Upload
the-democratic-society
View
215
Download
0
Embed Size (px)
Citation preview
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
1/41
THE DEMOCRATIC SOCIETY
The North Street Quarter Development
Summary of
First Stage Consultation Findings
February 2013
The views expressed in this report are the views of the authors and
do not necessarily reflect those oftheSanton Group
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
2/41
2
Executive Summary
This report draws on opinions collected from 278 questionnaires, a further 356comments posted on word leaves and other views gathered at two consultation
workshops held in Lewes on 19th and 29th January 2013.1 It will inform the development
of the North Street Quarter in Lewes by the Santon Group.
The report cannot claim to provide a representative view of the opinions of all Lewes
residents, visitors or businesses. Public engagement workshops attract a self-selected
sample, many of who are likely to be more engaged in local issues and some who may
represent particular interests. Given this, other engagement activities, such as meetings
with specific groups and a young peoples consultation have also been, or are being,undertaken by the Santon Group.
This report has been produced independently of the Santon Group and does not
necessarily reflect the companys views. However, its opinions on the consultation and
how it will inform the next steps have been incorporated into this report. It provides a
quantitative assessment of the surveys closed questions. However, these often fail to
capture the richness of peoples views. Nearly 400 comments on word leaves and 675
comments were identified in the verbatim comments on the questionnaires (see Annexes
III and IV). Interpreting these is a much more difficult task, as it requires some judgmentas to what the comments are trying to convey and a further judgment as how best to
categorise them. Furthermore, the methodology that was used in the consultation
enabled people to provide multiple comments. This creates some difficulties with taking
a purely quantitative approach to interpreting the findings.
However, the report attempts to provide a balanced assessment of the views that were
articulated and, as such, should provide useful insights for the Santon Groups
professional teams that are responsible for the design and development of the site. With
only a small number of strong objectors, the development seems to be broadlywelcomed, as long as local residents are fully consulted along the way. There remains
some scepticism about the developers ability to deliver a scheme that reflects local
priorities and the Printworks development was cited by a number of people where this
did not happen sufficiently.
This is not the first time that residents have been consulted on the development of this
site. In 2010, the Phoenix Rising Survey, which was sponsored by the Lewes Community
Land Trust, found particularly strong support for a riverside walkway. It also found strong
1Note: 20 questionnaires were filled out on-line via the North Street Quarter website and a small number
of additional comments were provided in other formats.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
3/41
3
support for the site to have land with trees/wild flowers/willows; renewable energy
generation and affordable working units for small/cottage businesses. Then, residential
units were not considered to be a particularly high priority. The Joint Core Planning
Strategy, of which the North Street Quarter is part, has been developed following
extensive formal consultation between its inception in 2009 and its final approval in2012.
Development Priorities
Affordable housing seems to have emerged as an important development priority for
respondents, followed by good access to the river and wider environmental walks. The
number of comments relating to sustainability on the Word Leaves, also suggests that
green issues are important for consultation participants. There was concern that the
towns young people are increasingly unable to afford to live in Lewes and that thisneeded to be addressed. Many people accepted the need for a mix of tenures for
different age groups, but favoured social and shared equity housing, pepper-potted
throughout the development. The strong focus on housing contrasts with the findings
from the Phoenix Rising Survey findings in 2010.
The riverside walkway and other pedestrian and cycle routes were also favoured,
reflecting the findings in the 2010 survey. The river was seen as an unused asset and
many people believed that it should be opened up to the town, with a walkway along the
north side linking the development to the town centre.
There was little desire for a development that was simply a housing estate, however.
Many people thought the development also needed to provide employment
opportunities, though there was less agreement as to what these should be. There was
some concern that the creative and light industrial businesses currently on the site would
not be able to afford higher rents. Several respondents thought that they should be
incorporated into the development, whilst some others thought that they could be
housed affordably elsewhere.
Retail and visitor facilities were not given a particularly high priority, although there was
some support for a hotel and cinema on the site. Many people felt that any retail
development should complement existing retail activity and there was a preference for
independent shops over chains, particularly in the food sector.
There were mixed views on the need for cafs, bars and restaurants. These were seen as
having the potential to bring the riverside alive and to promote social interaction.
However, some respondents felt that the town already had enough cafes.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
4/41
4
There was support for studios and workshops for artists and designers and small
business units to cater for small, local businesses and start-ups. A number of people
suggested that vacant office space in the town indicated a lack of demand for more
offices.
Car parking seemed to divide opinion. Many people suggested that Lewes needed more
affordable parking spaces and there was a general recognition that cars owned by
people living in the development should be accommodated. However, there was
probably an overall preference in favour of pedestrians and cyclists, with support for a
network of cycle lanes and pathways connecting the development to different parts of
the town. A small number of people recommended pedestrian-only areas and/or shared
spaces for cars and pedestrians.
Traffic access was identified as a key concern for a small number of respondents, some ofwhom identified specific roads they feared would become rat-runs, if full consideration
was not given to traffic movement. The position of the bus station was also considered
important for local businesses and to ensure effective and efficient traffic flows in and
around the town.
The development provided an opportunity to create a new meeting place for the town,
provided by the riverside and community facilities that could include a cinema, open
performance space, art gallery and/or activities for young people, such as a skatepark.
The environmental credentials of the development were also highlighted, reflecting
Lewess position in the South Downs National Park and its status as a Transition Town.
Some people felt that the development could become an exemplar of modern,
sustainable construction techniques, incorporating renewable energy, roof gardens,
trees, green spaces and places for people to grow local food on allotments or
community gardens.
Defending against possibilities of further flood risk was a high priority, although some
respondents suggested that flood resilience should be considered as a moreappropriate approach.
Design Priorities
Respondents tended to want the development to reflect the character of the town, which
they saw as historic and cultural, socially and environmentally aware and small and
quirky. This did not seem to be about looking backwards. Instead it was about taking a
forward-looking approach that was sensitive to the towns existing architecture and
character.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
5/41
5
There seemed to be some fear that modern could mean bland, large and over-powering.
