3.52.003
15.03.52.15.3.52.001
15.03.52.15.3.52.002
15.03.52.08.2.52.001
15.03.52.08.3.52.006
15.03.52.08.3.52.008
15.03.52.09.3.52.003
15.03.52.11.3.52.001
AMENITIES FOR STAFF
15.00.52.11.2.55.001
15.03.52.15.3.52.004
15.03.52.16.2.52.001
15.03.52.15.2.52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 69
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Vadodara1225 Vadodara Division - Improvement to drainage DRF 1,90,00 1,88,04 1,00 96
arrangements in Railway colony of variousstations.
1226 Derol,Timba Road,Godhara:-Improvement to watering Cap. 1,08,30 1,08,29 1 ..
arrangement by providing 100000 liters capacityRCC OH tank with 20mm dia. Bore and paipe linearrangement
1227 Pratapnagar:-Providing facilities for stem cell DF(2) 20,78 .. 15,00 5,78
threrapy in Railway Hospital in connection withenhanced madical facilities as per guidelines.
Ratlam1228 Dahod - Standardization of Sub standard qtrs 200 DRF 1,23,32 1,10,65 .. 12,67
Nos. in type-II at Dhobighat, fiulter site area,Sudaimata, Godhra road , char rasta & Bakri road in connection with CWP
1229 Dahod:- Provision of toilets inside the compound DF(2) 78,22 12,76 40,00 25,46
wall in quarters with old & dilapidated communitytoilets
1230 Chanderiya - Ratlam section - Providing New bore Cap. 1,15,24 77,69 37,00 55
well with pipe line (at NMH, HKL, MLG, PIP, MDS, DRF 76,82 45,77 16,00 15,05
JAO, DLD & BRLA stations) along with Over head RCCwater tank at NMH= 2.25 Lac lit., MDS= 1.0 Laclit. & JAO =1.0 Lac lit, NBH 1.0 Lac litres
1231 Godhra-Nagda Section - Improvement to water supply Cap. 52,49 .. 50,00 2,49
network at various stations of staff colony. DRF 1,07,63 .. 20,00 87,63
1232 Ratlam - Rebuilding of old Dilapidated DRF 2,38,77 98,95 50,00 89,82
senior/junior institute
1233 Ratlam-Chanderia Section:- Improvement to sub Cap. 91,27 91,27 .. ..
standard quarters by providing basic facility likelat, bath, kitchen & court yard & Raising ofplinth of staff quarters of Mandsaur(Gang chawlNo.47)& Jaora. (RTM/U/09-10)
1234 RTM-Replacement of over aged filter plant at. DRF 1,10,91 1,00,99 1,00 8,92
1235 Dahod:- Rewiring of 219 units Types I and 412 DRF 89,06 35,12 20,00 33,94
units Type II (Total= 631 units) staff Quarter at FLG Colony.
1236 Ratlam - Provision of Lifts at DRMs office. DF(2) 49,13 .. 1,00 48,13
Ahmedabad1237 Ahmedabad Division:- Providing latrine & bathroom DF(2) 93,66 18,38 70,00 5,28
in sub-standard type-I quarters under AEN/MG/SBI
1238 Sabarmati:- Replacement of 2 Nos. existing DRF 98,25 96,05 2,00 20
dilapidated tanks at township and near pump No. 4with one bore and inter connectivity of variousbores. (ADI/U/09-10)
15.05.52.13.6.54.001
15.05.52.15.3.54.001
15.05.52.16.6.54.001
15.01.52.15.3.50.001
15.01.52.09.3.50.003
15.05.52.11.2.54.001
15.05.52.15.3.54.002
15.05.52.15.2.54.001
15.05.52.15.2.54.002
15.05.52.09.2.54.001
15.05.52.09.3.54.005
AMENITIES FOR STAFF
15.06.52.11.2.55.001
15.06.52.10.2.55.001
15.06.52.15.3.55.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 70
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
1239 Kalol :-Providing 1 lakh litres RCC OH tank on DRF 32,92 29,08 3,00 84
replacement basis
1240 Gandhidham (Colony) - Providing 1 lac. Ltr DF(2) 41,32 .. 35,00 6,32
capacity RCC OH Tank at double storey quarters.
