29

LINK 22 Capabilities Data Link Processor

Embed Size (px)

DESCRIPTION

INTERNATIONAL DATA LINK SYMPOSIUM 2003 NEWBURY, 30 SEP TO 2 OCT 2003. LINK 22 Capabilities Data Link Processor. Dipl. Ing. Heinz Marsau-Rierl Senior Project Manager Data Link Systems / NILE Telefon: +49 421 457 3707 Fax: +49 421 457 2038 E-Mail: [email protected]. - PowerPoint PPT Presentation

Citation preview

Page 1: LINK 22 Capabilities Data Link Processor
Page 2: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 2 / 19.04.23 21:20

Dipl. Ing. Heinz Marsau-RierlSenior Project Manager Data Link Systems / NILETelefon : +49 421 457 3707Fax : +49 421 457 2038E-Mail : [email protected]

The following sheets are property of Atlas Elektronik GmbH Bremen GermanyReproduction, utilization, or disclosure to third parties in any form whatsoever,

is not permitted without written consent of the proprietor.

INTERNATIONAL DATA LINK SYMPOSIUM 2003NEWBURY, 30 SEP TO 2 OCT 2003

Page 3: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 3 / 19.04.23 21:20

Outline

 Company Profile

ATLAS Data Link Experience

Advantages and Key Aspects of the national Link 22 Development

Areas of Development in the Link 22 System

Development Realisation DLP

Relevant Specifications

Main Areas of DLP Functionality / Performance

Planed Link 22 Activities in the ISS Phase

Conclusion / Results of the national Procedure

Demonstration of a Link 22 System Chain (incl. a DLP Link 22) in a simulated NILE Network / Scenario

Page 4: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 4 / 19.04.23 21:20

History of the Company

1989TST-Telefunken

Systemtechnik GmbH

1989TST-Telefunken

Systemtechnik GmbH

1989MBB-UM

1989MBB-UM

Bremer Vulkan Verbund

1994STN ATLAS Elektronik GmbH

1994STN ATLAS Elektronik GmbH

100% BAE SYSTEMS2003

ATLAS ELEKTRONIK GmbH2003

ATLAS ELEKTRONIK GmbH

1966Fried. Krupp GmbH

1966Fried. Krupp GmbH KRUPP

Rheinmetall BAE SYSTEMS1997

STN ATLAS Elektronik GmbH1997

STN ATLAS Elektronik GmbH

1981MBB - Messerschmitt-Bölkow-Blohm GmbH

1981MBB - Messerschmitt-Bölkow-Blohm GmbH

1883AEG - Allgemeine

Elektrizitätsgesellschaft AG(founded as

DEG - DeutscheEdison Gesellschaft)

1883AEG - Allgemeine

Elektrizitätsgesellschaft AG(founded as

DEG - DeutscheEdison Gesellschaft)

1902Norddeutsche

Maschinen- und Armaturfabrik GmbH

1902Norddeutsche

Maschinen- und Armaturfabrik GmbH1924

Focke Wulf

1924Focke Wulf

1911Atlas Werke

1911Atlas Werke

1983Krupp Atlas Elektronik GmbH

1983Krupp Atlas Elektronik GmbH

1964VFW - Vereinigte

Flugtechnische Werke

1964VFW - Vereinigte

Flugtechnische Werke

1991Atlas Elektronik GmbH

1991Atlas Elektronik GmbH

1992 STN Systemtechnik Nord GmbH

1992 STN Systemtechnik Nord GmbH

1990DMT

Marinetechnik GmbH

1990DMT

Marinetechnik GmbH1990

MSG - Marine- undSondertechnik GmbH

1990MSG - Marine- und

Sondertechnik GmbH

DASA Deutsche Aerospace

Page 5: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 5 / 19.04.23 21:20

Surface Ship Systems

Submarine Systems

Mine Warfare Systems

Vessel Traffic Systems /Coastal Surveillance

Hydrographic Systems

Paramilitary / Commercial Market

Market Segments

Systems Services and Support

AUVs

Page 6: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 6 / 19.04.23 21:20

Hull Mounted Sonar SystemsActivated Towed Array SonarsACTAS

Combat Systems COSYS

Tactical NavigationSystems-WECDIS

Navigation Radars

Integrated Navigation

Surface Ship Systems

Page 7: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 7 / 19.04.23 21:20

ATLAS Experience

Projects in Data Link

LINK-11 Integration FPB S143

LINK-11 Specification and Integration for S143A FPB / F122 Frigate(AEG-, R&S-, R&C-Equipment) incl. Integration -Software

