Investitia: Obiect : POD PESTE CANAL LISTA DE CANTITATI NR 1 BILL OF QUANTITIES No 1 1 EURO = 3.9277 RON 0 1 2 3 4 5 1.INFRASTRUCTURA 1 2A2 100.00 5.16 2 2B4A 48.00 177.15 3 2B9A 1.10 ### 4 2B9B 3.50 ### 5 2B13B 47.70 116.70 6 2B15C 11.00 98.34 7 2B10A 1.10 787.86 8 2B10B 1.70 802.40 9 2B15G 34.20 102.13 10 2B12A 125.00 13.79 11 2B12B 40.80 37.34 12 2B21A1 m2 113.90 3.82 TOTAL 1 2.SUPRASTRUCTURA 13 2C1A2A 9.00 882.48 14 2C9A 4.30 728.41 15 2C9B 0.62 745.47 16 2C10F 17.00 107.26 17 2C8A 20.00 33.12 18 2C11 46.00 31.83 19 2C26A3 m 20.00 10.47 20 2C12 41.00 17.86 21 2C16D 20.00 59.18 22 2C15A 12.00 282.20 TOTAL 2 3. RACORDARI CU TERASAMENTELE 23 2B18A 10.00 179.07 24 2B17 40.00 34.06 25 2B21 33.00 31.83 26 2C16A 18.00 44.89 TOTAL 3 4. LUCRARI AUXILIARE 27 2A1 km 0.10 ### TOTAL 4 TOTAL RECONSTRUCTIA ECOLOGICA A AMENAJARII PISCICOLE MURIGHIOL JUD. TULCEA Nr crt No. Cod art. Article code DESCRIEREA LUCRARII WORKS DESCRIPTION UM M.U. Cantitate Quantity Pret unitar Unit price ( EURO ) Umpluturi la platforme Platform filling m3 m3 Forarea pilotilor de diametru mare - F=1080mm Drilling of piles with a large diametre - D= 1080 m m Armatura OB37 in piloti forati de diametru mare OB37 reinforcement for driller column of big t t Armatura PC52 in piloti forati de diametru mare PC52 reinforcement for driller column of big t t Beton clasa C20/25 in piloti forati Concrete of C20/25 class for drilled piles m3 m3 Beton clasa C20/25 in elevatii Concrete of C20/25 class for elevations m3 m3 Armatura OB37 in elevatii OB37 reinforcement in elevations t t Armatura PC52 in elevatii PC52 reinforcement in elevations t t Beton clasa C30/37 in elevatii Concrete of C30/37 class for elevations m3 m3 Cofraje plane pentru elevatii - obisnuite Plane shutterings for elevations - usual m2 m2 Cofraje curbe pentru elevatii - obisnuite Curve shuttering for elevations - usual m2 m2 Hidroizolatie pe suprafetele de beton in contact cu pamantul Grinzi pref. prec. cu armatura aderenta L=8,20m h=0,42m buc. pcs. Armatura OB37 in suprastructura OB37 reinforcement for superstructure t t Armatura PC52 in suprastructura PC52 reinforcement for superstructure t t Beton turnat monolit in suprastructura clasa C30/37 m3 m3 Cofraje plane pentru suprastructura - obisnuite Plane shuttering for the superstructure - usual m2 m2 Hidroizolatie Waterproofing m2 m2 Borduri 15x20cm kerbs with 15x20 cm Calea pe pod Carriageway on the bridge m2 m2 Parapet metalic directional tip foarte greu pe suprastructura m m Dispozitive de acoperire a rosturilor de dilatatie de 20 mm m m Placi de racordare L=3.00m Precast transition slabs L=3.00m buc. pcs. Dren din piatra bruta Rubble stone drain m3 m3 Hidroizolatii pe culei si placile de racordare Waterproofing on the abutments and precast m2 m2 Parapet metalic pietonal pe suprastructura Pedestrian guardrail on superstucture m m Drumuri tehnologice Technological roads

Liste de Cantitati Final

Embed Size (px)

Citation preview

PodInvestitia:RECONSTRUCTIA ECOLOGICA A AMENAJARII PISCICOLE MURIGHIOL JUD. TULCEAFaza: D.E.Obiect :POD PESTE CANALLISTA DE CANTITATI NR 1BILL OF QUANTITIES No 11 EURO =3.9277RON(07.10.2008)Nr crtNo.Cod art.Article codeDESCRIEREA LUCRARIIWORKS DESCRIPTIONUMM.U.CantitateQuantityPret unitarUnit price( EURO )Pret totalTotal costs( mii EURO)Pret unitarUnit price(RON)Pret totalTotal cost( mii RON)0123456781.INFRASTRUCTURA12A2Umpluturi la platformePlatform fillingm3m3100.005.160.5220.272.0313.927722B4AForarea pilotilor de diametru mare - F=1080mmDrilling of piles with a large diametre - D= 1080 mmmm48.00177.158.50695.7933.4013.927732B9AArmatura OB37 in piloti forati de diametru mareOB37 reinforcement for driller column of big diametrett1.101,018.931.124,002.054.4013.927742B9BArmatura PC52 in piloti forati de diametru marePC52 reinforcement for driller column of big diametrett3.501,037.043.634,073.1814.2613.927752B13BBeton clasa C20/25 in piloti foratiConcrete of C20/25 class for drilled pilesm3m347.70116.705.57458.3621.8613.927762B15CBeton clasa C20/25 in elevatiiConcrete of C20/25 class for elevationsm3m311.0098.341.08386.254.2513.927772B10AArmatura OB37 in elevatiiOB37 reinforcement in elevationstt1.10787.860.873,094.483.4013.927782B10BArmatura PC52 in elevatiiPC52 reinforcement in elevationstt1.70802.401.363,151.595.3613.927792B15GBeton clasa C30/37 in elevatiiConcrete of C30/37 class for elevationsm3m334.20102.133.49401.1413.72102B12ACofraje plane pentru elevatii - obisnuitePlane shutterings for elevations - usualm2m2125.0013.791.7254.166.77112B12BCofraje curbe pentru elevatii - obisnuiteCurve shuttering for elevations - usualm2m240.8037.341.52146.665.98122B21A1Hidroizolatie pe suprafetele de beton in contact cu pamantulm2113.903.820.4415.001.710TOTAL 129.82117.143.92773927.72.SUPRASTRUCTURA0132C1A2AGrinzi pref. prec. cu armatura aderenta L=8,20m h=0,42mPrecast prestressed beams with adherent reinforcement L=8,20m h=0,42mbuc.pcs.9.00882.487.943,466.1231.2013.9277142C9AArmatura OB37 in suprastructuraOB37 reinforcement for superstructurett4.30728.413.132,860.9812.3013.9277152C9BArmatura PC52 in suprastructuraPC52 reinforcement for superstructurett0.62745.470.462,927.981.8213.9277162C10FBeton turnat monolit in suprastructura clasa C30/37Concrete cast monolith in the superstructure class C 30/37m3m317.00107.261.82421.297.1613.9277172C8ACofraje plane pentru suprastructura - obisnuitePlane shuttering for the superstructure - usualm2m220.0033.120.66130.092.6013.9277182C11HidroizolatieWaterproofingm2m246.0031.831.46125.025.75192C26A3Borduri 15x20cmkerbs with 15x20 cmm20.0010.470.2141.120.82202C12Calea pe podCarriageway on the bridgem2m241.0017.860.7370.152.88212C16DParapet metalic directional tip foarte greu pe suprastructuraDirectional metallic guardrail verry heavy on superstructuremm20.0059.181.18232.444.65222C15ADispozitive de acoperire a rosturilor de dilatatie de 20 mmDevices for covering of expansion joints - 20 mmmm12.00282.203.391,108.4013.300TOTAL 221.0082.483.92773927.703. RACORDARI CU TERASAMENTELE0232B18APlaci de racordare L=3.00mPrecast transition slabs L=3.00mbuc.pcs.10.00179.071.79703.337.0313.9277242B17Dren din piatra brutaRubble stone drainm3m340.0034.061.36133.785.3513.9277252B21Hidroizolatii pe culei si placile de racordareWaterproofing on the abutments and precast trasition slabsm2m233.0031.831.05125.024.1313.9277262C16AParapet metalic pietonal pe suprastructuraPedestrian guardrail on superstucturemm18.0044.890.81176.313.170TOTAL 35.0119.683.92773927.704. LUCRARI AUXILIARE0272A1Drumuri tehnologiceTechnological roadskm0.1027,525.122.75108,110.4110.8113.92770TOTAL 42.7510.813.92773927.7TOTAL58.59230.113.9277PROIECTANT / DESIGNER,OFERTANT / TENDERER,Sef Proiect,Verificat, Intocmit,Ing. Mirela COJENESCUIng. Victor DRAGOMIR Tehn.Maria MOCOFANa)Prezentele liste de cantitati contin un numar de 20 articole si un numar de 2 pagini;The present bill of quantities contains a number of 20 article and 5 page;b)Proiectantul completeaza si raspunde de valorile inscrise in coloanele 1,2,3 si 4;The Designer completes and is responsible for the values mentioned in columns1,2,3 and 4;c)Ofertantul completeaza si raspunde de valorile inscrise in coloanele 5,6,7 si 8.The Tenderer completes and is responsible of the values mentioned in columns 5,6,7 and 8.PROIECTANT / DESIGNER,OFERTANT / TENDERER,Sef Proiect,Intocmit,Ing. Mirela COJENESCUIng. Victor DRAGOMIR

&C

Descr.pret_PDESCRIERE DE PRETURILUCRARI PODNr.Crt.CodarticolDescriere articol01212A2UMPLUTURI LA PLATFORMESe pltete la metru cub (m3) de umplutur, si se refera la platformele necesare efectuarii forajelor pentru piloti , msurat dup compactareIn pre se includ: decopertarea stratului vegetal i compactarea amprizei umpluturii; sptura n groapa de mprumut; transportul materialului rezultat din sptur; mprtierea i compactarea pmntului n umplutur; finisarea platformei i verificarea cotelor necesare, precum i desfacerea platformei; transportul materialului rezultat n depozit i redarea terenului n circuitul agricol la terminarea lucrrilor.Prin proiect i Caietul de sarcini se vor preciza tehnologia de compactare i caracteristicile materialului compactat.m322B4AFORAREA PILOTILOR DE DIAMETRU MARE - F=1080MMSe pltete la metru liniar (m) de forajIn pre se includ: amenajarea suplimentar a platformei pentru poziionarea instalaiei de forat; amenajrile necesare execuiei forajului; deplasarea instalaiei de forare de la un pilot la altul i de la o fundaie la alta; forarea pilotului de la nivelul platformei pn la vrful pilotului; transportul materialului rezultat din forare; mprtierea materialului n depozitul de antier; desfacerea i evacuarea amenajrilor necesitate de foraj; verificarea cotei de fundare i natura terenului de fundare.Prin proiect i Caietul de antier se vor preciza: diametrul i lungimea pilotului; tehnologia de forare i categoria de teren.m32B9AARMATURA OB37 IN PILOTI FORATI DE DIAMETRU MARESe pltete la ton (t)In pre se includ: procurarea oelului beton; procurarea evilor pentru control i injectare; procurarea tablei pentru toba de injecie; confecionarea tronsoanelor de carcas cu evile i toba de injectare; transportul materialelor; manipulrile barelor de armtur i a carcaselor; montajul carcasei de armtur; mbinrile ntre tronsoanele carcasei; susinerea carcasei n timpul mbinrilor dintre tronsoane i n final n timpul betonrii; verificarea dimensiunilor carcasei i a poziiei acesteia n gaura de foraj.t42B9BARMATURA PC52 IN PILOTI FORATI DE DIAMETRU MARESe pltete la ton (t)In pre se includ: procurarea oelului beton; procurarea evilor pentru control i injectare; procurarea tablei pentru toba de injecie; confecionarea tronsoanelor de carcas cu evile i toba de injectare; transportul materialelor; manipulrile barelor de armtur i a carcaselor; montajul carcasei de armtur; mbinrile ntre tronsoanele carcasei; susinerea carcasei n timpul mbinrilor dintre tronsoane i n final n timpul betonrii; verificarea dimensiunilor carcasei i a poziiei acesteia n gaura de foraj.t52B13BBETON CLASA C20/25 IN PILOTI FORATISe vor evalua preuri separate, difereniate dup clasa betonuluiSe pltete la metru cub (m3)In pre se includ: procurarea agregatelor necesare preparrii betonului; procurarea cimentului; prepararea betonului conform prescripiilor din Caietul de sarcini; transportul betonului de la staia de preparare la locul de punere n oper; manipulrile; punerea n oper a betonului; verificarea calitii betonului din pilotul forat prin metode nedistructive i de laborator; injectarea la baz a piloilor.Prin proiect i Caietul de sarcini se precizeaz clasa betonului, natura i sorturile agregatelor, calitatea cimentului, adaosurile.m362B15CBETON CLASA C20/25 IN ELEVATIISe pltete la metru cub (m3)In pre se includ: procurarea agregatelor necesare preparrii betonului; procurarea cimentului; procurarea adaosurilor; prepararea betonului conform prescripiilor din Caietul de sarcini; transportul betonului de la staie la locul de punere n oper; manipulrile; punerea n oper i protecia betonului pe timpul ntririi; verificarea calitii betonului la staie i pe antier.Prin proiect i Caietul de sarcini se vor preciza clasa betonului, natura i sorturile agregatelor, calitatea cimentului i