Rajkot1241 Rajkot:- Rehabilitation of old staff quarters in DRF 88,63 70,52 10,00 8,11
Loco & Construction colony.
1242 Rajkot:- Replacement of RCC Over Head Tank 2.50 KL DRF 92,34 9,81 70,00 12,53
capacity in KC Colony.
Bhavnagar1243 Sasangir :-Construction of Holiday Home 04 Rooms DF(2) 1,45,61 .. 20,00 1,25,61
& Officer Rest House 02 Rooms at
1244 Botad - Improvement to staff quarters of outside DF(2) 88,52 .. 40,00 48,52
plaster, balcony, chajja, sunshade etc.
Mumbai1245 Works costing below DRM's Power DF(2) 10,00 .. 10,00 ..
Vadodara1246 Works costing below DRM's Power DF(2) 10,00 .. 10,00 ..
Rajkot1247 Works costing below DRM's Power Cap. 6,00 .. 6,00 ..
Bhavnagar1248 Works costing below DRM's Power Cap. 10 .. 10 ..
TOTAL-WORKS IN PROGRESS Cap. .. .. 93,11 ..
DRF .. .. 2,68,00 ..
DF(2) .. .. 5,78,00 ..
B - New Works
Mumbai1249 Virar:Construction of Health unit DF(2) 2,09,31 .. 4,00 2,05,31
1250 Colaba ( Badhwar Park ) - Provision of fire exit DF(2) 1,42,24 .. 4,00 1,38,24
(stairs case) in P block.
Vadodara1251 Vadodara Division:-Rewiring of old staff quarters DRF 2,17,19 .. 20,00 1,97,19
(Type I, II , III,IV &V) Over Vadodara division.
Mumbai1252 Works costing below DRM's Power DRF 10 .. 10 ..
DF(2) 10 .. 10 ..
Vadodara1253 Works costing below DRM's Power DRF 10 .. 10 ..
DF(2) 10 .. 10 ..
Ratlam1254 Works costing below DRM's Power DRF 10 .. 10 ..
DF(2) 10 .. 10 ..
15.06.52.17.2.55.001
15.03.52.17.3.00.999
15.06.52.17.3.00.999
15.05.52.17.3.00.999
15.03.52.17.3.00.999
15.06.52.17.3.00.999
15.04.52.17.3.00.999
15.02.52.17.3.00.999
15.03.52.17.2.52.001
15.03.52.17.2.52.002
15.01.52.13.3.50.001
15.01.52.14.3.50.001
15.04.52.15.3.53.001
15.04.52.15.3.53.002
15.02.52.16.2.51.001
15.02.52.15.3.51.001
AMENITIES FOR STAFF
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 71
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Ahmedabad1255 Works costing below DRM's Power DRF 10 .. 10 ..
DF(2) 10 .. 10 ..
Rajkot1256 Works costing below DRM's Power DRF 10 .. 10 ..
DF(2) 10 .. 10 ..
Bhavnagar1257 Works costing below DRM's Power DRF 10 .. 10 ..
DF(2) 10 .. 10 ..
TOTAL-NEW WORKS DRF .. .. 20,60 ..
DF(2) .. .. 8,60 ..
TOTAL-Amenities For Staff Cap. .. .. 93,11 ..
DRF .. .. 2,88,60 ..
DF(2) .. .. 5,86,60 ..
