Anticipated Cost – The total cost for all six projects is $35.9 million. Location – Six locations in Albemarle County Improvements – VDOT has combined six projects in Albemarle County into one design-build package. One contractor will be selected to both complete the final design and construct all six projects. The projects were approved for SMART SCALE and/or Highway Safety Improvement Program (HSIP) funding by the Commonwealth Transportation Board in July 2017. 3 6 1 5 2 4 1. I-64 at exit 118 interchange modifications 2. I-64 at exit 124 diverging diamond interchange 3. Fontaine Avenue ramp improvements 4. Roundabout at Routes 250 and 151 5. Roundabout at Routes 20, 649 and 1494 6. Rio Mills Road/Berkmar Drive connector LEGEND www.VirginiaDOT.org [email protected] LOCATION AND DESIGN PUBLIC HEARINGS Design-Build Projects Albemarle County © 2018 Commonwealth of Virginia Comments may be submitted orally or in writing at the public hearing; by mail to Hal Jones, Project Manager, 701 VDOT Way, Charlottesville, VA 22911 or by email to [email protected]. Comments must be postmarked, emailed or delivered to VDOT by October 21, 2018 in order to be included in the public hearing record. After the public comment period closes, VDOT will review and evaluate any information received as a result of this hearing. This information, including the hearing summary, will be available for review at the VDOT Culpeper District office. After all comments have been addressed, the information received as a result of the hearing will be presented to VDOT’s Chief Engineer or designee for consideration. If approval of the major design features is received for the projects, they will move forward to the final design phase. More information about all six projects is available on VDOT’s website: www.virginiadot.org/projects/ culpeper/albdesignbuild.asp. Get Involved Contact Information Harold.Jones@ VDOT.Virginia.gov Teresa.Cook@ VDOT.Virginia.gov Louis.Hatter@ VDOT.Virginia.gov 434-422-9378 800-367-7623 540-899-4238 800-367-7623 540-829-7391 800-367-7623 540-727-3201 800-367-7623 1601 Orange Road Culpeper, VA 22701 87 Deacon Road Fredericksburg, VA 22405 1601 Orange Road Culpeper, VA 22701 1601 Orange Road Culpeper, VA 22701 Primary Contact: Hal Jones Project Manager Terry Cook Right of Way Manager, Special Projects Tonnette Harris Civil Rights Manager Lou Hatter Communications Manager Culpeper District Office of Communications Culpeper District Location and Design Northeast Region Right of Way Culpeper District Office of Civil Rights Tonnette.Harris@ VDOT.Virginia.gov Welcome to the Virginia Department of Transportation’s location and design public hearing for a design-build package comprised of six projects in Albemarle County. This public hearing is being held to provide an opportunity for any person, acting on his/her own behalf or representing a group or governing agency, to give VDOT comments and/or suggestions on the proposed projects. VDOT strives to ensure that all members of the community have the opportunity to participate in public decisions on transportation projects and programs affecting them. VDOT representatives are present to discuss the projects and answer your questions. A comment sheet is included in the handout for this meeting, and your input is encouraged. All oral and written comments received on the projects will be included in a transcript for review by VDOT personnel, citizens and other interested parties. Public Meeting Project Locations and Overview Tuesday, October 9, 2018 5:30 to 7:30 p.m. Monticello High School 1400 Independence Way Charlottesville, VA 22902 Wednesday, October 10, 2018 5:30 to 7:30 p.m. Western Albemarle High School 5941 Rockfish Gap Turnpike Crozet, VA 22932 Thursday, October 12, 2018 5:30 to 7:30 p.m. Albemarle High School 2775 Hydraulic Road Charlottesville, VA 22901

LOCATION AND DESIGN PUBLIC HEARINGS Design-Build ...Oct 21, 2018  · Anticipated Cost – The total cost for all six projects is $35.9 million. Location – Six locations in Albemarle

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LOCATION AND DESIGN PUBLIC HEARINGS Design-Build ...Oct 21, 2018  · Anticipated Cost – The total cost for all six projects is $35.9 million. Location – Six locations in Albemarle

Anticipated Cost – The total cost for all six projects is $35.9 million.

Location – Six locations in Albemarle County

Improvements – VDOT has combined six projects in Albemarle County into one design-build package. One contractor will be selected to both complete the final design and construct all six projects. The projects were approved for SMART SCALE and/or Highway Safety Improvement Program (HSIP) funding by the Commonwealth Transportation Board in July 2017.

3

6

1

5

2

4

1. I-64 at exit 118 interchange modi�cations 2. I-64 at exit 124 diverging diamond interchange3. Fontaine Avenue ramp improvements4. Roundabout at Routes 250 and 151 5. Roundabout at Routes 20, 649 and 14946. Rio Mills Road/Berkmar Drive connector

LEGEND

www.VirginiaDOT.org [email protected]

LOCATION AND DESIGN PUBLIC HEARINGS

Design-Build Projects Albemarle County

© 2018 Commonwealth of Virginia

Comments may be submitted orally or in writing at the public hearing; by mail to Hal Jones, Project Manager, 701 VDOT Way, Charlottesville, VA 22911 or by email to [email protected].

