l»)j©~ilW~~ San Joaquin Valley ffit ill)/San Joaquin . Valley . Unified Air Pollution Control District . AUTHORITY TO CONSTRUCT . PER.l\lIT NO: N-1758-15-4 . ISSUA.J.~CE DATE: 04/15196
-
Upload
others
-
View
2
-
Download
0
Embed Size (px)
Citation preview
n-950107,,
l»)j©~ilW~~ San Joaquin Valley ffit MAY 2 3 1996 ill)/ Unified Air
Pollution Control DiOOs=d,ou1NVALLEY
UNIFIED A.P.C.D. NO. REGIONMay 21, 1996
Richard Mueller A.L. Gilbert (dba: Berry Seed & Feed Company)
P.O. Box 459 Keyes, CA 95328
RE: Notice of Final Action - Emission Reduction Credit (ERC)
Certificate and Authorities to Construct/ Project #s: 950107 &
950108
Dear Mr. Mueller:
The Air Pollution Control Officer has issued Authorities to
Construct for the installation of grain processing equipment and an
Emission Reduction Credit Certificate N-104-4 resulting from the
installation of PM10 control equipment to the A.L. Gilbert Company
(dba: Berry Seed and Feed) located at 4431 Jessup Road in
Keyes.
Enclosed are copies of the Authorities to Construct, the original
ERC certificate, and a copy of the Notice of Final Action to be
published approximately three days from the date of this
letter.
All relevant comments received within the 30-day public comment
period have been addressed and incorporated into the application
review.
Thank you for your cooperation in this matter. Should you have any
questions, please contact Mr. Anthony Mendes, Permit Services
Manager - Northern Region, at (209) 545- 7000.
Seyed Sadredin Director of Permit Services
CV:ad Enclosures Certified Mail #2198 113 802 cc: Anthony Mendes,
Permit Services Manager - Northern Region
DavidLCrow Executire Director/Air Poll11tion Control Officer
1999 Tuolumne Street. Suite 200 Fresno. CA 93721 • (209) 497-1000•
FAX (209) 233-2057
Nonhern Region Central Region Southern Region 4230 Kiernan Avenue,
Sui1e 130 • Modesto. CA 95356 1999 Tuolumne Street. Suite 200
•Fresno.CA 93721 2700 M Street. Sui1e 275 • Bakersfie,a. CA 9330
I
(209) 545-7000 • FAX (209) 545-8652 (209) 497-1000 • FAX (209)
233,2057 (8051 862-5200 • FAX j80SI 862-;20I
San Joaqt1in Valley Unified Air Pollt1tion Control District
May 21, 1996
Mr. Raymond Menebroker, Chief Project Assessment Branch Stationary
Source Division California Air Resources Board PO Box 2815
Sacramento, CA 95812-2815
RE: Notice of Final Action - Emission Reduction Credit (ERC)
Certificate and Authorities to Construct Project #s: 950107 &
950108
Dear Mr. Menebroker:
The Air Pollution Control Officer has issued Authorities to
Construct for the installation of grain processing equipment and
ERCs resulting from the installation of PM10 control equipment to
the A.L. Gilbert Company {dba: Berry Seed a,,d Feed) located at
4431 Jessup Road in Keyes.
Enclosed are copies of the Authorities to Construct, the ERC
certificate, and the Notice of Final Action to be published
approximately three days from the date of this letter.
All comments received following the District's preliminary decision
were addressed. All relevant comments were incorporated into the
application reviews.
Thank you for your cooperation in this matter. Should you have any
questions, please contact Mr. Anthony Mendes, Permit Services
Manager - Northern Region, at (209) 545- 7000.
Seyed Sadredin Director of Permit Services
CV:ad Enclosures cc: Anthony Mendes, Permit Services Manager -
Northern Region
DavidLCrow E.,.,l!cutfre Director/Air Pollmlon Control
Officer
1999 Tuolumne o:tMI. Suit• 2tl0 Fresno. CA 93721 •1209H97•1DO0•FAX
tZ091233-2057
Nonhern Region Cent.r:1I Region Southern Region "'230 Kiernan
Avenue. Suite 13D • MQdesto. CA 95»6 1999 Tuolumne Slreel. Suihl
200 •Fresno.CA 93721 2700 M S1ree1. Suite Z75 • Bakerslie1a. C4
~J30l
(2119) 54S-7000 • FAll ('209) S45•865'2 !'209) 497-1000 • FAX 1209i
233-2057 \&llS\ Sli2·S200 • rAX llllS) !&2•o201
San Joaqt1in Valley Unified Air Pollution Control District
May21,1996
Ken Bigos, Chief New Source Section US EPA - Region IX 75 Hawthorne
Street San Francisco, CA 94105-3901
RE: Notice of Final Action - Emission Reduction Credit (ERC)
Certificate and Authorities to Construct Project #s: 950107 &
950108
Dear Mr. Bigos:
The Air Pollution Control Officer has issued Authorities to
Construct for the installation of grain processing equipment and
ERCs resulting from the installation of PM10 control equipment to
the A.L. Gilbert Company (dba: Berry Seed and Feed) located at 4431
Jessup Road in Keyes.
Enclosed are copies of the Authorities to Construct, the ERC
certificate, and the Notice of Final Action to be published
approximately three days from the date of this letter.
All comments received following the District's preliminary decision
were addressed. All relevant comments were incorporated into the
application reviews.
Thank you for your cooperation in this matter. Should you have any
questions, please contact Mr. Anthony Mendes, Permit Services
Manager - Northern Region, at (209) 545- 7000.
Sincerely,
CV:ad Enclosures cc: Anthony Mendes, Permit Services Manager -
Northern Region
Da.vidL Crow E.vecutfre Director/ Air Pollution Control
Officer
1999 Tuolumne S1,o-e,. Suite ioo Fresno. CA 93721
•12091497•lOOO•FAX (209) 233·WS7
Northern Region Central Region Southern Region ~230 Kiernan Avenue.