What seems to be wanted in Lewes is bold design; a mix of building styles with sufficient
space between them; and small-scale, low-rise developments that reflect the towns
individuality, and integrates well with the rest of Lewes.
Respondents see Lewes as different, quirky, creative and independent and they are likely
to want the design for the development to reflect these characteristics.
Key Issues
1. The interest in affordable housing is based on an understanding that this will
benefit local people and not people from outside. There may be an expectation
that assurances can be given to this effect and some indication of the quantum of
affordable housing that will be provided.
2. The consultation process must continue to engage Lewes residents to allay
specific concerns, to address a degree of scepticism that seems to exist about
developments in general, and to engage a wider range of people across the town.
3. There seems to be a fairly strong pro-independent/anti-corporate feeling amongst
many respondents. This may need further exploration to establish a balance that
is likely to be acceptable and to determine what type of chains and retail mix
would be preferable, given towns current retail offer.
4. Transport access issues during the development stage and after its completion are
likely to remain high on the agenda of local people, particularly those who live in
close proximity to the site.
5. There is concern about what will happen to the arts/creative and light industrial
businesses that are currently operating on the site, and solutions to their future
operation will need to be developed.
6. Green spaces and environmental sustainability are likely to remain important
components of the development for a number of people in the town.
7. The scale and height of buildings are important to many people and there seems
to be a preference for a mix of styles, which needs to be considered carefully in
the design phase.
Next Steps
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
6/41
6
These findings from the workshops will be used to help inform thinking on the
development and design options for the North Street Quarter. The Santon Group
recognises the need to continue to engage with Lewes residents and businesses through
a variety of channels. This will include meetings with specific interest groups, further
work to engage younger people, and maintaining on-going dialogue throughestablished structures.
Design options will be produced over the next few months and there will be a further
round of public consultation to obtain views on these during Summer 2013, followed by
a final consultation on more detailed development proposals, leading up to the
submission of a full planning application in Autumn 2013.
The NSQ website (www.northstreetqtr.co.uk) will be used more extensively over the
period to provide updates and information on issues relating to the development of thesite.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
7/41
7
Contents
Executive Summary 2
1. Introduction 8
2. The Consultation Approach 9
2.1 The Day Time and Evening Workshops 9
2.2 Interpreting this Report 11
2.3 The Consultation 13
2.4 The North Street Quarter Website 142.5 The Priory School Community Engagement Day 14
2.6 The Lewes Town Partnership Workshop 15
2.7 The Joint Core Strategy Proposed Submission (Part 1) 15
2.8 The Phoenix Rising Survey (2010) Sponsored by the Lewes
Community Land Trust
16
3. Development Priorities 17
3.1 Housing 183.2 The River 19
3.3 Retail, Commercial and Hospitality 20
3.4 Transport, Parking and Access 22
3.5 Community and Leisure 23
3.6 Environmental Sustainability 24
4. Design Priorities 25
5. Conclusions 27
Annex I Weighted Scores 31
Annex II Completed Questionnaire Charts and Tables 32
Annex III Quantitative Summary of Word Leaf Comments 35
Annex IV Quantitative Summary of Verbatim Comments 39
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
8/41
8
1. Introduction
This report provides an analysis of the first stage of community consultation that will be
used to inform the development proposals for the North Street Quarter site in Lewes,
East Sussex.
The Santon Group, which owns the site, is keen to ensure that, within regulatory
constraints, the development proposals reflect the needs and aspirations of Lewes
residents, businesses and visitors. A programme of pre-planning application
consultation events and activities, covering three distinct stages, has been planned to
reflect this:
Stage 1: Consultation on local priorities to inform initial design proposals
Stage 2: Consultation to test initial development design proposals
Stage 3: Consultation to refine detailed development design proposals.
The pre-planning consultation phase will run during the first three quarters of 2013, with
an expectation that a full planning application will be submitted before the end of the
year.
The Democratic Society is acting as an independent facilitator, leading on the design and
delivery of the consultation, with a key role in ensuring that local people are able to
contribute meaningfully to the debate, design and development of the proposals.
The Santon Group and representatives of the Democratic Society also meet regularly
with a North Street Quarter Sounding Group that includes representatives from:
Friends of Lewes;
Lewes Community Land Trust;
Lewes Town Partnership; and
Lewes Chamber of Commerce.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
9/41
9
The objectives of this group are to represent the views of other stakeholders and to
provide feedback to them on progress of the development proposals; and to review
consultation approaches so that they best engage the full range of local residents and
businesses.
A Cross-Party Working Group of elected members of Lewes District Council also meets
regularly to review progress and to oversee the progress of the development proposals.
The remainder of this report is structured as follows:
Section 2 sets out the approach that has been taken to the consultation during this first
stage and includes a short review of the Phoenix Rising consultation survey findings that
were published in 2010.
Section 3 provides an assessment of development priorities identified by workshop
participants.
Section 4 considers the design priorities identified by workshop participants.
Section 5 provides conclusions and recommendations for the Santon Group to consider.
2. The Consultation Approach
The Santon Group sees a meaningful consultation and engagement process as
important to the success of the development. This is both in commercial terms and in
ensuring that its design reflects local needs and aspirations, where possible.
The main activities during the first stage of the consultation centred mainly around the
following activities:
A Daytime Workshop;
An Evening Workshop;
Priory School Engagement ; and
The North Street Quarter website (www.northstreetqtr.co.uk)
2.1 Daytime and Evening Workshops
The Daytime Workshop was held between 0900-1500 on Saturday 19th January 2013 at
Lewes Town Hall and the Evening Workshop was held between 1500-2000 on Tuesday29th January 2013 at Southover Grange.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
10/41
10
At these workshops, residents and businesses were able to:
Review exhibition panels, which focused on different elements of the
development, including housing, environment, heritage and the cultural, socialand community landscape;
Discuss their hopes and concerns with architects, transport planners,
environmental professionals and other experts on the Santon Group project team;
Indicate their priorities on Word Leaves and sticking these to Word Trees; and
Complete short questionnaires, including verbatim comments, that asked them to
indicate their design and development priorities.
