Line Sizing (Liquid)

Embed Size (px)

Citation preview

  • 8/13/2019 Line Sizing (Liquid)

    1/22

    Calculation number 

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number  BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

    Line number  01-210-0-CO-010-8"-BC210-E38

    Line destination Crude Oil Outlet of 1st Stage Separator

    SIZE CASE   4 6 8 10 12

    PIPE DATA Nom.size (inches)   4 6 8 10 12

    PIPE RATING #   300 300 300 300 300

    PIPE SCH NO.   40 40 40 40 40

    PIPE INTERNAL DIA in   4.026 6.066 7.982 10.022 11.94

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192 0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   8.50 8.50 8.50 8.50 8.50

      psia 123.25 123.25 123.25 123.25 123.25

    TEMPERATURE deg C   60.0 60.0 60.00 60.00 60.00

    deg F 140.00 140.00 140.00 140.00 140.00deg R 600.00 600.00 600.00 600.00 600.00

    LIQUID FLOWRATE m3/hr    264.971 264.971 264.971 264.971 264.971

    bpd 40000.00 40000.00 40000.00 40000.00 40000.00

    LIQUID VISCOCITY cP   5.580 5.580 5.580 5.580 5.580

    LIQUID DENSITY kg/m3   833.00 833.00 833.00 833.00 833.00

    lb/ft3 51.98 51.98 51.98 51.98 51.98

    CALCULATION

    NRe (Reynold Number) 137716.05 91402.04 69461.89 55322.77 46435.91

    Relative Roughness 4.76900E-04 3.17E-04 2.41E-04 1.92E-04 1.61E-04

     A (Fric. Factor Constant) 7.88E+20 6.95E+20 5.53E+20 4.26E+20 3.36E+20

    B (Fric. Factor Constant) 9.2535E-10 6.5277E-07 5.2737E-05 2.0118E-03 3.3143E-02

    Moody Friction Factor 0.01955 0.01986 0.02044 0.02111 0.02175

    RESULT

    LIQUID VELOCITY m/s 9.032 3.979 2.298 1.458 1.027

    ft/s 29.614 13.045 7.534 4.779 3.367

    psi/100ft 28.33 3.71 0.97 0.32 1.37E-01

    kPa/100m 640.999 83.856 21.874 7.242 3.108

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    NOTE

    1 Flowrate based on design capacity of oil production (40000blpd).

    EXCO-00 29/10/2008 FO AJ HHRev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    ISSUED AS FINALDescription

  • 8/13/2019 Line Sizing (Liquid)

    2/22

    Calculation number 

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number BAB 002 1002

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_ 2\[208857486.xls.ms_office.xls]newLine number 01-210-0-CO-012-12"-AC210-E38

    Line destination Crude Oil to Booster Pump

     

    SIZE CASE   6 8 10 12

    PIPE DATA Nom.size (inches)   6 8 10 12

    PIPE RATING #   150 150 150 150

    PIPE SCH NO.   40 40 40 40

    PIPE INTERNAL DIA in   6.066 7.982 10.022 11.940

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   1.21 1.21 1.21 1.21

      psia 17.55 17.55 17.55 17.55

    TEMPERATURE deg C   65.00 65.00 65.00 65.00

    deg F 149.00 149.00 149.00 149.00deg R 609.00 609.00 609.00 609.00

    LIQUID FLOWRATE m3/hr    322.100 322.100 322.100 322.100

    bpd 48624.22 48624.22 48624.22 48624.22

    LIQUID VISCOCITY cP   4.434 4.434 4.434 4.434

    LIQUID DENSITY kg/m3   821.79 821.79 821.79 821.79

    lb/ft3 51.28 51.28 51.28 51.28

    CALCULATION

    NRe (Reynold Number) 137944.53 104832.31 83493.46 70081.37

    Relative Roughness 3.16518E-04 2.41E-04 1.92E-04 1.61E-04

     A (Fric. Factor Constant) 1.11E+21 9.60E+20 7.84E+20 6.44E+20

    B (Fric. Factor Constant) 9.0113E-10 7.2801E-08 2.7773E-06 4.5753E-05

    Moody Friction Factor 0.01873 0.01907 0.01956 0.02005

    RESULT

    LIQUID VELOCITY m/s 4.836 2.793 1.772 1.248

    ft/s 15.857 9.158 5.809 4.093

    psi/100ft 5.09 1.32 0.43 0.18

    kPa/100m 115.274 29.761 9.782 4.177

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    NOTE

    1 Flowrate based on crude booster pump's capacity of 322.10m3/hr.

    EXCO-00 29/10/2008 FO AJ HH

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    ISSUED AS FINAL

    Description

  • 8/13/2019 Line Sizing (Liquid)

    3/22

    Calculation number 

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_ 2\[208857486.xls.ms_office.xls]newLine number 01-210-0-CO-014-8"-AC210-E38