Suite 130 • Modulo. CA 95356 l 999 Tuolumne Street, Suite 200 •
Fresno, CA ~3721 2700 M Street. Suite 275 • Sakersfield. :: :.
i-~O~
(209) 545-7000 • FAX (209) S4S•B652 (209) 497-1 ODO• FAX (209)
<3J•2057 (805) 862-5200 • FAX (80Sl 862,;z.~•
San Joaquin Valley Unified Air Pollution Control District
AUTHORITY TO CONSTRUCT PER.l\lIT NO: N-1758-15-4 ISSUA.J.~CE DATE:
04/15196
LEGAL OWNER OR OPERATOR: BERRY SEED & FEED COMPA.'4"Y
1\-IAil.,lNG ADDRE.5S; J>.o. BOX 459
KEYES, CA 95328
EQUIPMENT DESCRIPTION: INCREASE THE MA.Th'-1UM AMOUNT Of
!'tfATERIAL RECEIVED TO 4.000 TONS PER DAY
CONDITIONS
1. The baghousc shall be equipped v.-itb. a pressure differential
gauge to indicate the pressure drop across the bags. The gauge
sha11 be maintained in good working condition at all times and
shall be located in an easily accessible location.
2. Replacement bags numbering at least 10% of the total number of
bags in the largest baghouse using each type of bag shall be
maintained on ~,c prcmi:sC3.
3. Material removed from dust collec~or(s) shall be disposed of in
a manner preventing entrainment into the atmosphere.
' 4. No air contaminant shall be dischar.:ed into the atmosphere
for a period or periods aegre2a!i·u! rr.ore tha..'1
three minutes in any one hour wnicn i3 dark or darker than
Ringclmann 1 or C9Uivalcnt to 20~ opacity .
.5. There shaU be no visible emissions from the baghouse and
associated ducting.
6. The baghouse cleaning frequency ar:d duration shall be adjusted
to optimize the control efficiency.
7. No air contaminant shall be rclc:ascc into the atmosphere which
causes a public nuisance.
CONDillONS CONTINUE ON NEXT PAGE Thi!: i~ NOT a PERMIT TO
OPE'R,~,:n:. Approval or denial nfa PERMIT TO OPERATE will bi? mad!
:,.iter an inspection to verify th11t the equipment has be-en
co115;ructed in nccon!;mce ,,ith the approved pl=s.
spi,cific:1tio11s 1111d couditicns of this Authority to Construct,
and to detenu.ine if tbe e,quipmeot (;lll1 be opcn,tc:d in
compliaocc with all Rul~1 ancl RefUlationll of the San Jo."ICjuin
Valley t:nified Air Pollution C~trol District. YOU Mi.JST NOTIFY
THE DISTRICT COMPLIANCE DtVISIOr,; AT (109) 545-7000 \VHEN
CONSTRl:CTIO~ OF THE EQL1P~fENT IS COMPLETED. linless r:oostrucricn
bas commenced pu.rsumt to Rule 2050. this Authority to Construct
shall expire and application shaU be eancdled two y~rs from the
date of is.~!!. The spplic:mt is respoa.iible for c::::iplying with
311 b.w~, ordin2nces and regulations of all other g,:,1:emmeutal
:ii;:encit:< whi(;b may pertain to ~ above oci11ip=t.
CROW. EXECU1IVE DIRECTOR/APCO
DAVI» L~.
I' No,£,_ R~ginal Office *4230 Kitman A•.-e., Suite 130 *Modesto,
Dlifornia 9SJS6 *{209) .545-7000* PAX (209) 54.5·365:
CONDITIONS FOR N-17.58-15-4 Page: 2
8. All transfer points and the rail receiving pit shall be enclosed
..
9. The maximum quantity of grain received shall not exceed 4,000
tons during any single day.
10. The PMlO emissions from receiving shall not exceed 1.7&03
lbs per ton of material received. This performance based limit is
to enforce the PMlO emission reductions granted by certificate
N-104-4.
11. The PMlO emissions from transfcring material to storage shall
not exc~ 4.4E-03 lbs ~r ton of material received. This pcrfonnance
based limit is to enforce the PMl0 emission reductions granted by
certificate N-104-4.
12. A log of daily amount of grain received shall be kept on the
premises and shall be made available for District inspection upon
request.
13. Prior to implementation of this Authoricy to Construct. the
PMlO emissions shall be miti 0 ated in accordance with the
requirements of District Rule 2201: New and Modified Stationary
Source Review.
San Joaquin Valley Unified Air Pollution Control District
AUTHORITY TO CONSTRUCT PER.t'-IIT NO: N-1758-26--0 ISSUA.i~CE DATE:
04i1SI06
LEGAL OWNER OR OPERATOR: BERRY SEED&. FEED COMPANY MAILING
ADDRESS: P.O. BOX 459
KEYES, CA 95328
LOCATION: 4431 JESSUP RO., KEYES
EQUIPME1'"T DESCRIPTION:· GRAU-. CLEANING SYSTEM INCLUD~G: rv,·o
250 TON MILL GRAIN STORAGE Br.--iS SERVED BY B~ VE:\T FILTERS; ONE
ROTEX MODEL 523 GC 20 TON/HR CiRAL'l' CLEANER SERVED BY A P&f
IT 6-42-355 BAGHOL"SE: TV,:o so TOS CLEA.i'I;' GRAIN STORAGE RTNS
SERVED BY BL'J' VE~'T FILTERS
CONDITIONS
1. No air contaminant shall be released into the atmosphere which
causes a public nuisance.
2. No air contaminant shall be discharced into the atmosphere for a
period or periods agiregati.r:g, more than three minutes in any one
hour whic& is dark or darker than Ringe1rnann 1 or equivalent
ro 20~ opacity.
3. The baghouse shall be equipped wit., a p:essure differential
gauee to indicate the pressure drc;::, ac:oss the bags. The gauge
shall be maintained in 2:ood working condition at all ti.mes and
shall be :oca.~ed in an easily accessible location. -
4. Replacement ba~s numbering at lea.st 10% uf the total number of
bags in the largest baghous.e usL"lg each· type of bag shall be
maintained on the premises.