A model of the site, set within its Lewes context, was also displayed at the workshops.
This allowed attendees to gain a sense of the scale of the development site and itssignificance to the town as a whole.
The workshops were publicised using a variety of methods, including:
Flyers and posters distributed around the town and sent to interested parties,
including schools;
Flyers and adverts in the local press
A radio interview by a representative from the Santon Group, Clive Wilding
An invitation to all local elected representatives Emails to key stakeholders, such as local schools and the local police commander
with a request to publicise the events through their networks.
Through the Sounding Group and its networks; and
Advertising boards outside the venues during both events.
Information about the events was also posted onto a range of websites, including those
of the North Street Quarter, The Democratic Society, the Lewes Community Land Trust
and the Lewes Town Partnership
A total of 632 people attended the two workshops and 278 questionnaires were
completed (including 20 that were completed on-line). All the questionnaires included
verbatim, or open comments, many of which were quite extensive.2 In addition 358
Word Leaf comments were left on the Word Trees.
The processing of the questionnaires was carried out by the Democratic Society and the
full comments can be viewed on Democratic Society website (www.demsoc.org).
2A further 8 questionnaires were received after the event and there were a small number of additional
comments were received by email or in other formats that have informed the qualitative interpretation of
the feedback in this report.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
11/41
11
Figure I: Number of Workshop Attendees and Completed Questionnaires
Attendees Completed
QuestionnairesWorkshop 1 (19 January 2013) 416 179
Workshop 2 (29 January 2013) 216 79
On-Line n/a 20
Total 632 278
No data was collected on the demographic profile of people who attended the two
workshops. However, some demographic data was collected from people who
completed survey questionnaires which showed:
54% were female;
72% were aged 16-64 years and 28% 65+ years;
89% lived in Lewes; and
68% of those in work were employed in Lewes.
A higher proportion of questionnaires were completed by females at the Evening
Workshop (57%) than at the Daytime Workshop (53%), but overall, there was little
difference between the profile of people who completed questionnaires at the two
workshops. However, only one person under the age of 16 years completed aquestionnaire.
The Santon Group was pleased with the two events. The company felt that the number
of people who gave up their time was high, particularly given the unfavourable weather
conditions. There was some concern that the event did not manage to engage younger
people, but the Santon Group expects to do this using other methods.
The wide range of constructive comments and the evident interest in the development
both from individuals and from well organised interest groups, was appreciated by theSanton Group. The views that have been expressed will be used to inform the next stage
of the design process.
2.2 Interpreting this Report
This report has been produced independently of the Santon Group and it does not
necessarily reflect its views. It draws on the completed questionnaires, the word leavesand other contributions that were provided at the workshops and on-line.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
12/41
12
Analysing quantitative data is relatively straight forward. Weighted scores3 have been
used to reflect first, second and third priorities in survey questions where respondents
were are asked to indicate preferences from a range of options.
However, this fails to capture the range and richness of peoples views. This was done
through comments on word leaves and verbatim comments on the questionnaire.
There were 399 separate comments on the Word Leaves and 675 in the verbatim
comments on the 278 questionnaires were identified.
Interpreting qualitative data can be a rather more complex. Firstly, some judgement is
required about what the comments are trying to convey. Secondly, these comments then
need to be classified in some way. In this case, the categories in no order of priority that
have been used are:
Consultation;
Traffic, parking and access;
Commercial and business;
Retail and hospitality
The river;
Housing;
Sustainability;
Community and leisure; and Design priorities.
The findings from the consultation cannot represent the views of all Lewes businesses
and residents precisely. They are an interpretation of the opinions and preferences of
people who attended the two events and who contributed their views on-line.
Every effort was made to engage with as wide a section of the Lewes population as
possible. However workshops, such as those held as part of this consultation, tend to
appeal to people who are already engaged and informed, some of whom may havespecial interests. Equally, paper-based and on-line questionnaires are more likely to be
completed by people with higher-level written communication skills. This means that it is
important to capture peoples views in other ways, including through meetings with
specific groups and workshops that enable people to articulate their views verbally.
Furthermore, the methodology that was chosen for the consultation meant that there was
no limit to the number of comments that each person could make. Taking a purely
3See ANNEX I: Weighted Scores for a full explanation
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
13/41
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
14/41
14
The Santon Group is employing a number of other methods to gather local opinion,
including meetings with specific interest groups; using on-line consultation tools; and
engaging young people through school-based and other activities.
2.4 The North Street Quarter Website
A dedicated North Street Quarter website (www.northstreetqtr.co.uk) has been
launched. This provides an historical background to the site; news and events relating to
the site (including details of the Workshops) and information about other Santon Group
developments. It will also include details of emerging plans as they develop.
Visitors to the site were also able to complete the survey questionnaire that was available
at the Workshops.
2.5 The Priory School Community Engagement
On 23rd November, Santon Group, working with RH Partnership, the Democratic Society,
Lewes District Council and Priory School ran a Childrens Takeover Day workshop. This is
national programme run by the Childrens Commissioner to get young people involved
in decision-making. Year 10 Business Studies students went on a tour of the North Street
Quarter, and discussed ideas for the site.
This was then followed up with a stall at Priory Schools Community Engagement Day onWednesday 19 December 2012, aimed at capturing young peoples views on the future
of the site.
All students in the school visited the exhibition in year groups. They were given outline
plans for the site; were asked to complete a questionnaire to indicate their development
priorities, and given the option to write ideas or comments on post it notes.