A - Works in Progress
Mumbai1258 Mumbai Central(L) to Bandra:Raising of suburban DF(1) 1,46,15 1,46,15 .. ..
section platforms at BCT (L) plat no.1&2, MXplat no 2&3, EPR plat no.1&2, BA plat no. 2&3 from 840mm to 920 mm (08 platforms)
1259 Churchgate & Grant Road -Raising of suburban DF(1) 1,47,89 87,04 13,90 46,95
section platforms at CCG plat .no 1&2,2&3,3&4 andGTR plat no 2&3 from 840mm to 920 mm( 08platforms)
1260 Mumbai Central - Design, Development, Supply, DF(1) 1,99,71 1,36,10 1,00 62,61
Installation, Testing & Commissioning of Machines/ Equipments for setting up a Mechanized Laundryof 3 Ton capacity on Turn Key Basis.
1261 Surat - Providing RCC overhead tank & water pipe DF(1) 1,75,69 1,32,38 .. 43,31
lines for segregation of coach watering
1262 Dadar - Renewal of deterioted COP covering and DRF 1,63,64 75,65 65,00 22,99
structure.
1263 Dahanu Road - Rasing of PF No.1, 2 ,3 and DF(1) 1,25,51 1,11,82 10,00 3,69
improvement to roof covering of cover shed underADEN-Dahanu Road Section.
1264 Dahanu Road: Improvement to circulating area, DF(1) 1,91,98 1,54,22 30,00 7,76
façade cover shed etc.
1265 Navsari: Extension and raising of platforms to DF(1) 1,94,95 .. 1,00,00 94,95
accimodate 24 coaches trains At PF No. 1
1266 Vapi: Extension of platforms to accommodate 24 DF(1) 1,80,68 .. 1,00,00 80,68
coaches trains-Vapi PF No. 3
1267 Santacruz-Virar section: Replacement of AC sheet DRF 1,72,43 1,43,10 13,00 16,33
COP by galvalume.
1268 Virar: Extension of PF 03 at Virar to accommodate DF(1) 1,99,70 1,09,73 40,00 49,97
18 coaches train.
15.03.53.15.3.52.002
15.03.53.15.3.52.006
15.03.53.09.3.52.002
15.03.53.14.3.52.003
15.03.53.15.3.52.001
15.03.53.15.3.52.003
15.03.53.15.3.52.004
15.03.53.15.3.52.005
15.04.52.17.3.00.999
15.02.52.17.3.00.999
PASSENGER AMENITIES
15.03.53.14.3.52.001
15.03.53.14.3.52.002
15.03.53.13.3.52.002
AMENITIES FOR STAFF
15.01.52.17.3.00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 72
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
1269 Udhna:- Providing new FOB at Platform No. 1,2 & 3. DF(1) 1,96,40 .. 90,00 1,06,40
1270 Vapi - Providing cover shed to cover full length DF(1) 1,94,81 .. 80,00 1,14,81
of PF No 2 & 3.
Vadodara1271 Vadodara:-Shifting of parcel office and booking DF(1) 1,86,92 82,43 50,00 54,49
office at Vadodara (P)
1272 Vadodara Division :- Dismantaling of corroded DRF 2,06,82 76,84 1,07,00 22,98
existing covershed and providing new covershed atBharuch Railway station on platfom No. 1, 2, 3, 4& 5.
1273 Vadodara Division:-Provision of of minimum DF(1) 2,19,69 1,97,31 18,56 3,82
essantial amenities on various Railway station onVadodara Division to eliminate shortfall.
1274 Vadodara Yard:-Improvement of facilities like DF(1) 1,27,28 1,07,47 1,00 18,81
pucca handling area, all weather approach road,adequate lighting, proper Cover shed etc atVadodara Goods shed
1275 Derol:-Extension of platforms of Dn & Up line DF(1) 1,93,75 1,31,93 30,00 31,82
platforms to accomodate 22/24 coaches trains.
1276 Anand:-Provision of three lifts at Anand station DF(1) 1,37,65 .. 1,20,00 17,65
for inter platform transfer of persons withdisabilities on platforms.
