Page 1: Link to the full tech notes

ECO-FRIENDLY WATER TREATMENT PLANT

BIG RIVER STEEL

Page 2: Link to the full tech notes

INTRODUCTION

CHALLENGES

LAYOUT

PROCESS TECHNOLOGY

EFFICIENCY

Page 3: Link to the full tech notes

INTRODUCTION

Page 4: Link to the full tech notes

INTRODUCTION| BIG RIVER STEEL

OSCEOLA

Page 5: Link to the full tech notes

EAF + LF + RH

CCM

COLD MILL +

GALVANIZED LINE

1st Phase : 1,5 Mtpy 2nd Phase: 3 Mtpy

1st PHASE :

• 150 Tn EAF • 150 Tn LF • 150 Tn RH • CSP ( 6 Stands) • PLS/SPM/CGL/BAF

INTRODUCTION | BIG RIVER STEEL

TUNNEL FURNACE+CSP

Page 6: Link to the full tech notes

CHALLENGES

Page 7: Link to the full tech notes

CHALLENGES | BIG RIVER STEEL

DO NOT MIX CIRCUITS

REDUCE INVESTMENT & OPERATION

COST

DESIGN PREMISES_____

INDEPENDENT AND

EFFICIENT OPERATION

REDUCE WORKS ONSITE COMPLETE IN

14 MONTHS

EASY OPERATION

AND MAINTENANCE

Page 8: Link to the full tech notes

CHALLENGES | BIG RIVER STEEL

CIVIL DESIGN & EXECUTION_____

• Proximity of New Madrid, Missouri.

• New Madrid area contains the highest level of seismicity in the central and eastern parts of the United States.

• Very high water level.

• Drain pumps needed and sheet piling must be used.

• Reduce excavations as much as possible.

Page 9: Link to the full tech notes

CHALLENGES | BIG RIVER STEEL

PIPING DESIGN_____

• Avoid Corrosion

• Pipes towards buildings ALL buried.

• HDPE pipes

• Tight Project schedule.

• Reduce erection time, waste material and cost.

• PREFABRICATED pipe.

Page 10: Link to the full tech notes

CHALLENGES | BIG RIVER STEEL

OPERATION & SOFTWARE_____

• Efficiency

• Reduce Operational Cost

• Automation and signals gathering improve operation.

• Fully Automated system

• Easy operation and maintenance.

Page 11: Link to the full tech notes

LAYOUT

Page 12: Link to the full tech notes

MELTSHOP AREA

HSM AREA

COLD MILL AREA

LAYOUT | BIG RIVER STEEL

Page 13: Link to the full tech notes

• NCW EAF+LF+RH • NCW EAF SPRAYS

• NCW GAS DUCT

• CW DEGASSER

• ELECTRICAL ROOM

LAYOUT | BIG RIVER STEEL

MELTSHOP AREA

Page 14: Link to the full tech notes

• PRETREATMENT

• NCW HSM +CCM

• CW CCM • CW HSM

• CW LAMINAR

• ELECTRICAL ROOM

LAYOUT | BIG RIVER STEEL

HSM ( CSP) AREA

Page 15: Link to the full tech notes

• NCW COLD MILL

• WASTE WATER • ELECTRICAL ROOM

LAYOUT | BIG RIVER STEEL

COLD MILL AREA

Page 16: Link to the full tech notes

PROCESS TECHNOLOGY

Page 17: Link to the full tech notes

PRETREATMENT

PROCESS WATER

EFFLUENTS TREATMENT

Page 18: Link to the full tech notes

PRETREATMENT

PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 19: Link to the full tech notes

IRON REMOVAL____

DEEP WELLS Iron Content 5 ppm

REQUIREMENTS Iron Content 0.1 ppm

Reliable technology with low operations costs and low investment …. NEEDED

OXIDATION + FILTRATION

GREEN SAND

High retention time needed, civil works increasing, important power consumption, iron removal limited

High chemical consumption, high cost, iron removal limited

DMI 65 MEDIA Not previous aerations needs. Low chemical

consumption. High performance.

PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 20: Link to the full tech notes

Catalytic Filtration media

• Tailor made for the removal of Manganese & Iron. • Silica sand based granular material, its active ingredients are

permanently fused into the grain • DMI-65 performs role of catalyst to promote oxidation of iron

and manganese in solution into precipitate • Also performs highest quality mechanical filtration

Potassium Permanganate not required Wide pH range

Up to 10 years operation

WATER QUALITY…

INDUSTRIAL WATER (IRON REMOVED)

SOFTENED WATER

DEMI WATER

EDI WATER

PROCESS & TECHNOLOGY | BIG RIVER STEEL

IRON REMOVAL____

Page 21: Link to the full tech notes

PRETREATMENT

WATER: River

IRON REMOVAL

FLOW: 800 m3/h F

RO / SOFTENER

READY FOR FUTURE

PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 22: Link to the full tech notes

PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 23: Link to the full tech notes

PROCESS WATER

Page 24: Link to the full tech notes

PROCESS & TECHNOLOGY | BIG RIVER STEEL

COMMON TECHNOLOGY

ALL FILTER SYSTEMS INCLUDE

RING FILTERS ONLY

Side filtration 10% NCW

Total Filtration CW

CONTACT SYSTEMS WITH

DECANTING BASINS

( 2 UNIT MINIMUM)

