Long Beach Transit

All-Electric Bus Recommendation

Board Meeting

February 25, 2013

Page 2: LBT Staff Recommendation for Electric Bus Project, 02/25/13

LBT Project Goals

1. Assess risk for a viable, effective & reliable all-

electric ZEB to address alternative fuel policy

2. Achieve reliable, safe & environmentally sound

service levels that are equal to or greater than the

current fleet

3. Introduce appealing, iconic all-electric buses that

increase ridership, improve the transit experience,

and enhance the image of Long Beach and LBT

4. Deploy all-electric buses that provide a cost-

effective solution for LBT (life-cycle costing)

5. Support FTA’s TIGGER goals by maximizing

reductions in GHG emissions and energy costs

Page 3: LBT Staff Recommendation for Electric Bus Project, 02/25/13

Project Milestones Task Milestone Date

Project Kickoff 06/05/12

Market Analysis Completed 8/15/12

Issue Bus & A&E RFP 10/01/12

Bus Proposal Submittal Due Date 12/5/12

Bus Proposal – Round 1 evaluation complete 12/20/12

Seek LBT Board Approval 02/25/13

Bus Contract and NTP 03/01/13

Proto-Type Coach Delivery 10/01/13

Charging Station Completion 12/31/13

Deploy Final Buses 02/09/14

Issue Station RFP 4/01/13

Station Proposal Submittal Due Date 5/01/13

Station Proposal Evaluation & Decision 6/01/13

LBT Board Approval 5/27/13

Station Contract and NTP 6/1/13

Complete Installation of Charging Stations 12/31/13

Complete Data Collection & FTA Reporting 03/01/16

Page 4: LBT Staff Recommendation for Electric Bus Project, 02/25/13

Project Scope

Up to (10) 35’ – 45’ all-electric coaches based

on APTA white book & LBT specialized equip

Must meet LBT’s Passport operating profile

Open to en-route and/or depot charging solutions

– Solution – open architecture, should be able to use across

multiple platforms & manufacturers in future;

– Design and installation oversight of equipment;

– Maintenance support for charging equipment

Provide training, diagnostic equip, Capital &

Maintenance plan including 1 year assessment

LBT looking towards this project to evaluate its long-

term viability

Page 5: LBT Staff Recommendation for Electric Bus Project, 02/25/13

Modeling Tools

Route Modeling – CTE collected route data and developed model to

determine energy requirements

– Factors battery size, motor size, vehicle weight,

speed, distance, grade, time, etc.

Rate Modeling – CTE established an energy cost model

– Based on SCE Rates and amount of charging at

given times of day, week, season, etc.

Established a basis to evaluate energy cost

& performance of proposed solutions

Page 6: LBT Staff Recommendation for Electric Bus Project, 02/25/13

Request for Proposal

RFP Issued Oct. 1 – APTA White Book updated with all-electric

propulsion, charging infrastructure specifications,

and LBT coach requirements

Written to increase number of responses – Open to conductive and inductive charging

– Open to en route or depot charging solutions

Rec’d 5 responses on December 5th – BYD - Complete Coach Works

– DesignLine Corp - EBUS, Inc

– Proterra

Page 7: LBT Staff Recommendation for Electric Bus Project, 02/25/13

Evaluation Process

LBT - 3 Evaluation Teams – One lead & up to 4 subject matter experts

– A total of 14 LBT employees read and discussed

proposal providing input on same

CTE provided technical evaluation – Technical overview of each proposal

– Modeled each proposal to assess performance on

LBT’s Passport route

– Calculated annual energy costs for each proposal

based on Rate Model

Page 8: LBT Staff Recommendation for Electric Bus Project, 02/25/13

Evaluation Criteria

Overall Proposal 10%

Experience of firm & Response to Inquiry 20%

Technical Design / Coach Operational

Considerations 15%

Technical Design / Charging Station Operational

Considerations 15%

Passenger & Community Considerations 10%

Maintainability / Product Support 10%

Pricing & Life Cycle Costs 20%

Page 9: LBT Staff Recommendation for Electric Bus Project, 02/25/13

BYD & Proterra – short listed

Questions / Clarifications

Invitation for Presentation – Demonstration of Solution

– Review of responses

Life Cycle Cost Analysis Included – WVU – TCRP C15 model

– Compare with Diesel, CNG & Gas Hybrid

– Considers…

• Capital: Bus, Infrastructure, Major components

• Operating: Fuel (fluid / electricity), Estimated

Scheduled & Unscheduled Maintenance

• 12 year life

Page 10: LBT Staff Recommendation for Electric Bus Project, 02/25/13

BYD Motors Inc.