Ratlam1277 Chittorgarh : Providing CC apron on PF no. 02 DF(1) 1,59,97 46,06 .. 1,13,91
1278 Augmentation of Laundry at IND & ETPat Junagad. DF(1) 1,10,18 52,24 5,00 52,94
1279 UJN - Providing additional FOB with connectivity DF(1) 2,84,79 1,82,58 15,00 87,21
to all passenger platforms at IND end
1280 UJN -Extension to existing FOB at NAD ends towards DF(1) 2,35,50 1,97,32 3,00 35,18
Passenger platform no 8
1281 Ujjain - Developing sitting space with covering DF(1) 2,53,53 1,85,39 1,00 67,14
shed on PF No 1 ( Nagda end) at old goods PF areaand Extension of PF shelter of galvenium at PF No2/3 in connection to Sinhastha 2016 at.
1282 RTM Div- Provision of Multiline train display DF(1) 1,69,71 94,59 20,00 55,12
boards at important stations in connection withSimhastha Mela 2016.
1283 Ratlam Division- Provision of 100 Toilets at DF(1) 1,82,52 36,19 40,00 1,06,33
various stations.
1284 Maksi-Provision of Minimum Essential Amenities DF(1) 1,59,76 53,66 20,00 86,10
(MEA) at Raising of Level of PF No.1.15.05.53.15.3.54.001
15.05.53.14.3.54.002
15.05.53.13.3.54.001
15.05.53.13.3.54.002
15.05.53.11.3.54.001
15.05.53.14.3.54.001
15.05.53.14.6.54.001
15.06.53.14.3.55.001
15.06.53.14.3.55.002
15.06.53.15.3.55.001
15.06.53.15.3.55.003
15.06.53.16.3.55.001
15.05.53.13.3.54.003
PASSENGER AMENITIES15.03.53.16.3.52.001
15.03.53.16.6.52.001
15.06.53.15.3.55.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 73
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
1285 Bercha-Provision of Minimum Essential DF(1) 1,60,48 1,10,20 5,00 45,28
Amenities(MEA) at (PF No.2) by Raising the levelof Paltform from RL to ML.
1286 Ratlam Division-Extension of platform length of DF(1) 1,67,55 1,13,42 10,00 44,13
Chittorgarh(PF No.4/5) & Nimbahera (PF No.1)station for accommodating 24 coaches train over.
1287 Ratlam Division-Provision of passenger DF(1) 1,10,51 79,52 10,00 20,99
announcement system, LCD display boards, VHF sets,Fare repeaters in connection with Simhastha Mela2016
1288 Ratlam Division-Provision of Coach Guidance Boards DF(1) 1,58,30 84,02 40,00 34,28
at Chittourgarh (PF No.3),Dewas(PFNo.1&2),Nimach(PF No.1),Mandsaur(PF No.1).
1289 Ratlam Division-Replacement of coach guidance DRF 1,51,25 88,80 62,45 ..
display system at Ratlam, Ujjain & ChittourgarhStatioin.
Ahmedabad1290 Ahmedabad :- Providing two passenger lift at DF(1) 2,35,20 1,92,48 20,00 22,72
platform No.1 and one passenger lift on platformNo.2-3, 4-5, and 6-7.
1291 Sabarmati - Replacement of old foot over bridge at DRF 96,85 67,43 .. 29,42
platform No. 2 & 3 infringing schedule ofdimension.
1292 ADI Division:- Removal of deficiencies in Minimum DF(1) 1,91,06 1,53,34 37,00 72
Essential Amenities at stations over AhmedabadDivision.
1293 Ahmedabad Division:- Final phase of removal of DF(1) 1,78,93 64,05 70,00 44,88
deficiencies in Minimum Essential Amenities.
1294 Ambli Road : Provision of Medium level PF No. 1 & DF(1) 1,98,92 1,30,91 60,00 8,01
2/3 and inter connecting pathway in connectionwith Adarsh Station at.
Rajkot1295 Rajkot:- Replacement of AC sheet, valley gutter DRF 1,17,10 47,31 65,00 4,79
and storm water down take pipe at Platform no.1 to5 at.
