Upload
others
View
15
Download
0
Embed Size (px)
Citation preview
THERMOSTAT MOUNTED AT 48" AFF.
('1' INDICATES AHU CONTROLLED)
('N' INDICATES NIGHT SETBACK)
SMOKE DETECTOR
(PROVIDED BY ELECTRICAL CONTRACTOR,
INSTALLED BY MECHANICAL CONTRACTOR
AND WIRED BY ELECTRICAL CONTRACTOR).
T
S
1-1
P/T
PIPING
B
B
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
CONDENSER WATER SUPPLY PIPING
CONDENSER WATER RETURN PIPING
HEATING WATER SUPPLY PIPING
HEATING WATER RETURN PIPING
NEW UNDERGROUND PIPING
CONDENSATE DRAIN PIPING
GATE VALVE
BALL VALVE
BUTTERFLY VALVE
SWING CHECK VALVE
SPRING CHECK VALVE
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE. PIPE
FULL SIZE DISCHARGE TO FLOOR DRAIN.
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
COMBINATION VENTURI AND BALL VALVE WITH
MEMORY STOP FOR FLOW BALANCING AND
SHUT OFF SERVICE
MULTI-TURN BALANCING VALVE
UNION
GLOBE VALVE
THERMAL EXPANSION VALVE
TRIPLE DUTY VALVE
ANGLE VALVE
SOLENOID VALVE
BACKPRESSURE RELIEF OR SAFETY VALVE
BACKPRESSURE REGULATOR (SELF-CONTAINED)
BACKPRESSURE REGULATOR (EXTERNAL PRESSURE)
FLEXIBLE PIPE CONNECTOR
COMBINATION PRESSURE AND TEMPERATURE TEST PLUG
WITH EXTENDED NECK AND CAP
STRAINER WITH BLOW DOWN GATE VALVE FULL SIZE OF
STRAINER AND 3/4" HOSE END CONNECTION WITH CAP
MANUAL AIR VENT WITH 1/2" BALL VALVE. ROUTE 1/2"
SOFT COPPER TUBING FROM DISCHARGE TO FLOOR
DRAIN UNLESS OTHERWISE NOTED.
ELBOW TURN UP
ELBOW TURN DOWN
CONNECTION, BOTTOM
CONNECTION, TOP
POINT OF CONNECTION TO EXISTING
LEGEND ABBREVIATIONS
POSITIVE PRESSURE SUPPLY DUCT TURNING UP
NEGATIVE PRESSURE RETURN OR EXHAUST DUCT
TURNING UP
POSITIVE PRESSURE SUPPLY DUCT TURNING DOWN
NEGATIVE PRESSURE RETURN OR EXHAUST DUCT
TURNING DOWN
RECTANGULAR DUCT SIZE. FIRST SIZE LISTED IS SIDE
SHOWN IN PLANS.
EXTERNALLY INSULATED DUCTWORK
EXISTING DUCTWORK TO REMAIN
EXISTING DUCTWORK TO BE DEMOLISHED
EXTERNALLY INSULATED ROUND FLEXIBLE DUCTWORK
DUCT ELBOW WITH TURNING VANES
RADIUSED DUCT ELBOW
FLEXIBLE DUCT CONNECTION
MANUAL VOLUME BALANCING DAMPER
TRANSITION
FLEX DUCT TAKE OFF WITH MVD
BRANCH DUCT TAKEOFF WITH MVD
RETURN OR SUPPLY DEVICE WITH MVD DIRECTLY BELOW
MAIN TRUNK DUCT
TEE WITH TURNING VANES
MOTORIZED DAMPER
FIRE DAMPER
@
AAV
ACD
ACC
AD
AFF
AFMS
AHU
AS
ASPA
BT
BD
CD
CF
CWP
CWS
CWR
CFM
CONT.
CP
DD
DDC
DPS
DWGS.
EA
EAL
EER
EF
EG
EL
EMCS
ENT
ESP
ET
EH
FD
FPM
GI
GPM
GR
GSHP
HP
HHW
HW
HWB
HWP
HWR
HWS
KH
LFD
LPS
LV
LVG
MAU
MAX.
MIN.
MVD
NFPA
OA
OAL
OAU
O.C.
PM
PRV
P/T
RA
RAG
SA
SD
SEER
SF
SMACNA
SPT
SW
TAG
T'STAT
TSP
TYP.
W/
W.G.
AT
AUTOMATIC AIR VENT
AUTOMATIC CONTROL DAMPER
AIR COOLED CHILLER
ACCESS DOOR
ABOVE FINISHED FLOOR
AIRFLOW MEASURING STATION
AIR HANDLING UNIT
AIR SEPARATOR
ALABAMA STATE PORT AUTHORITY
BALLAST TANK (CHILLED WATER)
BELT DRIVE
CEILING DIFFUSER
CHEMICAL FEEDER
CHILLED WATER PUMP
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CUBIC FEET PER MINUTE
CONTINUOUS
CONTROL PANEL
DIRECT DRIVE
DIRECT DIGITAL CONTROL
DIFFERENTIAL PRESSURE SENSOR
DRAWINGS
EXHAUST AIR
EXHAUST AIR LOUVER
ENERGY EFFICIENCY RATIO
EXHAUST FAN
EXHAUST GRILLE
ELEVATION
ENERGY MANAGEMENT AND CONTROL SYSTEM
ENTERING
EXTERNAL STATIC PRESSURE
EXPANSION TANK
ELECTRIC HEATER
FIRE DAMPER
FEET PER MINUTE
GRAVITY INTAKE
GALLONS PER MINUTE
GRAVITY RELIEF
GROUND SOURCE HEAT PUMP
HORSEPOWER
HEATING HOT WATER
HOT WATER
HOT WATERBOILER
HOT WATER PUMP
HOT WATER RETURN
HOT WATER SUPPLY
KITCHEN HOOD
LOUVERED FACE DIFFUSER
LITERS PER SECOND
LINE VOLTAGE
LEAVING METERS
MAKE-UP AIR UNIT
MAXIMUM
MINIMUM
MANUAL VOLUME DAMPER
NATIONAL FIRE PROTECTION ASSOCIATION
OUTSIDE AIR
OUTSIDE AIR LOUVER
OUTSIDE AIR UNIT
ON CENTER
ASPA PROJECT MANAGER
PRESSURE REDUCING VALVE
PRESSURE/TEMPERATURE
RETURN AIR
RETURN AIR GRILLE
SUPPLY AIR
SMOKE DETECTOR
SEASONAL ENERGY EFFICIENCY RATIO
SUPPLY FAN
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL
ASSOCIATION
STATIC PRESSURE TRANSMITTER
SWITCH
TRANSFER AIR GRILLE
THERMOSTAT
TOTAL STATIC PRESSURE
TYPICAL
WITH
WATER GAUGE
1. THE MECHANICAL CONTRACTOR IS REQUIRED TO HAVE A GENERAL CONTRACTORS LICENSE AND SHALL COORDINATE WITH ASPA PROJECT MANAGER AND OTHER TRADES AS NECESSARY
FOR REQUIRED OPENINGS IN WALLS, FOUNDATIONS, FLOORS, AND ROOFS.
2. THE MECHANICAL CONTRACTOR TO VERIFY MECHANICAL EQUIPMENT LOCATIONS AND BE RESPONSIBLE FOR ALL RELATED CLEARANCES IN THE FIELD. PROVIDE ADEQUATE MAINTENANCE
CLEARANCE AROUND EACH PIECE OF EQUIPMENT PER THE MANUFACTURER'S RECOMMENDATIONS. PROVIDE CLEARANCE IN FRONT OF ELECTRICAL PANELS AND OTHER ELECTRICAL
EQUIPMENT PER THE NATIONAL ELECTRICAL CODE REQUIREMENTS. COORDINATE WITH THE CONTROLS CONTRACTOR AND ELECTRICAL CONTRACTORS IN THE FIELD.
3. PROVIDE WATER PROOF SEALING OF PIPE AND DUCT PENETRATIONS OF EXTERIOR WALLS, FLOORS, AND/OR ROOF.
4. THE PIPING SYSTEM IS TO BE FLUSHED UNTIL CLEAN BEFORE EQUIPMENT CONNECTION.
5. PIPING SHOWN IN THESE DRAWINGS ARE DIAGRAMMATIC. ARRANGE IN A NEAT AND ORDERLY MANNER.
6. PENETRATIONS THROUGH FIRE RATED FLOORS AND WALLS ARE TO BE FIRE SEALED SO AS TO MAINTAIN FLOOR OR WALL INTEGRITY IN THE EVENT OF A FIRE.
7. VERIFY COLLAR SIZES ON ALL EQUIPMENT INLETS AND OUTLETS. TRANSITION DUCTWORK AS NECESSARY. EXTERNALLY INSULATE ALL TRANSITIONS AT EQUIPMENT CONNECTIONS.
8. INSTALL EQUIPMENT AND DUCTWORK TO MANUFACTURERS RECOMMENDED CLEARANCES.
9. PENETRATIONS OF FIREWALLS, CEILINGS, FLOORS, ETC. FOR PIPING TO BE UL LISTED FIRESTOPS AND SHALL BE INSTALLED AS PER MANUFACTURER'S RECOMMENDATION. CONTRACTOR
TO OBTAIN MANUFACTURER SHOP DRAWINGS AT JOBSITE FOR PENETRATIONS.
10. PROVIDE FLEXIBLE DUCT, PIPE CONNECTIONS, AND VIBRATION ISOLATORS FOR INTERNALLY ISOLATED UNITS.
11. DO NOT MOUNT DISCONNECT SWITCHES ON HVAC EQUIPMENT.
12. ALL ROUND FLEXIBLE DUCT TO BE FACTORY PRE-INSULATED. MAXIMUM LENGTH OF ANY FLEXIBLE DUCT RUNOUT TO BE 6 FT. WHERE LENGTH REQUIRED EXCEEDS 6 FT, INSTALL
EXTERNALLY INSULATED ROUND SNAPLOCK DUCT FOR BALANCE OF DISTANCE TO SPIN-IN TAP AT MAIN DUCT TRUNK.
13. SUPPLY AIR DUCTWORK TO BE SINGLE WALL LOW PRESSURE RECTANGULAR, SMACNA STATIC PRESSURE CLASS 250 Pa (1" W.G.), SEAL CLASS A, EXTERNALLY INSULATED WITH 2" THICK R-8
FIBERGLASS DUCT WRAP. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS.
14. RETURN AIR DUCTWORK TO BE SINGLE WALL LOW PRESSURE RECTANGULAR, SMACNA STATIC PRESSURE CLASS 250 Pa (1" W.G.), SEAL CLASS A. DUCT SIZES INDICATED ARE INSIDE
CLEAR DIMENSIONS. PROVIDE 2" THICK R-8 EXTERNAL FIBERGLASS DUCT WRAP.
15. OUTSIDE AIR INTAKE DUCTWORK TO BE SINGLE WALL LOW PRESSURE RECTANGULAR, SMACNA STATIC PRESSURE CLASS 250 Pa (1" W.G.), SEAL CLASS A, EXTERNALLY INSULATED WITH 2"
THICK R-8 FIBERGLASS DUCT WRAP. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS.
16. EXHAUST AIR DUCTWORK TO BE LOW PRESSURE SINGLE WALL RECTANGULAR, SMACNA STATIC PRESSURE CLASS 250 Pa (1" W.G.), SEAL CLASS A. PROVIDE 2" THICK R-8 EXTERNAL
FIBERGLASS DUCT WRAP.
17. AVOID ROUTING DUCTWORK OVER LIGHTS WHEREVER POSSIBLE. MAINTAIN MINIMUM 6" CLEARANCE BETWEEN DUCT INSULATION TO TOP OF LIGHTS.
18. WORK SHALL COMPLY WITH THE FOLLOWING AGENCIES
-2013 INTERNATIONAL BUILDING CODE
-2013 INTERNATIONAL MECHANICAL CODE
-2015 INTERNATIONAL ENERGY CONSERVATION CODE
-NATIONAL FIRE PROTECTION AGENCY (NFPA)
-AMERICAN SOCIETY OF HEATING AND REFRIGERATION ENGINEERS (ASHRAE)
-NATIONAL ELECTRIC CODE
19. TRANSFER DUCTS TO BE INTERNALLY INSULATED WITH 25mm (1") THICK ACOUSTICAL DUCT LINER. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS.