adaosurile.m372B10AARMATURA OB 37 IN ELEVATIISe pltete la ton (t)In pre se includ: procurarea oelului beton; confecionarea de bare din carcase; transportul materialului metalic; manipulrile barelor de armtur i a carcaselor; montarea barelor sau carcaselor precum i nndirea acestora prin sudur sau prin petrecere; mbinrile ntre bare i carcase; susinerile barelor pe poziie pentru mbinri sau montaj; verificarea poziiei conform proiectului.t82B10BARMATURA PC52 IN ELEVATIISe pltete la ton (t)In pre se includ: procurarea oelului beton; confecionarea de bare din carcase; transportul materialului metalic; manipulrile barelor de armtur i a carcaselor; montarea barelor sau carcaselor precum i nndirea acestora prin sudur sau prin petrecere; mbinrile ntre bare i carcase; susinerile barelor pe poziie pentru mbinri sau montaj; verificarea poziiei conform proiectului.t92B15GBETON CLASA C30/37 IN ELEVATIISe pltete la metru cub (m3)In pre se includ: procurarea agregatelor necesare preparrii betonului; procurarea cimentului; procurarea adaosurilor; prepararea betonului conform prescripiilor din Caietul de sarcini; transportul betonului de la staie la locul de punere n oper; manipulrile; punerea n oper i protecia betonului pe timpul ntririi; verificarea calitii betonului la staie i pe antier.Prin proiect i Caietul de sarcini se vor preciza clasa betonului, natura i sorturile agregatelor, calitatea cimentului i adaosurile.m3102B12ACOFRAJE PLANE PENTRU ELEVATII OBISNUITESe pltete la metru ptrat (m2)In pre se includ: procurarea materialelor necesare confecionrii cofrajelor inclusiv schele si esafodaje; confecionarea cofrajelor; montarea i demontarea cofrajelor, a schelelor si esafodajelor; transportul materialului necesar cofrajelor; manipulrile materialului necesar execuiei cofrajelor; verificarea dimensiunilor elementelor cofrate; curirea i depozitarea, n antier, a materialelor recuperate.Prin proiect i Caietul de sarcini se specific elementele pentru care se cere o fa vzut deosebit.m2112B12BCOFRAJE CURBE PENTRU ELEVATII - OBISNUITESe pltete la metru ptrat (m2)In pre se includ: procurarea materialelor necesare confecionrii cofrajelor inclusiv schelele si esafodajele; confecionarea cofrajelor; montarea i demontarea cofrajelor, a schelelor i eafodajelor; transportul materialului necesar cofrajelor, schelelor i eafodajelor; manipulrile materialului necesar execuiei cofrajelor, schelelor i eafodajelor; verificarea dimensiunilor elementelor cofrate; curirea i depozitarea, n antier, a materialelor recuperate.Prin proiect i Caietul de sarcini se specific elementele pentru care se cere o fa vzut deosebit. In acest caz preul se va stabili separat pentru fiecare tip de cofraj, defalcnd prin adugarea unui indice la codul articolului.m2122B21A1HIDROIZOLATIE PE SUPRAFETELE DE BETON IN CONTACT CU PAMANTULSe pltete la metru ptrat (m2) de suprafa pe care se aplic hidroizolaiaIn pre se includ: procurarea, transportul si manipularea materialelor necesare; pregatirea stratului suport; aplicarea a doua straturi de solutie bituminoasa; protectia suprafetei stratului bituminos pe parcursul executarii umpluturilor, daca se cere;Prin proiect i Caietul de sarcini se precizeaz tipul materialului.km132C1A2AGRINZI PREF. PREC. CU ARMATURA ADERENTA L=8,20M H=0,42MSe pltete la bucat (buc)In pre se includ: procurarea grinzilor prefabricate precomprimate; transportul grinzilor prefabricate precomprimate; manipularea grinzilor prefabricate precomprimate; depozitarea pe platform a grinzilor prefabricate precomprimate; riparea grinzilor pe platform i pe infrastructur; lansarea grinzilor n lungul cii; montarea grinzilor; asigurarea stabilitii grinzilor pe platform, n timpul i dup montaj; aezarea pe aparatele de reazem.buc142C9AARMATURA OB37 IN SUPRASTRUCTURASe pltete la ton (t)In pre se includ: procurarea oelului beton; confecionarea de bare sau carcase; transportul i manipulrile oelului beton i barelor sau carcaselor confecionate; mbinrile ntre bare; verificarea poziiei conform proiectului.t152C9BARMATURA PC 52 IN SUPRASTRUCTURASe pltete la ton (t)In pre se includ: procurarea oelului beton; confecionarea de bare sau carcase; transportul i manipulrile oelului beton i barelor sau carcaselor confecionate; mbinrile ntre bare; verificarea poziiei conform proiectului.t162C10FBETON TURNAT MONOLIT IN SUPRASTRUCTURA CLASA C30/37Se pltete la metru cub (m3)In pre se includ: procurarea agregatelor necesare preparrii betonului; procurarea cimentului; procurarea adaosurilor; prepararea betonului conform prescripiilor din Caietul de sarcini; transportul betonului de la staia de preparare la antier i manipulri; punerea n oper a betonului.Prin proiect i Caietul de sarcini se vor preciza clasa betonului i sorturile agregatelor, calitatea cimentului, adaosurile etc.buc172C8ACOFRAJE PLANE PENTRU SUPRASTRUCTURA - OBISNUITESe pltete la metru ptrat (m2)Se vor evalua preuri separate, difereniate dup tipul de cofraj (obinuit, de fa vzut etc.)In pre se includ: procurarea materialelor necesare realizrii cofrajelor; confecionarea cofrajelor; procurarea schelelor i eafodajelor; montarea i demontarea cofrajelor, a schelelor i eafodajelor; transportul i manipulrile cofrajelor, schelelor i eafodajelor; verificarea dimensiunilor elementelor cofrate. Prin proiect sau Caietul de sarcini speciale se va specifica calitatea fetei vazute a elementelor.km6029182C11HIDROIZOLATIESe pltete la metru ptrat (m2)In pre se includ: procurarea materialelor necesare hidroizolrii; prepararea; transportul i manipulrile materialelor; execuia hidroizolaiei; execuia proteciei hidroizolaiei; nchiderea marginilor hidroizolaiei cu materiale elastice.Prin proiect i Caietul de sarcini se precizeaz dimensiunile, alctuirea i calitatea materialelor care trebuie respectate la execuia hidroizolaiei.km27306192C26A3BORDURI 15X20CMSe pltete la metru liniar (m) de bordurIn pre se include: procurarea bordurilor i a mortarului de poz; transportul i manipularea bordurilor i a mortarului de poz; aezarea bordurilor n poziiile i la cotele prevzute n proiect n conformitate cu prevederile din Caietul de sarcini.m202C12CALEA PE PODSe pltete la metru ptrat (m2) de suprafa ntre borduriIn pre se includ: procurarea materialelor necesare execuiei cii pe pod; prepararea; transportul i manipulrile; execuia cii. nchiderea caii cu materiale elastice.Prin proiect i Caietul de sarcini se precizeaz alctuirea cii.m2212C16DPARAPET METALIC DIRECTIONAL TIP FOARTE GREU PE SUPRASTRUCTURASe pltete la metru liniar (m) de parapetIn pre se includ: procurarea parapetului; transportul i manipulrile panourilor de parapet; asamblarea i montarea panourilor de parapet; verificarea execuiei conform proiectului.Prin proiect i Caietul de sarcini se vor specifica caracteristicile, alctuirea i materialele pentru executarea parapetului.m222C15ADISPOZITIVE DE ACOPERIRE A ROSTURILOR DE DILATATIE DE 20 MMSe pltete la metru liniar (m) de rostIn pre se includ: procurarea rostului de dilataie sau a materialelor cu care se execut rostul; transportul materialelor; manipulrile elementelor de rost; montajul dispozitivului de acoperire a rostului; verificarea poziionrii rostului conform proiectului.Prin proiect sau Caietul de sarcini se va preciza tipul rostului de dilataie.m232B18APLACI DE RACORDARE L=3.00MSe pltete la bucat (buc)In pre se includ: procurarea plcilor prefabricate; procurarea materialelor pentru fundaie i grinda de rezemare, transportul, manipulrile, execuia fundaiei i a grinzii de rezemare; montajul plcilor de racordare, inclusiv rosturile de racordare i protecia plcilor.Prin proiect i Caietul de sarcini se vor preciza dimensiunile plcilor de racordare, dimensiunile i alctuirea fundaiei i a grinzii de rezemare.buc242B17DREN DIN PIATRA BRUTASe pltete la metru cub (m3)In pre se includ: procurarea materialelor necesare execuiei drenului; transportul materialelor; manipulrile materialelor; execuia drenului.Prin proiect i Caietul de sarcini se precizeaz dimensiunile drenului i natura pietrei brute.m3252B21HIDROIZOLATII PE CULEI SI PLACILE DE RACORDARESe pltete la metru ptrat (m2) de suprafa pe care se aplic hidroizolaiaIn pre se includ: procurarea materialului pentru hidroizolaie; procurarea stratului suport al hidroizolaiei din bitum filerizat; transportul i depozitarea materialelor; manipulrile necesare; amorsarea suprafeei; prepararea amestecului; aternerea n unul sau dou straturi a hidroizolaiei aa cum este prevzut n proiect.Prin proiect i Caietul de sarcini se precizeaz tipul materialului.m2262C16APARAPET METALIC PIETONAL DIN TEAVA RECTANGULARA PE SUPRASTRUCTURASe pltete la metru liniar (m) de parapetIn pre se includ: procurare parapet si vopsea; transportul i manipulrile panourilor de parapet si a vopselei; asamblarea i montarea panourilor de parapet; vopsirea parapetului; verificarea execuiei conform proiectului.Prin proiect i Caietul de sarcini se vor specifica caracteristicile, alctuirea i materialele pentru executarea parapetului.m272A1DRUMURI TEHNOLOGICESe pltete la kilometru (km)In pre se includ: sparea stratului vegetal; profilarea terasamentelor cu o nlime maxim de 1,00 m, compensnd necesarul de umplutur prin transportul pmntului n lungul amprizei drumului; nivelarea i finisarea platformei, execuia sistemului rutier; verificarea profilului proiectat, desfacerea drumului tehnologic i redarea terenului n circuitul agricol.Prin proiect i Caietul de sarcini se vor preciza caracteristicile geometrice ale drumului tehnologic i alctuirea sistemului rutier.km282B4BFORAREA PILOTILOR DE DIAMETRU MARE - F=1500MMSe pltete la metru liniar (m) de forajIn pre se includ: amenajarea suplimentar a platformei pentru poziionarea instalaiei de forat; amenajrile necesare execuiei forajului; deplasarea instalaiei de forare de la un pilot la altul i de la o fundaie la alta; forarea pilotului de la nivelul platformei pn la vrful pilotului; transportul materialului rezultat din forare; mprtierea materialului n depozitul de antier; desfacerea i evacuarea amenajrilor necesitate de foraj; verificarea cotei de fundare i natura terenului de fundare.Prin proiect i Caietul de antier se vor preciza: diametrul i lungimea pilotului; tehnologia de forare i categoria de teren.m292B8AARMATURA OB37 IN FUNDATII (RADIERE)Se pltete la ton (t)In pre se includ: procurarea oelului beton; confecionarea de bare sau carcase; transportul armturilor; manipulrile oelului beton, barelor i carcaselor; montarea barelor sau carcaselor precum i nndirea acestora prin sudur sau prin petrecere; verificarea poziiei conform proiectului.t302B8BARMATURA PC52 IN FUNDATII (RADIERE)Se pltete la ton (t)In pre se includ: procurarea oelului beton; confecionarea de bare sau carcase; transportul armturilor; manipulrile oelului beton, barelor i carcaselor; montarea barelor sau carcaselor precum i nndirea acestora prin sudur sau prin petrecere; verificarea poziiei conform proiectului.t312B9AARMATURA OB37 IN PILOTI FORATI DE DIAMETRU MARESe pltete la ton (t)In pre se includ: procurarea oelului beton; procurarea evilor pentru control i injectare; procurarea tablei pentru toba de injecie; confecionarea tronsoanelor de carcas cu evile i toba de injectare; transportul materialelor; manipulrile barelor de armtur