    Line destination Crude Oil to Electrostatic Coalescer

    SIZE CASE   4 5 6 8

    PIPE DATA Nom.size (inches)   4 5 6 8

    PIPE RATING #   150 150 150 150

    PIPE SCH NO.   40 40 40 40

    PIPE INTERNAL DIA in   4.026 5.047 6.066 7.982

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   4.50 4.50 4.50 4.50

      psia 65.25 65.25 65.25 65.25

    TEMPERATURE deg C   65.00 65.00 65.00 65.00

    deg F 149.00 149.00 149.00 149.00deg R 609.00 609.00 609.00 609.00

    LIQUID FLOWRATE m3/hr    322.100 322.100 322.100 322.100

    bpd 48624.22 48624.22 48624.22 48624.22

    LIQUID VISCOCITY cP   4.434 4.434 4.434 4.434

    LIQUID DENSITY kg/m3   822.16 822.16 822.16 822.16

    lb/ft3 51.30 51.30 51.30 51.30

    CALCULATION

    NRe (Reynold Number) 207935.73 165870.67 138006.80 104879.64

    Relative Roughness 4.76900E-04 3.80E-04 3.17E-04 2.41E-04

     A (Fric. Factor Constant) 1.10E+21 1.15E+21 1.11E+21 9.61E+20

    B (Fric. Factor Constant) 1.2682E-12 4.7178E-11 8.9464E-10 7.2277E-08

    Moody Friction Factor 0.01875 0.01865 0.01872 0.01907

    RESULT

    LIQUID VELOCITY m/s 10.980 6.987 4.836 2.793

    ft/s 35.999 22.907 15.857 9.158

    psi/100ft 39.63 12.73 5.10 1.32

    kPa/100m 896.641 288.129 115.320 29.773

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    NOTE

    1 Flowrate based on crude booster pump's capacity of 322.10m3/hr.

    EXCO-00 29/10/2008 FO AJ HH

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    ISSUED AS FINAL

    Description

  • 8/13/2019 Line Sizing (Liquid)

    4/22

    Calculation number 

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]newLine number 01-210-0-CO-017-8"-AC210-E38

    Line destination Oil to Coolers

     

    SIZE CASE   4 5 6 8

    PIPE DATA Nom.size (inches)   4 5 6 8

    PIPE RATING #   150 150 150 150

    PIPE SCH NO.   40 40 40 40

    PIPE INTERNAL DIA in   4.026 5.047 6.066 7.982

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   4.51 4.51 4.51 4.51

      psia 65.40 65.40 65.40 65.40

    TEMPERATURE deg C   64.28 64.28 64.28 64.28

    deg F 147.70 147.70 147.70 147.70deg R 607.70 607.70 607.70 607.70

    LIQUID FLOWRATE m3/hr    264.971 100.000 100.000 100.000

    bpd 40000.00 40000.00 40000.00 40000.00

    LIQUID VISCOCITY cP   3.744 3.744 3.744 3.744

    LIQUID DENSITY kg/m3   814.49 814.49 814.49 814.49

    lb/ft3 50.82 50.82 50.82 50.82

    CALCULATION

    NRe (Reynold Number) 200689.04 160089.97 133197.18 101224.52

    Relative Roughness 4.76900E-04 3.80E-04 3.17E-04 2.41E-04

     A (Fric. Factor Constant) 1.07E+21 1.11E+21 1.07E+21 9.18E+20

    B (Fric. Factor Constant) 2.2371E-12 8.3221E-11 1.5781E-09 1.2749E-07

    Moody Friction Factor 0.01881 0.01873 0.01881 0.01918

    RESULT

    LIQUID VELOCITY m/s 9.032 5.747 3.979 2.298

    ft/s 29.614 18.844 13.045 7.534

    psi/100ft 26.65 8.57 3.43 0.89

    kPa/100m 603.071 193.948 77.676 20.072

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    NOTE

    1 Flowrate based on design capacity of oil production (40000blpd).

    EXCO-00 29/10/2008 FO AJ HH

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    ISSUED AS FINAL

    Description

  • 8/13/2019 Line Sizing (Liquid)

    5/22

    Calculation number 

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]newLine number 01-210-0-CO-029-8"-AC210-E38

    Line destination Oil to Storage

     

    SIZE CASE   4 5 6 8

    PIPE DATA Nom.size (inches)   4 5 6 8

    PIPE RATING #   150 150 150 150

    PIPE SCH NO.   40 40 40 40

    PIPE INTERNAL DIA in   4.026 5.047 6.066 7.982

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   2.00 2.00 2.00 2.00

      psia 29.00 29.00 29.00 29.00

    TEMPERATURE deg C   45.00 45.00 45.00 45.00

    deg F 113.00 113.00 113.00 113.00deg R 573.00 573.00 573.00 573.00

    LIQUID FLOWRATE m3/hr    264.971 155.698 155.698 155.698

    bpd 40000.00 40000.00 40000.00 40000.00

    LIQUID VISCOCITY cP   5.427 5.427 5.427 5.427

    LIQUID DENSITY kg/m3   828.53 828.53 828.53 828.53

    lb/ft3 51.70 51.70 51.70 51.70

    CALCULATION

    NRe (Reynold Number) 140837.90 112346.62 93474.02 71036.50

    Relative Roughness 4.76900E-04 3.80E-04 3.17E-04 2.41E-04

     A (Fric. Factor Constant) 8.04E+20 7.80E+20 7.14E+20 5.71E+20

    B (Fric. Factor Constant) 6.4646E-10 2.4049E-08 4.5604E-07 3.6843E-05

    Moody Friction Factor 0.01950 0.01957 0.01979 0.02035

    RESULT

    LIQUID VELOCITY m/s 9.032 5.747 3.979 2.298

    ft/s 29.614 18.844 13.045 7.534

    psi/100ft 28.11 9.11 3.67 0.96

    kPa/100m 635.959 206.199 83.120 21.670

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    NOTE

    1 Flowrate based on design capacity of oil production (40000blpd).

    EXCO-00 29/10/2008 FO AJ HH

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    ISSUED AS FINAL

    Description

  • 8/13/2019 Line Sizing (Liquid)

