33
Sr. No. Name & Address CI (in Rs.) Applied For Section Page No. Remarks 1 Millenium Associates, Millenium Avinash, Plot No. 9/10/11, Sector- 10A, Behind D- Mart, Airoli, Navi Mumbai 69.00 Crs Establish RO(HQ) 1 to 19 2 Space Developer, Slum Rehabilitation Project, CTS No. 351, 351/1 to 351/110, 575, 575/1 to 9, Villagae Kanjur, Quarry Road, Off. LBS Marg, Bhandup (W), Mumbai 54.19 Crs Establish RO(HQ) 20 to 40 3 The Chief Commissioner of Income Tax Mumbai, CTS No. C-41 to 43, Block G, Bandra Kurla Complex, Mumbai 288.83 Crs Establish RO(HQ) 41 to 50 4 Mumbai Housing Area Development Authority (MHADA), Redevelopment of Transit Camps in to Transit EWS, MIG Type Tenements, CTS 145 at Gavanpada Mulund (E), MMUmbai 76.54 Crs Establish RO(HQ) 51 - 72 5 Yashraaj Ethanol Processing Pvt. Ltd. , (Bottling Plant) S. No. 124 A & B, Khushi, Limb Phata, Tal & DIst. Satara 50.30 Crs Establish JD(WPC) 73 - 78 6 Ador Powertron Ltd., Ramnagar Complex, Plot No. 51, D-II Block, MIDC Chinchwad, Pune 33.37 Crs Establish (Expansion) JD(APC) 79 - 85 7 Mumbai Housing Area Development Authority (MHADA), CTS No. 1C/1/1(Part), Shimpavali of Village - Kandivali at Charkop, Mumbai 74.36 Crs Establish & Operate RO(HQ) 86 - 120 8 Venkateshwar Sugar Industries, Tq. Loha, Dist. Nanded. 47.17 Crs 1st Operate JD(WPC) 121 - 128 9 Nilkanth Tech Park Pvt Ltd., CTS No. 758, 758/1 to 7, 759, 759/1 to 12, Village Marol, Andheri Kurla Road, Andheri 129.61 Crs Operate RO(HQ) 129 - 164 10 Malu paper Mill, Tq. Saoner, Dist. Nagpur. 31.23 Crs Renewal (Amalgamation) JD(WPC) 165 - 174 11 Maersk India Pvt. Ltd. Sector-6, Dronagiri warehousing complex, Navi Mumbai 71.86 Crs Amendment in existing consent RO(HQ) 175 - 191 12 Valsad District Co-op Milk Producers Union Ltd, MIDC Tarapur, Dist.- Thane 56.88 Crs Amendment JD(WPC) 192 - 197 13 Kopargaon SSK Ltd. (Distillery), At Post Kolpewadi, Tal Kopargaon, Dist Ahmednagar. 69.79 Crs Renewal (Amalgamation) JD(WPC) 198 - 205 List of Cases to be submitted before the 20th Consent Committee Meeting (Part-II) of 2012 scheduled on 15 .03.2013 at 14:00 hrs. Fresh Agenda

List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

Embed Size (px)

Citation preview

Page 1: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

Sr. No. Name & Address CI (in Rs.) Applied For Section Page No. Remarks

1 Millenium Associates, Millenium Avinash, Plot No. 9/10/11, Sector- 10A, Behind D-Mart, Airoli, Navi Mumbai

69.00 Crs Establish RO(HQ) 1 to 19

2 Space Developer, Slum Rehabilitation Project, CTS No. 351, 351/1 to 351/110, 575, 575/1 to 9, Villagae Kanjur, Quarry Road, Off. LBS Marg, Bhandup (W), Mumbai

54.19 Crs Establish RO(HQ) 20 to 40

3 The Chief Commissioner of Income Tax Mumbai, CTS No. C-41 to 43, Block G, Bandra Kurla Complex, Mumbai 288.83 Crs Establish RO(HQ) 41 to 50

4 Mumbai Housing Area Development Authority (MHADA), Redevelopment of Transit Camps in to Transit EWS, MIG Type Tenements, CTS 145 at Gavanpada Mulund (E), MMUmbai

76.54 Crs Establish RO(HQ) 51 - 72

5 Yashraaj Ethanol Processing Pvt. Ltd. , (Bottling Plant) S. No. 124 A & B, Khushi, Limb Phata, Tal & DIst. Satara 50.30 Crs Establish JD(WPC) 73 - 78

6 Ador Powertron Ltd., Ramnagar Complex, Plot No. 51, D-II Block, MIDC Chinchwad, Pune

33.37 Crs Establish (Expansion) JD(APC) 79 - 85

7 Mumbai Housing Area Development Authority (MHADA), CTS No. 1C/1/1(Part), Shimpavali of Village - Kandivali at Charkop, Mumbai

74.36 Crs Establish & Operate RO(HQ) 86 - 120

8 Venkateshwar Sugar Industries,Tq. Loha, Dist. Nanded. 47.17 Crs 1st Operate JD(WPC) 121 - 128

9 Nilkanth Tech Park Pvt Ltd., CTS No. 758, 758/1 to 7, 759, 759/1 to 12, Village Marol, Andheri Kurla Road, Andheri 129.61 Crs Operate RO(HQ) 129 - 164

10 Malu paper Mill,Tq. Saoner, Dist. Nagpur. 31.23 Crs Renewal

(Amalgamation) JD(WPC) 165 - 174

11 Maersk India Pvt. Ltd.Sector-6, Dronagiri warehousing complex, Navi Mumbai 71.86 Crs Amendment in

existing consent RO(HQ) 175 - 191

12 Valsad District Co-op Milk Producers Union Ltd, MIDC Tarapur, Dist.- Thane 56.88 Crs Amendment JD(WPC) 192 - 197

13 Kopargaon SSK Ltd. (Distillery), At Post Kolpewadi, Tal Kopargaon, Dist Ahmednagar.

69.79 Crs Renewal (Amalgamation) JD(WPC) 198 - 205

List of Cases to be submitted before the 20th Consent Committee Meeting (Part-II) of 2012 scheduled on 15 .03.2013 at 14:00 hrs.

