3
List of Remotely Operated Vehicle Operations 2002-2016 Date Contractor Task ROV System Position Rig or Vessel Client 2015 Canyon Field Maintenance and Repair - Shetlands XLX82 Sub. Eng. Siem Daya 2 Statoil May - Dec 2014 Canyon Skandi Constructor/North sea UK TDU, Well Stim. tooling XLS03/X LS04 Supervisor Skandi Construct or/ BP Feb Mar 2014 Canyon Deep Cygnus/Borkum West Wind Farm Installation Trenching Support tooling, TSS XLS 27 Supervisor Skandi Construct or Technip Offshore Wind Nov Dec 2013 Canyon Grand Canyon/North Sea Dutch sector Trencher Support XLX72/ XLX 73 Supervisor Skandi Construct or GDF Suez Oct Nov 2013 Canyon Grand Canyon/North Sea Norwegian Gas Line Trenching T1200 Trenching Sub Engineer Skandi Construct or EMAS Jan – Aug 2013 Target Resources/ Target Mega Marine Submarine Rescue to the Royal Malaysian Navy Submarine fleet. Task included: Distressed Submarine location, Emergency Life Support Pod posting, Debris clearance, Ventilation & Depressurization system installation. Ancillary: Torpedo recovery TXLR 09 Supervisor / Consultant Mega Bakti Royal Malaysia n Navy May – Dec 2012 UKPS/Perry Mobilization, integration, and setup of newly built ROV system for new company. Task included: Training of new personnel in use of ROV, preparation of entire administration system. Scope: Submarine rescue Operations TXLR 09 Supervisor / Instructor Mega Bakti Target Resourc es SDN BHD Jan/F Canyon SEPLA (Self-embedding plate XLS 41 Sub/Eng Normand Murphy

List of ROV Operations involved with 2002-2016

Embed Size (px)

Citation preview

Page 1: List of ROV Operations involved with 2002-2016

List of Remotely Operated Vehicle Operations 2002-2016

Date Contractor Task ROV System

Position Rig or Vessel

Client

2015 Canyon Field Maintenance and Repair - Shetlands

XLX82 Sub. Eng. Siem Daya 2

Statoil

May - Dec 2014

Canyon Skandi Constructor/North sea UK TDU, Well Stim. tooling

XLS03/XLS04

Supervisor Skandi Constructor/

BP

Feb Mar 2014

Canyon Deep Cygnus/Borkum West Wind Farm Installation

Trenching Support tooling, TSS

XLS 27 Supervisor Skandi Constructor

Technip Offshore Wind

Nov Dec 2013

Canyon Grand Canyon/North Sea Dutch sector

Trencher Support

XLX72/XLX 73

Supervisor Skandi Constructor

GDF Suez

Oct Nov 2013

Canyon Grand Canyon/North Sea Norwegian

Gas Line Trenching

T1200 Trenching Sub Engineer

Skandi Constructor

EMAS

Jan – Aug

2013

Target Resources/ Target Mega

Marine

Submarine Rescue to the Royal Malaysian Navy Submarine fleet.

Task included: Distressed Submarine location, Emergency Life Support Pod posting, Debris

clearance, Ventilation & Depressurization system

installation. Ancillary: Torpedo recovery

TXLR 09 Supervisor/

Consultant

Mega Bakti

Royal Malaysian Navy

May – Dec

2012

UKPS/Perry Mobilization, integration, and setup of newly built ROV system for new company. Task included: Training of new personnel in use

of ROV, preparation of entire administration system. Scope: Submarine rescue Operations

TXLR 09 Supervisor/

Instructor

Mega Bakti

Target Resources SDN

BHD

Jan/F Canyon SEPLA (Self-embedding plate XLS 41 Sub/Eng Normand Murphy

Page 2: List of ROV Operations involved with 2002-2016

eb 2012

Anchor) by suction pile follower Installation Anchor ops & Rig

support (Labuan)

Ivan Oil

Oct/Dec

2011

Canyon Trencher support, (T750 and I-Trencher) pre and post lay surveys

and rock and debris clearance of lay route for High Voltage DC cable

bundle including fiber optic control cable on EWIP project

(Irish Sea)

XL 16/ XL 33

Sub/ Eng Island Pioneer

ABB/ Eirgrid

MAR 2008 – Nov 2011

Canyon IRM, including XMT installations, Subsea Control Module

replacement and installation, complete field inspection using

survey equipment including cathodic protection monitoring

(India)

XLS 47/ XLS 15

Sub/ Eng Olympic Canyon

Reliance

Canyon Metrology phase in construction of Dhirubai field (India)

XL 19 Sub/ Eng Normand Fortress

Reliance

OCT 2007 – JAN 2008

Canyon Field construction, mooring anchor and chain installation, Vincent

project, North West Shelf, (Western Australia)

XLS 33/ XLS 41

PT 1 Toisa Proteus

Woodside

SEPT – OCT

07

Canyon Platform inspection, diver support, flooded member detection,

cathodic protection testing, and related jacket cleaning (Thailand)

Scorpion 20

PT1 Seacor Acclaim

PTTEP

APR - JUN 07

Canyon Geological and Biological sampling and survey around subsea volcanic

vents for the purpose of future subsea mining projects (Papua

New Guinea)

Triton Super

Trencher 203

PT1 Wave Mercury

Nautilus Minerals

JAN – MAR

Canyon Span Rectification and Pipelay survey (Thailand)

Scorpion 20/

Scorpion

PT1 Seacor Acclaim

Hyundai Heavy

Ind. PTT,

Page 3: List of ROV Operations involved with 2002-2016

07 25 Bechtel

NOV - DEC 06

Canyon Subsea Control pod installation (Western Australia)

Scorpion 20/

Scorpion 25

PT1 Nor Sun Tamboritha

OCT – NOV 06

Canyon Trenching in of flowline (Indonesia)

Triton Super

Trencher 208

PT1 Acergy Hawk

Acergy

AUG - OCT 06

Canyon Jacket installation (New Zealand) Viper PT2 Ensco 56 Technip/ Ensco

JUN – JUL 06

Canyon Emergency BOP recovery (China) Triton Super

Trencher 212

PT2 Binh Minh

Transocean

APR - MAY

06

Canyon Touch-down survey and pipelay survey (China)

Scorpion 20/

Scorpion 25

PT2 Binh Minh

GIL Mauritu

s holdings

Ltd.

Mar 02 – Mar 06

Irish Naval Service

Rescue, recovery, hull survey (Ireland)

Sub Atlantic Cheroke

e

Electrical Artificer

INS vessels /

Base

Dept. of the

Marine