i a carcaselor; montajul carcasei de armtur; mbinrile ntre tronsoanele carcasei; susinerea carcasei n timpul mbinrilor dintre tronsoane i n final n timpul betonrii; verificarea dimensiunilor carcasei i a poziiei acesteia n gaura de foraj.t322C10DBETON TURNAT MONOLIT IN SUPRASTRUCTURA CLASA C25/30Se pltete la metru cub (m3)In pre se includ: procurarea agregatelor necesare preparrii betonului; procurarea cimentului; procurarea adaosurilor; prepararea betonului conform prescripiilor din Caietul de sarcini; transportul betonului de la staia de preparare la antier i manipulri; punerea n oper a betonului.Prin proiect i Caietul de sarcini se vor preciza clasa betonului i sorturile agregatelor, calitatea cimentului, adaosurile etc.m3332C11HIDROIZOLATIESe pltete la metru ptrat (m2)In pre se includ: procurarea materialelor necesare hidroizolrii; prepararea; transportul i manipulrile materialelor; execuia hidroizolaiei; execuia proteciei hidroizolaiei; nchiderea marginilor hidroizolaiei cu materiale elastice.Prin proiect i Caietul de sarcini se precizeaz dimensiunile, alctuirea i calitatea materialelor care trebuie respectate la execuia hidroizolaiei.m2342C12CALEA PE PODSe pltete la metru ptrat (m2) de suprafa ntre borduriIn pre se includ: procurarea materialelor necesare execuiei cii pe pod; prepararea; transportul i manipulrile; execuia cii. nchiderea caii cu materiale elastice.Prin proiect i Caietul de sarcini se precizeaz alctuirea cii.m2352C13ATROTUAR PE SUPRASTRUCTURA, LATIME T=1,00MSe pltete la metru liniar (m) de trotuarIn pre se includ: procurarea i transportul materialelor necesare realizrii umpluturii la trotuare, inclusiv bordurile prefabricate; manipulrile materialelor; prepararea betonului, transportul i aternerea betonului de umplutur, montarea tuburilor pentru golurile necesare cablurilor de telecomunicaii; montarea bordurilor; aternerea asfaltului turnat pe trotuare; realizarea cordoanelor de mastic la marginea asfaltului.Preul include i bordura nalt sau bordura obinuit aa cum este prevzut n proiect.m362C15CDISPOZITIVE DE ACOPERIRE A ROSTURILOR DE DILATATIE DE 50 MMSe pltete la metru liniar (m) de rostIn pre se includ: procurarea rostului de dilataie sau a materialelor cu care se execut rostul; transportul materialelor; manipulrile elementelor de rost; montajul dispozitivului de acoperire a rostului; verificarea poziionrii rostului conform proiectului.Prin proiect sau Caietul de sarcini se va preciza tipul rostului de dilataie.m372C16APARAPET METALIC PIETONAL DIN TEAVA RECTANGULARA PE SUPRASTRUCTURASe pltete la metru liniar (m) de parapetIn pre se includ: procurare parapet si vopsea; transportul i manipulrile panourilor de parapet si a vopselei; asamblarea i montarea panourilor de parapet; vopsirea parapetului; verificarea execuiei conform proiectului.Prin proiect i Caietul de sarcini se vor specifica caracteristicile, alctuirea i materialele pentru executarea parapetului.m382C16BPARAPET METALIC DIRECTIONAL PE SUPRASTRUCTURASe pltete la metru liniar (m) de parapetIn pre se includ: procurarea parapetului; transportul i manipulrile panourilor de parapet; asamblarea i montarea panourilor de parapet; verificarea execuiei conform proiectului.Prin proiect i Caietul de sarcini se vor specifica caracteristicile, alctuirea i materialele pentru executarea parapetului.m392C16DPARAPET METALIC DIRECTIONAL TIP FOARTE GREU PE SUPRASTRUCTURASe pltete la metru liniar (m) de parapetIn pre se includ: procurarea parapetului; transportul i manipulrile panourilor de parapet; asamblarea i montarea panourilor de parapet; verificarea execuiei conform proiectului.Prin proiect i Caietul de sarcini se vor specifica caracteristicile, alctuirea i materialele pentru executarea parapetului.m402C1A12GRINZI PREF. PREC. CU ARMATURA ADERENTA L=21,00M H=0,93MSe pltete la bucat (buc)In pre se includ: procurarea grinzilor prefabricate precomprimate; transportul grinzilor prefabricate precomprimate; manipularea grinzilor prefabricate precomprimate; depozitarea pe platform a grinzilor prefabricate precomprimate; riparea grinzilor pe platform i pe infrastructur; lansarea grinzilor n lungul cii; montarea grinzilor; asigurarea stabilitii grinzilor pe platform, n timpul i dup montaj; aezarea pe aparatele de reazem.buc412C1A17GRINZI PREF. PREC. CU ARMATURA ADERENTA L=24,00M H=1,00MSe pltete la bucat (buc)In pre se includ: procurarea grinzilor prefabricate precomprimate; transportul grinzilor prefabricate precomprimate; manipularea grinzilor prefabricate precomprimate; depozitarea pe platform a grinzilor prefabricate precomprimate; riparea grinzilor pe platform i pe infrastructur; lansarea grinzilor n lungul cii; montarea grinzilor; asigurarea stabilitii grinzilor pe platform, n timpul i dup montaj; aezarea pe aparatele de reazem.buc422C1B1GRINZI PREF. TRONSONATE POSTCOMPRIMATE L=30,00M H=1,03MSe pltete la bucat (buc)In pre se includ: procurarea, transportul, manipulrile, amenajarea platformei pentru rezemarea tronsoanelor; aezarea tronsoanelor pe platform i asamblarea acestora; riparea tronsoanelor i a grinzilor asamblate; lansarea grinzilor; montarea grinzilor; asigurarea stabilitii grinzilor pe platform la montaj i dup montare; aezarea pe aparatele de reazem.Nu se includ armturile postntinse i ancorajele aferente.buc432C1B1AGRINZI PREF. TRONSONATE POSTCOMPRIMATE L=27,00M H=1,03MSe pltete la bucat (buc)In pre se includ: procurarea, transportul, manipulrile, amenajarea platformei pentru rezemarea tronsoanelor; aezarea tronsoanelor pe platform i asamblarea acestora; riparea tronsoanelor i a grinzilor asamblate; lansarea grinzilor; montarea grinzilor; asigurarea stabilitii grinzilor pe platform la montaj i dup montare; aezarea pe aparatele de reazem.Nu se includ armturile postntinse i ancorajele aferente.buc442C1B2GRINZI PREF. TRONSONATE POSTCOMPRIMATE L=24,00M H=1,60MSe pltete la bucat (buc)In pre se includ: procurarea, transportul, manipulrile, amenajarea platformei pentru rezemarea tronsoanelor; aezarea tronsoanelor pe platform i asamblarea acestora; riparea tronsoanelor i a grinzilor asamblate; lansarea grinzilor; montarea grinzilor; asigurarea stabilitii grinzilor pe platform la montaj i dup montare; aezarea pe aparatele de reazem.Nu se includ armturile postntinse i ancorajele aferente.buc452C1B3GRINZI PREF. TRONSONATE POSTCOMPRIMATE L=27,00M H=1,60MSe pltete la bucat (buc)In pre se includ: procurarea, transportul, manipulrile, amenajarea platformei pentru rezemarea tronsoanelor; aezarea tronsoanelor pe platform i asamblarea acestora; riparea tronsoanelor i a grinzilor asamblate; lansarea grinzilor; montarea grinzilor; asigurarea stabilitii grinzilor pe platform la montaj i dup montare; aezarea pe aparatele de reazem.Nu se include armturile postntinse i ancorajele aferente.buc462C1B4GRINZI PREF. TRONSONATE POSTCOMPRIMATE L=30,00M H=1,80MSe pltete la bucat (buc)In pre se includ: procurarea, transportul, manipulrile, amenajarea platformei pentru rezemarea tronsoanelor; aezarea tronsoanelor pe platform i asamblarea acestora; riparea tronsoanelor i a grinzilor asamblate; lansarea grinzilor; montarea grinzilor; asigurarea stabilitii grinzilor pe platform la montaj i dup montare; aezarea pe aparatele de reazem.Nu se includ armturile postntinse i ancorajele aferente.buc472C26A1BORDURI 20X25CMSe pltete la metru liniar (m) de bordurIn pre se include: procurarea bordurilor i a mortarului de poz; transportul i manipularea bordurilor i a mortarului de poz; aezarea bordurilor n poziiile i la cotele prevzute n proiect n conformitate cu prevederile din Caietul de sarcini.m482C26A2BORDURI 25X30CMSe pltete la metru liniar (m) de bordurIn pre se include: procurarea bordurilor i a mortarului de poz; transportul i manipularea bordurilor i a mortarului de poz; aezarea bordurilor n poziiile i la cotele prevzute n proiect n conformitate cu prevederile din Caietul de sarcini.m492C26B1BORDURI INALTE CURENTESe pltete la metru liniar (m) de bordur executatIn pre se includ: aprovizionarea cu agregate i borduri prefabricate din beton; transportul la locul de punere n oper; realizarea efectiv a lucrrii.Realizarea lucrrii const din: prepararea mortarului de ciment; executarea stratului de mortar de min. 2cm ; aezarea bordurilor; rostuirea lor cu mortar de ciment.m502C26B2BORDURI INALTE DE CAPATSe pltete la metru liniar (m) de bordur executatIn pre se includ: aprovizionarea cu agregate i borduri prefabricate din beton; transportul la locul de punere n oper; realizarea efectiv a lucrrii.Realizarea lucrrii const din: prepararea mortarului de ciment; executarea stratului de mortar de min. 2cm ; aezarea bordurilor; rostuirea lor cu mortar de ciment.m512C26CPREFABRICAT DE B.A. PENTRU PARAPET DE SIGURANTASe pltete la bucata (buc) masurata pe santier In pret se include:- aprovizionarea cu agregate si ciment;- fabricarea sau aprovizionarea cu prefabricate, inclusiv transporturile aferente;- trasarea pentru montarea prefabricatelor cu parapet de siguranta aliniat;- preparare amestec de mortar cu ciment;- plasarea prefabricatelor pe mortar de poza si imbinarea lor cu mortar de ciment;- curatarea locului de muncaTotul in conformitate cu alinierea si cotele din proiect sau stabilite de inginer consultant.buc522C6FASCICULE DIN CABLE SBP ISe pltete la metru liniar (m) de cabluSe vor evalua preuri separate, difereniate dup alctuirea cablelor.In pre se includ: procurarea cablelor SBPI; transportul cablelor pn la antier; manipularea cablelor; montajul cablelor la poziiile din proiect; tensionarea i injectarea cu mortar de cimentPrin proiect se va specifica alctuirea cablelor.m532C7AANCORAJE ACTIVE PENTRU FASCICULE DIN SBP ISe pltete la bucat (buc)In pre se includ: procurarea ancorajelor; transportul ancorajelor; manipulrile ancorajelor; montajul i acoperirea cu beton a ancorajului.buc542C7BANCORAJE PASIVE PENTRU FASCICULE DIN SBP ISe pltete la bucat (buc)In pre se includ: procurarea ancorajelor; transportul ancorajelor; manipulrile ancorajelor; montajul i acoperirea cu beton a ancorajului.buc552C8ACOFRAJE PLANE PENTRU SUPRASTRUCTURA - OBISNUITESe pltete la metru ptrat (m2)Se vor evalua preuri separate, difereniate dup tipul de cofraj (obinuit, de fa vzut etc.)In pre se includ: procurarea materialelor necesare realizrii cofrajelor; confecionarea cofrajelor; procurarea schelelor i eafodajelor; montarea i demontarea cofrajelor, a schelelor i eafodajelor; transportul i manipulrile cofrajelor, schelelor i eafodajelor; verificarea dimensiunilor elementelor cofrate. Prin proiect sau Caietul de sarcini speciale se va specifica calitatea fetei vazute a elementelor.m2562C9AARMATURA OB37 IN SUPRASTRUCTURASe pltete la ton (t)In pre se includ: procurarea oelului beton; confecionarea de bare sau carcase; transportul i manipulrile oelului beton i barelor sau carcaselor confecionate; mbinrile ntre bare; verificarea poziiei conform proiectului.t572C9BARMATURA PC 52 IN SUPRASTRUCTURASe pltete la ton (t)In pre se includ: procurarea oelului beton; confecionarea de bare sau carcase; transportul i manipulrile oelului beton i barelor sau carcaselor confecionate; mbinrile ntre bare; verificarea poziiei conform proiectului.t

&LDESCRIERI DE PRET&CPage &P of 4&RS.C.LUCA WAY S.R.L.