LINK-11 Integration Belgian Frigate(AEG HF Tx/Rx -, R&C - Equipm. ) incl. L 11 Interface Sim. Software

Study: HF- Components / LINK-11- Remote Control - CRO - Baltic Sea

JMCIS Joint Maritime Command Information System F124 Integration

MULUS Multi Link Subsystem Studies

Link 11 Integration into Submarines ( e.g. SAURO Italy )

Link Y Integration into OPV Royal Malaysian Navy

Page 8: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 8 / 19.04.23 21:20

ATLAS Experience

Contracts Project NILE

Scope of Work: System Analysis, Simulations (protocol, network), Engineering Work,Development, Consulting MOD

Concept phase Analysis 4,8 KB/S HF- Communication1985 Follow on study LINK-11-Improvement HF

Automatic channel selection, propagation analysis in HF band

Definition phase ECM - Resistance in HF- Communication from 1987 Technical Investigations, LINK-11- Improvement

Definition phase

D&D-Subphase I Special Investigations NILE Design & from 1993 Development Subphase One (incl. OPNET Sim.)

D&D Subphase II Predevelopment National Asset Link 22from 1998 NNR-Kernel System (National NILE Reference System)- ongoing

ISS Phase National Asset Link 22, Extension Message Implementation DLPfrom 2003

Page 9: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 9 / 19.04.23 21:20

Areas of ongoing national NILE Development

Fixed Freq. HF Radio*

ECCM HF Radio*

Fixed Freq. UHF Radio*

ECCMUHF Radio*

SignalProcessor

Controller(s)(SPC)*Modems

Net TimingRadio Control

CMS

System&

NetworkController

(SNC)*

DLPLINK-22CRYPTO

LLC*

STANAG-5522

Protocols

Time-of-Day

* NCE NILE Communications Equipment

CMS_SIM DLP SNC_SIM

Link 22 - Capabilities

Page 10: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 10 / 19.04.23 21:20

ATLAS Link 22 Development

Procedure

Starting early Investigations and Studies ( 1985 until Now ) Scope of Work: System Analysis, Simulations (protocol, network), Engineering

Work,Development, Consulting MOD Beginning Predevelopment DLP Link 22 Mid 1998 Key aspects and advantages of the national NILE program

Use of know how and results of the past NILE studies / contracts Use of existing specifications produced in NILE D&D Subphase I + II Parallel Development national / multinational

Predevelopment DLP Demonstrator/NNRS (national) - FAT 07/03 SNC (multinational NILE PMO) NRS (multinational NILE PMO) MLTT Multi Link Test Tool (multinational NILE PMO)

Being prepared for Kick Off of national SNC Platform and LLC-Simulator Integration and Assembly Link 22 chain

Consideration of future Multi Link Subsystem requirements

Page 11: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 12 / 19.04.23 21:20

Software DevelopmentSoftware Development

Specification, Development and Integration in accordance with MIL-STD-498

Documentation Language English

Programming Language is C++

Operating System is Windows NT /XP

Object Oriented Programming

Software is prepared for future Extension

Link 22 - Capabilities

Page 12: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 13 / 19.04.23 21:20

Main SpecificationsMain Specifications

STANAG 5522/ED1 Tactical Data Exchange Link 22

LGN 156-15-001 Interface Design Description for the DataFinal Link Processing Segment and the System

Network Controller for the NATOImproved Link Eleven (NILE) Program

CP11205 CDE(IDS)84-19 Command and Control Processor to Rev 8 Combat REV 8 Direction System Model 5

Interface Design Specification (IDS) (U)

DLP FRS Functional Requirement Specification forVersion 1.0 the Data Link Processing Segment of the Link 22 (NILE) System

Link 22 - Capabilities

Page 13: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 14 / 19.04.23 21:20

DLP Main Areas of FunctionalityDLP Main Areas of Functionality

Database Track Store TSR Queue SRID List References STANAG 5522 TR/UR SN Directory

Tact. Interface

CMSInterf.

Messages

CMS_SIM DLP SNC_SIM

SNCInterf.