5. Material removed from dust co11ectnr(s) shall be disposed of in
a manner preventing entrainme-:it into the atmosphere.
6. The baghouse cleaning frequency and duration shall be adjusted
to optimize the control efficiency.
7. There shall be no visible emissions from the dust control
system.
CONDmONS CONTINUE ON NDXT PAGE This is NOT a PER.\-fIT TO OPERATE.
A~provl.l or denial ofa PERMIT TO OPERATE \liill ~ made ate:- a::t
inspe.ction to verify that the equipment ha.o: ~n cons:.-u;;!ed
i.::l accordance ',a,ith the appro•;ed pians. sp-ecitications and
-x-c.ditiocs of th.i3 Authcrity to Construct, and to deter.nine if
the ec;_':!i;nnent can be operated in complian~ with all Rules and
Rer-.tlation:<: of the San Joaquin Valley Unifa•.d Air Pollution
Cc.-~t.-oi Di.ct.-ict. YOU ~tUST NOTIFY THE DISTRICT
COMPI.l.-\.'-:CE D1VIS10S AT (209) SJS.7000 WHBN CONSTP.UCTIO:-. OF
TH£ EQUIP~fENT IS COMPLETED. t.:nl<$3:J constnacrion h~
:ommenco:-c! pursuant to Ruic 2050, th.is Aulhorily tu Cuu.,,ruct
shall expire and application sh.111 l-e ;aoc~lled two years from
the date of i:;:.'U~. The appticanc is responsible for coe?plying
""'ith au Jaws, ordi11:\llces and regulations of all other
go"erame:it3l agencies which my pertain to the above
equipment.
L. CROW. EXEC~ DlRECTOR,'AI'CO
!/i[~~~sf6Jpl~: DIRECTOR OF PER.\fIT SERVTCES
Nort~egm:u Office ._.230 Ki~an Avc.. Suit.: 1:10 *Modesto~
Califomia 95356 *(209) 545-7000"' FAX (209) 545-8652
l~U-C!lltlff/OM1~-
CONDffiONS FOR N-1758-26--0 Page: 2
8. No more than 1,440 tons of giain shall be processed by the grain
cleaning system in any one day.
9. The PMI0 emissions from the grain cleaning system shaJl not
exceed L27e-02 pounds per ton of grain processed. .
10. A daily record of the amount of grain processed shall be
maintained on the premises at all times.
11. ~ rec9rds shall be retained for a minimum of 2 years, and shall
be made available for District mspect10n upon request.
12. Prior to implementation of this Authority to Construct, the
PMIO emissions shall be mitigated in accordance with the
re.quiremenls of District Rule 2201; New and Modified Stationary
Source Review.
DAV
fa
San Joaquin Valley Unified Air Pollution Control District
AUTHORI1,Y TO CONSTRUCT PER..',,flT NO: N-1758-7.7-0 ISSUA:~CE DA
TE: 04/15196
LEGAL OWNER OR OPERATOR: BERRY SEED & fEED COMPANY MAILING
ADDRESS; P.O. BOX 4S9
KEYES, CA 95328
l .OCATION: 4431 JESSUP RD.• KEYES
EQUIP:MENT DF.sCRIPTION: ROLLER MILLING SYSTEM INCLUDING: TIUtEE
STE~'4 CONDlTIONING CHA:.\fBERS; THREE FER.~L-ROSS 20 TONIF_Jl
FLAKING MILLS: ONE AIR LIFT SYSTE~f SE.~\:,:;:) BY ONE 1D3D
CYCLONE: O1',."E GRAlS COOLER SERVED BY ONE 1D30 CYCLONE
C0!'.1DITIONS
I. No air contaminant shall be released into the atmosphere which
cau~e~ a puhlic n11i~nce.
2. No air contaminant shall be dischareed ir.to the atmosphere for
a period or periods aegrcga.6\e: more than three minutes in any one
hour whlcfl is dar~ or darker than Ringelmann 1 or equivalent to
20% opa1.ity.
3. Material removed from dust collector(s) shall be disposed of in
a manner preventing entrd.1ment into the atmosphere.
4. No more than a total of 1.440 tons of ::rain shall be processed
by the ecrrain rolling: svstem fa any one day. . - - .
5. The PMIU emissions from the grain roiling system shall not
exceed 8.0e-03 pounds per ton of grain proce\Sed. _
6. A daily record of the amount of grain processed shall be
maintained on the premisi:s at alt limes.
7. ~11 rec9rds shall be retained for a minimum of 2 years. and
shall be made available for District inspection upon request.
.
CONDITiONS CONTINUE ON NEXT PAG[ This is NOT a PERMIT TO Of'ERATI.
At:'C':-::,·a! or denial of a PERJ.\[IT TO OPER..'\ fE "'ill be
ma(!e a::..-r an i11spiecnon ro \'eiify that the equipment has been
coostr.1e:ed i.n accordance with the approved plans, ~i!:kations
and :-:nuitions of this Authority to C0t1stn.ict, and to determine
if ,be eqUt]:'o-:nt can be opented in compliance with all R:.ile~
:and R.~~htinn~ nf the ~lln J('IA(lnin Valley Unified Air Pollution
Ccutr.:-I Di.,.-tri:t. YOU MUST NOTIFY THE DISTRfCT COMPLiA.~Cli
DJ\.1S10~ AT (209} 545-7000 WHEN CONSTR.UCTIO?-:" OF THE :EQUIPMENT
IS COMPLETED. Ualess constru\'.:ticu hu commenced pursuazlt to
R\ll1:< 2050, this Authority to Co~-:-.:::: shall expire and
application shall be cancelled two years from the dare of issuance.
Th~ applicant is responsible for comply'..ng with all laws,
ordinances and rcgularions of all other gc,·CT::::mental agencies
which may pertain to the above equipment.
L. CROW, I!XBCl.,'TIVE DIRECTOR.1.A.PCO
•P.~•MIT SERVICES
Noru11C111~ al Office •4230 IGeman A,,·s.• Suicc 130 •Mode:slo.