Corelare BP_DPCODDESCRIEREUMPRET/UM01232A1Drumuri tehnologiceSe pltete la kilometru (km)In pre se includ: sparea stratului vegetal; profilarea terasamentelor cu o nlime maxim de 1,00 m, compensnd necesarul de umplutur prin transportul pmntului n lungul amprizei drumului; nivelarea i finisarea platformei, execuia sistemului rutier; verificarea profilului proiectat, desfacerea drumului tehnologic i redarea terenului n circuitul agricol.Prin proiect i Caietul de sarcini se vor preciza caracteristicile geometrice ale drumului tehnologic i alctuirea sistemului rutier.km2A1Technological roadsPaid per kilometre (km)The price includes: - digging of the vegetal layer;- earthworks profiling with a maximum hight of 1.00 m, compensating the necessary of filling through the earth transport along the road territory; - platform levelling and finishing, pavement execution;- checking of the designed profile, demolition of the technological road and restoring to the agricultural use.The Project and the Technical Specifications will provide the geometrical characteristics of the technological road and the pavement design.km2A1Drumuri tehnologiceTechnological roadskmkm19,200.002A10Umplutur pentru profilarea albieiSe pltete la metru cub (m3)In pre se includ: trasarea profilului umpluturii; cota parte a batardoului pentru scoaterea de sub nivelul apei i epuismente; sparea pmntului n groapa de mprumut sau n depozitul intermediar; transportul pmntului; mprtierea i compactarea la profil a materialului; verificarea calitii materialului dup compactare;In Caietul de sarcini se precizeaz tehnologia de compactare i caracteristicile materialului compactat.m32A10Filling for the water bed profilingPaid at cubic metre (m3)The price includes:- setting-out of the filling profile;- quota of the cofferdam for dewatering and pumping-out;- earth digging into the borrow pit or into the intermediary storage;- earth transport;- scaterring and profile compaction of the material;- checking of the material quality after compaction;The Technical Specifications provide the compaction technology and the characteristics of the compacted material.m32A10Umplutura pentru profilarea albieiFilling for the water bed profilingm3m33.402A11Finisarea suprafeelorSe pltete la metru ptrat (m2)In pre se includ: ablonarea; nivelarea suprafeelor nclinate prin sparea i umplerea denivelrilor pn la 10 cm; compactarea; verificarea suprafeelor executate.m22A11Surfaces finishingPaid per square metre (m2)The price includes:- gauging;- quota of the cofferdam for dewatering and pumping-out;- levelling of inclined surfaces by digging and filling the dislevelments up to 10 cm;- compaction;- checking of executed surfaces.m22A11Finisarea suprafetelorSurfaces finishingm2m25.102A12Strat drenant din balastSe pltete la metru ptrat (m2)In pre se includ: procurarea i transportul materialelor; manipularea materialelor; execuia stratului drenant.In proiect se precizeaz grosimea stratului drenant.Prin Caietul de sarcini se precizeaz calitatea materialelor i condiiile de punere n oper.m22A12Ballast drain layerPaid at square metre (m2)The price includes:- materials procurement and transport;- materials handling;- the part of costs for caison to take out of the water;- ballast draining layer execution;The thickness of drain layer will be stipulated in ProjectQuality of materials and conditions of execution works will be stipulated in Technical Specification.m22A12Strat drenant din balastBallast drain layerm2m24.152A13Pereu cu grosimea de 15 cm, din piatr brutSe pltete la metru ptrat (m2)In pre se includ: trasarea pereului; procurarea materialelor; transportul i manipulrile; execuia pereului; execuia grinzilor de ncastrare, din beton.Prin Caietul de sarcini se precizeaz calitatea materialelor.m22A13Pitching with a thickness of 15 cm of coarse stonePaid per square metre (m2)The price includes:- pitching setting-out;- quota of the cofferdam for dewatering and pumping-out;- materials supply;- transport and handling;- execution of the pitching;- execution of embedding beams of concrete.The Technical Specifications provide the materials quality.m22A13Pereu cu grosimea de 15cm, din piatra brutaPitching with a thickness of 15cm of coarse stonem2m224.302A13APereu cu grosimea de 20 cm, din piatr brutSe pltete la metru ptrat (m2)In pre se includ: trasarea pereului; cota parte a batardoului pentru scoaterea de sub nivelul apei i epuismentele; procurarea materialelor; transportul i manipulrile; execuia pereului; execuia grinzilor de ncastrare, din beton.Prin Caietul de sarcini se precizeaz calitatea materialelor.m22A13APitching with a thickness of 20cm of coarse stonePaid per square metre (m2)The price includes:- pitching setting-out;- quota of the cofferdam for dewatering and pumping-out;- materials supply;- transport and handling;- execution of the pitching;- execution of embedding beams of concrete.The Technical Specifications provide the materials quality.m22A13APereu cu grosimea de 20cm, din piatra brutaPitching with a thickness of 20cm of coarse stonem2m224.302A13CPereu cu grosimea de 30 cm, din piatr brutSe pltete la metru ptrat (m2)In pre se includ: trasarea pereului; cota parte a batardoului pentru scoaterea de sub nivelul apei i epuismentele; procurarea materialelor; transportul i manipulrile; execuia pereului; execuia grinzilor de ncastrare, din beton.Prin Caietul de sarcini se precizeaz calitatea materialelor.m22A13CPitching with a thickness of 30 cm of coarse stonePaid per square metre (m2)The price includes:- pitching setting-out;- quota of the cofferdam for dewatering and pumping-out;- materials supply;- transport and handling;- execution of the pitching;- execution of embedding beams of concrete.The Technical Specifications provide the materials quality.m22A13CPereu cu grosimea de 30cm, din piatra brutaPitching with a thickness of 30 cm of coarse stonem2m224.302A13DPereu cu grosimea de 20cm, din betonSe pltete la metru ptrat (m2)In pre se includ: trasarea , saparea , indepartarea si transportul pamantului intr-un depozit;- procurarea nisipului si betonului si transportul lor la locul de punere in opera;- asternerea nisipului la sablon si pilonarea acestuia;- turnarea betonului cu realizarea rosturilor dintre dale;- protejarea betonului turnat si colmatarea rosturilor cu bitum filerizat.m22A13DPitching with a thickness of 20cm of concretePaid at square metre (m2)The price includes: assignement, digging and transport the earth in the store ; supply and transport the sand ans concrete on the work side; handling the materials; leveling and compaction the sand ; casting the concrete and the execution the joints between the prefabricated concrete; protection the concrete and execution the joints;m22A13DPereu cu grosimea de 20cm, din betonPitching with a thickness of 20cm of concretem2m227.322A14Reparaii pereu la sferturile de conSe pltete la metru ptrat (m2)In pre se includ: transportul i manipulrile materialelor; buciardarea betonului degradat; curarea zonei degradate prin suflare cu aer com2rimat; ncrcarea, transportul i m2rstierea n depozit a materialului rezultat din demolare; procurarea i prepararea mortarului special conform instruciunilor productorului; aplicarea mortarului special pentru refacerea elementului din beton la dimensiunile iniiale; finisarea suprafeelor;Prin Caietul de sarcini se precizeaz calitatea materialelor.m22A14Pitching repairing at cone-quartersPaid per square metre (m2)The price includes:- transport and handling the materials;- bush hammering of bad concrete;- cleaning the joints by air compressed;- loading, transport ant deposit the results of materials;- supplying and prepairing the special mortar;- applying the special mortar for repairing the elements in conformity with the dimension;- surface finishing.The Technical Specifications provide the materials quality.m22A14Reparaii pereu la sferturi de conPitching repairing at cone-quartersm2m211.422A14ARefacere pereu degradatSe pltete la metru ptrat (m2)In pre se includ: transportul i manipulrile materialelor; desfacerea pereului pe zonele degradate inclusiv sortarea materialelor; curarea zonei degradate prin suflare cu aer com2rimat; ncrcarea, transportul i m2rstierea n depozit a materialului rezultat din demolare; procurarea sau prepararea mortarului de ciment si a pietrei brute conform proiect; refacerea pereului degradat (refacerea substratului de nisip si aezarea pietrei brute la cot); rostuira pereului cu mortar de ciment; finisarea suprafeelor;Prin Caietul de sarcini se precizeaz calitatea materialelor.m22A14AImprovement of degraded stone facingPaid per cubic metre (m3)The price includes:- transport and materials handling;- demolation of stone facing including to sort it;- cleaning degraded area with compressed air;- loading, transport, and leveling in storage materials from demolation;- supply and prepearing the cement plaster and the stone according with execution project- improvement of degraded stone facing (improvement the sand layer and execution of stone facing to the level)- jointing stone facing with cement plaster surfaces finishingThe quality of materials will be stipulated in Technical Specification.m22A14ARefacere pereu degradatImpruvement of degraded pitchingm2m27.102A15Reparaii rosturi pereu la sferturile de conSe pltete la metru liniar de rost (m)In pre se includ: transportul i manipulrile materialelor; ndeprtarea depunerilor din rosturi; curarea rosturilor prin suflare cu aer com2rimat; ncrcarea, transportul i m2rstierea n depozit a materialului rezultat din curire; procurarea i prepararea bitumului; aplicarea bitumului pentru colmatarea rostului;Prin Caietul de sarcini se precizeaz calitatea materialelor.m2A15Pitching joints repairing for the cone quarters Paid per linear metre (m)The price includes:- transport and handling the materials;- taking out the rest of materials in the joints;- cleaning the joints by air compressed;- loading, transport ant deposit the results of materials;- supplying and prepairing the bitumen;- applying the bitumen in to the joints;The Technical Specifications provide the materials quality.m2A15Reparatii rosturi pereu la sferturi de conPitching joints repairing for the cone quartersmm1.092A15ARostuire zidarie uscataSe pltete la metru patrat (m2)In pre se includ: transportul i manipulrile materialelor; ndeprtarea depunerilor din rosturi; curarea rosturilor prin suflare cu aer com2rimat; ncrcarea, transportul i m2rstierea n depozit a materialului rezultat din curire; procurarea sau prepararea mortarului pentru rostuire; rostuirea propriu-zisa; verificarea suprafetei rostuite;Prin Caietul de sarcini se precizeaz calitatea materialelor.m22A15Am22A15ARostuire zidarie uscatam2m23.922A16Montare dispozitive reflectorizate la parapetii directionali pe pod si rampeSe pltete la bucata (buc)In pre se includ: procurarea materialelor; transportul i manipulrile materialelor; desfacerea piulitelor si suruburilor parapetului pentru prinderea dispozitivelor reflectorizante; prinderea dispozitivelor reflectorizante i refacerea prinderii;Prin Caietul de sarcini se precizeaz calitatea materialelor.buc2A16buc2A16Montare dispozitive reflectorizante la parapetibuc.pcs.2A17Mana curenta la scarile de pe taluzSe pltete la metru liniar (m)In pre se includ: procurarea materialelor necesare executiei parapetului; transportul i manipularea materialelor; execuia fundatiei parapetului; execuia si vopsirea parapetului.Prin proiect i Caietul de sarcini se precizeaz elementele geometrice i alctuirea parapetului.m2A17m2A17Mana curenta la scarile de pe taluzmm9.272A18Amenajari la podee in trepte amonte i avalSe pltete la metru cub (m3)In pre se includ:- trasarea spturii;- procurarea materialelor, inclusiv manipularile si transportul la locul de