Bhavnagar1296 Bhavnagar Division: Provision of 18 Latrines for DF(1) 1,38,76 .. 73,00 65,76
gents and ladies at 18 stations and 13 urinals for gents and ladies at 10 stations.
1297 Wadhwan City: Raising and extension of existing DF(1) 1,99,83 72,26 80,00 47,57
platform to accommodate 24 coach trains.
Mumbai1298 Works costing below DRM's Power DRF 4,50,00 .. 4,50,00 ..
DF(1) 3,05,00 .. 3,05,00 ..
15.04.53.15.3.53.001
15.02.53.16.3.51.002
15.02.53.16.3.51.001
15.03.53.17.3.00.999
15.05.53.15.3.54.005
15.01.53.08.3.50.001
15.01.53.10.3.50.001
15.01.53.14.3.50.001
15.01.53.15.3.50.002
15.01.53.15.3.50.001
PASSENGER AMENITIES15.05.53.15.3.54.003
15.05.53.15.3.54.002
15.05.53.15.3.54.006
15.05.53.15.3.54.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 74
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Vadodara1299 Works costing below DRM's Power DRF 45,00 .. 45,00 ..
DF(1) 1,90,00 .. 1,90,00 ..
Ratlam1300 Works costing below DRM's Power DRF 1,10,00 .. 1,10,00 ..
DF(1) 2,70,00 .. 2,70,00 ..
Ahmedabad1301 Works costing below DRM's Power DRF 1,30,00 .. 1,30,00 ..
DF(1) 1,20,00 .. 1,20,00 ..
Rajkot1302 Works costing below DRM's Power DRF 1,35,00 .. 1,35,00 ..
DF(1) 1,20,00 .. 1,20,00 ..
Bhavnagar1303 Works costing below DRM's Power DRF 1,10,87 .. 1,10,87 ..
DF(1) 1,20,27 .. 1,20,27 ..
TOTAL-WORKS IN PROGRESS DRF .. .. 12,93,32 ..
DF(1) .. .. 23,18,73 ..
B - New Works
Mumbai1304 Nandurbar :- Upgrading coach watering DF(1) 1,09,08 .. 40,00 69,08
infrastructure under udhna - jalgaon section
Vadodara1305 Vadodara:-Proposal for Ramp at Platform No. 4 &5 DF(1) 1,02,02 .. 40,00 62,02
by dismantling landing of existing FOB atAhmedabad end.
Ratlam1306 Ratlam-Upgradation of watering facility as per DRF 1,13,78 .. 1 1,13,77
VIJAYWADA PATTERN at platform 04.
Ahmedabad1307 Providing facilities (except FOB ramp) for DF(1) 1,10,40 .. 40,00 70,40
Physically challenged persons at A, B & Dcategory stations.
Bhavnagar1308 Gondal : Provision of Foot Over Bridge. DF(1) 1,07,55 .. 40,00 67,55
Mumbai1309 Works costing below DRM's Power DRF 48,00 .. 48,00 ..
DF(1) 75,00 .. 75,00 ..
Vadodara1310 Works costing below DRM's Power DRF 33,00 .. 33,00 ..
DF(1) 65,00 .. 65,00 ..
Ratlam1311 Works costing below DRM's Power DRF 32,99 .. 32,99 ..
DF(1) 65,00 .. 65,00 ..
Ahmedabad1312 Works costing below DRM's Power DRF 33,00 .. 33,00 ..
DF(1) 67,00 .. 67,00 ..
Rajkot1313 Works costing below DRM's Power DRF 25,00 .. 25,00 ..
DF(1) 45,00 .. 45,00 ..
Bhavnagar1314 Works costing below DRM's Power DRF 25,56 .. 25,56 ..
DF(1) 45,65 .. 45,65 ..