A total of 55 questionnaires were completed. There was strong support for young
peoples involvement (93%), with getting involved in the public design workshops beingthe most favoured approach.
Providing more leisure activities (59 mentions) was the most common priority amongst
young people, with particular mentions of a skatepark; watersports and riverside
activities. Other priorities with more than 20 mentions were a cinema; restaurants/cafs;
and shopping with local independent shops and markets.
There was not a clear cut preference for style of the development, but more young
people (9) preferred a modern or a not modern/not traditional style than preferred anhistoric/traditional style for the development.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
15/41
15
2.6 The Lewes Town Partnership Workshop
The Lewes Town Partnership held a workshop on the NSQ development on Thursday
17th January 2013. This was not part of the Santon Groups consultation process.However, the issues and concerns that were raised at this event are useful to feed into
the consultation feedback on the development of the site.
Residents attending the workshop were divided into four groups, each being asked to
identify their main priorities, wants and concerns for the site. The main priorities
identified were affordable housing; a variety of well integrated housing units to provide
for the elderly, families and singles; a site that positively enhances the town; and
riverside recreation.
Making better use of the river; integrating the site to the rest of the town; and providing
good affordable housing were identified as common wants. Flood defences, the impact
and potential lack of demand for new retail and office space; and the loss of low cost
workspace currently on the site were amongst the concerns identified at the workshop.
2.7 The Joint Core Strategy Proposed Submission (Part 1)
In January 2013 Lewes District Council and the South Downs National Park Authority
published their Part 1 Joint Core Strategy (JCS) Proposed Submission. It is scheduled to
be adopted in Autumn 2013 and will guide development within the District up until
2030.
The JCS has been informed by on-going engagement with the public and key
organisations4 since the publication of the Issues and Emerging Topic Papers in May
2010. In parallel with the consultation on the Topic Papers, Lewes District Council held
seven drop-in sessions and two discussion forums in various venues across the district to
obtain views on the content of the Topic Papers and to understand the issues people felt
a plan for the district should address.
The Emerging Core Strategy was published for consultation in September 2011 for a
period of 12 weeks. This set out the different policy options that were being considered
in formulating the Core Strategy. Consultees were invited to submit comments on all
options under consideration and suggest alternatives.
4Part 1 Joint Core Strategy Proposed Submission. Lewes District Council and the South Downs National
Park Authority January 2013
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
16/41
16
The JCS suggests that in excess of 400 households in Lewes are in need of affordable
housing, but opportunities for outward expansion are extremely limited.
The North Street Quarter and the adjacent Eastgate area is identified as the main current
opportunity for redevelopment in the town5
. Details of the scope of Spatial Policy 3,which relates to this site can be found on pages 49-53.
2.8 The Phoenix Rising Survey (2010)- Sponsored by Lewes
Community Land Trust
This is not the first time that Lewes residents have been asked for their views of what they
would like to see developed at the North Street Quarter. In June 2010, a report6 was
produced that provided feedback on local peoples views to inform a previousdevelopment proposal at the site.
This report was based 141 comments on post-it notes, 479 completed questionnaires
and a further 101 unstructured comments. The Phoenix Rising consultation report used
an approval rating scoring system and found that there was most support for a Riverside
Walkway (80%).
Other elements that achieved more than 50% approval rating were Some Land For
Trees/Wildflower/Willows (68%), Renewable Energy Generation from TidalFlow/Solar/Other (61%); Affordable Working Units for Small/Cottage Businesses (60%),
Protecting Historic Buildings (58%), Retaining Existing Businesses (52%), and Open
Public Spaces/Parks (52%). There was below a 20% approval rating for a Sports Facility
(-4%), Large Creative Spaces Available for Bonfire Societies (7%); a Self Build Housing
Co-operative (16%), or a Thomas Paine Square (17%).
The report suggested that, at the time, the site was not perceived as best used primarily
for residential development (although there was support for affordable housing). The
retention of existing businesses was seen as a key element in the mix, althoughrespondents tended to think that these businesses should be financially viable. Other
elements highlighted in the report included: support for a small scale cinema; resources
and activities for young people; and a communal square.
5Details of Spatial Policy 3, which related so this site can be found on pages 49-53 of the Joint Core
Strategy, which is available on the Lewes District Council website (www.lewes.gov.uk)6
Audley A. Phoenix Rising Summary Report on Findings from the Phoenix Rising Survey and Exhibitions
for the Lewes Community Land Trust. June 2010
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
17/41
17
3. Development Priorities
With only a small number of strongly articulated exceptions, there was general support
for the development of the North Street Quarter area, but concerns that anydevelopment should reflect the needs and aspirations of the towns residents.
Survey respondents were asked to rank their three most important priorities for what
should be developed on the site from a list of ten options. For the analysis, these were
then given weighted scores (First Priority 3; Second Priority 2, and Third Priority 1). The
findings are shown in Figure II, below.
Figure II: Development Priorities: Weighted Scores
The two most important priorities cited by respondents were:
Affordable housing (Weighted Score: 362); and
Good access to the river (319).
Other development priorities that were considered important included:
More employment opportunities (199);
Workspace for artists and designers (190); and
More community facilities (140).
There was less support for priorities relating to retail, leisure and the visitor economy.
0 50 100 150 200 250 300 350 400
IMPROVED VISITOR FACILITIES
HOTELS TO BOOST TOURISM
WIDER CHOICE OF SHOPPING
WIDER CHOICE OF LEISUER OPPORTUNITIES IN
THE EVENING
MORE ACTIVITIES FOR YOUNGER PEOPLE
MORE COMMUNITY FACILITIES
WORKSPACE FOR ARTISTS AND DESIGNERS
MORE EMPLOYMENT OPPORTUNITIES
GOOD ACCESS TO THE RIVER AND WIDER
ENVIRONMENTAL WALKS
MORE AFFORDABLE HOUSING
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
18/41
18
3.1 Housing
Affordable housing is vitally important in making the development widely accessible,
whether this is social housing, key worker housing, both rented and market accessible
Affordable housing seemed to emerge as a particularly important issue for many
respondents. This contrasts somewhat with findings from the 2010 consultation survey.