punere in opera;- executia sapaturii, transportul pamantului in afara zonei de lucru si im2rastierea acestuia;- confectionarea si montarea cofrajelor;- transportul materialelor;- procurarea sau prepararea betonului, transportul pana la locul de punere in opera;Prin detaliile de executie si Caietul de sarcini se precizeaz cota de fundare i natura terenului de fundare, clasa betonului.m32A18Arrangements at culverts with steps upstream and downstreamPaid per cubic metre (m3)The price includes:- drawing of digging;- supplay materials, handle and transport at working place;- digging, soil transport and leseling it in storage;- execution and mounting shuttering;- material transportation;- supplay and concrete prepearing, transport to the working place;The level of foundation, the ground foundation and the concrete class will be according technical specification.m32A18Amenajari la podete in trepte amonte si avalArrangements at culverts with steps upstream and downstreamm3m3116.352A19Obtinerea terenului (exproprieri)Se pltete la hectar (ha)In pre se includ:- cheltuieli efetuate pentru cum2rarea de terenuri;- plata concesiunii pe durata realizarii lucrrilor;- exproprieri;- despgubiri;- schimbarea regimului juridic al terenului;- scoaterea tem2orar sau definitiv din circuitul agricol;- alte cheltuieli de acceai natur.ha2A19Land acquisition (expropriations)Paid per expropiate hectare (ha) The price includes:- expences for acquisition the land expropiate;- payment for concession during the execution work expropriates;- damages;- changing of juridical conditions;- taking out temporary of definitive from agriculture use;- other expences in condition with land expropiate.ha2A19Obtinerea terenului (exproprieri)Land acquisition (expropriations)haha70,000.002A1AVarianta provizorie de circulatieSe pltete la kilometru (km)In pre se includ: sparea stratului vegetal; profilarea terasamentelor cu o nlime maxim de 1,00 m, com2ensnd necesarul de um2lutur prin transportul pmntului n lungul am2rizei drumului; nivelarea i finisarea platformei, execuia sistemului rutier; verificarea profilului proiectat, desfacerea variantei provizorii de circualtie i redarea terenului n circuitul agricol.Prin proiect i Caietul de sarcini se vor preciza caracteristicile geometrice ale variantei provizorii de circulatie i alctuirea sistemului rutier.km2A1AProvisional traffic variantPaid per kilometre (km)The price includes:- digging of the vegetal soil;- earthworks profiling with a maximum hight of 1,0 m compensating the necessary of filling through the earth transport along the road territoty;-platform leveling and finishing;- pavement execution;- checking of the designed profile, demolition of the technological road and restorningto the agricultural use;- The Project and the Technical Specifications will be provide the geometrical characteristics of the temporary road and the pavement design.km2A1AVarianta provizorie de circulatieProvisional traffic variantkmkm400,000.002A2Umpluturi la platformeSe pltete la metru cub (m3) de umplutur, msurat dup commactareIn pre se includ: decopertarea stratului vegetal i compactarea amprizei umpluturii; sptura n groapa de mprumut; transportul materialului rezultat din sptur; mprtierea i compactarea pmntului n umplutur; finisarea platformei i verificarea cotelor proiectate, precum i desfacerea platformei; transportul materialului rezultat n depozit i redarea terenului n circuitul agricol la terminarea lucrrilor.Prin proiect i Caietul de sarcini se vor preciza tehnologia de compactare i caracteristicile materialului compactat.m32A2Platform fillingsPaid per cubic metre (m3) of filling, measured after compactionThe price includes:- removal of the vegetal layer and compaction of the filling territory;- digging in the borrow pit;- transport of the material resulted from the digging;- earth scattering and compaction into the filling;- platform finishing and checking of the designed quotas, as well as platform demolition;- transport of the material resulted in the deposit and land restoring to the agricultural use upon works completion.The Project and Technical Specifications will provide the compaction technology and the characteristics of the compacted material.m32A2Umpluturi la platformePlatform fillingm3m33.602A20Amenajarea terenuluiSe pltete la metru ptrt (m2)In pre se includ:- cheltuieli efetuate la inceperea lucrrilor pentru pregtirea am2lasamentului;- demolri;- defrisri;- evacuri materiale rezultate din devieri retele utiliti din am2lsament, sistematizri pe vertical, drenajeepuismente (exclusiv cele aferente realizrii pentru investitia de baz) - devieri de cursuri de ap;- stramutri de localitai sau de monumente istorice.m22A20Land arrangementPaid per square metre (m2)The price includes: - demolations;- cutting trees;- materials evacuate results from replacement and protection the utilities, drainage,landscaping;- deviate of river way;- displacement of localities of history monuments.m22A20Amenajarea terenuluiLand arrangementm2m22.002A3Sistemul rutier la platformeSe pltete la metru ptrat (m2)In pre se includ: procurarea materialelor; transportul materialelor; manipularea materialelor; realizarea sistemului rutier; desfacerea i transportul materialelor rezultate, dup terminarea lucrrilor.Prin proiect i Caietul de sarcini se precizeaz alctuirea sistemului rutier.m22A3Platform pavementPaid per square metre (m2)The price includes:- materials supply;- materials transport;- materials handling;- pavement carrying out; - removal and transport of resulted materials, upon works completion.The Project and Technical Specifications provide the pavement design.m22A3Sistemul rutier la platformePlatform pavementm2m23.732A4Umpluturi la sferturi de conSe pltete la metru cub (m3)In pre se includ: sptur n groapa de mprumut sau n depozit intermediar; transportul materialului rezultat din sptur; mprtierea materialului n sferturi de con n straturi de 10 cm; compactarea pmntului cu maiul mecanic; finisarea i verificarea suprafeelor realizate n conformitate cu prevederile din desene i specificaii tehnice; verificarea calitii umpluturii dup compactare.Prin proiect i Caietul de sarcini se vor preciza tehnologia de compactare i caracteristicile materialului compactat.m32A4Fillings at cone quarters Paid per cubic metre (m3)The price includes:- digging in the borrow pit or in an intermediary storage;- transport of the material resulted from the digging;- materials scaterring into cone quarters in layers of 10 cm;- earth compaction with the mechanic rammer;- finishing and checking of the surfaces caried out in conformity with the provisions from the Drawings and the Technical Specifications;- checking of the filling quality after compaction.The project and Technical Specifications will provide the compaction technology and the characteristics of the compacted material. Filling around the foundation, with the earth resulted after digging and its compaction till a min 95%ProctorThe price includes digging in borrow pit or intermediary storage, transport, scattering and compaction of the earth, finishing and verification areas according to the Technical Specifications.m32A4Umpluturi la sferturi de conFillings at cone quartersm3m34.932A5Pereu la sferturile de conSe pltete la metru ptrat (m2)In pre se includ: trasarea i sptura pentru fundaia sfertului de con; transportul i mprtierea materialului rezultat din sptur; procurarea materialelor pentru pereu; transportul i manipularea materialelor; cofrarea i betonarea fundaiei sfertului de con; execuia pereului, inclusiv a substratelor.Prin proiect i Caietul de sarcini se precizeaz dimensiunile fundaiei, clasa betonului din fundaie i alctuirea pereului.m22A5Pitching at the cone quartersPaid per square metre (m2)The price includes:- setting out and digging for the cone quarters foundation;- transport and scaterring of the material resulted from the digging;- materials supply for the pitching;- materials transport and handling;- forming and concreting of the cone quarters foundation;- execution of the pitching, including the sub-layers.The Project and the Technical Specifications provide the dimensions of the foundation, the class of the foundation concrete and the pitching structure.m22A5Pereu la sferturi de conPitching at the cone quartersm2m224.192A6Scri pe taluz, inclusiv mana curentaSe pltete la metru liniar (m) de scar msurat pe taluzIn pre se includ: sptura necesar pe taluz pentru montarea scrilor; procurarea materialelor; transportul i manipularea materialelor; execuia fundaiei scrii la piciorul taluzului; execuia treptelor; execuia parapetului.Prin proiect i Caietul de sarcini se precizeaz elementele geometrice i alctuirea treptelor i parapetului.m2A6Stairs on the slope, including handrail Paid per linear metre (lm) of stair measured on the slope- necessary digging on the slope for stairs mounting;- materials supply;- materials transport and handling;- execution of the stair foundation at the slope foot;- steps execution;- guardrail execution.The Project and the Technical Specifications provide the geometric elements and the structure of the steps and the guardrail.m2A6Scari pe taluz, inclusiv mana curentaStairs on slopes, including hand-railmm128.602A7Casiuri pe taluzSe pltete la metru liniar (m) de casiu msurat pe taluzIn pre se includ: sptura pe taluz necesar executrii casiului; procurarea materialelor necesare realizrii casiului; transportul i manipularea materialelor; execuia fundaiei la piciorul taluzului pentru realizarea camerei de colectare a apelor; execuia casiului i a racordrii acestuia la platforma drumului i la sistemul de colectare a apelor de la piciorul taluzului.Prin proiect i Caietul de sarcini se precizeaz elementele geometrice i alctuirea casiului.m2A7Side ditches on the slope Paid per linear metre (m) of side-ditch measured on the slopeThe price includes:- digging in the slope necessary to the side-ditch execution;- supply of the materials necessary to the execution of the side-ditch;- materials transport and handling;- execution of the foundation at the slope foot for the execution of the waters cllection chamber;- execution of the side-ditch and of its connection to the road platform and to the waters collection system at the slope foot.The Project and the Technical Specifications provide the geometrical elements and the side-dich structure.m2A7Casiuri pe taluzSide ditches on slopemm29.402A8Demolare sfert de conSe pltete la metru cub (m3)In pre se includ: demolarea pereului din beton sau piatr brut al sfertului de con existent; sptura pentru desfacerea umpluturii sfertului de con; ncrcarea materialului rezultat din demolarea sfertului de con i din sptura pentru desfacerea umpluturii sfertului de con; transportul materialului rezultat din sptur i demolare; descrcarea i mprtierea n depozit a materialului rezultat.m32A8Cone-quarter demolitionPaide per cubic metre (m3)The price includes:- demolition of the ptiching of concrete or crushed stone of the existing cone quarter;- digging for the removal of the cone quarter filling;- loading of the material resulted from the demolition of the cone quarter and from the digging for the removal of the cone quarter;- transport of the material resulted from the digging and the demoliton;- unloading an scaterring into the storage of the resulted material.m32A8Demolare sfert de conCone-quarter demolitionm3m32.352A9Sptur pentru profilarea albiei amonte si avalSe pltete la metru cub (m3)In pre se includ: trasarea profilului spturii; sparea pmntului n exces; evacuarea n depozit a materialului necorespunztor pentru umpluturi; transportul, mprtierea la profil i compactarea materialului n umpluturi; verificarea calitii materialului dup compactare;In Caietul de sarcini se precizeaz tehnologia