    6/22

    Calculation number 

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

    Line number 01-555-0-PW-021-4"-AC210-V

    Line destination Produced Water Outlet from Flotation Cell

     

    SIZE CASE   3 4 5 6 8 10

    PIPE DATA Nom.size (inches)   3 4 5 6 8 10

    PIPE RATING #   150 150 150 150 150 150

    PIPE SCH NO.   40 40 40 40 40 40

    PIPE INTERNAL DIA in   3.068 4.026 5.046 6.066 7.982 10.022

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192 0.00192 0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   3.00 3.00 3.00 3.00 3.00 3.00

      psia 43.50 43.50 43.50 43.50 43.50 43.50

    TEMPERATURE deg C   65.0 65.0 65.00 65.00 65.00 65.00

    deg F 149.00 149.00 149.00 149.00 149.00 149.00deg R 609.00 609.00 609.00 609.00 609.00 609.00

    LIQUID FLOWRATE m3/hr    59.618 59.618 59.618 59.618 59.618 59.618

    bpd 9000.00 9000.00 9000.00 9000.00 9000.00 9000.00

    LIQUID VISCOCITY cP   0.440 0.440 0.440 0.440 0.440 0.440

    LIQUID DENSITY kg/m3   978.30 978.30 978.30 978.30 978.30 978.30

    lb/ft3 61.05 61.05 61.05 61.05 61.05 61.05

    CALCULATION

    NRe (Reynold Number) 605611.41 461504.18 368215.58 306300.00 232775.72 185393.72

    Relative Roughness 6.25815E-04 4.77E-04 3.80E-04 3.17E-04 2.41E-04 1.92E-04

     A (Fric. Factor Constant) 1.29E+21 1.74E+21 2.07E+21 2.25E+21 2.30E+21 2.14E+21

    B (Fric. Factor Constant) 4.7310E-20 3.6580E-18 1.3565E-16 2.5805E-15 2.0848E-13 7.9531E-12

    Moody Friction Factor 0.01838 0.01771 0.01733 0.01715 0.01710 0.01726

    RESULT

    LIQUID VELOCITY m/s 3.500 2.032 1.294 0.895 0.517 0.328

    ft/s 11.474 6.663 4.242 2.935 1.695 1.075

    psi/100ft 6.16 1.53 0.48 0.19 4.81E-02 1.56E-02

    kPa/100m 139.421 34.520 10.923 4.306 1.088 0.352

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15 4 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    Fraude Number 4.003 2.029 1.154 0.728 0.367 0.208

    NOTE

    1 Flowrate based on design flowrate of produced water which is 9000blpd.

    EXCO-00 29/10/2008 FO AJ HH

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    ISSUED AS FINAL

    Description

  • 8/13/2019 Line Sizing (Liquid)

    7/22

    Calculation number 

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

    Line number 01-590-0-CW-003-8"-AN140-N

    Line destination Cooling Water Discharge from Crude Coolers

     

    SIZE CASE   8 10 12 14 16 18

    PIPE DATA Nom.size (inches)   8 10 12 14 16 18

    PIPE RATING #   300 300 300 300 300 300

    PIPE SCH NO.   40 40 40 40 40 40

    PIPE INTERNAL DIA in   7.982 10.022 11.940 13.124 15.2496 16.8687

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192 0.00192 0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   4.70 4.70 4.70 4.70 4.70 4.70

      psia 68.15 68.15 68.15 68.15 68.15 14.69

    TEMPERATURE deg C   45.0 45.0 45.00 45.00 45.00 45.00

    deg F 113.00 113.00 113.00 113.00 113.00 113.00deg R 573.00 573.00 573.00 573.00 573.00 573.00

    LIQUID FLOWRATE m3/hr    262.200 262.200 262.200 262.200 262.200 262.200

    bpd 39581.71 39581.71 39581.71 39581.71 39581.71 39581.71

    LIQUID VISCOCITY cP   1.000 1.000 1.000 1.000 1.000 1.000

    LIQUID DENSITY kg/m3   1030.00 1030.00 1030.00 1030.00 1030.00 1030.00

    lb/ft3 64.27 64.27 64.27 64.27 64.27 64.27

    CALCULATION

    NRe (Reynold Number) 474256.22 377715.60 317038.03 288447.21 248233.77 224407.67

    Relative Roughness 2.40544E-04 1.92E-04 1.61E-04 1.46E-04 1.26E-04 1.14E-04

     A (Fric. Factor Constant) 4.02E+21 4.22E+21 4.14E+21 4.02E+21 3.74E+21 3.50E+21

    B (Fric. Factor Constant) 2.3651E-18 9.0244E-17 1.4869E-15 6.7452E-15 7.4522E-14 3.7450E-13

