16
Trusted to deliver excellence © 2013 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose other than that for which it is supplied without the express written consent of Rolls-Royce plc. This information is given in good faith based upon the latest information available to Rolls-Royce plc, no warranty or representation is given concerning such information, which must not be taken as establishing any contractual or other commitment binding upon Rolls-Royce plc or any of its subsidiary or associated companies. LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head of Nordic region

LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

  • Upload
    buihanh

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

Trusted to deliver excellence

© 2013 Rolls-Royce plc

The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose other

than that for which it is supplied without the express written consent of Rolls-Royce plc.

This information is given in good faith based upon the latest information available to Rolls-Royce plc, no warranty or representation is given concerning

such information, which must not be taken as establishing any contractual or other commitment binding upon Rolls-Royce plc or any of its subsidiary or

associated companies.

LNG fuel –

a Norwegian Ferry tale

Finn Arne Rognstad

Head of Nordic region

Page 2: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

Rolls-Royce

Civil Aerospace Defence Aerospace Marine Energy

39 000 employees

• Aero engines • Helicopter engines

• Aero engines • Helicopter engines

• Ship Design • Equipment systems

• Gas turbines

World leading supplier addressing four global markets:

Page 3: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

Ship design and integrated systems

Diesel and gas engines

Propellers & gears

Azimuth thrusters

Waterjets Gas turbines Propulsion & steering systems

Podded propulsors Automation & DP

systems Stabilising systems Tunnel thrusters Automated handling

systems

2010 revenue - £2.6 billion

4,000 customers; 7,000 employees

Equipment ~ 30,000 vessels; sales & service activities in 35 countries

Comprehensive range of power & propulsion products, systems and services

The Rolls-Royce marine business

Page 4: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

4

a) Vestfjorden: 4

LNG fuelled ferries in Scandinavia

b) Trondheimsfjord: 3 Glutra (2002) Tresfjord (repower)

c) Moldefjord: 3

d) Bjørnafjord: 4

e) Boknafjord: 2

f) Oslo – Nesodden: 3

g) Stockholm - Turku: 1

h) Bergen - Hirtshals: 2

a)

b)

c)

d)

e) f) g)

h)

Total: 24

i) Øksfjord: 2 q3 2015

i)

Page 5: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

Torghatten 1 x Bergen BV12 gas Propulsion engine 1 x MTU fuel Generator engine 1 x RR HSG drive 2 x LNG tanks and Integrated LNG system Promas system •The gas fuel consumption is 650kg/hr at 78% load (equal to 159 g/kwHr) •Not using diesel back up •Some initial adjustment issues with LNG system

Page 6: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

Tresfjord conversion project

Conversion of propulsion system from liquid fuel to natural gas

Page 7: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

E-39 Bergen – Stavanger route

• Operating in Bjørnafjord and Boknafjord

• 6 ferries making 35 port calls each every day

• 75,000 port operations per year

• In operation since 2007

• Engines have passed 40,000 running hours

• No downtime due to LNG over the past 6 years

Page 8: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

Boknafjord 1 vessel built 2012 Gas/Electrical propulsion 3 x Bergen C6 gas Generator engines 1 x Bergen C6 fuel Generator engine 4 x RR Azipull propulsors Inherently safe LNG design New hydrodynamic design

Bergensfjord class 5 vessels built 2006/7 Gas/Electrical propulsion 4 Bergen K engines (discontinued) Emergency shut down LNG principle

Fjord 1 claims 25% fuel efficiency gain!

Fjord1

Page 9: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

Fjordline RoPax

2 x Bergen BV12 gas propulsion engines 2 x 295 m3 LNG tanks and Integrated LNG system 2 x Promas CPP propulors 2 x Brown Brothers Stabilizers 2 x Ulstein tunell thrusters

Page 10: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

10 LNG fuelled ferries in Scandinavia - Infrastructure

a)

b) c)

d) e) f) g)

h)

a) Truck from Hammerfest, 1000 km to LNG terminals in Moskenes and Lødingen

b) Truck from Kolsnes (Bergen) 600 km c) Truck from Kolsnes (Bergen) 500 km d) Truck or ship from Kolsnes (Bergen)to

LNG terminal at Halhjem e) Truck from Kolsnes (Bergen) 100 km f) Truck from Kolsnes (Bergen) 500 km g) Truck from terminal in Nynäshamn to bunkervessel in harbour h) LNG terminal at Risavika (Stavanger)

Page 11: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

LNG terminal Halhjem 11

Page 13: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

Summary

• LNG operation with ferries since 2001 (Glutra)

• No incidents or reported near incidents either onboard or during bunkering

• LNG preferred by chief engineers and operators

• Maintenance better. No lub oil change

• Teething problems present, but overcome

• Vast collective experience between operators, engine/equipment manufacturers and authorities

• Sharing of best practice in Scandinavian shipping community.

13

Page 14: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

Other LNG fuel projects

Ro-Ro vessel under construction in China for Norwegian

Norlines

Winner of “Next Generation Shipping Award” 2011

Page 15: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

•65t bollard pull •Mechanical drive •Rapid ramp up time •No diesel •80cubm LNG tank •2 x coldbox of 100%

”Showing the brute force of LNG”

Page 16: LNG fuel a Norwegian Ferry tale Finn Arne Rognstad Head uostas_2014.10… · Ship design and integrated systems Diesel and gas engines Propellers & gears Azimuth thrusters Gas turbines

16

Thank You !

•Clean Engineroom •Clean engine (40.000 hrs)

•Clean Fjords!!