Fresh Agenda

Page 2: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

14 Kopargaon SSK Ltd. (Country Liquor), At Post Kolpewadi, Tal Kopargaon, Dist Ahmednagar.

69.79 Crs Renewal (Expansion) JD(WPC) 206 - 215

15 Elringklinger Automobile Components (I) Pvt. Ltd., Plot No. G-2, MIDC Ranjangaon, Tal - Shirur, Dist. Pune 48.01 Crs Renewal

(Expansion) JD(APC) 216 - 249

16 Hindalco Industries Ltd., Durgamnwadi, Durgamanwadi Mine, A/p- Radhanagari, Dist - Kolhapur

41.60 Crs Renewal JD(APC) 250 - 256

17 Kalika Steel Alloys Pvt. Ltd., Plot No. C-8, Addl. MIDC, Jalna 49.15 Crs Renewal JD(APC) 257 - 264

18 Varroc Engineering (P) Ltd., Plot No. L-6/2, MIDC Area (Plant V), Waluj, Aurangabad

49.91 Crs Renewal JD(APC) 265 - 273

19 Ultra Engineers (Unit IV), Sector No. 10, Plot No. 58, PCNTDA, Bhosari, Pune 33.74 Crs Renewal JD(APC) 274 - 281

20 Western Coal Fields Ltd., Durgapur Rayatwari Colliery, Chandrapur 71.86 Crs Renewal JD(APC) 282 - 287

21 Ring Plus Aqua Ltd., (Starter Gear Div.), D-3/4, STICE, Musalgaon, Sinnar, Dist. - Nashik

60.13 Crs Renewal JD(APC) 288 - 294

22 Ring Plus Aqua Ltd., (Shaft Bearing Div.), Plot No. A-16/17, STICE, Musalgaon, Sinnar, Dist. - Nashik

25.98 Crs Renewal JD(APC) 295 - 301

23 Make Waves Sea Resort Pvt. LTd. (HotelRetreat), Erangal Village, Madh Marve Road, Malad (W), Mumbai

42.26 Crs Renewal AS(T) 302 - 309

24 Nanded Treasure Bazaar Pvt. Ltd., S. No. 71/D/4, 63/1, Vasarni, Tal. & Dist Nanded

72.97 Crs Renewal AS(T) 310 - 324

25 The Ravalgaon Sugar Farm Ltd., Sr. No. 1, 1A, 125A, Post- Ravalgaon, Tal - Malegaon, Dist- Nashik

54.20 Crs Renewal JD(WPC) 325 - 333

26 Baramati agro Industries,(Sugar Unit)A/p Kannad, Dist- Aurangabad.

50.70 Crs Renewal JD(WPC) 334 - 338

27 Nagpur Zilla Kapas Utpadak Sahakari Soot Girni Ltd, At- Patansaongi, Dist- Nagpur. 32.28 Crs Renewal JD(WPC) 339 - 344

28 Bhaurao Chavan SSK Ltd., (Unit - II), (Sugar Unit)Tal.- Kalamnuri, Dist.- Hingoli. 34.98 Crs Renewal JD(WPC) 345 - 351

29 Yashovardhan Promoters and Developers Pvt. Ltd. (Dew Drops), S. No. 44 A/1, Sub Plot No. 1, Pune Alandi Road, Vishrantwadi, Dhanori, Pune

76.09 Crs Renewal RO(HQ) 352 - 362

30 Shri Tradco Dessan Pvt. Ltd., (Formarly Kissan Starch) S. No. 93/94, Mumbai-Agra Road, Biladi Phata, Devopur, Tal & Dist Dhule

35.51 Crs Renewal (Expansion) JD(WPC) 363 - 372

Page 3: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

JD(WPC) 11AS(T) 2RO(HQ) 8JD(APC) 9Total 30

1 "Tech Park One" Panchshil Tech Park Pvt. Ltd., S. No. 191A/2A/1/2102, Next to Don Bosco School, Airport Road, Yerwada, Pune

229.47 Crs Establsih RO(HQ 373 - 397

Review Item

Page 4: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    31 

 

PART-II CC-Fresh Agenda

Agenda no. 1

Name of Industry: M/s.Millenium Associates, Millenium Avinash,Plot No.9/10/11,Sector-10A,

Behind D-Mart,Airoli,Navi Mumbai. • Application for C to E for construction of Residential Cum Commercial Project for,

Total Plot Area - 6673.50 Sq.mtrs. Total Construction Built Up Area- 23,745.25 Sq.mtrs.

• Application Received at SRO Navi Mumbai on 20/10/2012 and at HQ on 6/1/12012.

• Project proponent has not obtained EC from Competent Authority and applied for EC towards GOM dated 28/9/2011,

• Firm has completed construction work of two building without C to E and EC.

• RO Navi Mumbai has issued Interim Direction Dated 31/10/2012 for starting construction without C to E and EC from Competent Authority and accordingly applicant has submitted Bank Guarantee which is valid upto 6/11/2013.

• Board official visited the site dated 18/12/2012 and reported that during visit construction activity not found in operation

• Project proponent has not obtained EC.Project Proponent has applied for C to E.Project Proponent has completed construction of two building.RO Navi Mumbai issued proposed direction followed by Interim Direction and directed to stop construction activity with BG of Rs.10 Lakh which is obtained by RO Navi Mumbai which is valid upto 6/11/2013.As per field visit report dated 18/12/2012, construction activity was not found in operation.The case may be discussed in CC since construction activity is already completed without C to E And EC for Policy decision.

 

Page 5: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    32 

 

 

Agenda no. 2 Name of Industry M/s.Space Developers.,(SRA Project), CTS No.351,351/1 to 351/110,575,575/1 to9, Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78.