    Moody Friction Factor 0.01595 0.01585 0.01589 0.01595 0.01609 0.01623

    RESULT

    LIQUID VELOCITY m/s 2.274 1.442 1.016 0.841 0.623 0.509

    ft/s 7.455 4.729 3.332 2.758 2.042 1.669

    psi/100ft 0.91 0.29 0.12 0.08 3.62E-02 2.20E-02

    kPa/100m 20.671 6.584 2.749 1.720 0.819 0.499

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    Fraude Number 1.612 0.913 0.589 0.465 0.320 0.248

    NOTE

    1 Flowrate based on design flowrate of produced water which is 9000blpd.

    EXCO-00 29/10/2008 FO AJ HH

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    ISSUED AS FINAL

    Description

  • 8/13/2019 Line Sizing (Liquid)

    8/22

    Calculation number 

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

    Line number 01-130-0-TW-046-6"-FC200-V

    Line destination Water Injection Line From Water Injection Pump Discharge

    SIZE CASE   6 8 10 12 14 16

    PIPE DATA Nom.size (inches)   6 8 10 12 14 16

    PIPE RATING #   2500 2500 2500 2500 2500 2500

    PIPE SCH NO.   40 40 40 40 40 40

    PIPE INTERNAL DIA in   6.066 7.982 10.022 11.940 13.124 15.2496

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192 0.00192 0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   210.00 210.00 210.00 210.00 210.00 210.00

      psia 3045.00 3045.00 3045.00 3045.00 3045.00 14.69

    TEMPERATURE deg C   30.0 30.0 30.00 30.00 30.00 30.00

    deg F 86.00 86.00 86.00 86.00 86.00 86.00deg R 546.00 546.00 546.00 546.00 546.00 546.00

    LIQUID FLOWRATE m3/hr    99.364 99.364 99.364 99.364 99.364 99.364

    bpd 15000.00 15000.00 15000.00 15000.00 15000.00 15000.00

    LIQUID VISCOCITY cP   1.000 1.000 1.000 1.000 1.000 1.000

    LIQUID DENSITY kg/m3   1030.00 1030.00 1030.00 1030.00 1030.00 1030.00

    lb/ft3 64.27 64.27 64.27 64.27 64.27 64.27

    CALCULATION

    NRe (Reynold Number) 236490.45 179723.26 143140.20 120146.65 109307.46 94071.39

    Relative Roughness 3.16518E-04 2.41E-04 1.92E-04 1.61E-04 1.46E-04 1.26E-04

     A (Fric. Factor Constant) 1.84E+21 1.78E+21 1.59E+21 1.38E+21 1.26E+21 1.07E+21

    B (Fric. Factor Constant) 1.6182E-13 1.3073E-11 4.9874E-10 8.2162E-09 3.7296E-08 4.1185E-07

    Moody Friction Factor 0.01758 0.01765 0.01791 0.01823 0.01844 0.01882

    RESULT

    LIQUID VELOCITY m/s 1.492 0.862 0.547 0.385 0.319 0.236

    ft/s 4.892 2.825 1.792 1.263 1.045 0.774

    psi/100ft 0.57 0.15 0.05 0.02 1.26E-02 6.08E-03

    kPa/100m 12.909 3.286 1.068 0.453 0.286 0.138

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    Fraude Number 1.214 0.611 0.346 0.223 0.176 0.121

    NOTE

    1 Flowrate based on design flowrate of water injection system.

    EXCO-00 29/10/2008 FO AJ HH

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    ISSUED AS FINAL

    Description

  • 8/13/2019 Line Sizing (Liquid)

    9/22

    Calculation number 

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]newLine number 01-210-0-CO-026-6"-BC210-V

    Line destination Oil from Test Separator

     

    SIZE CASE   3 4 5 6 8

    PIPE DATA Nom.size (inches)   3 4 5 6 8

    PIPE RATING #   300 300 300 300 300

    PIPE SCH NO.   40 40 40 40 40

    PIPE INTERNAL DIA in   3.068 4.026 5.047 6.066 7.982

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192 0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   8.50 8.50 8.50 8.50 8.50

      psia 123.25 123.25 123.25 123.25 123.25

    TEMPERATURE deg C   60.0 60.0 60.00 60.00 60.00

    deg F 140.00 140.00 140.00 140.00 140.00deg R 600.00 600.00 600.00 600.00 600.00

    LIQUID FLOWRATE m3/hr    99.364 99.364 99.364 99.364 99.364

    bpd 15000.00 15000.00 15000.00 15000.00 15000.00

    LIQUID VISCOCITY cP   5.580 5.580 5.580 5.580 5.580

    LIQUID DENSITY kg/m3   833.00 833.00 833.00 833.00 833.00

    lb/ft3 51.98 51.98 51.98 51.98 51.98

    CALCULATION

    NRe (Reynold Number) 67769.49 51643.52 41196.12 34275.77 26048.21

    Relative Roughness 6.25815E-04 4.77E-04 3.80E-04 3.17E-04 2.41E-04

     A (Fric. Factor Constant) 3.03E+20 2.62E+20 2.12E+20 1.70E+20 1.14E+20

    B (Fric. Factor Constant) 7.8255E-05 6.0507E-03 2.2509E-01 4.2684E+00 3.4483E+02

    Moody Friction Factor 0.02203 0.02244 0.02303 0.02368 0.02488

    RESULT

    LIQUID VELOCITY m/s 5.833 3.387 2.155 1.492 0.862

    ft/s 19.123 11.105 7.067 4.892 2.825

    psi/100ft 17.47 4.57 1.52 0.62 1.66E-01

    kPa/100m 395.223 103.451 34.304 14.060 3.745

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    NOTE

    1 Flowrate based on oil f lowrate of 15000blpd.

    EXCO-00 29/10/2008 FO AJ HH

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    ISSUED AS FINAL

    Description

  • 8/13/2019 Line Sizing (Liquid)