de compactare i caracteristicile materialului compactat.m32A9Digging for the water bed profiling upstream and downstreamPaid per cubic metre (m3)The price includes:- setting-out of the foundation;- digging of the exceeding earth; - evacuation into the storage of the material inappropriate for fillings;- transport, profile scaterring and compaction of the material into fillings;- checking of the material quality after compaction;The Technical Specifications provide the compaction technology and the characteristics of the compacted material.m32A9Sapatura pentru profilarea albiei amonte si avalDigging for bed of river forming upstream and downstreamm3m32.702B1Sptura cu adncimea mai mic de 4,00 mSe pltete la metru cub (m3)In pre se includ: sptura n groapa de fundaie; evacuarea, transportul i m2rtierea n depozit a pmntului rezultat din sptur; procurarea, transportul i manipularea materialelor necesare sprijinirilor pereilor gropilor de fundaie; execuia sprijinirilor; epuizarea apelor; recuperarea materialelor de sprijinire dup execuia lucrrilor; curirea i transportul materialelor recuperate n depozitul de antier; verificarea cotei de fundare i a naturii terenului de fundare.m32B1Digging up to a depth of 4 mPaid per cubic metre (m3)Includes:- marking of the foundation;- excavation in the foundation ditch;- earth evacuation, transport and spreading in deposit;- water pumping out;- procurement, transport and handling of the shoring materials;- shoring execution;- shoring materials recovery after works period;- construction and demolition of the temporary roads and work platforms;- restoring to the original condition of the site area after the end work.m32B1Sapatura cu adancimea 4,00mDigging with a depth of 4.00 m and morem3m310.902B20ADemontarea parapetului metalic existent avnd greutatea de 25 kg/mSe pltete la metru liniar (m) de parapet metalic de pe culei i suprastructurIn pre se includ: desfacerea uruburilor de prindere a stlpilor; tierea cu flacra oxiacetilenic a pieselor metalice; separarea n piese sau n grupuri de piese; ncrcarea n mijloace de transport i transportul n depozit; descrcarea; sortarea pe dimensiuni i depozitarea pe sorturi.m2B20ADismantling of the existing metallic guardrail with a weight of 25kg/m Paid per linear metre (m) of metallic guardrail on the abutments and superstructureThe price includes: removal of the poles connection screws; cutting with the oxyacetiyene flame of the metallic pieces; separation in pieces or in groups of pieces; loading in means of transport and transport to the storage yard; unloading; sorting on dimensions and depositing on grades.m2B20ADemontarea parapetului metalic existent g=25 kg/mDismantling of the existing metallic guardrail with a weight of 25kg/mmm4.702B20BDemontarea parapetului metalic existent avnd greutatea de 20 kg/mSe pltete la metru liniar (m) de parapet metalic de pe culei i suprastructurIn pre se includ: desfacerea uruburilor de prindere a stlpilor; tierea cu flacra oxiacetilenic a pieselor metalice; separarea n piese sau n grupuri de piese; ncrcarea n mijloace de transport i transportul n depozit; descrcarea; sortarea pe dimensiuni i depozitarea pe sorturi.m2B20BDismantling of the existing metallic guardrail with a weight of 20kg/m Paid per linear metre (m) of metallic guardrail on the abutments and superstructureThe price includes: removal of the poles connection screws; cutting with the oxyacetiyene flame of the metallic pieces; separation in pieces or in groups of pieces; loading in means of transport and transport to the storage yard; unloading; sorting on dimensions and depositing on grades.m2B20BDemontarea parapetului metalic existent g=20 kg/mDismantling of the existing metallic guardrail with a weight of 20 kg/mmm1.872B20CDemontarea parapetului metalic avnd greutatea de 30 kg/mlSe pltete la metru liniar (m) de parapet metalic de pe culei i suprastructurIn pre se includ: desfacerea uruburilor de prindere a stlpilor; tierea cu flacra oxiacetilenic a pieselor metalice; separarea n piese sau n grupuri de piese; ncrcarea n mijloace de transport i transportul n depozit; descrcarea; sortarea pe dimensiuni i depozitarea pe sorturi.m2B20CDismantling of the existing metallic guardrail with a weight of 30kg/m Paid per linear metre (m) of metallic guardrail on the abutments and superstructureThe price includes: removal of the poles connection screws; cutting with the oxyacetiyene flame of the metallic pieces; separation in pieces or in groups of pieces; loading in means of transport and transport to the storage yard; unloading; sorting on dimensions and depositing on grades.m2B20CDemontarea parapetului metalic existent g=30 kg/mDismantling of the existing metallic guardrail with a weight of 30kg/mmm4.712B21Hidroizolaii pe culei i plcile de racordareSe pltete la metru ptrat (m2) de suprafa pe care se aplic hidroizolaiaIn pre se includ: procurarea materialului pentru hidroizolaie, inclusiv betonul de umplutur pe plcile de racordare; procurarea stratului suport al hidroizolaiei din bitum filerizat; transportul i depozitarea materialelor; manipulrile necesare; amorsarea suprafeei; prepararea amestecului; aternerea n unul sau dou straturi a hidroizolaiei aa cum este prevzut n proiect.Prin proiect i Caietul de sarcini se precizeaz tipul materialului.m22B21Waterproofing on the abutments and precast trasition slabsPaid per square metre (m2) of surface on which it is applied the waterproofing The price includes: supply of the material for waterproofing, including the filling concrete on the connection plates; supply of the hydroinsulation support layer of filerized bitumen; transport and depositing of materials; necessary handlings; surface priming; mix preparation; waterproofing placing in one or two layers as provided in the project. The Project and Technical Specifications provide the material type.m22B21Hidroizolatii pe culei si placile de racordareWaterproofing on the abutments and precast trasition slabsm2m25.802B22Cale pe culeiSe pltete la metru ptrat (m2)In pre se includ: procurarea materialelor i transportul lor; manipulrile materialelor; prepararea i aternerea stratului de beton armat sau din mortar asfaltic de protecie a hidroizolaiei; aternerea stratului de asfalt i realizarea cordoanelor de mastic la marginea asfaltului, aa cum este indicat n proiect.m22B22Carriageway on the abutmentsPaide per square metre (m2)The price includes:- supply of materials and transport;- handlings of materials;- preparation and casting of the reinforced concrete of asphalt mortar layer for the protection of the hydroinsulation;- casting of the asphalt layer and carrying-out of of mastic cords at the asphalt edge, as indicated in the Project.m22B22Cale pe culeiCarriageway on the abutmentsm2m212.462B23ATrotuar pe culei, latime T=1.00 mSe pltete la metru (m) de trotuarIn pre se includ: procurarea i transportul materialelor necesare preparrii betonului, precum i a tuburilor din PVC pentru cablurile Tc, inclusiv a bordurilor; manipularea materialelor; prepararea betonului; transportul i aternerea betonului de umplutur i montarea tuburilor din PVC pentru realizarea golurilor necesare cablurilor Tc; montarea bordurilor; aternerea asfaltului turnat pe trotuare i realizarea cordoanelor de mastic la marginea asfaltului.m2B23AFootway on abutments with a width of T = 1.00 mPaid per linear metre (m) of sidewalkThe price includes:- supply and transport of the materials necessary to the preparation of concrete and PVC pipes for the Tc cables, including kerbs;- materials handling;- concrete preparation;- transport and casting od the filling concrete and mounting of PVC pipes for the carrying-out of holes necessary to the Tc cables;- mounting of kerbs;- laying of the asphalt cast on sidewalks and carrying-out of mastic cords at the asphalt edge.m2B23ATrotuar pe culei, latime T=1,00mFootway on abutments with a width of T = 1.00 mmm42.402B23BTrotuare cu limea de T = 1,50 mSe pltete la metru (m) de trotuarIn pre se includ: procurarea i transportul materialelor necesare preparrii betonului, precum i a tuburilor din PVC pentru cablurile Tc, inclusiv a bordurilor; manipularea materialelor; prepararea betonului; transportul i aternerea betonului de umplutur i montarea tuburilor din PVC pentru realizarea golurilor necesare cablurilor Tc; montarea bordurilor; aternerea asfaltului turnat pe trotuare i realizarea cordoanelor de mastic la marginea asfaltului.m2B23BFootway on abutments with a width of T = 1.50 mPaid per metre (m) of sidewalkThe price includes:- supply and transport of the materials necessary to the preparation of concrete and PVC pipes for the Tc cables, including kerbs;- materials handling;- concrete preparation;- transport and casting od the filling concrete and mounting of PVC pipes for the carrying-out of holes necessary to the Tc cables;- mounting of kerbs;- laying of the asphalt cast on sidewalks and carrying-out of mastic cords at the asphalt edge.m2B23BTrotuar pe culei, latime T=1,50mFootway on abutments with a width of T = 1.50 mmm80.562B23CTrotuare cu limea de T = 2,00 mSe pltete la metru (m) de trotuarIn pre se includ: procurarea i transportul materialelor necesare preparrii betonului, precum i a tuburilor din PVC pentru cablurile Tc, inclusiv a bordurilor; manipularea materialelor; prepararea betonului; transportul i aternerea betonului de umplutur i montarea tuburilor din PVC pentru realizarea golurilor necesare cablurilor Tc; montarea bordurilor; aternerea asfaltului turnat pe trotuare i realizarea cordoanelor de mastic la marginea asfaltului.m2B23Cm2B23CTrotuar pe culei, latime T=2,00mFootway on abutments with a width of T = 2.00 mmm107.072B23DTrotuare cu limea de T = 2,50 mSe pltete la metru liniar (m) de trotuarIn pre se includ: procurarea i transportul materialelor necesare preparrii betonului, precum i a tuburilor din PVC pentru cablurile Tc, inclusiv a bordurilor; manipularea materialelor; prepararea betonului; transportul i aternerea betonului de umplutur i montarea tuburilor din PVC pentru realizarea golurilor necesare cablurilor Tc; montarea bordurilor; aternerea asfaltului turnat pe trotuare i realizarea cordoanelor de mastic la marginea asfaltului.m2B23Dm2B23DTrotuar pe culei, latime T=2,50mFootway on abutments with a width of T = 2.50 mmm2B24Torcretare infrastructuriSe pltete la metru ptrat (m2)In pre se includ: curirea suprafeelor de beton degradat, suflarea cu jet de ap i aer comprimat; strngerea n grmezi a materialului decapat, ncrcarea n mijloace auto; transportul i descrcarea n depozit a materialului decapat; procurarea cofrajelor; eafodajele necesare realizrii torcretului; transportul materialelor necesare realizrii torcretrii, precum i a instalaiilor de torcretare; montarea i demontarea instalaiilor de torcretare; prepararea amestecului necesar torcretrii; procurarea i montarea armturilor, precum i asigurarea poziiei armturilor prin boluri mpucate cte 4 pe mp; punerea n oper a plasei de rabi; punerea n oper a betonului torcretat; prelucrarea feei vzute;Prin proiect i Caietul de sarcini se precizeaz tipul materialului.m22B24Substructure injection of concretePaid per square metre (m2)The price includes:- surfaces cleaning of damaged concrete, blowing with air jet and compressed air;- collection in piles of the removed material, loading into means of transport;- transport and unloading in the storage yard of the removed material;- supply of formworks;- scaffolds necessary to the execution of the guniting;- transport of the materials necessary to the execution of the guniting, as well as of the guniting installations;- mounting and dismantling of the guniting installations;- preparation of the mixture necessary to the guniting;- supply and mounting of reinforcements, as well as fixing of