• Application for C to E for SRA Project for, Total Plot Area-4470.28 Sq.mtrs. Praposed Built Up Area (As per FSI)-12474.70 Sq.mtrs. Total Construction BUA-21,189.88 Sq.mtrs.

• Application Received at SRO Mumbai on 21/1/2013 and at HQ on 14/2/2013.

• Said project obtained EC from GOM Dated 4/1/2013. (N-9) Total Plot Area-4470.28 Sq.mtrs. Praposed Built Up Area (As per FSI)-12474.70 Sq.mtrs. Total Construction BUA-21,189.88 Sq.mtrs.

• RO Mumbai recommended C to E upto commissioning of the project or 5 years

whichever is earlier.

• We may grant C to E with condition of submission BG of Rs. 5 Lacs for providing STP and MSW processing plant.

 

 

 

 

 

 

 

 

 

 

 

Page 6: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    33 

 

Agenda no. 3 Name of Industry The Chief commissioner of income tax,Mumbai , CTS No.C-41 to C43,Block G,Bandra Kurla Complex,Mumbai

• Application for C to E for construction of office compex building(ie. 6 Buildings having Nos.55 to 60) for,

Total Plot Area -9,500 Sq.mtrs. Praposed BUA [As per FSI] -37,967.60 Sq.mtrs Total Construction Built Up Area-58,346.90 Sq.mtrs.

• Application Received at SRO Mumbai on 26/11/2012 and at HQ on 9/1/2013.

• Project proponent has obtained EC from GOM dated 18/11/2012(C-23)

Total Plot Area -9,500 .00 Sq.mtrs. Praposed BUA [As per FSI ] -37,967.60 Sq.mtrs Total Construction Built Up Area-58,346.90 Sq.mtrs

• Board official visited the site dated 18/12/2012 and reported that fencing work completed and

excavation is under progress.

• RO Mumbai recommended C to E upto Commissioning of the project or 5 years whichever is earlier .

• As per RO Report, only excavation work is in process.We may Grant C to E with condition of submission of BG of Rs.10 Lakh for providing STP and MSW Processing Plant.

 

 

 

 

 

 

 

Page 7: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    34 

 

Agenda no. 4 Name of Industry Mumbai Housing Area Development Authority (MHADA), Redevelopment of Transit Camps into Transit EWS, MIG Type Tenements, CTS 145 at Gavanpada Mulund (E), Mumbai-81

• Application for C to E for redevelopment of Transit camp into transit (Total 6 building projects)for, Total Plot Area -18,614.00 Sq.mtrs.

Total Built Up Area-43,846.23 Sq.mtrs.

• Application Received at SRO Mumbai on 4/12/2012 and at HQ on 9/1/2013.

• Project proponent has obtained EC from GOM dated 17/10/2011 Total Plot Area -18,614.00 Sq.mtrs. Total Built Up Area-43,846.23 Sq.mtrs.

• Board official visited the site dated 13/12/2012and reported that, Total 6 Building Project (3 Nos of Existing Transit Building+ 3 Nos.of Sale Building)] a. Transit Building: construction of 2 Buildings are fully completed and 3rd Buildings have 5 wings ,construction of 4 wings are Already completed and construction work of 5th wing is at plinth level. b. Sale Building : construction work of one building is at plinth level and construction work of other 2 building is not yet started. Presently transit tenets are staying in building No. 1 & 3.

• RO Mumbai recommended C to E upto Commissioning of the project or 5 years whichever is

earlier subject to obtain necessary BG for Providing STP and MSW Plant

• We may grant C to E with condition of submission BG of Rs. 5 Lacs for providing STP and MSW processing plant and Submission of Board Resolution with BG of Rs. 2 Lakh for starting construction without consent from the Board.

Page 8: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    35 

 

Agenda no. 5 Yashraaj Ethanol Processing Pvt. Ltd. , S. No. 124 A & B, Khushi, Limb Phata, Tal & DIst. Satara Web Agenda:

• Applied for Consent to Establish for bottling plant. • Existing unit has valid consent up to 28.2.2013 for manufacturing of ENA, Impure sprit,

Distiller’s Wet grain soluble (DWGS), fusel oil. • Located at about 5.0 Kms from river Krishna (A-II) class. • Unit has applied for for Bottling plant – 1350 KL/M in same premises. • Industrial effluent is 4.0 CMD and D.E is 4.0 CMD. • Industry has proposed PSF (Pressure Sand Filter) & ACF (Activated sand Filter) for the

treatment of the effluent and same will be recycled for bottle washing purpose. • Case is under purview of Consent Committee. • Recommended for Grant of C to E for Bottling Plant.

Page 9: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    36 

 

Agenda no. 6 Name of the industry: - M/s. Ador Powertron Ltd.,

Ramnagar Complex, Plot No. 51, D - II Block ,

MIDC Chinchwad, Pune- 411019

• Applied for consent to establish for expansion

• Application received at SRO- Pune on dtd 21/11/2012 and at HQ on 07/01/2013

• Existing plant consent is valid up to 31/12/2015.

• The generation of Industrial effluent will be NIL (existing NIL)

• For 6.4 CMD domestic effluents (proposed 0.8 CMD) they have provided septic tank and overflow connected to local body sewer line.

• SRO PC reported that industry has provided Wet scrubbing arrangement to the painting section. The waste water generated (Scrubbing water) is disposed by sending it to MEPL Ranjagaon (CHWTSDF) along with paint waste.

• Regional officer Pune has recommended the case for grant consent to establish for expansion, subject to submission of compliance report.

• Industry has not provided VOC control system to paint booth, we may forfeit 1/- Lakhs BG & obtained fresh 2/- lakh BG for compliance within 4 month period.

• We may grant consent to establish for expansion subject to fulfilling above said condition

• We may place the consent application before CC for further consideration.