20. ALL CONDENSATE PIPING FROM EVAPORATOR COILS WILL BE INSULATED TYPE L COPPER. ROUTE CONDENSATE DRAIN TO FLOOR DRAIN.
21. ALL WORK AND EQUIPMENT SHALL BE PROVIDED WITH A TWO YEAR WARRANTY STARTING FROM THE TIME OF SUBSTANTIAL COMPLETION OF THE PROJECT AS DETERMINED BY THE ASPA
PROJECT MANAGER. REFER TO BID TABULATION FORM FOR ADDITIONAL "EXTENDED WARRANTY" PRICING REQUIREMENTS.
22. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
GENERAL NOTES
M
F
CONTRACTOR SHALL BE ADVISED, THE WORK REQUIRED FOR THIS OCCUPIED BUILDING MUST BE PERFORMED IN A MANNER THAT IS MINIMALLY DISRUPTIVE TO THE DAILY OPERATIONS
OF THE OCCUPANTS. IT IS EXPECTED THE WORK AT THE PENTHOUSE LEVEL BE PERFORMED MONDAY THROUGH FRIDAY FROM 7:00AM TO 5:00PM. CHILLED WATER IS TO BE PROVIDED
BY A CONTRACTOR PROVIDED TEMPORARY CHILLER DURING THE DEMOLITION AND INSTALLATION OF THE NEW CHILLED WATER SYSTEM.
WORK ASSOCIATED WITH THE REPLACEMENT OF THE DUAL DUCT VAV BOXES ON FLOORS 1, 2, AND 3, SHALL BE COORDINATED WITH THE ASPA PM A MINIMUM OF 10 DAYS PRIOR TO
WORK TAKING PLACE. THIS TIMEFRAME IS REQUIRED TO ALLOW FOR THE COORDINATION WITH THE OCCUPANTS AS NECESSARY.
BASE BID
1. THE REPLACEMENT OF THE CHILLER, CHILLED WATER PUMPS, CHILLED WATER PIPING SYSTEM, AHU-1 CHILLED WATER CONTROL VALVE, AND ASSOCIATED CHILLED WATER
APPURTENANCES AT THE MECHANICAL PENTHOUSE LEVEL.
2. THE REPLACEMENT OF THE NATURAL GAS FIRED BOILER, HOT WATER PUMPS, HOT WATER PIPING SYSTEM, AHU-1 HOT WATER CONTROL VALVE, AND ASSOCIATED HEATING HOT
WATER APPURTENANCES AT THE PENTHOUSE LEVEL.
3. REPLACEMENT OF THE CHILLED WATER CONTROL VALVE AT THE FIRST FLOOR AIR HANDLING UNIT (AHU-3) SERVING THE KILLIAN ROOM.
4. REPLACEMENT OF THE EXISTING PNEUMATIC CONTROL SYSTEM WITH A NEW DDC CONTROL SYSTEM. DDC CONTROL SYSTEM INSTALLED UNDER THE BASE BID SHALL INCLUDE
ALL NECESSARY COMPONENTS TO ALLOW FOR THE ADDITION OF THE 36 DUAL DUCT VAV BOXES INCLUDED IN ADDITIVE ALTERNATE #1, AND THE 7 HOT WATER CONTROL VALVES
IN ADDITIVE ALTERNATE #2.
5. SEE INSULATION NOTES ON DRAWING M4.1 FOR ADDITIONAL INFORMATION.
a. CONTRACTOR SHALL PROVIDE AND INSTALL INSULATION ON THE RETURN AIR DUCT FOR AIR HANDLING UNIT (AHU-1) AT THE MECHANICAL PENTHOUSE LEVEL ONLY.
b. CONTRACTOR SHALL PROVIDE AND INSTALL INSULATION ON THE SUPPLY AND RETURN AIR DUCT FOR AIR HANDLING UNIT (AHU-2) AT THE MECHANICAL PENTHOUSE LEVEL
ONLY.
6. ALL WORK INDICATED AND SPECIFIED THAT IS NOT INCLUDED IN ADD ALTERNATES 1 AND 2.
ADDITIVE ALTERNATE #1
1. REPLACE DUAL DUCT VAV BOXES ON FLOORS 1, 2, AND 3. REPLACEMENT OF PNEUMATIC CONTROLS WITH DDC CONTROLS FOR EACH OF THE DUAL DUCT VAV BOXES.
INDIVIDUAL DUAL DUCT VAV BOX ACTUATORS AND ASSOCIATED THERMOSTATS SHALL BE CONNECTED TO THE BUILDING DDC SYSTEM INSTALLED IN THE BASE BID.
ADDITIVE ALTERNATE #2
1. REPLACE FIVE PNEUMATIC HOT WATER COIL CONTROL VALVES AND TWO PNEUMATIC HOT WATER UNIT HEATER CONTROL VALVES WITH NEW DDC CONTROL VALVES. THIS
WORK IS ALL LOCATED ON THE 4TH FLOOR. THIS WORK INCLUDES THE REPLACEMENT OF THE PNEUMATIC THERMOSTATS WITH DDC THERMOSTATS. THE CONTROL VALVES AND
ASSOCIATED THERMOSTATS SHALL BE CONNECTED TO THE DDC SYSTEM INSTALLED IN THE BASE BID.
GENERAL SCOPE OF WORK
1. A FULL TIME SUPERVISOR IS REQUIRED TO BE ONSITE WHEN WORK IS TAKING PLACE.
2. TWIC CREDENTIALS ARE REQUIRED FOR ALL WORKERS ONSITE.
3. A DRUG FREE WORKPLACE WITH WRITTEN SAFETY MANUALS ARE REQUIRED TO BE ONSITE.
4. CONTRACTOR MUST HAVE A PHYSICAL BUILDING LOCATED WITHIN 25 MILES OF THE PROJECT SITE.
5. CONTRACTOR MUST HAVE A SERVICE DEPARTMENT THAT IS AVAILABLE FOR AFTER HOURS AND WEEKEND CALL OUTS.
6. CONTRACTOR MUST HAVE A MINIMUM OF 5 FULL TIME EMPLOYEES ON STAFF WITH EXPERIENCE SERVICING NEW EQUIPMENT INCLUDED IN THE SCOPE OF WORK.
7. REFER TO SPECIFICATION FRONT END DOCUMENTS FOR ADDITIONAL REQUIREMENTS FOR THIS PROJECT.
8. CONTRACTOR ON THIS PROJECT SHALL HOLD AN ALABAMA GENERAL CONTRACTOR'S LICENSE.
9. CONTRACTOR SHALL PROVIDE ADDRESSING THESE QUALIFICATIONS WITH THE BID PACKAGE.
CONTRACTOR QUALIFICATIONS
LIQUIDATED DAMAGES FOR HVAC OUTAGES DURING OCCUPIED HOURS WILL BE $2,000.00 PER DAY WHCH WILL BE IMPOSED IF THE HVAC WORK IS NOT COMPLETED AS SCHEDULED
AND AGREED UPON WITH ASPA PM. INCLUDE DETAILED SCHEDULE IN BID PACKAGE. SCHEDULE START DATE TO BE ADJUSTED BASE UPON NOTICE TO PROCEED ISSUED AND TO
ALLOW WORK TO BE DONE DURING DAYS WITH MILD TEMPERATURES (50°F TO 65°F) DURING OCCUPIED TIMES DUE TO LACK OF HVAC. THE AIR HANDLING UNIT AHU-1 HAS THE
CAPABILITY TO OPERATE IN ECONOMIZER MODE IF A PARTITION IS INSTALLED INSIDE THE PLENUM SPACE BEHIND THE AIR HANDLING UNIT. CONTRACTOR WILL BE RESPONSIBLE FOR
MAKING UNIT FUNCTION IN THIS MANNER.
LIQUIDATED DAMAGES
Sm
ith M
echanical
Co
nsu
ltin
g &
D
esig
n
19-053
1-7-20
FO
R T
HE
HV
AC
R
EN
OV
AT
IO
NS
MO
BIL
E, A
LA
BA
MA
3
66
02
NO
RT
H W
AT
ER
S
TR
EE
T
ALA
BAMA
ST
ATE
POR
TAUTHOR
ITY
IN
TE
RN
AT
IO
NA
L T
RA
DE
C
EN
TE
R
M1.0
HVAC LEGEND AND
NOTES
AutoCAD SHX Text24x12
AutoCAD SHX TextCHWS
AutoCAD SHX TextHWR
AutoCAD SHX TextHWS
AutoCAD SHX TextCHWR
AutoCAD SHX TextD
AutoCAD SHX TextPRV
AutoCAD SHX TextCWS
AutoCAD SHX TextCHR
AutoCAD SHX TextISSUE DATE:
AutoCAD SHX TextPROJECT NO:
AutoCAD SHX TextREVISIONS:
AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.
AutoCAD SHX TextSHEET TITLE:
AutoCAD SHX TextSHEET NUMBER:
AutoCAD SHX TextNOT VALID UNLESS SIGNED
AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E
AutoCAD SHX Text7150 CHARLANDA CT.
AutoCAD SHX TextMOBILE, AL 36695
AutoCAD SHX Text(251) 402-1364
AutoCAD SHX TextROGER J. SMITH, PE 24744
AutoCAD SHX Textwww.smithmechanicalconsulting.com
AutoCAD SHX TextG
AutoCAD SHX TextM
AutoCAD SHX TextE
AutoCAD SHX TextS
AutoCAD SHX TextR
AutoCAD SHX TextJ
AutoCAD SHX Text.
AutoCAD SHX TextNo. 24744
AutoCAD SHX TextD
AutoCAD SHX TextE
AutoCAD SHX TextM
AutoCAD SHX TextR
AutoCAD SHX TextE
AutoCAD SHX TextPROFESSIONAL
AutoCAD SHX TextA
AutoCAD SHX TextO
AutoCAD SHX TextR
AutoCAD SHX TextG
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextI
AutoCAD SHX TextN
AutoCAD SHX TextE
AutoCAD SHX TextC
AutoCAD SHX TextL
AutoCAD SHX TextI
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextS
AutoCAD SHX TextA
AutoCAD SHX TextL
AutoCAD SHX TextB
AutoCAD SHX TextA
AutoCAD SHX TextA
AutoCAD SHX TextH
AutoCAD SHX TextT
AutoCAD SHX TextI
AutoCAD SHX Text1/7/2020
A. BUTTERFLY VALVES SHALL BE RATED AT A MINIMUM OF 150 PSIG WOG AND SHALL PROVIDE BUBBLETIGHT SHUTOFF. VALVES SHALL HAVE LUG
STYLE CAST IRON BODY, ALUMINUM BRONZE DISC, 416 STAINLESS STEEL STEM, EPDM SLEEVES, SEATS AND O-RINGS, AND LEVER OPERATOR.
VALVES SHALL BE SUITABLE FOR DEAD END SERVICE AND SHALL BE MILWAUKEE 'M' SERIES, OR EQUAL BY KITZ OR HAMMOND.
B. ALL BALL VALVES, INCLUDING THOSE USED FOR DRAIN/BLOWDOWN VALVES, GAGE, AIR VENT, COLD WATER MAKE-UP, CHEMICAL TREATMENT
AND EXPANSION TANK SERVICE SHALL BE BRONZE BODY, THREADED ENDS, ALL STAINLESS STEEL TRIM AND STAINLESS STEEL LATCH-LOCK
HANDLE, MILWAUKEE 20BSOR-02-LL, OR EQUAL BY KITZ OR HAMMOND.
C. ALL TAPS FOR P/T PORTS, GAGES, DIFFERENTIAL PRESSURE SWITCHES, DRAIN VALVES ETC. SHALL BE MAKE WITH FORGED STEEL
THREDOLETS OR WELDED REDUCING TEE IN PIPING SIZE 2 1/2" AND LARGER, GALVANIZED MALLEABLE IRON SCREWED REDUCING TEE IN STEEL
PIPING SIZE 2" AND SMALLER, AND SOLDERED TEES IN COPPER PIPING. MOUNT P/T PORTS IN VERTICAL POSITION.