N-SeriesMessages

C&S InterfaceMessages

Link 22 - Capabilities

(Super) Network Establishment

L22 Message Management

Conversion N-Series <-> L22

Page 14: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 15 / 19.04.23 21:20

Functional Model of CDS SimulatorFunctional Model of CDS Simulator

N-series messages

InterfaceCDS_SIM Functionality

n-series

messages

DLPCDS_SIM

1452

1451

14501447

1455

14571454

1453

1456

•Generation dynamic tactical scenario•Exchange of tactical and control data with CSCI DLP•Data extraction•Data analysis•Process up to 100 tracks (local/remote)

Link 22 - Capabilities

Page 15: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 16 / 19.04.23 21:20

Functional Model of SNC SimulatorFunctional Model of SNC Simulator

Tactical Interface Messages

Interface Network_SIMSNC_SIM Functionality

NCS

SN Directory

Message Delivery

Message Reception

C & S Interface Messages

(3 n 5)

NU(2)

NU(n)

DLP SNC_SIM

Link 22 - Capabilities

Page 16: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 17 / 19.04.23 21:20

DLP Link 22 Message ImplementationDLP Link 22 Message Implementation

The following subset of Link 22 messages (according to STANAG 5522) will be processed by the DLP

Surveillance Implementation e.g.

AIR POS, AIR CAS (F2, F5-0)

SUR POS, SUR CAS (F3, F5-1)

SUB POS, SUB CAS (F4-0. F4-1)

PLI POS (F1-1)

PLI IFF (F02.1-0)

Link 22 - Capabilities

Page 17: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 18 / 19.04.23 21:20

DLP N-Series Message ImplementationDLP N-Series Message Implementation

The following subset of N-Series messages (following CP 11205 CDE 84-19) will be processed by the DLP e.g.

Air PPLI, Surface PPLI, Subsurface PPLI, Land Point PPLI, Land Track PPLI

Air Track, Surface Track, Subsurface Track

Link 22 - Capabilities

Area of Propability

Track Management

New defined Messages

Network Parameter (OPTASK Link)

DLP Info

Comm Control

Page 18: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 19 / 19.04.23 21:20

CDS Simulator Development (Test Tool to verify the DLP) Generation of tactical scenarios Data Exchange between CDS-SIM and DLP via N-Series Messages

following CP11205 CDE(IDS)84-19 Rev 8 Data Logging of all data passing CDS_SIM - DLP Interface

Conclusion / Results of the national ProcedureConclusion / Results of the national Procedure

SNC Simulator Development (Test Tool to verify the DLP) Data Exchange between SNC_SIM and DLP via Tactical Interface Msgs and C&S Messages in accordance to IDD DLP-SNC Realization of SNC Functions Simulation of up to 4 NILE Networks (to build a virtual Super Network) Data Logging

of all data passing SNC_SIM-DLP Interface of all data passing simulated Interfaces (NU1 to/from simulated NUs)

Link 22 - Capabilities

Page 19: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 20 / 19.04.23 21:20

DLP Link 22 Development

Conclusion / Results of the national ProcedureConclusion / Results of the national Procedure

Realization of a CDS-DLP Link 22 Interface (N-Series Message Format)

Realization of a DLP-NCE Interface in accordance to IDD DLP-SNC Final

(Super) Network Establishment (SN and individual networks) in

accordance to DLP FRS Version 1.0

Link 22 Message Management in accordance to DLP FRS Version 1.0

Implementation of Link 22 Messages

Transmission Rules and Update Rates (STANAG 5522)

TSR Management

Mapping of Link 22 Messages to N-Series Messages and vice versa

Factory Acceptance Test successfully performed in July 2003

Federal Office of the Bundeswehr Information Management/Info Technology

and German Navy

Link 22 - Capabilities

Page 20: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 21 / 19.04.23 21:20

National NILE Reference System

1452

1451

14501447

1455

14571454

1453

1456

•Generation dynamic tactical scenario•Exchange of tactical and control data with CSCI DLP•Data extraction•Data analysis

NU1NU1

NU1

NU3

NU2

NU5

NU5

•DLP Interface incl. Data - Extraction •Message Processing. + SN Management•NILE Network Sim.of ”NILE Units” + tactical scenarios.