The importance of affordable housing was also reflected in the verbatim comments and
in those that were left on the Word Leaves. Several respondents felt that Lewes was
becoming inaccessible to the towns younger people and that houses should be built for
local people, rather than be used as second homes or for newcomers to Lewes.
I find it very sad that a lot of youngsters who have grown up in Lewes and come fromLewes families are having to move out of the town because they cannot afford to live here,
thereby diluting the character of the town. Affordable housing, with priority given to
existing residents of the town.
If possible provide housing that younger people and families could buy or rent so that
Lewes does not become solely a place for well-off and mature inhabitants
There was a general recognition of a need for a mix of housing types, particularly for
young people and families, and for older people looking to downsize, but the emphasis
should, where possible be on affordability, rather than on larger, expensive homes.
Survey respondents were asked to indicate the type of housing that the development
should prioritise. (See Figure III).
Figure III: Housing Priorities Weighted Scores
0 50 100 150 200 250 300 350 400 450
STUDENT ACCOMMODATION
HOUSING TO RENT AT MARKET VALUE
FAMILY HOUSE (3 BED)
WARDEN ASSISTED FOR OLDER PEOPLE
FLAT/APARTMENTS (1/2 BEDS)
SHARED EQUITY HOUSING
SOCIAL RENTED
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
19/41
19
Social rented housing (Weighted Score: 397) was identified as the most important
priority, followed by Shared Equity Housing (293); and Flats/Apartments (1/2 bedroom)
(216). Some comments on the questionnaire and the Word Leaves mentioned the
importance of pepper-potting social housing across the development. Other ideas
included providing flexible buildings that enabled people to remain in the same placeor on the same development at different stages of their lives.
A small number of respondents expressed concerns about building houses on a flood
plain and were anxious that the scale of housing would add pressure to the towns
transport and community infrastructure.
Whatever the scale and mix of housing that is eventually developed, several respondents
wanted to avoid a housing estate feel to the site, with what one respondent described
as an identikit development.
3.2 The River
Riverside Walkway and Footbridge
A riverside walk, on the Phoenix side of the river would be a huge improvement, and also
improved links to other walking routes through and around the town
The potential of opening up the river so that it becomes a key feature of the town wasseen as a priority for a many respondents. Several also suggested that the development
could extend the network of paths and cycle lanes and improve connectivity to other
parts of the town. The importance of the river to the development also reflects the
findings from the 2010 survey.
A riverside walkway that stretches to Wileys Bridge is widely supported and some
respondents felt that this could include seating, cafes, bars and restaurants.
I want to see a walkway beside the river with cafes and places to sit. We have a river lets use it.
The key point is that the river is widely seen as an unused asset for the town and the NSQ
development provides an opportunity to open it up to the public. With a small number
of exceptions, there was support for an additional footbridge over the river that could
include a cycle path and would additional pedestrian routes around the town.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
20/41
20
Flood Risks
Many excellent plans and ideas. BUT flooding remains a major risk in the future at some
unpredictable time
The river is also identified as one of the towns key threats, with flood risks identified as a
major concern for several respondents. A small number of people questioned the
wisdom of building housing on the site at all, given these risks. However, for most
people who commented on this issue, the question was how best to manage the flood
risks, rather than to oppose the development.
There was some resistance to building flood defences. Instead, some respondents
preferred to focus on soft flood prevention or flood resilience. These people felt that
the development should be designed in recognition that there will be some flooding andthat there could be floodable public areas.
3.3 Retail, Commercial and Hospitality
We need local business that can provide long-term employment to keep the young
people in the town. This will promote growth of the townWe do not want Lewes to be
full of people who commute to work
Providing employment opportunities was seen as a high priority for the development,but it was less clear as to what these employment opportunities should be. Shopping,
leisure and the visitor economy were not seen as particularly high priorities overall, and
there was uncertainty amongst some respondents about the need for additional office
space. Many respondents expressed concern about the potential loss of existing
creative and light industrial business activity on the site and there tended to be more
support for small scale start up office space than for trying to attract large corporate
enterprises.
Retail and Hospitality
I hope that it (the development) will enhance the towns character as a place for
independent shops
Overall, retail was not considered to be a major priority for the development. A small
number of survey respondents questioned the need for any more shops, and many of
those that saw a need were keen to ensure that any new provision did not upset the retail
ecology of the town.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
21/41
21
However, respondents were asked on the questionnaire to indicate their preferred type
of retail, based on four options (See Figure IV):
Food shopping independent;
Non-food shopping independent; Food shopping supermarket; and
Non-food shopping chain.
Figure IV: Retail Preferences (% Responses)
There was very strong support for independent shops (87%) and only small support
(13%) for chains or supermarkets. These views were also expressed pretty clearly in the
verbatim comments, although less so on the Word Leaves. Several respondents
explicitly stated that they would prefer not to see any or too many national chains orsupermarkets and that the development should aim to promote independent retail,
which is seen as an important part of the towns character.
However, a small number of respondents noted that Lewes lacked shops that sold
practical items that people needed for their everyday living and where there was
support for national chains, this tended to be for non-food retail outlets. A small number
of respondents also suggested that the site could include a covered market.
Although overall, facilities for visitors were not considered to be a high priority, verbatimcomments suggested that there was some support for a hotel on the site, with a general
preference for small-scale, boutique style hotel accommodation.
Cafes, restaurants and bars seemed to divide opinion. Some respondents felt that there
were already plenty of these in Lewes, but others believed that they could become a key
feature of a riverside or public meeting area. Again, there tended to be preference for
independents over chains, where possible.