the position of reinforcements through shot bolts, 4 per sq.m;- placing in the work of the rabitz plastering net;- placing in the work of the gunited concrete;- processing of the visible face;The Project and Technical Specifications provide the material type.m22B24Torcretare infrastructuriSubstructure injection of concretem2m240.792B25ForajeSe pltete la metru liniar (m)In pre se includ: amenajarea platformelor pentru instalaia de forare; aducerea instalaiei de forare pe poziie; mutarea instalaiei de forare de la o pil sau culee la alta n cadrul aceluiai pod; executarea forajelor; strngerea n grmezi a materialului rezultat i ncrcarea lui n mijloace de transport; transportul i mprtierea n depozit a materialului rezultat din foraje; prepararea materialului de injecie i injectarea conform prevederilor din proiect.m2B25m2B25ForajeDrillingsmm2B25AForaje D=75 mmSe pltete la metru liniar (m)In pre se includ: amenajarea platformelor pentru instalaia de forare; aducerea instalaiei de forare pe poziie; mutarea instalaiei de forare de la o pil sau culee la alta n cadrul aceluiai pod; executarea forajelor; strngerea n grmezi a materialului rezultat i ncrcarea lui n mijloace de transport; transportul i mprtierea n depozit a materialului rezultat din foraje; prepararea materialului de injecie i injectarea conform prevederilor din proiect.m2B25ADrillings D=75 mmm2B25AForaje D=75 mmDrillings D=75 mmmm50.912B25A1Foraje D=120 mmDrillings D=120 mmmm110.642B25BForaje D=150 mmSe pltete la metru liniar (m)In pre se includ: amenajarea platformelor pentru instalaia de forare; aducerea instalaiei de forare pe poziie; mutarea instalaiei de forare de la o pil sau culee la alta n cadrul aceluiai pod; executarea forajelor; strngerea n grmezi a materialului rezultat i ncrcarea lui n mijloace de transport; transportul i mprtierea n depozit a materialului rezultat din foraje; prepararea materialului de injecie i injectarea conform prevederilor din proiect.m2B25BDrillings D=150 mmm2B25BForaje D=150 mmDrillings D=150 mmmm150.452B26piuirea n cmp continuuSe pltete la metru ptrat (m2)In pre se includ: aprovizionarea, transportul la lucrare i de la lucrare a schelelor metalice tubulare pentru lucru; montarea i demontarea schelelor metalice; prelucrarea suprafeelor de beton existente prin piuire n cmp continuu cu unelte de mn pe o adncime de 0,5 cm de la nivelul suprafeei actuale.m22B26Chiselling in continuous fieldm22B26Spituire in camp continuuChiselling in continuous fieldm2m23.862B27Perforri pentru introducerea ancorajelorSe pltete la metru liniar (m)In pre se includ: aducerea utilajului de forare pe poziie; mutarea utilajului de forare de la o pil la alta la acelai pod; realizarea instalaiei de alimentare cu energie; schelele i eafodajele necesare (procurare, montare, demontare); executarea perforrii i curirea prin suflare cu aer comprimat.m2B27Punching for anchors introductionPaid per linear metre (m)The price includes:- bringing of the punching installation on position; - moving of the punching installation from one pier to another at the same bridge;- execution of the energy supply installation;- necessary scaffolds (supply, mounting, dismantling);- execution of the punching and cleaning by blowing compressed air.m2B27Perforari pentru introducerea ancorelorPunching for anchors introductionmm1.172B27AGuri n fii la partea inferioarSe pltete la metru liniar (m)In pre se includ: procurarea schelelor de lucru; montarea i demontarea schelelor de lucru; executarea gurilor cu f=20 mm.m2B27AHoles in beams at inferior sidePaid per linear metre (lm)The price includes:- supply of working scaffolds;- mounting and dismantling of the working scaffolds;- execution of boxes with f=20 mm.m2B27AGauri in fasii la partea inferioaraHoles in beams at inferior sidemm14.742B28Ancore matate cu mortar de ciment M100 n guri perforateSe pltete la metru liniar (m) de ancorIn pre se includ: procurarea oelului beton pentru ancore i confecionarea acestora; procurarea mortarului pentru matare; transportul la locul de punere n oper; udarea gurilor; umplerea gurilor cu mortar; introducerea i fixarea ancorelor n guri, inclusiv meninerea acestora n poziia din proiect.Prin proiect i Caietul de sarcini se dau diametrul ancorelor i compoziia mortarului.m2B28Anchors caulked with cement mortar M100 in drilled holes Paid per linear metre (m) of anchor The price includes: supply of concrete steel for anchors and manufacturing of anchors; supply of mortar for filling; transport to the placing in the work; holes watering; holes filling with mortar; setting and fixing of anchors in holes, including maintaining them in the position in the project. The Project and Technical Specifications provide the anchors diametre and the mortar composition.m2B28Ancore matate cu mortar de ciment M100 in gauri perforateAnchors caulked with cement mortar M100 in drilled holesmm1.872B28AAncore D=12 mm matate cu rasina in gauri perforateAnchors D=12mm caulked with rezine in punched holesmm1.872B29Matarea fisurilor la culei i pile Se pltete la metru liniar (m) de fisurIn pre se includ: aprovizionarea materialelor pentru matare; transportul materialelor; prepararea i punerea n oper a materialelor necesare matrii fisurilor (crpturilor), inclusiv prelucrarea marginilor acestora nainte de matare conform prevederilor din Caietul de sarcini; procurarea, transportul, montarea i demontarea schelelor de lucru.m2B29Cracks caulking at abutments and piers Paid per linear metre (m) of anchor The price includes: supply of concrete steel for anchors and manufacturing of anchors; supply of mortar for filling; transport to the placing in the work; holes watering; holes filling with mortar; setting and fixing of anchors in holes, including maintaining them in the position in the project. The Project and Technical Specifications provide the anchors diametre and the mortar composition.m2B29Matarea fisurilor la culei si pileCracks caulking at abutments and piersmm10.732B3Sptur n chesoane deschise Se pltete la metru cub (m3)In pre se includ: sptura n interiorul chesonului; evacuarea i transportul pmntului rezultat din sptur; m2rtierea pmntului n depozit; epuizarea apelor din cheson; lucrrile necesare meninerii chesonului n poziie vertical pe msura avansrii; verificarea cotei de fundare i a naturii terenului de fundare.m32B3Digging in open caissons Paid per cubic metre (m3)In the price shall be included:- digging in the caisson inner;- removal and transportation of the soil resulted from the digging;- soil spreading in the store;- dewatering from the caisson;- the works necessary for the caisson maintenance in vertical position during the advancing;- checking of the setting quota and of the setting ground nature.m32B3Sapatura in chesoane deschiseDigging in open caissonsm3m314.182B30Demolare beton elevaieSe pltete la metru cub (m3)In pre se includ: montarea i demontarea schelelor de lucru; demolarea betonului simplu sau armat la cotele prevzute n proiect; curirea i ndreptarea armturilor ce se pstreaz i poziionarea lor conform proiectului; piuirea i curarea suprafeei betonului ce nu se demoleaz; strngerea materialului demolat, ncrcarea n mijloace de transport, transportul, descrcarea i mprtierea n depozit.m32B30Elevation concrete demolition Paid per cubic metre (m3)The price includes: mouting and dismantling of working scaffolding; demolition of the simple or reinforced concrete at the levels provided in the project; cleaning and correction of reinforcements that are maintained and their positioning according to the project; chiselling and cleaning of the concrete surface that is not demolished; collection of the demolished material, loading into means of transport, transport, unloading and scaterring in the storage yard.m32B30Demolare beton elevatieElevation concrete demolitionm3m331.862B31Recondiionarea aparatelor de reazem existenteSe pltete la bucat (buc)In pre se includ: procurarea, transportul, manipularea i punerea n oper a materialelor necesare recondiionrii; procurarea schelelor de lucru; montarea i demontarea schelelor de lucru; ndeprtarea vopselei vechi; degresarea suprafeelor metalice; curirea pn la luciu metalic a pieselor metalice; vopsirea cu un strat de miniu de plumb; vopsirea cu dou straturi de vopsea; ungerea cu vaselin.buc2B31Repairing existing bearing and execution Paid per piece (pcs)The price includes:- supplay, transport, handeling and work execution;- supplay, work scaffolding;- mounting and dismounting work scaffolding;- cleaning the old paint degreassing of metallic pieces;- paint whit minium;- paint in two layer;- lubricate whit grease.pcs2B31Reconditionare aparate de reazem existenteRepairing existing bearing and executionbuc.pcs.17.552B31ARecondiionarea aparatelor de reazem existenteSe pltete la bucat (buc)In pre se includ: procurarea, transportul, manipularea i punerea n oper a materialelor necesare recondiionrii; procurarea schelelor de lucru; montarea i demontarea schelelor de lucru; ndeprtarea vopselei vechi; degresarea suprafeelor metalice; curirea pn la luciu metalic a pieselor metalice; vopsirea cu un strat de miniu de plumb; vopsirea cu dou straturi de vopsea; ungerea cu vaselin.buc2B31ARepairing existing bearing and execution Paid per piece (pcs)The price includes:- supplay, transport, handeling and work execution;- supplay, work scaffolding;- mounting and dismounting work scaffolding;- cleaning the old paint degreassing of metallic pieces;- paint whit minium;- paint in two layer;- lubricate whit grease.pcs2B31BDemontarea, recondiionarea si remontarea aparatelor de reazem metalice existenteSe pltete la bucat (buc)In pre se includ: procurarea, transportul, manipularea i punerea n oper a materialelor necesare recondiionrii; procurarea schelelor de lucru; montarea i demontarea schelelor de lucru; demontarea aparatelor de reazem; ndeprtarea vopselei vechi; degresarea suprafeelor metalice; curirea pn la luciu metalic a pieselor metalice; remontarea aparatelor de reazem conform proiect; vopsirea cu un strat de miniu de plumb; vopsirea cu dou straturi de vopsea; ungerea cu vaselin.buc2B31BDismounting, repairing and mounting the existing metallic bearing devicespcs2B31BDemontarea, reconditionarea si remontarea aparatelor de reazem metalice existenteDismounting, repairing and mounting the existing metallic bearing devicesbuc.pcs.39.702B32Injecii pentru consolidare infrastructuriSe pltete la metru liniar (m)In pre se includ: amenajarea platformei pentru instalaia de forare; executarea forajelor f < 76 mm; strngerea n grmezi a materialului rezultat i ncrcarea n mijloacele de transport; transportul i mprtierea n depozit a materialului; introducerea tuburilor metalice perforate f < 76 mm; prepararea materialului de injecie i injectarea conform prevederilor din proiect.m2B32Injections for substructures consolidationm2B32Injectii pentru consolidare infrastructuriInjections for substructures consolidationmm46.572B33Demolarea betonului din trotuareSe pltete la metru cub (m3)In pre se includ: desfacerea bordurilor existente; decaparea asfaltului de pe trotuare; demolarea betonului de umplutur de la trotuare; demontarea plcilor de acoperire a golurilor pentru cabluri; demontarea dispozitivelor de acoperire a rosturilor de dilataie pe trotuare; desfacerea hidroizolaiei i a stratului suport al acesteia; strngerea materialului rezultat din demolri, ncrcarea n mijloace de transport, transportul, descrcarea i mprtierea n depozitul de antier.m32B33Footway concrete demolitionm32B33Demolarea betonului din trotuareFootway concrete demolitionm3m329.362B33AMortar special pentru refacerea betonului degradat Se pltete la metru patrat (m2) de fisuraIn pre se includ: procurarea, transportul si manipularea materialelor; amenajarea si demontarea schelelor de