Conversion N-Series <-> L22

Link 22 Message Handling

External Management/ TSR Handling

CDS-Sim DLP SNC-Sim

N-Series MessagesC&S MessagesLink 22 Messages

Database Track Store TSR Queue SRID List References STANAG 5522 TR/UR SN Directory

Link 22 - Capabilities

Page 21: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 22 / 19.04.23 21:20

Extension Message Implementation F / FJ - series STANAG 5522, Extension C&S Messages I/F DLP – SNC

DLP Control. HMI

. CORBA I/F

ISS - Phase Follow on Development DLP Link 22 (national)

Link 22 - Capabilities

Page 22: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 23 / 19.04.23 21:20

Multi Link Enhancement Link 22Multi Link Enhancement Link 22

DTSLink 11

Data Link ProcessorLink 11

Data Base ManagementProcessing

CMS InterfaceProcessing

CMS

SNC

Data Link ProcessorLink 22 (NILE)

Multi Link Subsystem

Link 16 LVT

Data Link Management Processing

Data Link ProcessorLink 16

Link 22 - Capabilities

Page 23: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 24 / 19.04.23 21:20

Generic Interface DLP - CMS Interim Solution DLP Link 22 CORBA I/F integration into F 123 SATIR

National NILE System Integration

Link 22 - Capabilities

Page 24: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 25 / 19.04.23 21:20

AN/UYK 43 Host Computer

OSM with CORBA

I/O

Fast Ethernet (redundant)

CORBA CORBACORBA

Link 11

Link 16 Link 22

Network Design Tool Multi Link Proc. with Link 22-Extension

MIDS - LVT

KG40SNC

LLC

SPCDTS

ADatP-3

IRIS/AMH

MCCIS (ICS)

CORBA Plattformrepository from F124

OTH-T Gold

COMMSApplikations-

Server

CORBA

Trackstore

Applikations-Server

CORBA

OO-Trackstore

CORBA

Future MULTI - LINK - Solution

Link 22 - Capabilities

Page 25: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 26 / 19.04.23 21:20

Future Trials and Tests GE NavCCSysCom with real Platform Reference Systems incl. MLTT

NU4 NU1NU1

NU3NU5NU1

NU3Interrupt Slot

NU2NN1 – HF FF

1

2

3

4

5

6

7

MLTT

e.g. Reference System F123

e.g.Reference System F124NU2

Link 22 - Capabilities

Page 26: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 27 / 19.04.23 21:20

Demonstration Link 22 System

1452

1451

14501447

1455

14571454

1453

1456

•Generation dynamic tactical scenario•Exchange of tactical and control data with CSCI DLP•Data extraction•Data analysis

NU1NU1

NU1

NU3

NU2

NU5

NU5

•DLP Interface inkl. Daten - Extraktion •Message Bearbeitg. + SN Management•NILE Network Sim.von ”NILE Units” + taktischen Objekten.

Conversion N-Series <-> L22

Link 22 Message Handling

External Management/ TSR Handling

CDS-Sim DLP SNC-Sim

N-Series MessagesC&S MessagesLink 22 Messages

Database Track Store TSR Queue SRID List References STANAG 5522 TR/UR SN Directory

Link 22 - Capabilities

Page 27: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 28 / 19.04.23 21:20

Link 22 System DemonstrationLink 22 System DemonstrationLink 22 - Capabilities

Page 28: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 29 / 19.04.23 21:20

Scenario Example for the DemonstrationScenario Example for the Demonstration

Link 22 - Capabilities

NU2NU2

NU1

NU3NU2NU1NU3

NU1 PI Slot

NU2

NU5NU4

NU1

NU1NU4NU5NU4

NU1 PI Slot

NU5

NU1: Multi Network Node

NN1

NN2

Page 29: LINK 22 Capabilities Data Link Processor

PB_ 000_JJJJ_MM/ 30 / 19.04.23 21:20

Link 22 - SolutionLink 22 - Solution

Fixed Freq. HF Radio*

ECCM HF Radio*

Fixed Freq. UHF Radio*

ECCMUHF Radio*

SignalProcessor

Controller(s)(SPC)*

CMS

System&

NetworkController

DLP Link 22

LINK-22CRYPTO

LLC*

Link 22 Products

• Data Link Processor Hardware / Software• SNC I/F Simulator

Link 22 Engineering

• Studies• Data Link System Simulation • Development• Integration of Data Link Systems

NILE UNIT

Contact: ATLAS Elektronik GmbHDipl. Ing. Heinz Marsau-RierlSenior Project Manager NILETelefon : + 49 421 457 3707Fax : + 49 421 457 2038Mobile : + 49 171 766 57 72E-Mail : [email protected]