0 5 10 15 20 25 30 35 40 45 50
FOOD SHOPPING - SUPERMARKET
NON FOOD SHOPPING - CHAIN
NON FOOD SHOPPING - INDEPENDENT
FOOD SHOPPING - INDEPENDENT
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
22/41
22
Other Commercial Activity
AFFORDABLE small workshops and studios are very badly needed so small enterprises
are not forced to leave the town
There was more support for providing affordable and flexible space for small businesses
on the site than for attempting to accommodate larger, corporate businesses.
Many respondents noted that there was already a thriving creative/artistic and light
industrial business community on the site, and there was some concern that many of
these would be priced out of the area by the development. Several respondents felt that
these businesses should be accommodated as part of the development. Others felt that
they could be affordably relocated elsewhere in the town.
Some people suggested that the whole town benefited from the cultural capital
generated by the existing creative activity on the site and did not want this to be lost.
There was support for studios and workshops for artists and designers and also for
affordable workshops for artisans and other light industrial businesses. Some people
commented positively on the scruffiness of the area, and had concerns about it
becoming too sanitised.
Few people saw the need for significant additional office space, with some noting that
there were already empty offices in the town. Instead, there was more support small,flexible units for start-ups and space to accommodate small, local businesses.
3.4 Transport, Parking and Access
Acknowledge that we own cars and need to park, but that better cycling facilities would
be great
There were no direct questions on the questionnaire about transport access to and from
the site. However, respondents were asked state how important a Secure Car Park and20 mph Town Centre Streets were to the development.
Of the options that were provided a Secure Car Park was considered the least
important, although it may not have been entirely clear what the term meant. However,
there was more support for 20mph Town Centre Streets and the verbatim comments
and word leaves suggested that there were a number of transport, travel and access
issues that needed to be considered.
Parking seemed to divide opinion. Overall, comments suggested that there wasprobably a preference for prioritising pedestrians and cyclists over cars in the
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
23/41
23
development. Although there were people who favoured a car free zone, several
people recognised that cars needed to be catered for, and a number of people felt that
Lewes currently lacked affordable or free car parking space in Lewes.
Extending the networks of cycle routes and pathways to integrate the development intothe rest of the town was generally favoured and there was some support for shared
spaces for cars and pedestrians. Siting the bus station so that it connects people to the
town and improves traffic movement in and around it, was also seen by some people as
important.
Access to and from the site is potentially a significant issue and one that is likely to be of
particular concern to residents living close to the development. Some respondents
raised concerns that the development would add to traffic along secondary access
points. Brook Street, Abinger Place Sun Street, Lancaster Street and St Johns Hill were allcited as roads that could become rat runs. Suggestions to prevent this included
building new access roads and making Lancaster Street a one-way street.
3.5 Community and Leisure
Space for community activity for all ages
Overall, providing more community facilities was seen to be a reasonably important
priority. Although a public square was not considered to be amongst the most importantdesign priorities for the site, verbatim comments and word leaves suggested that there
was a good level of support for developing the site in a way that built social capital and
encouraged social interaction.
Opening up the river was seen as one way of doing this; and ensuring that the
development had space between buildings and well designed green and open spaces
was also favoured.
The consultation with young people identified a preference for a skatepark and therewas some support for providing activities for young people on the word leaves and in
the verbatim comments.
A number of people suggested that Lewess leisure offer did not currently include a
cinema and some favoured a flexible performance space and/or art gallery so that the
development could maintain and reflect the towns creativity and cultural identity.
A small number of respondents highlighted the need to ensure that there was sufficient
health and education provision for new residents on the site.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
24/41
24
3.6 Environmental Sustainability
This is a perfect opportunity for an integrated development that meets the highest
environmental standards in an innovative way by fully acknowledging the sites physical
and historical context and factoring in adaptation to (and mitigation of) climate change
With the exception of references to flood risks there were no questions that relateddirectly to environmental sustainability in the questionnaire. Yet, respondents quite
strongly identified Lewes as a socially liberal and environmentally aware town. Analysis
of the Phoenix Rising survey also suggested that renewable energy and green spaces
were high priorities in 2010.
It is, perhaps, not surprising then that there were more Word Leaves comments relating
to sustainability than to anything else, reflecting the towns green focus. These included
ensuring that the buildings were built to high environmental standards; planting trees
and providing green spaces; incorporating roof gardens; making provision for foodgrowing, through allotments and community gardens; and providing renewable energy
facilities.
For some respondents, Lewes Transition Town status means that there is an opportunity
for the development to be genuinely forward-thinking in terms of it environmental and
community credentials.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
25/41
25
4. Design Priorities
Ensure architects understand the culture and types of buildings already in Lewes
Questionnaire respondents were asked to choose the characteristics that best reflected
Lewes so that, where possible, the development could reflect what people considered to
be the towns character. (see Figure V).
Figure V: Design Priorities Weighted Scores
Based on the weighted scoring system (see Annex I), two descriptions seemed to betterreflect Lewes than the other five. These were:
A town with an historic and cultural heritage that inspires artists and designers
(Weighted Score: 320); and
Socially liberal and environmentally aware (310).
The town was also considered to be Quirky and Full of Surprises and to be (219) An
Important Commercial Centre in the Heart of a Rural Location (185).
The developers were challenged to be bold not bland and overall, most people
seemed to want the development to be both integrated with the town and to reflect and
respect its current architecture and character.
This is not about living in the past indeed, there were several comments warning
against pastiche designs. There seemed to be a preference for a mix of styles that are
modern and individual in their outlook, but also respect the areas historical, industrial
context.
