Upload
hj
View
803
Download
1
Embed Size (px)
Citation preview
Lean Six Sigma Improvement Process Road Map
ControlControlControlControlImproveImproveImproveImprove
Enterprise-Wide Deployment
• Enterprise view• Leadership• Organizational
goals and objectives
• History of organizational improvement / foundation of six sigma
Business Process Management
• Process vs. functional view
• Voice of the customer
• Business results
Project Management
• Project charter and plan
• Team leadership• Team dynamics
and performance• Change agent• Management and
planning tools
Improve• Design of
experiments (DOE)
• Response surface methodology
• Evolutionary operations (EVOP)
Control• Statistical process
control• Advanced statistical
process control• Lean tools for control• Measurement
system re-analysis
• Value of six sigma• Business system
and process• Process inputs,
outputs, and feedback
• Enterprise leadership
• Six sigma roles and responsibilities
• Linking projects to organizational goals
• Risk analysis• Closed-loop
assessment / knowledge management
• Process elements• Owners and
stakeholders• Project
management and benefits
• Project measures• Identify customer• Collect customer
data• Analyze
customer data• Determine
critical customer requirements
• Process performance metrics
• Benchmarking• Financial benefits
• Charter / plan elements
• Planning tools• Project
documentation• Charter negotiation• Initiating teams• Selecting team
members• Team stages• Team-building
techniques• Team facilitation
techniques• Team performance
evaluation• Team tools• Managing change• Organizational
roadblocks• Negotiation and
conflict resolution techniques
• Motivation techniques
• Communication
• Terminology• Planning and
organizing experiments
• Design principles• Design and analysis
of one-factor experiments
• Design and analysis of full-factorial experiments
• Design and analysis of two-level fractional experiments
• Taguchi robustness concepts
• Mixture experiments• Steepest ascent /
descent experiments• Higher-order
experiments
• Objectives and benefits
• Selection of variable• Rational Sub
grouping• Selection and
application of control charts
• Analysis of control charts
• PRE-control
ASQ – Six Sigma Black Belt Certification Body of Knowledge
Define• Project Scope• Metrics• Problem
statement
DefineDefineDefineDefine
• Pareto charts• Top-level process
(macro) maps• Quality• Cycle time• Cost• Current statement• Baseline• Improvement
goals
Measure• Process analysis and
documentation• Probability and statistics• Collecting and
summarizing data• Properties and
applications of probability distributions
• Measurement system• Analyzing process
capability
MeasureMeasureMeasureMeasure
• Tools• Process inputs and
outputs• Drawing valid statistical
conclusions• Central limits theorem
and sampling distribution of the mean
• Basic probability concepts• Types of data• Measurement scales• Methods of collecting
data• Techniques for assuring
data accuracy and integrity
• Descriptive statistics• Graphical methods• Distributions• Measurement methods• Measurement system
analysis• Metrology• Process capability indices• Process performance
indices
AnalyzeAnalyzeAnalyzeAnalyze
Analyze• Exploratory data analysis• Hypothesis testing
• Mutli-vary studies• Measuring and
modeling relationship between variables
• Simple linear correlation
• Diagnostics• Fundamental
concepts of hypothesis testing
• Point and interval estimation
• Tests for means, variances, and proportions
• Paried-comparison test
• Goodness-of-fit test• Analysis of variance
(ANOVA)• Contingency table• Non-parametric test
Enterprise-WideEnterprise-WideDeploymentDeployment
BusinessBusinessProcessProcess
ManagementManagement
Project
Management
Lean Six Sigma Improvement Process Road MapLean Enterprise• Lean concepts• Lean tools• Total productive
maintenance (TPM)
Design for Six Sigma (DFSS)
• Quality function deployment
• Robust design and process
• Failure mode and effects analysis (FMEA)
• Design for X (DFX)
• Special design tools
• Theory of constrains
• Lean thinking• Continuous flow
manufacturing (CFM)
• Non-value-added activities
• Cycle-time reduction
• Functional requirements
• Noise strategies• Tolerance design• Tolerance and
process capability
LeanEnterprise
Design
for Six Sigma
(DFSS)
ASQ – Six Sigma Black Belt Certification Body of Knowledge