    10/22

  • 8/13/2019 Line Sizing (Liquid)

    11/22

  • 8/13/2019 Line Sizing (Liquid)

    12/22

  • 8/13/2019 Line Sizing (Liquid)

    13/22

  • 8/13/2019 Line Sizing (Liquid)

    14/22

    Calculation number 

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]newLine number 01-210-0-CO-060-4"-AC210-V

    Line destination Condensate return to 2nd Stage Separator (Header)

     

    SIZE CASE   2 3 4   6 8

    PIPE DATA Nom.size (inches)   2 3 4   6 8

    PIPE RATING #   150 150 150   300 300

    PIPE SCH NO.   40 40 40   40 40

    PIPE INTERNAL DIA in   2.066 3.068 4.026   6.066 7.982

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192   0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   8.30 8.30 8.30   8.30 8.30

      psia 120.35 120.35 120.35 120.35 120.35

    TEMPERATURE deg C   44.8 44.8 44.81   44.81 44.81

    deg F 112.66 112.66 112.66 112.66 112.66deg R 572.66 572.66 572.66 572.66 572.66

    LIQUID FLOWRATE (Note 1) m3/hr    1.600 1.600 1.600   0.500 0.500

    bpd 241.54 241.54 241.54 241.54 241.54

    LIQUID VISCOCITY cP   0.596 0.596 0.596   0.596 0.596

    LIQUID DENSITY kg/m3   837.80 837.80 837.80   837.80 837.80

    lb/ft3 52.28 52.28 52.28 52.28 52.28

    CALCULATION

    NRe (Reynold Number) 15261.81 10277.35 7831.82 5197.97 3950.25

    Relative Roughness 9.29332E-04 6.26E-04 4.77E-04 3.17E-04 2.41E-04

     A (Fric. Factor Constant) 2.86E+19 1.58E+19 9.54E+18 3.98E+18 2.09E+18

    B (Fric. Factor Constant) 1.7880E+06 9.9991E+08 7.7314E+10 5.4540E+13 4.4062E+15

    Moody Friction Factor 0.02959 0.03186 0.03394 0.03786 0.04103

    RESULT

    LIQUID VELOCITY m/s 0.207 0.094 0.055 0.024 0.014

    ft/s 0.679 0.308 0.179 0.079 0.045

    psi/100ft 0.04 0.01 0.00 0.00 7.12E-05

    kPa/100m 1.000 0.149 0.041 0.006 0.002

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100mSELECTION CRITERION

    NOTE

    1 Flowrate is based on 'Line Sizing Calculation' document 08055E-801-FI-02 and Hysys simulation Design Case

    EXCO-00 29/10/2008 FO AJ HH

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    ISSUED AS FINAL

    Description

  • 8/13/2019 Line Sizing (Liquid)

    15/22

    Calculation number BAE 00 C0701-EC-PR003

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]newLine number 01-210-0-CO-059-3"-BC210-V

    Line destination Condensate return to 1st Stage Separator (Header)

     

    SIZE CASE   2 3 4   6   8

    PIPE DATA Nom.size (inches)   2 3 4   6   8

    PIPE RATING #   300 300 300   300   300

    PIPE SCH NO.   40 40 40   40   40

    PIPE INTERNAL DIA in   2.066 3.068 4.026   6.066   7.982

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192   0.00192   0.00192

    PROCESS DATA

    PRESSURE bara   122.69 122.69 122.69   122.69   122.69

      psia 1779.01 1779.01 1779.01 1779.01 1779.01

    TEMPERATURE deg C   49.8 49.8 49.80   49.80   49.80

    deg F 121.64 121.64 121.64 121.64 121.64deg R 581.64 581.64 581.64 581.64 581.64

    LIQUID FLOWRATE (Note 1) m3/hr    5.600 5.600 5.600   1.820   1.820

    bpd 845.38 845.38 845.38 845.38 845.38

    LIQUID VISCOCITY cP   6.324 6.324 6.324   6.324   6.324

    LIQUID DENSITY kg/m3   421.60 421.60 421.60   421.60   421.60

    lb/ft3 26.31 26.31 26.31 26.31 26.31

    CALCULATION

    NRe (Reynold Number) 2532.89 1705.65 1299.79 862.67 655.59

    Relative Roughness 9.29332E-04 6.26E-04 4.77E-04 3.17E-04 2.41E-04

     A (Fric. Factor Constant) 5.93E+17 2.10E+17 9.59E+16 2.66E+16 1.05E+16

    B (Fric. Factor Constant) 5.3976E+18 3.0186E+21 2.3340E+23 1.6465E+26 1.3302E+28

    Moody Friction Factor 0.03602 0.03753 0.04925 0.07420 0.09764

    RESULT

    LIQUID VELOCITY m/s 0.725 0.329 0.191 0.084 0.049

    ft/s 2.377 1.078 0.626 0.276 0.159

    psi/100ft 0.33 0.05 0.02 0.00 1.04E-03

    kPa/100m 7.502 1.083 0.365 0.071 0.024

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100mSELECTION CRITERION

    NOTE

    1 Flowrate is based on 'Line Sizing Calculation' document 08055E-801-FI-02 and Hysys simulation Design Case.

    EXCO-00 29/10/2008 FO AJ HH

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    ISSUED AS FINAL

    Description

  • 8/13/2019 Line Sizing (Liquid)