acces; indepartarea tencuielilor, a betonului superficial degradat, curatirea armaturilor; procurarea sau prepararea mortarului special, inclusiv transportul; prelevare de probe si testarea in laborator; aplicarea mortarului conform tehnologiei producatorului si finisarea suprafetei; tratarea si protejarea suprafetei dupa aplicare.Toate operatiie se vor executa in conformitate cu specificatiile tehnice din Caietul de sarcini.m22B33Am22B34Mortar pentru injectiiSe pltete la metru liniar (m)In pre se includ: procurarea sau prepararea mortarului pentru injectii, inclusiv transportul acestuia la locul de punere in opera; procurarea, transportul, montarea si demontarea schelei de lucru; identificara tuturor fisurilor; montarea stuturilor de injectare; matarea fisurilor; injectarea fisurilor, inclusiv verificara acestora.m2B34Mortar grounting in cracksm2B34Mortar pentru injectiiMortar grounting in cracksmm18.502B35TencuialSe pltete la metru ptrat (m2)In pre se includ: procurarea materialelor; transportul schelelor de lucru, al utilajelor pentru realizarea tencuielii i al materialelor; montarea i demontarea schelelor; aplicarea tencuielii.m22B35Coatingm22B35TencuialaCoatingm2m22.142B36Reparatii betoane cu mortare specialeSe plateste la metru patrat (m2)Sunt incluse: procurarea, transportul si manipularea schelelor de lucru; montarea si demontarea schelelor; diagnosticarea si marcarea zonelor degradate; spituirea betonului existent degradat pana la betonul sanatos cu unelte de mana, conform precizarilor din proiect; sablarea suprafetei spituite si apoi curatarea prin suflare cu jet de aer sau cu apa sub presiune; incarcarea, transportul si imprastierea in depozit a materialului rezultat din demolare; procurarea si prepararea mortarului special conform instructiunilor producatorului; aplicarea mortarului special pentru refacerea elementului din beton la dimensiunile initiale; finisarea suprafetelor; transportul in depozit si depozitarea schelelor de lucru; redarea terenului din depozit in circuitul agricol la terminarea lucrarilor.m22B36Repair of the concrete surfaces with special mortarsPaid per square metre (m2)There are included:- supply, transport and handling of the firing platforms;- the firing platforms withdrawal;- diagnostic and demarcation of the damaged areas;- chisseling of the existing damaged concrete up to the non-damaged one with hand tools, according to the project's stipulations;- sandblast cleaning of the chisseling surface and then cleaning by bubble aeration or by pressurized water;- loading, transport and spreading in the store of the material resulted from the demolition;- special binder supply and preparation according to the producer's instructions;- special binder application for the concrete unit recovery at the initial dimensions;- surfaces finishing;- transport in the store and firing platforms storage;- reclaiming of the ground from the store at the end of the works.m22B36Reparatii betoane cu mortare specialeRepair of the concrete surfaces with special mortarsm2m216.402B37Schela metalica pentru reparatii la infrastructuriSe pltete la metru patrat (m2) de schela metalicaIn pre se includ: procurarea, transportul dus i ntors, depozitarea la antier i manipularea materialelor; pregtirea, asamblarea i montarea materialelor i subansamblelor conform proiectului; executarea paleelor din piloi metalici btui sau nfipi n teren prin vibrare; executarea schelei de lucru din lemn; demontarea lemnriei din schel i transportul n depozit; demontarea paleelor metalice i transportul n depozit.Prin proiect i Caietul de sarcini se vor preciza detaliile i condiiile tehnice de execuie.m22B37Metallic schaffolding for rehabilitations to substructuresPaid per square metre (m2) of iron frameThe price includes:- supply, transport for one way and back, storage to site and materials handling;- preparation, assembly and mounting of materials and of the subassemblies according to the project;- bents execution of driven or thrusted in the ground by vibration metallic piles ;- execution of the wood firing platform;- timber dismounting from the structural frame and transport to the store;- dismounting of the metallic bents and transport to the store.The project and the Technical Specifications shall specify the details and the execution technical terms.m22B37Schela metalica pentru reparatii la infrastructuriMetallic schaffolding for rehabilitations to substructuresm2m218.512B38Rostuire pereu existent din piatra brutaSe pltete la metru patrat (m2) de suprafata rostuitaIn pre se includ: curatirea rosturilor pe o adncime de 3 cm; spalarea cu apa a rosturilor; procurarea sau prepararea mortarului de ciment, inclusiv transportul la locul de punere in opera; prelevare de probe si testarea lor in laborator si santier; umplerea rosturilor cu mortar de ciment; netezirea mortarului de ciment cu vergele de rostuit.Prin Caietul de sarcini se vor preciza caracteristicile mortarului de ciment.m22B38Joint the existing pitching rough stonePaid per square metre (m2) of the square jointingThe price includes: - cleaning the joints of high 3 cm;- washing with water the joints;- supplying or prepparing and transport on the site of the cement mortar;- taking and testing in laboratory and on the site the cement mortar and rough stone- filling the joints with cement mortar;- leveling the joints.m22B38Rostuire pereu existent din piatra brutaJoint the existing pitching rough stonem2m23.272B39Rostuire placaj existent din piatra la culei si pileSe pltete la metru liniar (m) de rostIn pre se includ: curatirea rosturilor; procurarea sau prepararea mortarului de ciment, inclusiv transportul la locul de punere in opera; prelevare de probe si testarea lor in laborator si santier; rostuirea propriu-zisa a mortarului de ciment; netezirea fetei vazute si indepartarea materialului ramas in exces; finisarea fetei vazute.m2B39m2B39Rostuire placaj existent din piatra la culei si pilemm1.252B4Forarea piloilor (se va specifica diametrul pilotului, lungimea unui pilot i tipul instalaiei de forat)Se pltete la metru liniar (m) de forajIn pre se includ: amenajarea suplimentar a platformei pentru poziionarea instalaiei de forat; amenajrile necesare execuiei forajului; deplasarea instalaiei de forare de la un pilot la altul i de la o fundaie la alta; forarea pilotului de la nivelul platformei pn la vrful pilotului; transportul materialului rezultat din forare; mprtierea materialului n depozitul de antier; desfacerea i evacuarea amenajrilor necesitate de foraj; verificarea cotei de fundare i natura terenului de fundare.Prin proiect i Caietul de antier se vor preciza: diametrul i lungimea pilotului; tehnologia de forare i categoria de teren.In cazul n care n cadrul unei lucrri apar mai multe tipuri de forri, se va stabili un pre de forare pentru fiecare diametru i tehnologie de forare.m2B4m2B40Refacerea zidariei degradateSe pltete la metru cub (m3) de zidarieIn pre se includ: procurarea materialelor si transportul lor; procurarea sau prepararea mortarului de ciment, inclusiv transportul la locul de punere in opera; transportul, montarea si demontarea schelelor; pregatirea suprafetei prin degajarea spatiului fiecarui molon ce se inlocuieste, inclusiv a mortarului prins in moloanele adiacente; alegerea moloanelor (pietrelor) la dimensiunea potrivita si prelucrarea lor partiala; udarea abundenta a golului si a pietrei ce urmraza a fi montata; aplicarea mortarului in golul pentru fiecare molon; introducerea si fixarea molonului; prelevare de probe si testarea lor in laborator si santier; rostuirea propriu-zisa a moloanelor.m32B40m32B40Refacerea zidariei degradatem3m371.822B41Schela de lucru suspendataSe pltete la metru patrat (m2) de schelaIn pre se includ: procurarea, transportul dus i ntors, depozitarea la antier i manipularea materialelor; pregtirea materialelor si subansamblelor din lemn si metal; montarea platformei de lucru din lemn si a fierariei de prindere; demontarea lemnriei din schel, a fierariei de prindere i transportul n depozit;Prin proiect i Caietul de sarcini se vor preciza detaliile i condiiile tehnice de execuie.m22B41m22B41Schela metalica suspendatam2m218.512B42Curatirea betonului la infrastructura (bancheta cuzinetilor, etc.)Se pltete la metru patrat (m2)In pre se includ: curirea suprafeei betonului cu peria de srm si suflare cu aer; splarea cu jet de ap a suprafeei betonului; strngerea resturilor de materiale rezultate din curatirea suprafetei, ncrcarea n mijloace de transport, transportul, descrcarea i mprtierea n depozitul de antier.m22B42m22B42Curatirea betonului la infrastructuri (bancheta cuzinetilor, etc.)m2m22.432B4AForarea piloilor cu diametrul mare - D=1080mmSe pltete la metru liniar (m) de forajIn pre se includ: amenajarea suplimentar a platformei pentru poziionarea instalaiei de forat; amenajrile necesare execuiei forajului; deplasarea instalaiei de forare de la un pilot la altul i de la o fundaie la alta; forarea pilotului de la nivelul platformei pn la vrful pilotului; transportul materialului rezultat din forare; mprtierea materialului n depozitul de antier; desfacerea i evacuarea amenajrilor necesitate de foraj; verificarea cotei de fundare i natura terenului de fundare.Prin proiect i Caietul de antier se vor preciza: diametrul i lungimea pilotului; tehnologia de forare i categoria de teren.In cazul n care n cadrul unei lucrri apar mai multe tipuri de forri, se va stabili un pre de forare pentru fiecare diametru i tehnologie de forare.m2B4ADrilling of piles with a large diametre - D= 1080 mmPaid per linear metre (m) of drilling.The price includes:- supplementary arrangement of the platform for the positioning of the drilling installation;- arrangements necessary to the execution of the drilling;- moving of the drilling installation from one pile to another and from one foundation to another;- pile drilling from the platform level to the pile top;- transport of the material resulted from drilling;- scaterring of the material into the site storage;- removal and evacuation of the arrangements required by the drilling;- checking of the foundation quota and of the nature of the foundation soil.The Project and Site Book will provide:- the diametre and length of the pile;- the drilling ctegory and the soil category.In the case when within a work there appear more typs of driilings, it will be set a drilling price for each diametre and drilling technology.m2B4AForarea pilotilor de diametru mare - F=1080mmDrilling of piles with a large diametre - D= 1080 mmmm123.572B4BForarea piloilor cu diametrul mare - D=1500mmSe pltete la metru liniar (m) de forajIn pre se includ: amenajarea suplimentar a platformei pentru poziionarea instalaiei de forat; amenajrile necesare execuiei forajului; deplasarea instalaiei de forare de la un pilot la altul i de la o fundaie la alta; forarea pilotului de la nivelul platformei pn la vrful pilotului; transportul materialului rezultat din forare; mprtierea materialului n depozitul de antier; desfacerea i evacuarea amenajrilor necesitate de foraj; verificarea cotei de fundare i natura terenului de fundare.Prin proiect i Caietul de antier se vor preciza: diametrul i lungimea pilotului; tehnologia de forare i categoria de teren.In cazul n care n cadrul unei lucrri apar mai multe tipuri de forri, se va stabili un pre de forare pentru fiecare diametru i tehnologie de forare.m2B4Bm2B4BForarea pilotilor de diametru mare - F=1500mmDrilling of big diametre columnmm0.002B4CForarea piloilor cu diametrul mare - D=2000mmSe pltete la metru liniar (m) de forajIn pre se includ: amenajarea suplimentar a platformei pentru poziionarea instalaiei de forat; amenajrile necesare execuiei forajului; deplasarea instalaiei de forare de la un pilot la altul i de la o fundaie la alta; forarea pi