D. ALL GAGE (INTERIOR), AIR VENT, DRAIN VALVE, STRAINER BLOWDOWN AND DIFFERENTIAL PRESSURE CONNECTION PIPING SHALL BE SCREWED
BRASS PIPE. AIR VENT DISCHARGE PIPING MAY BE HEAVY WALL SOFT COPPER TUBING IF RUN STRAIGHT AND PERPENDICULAR TO BUILDING
LINES AND PROPERLY SUPPORTED AT REGULAR INTERVALS.
E. PRESSURE/TEMPERATURE TEST PORTS SHALL BE BRASS BODY 1/4" MPT WITH DUAL NORDEL SEALS AND BRASS CAP W/RETAINER STRAP, FLOW
DESIGN INC. SUPERSEAL. PROVIDE 2-3/4" LENGTH FOR INSULATED PIPING AND 1-1/4" LENGTH FOR NON-INSULATED PIPING. MOUNT P/T PORTS
IN VERTICAL POSITION ACCESSIBLE FOR EASY INSERTION OF TEMPERATURE AND PRESSURE MEASURING DEVICES.
F. THE USE OF BUSHINGS AND CLOSE NIPPLES FOR THREADED CONNECTIONS OF ANY KIND IS NOT ALLOWABLE.
G. PROVIDE AUTOMATIC AIR VENTS AT ALL HIGH POINTS IN PIPING AND ELSEWHERE AS INDICATED, SEE TYPICAL DETAILS.
H. SUPPORT PIPING FROM GROUND WITH GALVANIZED STEEL SCHEDULE 40 PIPE STANDS PRIOR TO FINAL CONNECTION TO PUMPS SUCH THAT NO
PIPING WEIGHT IS CARRIED BY PUMP CONNECTIONS.
I. ALL IRREGULAR SHAPED CHILLED WATER SYSTEM ACCESSORIES SUCH AS AIR SEPARATOR, EXPANSION TANK, CHILLED WATER PUMPS, ETC.
SHALL BE INSULATED WITH TWO LAYERS OF ONE INCH THICK ARMAFLEX AND SHALL BE PAINTED WITH TWO COATS OF ELASTOMERIC PAINT.
J. MECHANICAL CONTRACTOR SHALL INSTALL THRED-O-LETS FOR DDC TEMPERATURE WELLS WHERE REQUIRED BY ENGINEER AND/OR TRANE
DDC CONTRACTOR.
K. ALL NEW HOT WATER PIPING SHALL BE INSULATED WITH 1-1/2" THICK SECTIONAL FIBERGLASS WITH AN ASJ JACKET. ALL FITTINGS AND VALVES
TO BE PROVIDED WITH PREMOLDED INSULATION SECTIONS.
L. ALL NEW HYDRONIC PIPING SHALL MATCH EXISTING PIPING MATERIALS.
M. CONTRACTOR SHALL DRAIN AND REFILL EXISTING HOT WATER SYSTEM AND PROVIDE NEW CHEMICAL TREATMENT FOR REFILL.
N. CONTRACTOR SHALL REBALANCE ALL EXISTING HOT WATER COILS. OBTAIN THE ORIGINAL BUILDING DRAWINGS FOR LOCATION AND
DESCRIPTION OF DEVICES AS WELL AS FLOW INFORMATION.
O. THE MECHANICAL CONTRACTOR PERFORMING WORK ON THIS PROJECT WILL BE RESPONSIBLE FOR ALL ASSOCIATED ELECTRICAL AND
CONTROLS WORK REQUIRED TO SUPPORT THE INSTALLATION OF THE NEW BOILER, CHILLERS, AND ASSOCIATED PUMPS AS DESCRIBED IN
THESE DOCUMENTS.
GENERAL PIPING NOTES
AIR COOLED CHILLER SCHEDULE (BASE BID)
MARK MIN. EER IPLV
EVAPORATOR DATA CONDENSER DATA COMPRESSER DATA ELECTRICAL DATA
GPM
ENT. WATER
TEMP.
LVG. WATER
TEMP.
MAX. WATER
PRESS.
DROP (FT.
W.C.)
FOULING
FACTOR
AMBIENT
TEMP. (DB)
DEG. F
LOW
AMBIENT
TEMP. (DB)
DEG. F
CONDENSER FANS
MIN.
QUANT.
CAPACITY
REDUCTION
VOLTS PHASE Hz
QUANT. FLA
APPROX. %
RANGE
ACC-1 75.0 HFC-410A WATER 10.1115.58
185.7 54.0 44.0 10.0 0.00010 95.0 26.0 4 4.0 4 25-100 181 460 3 60
EER - ENERGY EFFICIENCY RATIO. POWER INPUTS SHALL INCLUDE ALL COMPRESSORS, CONDENSER FANS, AND CONTROL POWER AT FULL LOAD CONDITIONS.
IPLV - INTEGRATED PART LOAD VALUE OF EER'S AT ARI CONDITIONS.
SCROLL TYPE CHILLER WITH LOW AMBIENT CONTROLS AND FLANGE KIT.
PROVIDE FACTORY MOUNTED DISCONNECT SWITCH, POWER SUPPLY MONITOR, AND SINGLE POINT POWER CONNECTION. AND SOFT START STARTER.
PROVIDE FACTORY WEATHERPROOF CONTROL PANEL WITH MICROPROCESSOR BASED OPERATING AND SAFETY CONTROLS, STARTERS AND CONTROL VOLTAGE TRANSFORMER.
PROVIDE CORROSION RESISTANT COATING ON THE CONDENSER COILS. PROVIDE COILS WITH HAIL GUARDS.
PROVIDE VANDAL-PROTECTIVE LOUVERED GUARDS AROUND BOTTOM OF CHILLER PERIMETER OPENING TO PROTECT PIPING, INSULATION, ETC.
PROVIDE WITH SINGLE POINT POWER CONNECTION WITH 120 VOLT RECEPTACLE CONVENIENCE OUTLET.
PROVIDE WITH MINIMUM SOUND ATTENUATION PACKAGE.
PROVIDE EVAPORATOR WITH FREEZE PROTECTION. COORDINATE POWER REQUIREMENTS WITH ELECTRICAL CONTRACTOR TO PROVIDE A POWER CIRCUIT AS NECESSARY.
BASIS OF DESIGN YORK YLAA STANDARD EFFICIENCY. PROVIDE WITH TWO YEAR PARTS AND LABOR WARRANTY INCLUDING REFRIGERANT, ADDITIONALLY PROVIDE WITH 10 YEAR COMPRESSOR WARRANTY. REFER TO BID
TABULATION SHEET FOR ADDITIONAL WARRANTY REQUIREMENTS.
TOTAL
UNIT
MCA
LIQUID TYPE
REFRIG.
TYPE
MIN.
CAPACITY
(TONS)
3
REMARKS
COMP.
RLA
4@48
BASE-MOUNTED.
ES
SEE SEQUENCE OF OPERATION ON SHEETS M6.1
AND M6.4
TOTAL HEAD
(FT H O)
PERFORMANCE DATA
PUMP SCHEDULE (BASE BID)
SERVICE
CHWCHWP-1
ES=END SUCTION
IL=INLINE
MARK
CAPACITY
(GPM)
VARIABLE SPEED
300
2
60
TYPE
ELECTRICAL DATA
MAXIMUM
SPEED (RPM)
MOTOR HP
MINIMUM
EFFICIENCY
176072% 7.5
HERTZPHASEVOLTS
60460 3
REMARKS
ONCE PUMP IS INSTALLED, THE PUMP AND
MOTOR SHAFT SHALL BE REALIGNED PER THE
PUMP MANUFACTURERS RECOMMENDATIONS.
HOT WATER HEATING BOILER SCHEDULE (BASE BID)
ELECTRICAL DATA
MINIMUM MINIMUM MINIMUM FUEL FLOW PRESSURE
MARK INPUT OUTPUT EFFICIENCY RATE DROP MAXIMUM EWT LWT BASIS OF NOTES
HWB-
(MBTUH) (MBTUH) (%) (GPM) (FT of HEAD) (°F) (°F)
DESIGN VOLTS Hz PHASE
13,000 2,550
85 NATURAL GAS 210 12.0 160 180 RAYPAK MVB TYPE H 120 60 11, 2, 3, 4, 5, 6, 7, 8, 9
NOTES
1 COORDINATE ALL ELECTRICAL REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR. COORDINATE ALL CONTROLS REQUIREMENTS WITH THE CONTROLS CONTRACTOR.
2
INSTALL BOILER IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
3BOILER SHALL HAVE FULL ELECTRONIC MODULATION, CONSTANT RATIO UP TO 7:1 TURNDOWN.
4
MINIMUM WATER INLET TEMPERATURE IS 120°F.
5
PROVIDE BOILER WITH FACTORY START-UP.
6
BOILER SHALL BE INSTALLED PER THE REQUIREMENTS OF THE STATE OF ALABAMA BOILER AND PRESSURE VESSEL SAFETY DIVISION. CONTRACTOR SHALL CONTACT THE INSPECTOR TO ARRANGE AN INSPECTION OF THE COMPLETED INSTALLATION.
THE CONTRACTOR SHALL PROVIDE A WRITTEN INSPECTION REPORT TO THE ARCHITECT/OWNER OF THE FINDINGS. THE CONTRACTOR SHALL CORRECT ANY DEFFICIENCIES NOTED IN THE REPORT.
7
MECHANICAL CONTRACTOR SHALL REGISTER THE BOILER TO THE ALABAMA PORT AUTHORITY STATE AND PAY ALL REQUIRED FEES FOR REGISTRATION AND INSPECTION. THE BOILER INSTALLATION SHALL MEET ALL STATE OF ALABAMA
REQUIRMENTS. BOILER PERMIT SHALL BE OBTAINED FROM THE ALABAMA DEPARTMENT OF LABOR. ALL BOILER REGISTRATION AND INSPECTION DOCUMENTATION SHALL BE TURNED OVER WITH THE CONSTRUCTION CLOSEOUT DOCUMENTS.
FLUE SIZE
(IN)
12
200
TOTAL
UNIT
MOCP
ACC-2 75.0 HFC-410A WATER 10.1115.58
185.7 54.0 44.0 10.0 0.00010 95.0 26.0 4 4.0 4 25-100 181 460 3 60
4@48
200
ESHHWHWP-2 225 60 176072% 5 60460 3
ESHHWHWP-3 225 60 176072% 5 60460 3
ESCHWCHWP-2 300 60 176072% 7.5 60460 3
REDUNDANT PUMPS. CONTROLS TO BE
SEQUENCED TO SWITCH PUMPS EVERY OTHER
DAY TO BE PRIMARY.
ILHHWHWP-1 175 18 116078% 1.5 60460 3
PUMP IS MOUNTED ON THE BOILER.
8
COORDINATE BOILER CONTROL REQUIREMENTS WITH THE CONTROLS CONTRACTOR. PROVIDE INTERFACE MODULE AS NECESSARY THAT IS COMPATIBLE WITH THE CONTROLS SYSTEM BEING INSTALLED ON THIS PROJECT.
9
PROVIDE BOILER WITH 25 YEAR THERMAL SHOCK WARRANTY AND 10 YEAR HEAT EXCHANGER WARRANTY.
COORDINATE ALL ELECTRICAL REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR AND CONTROLS REQUIREMENTS WITH THE CONTROLS CONTRACTOR.
PUMP IS TO BE INSTALLED AT THE BUILDING EXTERIOR.
PUMP AND MOTOR SHALL BE RATED FOR EXTERIOR
USE. ELECTRICAL ENCLOSURES SHALL BE NEMA 3R.
CONDUIT SHALL BE RIGID WITH ARMORED WATER
TIGHT FLEX WHIP ADJACENT TO MOTOR CONNECTION.
