Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
{{LEPC HAZARDOUS MATERIAL PLAN REQUIREMENTS/REVIEW
2019 EMAI/IERC Presentation
IERC REQUIRMENTS
• LEPC plan writing checklist
• Used by the IERC Policy-Technical Committee to evaluate plans.
• Based on NRT-1 and NRT-1a, as well as federal and state statutes.
• Located online at:
• https://www.in.gov/dhs/files/9
planning_elements_for_LEPC_plan_writing.pdf
IERC REQUIRMENTS
• SARA Title III plans should observe the provisions of
OSHA’s 1910.120.
• Remember uploading the LEPC plan allows for 10 MB per
element in Tier II Manager, with a total of 90 MB in all.
• Plans can be divided into nine elements, with 10 MB per section
available (or as many sections that is preferred) to fit it into the
90 MB.
LEPC PLAN ELEMENTS
IDENTIFICATION OF FACILITIES/ROUTES
IDENTIFICATION OF FACILITIES/ROUTES
EMERGENCY RESPONSE PROCEDURES
KNOW YOUR CECS AND FECS
KNOW YOUR CECS AND FECS
NOTIFICATION OF A RELEASE
NOTIFICATION OF A RELEASE
DETECTION SYSTEMS
AVAILABILITY OF RESOURCES
EVACUATIONS
EVACUATIONS
TRAINING
EXERCISING THE PLAN
EXERCISING THE PLAN
• Discussion-based• Seminar – permitted starting 2019
• Workshop – permitted starting 2019
• Tabletop
• Operations-based• Functional
• Full-scale
• Instructions for exercises:• List proposal dates in the plan
• Describe/provide evaluation methods
• Base exercises around EHS/HS chemicals
• Work with facilities to exercise the plan
QUESTIONS?
{{THANK YOU!