Califomia 9.S3S6 •(209) 545·7000• f'A,"( (209) S4l·S6.S2
,-...11---ftlDl'l'll<ff-=mlll!IIQ'-1-
CONDillONS FOR N-1758-27-0 Page: 2
8. Prior to implementation of this Authority to Construct, the PMlO
emissions shall be miligatt:d in accordance with the requirements
of District Ruic 2201: New and Modified Sra.tionary Source
Review.
San Joaquin Valley Unified Air Pollution Control District
AUTHORITY TO CONSTRUCT PER.i'1IT NO: N-175&-28-0 ISSUA.i.'iCE
DATE: 0,.1_ 15 ·95
LEGAL OWNER OR OPERATOR: BEAAY SEED & FEED COMPANY MAILING
ADDRFSS: P.O. BOX 459
K.E'fES. CA 95328
LOCATION: 4431 JESSUP RD., JC.EYES
EQUII'MENT DESCRIPTION; GRAIN GRINDL"IG SYSTl:!M L'JCLUDING: OSE
~L-\GN'UM 20X44 24 TON/HR GRA1N GRJNDER SERVED BY A ?&.FIT
6-42-355 BAGHOUSE; GRINDING MATERIAL STORAGE (100 TONS) SERVED BY
BIN VEST FILTF.RS; CiROt:"\v MATERIAL STORAGE (100 TONS) SERVED BY
BL'i VEl'."T FILTERS
CO~H>ITIONS
1. No air contaminant shall be released into the atmosphere which
causes a public nuisance.
2. No air contaminant shall be discharged into the atmosphere for a
period or periods aggrega:in~ :';i0!\': than three minutes in any
one hour which is d.2:k or darker than Ringdmann 1 or equivalent to
:o~ t72city.
3. The baghouse shall be ~uipped with a :pressure differential
gauie to indicate the pressure crop a::-on the bags. The gauge
~ha,l be maintai:-:e<l in good working condition at all times
and sha.11 ':,e loc:;.:.ec in an easily accessible location.
4. Replacement bags numbering at least 10~ of the total number uf
bags in the largest bagho~se us:::g each type of bag shall be
maintained on the pre:nises.
5. Material removed from dust collector(s) shall be disposed of in
a manner preventing entraL'1ment ir.::o the atmosphere.
6. The baghouse ch:aning frequency and duration shall be adjusted
to optimize the control efficiency.
7. There shall be no visible emissions from the dust control
system.
CONDmO!',;'S COZ,,"'TINUE ON NFJIT PAGE Tb.is is NOT a PERMIT TO
OPERA.TE. :>.rrroval or denial of a PERMIT TO OPERATE ""ill be
ma.:!e a:'t<!r ;~ ~7ection to verify that the equipment bas been
coru-1r.1:~ in ac::ordmce with the appro-.ed plans, specificarincs
a.."'!d .::amliti,;c.« of thi,: Authority to Construct, and to
determine if the ~mpment cm be operated in compliance ...,.ith all
Rules and :'{~:;,Jla~c--:-..-. of the S:tn Joaquin Valley Unified
Air Pollutio11 Co.atroi .Dimict. YOU MUST NOTIFY THE D[STR.tCT
CO~f?!.tA:,.iCi. ~fVIS1OK AT (209) 545-7000 WHEN CONSTRUcno:-; OF
irr:: EQUIPME~"T IS COMPLETED. Unle~, constructicn l,.1$
,;-c=n.:nced puMJant to Rule 2050, this Authority tu Cum,l..,~!
:,h,dl c11pirc and llppliciuicn shall be cancelled rv,;o )·i:ars
frot:1 :!::-e cute of issuance. Th6 applicant is responsible for
comp!:i:ig ...,itb all laws. ordinances and regul~tions or ail
other governmrn:.,.: 1gencies which may pertain to the above
equipment.
DA L. CROW, EXECUTIVE DIIU!CTOR-'APCO
~~ SYED F. R OF PER.\fIT SERVICES
Nort 'oal Offo:e *42JO Kiem:t.n Ave., Suire 130 •Modesto,
Califomi;a 9S3SG "'(209) 5'45-7000• FA..X (209) S4S-86.5Z
CONDmONS FOR N-1758-28-0 Page: 2
8. No more than 576 tons of gnin shall be processed by the grain
grinding system in any one day.
9. The PM10 emissions from the grain grinding system shall not
exceed 6.7c-03 pounds per ton of grain processed. - ·
10. A daily record of the amount of grain processed shall be
maintained on the premises at all time..-::.
11. ~11 rec'?rds shall be retained for a minimum of 2 years, and
shall be made available for District inspection upon request.
12. Priur to implemencation of this Authoricy to Construct the PM10
emissions shall be mitigated L11 accordance with lhe requirements
of District Rule 2201: New and Modified Stationary Source
Review.
San Joaquin Valley Unified Air Pollution Control ·District
Northern Regional Office :It 4230 Kiernan Ave., Suite 130 :1t
Modesto, CA 95356
Emission Reduction Credit Certificate N-104-4
Issued To: Berry Seed & Feed Issue Date: May 21, 1996
Location of Reduction: 4431 Jessup Road Keyes, CA
For PMI0 Reduction In The Amount Of:
Quarter 1 Quarter 2 Quarter 3 I Quarter 4 19,353 lbs 17,086 lbs
18,646 lbs I 20,750 lbs
( ] Conditions Attached
Method Of Reduction [ ] Shutdown of Entire Stational")· Source [ ]
Shutdown of Emissions Unit [ X] Other: Addition of control
equipment to an existing receiving pit and comreving svstem
David L. Crow, APCO
The Modesto Bee
EMISSION REDUCTION CREDIT CERTIFICATE AND AUTHORITIES TO
CONSTRUCT
NOTICE IS HEREBY GIVEN that the Air Pollution Control Officer has
issued an em1ss1on reduction credit certificate to the A.L. Gilbert
Company (dba: Berry Seed and Feed) for the installation of PM 10
control equipment and Authorities to Construct for the installation
of grain processing equipment.