Sm
ith M
echanical
Co
nsu
ltin
g &
D
esig
n
19-053
1-7-20
FO
R T
HE
HV
AC
R
EN
OV
AT
IO
NS
MO
BIL
E, A
LA
BA
MA
3
66
02
NO
RT
H W
AT
ER
S
TR
EE
T
ALA
BAMA
ST
ATE
POR
TAUTHOR
ITY
IN
TE
RN
AT
IO
NA
L T
RA
DE
C
EN
TE
R
M1.1
HVAC SCHEDULES
AutoCAD SHX Text%%UCHILLER NOTES
AutoCAD SHX Text1
AutoCAD SHX Text2
AutoCAD SHX Text3
AutoCAD SHX Text4
AutoCAD SHX Text5
AutoCAD SHX Text6
AutoCAD SHX Text7
AutoCAD SHX Text8
AutoCAD SHX Text9
AutoCAD SHX Text10
AutoCAD SHX Text11
AutoCAD SHX Text1
AutoCAD SHX Text2
AutoCAD SHX Text4
AutoCAD SHX Text5
AutoCAD SHX Text6
AutoCAD SHX Text7
AutoCAD SHX Text8
AutoCAD SHX Text11
AutoCAD SHX Text9
AutoCAD SHX Text10
AutoCAD SHX Text%%UPUMP NOTES
AutoCAD SHX Text1
AutoCAD SHX Text2
AutoCAD SHX Text3
AutoCAD SHX Text4
AutoCAD SHX Text1
AutoCAD SHX Text2
AutoCAD SHX Text3
AutoCAD SHX Text4
AutoCAD SHX Text5
AutoCAD SHX Text5
AutoCAD SHX Text2
AutoCAD SHX Text3
AutoCAD SHX Text4
AutoCAD SHX Text5
AutoCAD SHX Text3
AutoCAD SHX Text4
AutoCAD SHX Text5
AutoCAD SHX Text6
AutoCAD SHX Text7
AutoCAD SHX Text9
AutoCAD SHX Text10
AutoCAD SHX Text2
AutoCAD SHX Text3
AutoCAD SHX Text4
AutoCAD SHX Text5
AutoCAD SHX Text2
AutoCAD SHX Text3
AutoCAD SHX Text4
AutoCAD SHX Text5
AutoCAD SHX Text6
AutoCAD SHX Text3
AutoCAD SHX Text7
AutoCAD SHX Text7
AutoCAD SHX Text11
AutoCAD SHX Text11
AutoCAD SHX Text6
AutoCAD SHX Text6
AutoCAD SHX Text6
AutoCAD SHX Text6
AutoCAD SHX Text12
AutoCAD SHX Text12
AutoCAD SHX Text12
AutoCAD SHX Text8
AutoCAD SHX Text8
AutoCAD SHX Text8
AutoCAD SHX TextISSUE DATE:
AutoCAD SHX TextPROJECT NO:
AutoCAD SHX TextREVISIONS:
AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.
AutoCAD SHX TextSHEET TITLE:
AutoCAD SHX TextSHEET NUMBER:
AutoCAD SHX TextNOT VALID UNLESS SIGNED
AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E
AutoCAD SHX Text7150 CHARLANDA CT.
AutoCAD SHX TextMOBILE, AL 36695
AutoCAD SHX Text(251) 402-1364
AutoCAD SHX TextROGER J. SMITH, PE 24744
AutoCAD SHX Textwww.smithmechanicalconsulting.com
AutoCAD SHX TextG
AutoCAD SHX TextM
AutoCAD SHX TextE
AutoCAD SHX TextS
AutoCAD SHX TextR
AutoCAD SHX TextJ
AutoCAD SHX Text.
AutoCAD SHX TextNo. 24744
AutoCAD SHX TextD
AutoCAD SHX TextE
AutoCAD SHX TextM
AutoCAD SHX TextR
AutoCAD SHX TextE
AutoCAD SHX TextPROFESSIONAL
AutoCAD SHX TextA
AutoCAD SHX TextO
AutoCAD SHX TextR
AutoCAD SHX TextG
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextI
AutoCAD SHX TextN
AutoCAD SHX TextE
AutoCAD SHX TextC
AutoCAD SHX TextL
AutoCAD SHX TextI
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextS
AutoCAD SHX TextA
AutoCAD SHX TextL
AutoCAD SHX TextB
AutoCAD SHX TextA
AutoCAD SHX TextA
AutoCAD SHX TextH
AutoCAD SHX TextT
AutoCAD SHX TextI
AutoCAD SHX Text1/7/2020
1. INSTALL ALL WORK IN COMPLIANCE WITH THE LOCAL AUTHORITY HAVING JURISDICTION, THE 2012
INTERNATIONAL MECHANICAL CODE, AND THE 2015 INTERNATIONAL ENERGY CONSERVATION CODE.
2. COORDINATE ALL ELECTRICAL REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR PRIOR TO BEGINNING
ANY WORK.
3. DUCT CONSTRUCTION SHALL BE PER THE LATEST REQUIREMENTS OF NFPA 90A AND 90B, SMACNA AND
ASHRAE AND SHALL MEET OR EXCEED THEIR REQUIREMENTS FOR SUPPORT AND REINFORCEMENT.
4. BRANCH SUPPLY AND RETURN DUCT RUNOUTS SHALL BE GALVANIZED SNAP-LOCK WITH ALL JOINTS AND
SEAMS SEALED WITH MASTIC. TRAVERSE JOINTS SHALL BE CONNECTED WITH SHEET METAL SCREWS MINIMUM
6" ON CENTER. ALL GALVANIZED DUCT SHALL BE INSULATED WITH 2" THICK, R-8 WRAP INSULATION.
INSULATION TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS.
5. R-8 FLEXIBLE DUCT TO SUPPLY GRILLES SHALL NOT EXCEED 8'-0". ROUTE EXTERNALLY INSULATED RIGID SNAP
LOCK DUCT TO WITHIN 8'-0" OF GRILLE.
6. EQUIPMENT PROVIDED AND INSTALLED ON THIS PROJECT SHALL MEET OR EXCEED THE MINIMUM EFFICIENCY
REQUIREMENTS INDICATED IN THE SCHEDULE.
7. DUCT CONSTRUCTION SHALL BE G-90 GALVANIZED SHEET METAL. DUCT SEALING SHALL BE CLASS "A", ALL
JOINTS, SEAMS, AND PENETRATIONS SHALL BE BRUSHED WITH 2 COATS OF WATER BASED MASTIC. THE DUCT
SEAL SHALL MEET OR EXCEED PRESSURE CLASS 2".
8. ALL SHEET METAL DUCT SHALL BE EXTERNALLY INSULATED WITH 2" THICK, MINIMUM R-8.0 DUCT WRAP WITH AN
FSK JACKET. JOINTS AND SEAMS SHALL OVERLAP 2" AND SHALL BE STAPLED AT 6" ON CENTER. ALL
INSULATION JACKET JOINTS AND SEAMS SHALL BE SEALED WITH PRESSURE SENSITIVE TAPE. INSULATION
APPLIED TO DUCT DIMENSIONS GREATER THAN 24" SHALL BE SECURED ON THE BOTTOM OF THE DUCT WITH
MECHANICAL FASTENERS AT 18" ON CENTER.
9. THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND OTHER TRADES
ALL REQUIRED OPENINGS IN WALLS, FOUNDATIONS, FLOORS, AND ROOFS.
10. THE MECHANICAL CONTRACTOR SHALL VERIFY ALL MECHANICAL EQUIPMENT LOCATIONS AND BE
RESPONSIBLE FOR ALL RELATED CLEARANCES IN THE FIELD. PROVIDE CLEARANCE IN FRONT OF ALL
ELECTRICAL PANELS PER NATIONAL ELECTRIC CODE REQUIREMENTS. DUCT SHALL NOT ROUTE OVER
ELECTRICAL PANELS.
15. DUCT SHALL BE FIELD MEASURED PRIOR TO INSTALLATION TO ENSURE PROPER FIT WITHIN STRUCTURAL
MEMBERS. DUCT SHALL BE OFFSET, OR TRANSITIONED AS NECESSARY TO ACCOMMODATE STRUCTURAL
MEMBERS. DUCT SHALL NOT BE PURCHASED PREFABRICATED FROM THESE DRAWINGS. ANY DUCT
PURCHASED PREFABRICATED FROM A DUCT VENDOR SHALL BE DONE FROM CONTRACTOR PROVIDED, FIELD
MEASURED SHOP DRAWINGS THAT HAVE BEEN SUBMITTED TO THE ENGINEER FOR PRIOR APPROVAL. NO
EXCEPTIONS.
16. OFFSET AND TRANSITION DUCT AS NECESSARY TO AVOID STRUCTURAL MEMBERS OR EQUIPMENT
CONNECTION SIZES. PROVIDE FLEXIBLE DUCT CONNECTORS ON ALL DUCT CONNECTION TO MOTORIZED
EQUIPMENT.
17. THE MECHANICAL CONTRACTOR PERFORMING WORK ON THIS PROJECT WILL BE RESPONSIBLE FOR ALL
ASSOCIATED ELECTRICAL AND CONTROLS WORK REQUIRED TO SUPPORT THE INSTALLATION OF THE NEW
BOILER, CHILLERS, AND ASSOCIATED PUMPS AS DESCRIBED IN THESE DOCUMENTS. ADDITIONAL
COORDINATION OF ELECTRICAL AND CONTROLS WORK ASSOCIATED WITH THE REPLACEMENT OF THE DUAL
DUCT VAV BOXES AND REPLACEMENT OF CONTROL POINTS ON EXISTING TO REMAIN AIR HANDLING UNITS AND
MEDIUM PRESSURE DUCT SYSTEM.
DUAL DUCT VAV BOX SCHEDULE (ADDITIVE ALTERNATE #1)
MARK REMARKS
DDB 1-1
12-1/2" x 28-1/8"
1, 2, 3
1. COORDINATE ALL ELECTRICAL REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR AND CONTROLS REQUIREMENTS WITH THE CONTROLS CONTRACTOR. 24 VOLT CONTROL
ACTUATORS SHALL BE PROVIDED WITH A TRANSFORMER TO STEP DOWN FROM 120/1Ø.
COLD
09"
2. BASIS OF DESIGN TITUS DEDV-N. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE EXISTING HOT AND COLD INLETS SIDES AND PROVIDING THE NEW BOX TO MATCH
THE EXISTING DUCT CONNECTION CONFIGURATION. DUCT CONNECTIONS SHOWN ON THE PLANS WERE DEVELOPED FROM THE ORIGINAL PLANS.
3. CONTRACTOR SHALL FIELD MOUNT DAMPER ACTUATORS. FIELD VERIFY ALL REQUIREMENTS AND COORDINATE INSTALLATION WITH THE CONTROLS CONTRACTOR.
NOTES:
MANUFACTURER
MODEL
NUMBER
TITUS DEDV
SIZE
HOT
09"
INLET
OUTLET
COLD CFM
MAX.
930
MIN.
512
HOT CFM
MAX.
930
MIN.
512
STATIC
INLET
1
DOWN
0.25
MIN.