BYD eBus Proposal • Ten BYD eBus battery electric buses

• Length: 40 ft

• Passengers: 35 seated/23 standees

• Curb Weight: 30,423 lbs

• Batteries: 324 kWh Iron-Phosphate /

includes a 7.5 yr warranty

• Range: up to 118 - 163 miles (calculated)

• Aluminum Body

• US-specified bus to be Altoona tested,

beginning March/April

• Ten BYD manual plug-in 80 kW depot

chargers

• Full Charge: 4 hours

• BYD ISE standard charging adapter

• WAVE Inductive en route option

• Buy America: 70-75%

– Completed Pre-buy America audit

Page 11: LBT Staff Recommendation for Electric Bus Project, 02/25/13

WAVE Inductive Charging

• LBT will use WAVE system as opportunity charging to

extend vehicle range at Queen Mary Stop

• System is currently in development, but shows

significant promise for LBT

Page 12: LBT Staff Recommendation for Electric Bus Project, 02/25/13

Proterra

EcoRide BE35 Proposal • Ten Proterra Eco BE35 battery

electric buses

• Length: 35 ft

• Passengers: 35 seated/25 standees

• Curb Weight: 29,180 lbs

• Batteries: 66 kWh Lithium-Titanate

• Range: up to 30 miles

• Composite body

• Altoona tested – February 2012

• Two Proterra 500 kW automated en

route charging stations

• Full Charge: < 10 minutes

• Proprietary charging interface

• One Proterra 50 kW manual plug-in

maintenance charger

• Full Charge: 1.5 hours

• Buy America: 80%

Page 13: LBT Staff Recommendation for Electric Bus Project, 02/25/13

Company Profiles

BYD Motors Proterra

Ownership BYD Company Ltd (China) Private Equity

Organization • US subsidiary to BYD Company

Ltd., a publicly held Chinese

Company

• US company

Core Businesses • Batteries / Energy

• Electric cars & Buses,

• Solar Panels

• Electric Buses

Employees ~ 200,000 ~160

Founded 1995 2004

Bus Manufacturing • China (Chassis)

• CA (proposed - 2014)

Greenville, SC

Key Suppliers • BYD America (batteries) in LA

• BYD Company Ltd (chassis)

• Altairnano (batteries)

• Eaton (transmission, charger)

Coaches Sold-to-date 1,000 32

Coaches Delivered-to-date 365 14

Max Service Miles 62,500 20,000 (Foothill)

Total In Service Miles (2012) 7.4 million 90,000

Page 14: LBT Staff Recommendation for Electric Bus Project, 02/25/13

Customer Profiles

BYD Company Ltd Proterra, Inc.

Customer Sold Deliv’d Customer Sold Deliv’d Shenzhen Bus Group, China 742 502 StarMetro, Tallahassee, FL 5 3

Hunan Transit, Changsha, China 101 101 City of Seneca, SC 4

Xian Transit, Xian, China 52 42 RTC, Reno, NV 4

KMB Bus, Hong Kong 29 15 RTA, Worcester, MA 3

Torokbalint, Hungary 20 6 Foothill Transit, Pomona, CA 3 3

BarcelonaTransit, Barcelona, Spain 20 6 VIA, San Antonio, TX 3 3

Expresso, Bogada, Columbia 10 8 San Joaquin RTD, Stockton, CA 2 1

Taiwan Xinzhu Transit, Taiwan 10 4

Schiermonnikoog, Friesland, Finland 6 4

Apple, Cupertino, CA 5 2

Shaoguan Transit, Shaoguan, China 5 5

ATM, Milan, Italy 2 2

SMRT, Singapore 2 1

London Transit, London, England 2

Movia, Copenhagen, Denmark 2

Hertz, Los Angeles, CA 1 1

Schiphol Airport, Amsterdam 1 1

Veolia Transport, Helsinki, Finland 1

Indumoto, Chile 1 1

Buquebus, Uruguay 1

Huizhou Dayawan District, China 1 1

TOTALS 924 702 TOTALS 24 10

Page 15: LBT Staff Recommendation for Electric Bus Project, 02/25/13

$10,340,000 $10,950,000

$12,410,000

$14,090,000

$15,810,000

$18,220,000 $17,700,000

$0

$2,000,000

$4,000,000

$6,000,000

$8,000,000

$10,000,000

$12,000,000

$14,000,000

$16,000,000

$18,000,000

$20,000,000

Diesel CNG Gasoline Hybrid BYD BYD (2) Proterra Proterra (2)

Dol

lars

Vehicle Capital Other Capital Unscheduled CostsScheduled Costs Total Fuel Costs Other Variable CostsTotal

Life Cycle Cost Analysis

Page 16: LBT Staff Recommendation for Electric Bus Project, 02/25/13

Ready to Move Forward BYD Best Solution

– Life Cycle Costs lower

– Company experience &

financially healthy

– Battery risk, minimal w/safe

technology & 7 ½ yr warranty

– Maximum flexibility in routing

and optimum time for charging

Opportunity charging – Manual depot chargers &

WAVE inductive

– Much lower cost to deploy

opportunity charging than high

voltage, “fast” charge solutions

Budget

Coaches & Chargers 9,642,616

WAVE Solution 1,886,000

Program Mgmt 650,000

Installation 963,500

Contingency 600,000

Miscellaneous 207,884

Total 13,950,000

Page 17: LBT Staff Recommendation for Electric Bus Project, 02/25/13

Questions And Answers