All comments received for Project #s 950107 & 950108 following
the District's preliminary decision were addressed. All relevant
comments were incorporated into the Application Reviews, which are
available for public inspection at the SAN JOAQUIN VALLEY UNIFIED
AIR POLLUTION CONTROL DISTRICT, NORTHERN REGION OFFICE, 4230
KIERNAN AVE .. SUITE 130, MODESTO. CA 95356 (209) 545-7000.
ERC APPLICATION EVALUATION
Processing Engineer: C. Valverde Date: 12 February 1996
Facility N aine: A.L. Gilbert (Berry Seed & Feed Company)
Mailing Address: P.O. Box 459
Keyes, CA 95328
Project Number: 950107 Certificate Number: N-104-4
Date Application Received: 01 March 1995 Date Application Deemed
Complete: 07 April 1995
I. SUMMARY
A.L. Gilbert is applying for emission reduction credits (ERC's) for
a reduction in emissions which occurred as a result of the
installation of PM 10 control equipment to control emissions from a
rail car receiving pit and from the equipment that transfers grain
from the pit to storage. The installation of the equipment to
control emissions from transferring grain to storage was authorized
by Authority to Construct (A/C) N- 1758-15-1. The installation of
the equipment to control emissions from receiving grain to storage
was authorized by NC N-1758-15-2.
A portion of the actual emission reductions (AER's) will be used to
offset the entire stationary source NSR balance for PMlO as
determined in the review of applications N-1758-26-0, 27-0, 28-0,
& 15-4. Pending a determination of compliance with District
Rule 2301: Emission Reduction Cmli.t Banking and public
notification, an ERC certificate will be issued to A.L. Gilbert
Company for all reductions in excess of those required to offset
the NSR balance for PMlO. The certificate will reflect the
following amount of emission reductions:
EMISSION REDUCTION CREDITS (pounds) QUARTER 1st ql.r 2nd qtr I 3rd
qtr I 4th qtr
ERC's 19,353 17,086 I 18,646 I 20,750
Page 1 of 8 16-Feb-96 11,49
II. APPLICABI,E RULES
m. LOCATION OF REDUCTIONS
4431 Jessup Road, Keyes
IV. METHOD OE GENERATING REDUCTIONS
The reduction in PMlO emissions was achieved by adding equipment to
control emissions from a previously uncontrolled operation. The
first operation, a rail car receiving pit was enclosed and the
enclosure was ducted to a baghouse. The second operation, which
includes conveying equipment to transfer grain from the receiving
pit to storage, is now operated under a vacuum and the air being
evacuated is ducted to two baghouses. One of the two baghouses
involved is the same unit that serves the rail receiving pit
enclosure.
V. CALCULATWNS
A. Assumptions and Emission Factors
1. Transfer to Storage (N-1758-15-1)
Both the uncontrolled and controlled emission factors for this
operation will be taken from the review of application N• 1758·
15-1. They are as follows:
Uncontrolled: 0.44 lbs/ton Controlled: 4.4e--03 lbs/ton
The uncontrolled PMlO emission factor is based on the emission
factor from AP-42, Table 6.~1 for a headhouse. The AP-42 emission
factor is for total particulate matter. It is assumed that PMIO
emissions are 29% of the total particulate emissions 4•
The controlled emission factor is based on the uncontrolled
emission factor and a control efficiency of 99% .
PMlO Mauual, Table V-2
Page2of8 Ui-Peb-!16 12: 05
2. Receiving Pit (N-l 75S.15-2)
Both the uncontrolled and controlled emission factors for this
operation will be taken from the review of application N-1758-15-2.
They are as follows:
Uncontrolled: 0.17 lbs/ton Controlled: 1.7e-03 lbs/ton
The uncontrolled PMlO emission factor is based on the emission
factor from AP-42, Table 6.4-1 for grain receiving. The AP-42
emission factor is for total particulate matter. It is assumed that
PMlO emissions are 29% of the total particulate emissions5•
The controlled emission factor is based on the uncontrolled
emission factor and a control efficiency of 99%.
B. Baseline Period Determination
As per policy NSR/ERC 10-2, for reductions authorized by a previous
Authority to Construct, the baseline emissions shall be selected
from a period as prescribed in Rule 2201 immediately preceding the
date on which the A/C authorizing the reduction was deemed
complete.
A/C N-1758-15-1 was deemed complete on 28 September 1992. The
baseline period for this emission unit will be the eight quarter
period ending with the last complete quarter prior to the completed
application for the A/C authorizing the reduction. Specifically,
the baseline period will be from 1 July 1990 thru 30 June
1992.
TONS OF MATERIAL TRANSFERRED TO STORAGE (N-1758-15-1) YEAR 1• qtr
2°" qtr 3rd qtr 41h qtr
1990 51,043.3 49,534.1 1991 50,274.6 47,802.2 52,507.3 61,756.0
1992 55,118.8 50,162.6
Average 52,696.7 48,982.4 51,775.3 55,645.1
A/C N-1758-15-2 was deemed complete on 15 June 1992. The baseline
period for this emission unit will be the eight quarter period
ending with the last complete quarter prior to the completed
application for the A/C authorizing the reduction. Specifically,
the baseline period will be from 1 April 1990 thru 31 March
1992.
S PMIOManual, Table V-2
Page 3 of 8 16-Peb-H 11:0
YEAR TONS OF MATERIAL RECEIVED (N-1758-15-2) l111 qtr 2nd qtr 3rd
qtr 41h qtr
1990 48,259.8 51,043.3 49,534.1 1991 50,274.6 47,802.2 52,507.3
61,756.0 1992 55,118.8
Average 52,696.7 48,031.0 51,775.3 55,645.1
C. Historical Actual Emissions (HAE)
The HAE from each unit will be calculated by multiplying the
average amount of material processed in each quarter during the
baseline period, as provided by the Applicant, by the emission
factor prior to the modification (or the uncontrolled emission
factor).
