6
document.xlsx Equipment Summary 1 of 6 REV NO. REVISION BY CHK LINN Energy - Amine Sweetening Unit A FOR APPROVAL (RFQ) DBR Major Equipment List 1.9MMSCFD, SG=0.82, 0.43%H2S,1.49% CO2 Pressure Vessels Rev Design Conditions MDMT Materials Material Thickness Vessel Tag No. Description D X L Type Pressure Temperature Temperature Shell/Heads Internal Shell Heads InsulationInsulation Weight ft x ft PSIG °F °F Material Thickness lbs A MDB-100 Amine Flash Tank 1 2 x 5 3 Phase 125.00 200 -20 SA-516-70 N/A N/A A Amine Reboiler 1 2 Phase A Inlet Gas Scrubber 1 2 Phase 500 A 1 3 Phase Air Coolers Rev Forced/ Bare Tube Design Conditions Tag No. Description Size / Bay Induced Duty Surface Side Pressure Temperature Bays Fans per Fan W x L (ft) Type MMBtu/hr Fluid psig °F Bay bhp bhp bhp A Reflux Cooler 1 Forced 0.093 Sour Amine 230 300 TBD TBD TBD TBD TBD A Lean Amine Cooler 1 Forced 0.170 Amine/Water 230 300 TBD TBD TBD TBD TBD Heat Exchangers Rev. Type Fluid Design Pressure Design Temperature Tube Flow Shell Flow Tag No. Description Size/shell Duty Surface Area Shell Tube Shell Tube Shell Tube (ft) x D (in MMBtu/hr psig psig °F °F lb/hr lb/hr A 1 0.151 Lean Amine Rich Amine TBD TBD Columns Rev. Materials Material Thickness Design Press/Temp Tag No. Description Height Diameter Stage Height Stage Height Shell/Heads Internal Shell Heads Reboiler Column ft ft psig/°F psig/°F A Amine/Gas Contactor 1 50 S/S 12 in CS SST 1 N/A 500/300 A Amine Stripper 1 CS SST 0.5 TBD TBD No of Items Amine Stripping Condenser No of Items Driver per Fan Total Fan Drive Power ft 2 No of Items ft 2 /shell Lean/Rich Amine Exchanger No of Items Trays/ Packing Type Structured Pkg

Linn Energy Amine Equipment Summary List

Embed Size (px)

DESCRIPTION

Amine Line Sizing

Citation preview

Page 1: Linn Energy Amine Equipment Summary List

document.xlsx Equipment Summary 1 of 3

REV NO. REVISION BY CHK APP DATE

LINN Energy - Amine Sweetening Unit A FOR APPROVAL (RFQ) DBR 2/7/2014

Major Equipment List

1.9MMSCFD, SG=0.82, 0.43%H2S,1.49% CO2

Pressure Vessels

Rev No of Items

Design Conditions MDMT Materials Material Thickness Vessel

Tag No. Description D X L Type Pressure Temperature TemperatureShell/Heads Internal Shell Heads

Insulation Insulation Weight REMARKS

ft x ft PSIG °F °F Material Thickness lbs

A MDB-100 Amine Flash Tank 1 2 x 5 3 Phase 125.00 200 -20 SA-516-70 N/A N/A 150 # FLG Horizontal

A Amine Reboiler 1 2 Phase

A Inlet Gas Scrubber 1 2 Phase 500 Horizontal

A Amine Stripping Condenser 1 3 Phase

Air Coolers

Rev No of Items

Forced/ Bare Tube Design Conditions

Tag No. Description Size / Bay Induced Duty Surface Side Pressure Temperature Bays Fans per FanRemarks

W x L (ft) Type MMBtu/hr Fluid psig °F Bay bhp bhp bhp

A Reflux Cooler 1 Forced 0.093 Sour Amine 230 300 TBD TBD TBD TBD TBD 150# FLG

A Lean Amine Cooler 1 Forced 0.170 Amine/Water 230 300 TBD TBD TBD TBD TBD 150# FLG

Heat Exchangers

Rev. No of Items Type

Fluid Design Pressure Design TemperatureTube Flow Shell Flow

REMARKSTag No. Description Size/shell Duty Surface Area Shell Tube Shell Tube Shell Tube

L (ft) x D (in) MMBtu/hr psig psig °F °F lb/hr lb/hr

A Lean/Rich Amine Exchanger 1 0.151 Lean Amine Rich Amine TBD TBD

Columns

Rev. No of Items

Materials Material Thickness Design Press/Temp

REMARKSTag No. Description Height Diameter Stage Height Stage HeightShell/Heads Internal Shell Heads