Page 10: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    37 

 

Agenda no. 7 Name of Industry Mumbai Housing Area Developmant Board , CTS No. 1C/1/1(part), Shimpavali of village- Kandivali at Charkop, Mumbai – 400 092

• This office received said Application for C to E(MU-2975-11)& Operate (MU-4411-12) with separate IMIS No. for redevelopment of Construction Project for, Total Plot Area -13,378 Sq.mtrs. Total Built Up Area-27,797 Sq.mtrs.

• Application Received at SRO Mumbai on 13/12/2012 and at HQ on 13/2/2013

• Applicant has obtained EC from GOM Dated 13th Octomber,2010.

Total Plot Area -13,378 Sq.mtrs. Total Built Up Area-27,797 Sq.mtrs.

• Board official visited the site on 19.12.12 and reported that they have completed the construction work of MIG & EWS Bldg & which are not occupied.

• Proposed project will generate, Wet Garbage-1020 Kg/Day (Composting) Dry Garbage -680Kg/Day (will be handed over to authorized recycler) STP Sludge - 15 Kg/Day (will be used as organic manure

• SRO Reported that applicant has provided 2 Nos. of vermicomposting pit which seems to be for disposal of 1020 Kg/Day wet garbage.

• RO Mumbai has issued show cause issued to Applicant dated 2/1/2012 for starting the construction without obtaining consent from Board and Construction of Building is not as per EC. Applicant has submitted reply of SCN (Copy Attached).

• RO Recommended C to E and C to O with condition of submission necessary BG for Operation and maintenance of STP and MSW Processing Plant.

• Construction of Project is Completed, EC Obtained and now applied for C to E and C to Operate, hence we may place the application in CC for further decision.

 

 

Page 11: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    38 

 

Agenda no. 8 M/s Venkateshwara Agro Sugar Products Pvt. Ltd, Shivani(Jamga), Tq. Loha, Dist. Nanded.

• Applied for first consent to operate. • Sugar industry of 3500TCD obtained Consent to Establish on 30.08.2010 with condition

of EC. • Application submitted to SRO on 22.11.12 & at hq on 27.12.12. • C.I of ind is 47.17 Crores. • Civil work of ETP completed & electromechanical work was in progress. • Fly Ash arrester provided to Boiler however condition of ESP/Vetury scrubber/wet

scrubber was prescribed in Consent to establish. • Ro reported that the condition of EC may not be applicable as the capacity of plant is

3500TCD. • RO recommended for grant of Consent to operate wth condition of BG. • Recommended not to issue Consent to Operate since ETP & ECS are not provided.

Page 12: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    39 

 

Agenda no. 9

Name of Industry M/s.Nilkanth Tech Park Pvt.Ltd., CTS No.758,758/1 to7,759,759,759/1 to12 Vilage:Marol,Andheri-Kurla Road,Mumbai-86

• Application for C to Operate for Commercial Building Project(IT &IT Project) for, Total Plot Area-26,332.30 Sq.mtrs.

• Application Received at SRO Mumbai on 29/11/2012 and at HQ on 28/1/2013.

• Said project obtained EC from GOM Dated 4/1/2013.

Total Plot Area-26,332.30Sq.mtrs

• Board has issued C to E to said project dated 4/9/2006 Total Plot Area-26,332.30Sq.mtrs.

• Board official visited the site dated 7/12/2012(C-1) a.Total commercial buildings having 3 wings (A,B &C),Construction work of A & B is completed and construction work of C wing is under process. b.Not provided composting arrangement for solid waste treatment

• RO Mumbai recommended C to O upto 30/4/2014.

• RO Mumbai vide office note dated 16/7/2012,submitted proposal for forfeiture of Bank Guarantee which is valid upto 28/2/2013.Applicant has submitted letter dated 7/2/2013, regarding not to forfeiture of Bank Guarantee.

• We may place the Application in CC Meeting for further decision.

 

Page 13: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    40 

 

Agenda no. 10

Malu paper mill (Newsprint division Unit II) Borujwada, Dist. Nagpur.

• Applied for renewal of consent with Amalgamation of consent.

•Ind proposed to manufacture only one product instead of three products hence production capacity of one product i.e Kraft paper will increase.

•Due to stoppage of products pollution load will be decreased .

•IE generation will reduced to 70 CMD from 275 CMD .

•Provided Secondary treatment plant. Treated effluent will be recycled/reused in process.

•Provided Wet scrubber as an APC to Coal/wood/Rice husk fired boiler.

•By amalgamation of Both consents the Case may enter into purview of CC as the C.I of this Plant is 20.01 crores.

•The application for earlier renewal was submitted to HQ on 23.06.2-11 which is not traceable. . • Xerox Copy of application was called & clubbed herewith.

Page 14: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    41 

 

Agenda no. 11  

Name of the Applicant:

M/s. Maersk India Pvt. Ltd.. Sector-6, Dronagiri warehousing complex, Navi Mumbai

Application received for grant of amendment in consent. Consented Activity- (CFS) Cargo ware housing complex handling of containerized

cargo &storage which covers operational area and inside company premises excluding handling of chemical.

Proposed activity-Container yard (CFS) All type of cargo ware housing complex. (Handling of all type of containerized/non containerized cargo & storage ,which & inside company)

Application received at SRO,Taloja , dt: 4/7/2011 and at HQ on 24/01/12.

Applicant has submitted C.A. Certificate stating project cost is Rs.71.86 Cr.

Industry category-Orange.

RO-Navi MumbaiTaloja - Consent may be granted with overriding effect over earlier consent in orange category. Legal wing:-We may impose condition of threshold limits & they should not handle the

chemicals more than the threshold limits.

Remarks of HOD- We may consider the case for C to E by imposing condition of threshold limits & they should not handle the chemicals more than the threshold limits.

 

Page 15: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    42 

 

Agenda no. 12

M/s Valsad Dist. Co-op Milk producers Union ltd, E-23, MIDc Tarapur, Dist. Thane.