0.05
MAX NC
LEVELS
RAD
23
DIS
20
DDB 1-2
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV1240 682 1240 682 1 0.25 0.01 26 22
DDB 1-3
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV1095 1 0.25 0.01 24 20
DDB 1-4
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV795 1 0.25 0.01 18 17
DDB 1-5
10" x 24-1/8"
1, 2, 3
TITUS DEDV510 1 0.25 0.09 20 18
DDB 1-6
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV1050 1 0.25 0.01 23 19
DDB 1-7
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV960 1 0.25 0.06 23 22
DDB 1-8
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV810 1 0.25 0.04 22 19
DDB 1-9
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV1240 1 0.25 0.01 26 22
DDB 1-10
10" X 24-1/8"
1, 2, 3
TITUS DEDV405 1 0.25 0.06 19 15
DDB 1-11
10" X 24-1/8"
1, 2, 3
TITUS DEDV405 1 0.25 0.06 19 15
DDB 1-12
8 X 24-1/8"
1, 2, 3
TITUS DEDV200 1 0.25 0.02 16 15
DDB 2-1
12-1/2" x 28-1/8"
1, 2, 3
09" TITUS DEDV810 1 0.25 0.04 22 19
DDB 2-2
12-1/2" x 28-1/8"
1, 2, 3
09" TITUS DEDV960 1 0.25 0.06 23 22
DDB 2-3
12-1/2" x 28-1/8"
1, 2, 3
10" TITUS DEDV1080 1 0.25 0.01 24 20
DDB 2-4
10" X 24-1/8"
1, 2, 3
08" TITUS DEDV710 1 0.25 0.02 17 18
DDB 2-5
12-1/2" x 28-1/8"
1, 2, 3
09" TITUS DEDV800 1 0.25 0.04
DDB 2-6
12-1/2" x 28-1/8"
1, 2, 3
09" TITUS DEDV820 1 0.25 0.04
DDB 2-7
12-1/2" x 28-1/8"
1, 2, 3
10" TITUS DEDV1080 1 0.25 0.01 24 20
DDB 2-8
12-1/2" x 28-1/8"
1, 2, 3
09" TITUS DEDV810 1 0.25 0.04
DDB 2-9
12-1/2" x 28-1/8"
1, 2, 3
09" TITUS DEDV820 1 0.25 0.04
DDB 2-10
12-1/2" x 28-1/8"
1, 2, 3
09" TITUS DEDV800 1 0.25 0.04
DDB 2-11
10" X 24-1/8"
1, 2, 3
08" TITUS DEDV710 1 0.25 0.02 17 18
DDB 2-12
8" X 24-1/8"
1, 2, 3
06" TITUS DEDV350 1 0.25 0.1 17 14
DDB 3-1
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV1 0.25 0.04 22 19
DDB 3-2
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV1 0.25 0.06 23 22
DDB 3-3
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV1 0.25 0.01 24 20
DDB 3-4
10" X 24-1/8"
1, 2, 3
TITUS DEDV1 0.25 0.02 17 18
DDB 3-5
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV1 0.25 0.04
DDB 3-6
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV1 0.25 0.04
DDB 3-7
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV1 0.25 0.01 24 20
DDB 3-8
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV1 0.25 0.04
DDB 3-9
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV1 0.25 0.04
DDB 3-10
12-1/2" x 28-1/8"
1, 2, 3
TITUS DEDV1 0.25 0.04 22 19
DDB 3-11
10" X 24-1/8"
1, 2, 3
TITUS DEDV1 0.25 0.02 17 18
DDB 3-12
8" X 24-1/8"
1, 2, 3
TITUS DEDV1 0.25 0.1 17 14
10"
10"
10"
07"
10"
09"
09"
10"
07"
07"
05"
10"
10"
10"
07"
10"
09"
09"
10"
07"
07"
05"
09"
09"
10"
08"
09"
09"
10"
09"
09"
09"
08"
06"
09"
09"
10"
08"
09"
09"
10"
09"
09"
09"
08"
06"
09"
09"
10"
08"
09"
09"
10"
09"
09"
09"
08"
06"
810
960
1080
710
800
820
1080
810
820
800
710
350
602 1095 602
437
280
578
528
446
682
223
223
110
446
528
594
390
440
451
594
446
451
440
390
528
594
390
440
451
594
446
451
440
390
192
446
192
795
510
1050
960
810
1240
405
405
200
810
960
1080
710
800
820
1080
810
820
800
710
350
810
960
1080
710
800
820
1080
810
820
800
710
350
437
280
578
528
446
682
223
223
110
446
528
594
390
440
451
594
446
451
440
390
528
594
390
440
451
594
446
451
440
390
192
446
192
22 19
22 19
22 19
22 19
22 19
22 19
22 19
22 19
22 19
GENERAL HVAC NOTES
Sm
ith M
echanical
Co
nsu
ltin
g &
D
esig
n
19-053
1-7-20
FO
R T
HE
HV
AC
R
EN
OV
AT
IO
NS
MO
BIL
E, A
LA
BA
MA
3
66
02
NO
RT
H W
AT
ER
S
TR
EE
T
ALA
BAMA
ST
ATE
POR
TAUTHOR
ITY
IN
TE
RN
AT
IO
NA
L T
RA
DE
C
EN
TE
R
M1.2
HVAC SCHEDULES
AutoCAD SHX TextISSUE DATE:
AutoCAD SHX TextPROJECT NO:
AutoCAD SHX TextREVISIONS:
AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.
AutoCAD SHX TextSHEET TITLE:
AutoCAD SHX TextSHEET NUMBER:
AutoCAD SHX TextNOT VALID UNLESS SIGNED
AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E
AutoCAD SHX Text7150 CHARLANDA CT.
AutoCAD SHX TextMOBILE, AL 36695
AutoCAD SHX Text(251) 402-1364
AutoCAD SHX TextROGER J. SMITH, PE 24744
AutoCAD SHX Textwww.smithmechanicalconsulting.com
AutoCAD SHX TextG
AutoCAD SHX TextM
AutoCAD SHX TextE
AutoCAD SHX TextS
AutoCAD SHX TextR
AutoCAD SHX TextJ
AutoCAD SHX Text.
AutoCAD SHX TextNo. 24744
AutoCAD SHX TextD
AutoCAD SHX TextE
AutoCAD SHX TextM
AutoCAD SHX TextR
AutoCAD SHX TextE
AutoCAD SHX TextPROFESSIONAL
AutoCAD SHX TextA
AutoCAD SHX TextO
AutoCAD SHX TextR
AutoCAD SHX TextG
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextI
AutoCAD SHX TextN
AutoCAD SHX TextE
AutoCAD SHX TextC
AutoCAD SHX TextL
AutoCAD SHX TextI
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextS
AutoCAD SHX TextA
AutoCAD SHX TextL
AutoCAD SHX TextB
AutoCAD SHX TextA
AutoCAD SHX TextA
AutoCAD SHX TextH
AutoCAD SHX TextT
AutoCAD SHX TextI
AutoCAD SHX Text1/7/2020
FIRST FLOOR HVAC DEMO PLAN
1
N
KEYNOTES
EXISTING DUAL DUCT VAV BOX AND ASSOCIATED PNEUMATIC CONTROL TUBING TO BE REMOVED
ENTIRELY. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF BOX PRIOR TO BEGINNING
ANY WORK. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING ASSOCIATED
THERMOSTAT AND REMOVE ENTIRELY. PREPARE DUCT AS NECESSARY TO ACCEPT THE
INSTALLATION OF THE NEW DUAL DUCT VAV BOX. SEE NEW WORK PLAN FOR ADDITIONAL
REQUIREMENTS.
CONTRACTOR SHALL REMOVE CEILING TILES AND GRID OR GYPSUM CEILING AS NECESSARY TO
ALLOW FOR THE REMOVAL OF THE EXISTING DUAL DUCT VAV BOX AND THE INSTALLATION OF THE
NEW DUAL DUCT VAV BOX. ONCE NEW BOX HAS BEEN INSTALLED, THE CONTRACTOR SHALL
REINSTALL THE CEILING GRID AND TILES, OR MAKE REPAIRS TO THE GYPSUM CEILING TO MATCH
IMMEDIATE SURROUNDING. IT IS EXPECTED FOR THE CEILING TO HAVE THE SAME ORIGINAL
PAINTED FINISH ONCE THE WORK IS COMPLETE.
CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF THE EXISTING THERMOSTAT PRIOR
TO BEGINNING ANY WORK. THERMOSTAT SHALL BE REMOVED ENTIRELY WHEN VAV BOX IS
REMOVED. SEE NEW WORK PLAN FOR ADDITIONAL REQUIREMENTS.
EXISTING CHILLED WATER WATER AIR HANDLING UNIT (AHU-3) TO REMAIN. EXISTING PNEUMATIC
CHILLED WATER CONTROL VALVE TO BE REMOVED AND REPLACED NEW WITH DDC CONTROLLED
VALVE. REFERENCE NEW WORK PLAN FOR ADDITIONAL INFORMATION. CHILLED WATER PIPING
SHALL REMAIN. MODIFY PIPING AS NECESSARY TO ACCOMMODATE NEW CONTROL VALVE. THIS
WORK IS PART OF THE BASE BID.
1
1-2
30"Ø
25"Ø
1-3
1-4
1-6 1-7 1-8
1-11
1-1
20Ø
14
Ø
14
Ø
20
x1
2
26
x1
2
26
x1
2
24x12
20Ø
20
x6
16x616x6
10x10 10x10
18x12
14
x1
2
10
x1
0
10x10
12
x6
16
x1
0
12
x1
0
26x12
10
x6
1-5
20x10
15
x1
0
10
x1
0
10x10
10x10
10x10
10x10
10x10
14x4 12x12
14x4
10x10
16
x1
21
8x1
22
0x1
2
26x12
14x4
14
x4
10
x1
0
18Ø
18Ø
16Ø
16Ø
14x4
20
x1
2
8x8 8x8
14x4
8x6
14x10
8x8
26
x1
2
12x12
12x12
16x12
14
x4
14
x4
8x6
8x6
8x6
14
x4
12
x1
2
14
x4
8x8
12x12
20x12
16x12
12x12
10
x1
0
12
x8
8x6
24
x1
2
15Ø
15Ø
8x6
8x6
8x6
8x6
12x12
18x12
14
x4
14
x4
1-9
26x12
20
x1
2
12x12 14x4
8x6
14x4
14
x4
14
x4
14x10
8x6
8x6
14x10
8x6
1-10
12
Ø
12
Ø
16x10
16x10
8x6
8x6
14
x1
0
14x4
8x6
14x10
14x10
14
x1
0
14x48x6
34
x1
8
26x18
14
x4
12
x7
12
x7
12
x7
26x15
14
x4
12
x7
12
x7
12
x7
14
x4
12
x8
15x13
12
x8
12
x7
26x1334x18
12
x7
1-12
15Ø
8x6
10x8
16x10
8x6
T
1-8
T
1-6
T
1-7
T
1-5
T
1-4
T
1-3
8x6
T1-12
T
1-9
T
1-10
T
1-11
T
1-2
T
1-1
T
AHU-1
AHU-3
NOTE:
EXISTING DUCT, VAV BOX, AND THERMOSTAT
LOCATIONS AND SIZES WERE OBTAINED FROM
THE ORIGINAL BUILDING PLANS FROM 1966 PLUS
SEVERAL SUBSEQUENT RENOVATIONS. THE
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
LOCATIONS AND SIZES PRIOR TO BID AND
BEGINNING ANY WORK. EQUIPMENT LOCATIONS
SHOWN ON THE PLANS ARE APPROXIMATE. FIELD
VERIFY ALL DUCT SIZES AND LOCATIONS OF HOT
DECK AND COLD DECK INLETS ON THE DUAL
DUCT BOXES. BOXES SHALL BE ORDERED TO
MATCH EXISTING CONNECTION
CONFIGURATIONS. TRANSITION EXISTING DUCT
AS NECESSARY FOR CONNECTIONS TO NEW VAV
BOX INLETS AND OUTLETS.
COORDINATION OF WORK IN EACH AREA SHALL
BE MADE A MINIMUM OF 10 DAYS IN ADVANCE OF
WORK OCCURRING WITH THE ASPA PM.
DEMOLITION AND INSTALLATION OF NEW VAV BOX
SHALL OCCUR CONSECUTIVELY. REMOVAL OF
EXISTING BOX SHALL ONLY OCCUR WHEN NEW
BOX IS AVAILABLE AND READY FOR
INSTALLATION. AREAS OF WORK SHALL BE KEPT
TO A MINIMUM TO PREVENT EXCESSIVE
DISRUPTION TO ONGOING BUSINESS
OPERATIONS AT THE FACILITY. WORK AREAS
SHALL BE CLEANED DAILY BEFORE THE NEXT
BUSINESS DAY.
2
3
3
3
3
3
3
3
3
3
3
3
3
3
3
1 2
1 2
1 2
1 2
1 2
1 2
1 21 2
1 2
1 2
1 2
1 2
4
4
1-1/2" CR / CS
WORK ON THIS DRAWING IS INCLUDED IN
ADDITIVE ALTERNATE #1 EXCEPT FOR THE WORK
ASSOCIATED WITH AHU-3. WORK ASSOCIATED
WITH AHU-3 IS INCLUDED IN THE BASE BID.
