document.xlsx Equipment Summary 1 of 3
REV NO. REVISION BY CHK APP DATE
LINN Energy - Amine Sweetening Unit A FOR APPROVAL (RFQ) DBR 2/7/2014
Major Equipment List
1.9MMSCFD, SG=0.82, 0.43%H2S,1.49% CO2
Pressure Vessels
Rev No of Items
Design Conditions MDMT Materials Material Thickness Vessel
Tag No. Description D X L Type Pressure Temperature TemperatureShell/Heads Internal Shell Heads
Insulation Insulation Weight REMARKS
ft x ft PSIG °F °F Material Thickness lbs
A MDB-100 Amine Flash Tank 1 2 x 5 3 Phase 125.00 200 -20 SA-516-70 N/A N/A 150 # FLG Horizontal
A Amine Reboiler 1 2 Phase
A Inlet Gas Scrubber 1 2 Phase 500 Horizontal
A Amine Stripping Condenser 1 3 Phase
Air Coolers
Rev No of Items
Forced/ Bare Tube Design Conditions
Tag No. Description Size / Bay Induced Duty Surface Side Pressure Temperature Bays Fans per FanRemarks
W x L (ft) Type MMBtu/hr Fluid psig °F Bay bhp bhp bhp
A Reflux Cooler 1 Forced 0.093 Sour Amine 230 300 TBD TBD TBD TBD TBD 150# FLG
A Lean Amine Cooler 1 Forced 0.170 Amine/Water 230 300 TBD TBD TBD TBD TBD 150# FLG
Heat Exchangers
Rev. No of Items Type
Fluid Design Pressure Design TemperatureTube Flow Shell Flow
REMARKSTag No. Description Size/shell Duty Surface Area Shell Tube Shell Tube Shell Tube
L (ft) x D (in) MMBtu/hr psig psig °F °F lb/hr lb/hr
A Lean/Rich Amine Exchanger 1 0.151 Lean Amine Rich Amine TBD TBD
Columns
Rev. No of Items
Materials Material Thickness Design Press/Temp
REMARKSTag No. Description Height Diameter Stage Height Stage HeightShell/Heads Internal Shell Heads
Reboiler Column
ft ft psig/°F psig/°F
A Amine/Gas Contactor 1 50 S/S 12 in Structured Pkg CS SST 1 N/A 500/300
A Amine Stripper 1 CS SST 0.5 TBD TBD
Connection Rating
SEE MISC EQ TAG B-100 & B-101
Driver per Fan
Total Fan Drive Power Connection
Ratingft2
SST Tubes150# Rating
CS Tubes150# Rating
Connection Rating
ft2/shell
Trays/Packing Type
Connection Rating
document.xlsx Equipment Summary 2 of 3
REV NO. REVISION BY CHK APP DATE
LINN Energy - Amine Sweetening Unit A FOR APPROVAL (RFQ) DBR 2/7/2014
Major Equipment List
1.9MMSCFD, SG=0.82, 0.43%H2S,1.49% CO2
Pumps, Compressors, and Drivers
Rev No of Items Type Fluid Normal Flow Rated Flow
Operating DRIVER
REMARKSTag No. Description Temp Shaft power EfficiencyTYPE HP
@ Suction psi °F bhp %
A Amine Circulation Pumps TBD Centrifugal Amine/Water 40 ## gpm ## gpm
A Amine Relux Pumps TBD Centrifugal Amine/Water 90 ## gpm ## gpm
A Amine Booster Pumps TBD Cenrifugal Amine/Water 55 ## gpm ## gpm
A Amine Compressor 1 Recip / 3 St Nat. Gas 360 1.9 MMSCFD ## MMSCFD 56/85/86 Gas Engine 380
Control Valves, Regulators, & Pressure Safety Valves
Rev No of Items BodySize
Flow Design Conditions
REMARKSTag No. DescriptionLow High Units
Pressure Temperature
psi PSIG °F
A Amine LCV 1 Scrubber Level XMTRA Amine LCV 1 Contactor Level XMTRA Lean Amine FCV 1 Contactor Flow XMTRA Rich Amine LCV 1 Flash Tk Level XMTRA HC LCV 1 Flash Tk Level XMTRA GAS Press. Regs 2 Flash Tk N/AA TCV 1 Reboiler Temp XMTRA LCV 1 Stripper Level XMTRA Amine LCV 1 Condenser Level XMTRA Air Cooler Louvers Ctrl TBD Air Coolers Temp XMTRA Scrubber PSV 1 Scrubber N/AA Contactor PSV 1 Contactor N/AA Flash Tk PSV 1 Flash Tk N/A
A Lean/Rich Amine PSV 2 N/A
A Stripper PSV 1 Stripper N/A
Connection RatingDensity (lb/ft3) Differential
Pressure
Electric Motor
TBD X TBD% Pumps
Electric Motor
TBD X TBD% Pumps
Electric Motor
TBD X TBD% Pumps
Associated Equipment
Inlet/Outlet Line Size
Differential Pressure Controlling
DeviceConnection
Rating
Lean/Rich HEX
document.xlsx Equipment Summary 3 of 3
REV NO. REVISION BY CHK APP DATE
LINN Energy - Amine Sweetening Unit A FOR APPROVAL (RFQ) DBR 2/7/2014
Major Equipment List
1.9MMSCFD, SG=0.82, 0.43%H2S,1.49% CO2
Packaged Systems, Miscellaneous and Associated Equipment
Rev No of Items Size Type Fluid
Design Conditions
REMARKSTag No. Description Capacity Pressure Temperature Installed Weight
PSIG °F HP lbs hp
A B-100 1 Amine Reboiler
A B-101 Steam Bundle for Reboiler Amine Reboiler
A F-100 Rich Amine Filters 2 N/A N/AA F-200 Lean Amine Filer 1 N/A N/AA F-300 Lean Amine Filter 1 N/A N/A
A F-400 Lean Amine Polishing Filter 1 N/A N/A
Storage Tanks
Rev No of Items Type
Design Conditions MDMT Corrosion Insulation
REMARKSTag No. Description Size, Each Capacity Pressure Temperature Temperature Material Allowance Insulation Insulation Thickness Weight
ft x ft bbl PSIG °F °F inch Type Material in lbs
A Amine Storage Tank
Notes
1 Amine Reboiler can use Steam Coil or Burner with firetube. Recommend Steam Coil option if steam is available to reduce potential Amine degradation. (Tags: B-100, B101)2
3
Estimated Power Associated
EquipmentConnection
Rating
Burner/Firetube for Amine Reboiler
Connection Rating