• Industry has applied amendment in Consent. • Dairy & diary Products. Manu of pasteurized Milk, , Butter Milk, & Curd. • Consent is avlid till upto 31.03.2015. • Ind requested for amendment in consent in respect of Fuel i.e Biomass & additional D.G

set. • Recommended for amendment in Consent.

Page 16: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    43 

 

Agenda no. 13 M/s. Kopargaon SSK Ltd.,(Distillery unit.),Kopewadi Tq. Kopargaon Dist. Ahemadnagar.

• Applied for renewal of consent with amalgamation. • Category RED/LSI. • Existing consent dtd.29.09.2011, valid up to: 31.12.2012. • Existing consent dtd. 11.01.2012, valid up to : C to E. • C.I. of sugar unit of Rs. 45.44 Cr. • C.I. of Country liquor unit of Rs. 10.49 Cr. • C.I. of Distillery unit of Rs. 13.86 Cr. • Total C.I. of Rs.69.79 Cr. • I. E. generation to the tune of 400 CMD. • D. E. generation to the tune of 20 CMD. • Provided 28 days HDPL lined lagoon for spent wash storage. • Provided 8 acres of HDPL line compost yard with leachate collection sump. • Provided Bio-methanization followed by Bi-composting. • Install RO, MEE & incineration but it is to be commissioned. • Provided 5 days HDPL lined storage tank for untreated spent wash as per CREP

norms. • Industry using steam from sugar boiler. • Wet scrubber provided. • Environmental statement submitted on 27.09.2012.

RO/SRO recommended to grant the consent subject to BG of Rs. 1.0 Lakh against the commissioning of the RO, MEE & incineration with time bound.

Page 17: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    44 

 

Agenda no. 14 M/s. Kopargaon SSK Ltd.,(Country Liquor unit.),Kopewadi Tq. Kopargaon Dist. Ahemadnagar.

• Applied for renewal of consent with increased production qty. • Category RED/LSI. • Existing consent dtd.29.09.2011, valid up to: 31.12.2012. • Existing consent dtd. 11.01.2012, valid up to : C to E. • C.I. of sugar unit of Rs. 45.44 Cr. • C.I. of Distillery unit of Rs. 13.86 Cr. • Previous C.I. of Country Liquor unit of Rs. 8.39 Cr. • Enhanced C.I. of Country Liquor unit of Rs 2.09 Cr. • Total C.I. of Rs.69.79 Cr. • I. E. generation to the tune of 70 CMD. • Existing consent was granted for NIL I.E. • Industry generating bottle washing effluent. • Not provided adequate ETP, only collection tank arrangement provided. • Effluent discharging on land from collection tank. • JVS exceeding the prescribed standards. • P.D. dated 16.06.2012 was issued by RO. • RO/SRO recommended to refuse the consent or may be granted subject to obtaining

suitable BG. Industry may be called for hearing.

 

 

 

 

 

 

 

 

 

 

 

Page 18: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    45 

 

Agenda no. 15 Name of the industry: - M/s. Elringklinger Automobile Components (I) Pvt. Ltd.  

Plot No. G‐2, MIDC, Ranjangaon,  Tal. Shirur, Dist.Pune 412 220 

• Applied for renewal of consent with expansion

• Application received at SRO- Pune on dtd 24/12/2012 and at HQ on 07/02/2013

• Previously consent was valid up to 31/12/2012 • Industry located @ 10 KM away from tiver Ghod. • Generation of Industrial effluent is 2.5 CMD to treat industrial effluent ETP is provided • For 11 CMD domestic effluent septic tanks provided. • Regional officer Pune has recommended for grant of consent, after receipt of reply from

industry • We may grant consent to operate with expansion 31/12/2015 with operation

B.G. of Rs. 5/- Lakh

• We may place the consent application before CC for further consideration.

Page 19: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    46 

 

Agenda no. 16 Name of the industry: - M/s. Hindalco Industries Ltd., Durgamwadi, Durgamanwadi Mine, A/p- Radhanagari,

Tal – Radhanagari, Kolhapur.

• Case for renewal of consent. Bauxite ore mining 864000 MT/A. No change in quantity.

• CI is Rs.41.60 Crs and existing CI is Rs.40.63 Crs.

• Provided water sprinkling arrangement to internal roads, crushing activity, mining activity and provided garland drainage with settling tank arrangement. Silt check dams are provided in mining area. Provided simultaneous back filling of overburden and carried out a forestation. Planted about 2.86 lac no of trees.

• Submitted Environment Statement for the year 2011-12.

• SRO recommended grant of consent upto 31/12/2014.

• Paid fees of Rs.150100/- as per capital investment and Rs.150100/- as per extra charges to mining industries with prevailing rate of Rs.0.4ton of the product which short by Rs.541100/- considering consent period upto 31/12/2014.

• We may consider grant of renewal of consent upto 31/12/2014, after receipt of additional fees, with operational BG of Rs.5/- Lakhs.

• We may place the case before CC for further discussions.

Page 20: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    47 

 

Agenda no. 17 Name of the industry: - M/s. Kalika Steel Alloys Pvt. Ltd., Plot No. C08, Addl. MIDC, Jalna.

.

• Case for consent to establish for expansion.

• Expansion will be in plant & machineries. Will be increasing existing quantities of product MS Billets- 580 MT/D and will mfg. new product TMT Bars – 760 Mt/D

• This requires environmental clearance unit have applied for the same.

• CI for expansion is Rs.49.15 Crs and existing is Rs.13.48 Crs.

• Proposes to provide APC. Existing plant APc is modified and JVS results are within limits.

• Existing BG of Rs.1.5/- Lakhs is valid upto 31/07/2013.

• Environment statement of 2011-12 is submitted.

• SRO recommended grant of consent to establish subject to EC.

• We may consider grant of consent to establish for expansion subject to EC.

• We may place the case before CC for further discussions.

Page 21: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    48 

 

Agenda no. 18 Name of the industry: -  M/s. Varroc Engineering (P) Ltd., Plot No. L-6/2, MIDC Area (plant V), Waluj, Aurangabad.