TYPICAL DUAL DUCT VAV BOX AND
ASSOCIATED WALL THERMOSTAT.
Sm
ith M
echanical
Co
nsu
ltin
g &
D
esig
n
19-053
1-7-20
FO
R T
HE
HV
AC
R
EN
OV
AT
IO
NS
MO
BIL
E, A
LA
BA
MA
3
66
02
NO
RT
H W
AT
ER
S
TR
EE
T
ALA
BAMA
ST
ATE
POR
TAUTHOR
ITY
IN
TE
RN
AT
IO
NA
L T
RA
DE
C
EN
TE
R
M2.1
FIRST FLOOR HVAC
DEMO PLAN
AutoCAD SHX Text0'
AutoCAD SHX TextSCALE: 3/16"=1'-0"
AutoCAD SHX Text5'
AutoCAD SHX Text5'
AutoCAD SHX Text10'
http://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwgAutoCAD SHX TextISSUE DATE:
AutoCAD SHX TextPROJECT NO:
AutoCAD SHX TextREVISIONS:
AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.
AutoCAD SHX TextSHEET TITLE:
AutoCAD SHX TextSHEET NUMBER:
AutoCAD SHX TextNOT VALID UNLESS SIGNED
AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E
AutoCAD SHX Text7150 CHARLANDA CT.
AutoCAD SHX TextMOBILE, AL 36695
AutoCAD SHX Text(251) 402-1364
AutoCAD SHX TextROGER J. SMITH, PE 24744
AutoCAD SHX Textwww.smithmechanicalconsulting.com
AutoCAD SHX TextG
AutoCAD SHX TextM
AutoCAD SHX TextE
AutoCAD SHX TextS
AutoCAD SHX TextR
AutoCAD SHX TextJ
AutoCAD SHX Text.
AutoCAD SHX TextNo. 24744
AutoCAD SHX TextD
AutoCAD SHX TextE
AutoCAD SHX TextM
AutoCAD SHX TextR
AutoCAD SHX TextE
AutoCAD SHX TextPROFESSIONAL
AutoCAD SHX TextA
AutoCAD SHX TextO
AutoCAD SHX TextR
AutoCAD SHX TextG
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextI
AutoCAD SHX TextN
AutoCAD SHX TextE
AutoCAD SHX TextC
AutoCAD SHX TextL
AutoCAD SHX TextI
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextS
AutoCAD SHX TextA
AutoCAD SHX TextL
AutoCAD SHX TextB
AutoCAD SHX TextA
AutoCAD SHX TextA
AutoCAD SHX TextH
AutoCAD SHX TextT
AutoCAD SHX TextI
AutoCAD SHX Text1/7/2020
SECOND FLOOR HVAC DEMO PLAN
1
N
2-9
30"Ø25"Ø
2-10
2-11
2-1 2-2 2-3
2-4
2-5
2-6
2-72-8
20
Ø
15Ø 15Ø
18
Ø
1
5
Ø
15
Ø1
5Ø
15Ø15Ø
15
Ø
14Ø
16
Ø
14Ø
14
Ø
14Ø
14
Ø
14
Ø
20
x1
02
2x1
2
20x10
14x10
8x6
8x6
8x6
8x6
9x69x6
12x8 12x10 12x12
15x12 15x12
26
x1
2
20
x1
2
10x12
12
x7
15x12
12
x7
12
x7
10x12 10x12
12
x7
15x12
12
x7
12
x7
20x12
10x12
12
x7
12x12
8x6
8x6
8x6
6x8
12x10 12x8
8x6
8x6
8x6
26
x1
2
8x6
12
x7
12
x8
14x10
20x10
20
x1
02
2x1
0
12x6
14x10
20x10
20
x1
02
2x1
0
12x6
22
x1
2
12
x7
12
x8
22x12
16
x1
2
10
x1
2
10x12
8x6
10
x6
10x10
10x12 10x10
8x6
10
x6
8x12
8x6
12x6
22
x1
2
22x12
20
x1
0
20x10
12
x7
12
x8
14x10
12
x7
12
x7
12
x7
12
x7
10x12
15x1215x12
10x12
26
x1
2
10x12
12
x7
15x12
12
x7
12
x7
10x12
20
x1
2
16
x1
2
10x1210x10
8x6
10
x6
12x6
10x1210x10
8x6
10
x6
22x12
2-12
14Ø
15Ø
12
x6
12
x6
14x6
20
x1
2
12x10
8x10
T
2-2
T
2-9
T
2-8
T
2-6
T
2-11
T
2-1
T
2-3
T
2-4
T
2-5
T
2-10
T
2-7
T
2-12
3
3
3
3
3
3
3
3
3
3
3
3
1 2
1 2
1 2
1 2 1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
WORK ON THIS DRAWING IS INCLUDED IN
ADDITIVE ALTERNATE #1.
TYPICAL DUAL DUCT VAV BOX AND
ASSOCIATED WALL THERMOSTAT.
KEYNOTES
EXISTING DUAL DUCT VAV BOX AND ASSOCIATED PNEUMATIC CONTROL TUBING TO BE REMOVED
ENTIRELY. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF BOX PRIOR TO BEGINNING
ANY WORK. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING ASSOCIATED
THERMOSTAT AND REMOVE ENTIRELY. PREPARE DUCT AS NECESSARY TO ACCEPT THE
INSTALLATION OF THE NEW DUAL DUCT VAV BOX. SEE NEW WORK PLAN FOR ADDITIONAL
REQUIREMENTS.
CONTRACTOR SHALL REMOVE CEILING TILES AND GRID OR GYPSUM CEILING AS NECESSARY TO
ALLOW FOR THE REMOVAL OF THE EXISTING DUAL DUCT VAV BOX AND THE INSTALLATION OF THE
NEW DUAL DUCT VAV BOX. ONCE NEW BOX HAS BEEN INSTALLED, THE CONTRACTOR SHALL
REINSTALL THE CEILING GRID AND TILES, OR MAKE REPAIRS TO THE GYPSUM CEILING TO MATCH
IMMEDIATE SURROUNDING. IT IS EXPECTED FOR THE CEILING TO HAVE THE SAME ORIGINAL
PAINTED FINISH ONCE THE WORK IS COMPLETE.
CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF THE EXISTING THERMOSTAT PRIOR
TO BEGINNING ANY WORK. THERMOSTAT SHALL BE REMOVED ENTIRELY WHEN VAV BOX IS
REMOVED. SEE NEW WORK PLAN FOR ADDITIONAL REQUIREMENTS.
1
2
3
NOTE:
EXISTING DUCT, VAV BOX, AND THERMOSTAT
LOCATIONS AND SIZES WERE OBTAINED FROM
THE ORIGINAL BUILDING PLANS FROM 1966 PLUS
SEVERAL SUBSEQUENT RENOVATIONS. THE
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
LOCATIONS AND SIZES PRIOR TO BID AND
BEGINNING ANY WORK. EQUIPMENT LOCATIONS
SHOWN ON THE PLANS ARE APPROXIMATE. FIELD
VERIFY ALL DUCT SIZES AND LOCATIONS OF HOT
DECK AND COLD DECK INLETS ON THE DUAL
DUCT BOXES. BOXES SHALL BE ORDERED TO
MATCH EXISTING CONNECTION
CONFIGURATIONS. TRANSITION EXISTING DUCT
AS NECESSARY FOR CONNECTIONS TO NEW VAV
BOX INLETS AND OUTLETS.
COORDINATION OF WORK IN EACH AREA SHALL
BE MADE A MINIMUM OF 10 DAYS IN ADVANCE OF
WORK OCCURRING WITH THE ASPA PM.
DEMOLITION AND INSTALLATION OF NEW VAV BOX
SHALL OCCUR CONSECUTIVELY. REMOVAL OF
EXISTING BOX SHALL ONLY OCCUR WHEN NEW
BOX IS AVAILABLE AND READY FOR
INSTALLATION. AREAS OF WORK SHALL BE KEPT
TO A MINIMUM TO PREVENT EXCESSIVE
DISRUPTION TO ONGOING BUSINESS
OPERATIONS AT THE FACILITY. WORK AREAS
SHALL BE CLEANED DAILY BEFORE THE NEXT
BUSINESS DAY.
Sm
ith M
echanical
Co
nsu
ltin
g &
D
esig
n
19-053
1-7-20
FO
R T
HE
HV
AC
R
EN
OV
AT
IO
NS
MO
BIL
E, A
LA
BA
MA
3
66
02
NO
RT
H W
AT
ER
S
TR
EE
T
ALA
BAMA
ST
ATE
POR
TAUTHOR
ITY
IN
TE
RN
AT
IO
NA
L T
RA
DE
C
EN
TE
R
M2.2
SECOND FLOOR HVAC
DEMO PLAN
AutoCAD SHX Text0'
AutoCAD SHX TextSCALE: 3/16"=1'-0"
AutoCAD SHX Text5'
AutoCAD SHX Text5'
AutoCAD SHX Text10'
http://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwgAutoCAD SHX TextISSUE DATE:
AutoCAD SHX TextPROJECT NO:
AutoCAD SHX TextREVISIONS:
AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.
AutoCAD SHX TextSHEET TITLE:
AutoCAD SHX TextSHEET NUMBER:
AutoCAD SHX TextNOT VALID UNLESS SIGNED
AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E
AutoCAD SHX Text7150 CHARLANDA CT.
AutoCAD SHX TextMOBILE, AL 36695
AutoCAD SHX Text(251) 402-1364
AutoCAD SHX TextROGER J. SMITH, PE 24744
AutoCAD SHX Textwww.smithmechanicalconsulting.com
AutoCAD SHX TextG
AutoCAD SHX TextM
AutoCAD SHX TextE
AutoCAD SHX TextS
AutoCAD SHX TextR
AutoCAD SHX TextJ
AutoCAD SHX Text.
AutoCAD SHX TextNo. 24744
AutoCAD SHX TextD
AutoCAD SHX TextE
AutoCAD SHX TextM
AutoCAD SHX TextR
AutoCAD SHX TextE
AutoCAD SHX TextPROFESSIONAL
AutoCAD SHX TextA
AutoCAD SHX TextO
AutoCAD SHX TextR
AutoCAD SHX TextG
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextI
AutoCAD SHX TextN
AutoCAD SHX TextE
AutoCAD SHX TextC
AutoCAD SHX TextL
AutoCAD SHX TextI
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextS
AutoCAD SHX TextA
AutoCAD SHX TextL
AutoCAD SHX TextB
AutoCAD SHX TextA
AutoCAD SHX TextA
AutoCAD SHX TextH
AutoCAD SHX TextT
AutoCAD SHX TextI
AutoCAD SHX Text1/7/2020
THIRD FLOOR HVAC DEMO PLAN
1
N
3-9
30"Ø25"Ø
3-10
3-11
3-1 3-2 3-3
3-4
3-5
3-6
3-73-8
20
Ø
15Ø 15Ø
18
Ø
1
5
Ø
15
Ø1
5Ø
15Ø15Ø
15
Ø
14Ø
16
Ø
14Ø
14
Ø
14Ø
14
Ø
14
Ø
20
x1
02
2x1
2
20x10
14x10
8x6
8x6
8x6
8x6
9x69x6
12x8 12x10 12x12
15x12 15x12
26
x1
2
20
x1
2
10x12
12
x7
15x12
12
x7
12
x7
10x12 10x12
12
x7
15x12
12
x7
12
x7
20x12
10x12
12
x7
12x12
8x6
8x6
8x6
6x8
12x10 12x8
8x6
8x6
8x6
26
x1
2
8x6
12
x7
12
x8
14x10
20x10
20
x1
02
2x1
0
12x6
14x10
20x10
20
x1
02
2x1
0
12x6
22
x1
2
12
x7
12
x8
22x12
16
x1
2
10
x1
2
10x12
8x6
10
x6
10x10
10x12 10x10
8x6
10
x6
8x12
8x6
12x6
22
x1
2
22x12
20
x1
0
20x10
12
x7
12
x8
14x10
12
x7
12
x7
12
x7
12
x7
10x12
15x1215x12
10x12
26
x1
2
10x12
12
x7
15x12
12
x7
12
x7
10x12
20
x1
2
16
x1
2
10x1210x10
8x6
10
x6
12x6
10x1210x10
8x6
10
x6
22x12
3-12
14Ø
15Ø
12
x6
12
x6
14x6
20
x1
2
12x10
8x10
T
3-11
T
3-2
T
3-7
T
3-5
T
3-9
T
3-10
T
3-8
T3-12
T3-4
T3-1
T3-3
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
3
3
3
3
3
3
3
3
3
3
3
T
3-6
3
T
3-12
3
TYPICAL DUAL DUCT VAV BOX AND
ASSOCIATED WALL THERMOSTAT.