    16/22

    Calculation number BAE 00 C0701-EC-PR003

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number  BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

    Line number  01-555-0-CO-101-2"-AC210-E25

    Line destination Oil Return from Flotation Cell

     

    SIZE CASE   1 2 3 4

    PIPE DATA Nom.size (inches)   1 2 3 4

    PIPE RATING #   150 150 150 150

    PIPE SCH NO.   40 40 40 40

    PIPE INTERNAL DIA in   1.049 2.066 3.068 4.026

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   3.00 3.00 3.00 3.00

      psia 43.50 43.50 43.50 43.50

    TEMPERATURE deg C   65.00 65.00 65.00 65.00

    deg F 149.00 149.00 149.00 149.00deg R 609.00 609.00 609.00 609.00

    LIQUID FLOWRATE (Note 1)m3/hr    3.000 3.000 3.000 3.000

    bpd 452.88 452.88 452.88 452.88

    LIQUID VISCOCITY cP   4.434 4.434 4.434 4.434

    LIQUID DENSITY kg/m3   822.16 822.16 822.16 822.16

    lb/ft3 51.30 51.30 51.30 51.30

    CALCULATION

    NRe (Reynold Number) 7432.89 3774.01 2541.43 1936.69

    Relative Roughness 1.83031E-03 9.29E-04 6.26E-04 4.77E-04

     A (Fric. Factor Constant) 5.52E+18 1.61E+18 6.28E+17 3.06E+17

    B (Fric. Factor Constant) 1.7846E+11 9.1455E+15 5.1146E+18 3.9546E+20

    Moody Friction Factor 0.03635 0.04237 0.03620 0.03307

    RESULT

    LIQUID VELOCITY m/s 1.506 0.388 0.176 0.102

    ft/s 4.939 1.273 0.577 0.335

    psi/100ft 5.55 0.22 0.03 0.01

    kPa/100m 125.564 4.939 0.584 0.137

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    NOTE

    1  Oil outlet from the flotation cell is based on 5% of total flowrate into the flotation cell which is at 60m3/hr.

    EXCO-00 29/10/2008 FO AJ HH

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    Issued for design

    Description

  • 8/13/2019 Line Sizing (Liquid)

    17/22

    Calculation number BAE 00 C0701-EC-PR003

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

    Line number

    Line destination Oil from Test Separator

     

    SIZE CASE   8 3 6 4 5

    PIPE DATA Nom.size (inches)   8 3 6 4 5

    PIPE RATING #   300 300 300 300 300

    PIPE SCH NO.   40 40 40 40 40

    PIPE INTERNAL DIA in   7.982 3.068 6.066 4.026 5.047

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192 0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   8.50 8.50 8.50 8.50 8.50

      psia 123.25 123.25 123.25 123.25 123.25

    TEMPERATURE deg C   60.0 60.0 60.00 60.00 60.00

    deg F 140.00 140.00 140.00 140.00 140.00

    deg R 600.00 600.00 600.00 600.00 600.00LIQUID FLOWRATE (Note 1) m3/hr     99.364 53.000 53.000 53.000 53.000

    bpd 15000.00 15000.00 15000.00 15000.00 15000.00

    LIQUID VISCOCITY cP   4.581 4.581 4.581 4.581 4.581

    LIQUID DENSITY kg/m3   823.27 823.27 823.27 823.27 823.27

    lb/ft3 51.37 51.37 51.37 51.37 51.37

    CALCULATION

    NRe (Reynold Number) 31358.33 81583.68 41261.60 62170.82 49593.57

    Relative Roughness 2.40545E-04 6.26E-04 3.17E-04 4.77E-04 3.80E-04

     A (Fric. Factor Constant) 1.58E+20 3.71E+20 2.29E+20 3.34E+20 2.79E+20

    B (Fric. Factor Constant) 1.7718E+01 4.0216E-06 2.1944E-01 3.1094E-04 1.1568E-02

    Moody Friction Factor 0.02389 0.02148 0.02282 0.02177 0.02226

    RESULT

    LIQUID VELOCITY m/s 0.862 5.833 1.492 3.387 2.155

    ft/s 2.825 19.123 4.892 11.105 7.067

    psi/100ft 0.16 16.84 0.59 4.38 1.45E+00

    kPa/100m 3.555 380.956 13.389 99.194 32.764

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    NOTE

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    Description

  • 8/13/2019 Line Sizing (Liquid)

    18/22

    Calculation number BAE 00 C0701-EC-PR003

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number  BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