1. Transfer to Storage
HAE FOR THE TRANSFER EQUIPMENT (pounds) I 1st qtr I :zed qtr 3111
qtr I 4111 qtr
Average I 52,696.7 I 48,982.4 51,775.3 I 55,645.1 0.44
lbs/ton
HAE (lbs) I 23,187 I 21,552
Emission Factor
I 1st qtr I 2nd qtr 3111 qtr I 41hqtr
Average I 52,696.7 I 48,031.0 51,775.3 I 55,645.1 0.17
lbs/ton
HAE (lbs) I 8,958 I 8,165
Emission Factor
D. Actual Emission Reductions (AER)
The AER's will be calculated by multiplying the HAE by the change
in control efficiency (ACE). ·
AER = HAE x ACE ACE = [(EF1 - EF2 )/ EF1]
where, EF2 = emission factor after modification EF1 = emission
factor before modification
Page4 of 8 :u;.i,e1,.96 11 ,n
~CE - [(0.44 - 4.35e-03 )/ 0.44] - 0~99
AER FOR THE TRANSFER EQUIPMENT (pounds)
I 1st 4tr I . 2nd 4tr 3rd qtr I 4th qtr
HAE I 23,187 I 21,552 22,781 I 24,484
~CE 0.99
2. Receiving Pit
AER FOR THE RECEIVING PIT (pounds)
I 1st 4tr I 2nd qtr 3rd q1r l 4th qtr
HAE I 8,958 I 8,165 8,802 I 9,400
~CE 0.99
E. Air Quality Improvement Deduction
Pursuant to Rule 2201, Section 6. 5, ten percent of all actual
emission reductions are deducted as a contribution toward air
quality improvement.
EMISSION REDUCTIONS AVAILABLE FOR USE AS OFFSETS (lbs) 1st qtr tld
qtr 3nl qtr 4th qtr
TOTALAER 31,823 29,419 31,267 33,604 10% DEDUCTION 3,182 2,942
3,127 3,360
AER's AVAILABLE FOR USE AS 28,641 26,477 28,140 30,244
OFFSETS
There will be no increase in permitted emissions.
Page 5 of 8
G. Bankable Emission Reduction Credits
A portion of the available emission reductions will be used to
offset the source's NSR balance for PMlO to zero. The amount of
offsets required was determined in the review of applications
N-17S8-26-0, 27-0, 28-0, & 15-4. Thus, the amount of reductions
used to offset the NSR balance for PMlO will be subtracted from the
total actual emission reductions that are available for use as
offsets. The remainder will be banked.
EMISSION REDUCTIONS AVAILABLE FOR BANKING (lbs) 1st qtr t"' qtr 3nl
qtr 41h qtr
AER's AVAILABLE FOR USE AS OFFSETS . 28,641 26,4n 28,140
30,244
REDUCTIONS USED TO OFFSET THE NSR 9,288 9,391 9,494 9,494
BALANCE NET AVAILABLE FOR 19,353 17,086 18,646 20,750
BANKING
VI. COMPLIANCE
In order to insure compliance with Rule 2301, all emission
reductions must meet the following criteria to be bankable.
A. Real
The proposed emission reductions occurred as a result of the
addition of control equipment to control PMlO emissions from a rail
receiving pit and the equipment used to transfer grain from the
receiving pit to storage. The emissions were calculated based on
logs of the amount of material received at the receiving pit for
each quarter of the baseline period. The District is, therefore,
satisfied that the emissions in the amounts calculated did indeed
occur. Therefore, the reductions are real.
B. Enforceable
The Permits to Operate and all subsequent Permits to Operate for
the equipment from which the reduction in emissions was generated
will contain enforceable conditions which limit the controlled PMlO
emission concentrations to the values used to quantify the
reduction in emissions. As required by District policy NSR/ERC
22-1, the PMlO emission limits are performance based limitations in
pounds of PMlO per ton of product received.
Page 6of8 16·1'eb·96 11 :4!1
.........
The performance based limitations will ensure that the rmnnnum
control efficiencies for the modified equipment will be maintained
at all throughputs without affecting the potential capacity of the
receiving and storage equipment. The conditions specifying the
performance based limitations will include language stating that
the conditions are to enforce the emission reductions from this
project. This addition will ensure the enforceability of the
emission reduction credits for all future actions pertaining to the
Permit to Operate. The performance based conditions to enforce the
PMlO emission reductions from this project are as follows:
The PMlO emissions from receiving shall not exceed 1.7e-03 pounds
per ton of material received. This performance based limit is to
enforce the PMlO emission reductions granted by certificate
N-104-4.
The PMlO emissions from transferring material to storage shall not
exceed 4.4e-03 pounds per ton of material received. This
performance based limit is to enforce the PM 10 emission reductions
granted by certificate N-104-4.
To exceed these performance based limitations would be a violation
of District rules. Therefore, the reductions are enforceable.
C. Quantifiable
The emissions were calculated based on the quarterly amount of
material received, emission factors approved by the EPA, and
minimum control efficiencies that are required by permit
conditions. Therefore, the reductions are quantifiable.
D. Permanent
As was previously stated, the reduction in emissions was achieved
by installing equipment to control PMlO emissions from two
processes at this source. This control equipment will be required
to remain installed and operational at all times. The equipment may
not be removed or altered without first obtaining authorization
from the District. Therefore, the reductions are pem13.llent.
E. Surplus
The installation of the new control equipment was not the result of
any current or proposed rule. Therefore, the reductions are
surplus.
Page 7 of8 16-Feb-96 11: 49
........
F. Timeliness
The application for ERC's was submitted after the issuance of the
A/C's which authorized the reduction in emissions and prior to
implementation of those A/C's. Therefore, the application for ERC's
was submitted within the required 180 days from the date of
reduction.