Reboiler Column

ft ft psig/°F psig/°F

A Amine/Gas Contactor 1 50 S/S 12 in Structured Pkg CS SST 1 N/A 500/300

A Amine Stripper 1 CS SST 0.5 TBD TBD

Connection Rating

SEE MISC EQ TAG B-100 & B-101

Driver per Fan

Total Fan Drive Power Connection

Ratingft2

SST Tubes150# Rating

CS Tubes150# Rating

Connection Rating

ft2/shell

Trays/Packing Type

Connection Rating

Page 2: Linn Energy Amine Equipment Summary List

document.xlsx Equipment Summary 2 of 3

REV NO. REVISION BY CHK APP DATE

LINN Energy - Amine Sweetening Unit A FOR APPROVAL (RFQ) DBR 2/7/2014

Major Equipment List

1.9MMSCFD, SG=0.82, 0.43%H2S,1.49% CO2

Pumps, Compressors, and Drivers

Rev No of Items Type Fluid Normal Flow Rated Flow

Operating DRIVER

REMARKSTag No. Description Temp Shaft power EfficiencyTYPE HP

@ Suction psi °F bhp %

A Amine Circulation Pumps TBD Centrifugal Amine/Water 40 ## gpm ## gpm

A Amine Relux Pumps TBD Centrifugal Amine/Water 90 ## gpm ## gpm

A Amine Booster Pumps TBD Cenrifugal Amine/Water 55 ## gpm ## gpm

A Amine Compressor 1 Recip / 3 St Nat. Gas 360 1.9 MMSCFD ## MMSCFD 56/85/86 Gas Engine 380

Control Valves, Regulators, & Pressure Safety Valves

Rev No of Items BodySize

Flow Design Conditions

REMARKSTag No. DescriptionLow High Units

Pressure Temperature

psi PSIG °F

A Amine LCV 1 Scrubber Level XMTRA Amine LCV 1 Contactor Level XMTRA Lean Amine FCV 1 Contactor Flow XMTRA Rich Amine LCV 1 Flash Tk Level XMTRA HC LCV 1 Flash Tk Level XMTRA GAS Press. Regs 2 Flash Tk N/AA TCV 1 Reboiler Temp XMTRA LCV 1 Stripper Level XMTRA Amine LCV 1 Condenser Level XMTRA Air Cooler Louvers Ctrl TBD Air Coolers Temp XMTRA Scrubber PSV 1 Scrubber N/AA Contactor PSV 1 Contactor N/AA Flash Tk PSV 1 Flash Tk N/A

A Lean/Rich Amine PSV 2 N/A

A Stripper PSV 1 Stripper N/A

Connection RatingDensity (lb/ft3) Differential

Pressure

Electric Motor

TBD X TBD% Pumps

Electric Motor

TBD X TBD% Pumps

Electric Motor

TBD X TBD% Pumps

Associated Equipment

Inlet/Outlet Line Size

Differential Pressure Controlling

DeviceConnection

Rating

Lean/Rich HEX

Page 3: Linn Energy Amine Equipment Summary List

document.xlsx Equipment Summary 3 of 3

REV NO. REVISION BY CHK APP DATE

LINN Energy - Amine Sweetening Unit A FOR APPROVAL (RFQ) DBR 2/7/2014

Major Equipment List

1.9MMSCFD, SG=0.82, 0.43%H2S,1.49% CO2

Packaged Systems, Miscellaneous and Associated Equipment

Rev No of Items Size Type Fluid

Design Conditions

REMARKSTag No. Description Capacity Pressure Temperature Installed Weight

PSIG °F HP lbs hp

A B-100 1 Amine Reboiler

A B-101 Steam Bundle for Reboiler Amine Reboiler

A F-100 Rich Amine Filters 2 N/A N/AA F-200 Lean Amine Filer 1 N/A N/AA F-300 Lean Amine Filter 1 N/A N/A

A F-400 Lean Amine Polishing Filter 1 N/A N/A

Storage Tanks

Rev No of Items Type

Design Conditions MDMT Corrosion Insulation

REMARKSTag No. Description Size, Each Capacity Pressure Temperature Temperature Material Allowance Insulation Insulation Thickness Weight

ft x ft bbl PSIG °F °F inch Type Material in lbs

A Amine Storage Tank

Notes

1 Amine Reboiler can use Steam Coil or Burner with firetube. Recommend Steam Coil option if steam is available to reduce potential Amine degradation. (Tags: B-100, B101)2

3

Estimated Power Associated

EquipmentConnection

Rating

Burner/Firetube for Amine Reboiler

Connection Rating