Page 1: Linking BMPs  to  Pollutant Sources

Linking BMPs to

Pollutant Sources

Page 2: Linking BMPs  to  Pollutant Sources

After impairments are understood, pollutant causes and sources known, pollutant loads estimated, critical areas identified…. it’s time to select the treatment measures – BMPs – that will achieve your goals.

Page 3: Linking BMPs  to  Pollutant Sources

Linking BMPs to Sources

• Match BMP to pollutant(s)• Match BMP to source(s)• Consider pollutant transport/delivery• Evaluate load reduction capability• Cost• Acceptability/practicality

Page 4: Linking BMPs  to  Pollutant Sources

Match BMP to pollutant(s)

Page 5: Linking BMPs  to  Pollutant Sources

Match BMP to pollutant(s)

USDA-NRCS Conservation Practice Physical Effects (CPPE)http://efotg.nrcs.usda.gov/references/public/IN/IndianaCPPE-12-2006-Corrected.xls

Practice

Nutrients and Organics in

Surface Water

Suspended Sediment and

Turbidity in Surface Water

Pathogens in Groundwater

Pathogens in Surface Water

Pesticides in Surface Water

Petroleum in Surface Water

Harmful Temperatures

of Surface Water

Agrichemical Mixing Facility (702) 0 0 0 0 0 0 0

Channel Stabilization (584) 0 1 0 0 0 0 1

Conservation Crop Rotation (328) 2 2 2 1 2 0 0

Constructed Wetland (656) 3 4 3 2 2 0 0

Contour Buffer Strips (332) 3 3 -1 1 2 0 0

Filter Strip (393) 5 5 1 1 3 1 0

Nutrient Management (590) 5 0 1 1 0 0 0

Pest Management (595) 0 2 0 0 5 0 0

Residue and Tillage Management 1 4 0 0 5 0 0

Riparian Forest Buffer (391) 5 5 2 3 4 1 3

Water and Sediment Control Basin (638) 2 4 -1 2 2 2 -2

adapted from:

Page 6: Linking BMPs  to  Pollutant Sources

Match BMP to source(s)

Page 7: Linking BMPs  to  Pollutant Sources

Consider pollutant transport/delivery

BMP interventions in NPS pathways:• Availability/pollutant prevention (e.g., NMP)• Detachment (e.g., conservation tillage)• Transport (e.g., WASCOB)• Delivery (e.g., filter strip, riparian buffer)

Page 8: Linking BMPs  to  Pollutant Sources

Evaluate load reduction capability• Stormwater/Urban (BMP Effectiveness database; Menu

of BMPs)• Agriculture (Ag Management Measure document)• Forestry (Forestry Management Measures document)• Mining (Development document for proposed Effluent

Guideline for Mining)

www.epa.gov/nps

Page 9: Linking BMPs  to  Pollutant Sources

www.epa.gov/owow/nps/agmm/index.html

Page 10: Linking BMPs  to  Pollutant Sources

www.epa.gov/owow/nps/agmm/ index.html

Page 11: Linking BMPs  to  Pollutant Sources

www.bmpdatabase.org/docs.htm

Page 12: Linking BMPs  to  Pollutant Sources

http://www.epa.gov/owow/nps/forestrymgmt/

Page 13: Linking BMPs  to  Pollutant Sources

Sample BMP effectiveness table

Page 14: Linking BMPs  to  Pollutant Sources

Cost

• Look at experience in other watershed programs in the region

• NRCS cost tables, other programs

Page 15: Linking BMPs  to  Pollutant Sources

Cost

http://efotg.nrcs.usda.gov/references/public/IN/Average_Annual_Cost_2007.xls

Estimated cost of selected NRCS conservation practices

Code Conservation Practice_Name UnitInstallation

CostLife

YearsInstallation

Cost /YrO&M

Factor O&M Cost/YrTotal Annual

Cost327 Conservation Cover Ac $1,000.00 10 $131.87 0.03 $30.00 $161.87328 Conservation Crop Rotation Ac $15.00 1 $15.00 0.00 $0.00 $15.00329 Residue Management, No-Till/Strip Till/Direct Seed Ac $50.00 1 $50.00 0.00 $0.00 $50.00330 Contour Farming Ac $5.00 1 $5.00 0.00 $0.00 $5.00332 Contour Buffer Strips Ac $90.00 10 $11.87 0.03 $2.70 $14.57340 Cover Crop Ac $300.00 1 $300.00 0.00 $0.00 $300.00342 Critical Area Planting Ac $1,000.00 10 $131.87 0.05 $50.00 $181.87344 Residue Management, Seasonal Ac $30.00 1 $30.00 0.00 $0.00 $30.00345 Residue Management, Mulch Till Ac $30.00 1 $30.00 0.00 $0.00 $30.00350 Sediment Basin No $10,000.00 20 $828.14 0.03 $300.00 $1,128.14362 Diversion Ft $20.00 10 $2.64 0.02 $0.40 $3.04370 Atmospheric Resource Quality Management Ac $10.00 1 $10.00 0.00 $0.00 $10.00380 Windbreak/Shelterbelt Establishment Ft $6.00 15 $0.59 0.01 $0.06 $0.65386 Field Border Ft $4.00 10 $0.53 0.01 $0.04 $0.57393 Filter Strip Ac $500.00 10 $65.94 0.02 $10.00 $75.94412 Grassed Waterway Ac $500.00 10 $65.94 0.02 $10.00 $75.94422 Hedgerow Planting Ft $2.00 15 $0.20 0.05 $0.10 $0.30447 Irrigation System, Tailwater Recovery No $10,000.00 20 $828.14 0.03 $300.00 $1,128.14449 Irrigation Water Management Ac $35.00 1 $35.00 0.00 $0.00 $35.00450 Anionic Polyacrylamide (PAM) Erosion Control Ac $50.00 1 $50.00 0.00 $0.00 $50.00570 Runoff Management System No. $10,000.00 15 $988.00 0.02 $200.00 $1,188.00589 Cross Wind Trap Strips/Ridges Ac $12.00 5 $2.80 0.01 $0.12 $2.92590 Nutrient Management Ac $60.00 1 $60.00 0.00 $0.00 $60.00595 Pest Management Ac $125.00 1 $125.00 0.00 $0.00 $125.00

Page 16: Linking BMPs  to  Pollutant Sources

Acceptability/practicality

• Look at what’s worked and what hasn’t• Consider costs/benefits• Property ownership/site access • Look for added benefits• Use a combination of techniques

Page 17: Linking BMPs  to  Pollutant Sources

Rank alternatives