15.01.53.17.3.00.999
15.04.53.17.3.00.999
15.02.53.17.3.00.999
15.05.53.17.3.54.001
15.01.53.17.3.50.001
15.02.53.17.3.51.001
15.03.53.17.3.00.999
15.06.53.17.3.00.999
15.05.53.17.3.00.999
15.05.53.17.3.00.999
15.01.53.17.3.00.999
15.04.53.17.3.00.999
15.02.53.17.3.00.999
15.03.53.17.3.52.001
15.06.53.17.3.55.001
PASSENGER AMENITIES
15.06.53.17.3.00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 75
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
TOTAL-NEW WORKS DRF .. .. 1,97,56 ..
DF(1) .. .. 5,22,65 ..
TOTAL-Passenger Amenities DRF .. .. 14,90,88 ..
DF(1) .. .. 28,41,38 ..
A - Works in Progress
Mumbai1315 Mumbai central & churchgate- Imp. of Fire safety DF(3) 1,72,98 .. 16,00 1,56,98
work at PRS ,stn.build. & JRH bldg. at BCT &stnbldg & GLO bldg. at CCG asper Fire Auditguideline.
1316 Churchgate-GLO building- Improvement of Head DRF 1,96,82 .. 7,00 1,89,82
quarter building, structure (Roof, Masonry,woodwork, Dome, Balusters etc
1317 Mumbai Division - Providing RPF barracks at BL ( DF(2) 2,08,02 78,43 42,99 86,60
20 beds) and Vapi (10beds) dog kennels andMalkhanas at BCT , BDTS and USD lock ups at BDTS,UDN & BDTS , rest rooms at BSR, VR, and NDB forRPF staff & cementing of parade ground at BL.
1318 Mumbai Central - Installation of Effluent DF(3) 56,99 .. 40,00 16,99
treatment facility for JRH.
1319 Churchgate - Modernization of office space at 3rd DRF 47,97 26,35 13,30 8,32
floor of GLO building and 2nd floor of station DF(2) 47,98 40,45 7,00 53
building..
1320 Provision of Integrated Emergency Response Cap. 2,49,37 .. 1,00,00 1,49,37
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
04 Stations (Vangaon, Bilimora, Udhna, &Nnadurbar) with Central Monitoring of MumbaiDivision.
1321 Provision of Integrated Emergency Response Cap. 2,49,16 .. 1,00,00 1,49,16
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
04 Stations (Vapi Valsad, Navsari & Udvada ) ofMumbai Division.
1322 Provision of Integrated Emergency Response Cap. 2,47,47 .. 1,00,00 1,47,47
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
06 Stations (Vaitarna, Saphale, Kelve Road,Palghar, Boisar & Dahanu Road) of MumbaiDivision.
1323 Churchgate - Replacement of existing damaged DRF 94,86 .. 35,00 59,86
Hydraulic buffer with new hydraulic buffer set atPlatform No. 3 .
Vadodara1324 Pratapnagar (Railway Staff College) - Upgradation DF(2) 2,22,48 2,22,48 .. ..
of sports facilities. (Vadodara division)(S&C/U/07-08)
1325 Vadodara Division:-Consultancy for restoration of DF(3) 42,23 .. 10,00 32,23
Pratap Vilas Palace building in National Academey(Railway Staff College) at Pratapnagar, Vadodara.
15.03.64.16.6.52.001
15.06.64.07.2.30.002
15.06.64.14.3.55.001
15.03.64.07.2.52.001
15.03.64.14.3.52.001
15.03.64.14.6.52.001
15.00.64.16.2.52.011
15.00.64.16.2.52.012
15.00.64.16.2.52.014
OTHER SPECIFIED WORKS
15.03.64.16.2.52.001
15.03.64.16.2.52.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 76
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
1326 Provision of Integrated Emergency Response Cap. 2,26,00 .. 1,00,00 1,26,00
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
02 Stations (Vadodara , & Godhara ) with CentralMonitoring of Vadodara Division.
1327 Provision of Integrated Emergency Response Cap. 1,73,60 .. 1,00,00 73,60
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
04 Stations (Anand, Nadiad , Bharuch &Ankleshwar) of Vadodara Division.
Ratlam1328 RTM - Improvement to sports facilities at. DF(2) 67,46 67,45 1 ..