• Applied for renewal of consent. No change in product & its quantities.

• CI is Rs.49.91 Crs and existing CI was Rs.48.40 Crs.

• Provided ETP & is member of CETP, JVS results are within limit.

• Provided scrubber to phosphating & spl section.

• Submitted Envt,. Statement for year 2011-12, cess returns are filed regularly.

• SRO recommended grant consent renewal upto 30/04/2016.

• We may consider renewal of consent with operational BG of Rs.2/- Lakhs.

• We may place the case before CC for further discussions.

Page 22: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    49 

 

Agenda no. 19 Name of the industry: - M/s.Ultra Engineers ( Unit IV ),

Sector No.10,Plot No 58 , PCNTDA, Bhosari,Pune-26

• Applied for renewal of consent

• Application received at SRO- Pune on dtd 01/08/2012 and at HQ on 21/12/2012

• Earlier industry obtained consent to operate in green category on 12/06/2009 which valid up to 30/04/2012 (without any surface treatment).

• Industrial effluent generation is 3.0 CMD for which primary effluent treatment plant provided. Need to be full fledged ETP

• For DE of 5 CMD septic tank provided & the overflow is connected to PCMC drainage.

• RO Pune recommended the case for grant of renewal of consent to operate for period upto 30.04.2014.

• Industry obtained CHWTSDF membership

• We may grant the renewal of consent for period up to 30/04/2014 with imposing 5/- Lakhs BG.

• We may place the consent application before CC for further consideration.

Page 23: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    50 

 

Agenda no. 20 Name of the Industry: M/s. Western Coalfields Ltd.,

Durgapur Rayatwari Colliery, Chandrapur.

• Applied for renewal of consent Coal production 0.92 MDT/A.. • Earlier consent valid up to 31.12.2012.

• Analysis results of AAQM is higher. We may grant consent for period up to 31.12.2013 with forfeiting of Bank Guarantee of Rs.2/- Lakhs due to not achieving results and also take Bank Guarantee of Rs. 10/- Lakhs towards Operation and Maintenance.

Agenda no. 21 Name of the Industry: M/s Ring Plus Aqua Ltd. (Starter Gear Div.),

D-3/4, STICE, Musalgaon, Sinnar, Dist: Nashik.

1. Applied for grant of renewal of consent to operate at RO Nashik on 26.12.2012.

2. Industry has obtained consent to operate which was valid up to 31.12.2012.

3. Application for grant of consent to operate received to HQ on 02.02.2013

4. Industrial effluent Nil.

5. Industry has submitted Environment statement -2011-2012.

6. RO-Nashik has recommended for renewal of consent for the period up to

31.12.2013.

7. Recommended for renewal of consent for the period up to 31.12.2013.

Page 24: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    51 

 

Agenda no. 22 Name of the Industry: M/s Ring Plus Aqua Ltd. (Shaft bearing Div.),

Plot no.A-16/17, SITC Musalgaon, Sinner,

Tal: Sinner, Dist: Nashik.

1. Applied for grant of renewal of consent to operate at RO Nashik on

25.12.2012.

2. Industry has obtained consent to operate which was valid up to 31.12.2012.

3. Application for grant of consent to operate received to HQ on 02.02.2013

4. Industrial effluent Nil.

5. Industry has submitted Environment statement -2011-2012.

6. RO-Nashik has recommended for renewal of consent for the period up to

31.12.2013.

7. Recommended for renewal of consent for the period up to 31.12.2013.

Page 25: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    52 

 

Agenda no. 23 Name of Industry: M/s Make Waves Sea Resort Pvt. Ltd.,

(Hotel Retreat), Erangal Village, Madh Marve Road,

Malad (W), Mumbai-400 064.

1. Application for grant of renewal of Consent to Operate of 5 Star Hotel (147 rooms) received at R.O. (Mumbai) on 7/09/2011.

2. Application was returned to the applicant vide letter No. SROM-IV/TB/111029FT0145 dtd. 29/10/11.

3. Regional Officer (Mumbai) had issued SCN on 16/06/2012. 4. Applicant has resubmitted application for grant of renewal of Consent to Operate on

18/01/2013. 5. R.O.(Mumbai) forwarded application to A.S.(T) on 08/02/13. Hard copy of application

received at HQ on 12/02/2013. 6. Firm has provided primary treatment to treat laundry effluent. After treatment, mixed with

sewage for further treatment in the STP consisting of primary, secondary & tertiary treatment. After treatment, treated sewage/effluent is utilized upto maximum extent for flushing, cooling purpose, and rest is discharged on land for gardening. JVS results are observed exceeding Consented limits.

7. Firm has not provided Ozonization treatment for swimming pool water. 8. Dry waste – 25 Kg/day is disposed off by sale. Wet waste - 50 Kg/day & STP Sludge – 130 Kg/month is sent to MCGM dumping site.

9. In Consent processing report, C.I. is mentioned as Rs. 42.25 Crores. But, C.A. Certificate showing C.I. of Rs. 21.50 Crores in fixed assets of M/s Ramda Plaza Palm Grove, Juhu Tara Road, Juhu, Mumbai-400 059 is attached alongwith the application form.

10. Hotel Authority has not paid adequate Consent fee as per Env. Dept.’s revised Consent fee G.R. dtd. 25/08/2011.

11. Firm has not submitted details of Water CESS Return submission & Environment Statement submission.

12. RO(Mumbai) has recommended refusal for grant of renewal of Consent to Operate. 13. In view of above, it is recommended for issuance of Show cause Notice for refusal.

Page 26: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    53 

 

Agenda no. 24 Name of Industry: M/s Nanded Treasure Bazaar Pvt. Ltd., S. No. 71/D/4 63/1, Vasarni, Tal. & Dist. Nanded.

14. Application for grant of renewal of Consent to Operate of Shopping Mall, Multiplex & 3 Star Hotel (58 rooms) received at S.R.O. (Nanded) on 7/09/2011.