VII. RECOMMENDATION
Issue an Emission Reduction Credit Certificate to the A.L. Gilbert
Company for a reduction in PMIO emissions which occurred as a
result of the installation of equipment to control PMlO emissions
from a rail receiving pit and from grain transferring equipment at
4431 Jessup Road in Keyes. The certificate will reflect the
following amount of reductions:
EMISSION REDUCTION CREDITS (pounds) QUARTER I 1st qtr I 2..i qb' I
3rd qb' 41h qb'
ERC's I 19,353 I 17.086 I 18,646 20,750
i:\fttdWSOIDB.doc
07 April 1995
A.L. Gilbert Co. (Berry Seed & Feed) Richard Mueller P.O. Box
459 Keyes, CA 95328
Re: Application# N-104-4 Project Description: Emission Reduction
Credits (ERC's) from the addition of control equipment to the rail
receiving pit
Dear Mr. Mueller:
Tue Air Pollution Control District is in receipt of the additional
information requested regarding the above-referenced project, and
has again reviewed the application for completeness. Based on this
review, the application now appears to be complete. However, during
the processing of this application, the District may request
additional information to clarify, correct or otherwise supplement
the information on file.
Thank you for your cooperation. Should you have any questions,
please telephone Mr. Anthony Mendes of Permit Services at (209)
545-7000.
Sincerely,
SS/AM/cv~
Oa~·id I.. Crow E.tr:ecutir,e Director/Air l'ollutio,r Co,r/ro/
Officer
1999 TUOiumne Street Su,1e 200 •Fresno.CA 9J72 I • (2091 -197-1000
• FAX (209) 233-2057
Northern Region Central Region Southern Region
4230 K,ernan A""nue, Su,le 130 • Modeslo, CA95J56 1999 Tuolumne
St,eel, Su,le 200 • Frnsno. CA 9J72 I 2700 M Slrool, Su,10275 •
Bakersl,eld, CA 9JJ01 (2091 545-7000 • Fa, {209} 545-8652 '
{209)497-tOO0 • Fa, 1209) 233-2057 (805) 861-3682 • Fa, (805)
861-2060
Oakdale, California 95361-0038 (209) 847-1721 • 524-9261 • Fax
(209) 847-3542
Since 1892 Bulk Dairy Feeds Sacked Feeds Liquid Feeds Field
Seeds
March 3 l. 1995 ~~~ID San Joaquin Val1ey Unified Air Pollution
Control District SAN JOA8UIN VALLEY
UNIAE A.P.C.O.4230 Kiernan Avenue. Suite 130 NO. REGIONModesto. Ca.
95356
Attn. Mr. Anthony Mendes
Reference: A) My letter dated 2/28/95 with 4 ATC applications and
an ERC application. Application# N-104-4
B) Your letter dated 3/21 /95 requesting additional
information
Dear '-1r. Mendes.
Enclosed is the additional infom1ation requested by reference (B).
The information submitted summarizes the total grain and pellets
received by quarter from 1990 through 1992. Our records indicate
the ATC # N-1758-15-2 was deemed complete 6/ 15/92 therefore lhe
logical period for determining the credit would be the two year
period ending 6/30/92.
As discussed duri 11 g our phone conversation yesterday. we have
records of actual products received in both monthly totals and by
individual shipments by rail car number and truck by each
individual product but are somewhat reluctant to provide that
detail of data for public record. I would be happy to show you that
information upon your request.
It is requested that the actual production numbers within the
enclosure be held confidential as much as possible. Hopefully the
above will provide the necessary information for the evaluation of
the requested EMISSION REDUCTION CREDIT. Should you have any
questions or require any additional information. don ·1 hesitate to
call.
Thank you for your assistance.
Richard A. Mueller
MARCH 1988 DEC. 1992
IV 49617.3 61756.0 49534. l GRAIN 48769.8 58154.0 45612.8
PELLETS 847.S 3602.0 3921.3 - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
I I I 55979.4 52507.3 51043.3 GRAIN 54554.7 48523.2 48431.2
PELLETS 1424.7 3984. 1 2612. 1 - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
I I 50162.6 47802.2 48259.8. GRAIN 49354.0 43600.3 45699.8
PELLETS 808.6 4201.9 2560.0 - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - I 55118.8 50274.6 45928.3 GRAIN
52903.7 45697.7 41721.0
PELLETS 2215.1 4576.9 4207.3 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
March 21, 1995
A.L. Gilbert Co. (Berry Seed & Feed) Richard Mueller P.O. Box
459 Keyes, CA 95328
Re: Application_# N-104-4 Project Description: Emission Reduction
Credits (ERC's) from the addition of control equipment to the rail
receiving pit
Dear Mr. Mueller:
Your application for ERC's for the above referenced project has
been reviewed for completeness by the Air Pollution Control
District. Based on this preliminary review, the application has
been determined to be incomplete. Prior to further processing, a
quarterly record of the amount of material received at the rail
receiving pit for the two year period ending 31 March 1992 must be
submitted to the District. .
In response, please refer to the above application number, and send
to the attention of Chris Valverde.
Please be advised that failure to provide the requested information
within 30 days may result in the denial of the requested
Authorities to Construct.
Thank you for your cooperation in this matter. Should you have any
questions, please telephone Chris Valverde of Permit Services at
(209) 545-7000.
Sincerely,
SS/AM/CV/ David I•. Crow
E.Y:ectdilie Direclor/Air Pol/ulion Control O.[flcer
1999 Tuolumne Slreel. Su,te 200 •Fresno.CA 93721 • (209] 497• 1000
• FAX (209] 233-2057
Northern Region Central Region Sou1hern Re"iml
4230 K""nan Avenue. &,,1e 130 •Modesto.CA 95356 1999 Tuolumne
Slre<al. S1J1le 200 • Fresno. CA 93721 2700 M S11eet, S..,~e 275
• Bakors!•clc. CA 93301 {209] 545-7000 • Fa, (209] 545-8652 • (209]
497- lllOO • Fa, (209) 233-2057 (805) 86 I•3682 • Fa, (8051 861
·2060
APPLICATION FOR:
l)<I EMISSION REDUCTION CREDIT (ERC) [ J ERC RE-ISSUE AFl'ER
PARTIAL USE [ J CONSOLIDATION OF ERC CERTIFICATES [ JERC TRANSFER
OF OWNERSHIP
1. ERC TO BE ISSUED TO:
l.
