27
Lessons Learned from Commissioning CHP Plants Herbert Tull, PE | Jacobs Engineering Group Inc.

Lessons Learned from Commissioning CHP Plants

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Lessons Learned from Commissioning CHP Plants

Lessons Learned from Commissioning CHP Plants

Herbert Tull, PE | Jacobs Engineering Group Inc.

Page 2: Lessons Learned from Commissioning CHP Plants

1. Quality

2. Strategy

3. Sequence

Page 3: Lessons Learned from Commissioning CHP Plants

Lesson 1 Quality

Page 4: Lessons Learned from Commissioning CHP Plants

JACOBS 4

Lesson 1 Quality

Quality is the fitness for use.“Joseph M. Juran

Page 5: Lessons Learned from Commissioning CHP Plants

JACOBS 5

Lesson 1 Quality

Inspections can identify

good or bad

…but inspection alone

cannot fix anything.

Page 6: Lessons Learned from Commissioning CHP Plants

JACOBS 6

Lesson 1 Quality

When should you verify

quality?

Page 7: Lessons Learned from Commissioning CHP Plants

JACOBS 7

Lesson 1 Quality

Page 8: Lessons Learned from Commissioning CHP Plants

JACOBS 8

Lesson 1 Quality

Page 9: Lessons Learned from Commissioning CHP Plants

JACOBS 9

Lesson 1 Quality

Was it factory tested?

Yes!

But… Err….. Oops.

Page 10: Lessons Learned from Commissioning CHP Plants

JACOBS 10

Lesson 1 Quality

Quality has tasks for everybody.

Vendors

Submittals &

Start-up

Contractors

Inspections &

Installation

AHJ Inspectors

Boiler &

Electrical

Commissioning

Review, PFC,

FPT & Plant

Page 11: Lessons Learned from Commissioning CHP Plants

JACOBS 11

Lesson 1 Quality

Trust but verify.

This vendor provided

his startup sheet data.

The boiler efficiency

calculated out to

106%

Page 12: Lessons Learned from Commissioning CHP Plants

Lesson 2 Strategy

Page 13: Lessons Learned from Commissioning CHP Plants

JACOBS 13

Lesson 2 Strategy

Construction Operation

MAGIC?

Page 14: Lessons Learned from Commissioning CHP Plants

JACOBS 14

Lesson 2 Strategy

Construction Operation

STRATEGY !

SEQUENCE +

COMMUNICATION =TEAMWORK

Page 15: Lessons Learned from Commissioning CHP Plants

Lesson 3 Sequence

Page 16: Lessons Learned from Commissioning CHP Plants

JACOBS 16

Lesson 3 Sequence

Integrated Plant Operations

Steam Demand

HRSG Steam

Feedwater

Electric Demand

Emissions Control

HRSG Boilers

Gas Turbine & Generator

Water Fuel Delivery

Electric Power

Plant Ctrl System

Compressed Air

Plant systems have

dependencies. Build

the wall from

bottom to top.

Page 17: Lessons Learned from Commissioning CHP Plants

JACOBS 17

Lesson 3 Sequence

Integrated Plant Operations

Steam Demand

HRSG Steam

Feedwater

Electric Demand

Emissions Control

HRSG Boilers

Gas Turbine & Generator

Water Fuel Delivery

Electric Power

Plant Ctrl System

Compressed AirBasic Services

Page 18: Lessons Learned from Commissioning CHP Plants

JACOBS 18

Lesson 3 Sequence

Integrated Plant Operations

Steam Demand

HRSG Steam

Feedwater

Electric Demand

Emissions Control

HRSG Boilers

Gas Turbine & Generator

Water Fuel Delivery

Electric Power

Plant Ctrl System

Compressed Air

Plant Utility Systems

Page 19: Lessons Learned from Commissioning CHP Plants

JACOBS 19

Lesson 3 Sequence

Integrated Plant Operations

Steam Demand

HRSG Steam

Feedwater

Electric Demand

Emissions Control

HRSG Boilers

Gas Turbine & Generator

Water Fuel Delivery

Electric Power

Plant Ctrl System

Compressed Air

Production Equipment

Page 20: Lessons Learned from Commissioning CHP Plants

JACOBS 20

Lesson 3 Sequence

Integrated Plant Operations

Steam Demand

HRSG Steam

Feedwater

Electric Demand

Emissions Control

HRSG Boilers

Gas Turbine & Generator

Water Fuel Delivery

Electric Power

Plant Ctrl System

Compressed Air

Outside Connection

Page 21: Lessons Learned from Commissioning CHP Plants

JACOBS 21

Lesson 3 Sequence

Integrated Plant Operations

Steam Demand

HRSG Steam

Feedwater

Electric Demand

Emissions Control

HRSG Boilers

Gas Turbine & Generator

Water Fuel Delivery

Electric Power

Plant Ctrl System

Compressed Air

Total Capacity / Efficiency

Page 22: Lessons Learned from Commissioning CHP Plants

Lesson 4 Communication

Page 23: Lessons Learned from Commissioning CHP Plants

JACOBS 23

Lesson 4 Communication

Daily

schedules

for morning

meetings

Yesterday Today Tomorrow

Page 24: Lessons Learned from Commissioning CHP Plants

JACOBS 24

Lesson 4 Communication

Each day

shows the

expected tasks.

Schedule

vendors on site

only when

needed.

Page 25: Lessons Learned from Commissioning CHP Plants

JACOBS 25

Summary

Sweet success!

It’s a cold winter morning

your CHP plant is online,

meeting campus power

and steam demands.

Page 26: Lessons Learned from Commissioning CHP Plants

JACOBS 26

Questions?

Easy as 3.14159 226535 89793 23846 . . .

Page 27: Lessons Learned from Commissioning CHP Plants

Herbert Tull, PE

Booth #[email protected]