15. S.R.O. (Nanded) forwarded application to A.S.(T) Section on 11/10/2011. 16. Query & Reminder-I letters were issued on 2/11/2011 & 19/12/2011 respectively. 17. S.R.O.(Nanded) submitted reply to query letter vide letter dtd. 27/12/2011. 18. Further query letter was issued vide letter dtd. 7/01/2012. After non-receipt of reply, D.O.

Letter was issued to S.R.O.(Nanded) on 20/04/2012. 19. S.R.O.(Nanded) has submitted reply to D.O. letter vide letter dtd. 4/05/2012 received on

18/05/2012. 20. Letter dtd. 22/05/2012 was issued for payment of additional Consent Fee towards Consent

to Establish Fee on account of difference of C.I. 21. Application was returned to S.R.O.(Nanded) for resubmission alongwith payment of

additional Consent fee and submission og requisite information vide letter dtd. 12/09/2012. 22. S.R.O.(Nanded) has resubmitted application for grant of renewal of Consent to Operate on

8/02/2013. 23. Firm has provided STP to sewage consisting of primary, secondary & tertiary treatment.

After treatment, treated sewage/effluent is utilized upto maximum extent for flushing, cooling purpose, and rest is discharged on land for gardening. JVS results are observed within Consented limits. Copy of the latest JVS result is not submitted.

24. Dry waste – 400 Kg/day is disposed off by sale. Wet waste - 350 Kg/day & STP Sludge – 200 Kg/month is sent to Municipal dumping site.

25. Firm has not submitted details of Water CESS Return submission & Environment Statement submission.

26. As per S.R.O.(Nanded)’s resubmission, Hotel’s Category is 3 Star. As per CPCB’s direction dtd. 4/06/2012 regarding classification of Industries under Red/Orange/Green Category, Hotel with Star category 3 Star and above comes under “Red” Category. Hence, granting authority is Consent Committee under the Chairmanship of Hon’ble Chairman and Hotel’s name needs to be added in the CC List.

27. On account of change in category, Hotel authority isupposed to pay additional Consent fee for grant of renewal of Consent to Operate.

28. SRO(Nanded) has recommended to grant of renewal of Consent to Operate upto 30/09/2013 under “Orange” Category.

29. Renewal of Consent to Operate may be granted under Red Category for appropriate period after receipt of the additional Consent Fee as per Env. Dept.’s revised Consent Fee G.R. dtd. 25/08/2011 subject to condition of submission of Water CESS Returns & Environment Statement within 2 months and G.G. of Rs. 2.0 Lakhs towards compliance of the same within 15 days from issue of the Consent.

Page 27: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    54 

 

Agenda no. 25 M/s. The Ravalgaon Sugar Farms Ldt., Tq. Malegaon Dist. Nashik.

• Applied for renewal for sugar & confectionery products with same production qty. • Category RED/LSI. • Capacity 2000TCD. • Previous C.I. of Rs. 47.46 Cr. • Enhanced C.I. of Rs. 06.74 Cr. • Total C.I. of Rs. 54.20 Cr. • C.I. increased due to cost of sugar godown included. • I. E. generation to the tune of 900 CMD. • Not complied with CREP as effluent is more than 100 liters per ton of crushing.

Need to upgrade ETP. • D.E. generation to the tune of 300 CMD. • ETP, comprising grit chamber, oil skimmer, primary clarifier, collection cum neut.

Tank, aeration tank, secondary clarifier & settling tank provided. • 50 acres area plantation done. • Air pollution control. • Boiler-I, mechanical dust collector & fly ash arrestor provided provided. • Boiler-2 & 3, mechanical dust collector provided. • ESP/wet scrubber not provided. • Cess paid up : June 2011 & Env. Statement submitted for year 2011-2012. • BG of Rs. 3.0 Lakhs submitted against P.D. issued for providing of wet scrubber, BG

valid up to: 6.01.2014. • Industry has provided closed pipeline for avoiding ingress of bagasse.

Page 28: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    55 

 

Agenda no. 26

M/s Baramati Agro Ltd Kannad Mahatama Phule nagar, Kannad, Dist. Aurangabad,.

Applied for renewal of Consent. Formerly Known as Kannad SSK Ltd.

•Ind was in not in Operation till 2007. Now taken over by M/s Baramati Agro ltd.

Application received at SRO on 21.11.12 & at HQ 18.01.13

•Sugar ind 2500TCD.

•Total Capital Investment is 50.70 Cr.

•Industrial effluent generated 420 CMD.

•Provided Secondary treatment for treatment of effluent.

•Treated industrial effluent is used on land for irrigation. 60 acres land provided.

•Bagasse fired Boiler. Provided with Fly Ash Arrester to control air pollution.

•Upgradation and modification work of ETP is completed.

•CREP non complied.

•SRO, and RO has recommended case for Renewal up to 31/10/2014 with bank Gurantee of Rs 5.0 lkahs & 2.o lakhs.

• Even though the unit is old & not in operation since it is taken over by new co & management this may be treated as First C to O & so in that way it must comply with all conditions of consent & CREP. CC may decide to grant renewal with condition of BG of Rs 5+2+3 lakhs as per our policy for renewal /existing ind after considering above.

Page 29: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    56 

 

Agenda no. 27

Nagpur Zilla Kapas Utpadak Sahakari soot Girni Ltd. at-patansaongi,Dist-Nagpur

Applied for renewal of Consent with increase in Capital investment .The production quantity remains same.

•Textile industry involving Ginning. Pressing, Blow room, Carding, Combing Drawing activity.

•No fuel consumption.

•SRO Nagpur-I recommended for grant of renewal of Consent after receipt of consent fees of Rs 15,000/- for increased C.I of Rs 2.28 Crores..

•As per recommendations we may grant Consent.

• Recommended for grant of consent after receipt of required consent fees as per letter of SRO Nagpur-1.