3.
s.
6.
7.
I
8.
'iS:32.8 4. DATE OF .I/,/ I q e-
REDUCTION: ~S'1" t/~,S, /U
Cityl /(£Y£.S C4. EXJSfING ERC NO(S):
METHOD RESULTING IN EMISSION REDUCTION: [ J SHUTDOWN )4 RETROFIT {
J PROCESS CHANGE [) OTHER
DESCRIPTION: Rsc£1v1N1 P,r E.11u.oSUAe . WirH H£r;,9r1vc 4,<
tJN
f',r 1/NIJ /44,,ys.r/,t 7i s~..(A-(; - CoNN!'CTcLJ Jo'
(U•udditianal,._if-->')
REQUES'IED ERC.S (In Pounds Per Calendar Quarter):
I voe I NOx I 1st QTR
1ndQTR
3rdQTR
lf,cHAl(O I! /JlvcJ.J..£
/8 S80 . /8 6/S 20 S30 21 0'17 $ $
TYPE OR PRINT TITLE OF APPLICANT:
£"'<:; IN EGA.. DATE:
I OTHER I
\UNIFIED A.P.C.D. q5Q/tJ'7PROJECT NO.:
Northern Regional Office• 4230 Kiernan Ave., Suite 130 • Mode.sto,
California 9S3S6 • ( S4S-1000 • FAX (209) S4S-86S2
@P,.n1e<lonRec-;cta<lPo....,, ()U er Covnte r
".:l,_ f -Ge:;-
I ,
+ - - _!
GRAIN • FEEDS ~--,·· -~-; 049109..~-~IL~Arco.
P.O. Box 38 - 304 North Yosemite Ave.·cf ,-.. nr..,. . .. ·
Oakdale, California 95361 :· . ·. '7 f'...:r.lnfelstafe . :'
f3ari< OAKDALE OFFICE . . '
,· DATE CHECK NO. DISCOUNT AMOUNT·... ~-~ , !~.,-... ....
---,~
. . ' ,., .
}
ERC APPLICATION l~t~~~!~~ SAN JOAQUIN VALLEY
UNIFIED A.P.C.D. NO. REGION
650.00
650.00
A. L. GILBERT COMPANY P.O. Box 38 • 304 North Yosemite Ave.
Oakdale, Celif. 95381 049109
Date I Initials j Given To
-~:71"Ldq, -l !
C0>-40 t..fP..
3:CT Nu'"'M:BE-':l; _9_5_0_1_07__ t"AOJ...r.rY ID:______ P ,MIT
~Os:______________
~CA.J.'IT NA.i\1E;
_A_._L_._G_I_L_B_E_RT_C_O_M_PA_N_Y_______________________
ISE
ADDRESS:_4.:....4:.:::3-=-1--'J:....:E:.;:.S..;;.S.;;..UP_R..:...OA_O--',:.,.._K_EY_E_S_____________________
P.REI..I.MlNARY REVIEW I ENG:R I DATE I SUFR IDATE I A. Applic:uion
De:m.ed !ncom;,LC!e I I I I I B. Appliczion De=med Compl~ ( ]
AW:litiug CB Offi;ci:s I «;J_) I,_, /~<l I I
I I I C.. Applic:i.tion Pc:tding De:ual I I I I D. Appliczion
De:ricd I I I I I
'ENG-INEElUNG EVALUA.TION I lNlT I DAT.E
E. ~ginc:::::ing E•ruuation Comple!e
F. Supe::vising ~o:i:a..c=:' Approval
G. Complianc::: Division Approval
( ] Noc Required
I Dire:::!or .Review-: [ ] Noc Required ( ] Required
:.~ STAE.F: Pcrior:n tasks as indic:ued. below. Inil:i:u and
&itc wac::t Cltn\)lctcd.
:UMINARY 'REVlEW ( ] ______ M,iil Lico01ple:cn= ~ to tb.e
~plic::nc. ( l Mm ~myl== L=: (0 die ~U=t. ( ) . Mail [ntc::lc to
Dc:y lae::- to the Applic::nc (C!rtified M:ill). ( ] Mil.ii
De:i.id.l L:=:- to tile Appti=c (Cu-titied. M:u1}.
1,J'ECI'S NOT REQUIRING POBUC NOTIFICATION
E:.!MINAltY DIS?OSIIION: ( ] --,.------M4il. lmminait Denial
l..=tc:- co die Apptic::uic (Certified M:u1}.
'{JJ.. DtsPOSmoN: { J ______ M&il ATC(s) to Distnautiaa.
( ] M4il D~ia! ~ co the A{>pli=t (Cenilied M.:ill}.
UECTS 'REOUllllNG l'UBUC NOTIFICATION
5!..IMIMAR.Y DECISION: ( ) ______ Ddivc: Ad to uir: Newspaper
t<OT LA.TE..tt ntAM __________
C I ______ Ma.ii copic:s a( Caver Lc:a.c:- &11d Ellgin.;:.--idg
Evduaciaa ro Disuioudaa.
______ Dcilvc: Ad ca die Ncwspapc:- NOT LATER THAN __________
\
,_ ( 1______ Mail co9ics o( Cave:- L=c:- s.nd ATC(s) c.o
Di~cibucion.
( 1_ _____ Mail copies of Cove:- L.--ac::- c.o Disu-foudoa.
'fAL DEOSlON: ( l
iUT-10{'{
t APPUCAfIT C I _______ E?A • 75 H.,......,tjiornc Sc., San
Fra.ac:i~co, CA 94105 Aun: A~l-4
-' ;
COMPLIA,,'fCE . l I ______ SNUAPCO • 1999 Tuolumne: Sc., Fresno. CA
937'1.l Aun: Scycd Sadrc::lin PREvOSE FILE
~ ( ] ______ OTHER ___________BLDG DE?T
-
.
"(
--