    Line number  01-500-0-SW-508-14"-AN140-V

    Line destination SW LIFT PUMP LINE

     

    SIZE CASE   12 14   8 10 12

    PIPE DATA Nom.size (inches)   12 14   8 10 12

    PIPE RATING #   300 300   300 300 300

    PIPE SCH NO.   40 40   40 40 40

    PIPE INTERNAL DIA in   12.350 13.290   7.982 10.022 11.94

     ABSOLUTE ROUGHNESS in   0.00192 0.00192   0.00192 0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   7.70 7.70   7.70 7.70 7.70

      psia 111.65 111.65 111.65 111.65 111.65

    TEMPERATURE deg C   30.0 30.0   30.00 30.00 30.00

    deg F 86.00 86.00 86.00 86.00 86.00deg R 546.00 546.00 546.00 546.00 546.00

    LIQUID FLOWRATE m3/hr    800.000 800.000   264.971 264.971 264.971

    bpd 120768.00 120768.00 120768.00 120768.00 120768.00

    LIQUID VISCOCITY cP   1.000 1.000   1.000 1.000 1.000

    LIQUID DENSITY kg/m3   1030.00 1030.00   1030.00 1030.00 1030.00

    lb/ft3 64.27 64.27 64.27 64.27 64.27

    CALCULATION

    NRe (Reynold Number) 935211.12 869063.76 1446987.89 1152450.34 967324.73

    Relative Roughness 1.55466E-04 1.44E-04 2.41E-04 1.92E-04 1.61E-04

     A (Fric. Factor Constant) 9.50E+21 9.82E+21 6.74E+21 8.30E+21 9.33E+21

    B (Fric. Factor Constant) 4.5238E-23 1.4630E-22 4.1939E-26 1.5999E-24 2.6357E-23

    Moody Friction Factor 0.01432 0.01426 0.01495 0.01456 0.01435

    RESULT

    LIQUID VELOCITY m/s 2.898 2.503 6.938 4.401 3.100

    ft/s 9.502 8.205 22.746 14.429 10.165

    psi/100ft 0.86 0.59 7.97 2.49 1.02E+00

    kPa/100m 19.486 13.447 180.367 56.311 23.120

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    NOTE

    1 Flowrate based on operating flowrate from the seawater lift pump.

    EXCO-00 29/10/2008 FO AJ HHRev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    Issued for designDescription

  • 8/13/2019 Line Sizing (Liquid)

    19/22

    Calculation number BAE 00 C0701-EC-PR003

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number  BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

    Line number 

    Line destination Condensate return to 2nd Stage Separator from HP Compressor 

     

    SIZE CASE   2 3 4   6 8

    PIPE DATA Nom.size (inches)   2 3 4   6 8

    PIPE RATING #   300 300 300   300 300

    PIPE SCH NO.   40 40 40   40 40

    PIPE INTERNAL DIA in   2.066 3.068 4.026   6.066 7.982

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192   0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   8.30 8.30 8.30   8.30 8.30

      psia 120.35 120.35 120.35 120.35 120.35

    TEMPERATURE deg C   44.8 44.8 44.81   44.81 44.81

    deg F 112.66 112.66 112.66 112.66 112.66deg R 572.66 572.66 572.66 572.66 572.66

    LIQUID FLOWRATE (Note 1) m3/hr    0.500 0.500 0.500   0.500 0.500

    bpd 75.48 75.48 75.48 75.48 75.48

    LIQUID VISCOCITY cP   0.596 0.596 0.596   0.596 0.596

    LIQUID DENSITY kg/m3   837.80 837.80 837.80   837.80 837.80

    lb/ft3 52.28 52.28 52.28 52.28 52.28

    CALCULATION

    NRe (Reynold Number) 4769.32 3211.67 2447.44 1624.37 1234.45

    Relative Roughness 9.29332E-04 6.26E-04 4.77E-04 3.17E-04 2.41E-04

     A (Fric. Factor Constant) 2.79E+18 1.15E+18 5.81E+17 1.89E+17 8.38E+16

    B (Fric. Factor Constant) 2.1615E+14 1.2088E+17 9.3466E+18 6.5935E+21 5.3268E+23

    Moody Friction Factor 0.03959 0.04367 0.03390 0.03941 0.05186

    RESULT

    LIQUID VELOCITY m/s 0.065 0.029 0.017 0.008 0.004

    ft/s 0.212 0.096 0.056 0.025 0.014

    psi/100ft 0.01 0.00 0.00 0.00 8.78E-06

    kPa/100m 0.131 0.020 0.004 0.001 0.000

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    NOTE

    1 Flowrate is based on 'Line Sizing Calculation' document 08055E-801-FI-02

    EXCO-00 29/10/2008 FO AJ HH

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    Issued for design

    Description

  • 8/13/2019 Line Sizing (Liquid)

    20/22

    Calculation number BAE 00 C0701-EC-PR003

    DESCRIPTION

    Project OYO FIELD DEVELOP MENT

    Project number BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

    Line number 01-210-0-CO-059-3"-BC210-V

    Line destination Condensate return to 1st Stage Separator from HP Compressor

     