0 50 100 150 200 250 300 350
A TOWN WITH AN HISTORIC AND CULTURAL HERITAGE
THAT INSPIRES ARTISTS AND DESIGNERS
SOCIALLY LIBERAL AND ENVIRONMENTALLY AWARE
QUIRKY AND FULL OF SURPRISES
AN IMPORTANT COMMERCIAL CENTRE IN THE HEART
OF A RURAL LOCATION
SMALL AND YOU CAN WALK AROUND IT EASILY
FORWARD-LOOKING AND EMBRACES MODERNITY
A GREAT PLACE FOR CHILDREN AND FAMILIES
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
26/41
26
There was some fear of a bland, uniform development, out of scale with the rest of the
town and which could be found in anywhere else in the country. Many people expressed
a preference for small scale, low-rise buildings, with sufficient space between them and
open/green spaces, walkways and cycle lanes that incorporate the river. Using high
quality building materials was also considered important.
Respondent were also asked to choose their Design Priorities based on seven options
(See Figure VI).
Figure VI: Design Priorities Weighted Scores
Most of Design Priority issues have been covered elsewhere in this report, but they re-
affirm the importance that is attached to integrating the development into the town,
opening up the river on both sides and ensuring that flood risks are managed at the site.
-50 0 50 100 150 200 250 300
INCLUDE A SECURE PUBLIC CAR PARK
INLCUDE A PUBLIC SQUARE
MAKE CAUSEWAY MORE PEDESTRAIN FRIENDLY
20 MPH TOWN CENTRE STREETS
BOLSTER AND EXTEND FLOOD DEFENCES
A RIVERSIDE WALKWAY WITH ACCESS TO BOTHRIVER BANKS
INTEGRATION WITH TOWN CENTRE BY IMPROVED
PEDESTRIAN FACILITIES
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
27/41
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
28/41
28
There seems to be a strong focus on independence, individuality and creating a
development that makes good use of the river, green spaces, cycle lanes and walkways,
and is connected to other parts of the town. There appears to be some fear of a bland
development, where buildings are either too large and over-powering, or too uniform in
their design.
Respondents had no thirst for a housing estate style development that was not
integrated into the town. Employment is identified as important, but it does not always
seem clear what this should be. In keeping with the focus on individuality and scale,
there appears to be much more support for independent shops, cafes and local small
businesses than large chains and corporates.
Creative businesses on the site are seen by many to make an important contribution to
the town as a whole. There is some concern that both these and the light industrialbusinesses should either be accommodated in the new development or, at least, found
affordable accommodation elsewhere. There is also support for affordable business
units for local start up businesses. Not everything can be provided at sub-market prices
and it may be challenging to find the right balance commercial and residential
affordability on the site.
People seem to want the new development to be designed to encourage people to
meet and to build social capital. The riverside walk could be a key part of this, but there
is also some support for a cinema, performance space and art gallery and activities foryoung people. Although this is not seen as a development primarily for visitors, there is
also some support for a hotel on the site, but again, scale and style may be important.
Transport access, managing flood risks and environmental sustainability are likely to
remain important issues as the development plans emerge. Residents close to the site
have specific concerns about increased traffic volumes and rat runs near to where they
live; there are differences of opinion as how best to address flood risks; and as a
Transition Town, many residents are likely to continue to focus on the environmental
sustainability elements of the development.
Overall, respondents tended to favour a scheme that encourages walking and cycling
over car use, but Lewes was seen by a number of people to lack affordable parking
space, whilst the location of the bus station was also seen as an important consideration.
Key Issues to Address
The key issues for the Santon Group to consider in moving the project forward are:
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
29/41
29
1. The interest in affordable housing is based on an understanding that this will
benefit local people and not people from outside. There may be an expectation
that assurances can be given to this effect and some indication of the quantum of
affordable housing that will be provided.
2. The consultation process must continue to engage Lewes residents to allay
specific concerns, to address a degree of scepticism that seems to exist about
developments in general, and to engage a wider range of people across the town.
3. There seems to be a fairly strong pro-independent/anti-corporate feeling amongst
many respondents. This may need further exploration to establish a balance that
is likely to be acceptable and to determine what type of chains and retail mix
would be preferable, given towns current retail offer.
4. Transport access issues during the development stage and after its completion are
likely to remain high on the agenda of local people, particularly those who live in
close proximity to the site.
5. There is concern about what will happen to the arts/creative and light industrial
businesses that are currently operating on the site, and solutions to their future
operation will need to be developed.
6. Green spaces and environmental sustainability are likely to remain importantcomponents of the development for a number of people in the town.
7. The scale and height of buildings are important to many people and there seems
to be a preference for a mix of styles, which needs to be considered carefully in
the design phase.
Next Steps
These findings from the workshops will be used to help inform thinking on thedevelopment and design options for the North Street Quarter. The Santon Group
recognises the need to continue to engage with Lewes residents and businesses through
a variety of channels. This will include meetings with specific interest groups, further
work to engage younger people, and maintaining on-going dialogue through
established structures.
Design options will be produced over the next few months and there will be a further
round of public consultation to obtain views on these during Summer 2013, followed by
a final consultation on more detailed development proposals, leading up to the
submission of a full planning application in Autumn 2013.