1329 RTM-Providing Effulent treatment plant in DF(3) 81,12 .. 40,00 41,12
Divisional Railway Hospital.
1330 Indore-Dewas-Ujjain section-Providing Boundary DF(3) 92,51 54,22 30,00 8,29
wall to Protect Rly land from Encroachment. atDWX(Stn Colony),NRGR(Behind Rly colony)&VRG stn.
1331 Provision of Integrated Emergency Response Cap. 1,71,01 .. 1,00,00 71,01
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
03 Stations (Dahod, Nimach& Chiottaurgarh) withCentral Monitoring of Ratlam Division.
1332 Provision of Integrated Emergency Response Cap. 2,05,52 .. 1,00,00 1,05,52
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
03 Stations (Indore, Dewas & Mhow) of RatlamDivision.
1333 Provision of Integrated Emergency Response Cap. 2,26,47 .. 1,00,00 1,26,47
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
03 Stations (Ratlam, Nagda & Mandsor) of RatlamDivision.
Ahmedabad1334 Maninagar:- Providing RPF building including DF(3) 35,34 11,52 16,00 7,82
IPF,SIPF,Clerical, Armed & CCTV room at PF No.1.
1335 Provision of Integrated Emergency Response Cap. 1,65,15 .. 1,00,00 65,15
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
03 Stations (Palanpur, Viramgam & Mahesana) of Ahmedabad Division.
1336 Provision of Integrated Emergency Response Cap. 2,15,75 .. 1,00,00 1,15,75
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
04 Stations (Gandhidham New Bhuj, Samakhyali & Bhauchau) of Ahmedabad Division.
Rajkot1337 Rajkot:- Replacement of old temperary office shed DRF 79,22 8,09 25,00 46,13
used as office for SSE(Pway) eastRajkot,SSE(W)RJT, SSE(Tele) and SSE(Elect) office.
1338 HAPA - Supply, Installation, Testing and DF(3) 35,68 17,72 17,00 96
Commissioning of Effluent Treatment Plant at C&WDepot of Capacity 10cubic metre per day.
15.01.64.14.3.50.001
15.00.64.16.2.50.006
15.00.64.16.2.50.010
15.04.64.15.3.53.001
15.04.64.14.3.53.001
15.05.64.12.3.54.001
15.05.64.14.3.54.001
15.05.64.15.3.54.001
15.00.64.16.2.54.004
15.00.64.16.2.54.005
15.00.64.16.2.54.007
OTHER SPECIFIED WORKS15.00.64.16.2.55.002
15.00.64.16.2.55.009
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 77
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
1339 Provision of Integrated Emergency Response Cap. 2,46,92 .. 1,00,00 1,46,92
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
03 Stations (Rajkot , Surendra Nagar & Wankaner) with Central Monitoring of Rajkot Division.
1340 Provision of Integrated Emergency Response Cap. 1,87,52 .. 1,00,00 87,52
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
04 Station (Jamnagar , Hapa, Dwarka & Okha) of Rajkot Division.
Bhavnagar1341 Provision of Integrated Emergency Response Cap. 1,06,00 .. 1,00,00 6,00
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
01 Station ( Botad) with Central Monitoring of Bhavnagar Division.
1342 Provision of Integrated Emergency Response Cap. 2,31,71 .. 1,00,00 1,31,71
Management System (Video Surveillance System) at Cap(Nirb) .. .. .. ..
06 Stations (Bhavnagar Terminus, Veraval,Junagarh, Somnath, Gondal & Porbander) of Bhavnagar Division.
Mumbai1343 Works costing below DRM's Power DF(3) 15,00 .. 15,00 ..
Vadodara1344 Works costing below DRM's Power DRF 2,70 .. 2,70 ..