KEYNOTES
EXISTING DUAL DUCT VAV BOX AND ASSOCIATED PNEUMATIC CONTROL TUBING TO BE REMOVED
ENTIRELY. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF BOX PRIOR TO BEGINNING
ANY WORK. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING ASSOCIATED
THERMOSTAT AND REMOVE ENTIRELY. PREPARE DUCT AS NECESSARY TO ACCEPT THE
INSTALLATION OF THE NEW DUAL DUCT VAV BOX. SEE NEW WORK PLAN FOR ADDITIONAL
REQUIREMENTS.
CONTRACTOR SHALL REMOVE CEILING TILES AND GRID OR GYPSUM CEILING AS NECESSARY TO
ALLOW FOR THE REMOVAL OF THE EXISTING DUAL DUCT VAV BOX AND THE INSTALLATION OF THE
NEW DUAL DUCT VAV BOX. ONCE NEW BOX HAS BEEN INSTALLED, THE CONTRACTOR SHALL
REINSTALL THE CEILING GRID AND TILES, OR MAKE REPAIRS TO THE GYPSUM CEILING TO MATCH
IMMEDIATE SURROUNDING. IT IS EXPECTED FOR THE CEILING TO HAVE THE SAME ORIGINAL
PAINTED FINISH ONCE THE WORK IS COMPLETE.
CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF THE EXISTING THERMOSTAT PRIOR
TO BEGINNING ANY WORK. THERMOSTAT SHALL BE REMOVED ENTIRELY WHEN VAV BOX IS
REMOVED. SEE NEW WORK PLAN FOR ADDITIONAL REQUIREMENTS.
1
2
3
WORK ON THIS DRAWING IS INCLUDED IN
ADDITIVE ALTERNATE #1.
NOTE:
EXISTING DUCT, VAV BOX, AND THERMOSTAT
LOCATIONS AND SIZES WERE OBTAINED FROM
THE ORIGINAL BUILDING PLANS FROM 1966 PLUS
SEVERAL SUBSEQUENT RENOVATIONS. THE
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
LOCATIONS AND SIZES PRIOR TO BID AND
BEGINNING ANY WORK. EQUIPMENT LOCATIONS
SHOWN ON THE PLANS ARE APPROXIMATE. FIELD
VERIFY ALL DUCT SIZES AND LOCATIONS OF HOT
DECK AND COLD DECK INLETS ON THE DUAL
DUCT BOXES. BOXES SHALL BE ORDERED TO
MATCH EXISTING CONNECTION
CONFIGURATIONS. TRANSITION EXISTING DUCT
AS NECESSARY FOR CONNECTIONS TO NEW VAV
BOX INLETS AND OUTLETS.
COORDINATION OF WORK IN EACH AREA SHALL
BE MADE A MINIMUM OF 10 DAYS IN ADVANCE OF
WORK OCCURRING WITH THE ASPA PM.
DEMOLITION AND INSTALLATION OF NEW VAV BOX
SHALL OCCUR CONSECUTIVELY. REMOVAL OF
EXISTING BOX SHALL ONLY OCCUR WHEN NEW
BOX IS AVAILABLE AND READY FOR
INSTALLATION. AREAS OF WORK SHALL BE KEPT
TO A MINIMUM TO PREVENT EXCESSIVE
DISRUPTION TO ONGOING BUSINESS
OPERATIONS AT THE FACILITY. WORK AREAS
SHALL BE CLEANED DAILY BEFORE THE NEXT
BUSINESS DAY.
Sm
ith M
echanical
Co
nsu
ltin
g &
D
esig
n
19-053
1-7-20
FO
R T
HE
HV
AC
R
EN
OV
AT
IO
NS
MO
BIL
E, A
LA
BA
MA
3
66
02
NO
RT
H W
AT
ER
S
TR
EE
T
ALA
BAMA
ST
ATE
POR
TAUTHOR
ITY
IN
TE
RN
AT
IO
NA
L T
RA
DE
C
EN
TE
R
M2.3
THIRD FLOOR HVAC
DEMO PLAN
AutoCAD SHX Text0'
AutoCAD SHX TextSCALE: 3/16"=1'-0"
AutoCAD SHX Text5'
AutoCAD SHX Text5'
AutoCAD SHX Text10'
http://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwgAutoCAD SHX TextISSUE DATE:
AutoCAD SHX TextPROJECT NO:
AutoCAD SHX TextREVISIONS:
AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.
AutoCAD SHX TextSHEET TITLE:
AutoCAD SHX TextSHEET NUMBER:
AutoCAD SHX TextNOT VALID UNLESS SIGNED
AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E
AutoCAD SHX Text7150 CHARLANDA CT.
AutoCAD SHX TextMOBILE, AL 36695
AutoCAD SHX Text(251) 402-1364
AutoCAD SHX TextROGER J. SMITH, PE 24744
AutoCAD SHX Textwww.smithmechanicalconsulting.com
AutoCAD SHX TextG
AutoCAD SHX TextM
AutoCAD SHX TextE
AutoCAD SHX TextS
AutoCAD SHX TextR
AutoCAD SHX TextJ
AutoCAD SHX Text.
AutoCAD SHX TextNo. 24744
AutoCAD SHX TextD
AutoCAD SHX TextE
AutoCAD SHX TextM
AutoCAD SHX TextR
AutoCAD SHX TextE
AutoCAD SHX TextPROFESSIONAL
AutoCAD SHX TextA
AutoCAD SHX TextO
AutoCAD SHX TextR
AutoCAD SHX TextG
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextI
AutoCAD SHX TextN
AutoCAD SHX TextE
AutoCAD SHX TextC
AutoCAD SHX TextL
AutoCAD SHX TextI
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextS
AutoCAD SHX TextA
AutoCAD SHX TextL
AutoCAD SHX TextB
AutoCAD SHX TextA
AutoCAD SHX TextA
AutoCAD SHX TextH
AutoCAD SHX TextT
AutoCAD SHX TextI
AutoCAD SHX Text1/7/2020
FOURTH FLOOR HVAC DEMO PLAN
1
N
72
x3
6
72x36
64x42
24x20 24x20
36
x2
0
KEYNOTES
EXISTING DUCT MOUNTED HOT WATER COIL TO REMAIN. CONTRACTOR SHALL REMOVE THE
EXISTING PNEUMATIC HOT WATER CONTROL VALVE AND PREPARE THE EXISTING PIPING FOR
RECONNECTION TO A NEW DDC HOT WATER CONTROL VALVE. CONTRACTOR SHALL MODIFY THE
EXISTING PIPING AS NECESSARY FOR RECONNECTION TO EXISTING COIL. CONTRACTOR SHALL
FIELD VERIFY PIPING SIZES PRIOR TO BEGINNING ANY WORK.
EXISTING PNEUMATIC ZONE REHEAT THERMOSTAT TO BE REMOVED ENTIRELY. REMOVED
ASSOCIATED PNEUMATIC CONTROL TUBING ENTIRELY. SEE NEW WORK PLAN FOR ADDITIONAL
REQUIREMENTS.
EXISTING HOT WATER UNIT HEATER TO REMAIN. CONTRACTOR SHALL REMOVE THE EXISTING
PNEUMATIC HOT WATER CONTROL VALVE AND PREPARE THE EXISTING PIPING FOR
RECONNECTION TO A NEW DDC HOT WATER CONTROL VALVE. CONTRACTOR SHALL MODIFY THE
EXISTING PIPING AS NECESSARY FOR RECONNECTION TO EXISTING COIL. CONTRACTOR SHALL
FIELD VERIFY PIPING SIZES PRIOR TO BEGINNING ANY WORK.
1
2
3
#1
#2
#3
#4
#5
T
#3
T
#4
T
#5
T
UH-2
UH-2
T
UH-1
UH-1
1" HWS/HWR
1" HWS/HWR
1-1
/4
" H
WS
/H
WR
3/4" HWS/HWR
1-1/4" HWS/HWR
1-1
/2
" H
WS
/H
WR
2" H
WS
/H
WR
1-1/4" HWS/HWR
1" HWS/HWR
1" HWS/HWR
T
#1
T
#2
WORK ON THIS DRAWING IS INCLUDED IN
ADDITIVE ALTERNATE #2.
1
1
1
1
1
3
3
2
2
2
2
2
2
2
ALL SUPPLY AND RETURN DUCT ON THIS SHEET IS
EXISTING TO REMAIN. NO WORK REQUIRED.
NOTE:
WORK ON THIS FLOOR INCLUDES THE REMOVAL
AND REPLACEMENT OF THE HOT WATER
CONTROL VALVES AT THE DUCT REHEAT COILS
AND THE HOT WATER UNIT HEATERS LOCATED IN
THE KITCHEN AREA. AREAS OF WORK SHALL BE
KEPT TO A MINIMUM TO PREVENT EXCESSIVE
DISRUPTION TO ONGOING BUSINESS
OPERATIONS AT THE FACILITY. WORK AREAS
SHALL BE CLEANED DAILY BEFORE THE NEXT
BUSINESS DAY.
Sm
ith M
echanical
Co
nsu
ltin
g &
D
esig
n
19-053
1-7-20
FO
R T
HE
HV
AC
R
EN
OV
AT
IO
NS
MO
BIL
E, A
LA
BA
MA
3
66
02
NO
RT
H W
AT
ER
S
TR
EE
T
ALA
BAMA
ST
ATE
POR
TAUTHOR
ITY
IN
TE
RN
AT
IO
NA
L T
RA
DE
C
EN
TE
R
M2.4
FOURTH FLOOR HVAC
DEMO PLAN
AutoCAD SHX Text0'
AutoCAD SHX TextSCALE: 3/16"=1'-0"
AutoCAD SHX Text5'
AutoCAD SHX Text5'
AutoCAD SHX Text10'
http://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwgAutoCAD SHX TextSTAIRS
AutoCAD SHX TextISSUE DATE:
AutoCAD SHX TextPROJECT NO:
AutoCAD SHX TextREVISIONS:
AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.
AutoCAD SHX TextSHEET TITLE:
AutoCAD SHX TextSHEET NUMBER:
AutoCAD SHX TextNOT VALID UNLESS SIGNED
AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E
AutoCAD SHX Text7150 CHARLANDA CT.
AutoCAD SHX TextMOBILE, AL 36695
AutoCAD SHX Text(251) 402-1364
AutoCAD SHX TextROGER J. SMITH, PE 24744
AutoCAD SHX Textwww.smithmechanicalconsulting.com
AutoCAD SHX TextG
AutoCAD SHX TextM
AutoCAD SHX TextE
AutoCAD SHX TextS
AutoCAD SHX TextR
AutoCAD SHX TextJ
AutoCAD SHX Text.