    SIZE CASE   2 4 6   6 8

    PIPE DATA Nom.size (inches)   2 4 6   6 8

    PIPE RATING #   300 300 300   300 300

    PIPE SCH NO.   40 40 40   40 40

    PIPE INTERNAL DIA in   2.066 4.026 6.066   6.066 7.982

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192   0 .00192 0.00192

    PROCESS DATA

    PRESSURE bara   122.69 122.69 122.69   122.69 122.69

      psia 1779.01 1779.01 1779.01 1779.01 1779.01

    TEMPERATURE deg C   49.8 49.8 49.80   49.80 49.80

    deg F 121.64 121.64 121.64 121.64 121.64

    deg R 581.64 581.64 581.64 581.64 581.64

    LIQUID FLOWRATE (Note 1) m3/hr     1.820 1.820 1.820   1.820 1.820

    bpd 274.75 274.75 274.75 274.75 274.75LIQUID VISCOCITY cP   6.324 6.324 6.324   6.324 6.324

    LIQUID DENSITY kg/m3   421.60 421.60 421.60   421.60 421.60

    lb/ft3 26.31 26.31 26.31 26.31 26.31

    CALCULATION

    NRe (Reynold Number) 823.19 422.43 280.37 280.37 213.07

    Relative Roughness 9.29332E-04 4.77E-04 3.17E-04 3.17E-04 2.41E-04

     A (Fric. Factor Constant) 2.17E+16 2.04E+15 3.82E+14 3.82E+14 1.11E+14

    B (Fric. Factor Constant) 3.4839E+26 1.5065E+31 1.0627E+34 1.0627E+34 8.5856E+35

    Moody Friction Factor 0.07776 0.15153 0.22830 0.22830 0.30041

    RESULT

    LIQUID VELOCITY m/s 0.236 0.062 0.027 0.027 0.016

    ft/s 0.772 0.203 0.090 0.090 0.052

    psi/100ft 0.08 0.01 0.00 0.00 3.39E-04

    kPa/100m 1.711 0.119 0.023 0.023 0.008

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    NOTE

    1 Flowrate is based on 'Line Sizing Calculation' document 08055E-801-FI-02

    EXCO-00 29/10/2008 FO AJ HHRev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    Issued for designDescription

  • 8/13/2019 Line Sizing (Liquid)

    21/22

    Calculation number BAE 00 C0701-EC-PR003

    DESCRIPTION

    Project OYO FIELD DEVELOPMENT

    Project number  BAB 002 1004

    Client ENI

    File name \\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

    Line number  01-230-0-CO-062-2"-AC210-E25 and 01-230-0-CO-061-2"-AC210-E25

    Line destination Recycle line from the condensate return pump back to LP Flare KOD.

     

    SIZE CASE   2 3 4 5 6

    PIPE DATA Nom.size (inches)   2 3 4 5 6

    PIPE RATING #   300 300 300 300 300

    PIPE SCH NO.   40 40 40 40 40

    PIPE INTERNAL DIA in   2.066 3.068 4.026 5.046 6.066

     ABSOLUTE ROUGHNESS in   0.00192 0.00192 0.00192 0.00192 0.00192

    PROCESS DATA

    PRESSURE bara   4.00 4.00 4.00 4.00 4.00

      psia 58.00 58.00 58.00 58.00 58.00

    TEMPERATURE deg C   45.0 45.0 45.00 45.00 45.00

    deg F 113.00 113.00 113.00 113.00 113.00deg R 573.00 573.00 573.00 573.00 573.00

    LIQUID FLOWRATE m3/hr    20.000 20.000 20.000 20.000 20.000

    bpd 3019.20 3019.20 3019.20 3019.20 3019.20

    LIQUID VISCOCITY cP   4.581 4.581 4.581 4.581 4.581

    LIQUID DENSITY kg/m3   823.27 823.27 823.27 823.27 823.27

    lb/ft3 51.37 51.37 51.37 51.37 51.37

    CALCULATION

    NRe (Reynold Number) 24385.35 16421.16 12513.69 9984.17 8305.33

    Relative Roughness 9.29332E-04 6.26E-04 4.77E-04 3.80E-04 3.17E-04

     A (Fric. Factor Constant) 6.04E+19 3.84E+19 2.50E+19 1.66E+19 1.15E+19

    B (Fric. Factor Constant) 9.9082E+02 5.5411E+05 4.2844E+07 1.5888E+09 3.0224E+10

    Moody Friction Factor 0.02695 0.02852 0.03010 0.03168 0.03316

    RESULT

    LIQUID VELOCITY m/s 2.589 1.174 0.682 0.434 0.300

    ft/s 8.488 3.849 2.235 1.423 0.985

    psi/100ft 6.18 0.91 0.25 0.08 3.48E-02

    kPa/100m 139.810 20.493 5.556 1.891 0.788

    SELECTION CRITERIA

    Liquid velocity ft/s 3 - 15 3 - 15 3 - 15 3 - 15 3 - 15

    m/s

    Pressure drop psi/100ft

    kpa/100m

    SELECTION CRITERION

    NOTE

    1 Flowrate based condensate return pump's capacity.

    EXCO-00 29/10/2008 FO AJ HH

    Rev Date Prep Chkd App

    BUMI ARMADA ENGINEERING SDN BHD

    LIQUID PIPE SIZING CALCULATION

    Issued for design

    Description

  • 8/13/2019 Line Sizing (Liquid)

    22/22