DF(2) 5,00 .. 5,00 ..
DF(3) 2,50 .. 2,50 ..
Ratlam1345 Works costing below DRM's Power DRF 1,00 .. 1,00 ..
DF(3) 2,50 .. 2,50 ..
Ahmedabad1346 Works costing below DRM's Power DF(3) 2,00 .. 2,00 ..
Bhavnagar1347 Works costing below DRM's Power DF(3) 2,00 .. 2,00 ..
TOTAL-WORKS IN PROGRESS Cap. .. .. 14,00,00 ..
DRF .. .. 84,00 ..
DF(2) .. .. 55,00 ..
DF(3) .. .. 1,93,00 ..
B - New Works
Ahmedabad1348 Ahmedabad Division:- Providing RPF Barrack for DF(3) 1,97,49 .. 8,00 1,89,49
ladies staff 30 bed capacity at Ahmedabad areaand 60 bed capacity at Sabarmati area.
Mumbai1349 Works costing below DRM's Power DRF 10 .. 10 ..
DF(3) 10 .. 10 ..
Vadodara1350 Works costing below DRM's Power DRF 10 .. 10 ..
DF(3) 10 .. 10 ..
Ratlam1351 Works costing below DRM's Power DRF 10 .. 10 ..
DF(3) 10 .. 10 ..
15.05.64.17.3.00.999
15.05.64.17.3.00.999
15.01.64.17.3.00.999
15.02.64.17.3.00.999
15.01.64.17.2.50.001
15.03.64.17.3.00.999
15.06.64.17.3.00.999
15.00.64.16.2.53.003
15.00.64.16.2.53.008
15.00.64.16.2.51.001
15.00.64.16.2.51.013
15.03.64.17.3.00.999
15.06.64.17.3.00.999
OTHER SPECIFIED WORKS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 78
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
Ahmedabad1352 Works costing below DRM's Power DRF 10 .. 10 ..
DF(3) 10 .. 10 ..
Rajkot1353 Works costing below DRM's Power DRF 10 .. 10 ..
DF(3) 10 .. 10 ..
Bhavnagar1354 Works costing below DRM's Power DRF 10 .. 10 ..
DF(3) 10 .. 10 ..
TOTAL-NEW WORKS DRF .. .. 60 ..
DF(3) .. .. 8,60 ..
TOTAL-Other Specified Works Cap. .. .. 14,00,00 ..
DRF .. .. 84,60 ..
DF(2) .. .. 55,00 ..
DF(3) .. .. 2,01,60 ..
OTHER SPECIFIED WORKS
15.01.64.17.3.00.999
15.04.64.17.3.00.999
15.02.64.17.3.00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachWESTERN RAILWAY
Assets-Acquisition, Construction and Replacement for 2017-18
PAGE NO : 79
(Figures in thousands of rupees)Item No.
Project ID Particulars of Works Allocation Anticipated Cost
Outlay expected to end of 2016-17
Outlay 2017-18
Balance to complete
work
TOTAL-WORKS IN PROGRESS Cap. .. .. 18,78,62 ..DRF .. .. 27,64,93 ..DF(1) .. .. 23,18,78 ..DF(2) .. .. 6,33,00 ..DF(3) .. .. 5,72,37 ..RRSK .. .. 140,40,81 ..
TOTAL - NEW WORKS DRF .. .. 5,08,11 ..DF(1) .. .. 5,30,15 ..DF(2) .. .. 8,60 ..DF(3) .. .. 37,60 ..RRSK .. .. 83,23,74 ..
GRAND TOTAL Cap. .. .. 18,78,62 ..DRF .. .. 32,73,04 ..DF(1) .. .. 28,48,93 ..DF(2) .. .. 6,41,60 ..DF(3) .. .. 6,09,97 ..RRSK .. .. 223,64,55 ..
Note : Workwise distribution of outlays are accounted in above Summary (Excluding PHC's Resreve)
S U M M A R Y