AutoCAD SHX TextNo. 24744
AutoCAD SHX TextD
AutoCAD SHX TextE
AutoCAD SHX TextM
AutoCAD SHX TextR
AutoCAD SHX TextE
AutoCAD SHX TextPROFESSIONAL
AutoCAD SHX TextA
AutoCAD SHX TextO
AutoCAD SHX TextR
AutoCAD SHX TextG
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextI
AutoCAD SHX TextN
AutoCAD SHX TextE
AutoCAD SHX TextC
AutoCAD SHX TextL
AutoCAD SHX TextI
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextS
AutoCAD SHX TextA
AutoCAD SHX TextL
AutoCAD SHX TextB
AutoCAD SHX TextA
AutoCAD SHX TextA
AutoCAD SHX TextH
AutoCAD SHX TextT
AutoCAD SHX TextI
AutoCAD SHX Text1/7/2020
KEYNOTES
EXISTING CONDENSING UNIT, COMPRESSORS, AND PIPING TO BE REMOVED ENTIRELY. THE
EXISTING SHED STRUCTURE AND HOIST RAILS WITH ASSOCIATED SUPPORT POSTS TO BE
REMOVED ENTIRELY. IT IS EXPECTED ALL EQUIPMENT AND STRUCTURAL MEMBERS ABOVE THE
EQUIPMENT PEDESTALS AND HORIZONTAL SUPPORT BEAMS BE REMOVED ENTIRELY. ALL OF THE
EXISTING HORIZONTAL SUPPORT BEAMS ARE TO BE REMOVED ENTIRELY. PEDESTALS ARE TO BE
PREPARED TO ACCEPT NEW HOT DIPPED GALVANIZED STEEL SUPPORT BEAMS TO SUPPORT NEW
CHILLED WATER PUMPS AND CHILLERS. CONTRACTOR SHALL FIELD VERIFY EXISTING
STRUCTURAL BEAMS AS W12x30 OR W14x30 AND PROVIDE NEW BEAMS AS THE SAME SIZE.
PROVIDE ADDITIONAL SUPPORT BEAMS AT THE NEW CHILLED WATER PUMPS AS NECESSARY.
SEE NEW WORK PLAN FOR MORE INFORMATION. PRIOR TO REMOVAL OF THE EXISTING CHILLED
WATER SYSTEM, THE TEMPORARY CHILLER IS TO BE PLACED IN OPERATION TO SUPPORT THE
BUILDING.
EXISTING CHILLED WATER PUMP, EXPANSION TANK, AND OLD UNUSED CHILLER COMPONENTS
AND RACK TO BE REMOVED ENTIRELY. ALL CHILLED WATER SUPPLY AND RETURN PIPING
LOCATED AT THE PENTHOUSE MECHANICAL ROOM LEVEL TO BE REMOVED ENTIRELY. THE
CHILLED WATER BRANCH PIPING TURNING DOWN INSIDE THE DUCT CHASE TO THE FIRST FLOOR
TO REMAIN. THE EXISTING VIBRATION ISOLATION CURB/SUPPORT TO BE REMOVED ENTIRELY. IT
IS EXPECTED THIS AREA OF THE MECHANICAL ROOM BE CLEARED FOR THE INSTALLATION OF THE
NEW SYSTEM COMPONENTS. SEE NEW WORK PLAN FOR ADDITIONAL INFORMATION. PARTIAL
REMOVAL OF THIS EQUIPMENT MAY BE REQUIRED TO ACCOMMODATE CHANGEOVER SCHEDULE.
EXISTING PNEUMATIC CHILLED WATER CONTROL VALVE AND ASSOCIATED PNEUMATIC CONTROLS
ASSOCIATED WITH THE DUAL DECK AIR HANDLING UNIT TO BE REMOVED ENTIRELY. PREPARE
CHILLED WATER PIPING CONNECTIONS TO THE UNIT FOR NEW CHILLED WATER PIPING AND
CONTROLS. SEE NEW WORK PLAN FOR ADDITIONAL REQUIREMENTS.
CHILLED WATER PIPING TURNING DOWN INSIDE DUCT CHASE TO REMAIN. SEE NEW WORK PLAN
FOR ADDITIONAL INFORMATION.
EXISTING NATURAL GAS FIRED BOILER AND ASSOCIATED FLUE TO BE REMOVED ENTIRELY.
PREPARE EXISTING FLUE CONNECTION THROUGH ROOF FOR REUSE. SEE NEW WORK PLAN FOR
ADDITIONAL INFORMATION.
REMOVE NATURAL GAS PIPING BACK TO A POINT TO ALLOW FOR THE REMOVAL OF THE EXISTING
BOILER AND INSTALLATION OF THE NEW BOILER. CONTRACTOR SHALL RECONNECT THE EXISTING
NATURAL GAS PIPING TO THE NEW BOILER FULL SIZE OF THE EXISTING PIPING. PROVIDE WITH
NEW REGULATOR VENTED TO THE BUILDING EXTERIOR.
EXISTING HOT WATER EXPANSION TANK, PUMP, AND HOT WATER SUPPLY/RETURN PIPING AT
PENTHOUSE LEVEL TO BE REMOVED ENTIRELY.
HOT WATER SUPPLY AND RETURN PIPING TURNING DOWN IN DUCT CHASE TO 4TH FLOOR REHEAT
COILS TO REMAIN. SEE NEW WORK PLAN FOR ADDITIONAL INFORMATION.
EXISTING HOT DECK AND COLD DECK SUPPLY DUCT TO REMAIN ENTIRELY.
EXISTING PNEUMATIC CONTROL PANEL AND ASSOCIATED AIR COMPRESSOR TO BE REMOVED
ENTIRELY. SEE NEW WORK PLAN FOR NEW DDC CONTROLS REQUIREMENT.
EXISTING 7' WIDE x 9' TALL OUTSIDE AIR INTAKE LOUVER TO REMAIN. CONTRACTOR SHALL
REMOVE THE ASSOCIATED MOTORIZED DAMPER BEHIND THE LOUVER ENTIRELY. THE LOUVER
SHALL BE THOROUGHLY CLEANED AND PREPARED FOR REUSE. SEE NEW WORK PLAN FOR
ADDITIONAL REQUIREMENTS.
BLANK OFF EXISTING APPROXIMATE 30x24 OUTSIDE AIR INTAKE OPENING ON THE SIDE OF THE
RETURN AIR DUCT. SEE NEW WORK PLAN FOR NEW OUTSIDE AIR INTAKE DUCTING
REQUIREMENTS. SEAL WITH MASTIC AND INSULATE TO MATCH SURROUNDINGS.
EXISTING OUTSIDE INTAKE LOUVER TO REMAIN. CLEAN LOUVER AND REPLACE BIRD SCREEN
NEW. SEE NEW WORK PLAN FOR ADDITIONAL REQUIREMENTS.
EXISTING PNEUMATIC CONTROLS ON AIR HANDLING UNIT TO BE REMOVED ENTIRELY.
ASPA PERSONNEL WILL EVACUATE THE R-22 REFRIGERANT FROM THE EXISTING CHILLER SYSTEM
PRIOR TO THE MECHANICAL CONTRACTOR DEMOLISHING THE SYSTEMS. COORDINATE THIS
WORK WITH THE ASPA PM.
HOT AND COLD DECK DUCT INSULATION LOCATED WITHIN THE PENTHOUSE MECHANICAL ROOM IS
TO BE REMOVED BY THE ACM ABATEMENT CONTRACTOR. SEE NEW WORK PLAN FOR
REQUIREMENTS ASSOCIATED WITH REINSULATING THIS DUCT. THE SOUND ABSORBERS ARE TO
BE REINSULATED. THE REISULATING WORK IS PART OF THE BASE BID.
BOILER INSULATION TO BE REMOVED BY THE ABATEMENT CONTRACTOR UNDER THE BASE BID.
EXISTING BOILER FLUE AND ROOF CAP TO BE REMOVED ENTIRELY. PREPARE ROOF
PENETRATION FOR REUSE. SEE NEW WORK PLAN FOR ADDITIONAL REQUIREMENTS.
1
PENTHOUSE MECHANICAL FLOOR HVAC DEMO PLAN
1
N
34Ø
32Ø32Ø
RA
DOWN
RETURN
AIR FAN
SUPPLY
FAN
AHU-1
AHU-2
CHILLER COMPRESSORS
CONDENSING UNIT
AIR COOLED CONDENSING UNIT
BOILER
EXP.
TANK
PUMP
PUMP
4" CR
4" CR
1-1/2" CR / CS
4" CS
EXP.
TANK
4" CR / CS
3" HR / HS
3-1/2" HR / HS
2" HR / HS
3-1/2" HS
CP
MAIN PNEUMATIC
CONTROL PANEL
3" GAS
SOUND
ABSORBER
SOUND
ABSORBER
CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT THE
ROOF FROM DAMAGE DURING THE RENOVATION. ALL DAMAGE TO THE
ROOF SHALL BE REPAIRED BY THE CONTRACTOR AT HIS EXPENSE USING
THE OWNERS ROOFING CONTRACTOR THAT HOLDS THE ROOF WARRANTY.
EXISTING EQUIPMENT TO
REMAIN. NO WORK REQUIRED.
1
EXISTING EQUIPMENT TO
REMAIN. NO WORK REQUIRED.
EXISTING EQUIPMENT TO
REMAIN. NO WORK REQUIRED.
2
3
3
2
4
5
6
7
8
5
6
7
8
4
9
9
10
10
10
11
11
11
PNEUMATIC
CONTROL AIR
COMPRESSOR
WORK ON THIS DRAWING IS INCLUDED IN THE
BASE BID.
12
12
EXISTING COMBUSTION INTAKE
LOUVER TO REMAIN. CLEAN
LOUVER AND REPLACE BIRD
SCREEN NEW.
EXISTING HVAC
EQUIPMENT TO
REMAIN. NO WORK
REQUIRED.
13
13
14
14
14
15
15
ROOF
ROOF
ROOF
ROOF
COMPUTER ROOM CONDENSING UNIT
16
16
16
16
16
17
17
MECHANICAL
PENTHOUSE
18
18
Sm
ith M
echanical
Co
nsu
ltin
g &
D
esig
n
19-053
1-7-20
FO
R T
HE
HV
AC
R
EN
OV
AT
IO
NS
MO
BIL
E, A
LA
BA
MA
3
66
02
NO
RT
H W
AT
ER
S
TR
EE
T
ALA
BAMA
ST
ATE
POR
TAUTHOR
ITY
IN
TE
RN
AT
IO
NA
L T
RA
DE
C
EN
TE
R
M2.5
PENTHOUSE
MECHANICAL FLOOR
DEMO HVAC PLAN
AutoCAD SHX Text0'
AutoCAD SHX TextSCALE: 3/16"=1'-0"
AutoCAD SHX Text5'
AutoCAD SHX Text5'
AutoCAD SHX Text10'
http://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwgAutoCAD SHX TextSTAIRS
AutoCAD SHX TextDUCT CHASE
AutoCAD SHX TextELEVATORS
AutoCAD SHX TextISSUE DATE:
AutoCAD SHX TextPROJECT NO:
AutoCAD SHX TextREVISIONS:
AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.
AutoCAD SHX TextSHEET TITLE:
AutoCAD SHX TextSHEET NUMBER:
AutoCAD SHX TextNOT VALID UNLESS SIGNED
AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E
AutoCAD SHX Text7150 CHARLANDA CT.
AutoCAD SHX TextMOBILE, AL 36695
AutoCAD SHX Text(251) 402-1364
AutoCAD SHX TextROGER J. SMITH, PE 24744
AutoCAD SHX Textwww.smithmechanicalconsulting.com
AutoCAD SHX TextG
AutoCAD SHX TextM
AutoCAD SHX TextE
AutoCAD SHX TextS
AutoCAD SHX TextR
AutoCAD SHX TextJ
AutoCAD SHX Text.
AutoCAD SHX TextNo. 24744
AutoCAD SHX TextD
AutoCAD SHX TextE
AutoCAD SHX TextM
AutoCAD SHX TextR
AutoCAD SHX TextE
AutoCAD SHX TextPROFESSIONAL
AutoCAD SHX TextA
AutoCAD SHX TextO
AutoCAD SHX TextR
AutoCAD SHX TextG
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextI
AutoCAD SHX TextN
AutoCAD SHX TextE
AutoCAD SHX TextC
AutoCAD SHX TextL
AutoCAD SHX TextI
AutoCAD SHX TextE
AutoCAD SHX TextN
AutoCAD SHX TextS
AutoCAD SHX TextA
AutoCAD SHX TextL
AutoCAD SHX TextB
AutoCAD SHX TextA
AutoCAD SHX TextA
AutoCAD SHX TextH
AutoCAD SHX TextT
AutoCAD SHX TextI
AutoCAD SHX Text1/7/2020
Sheets and ViewsMechanical-M1.0Mechanical-M1.1Mechanical-M1.2Mechanical-M2.1Mechanical-M2.2Mechanical-M2.3Mechanical-M2.4Mechanical-M2.5