Page 30: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    57 

 

Agenda no. 28 Bhaurao Chavan SSK Ltd. Unit 2 Shivaji Nagar, Dongarkada, Tq. Kalamnuri, Dist. Hingoli • Applied for renewal of Consent .

•Sugar industry 1250 TCD.•Capital investment 34.98.

Application received at SRo Parbhani 20-11-12 & at HE on 01.01.13

•Previous consent of sugar was valid till 31.12.2012

•Industrial effluent generated 125 CMD.(Condition of CREP complied)

•Provided Secondary treatment plant. Treated effluent is used on land. Available land for disposal is 35 Hectres.

•JVS results are fluctuating one result within limit except SS & Other two results exceeding the consented standards with respect o BOD & COD..

•Fly ash arrester provided to boiler. Sugar dust catcher to bagging section.

•Cess paid upto Sept 2012.

•Environmental statement is submitted for the year 2011-12 .

•RO issued proposed directions on 21.11.12 for non Compliance of CREP conditions. RO recommended for renewal of Consent with Condition of B.G. of Rs 5.0 lakhs & 2.0 Lakhs.

Recommended for renewal of Consent with B.G. of Rs 5 Lakhs for O & M of Pollution control devices,Rs.2 lakhs for Avoiding ingress of Baggase into effluent Carrying pipeline & Rs 3 lakhs for Provision of APC as per CREP conditions, as per policy of Board.

Page 31: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    58 

 

Agenda no. 29 Name of the project: M/s. Yashovardhan Promoters and Developers Pvt. Ltd. (Dew Drops) ,

S. No. 44 A/1, Sub Plot No. 1, Pune Alandi Road, Vishrantwadi, Dhanori, pune.

• C to O, validity / expired on 31.01.2011. • PP has obtained EC from MoEF on 28/9/2007 for construction of residential and

commercial project, ‘Dew Drops’ at Alandi Road, Vishrantwadi, Pune. • EC granted for construction of 6 no. of residential building and 01 no.of commercial

building. (G +11)The total plot area is 27298 sq, meters and total built up area is 31711.19 sq. meters.

• At present, out of 06 nos. of building, the construction of 03 nos. of building of 132 flats and one commercial building is completed.

• PP has changed the scope of the project without prior approval from MoEF, and instead of construction of remaining 03 Nos. of building of 132 flats; they have started the construction of 16 Nos. of Row houses.

• Board had issued P.D. on 29/06/2011 & PP has submitted their reply for the same. • Promoter has provided 02 Nos of STP’s, one for commercial building and 2nd for

residential building. But, adequacy report of existing STP not submitted. • PP has provided vermin-composting facility, O&M is poor. • PP has submitted Environmental statement, but, cess returns are not submitted. • Capital Investment is Rs.7609 lakh. & Consent Fees of Rs.125000/- is paid. • As the PP has changed the scope of work and whether amendment in EC or town

planning map or under such circumstances, the Boards stand needs to be discussed, this matter may be discussed in CC for decision.

Page 32: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    59 

 

Agenda no. 30 M/s. Shri Tradco Dessan Pvt. Ltd., (Formerly Kissan Sahakari Starch Mfg. Society Ltd.) S.No. 93/94, Mumbai – Agra Road, Biladi Phata Deopur Tq. & Dist. Dhule.

• Applied for renewal of consent with change in name. • Category RED/LSI. • Existing consent dated 10.07.2003, valid up to: 31.12.2007. • SRO reported industry was closed since 2008. • SRO reported said industry takeover by Shri Tradco Dessan Pvt. Ltd., in year 2010. • SRO reported industry had applied for renewal of consent with change in name in

Aug, 2010 along with consent renewal fees of Rs. 2,50,000/- for further period from 31.12.2007 to 31.12.2012.

• Existing C.I. of Rs. 23.51 Cr. • Proposed C.I. of Rs. 12.00 Cr. • Total C.I. of Rs. 35.51 Cr. • C.I. increased due to modernization of plant. • I. E. generation to the tune of 550 CMD. • D.E. generation to the tune of 15.0 CMD. • JVS result dated 27.09.2012 exceeding the parameter like COD & TDS. • ETP provided comprising, equalization tank, buffer tank, UASB Digester, Bio-gas

holder, aeration tank, Clarifier Sand filter & SDB. • Air pollution control. • Boiler with chimney height 40 mtr. Provided. • Multi-cyclone dust collector followed by bag filters provided. • 27 acres open land provided for disposal of treated effluent. • Cess returns submitted up to: July, 2012. • Environmental statement submitted for the year 2011-12. • RO/SRO recommended to grant consent if approved by imposing appropriate BG for

up-gradation of ETP & APC system.

 

 

 

 

 

 

Page 33: List of Cases to be submitted before the 20th Consent ... · PDF fileUnion Ltd, MIDC Tarapur, ... 20 Western Coal Fields Ltd., ... Village-Kanjur,Quarry road,Off LBS Marg Bhandup(W),Mumbai-78

 

Web agenda of 20th CC meeting of 2012 dtd 15.03.2013    60 

 

 

 

Review Agenda no. 1  

M/s. Panchshil Tech Park Ltd.,  sr. no. 191/2A/1/2102, Next to Don Bosco School,  Off. Airport Road, Yerawada, Pune.  

The  case was discussed  in CC meeting dtd 04.12.2012 &  it was decided  to  revert with  legal opinion alongwith policy  in such cases. Accordingly  the matter was referred  to  legal section. The  legal section had  called  required  information  from RO‐Pune on 24.01.2013, however, meantime PP has  submitted desired details vide their letter dtd 05.02.2013.  

From the documents submitted by PP Legal section has confirmed that plinth has been completed prior to 07.07.2004, when EC was not required for construction project. Also completion certificate obtained appears to be consistent with the plinth certificate & can be taken into consideration.  

Based on the legal opinion, we may consider the case for grant of C to E & O. 

Case is placed for further discussion and review.