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
30/41
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
31/41
31
Annex I
Weighted Scores
In Questions 1a, 1b and 3 respondents were asked to indicate their top three priorities
from a range of options. The weighted scores that are referred to in this report and
associated charts have been developed as follows:
A = Priority 1 Responses x 3
B = Priority 2 Responses x 2
C = Priority 3 Responses x 1
WEIGHTED SCORE = A+B+C
In Question 2, respondents were asked to rate their Design Priorities on a five point
scale, where 1 is very important and 5 is not at all important. The weighted scores that
are referred to in this report and associated charts have been developed as follows:
A = 1 Very Important = 2
B = 2 = 1
C = 3 = 0D = 4 = -1
E = 5 Not at all important = -2
WEIGHTED SCORE = A+B+C+D+E
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
32/41
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
33/41
33
B: SURVEY RESPONSES
B1: LEWES CHARACTERISTICS WEIGHTED SCORES
B2: DEVELOPMENT PRIORITIES WEIGHTED SCORES
B3: RETAIL PRIORITIES
n=212
0 50 100 150 200 250 300 350
A TOWN WITH AN HISTORIC AND CULTURAL
HERITAGE THAT INSPIRES ARTISTS AND DESIGNERS
SOCIALLY LIBERAL AND ENVIRONMENTALLY
AWARE
QUIRKY AND FULL OF SURPRISES
AN IMPORTANT COMMERCIAL CENTRE IN THE
HEART OF A RURAL LOCATION
SMALL AND YOU CAN WALK AROUND IT EASILY
FORWARD-LOOKING AND EMBRACES MODERNITY
A GREAT PLACE FOR CHILDREN AND FAMILIES
0 50 100 150 200 250 300 350
IMPROVED VISITOR FACILITIES
HOTELS TO BOOST TOURISM
WIDER CHOICE OF SHOPPING
WIDER CHOICE OF LEISUER OPPORTUNITIES IN THE EVENING
MORE ACTIVITIES FOR YOUNGER PEOPLE
MORE COMMUNITY FACILITIES
WORKSPACE FOR ARTISTS AND DESIGNERS
MORE EMPLOYMENT OPPORTUNITIES
GOOD ACCESS TO THE RIVER AND WIDER ENVIRONMENTAL WALKS
MORE AFFORDABLE HOUSING
0 5 10 15 20 25 30 35 40 45 50
FOOD SHOPPING - SUPERMARKET
NON FOOD SHOPPING - CHAIN
NON FOOD SHOPPING - INDEPENDENT
FOOD SHOPPING - INDEPENDENT
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
34/41
34
B4: DESIGN PRIORITIES WEIGHTED SCORE
B5: HOUSING PRIORITIES WEIGHTED SCORES
-50 0 50 100 150 200 250 300
INCLUDE A SECURE PUBLIC CAR PARK
INLCUDE A PUBLIC SQUARE
MAKE CAUSEWAY MORE PEDESTRAIN FRIENDLY
20 MPH TOWN CENTRE STREETS
BOLSTER AND EXTEND FLOOD DEFENCES
A RIVERSIDE WALKWAY WITH ACCESS TO BOTH
RIVER BANKS
INTEGRATION WITH TOWN CENTRE BY IMPROVED
PEDESTRIAN FACILITIES
0 100 200 300 400 500
STUDENT ACCOMMODATION
HOUSING TO RENT AT MARKET VALUE
FAMILY HOUSE (3 BED)
WARDEN ASSISTED FOR OLDER PEOPLE
FLAT/APARTMENTS (1/2 BEDS)
SHARED EQUITY HOUSING
SOCIAL RENTED
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
35/41
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
36/41
36
- Shouldnt build houses in a flood area 1
Leisure 21
- Arts centre/gallery/performance area 11
- Skatepark 5- Boat hire/canoes 1
- Youth club 1
- Cinema 1
- Internet gaming 1
- No private galleries 1
Consultation 21
- General comments 6
- Printworks 6- Santons other work 4
- Children/young people 3
- Consultation on Section 106 1
- Meaning of Truly sustainable development 1
Retail/Hospitality 20
- No or limited supermarkets/chains 6
- Complement existing retail 2
- Market 2
- No cafes 2
- Useful shops 2
- Wholefood shop 1
- Bookshop 1
- Hotel 1
- Food outlets 1
- No more shops 1
- Independent 1
Open Spaces 9
- General comments 4
- Meeting place 3
- Young people 2
Community 9
- Education 5
- General comments 3- Health centre 1
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
37/41
37
Sustainability 87
- Greenspace/gardens/trees 24
- General comments 24
- Renewable energy 13- Green roofs (including beehives) 11
- Food growing/city farm/allotments 10
- Green buildings 4
- Clean up land pollution 1
Transport/Access 48
- Pedestrians/cyclists/walkways/cycle paths (except riverside) 13
- Reduced car/car free 9
- Bus station/better public transport 6- Footbridge 5
- Connections with Ringmer (including Park & Ride) 4
- Road access concerns 3
- Connectivity/integration with the town 3
- Road re-configuration/development 3
- Accommodate residents parking 2
Business 45
- Retain/support/integrate existing creative businesses and other activities 22
- Artists studios/workshops 11
- Small units/workshops 6
- Independent businesses 2
- There are already empty office/shops in the town 2
- Not just commercial businesses 1
- A large depot 1
Other 45- Love/respect/Joy/honesty/Compassion/Truth/Excellence
Inclusion/Diversity/Collaboration/Inspiration/People care
22
Creativity/Artists 7
- Zu/Starfish 2
- Need not greed 2
- Heart not fear 2
- Think Differently 2
- Meeting of people 1
- Portobello Road etc 1- Oasis of beauty 1
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
38/41
38
- Roofs 1
- Heart of Lewes 1
- Alive place 1
- Loo in the bus station 1
- Increase in households 1
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
39/41
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
40/41
40
Issue Comments
Housing 96
- Affordable/social housing 49
- General comments about the need for housing 8
- Family housing 6
- Housing for older people 6
- Flats/smaller units 5
- Too many houses/no more housing 5
- Mixed of tenures/sizes 4
- No or limited second/expensive homes 4
- Pepper-potting 3
- No social housing 1- Market value housing 1
- Floating houses 1
- Self build 1
- Not flats 1
- No high density housing 1
Business/Commercial 94
- Accommodate/support existing activity 33
- Small units/workshops/artists studios 31- General comments on the need for employment space 14
- Industrial businesses 6
- Vacant commercial spaces in the town 4
- Mixed employment uses 2
- Green businesses 2
- Not for profit businesses 1
- Local construction jobs 1
Sustainability 70- Green buildings/houses 16
- Greenspaces/trees 16
- General sustainability comments 15
- Renewable energy 9
- Food growing/allotments etc 9
- Green roofs 4
- Wildlife reserve 1
Issue Comments
7/29/2019 Lewes North Street Quarter: Public engagement workshops first stage report
41/41