SUBMERSIBLE PUMPS IN

SCALE PITS AND SLUDGE

MANAGEMENT

( STAINLESS & VORTEX)

Page 25: Link to the full tech notes

NCW EAF+LF

WATER: Clean

FLOW: 1892 m3/h

PRESSURE: 7 bar

T DROP: 15ºC

FUTURE EXPANSION

PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 26: Link to the full tech notes

NCW Sprays

WATER: Clean

FLOW: 3100 m3/h

PRESSURE: 7 bar

T DROP: 15ºC

FUTURE EXPANSION

PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 27: Link to the full tech notes

NCW Gas Duct

WATER: Clean

FLOW: 3350 m3/h

PRESSURE: 5,5 bar

CLOSE CIRCUIT

NCW Gas Duct

T DROP: 25 ºC

FUTURE EXPANSION

PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 28: Link to the full tech notes

NCW Gas Duct

WATER: Dirty

FLOW: 1040 m3/h

PRESSURE: 4 bar

TSS outlet : 80 ppm

CW Degasser PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 29: Link to the full tech notes

NCW Gas Duct

WATER: Clean

FLOW: 4180 m3/h

PRESSURE: 7 bar

NCW HSM & CCM

FUTURE EXPANSION

PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 30: Link to the full tech notes

NCW Gas Duct

WATER: Dirty

FLOW: 1165 m3/h

PRESSURE: 16/8 bar

2x7 mts decanters

CW CCM

FUTURE EXPANSION

PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 31: Link to the full tech notes

NCW Gas Duct

WATER: Dirty

FLOW: 8000 m3/h

PRESSURE: 13/6 bar

4X 11 mts. decanter

CW HSM

FUTURE EXPANSION

PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 32: Link to the full tech notes

NCW Gas Duct

WATER: Dirty

FLOW: 7100 m3/h

PRESSURE: 2/12 bar

25% FILTERED

CW LAMINAR PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 33: Link to the full tech notes

NCW Gas Duct

WATER: Clean

FLOW: 3055 m3/h

PRESSURE: 6,5 bar

FUTURE EXPANSION

NCW Cold Mill PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 34: Link to the full tech notes

EFFLUENT DISCHARGE

Page 35: Link to the full tech notes

Accomplish Discharge Limits Water Reuse

Zero Liquid Discharge

Remove from the waste water and cooling towers blowdown:

• Oils

• Solids

• Heavy metals

• Adjust pH

Accomplish Discharge Permits

PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 36: Link to the full tech notes

NCW Gas Duct

WATER: Waste

FLOW:100/180 m3/h

PRESSURE: 2 bar

OIL REMOVAL (DAF)

Waste Water

PH CONTROL

PROCESS & TECHNOLOGY | BIG RIVER STEEL

Page 37: Link to the full tech notes

EFFICIENCY

Page 38: Link to the full tech notes

EFFICIENCY | BIG RIVER STEEL

OPERATIONAL COSTS_____

Page 39: Link to the full tech notes

EFFICIENCY | BIG RIVER STEEL

• 12000 m3/h ( 53000 GPM) filtered. • Ring Filters reduce drastically backwash water. • Only 4 m3 per battery.

WATER__

Low Water Consuming Equipment Selected:

Sludge Dewatering :

• Installed a Press Plate per Contact Circuit. • Humidity values up to 20% • Water recovered.

Water Reuse

• Water used more than one time • Blowdown distribution system

MORE THAN 30000 M3/H (130,000 GPM)PUMPED !!

Page 40: Link to the full tech notes

EFFICIENCY | BIG RIVER STEEL

NCW Meltshop

CW HSM CW CCM

NCW Gas Duct NCW EAF Spray NCW HSM & CCM NCW Cold Mill

Purges Manifold

WASTE WATER TREATMENT

WASTE WATER COLD MILL

WATER_____

Page 41: Link to the full tech notes

EFFICIENCY | BIG RIVER STEEL

Pump Selection

ENERGY_____

: “More is better” ( NCW)

“NCW Pumps feed different areas with different simultaneity. Better to split in more pumps and keep soft starter than big pump”.

23 MW Installed !!

Page 42: Link to the full tech notes

EFFICIENCY | BIG RIVER STEEL

Variable Speed

ENERGY_____

• In contact circuits ( CW) with flow difference depending on product mix.

• All Cooling Towers fans, due to temperature variations.

Page 43: Link to the full tech notes

EFFICIENCY | BIG RIVER STEEL

CHEMICALS

Close collaboration between BRS / Cheamtreat/ Russula

Chemical signals link to main system

Fast Response to system changes ( Oil spillages, etc)

Page 44: Link to the full tech notes

EFFICIENCY | BIG RIVER STEEL

Page 45: Link to the full tech notes

• NEW TECHNOLOGLY IMPLEMENTED PUSHING TOWARDS MOBILE DEVICES.

• WIFI COVERAGE IN WHOLE WATER FACILITY.

• MONITORIZE WHENEVER, WHEREVER

EFFICIENCY | BIG RIVER STEEL

Page 46: Link to the full tech notes

THANK YOU

Juan Kessler

[email protected]

www.russula.com