Comments must be postmarked, emailed or delivered to VDOT by October 21, 2018 in order to be included in the public hearing record.

After the public comment period closes, VDOT will review and evaluate any information received as a result of this hearing. This information, including the

hearing summary, will be available for review at the VDOT Culpeper District office. After all comments have been addressed, the information received as a result of the hearing will be presented to VDOT’s Chief Engineer or designee for consideration. If approval of the major design features is received for the projects, they will move forward to the final design phase.

More information about all six projects is available on VDOT’s website: www.virginiadot.org/projects/culpeper/albdesignbuild.asp.

Get Involved

Contact Information

Harold.Jones@ VDOT.Virginia.gov

[email protected]

Louis.Hatter@ VDOT.Virginia.gov

434-422-9378 800-367-7623

540-899-4238800-367-7623

540-829-7391800-367-7623

540-727-3201800-367-7623

1601 Orange Road Culpeper, VA 22701

87 Deacon RoadFredericksburg, VA22405

1601 Orange Road Culpeper, VA 22701

1601 Orange Road Culpeper, VA 22701

Primary Contact:Hal JonesProject Manager

Terry Cook Right of Way Manager,Special Projects

Tonnette HarrisCivil Rights Manager

Lou HatterCommunications Manager

Culpeper District Office of Communications

Culpeper DistrictLocation and Design

Northeast RegionRight of Way

Culpeper District Office of Civil Rights

[email protected]

Welcome to the Virginia Department of Transportation’s location and design public hearing for a design-build package comprised of six projects in Albemarle County.

This public hearing is being held to provide an opportunity for any person, acting on his/her own behalf or representing a group or governing agency, to give VDOT comments and/or suggestions on the proposed projects.

VDOT strives to ensure that all members of the community

have the opportunity to participate in public decisions on transportation projects and programs affecting them.

VDOT representatives are present to discuss the projects and answer your questions.

A comment sheet is included in the handout for this meeting, and your input is encouraged. All oral and written comments received on the projects will be included in a transcript for review by VDOT personnel, citizens and other interested parties.

Public Meeting

Project Locations and Overview

Tuesday, October 9, 20185:30 to 7:30 p.m.

Monticello High School1400 Independence Way Charlottesville, VA 22902

Wednesday, October 10, 20185:30 to 7:30 p.m.

Western Albemarle High School 5941 Rockfish Gap Turnpike

Crozet, VA 22932

Thursday, October 12, 20185:30 to 7:30 p.m.

Albemarle High School2775 Hydraulic Road

Charlottesville, VA 22901

Page 2: LOCATION AND DESIGN PUBLIC HEARINGS Design-Build ...Oct 21, 2018  · Anticipated Cost – The total cost for all six projects is $35.9 million. Location – Six locations in Albemarle

2: I-64 at Exit 124 Diverging Diamond Interchange (DDI)

5: Construction of Roundabout at Routes 20, 649 and 1494

3: Fontaine Avenue Ramp Improvements

6: Rio Mills Road/Berkmar Drive Connection

This project involves eliminating the loop ramp from southbound Route 29 to eastbound I-64. A dual left-turn lane and a connection to the existing ramp from northbound Route 29 to eastbound I-64 will be constructed.This modification will eliminate two weave movements that have been identified as a factor in many crashes.

Estimated project cost: $1 million; Engineering of roadway plans: $265,000; Right of way acquisition and utility relocation: $0; Construction: $735,000

State Project: 0029-002-959,P101, C501; Federal Project: HSIP-5104(269); UPC: 111727

The intersection of Route 250 (Rockfish Gap Turnpike) and Route 151 (Critzers Shop Road) in Afton, near the Nelson County line, will be reconstructed as a roundabout.

In recent years there have been an increasing number of crashes at this intersection. This project will improve operations and safety at the busy intersection while managing traffic speeds and correcting geometric deficiencies that have been identified as contributing factors in crashes at the intersection.

A temporary signal was installed in April 2017 as an intermediate measure. Advance warning flashers and inlane rumble strips have also been installed on the downhill eastbound Route 250 approach to slow traffic.

Estimated project cost: $5.8 million; Engineering of roadway plans: $950,000; Right of way acquisition and utility relocation: $850,000; Construction: $4 million

State Project: 0250-002-954,P101, R201, C501; Federal Project: HSIP-002-7(049); UPC: 111730

This project will build a diverging diamond interchange (DDI) on Route 250 and make other low-cost improvements for safety and congestion relief. The work also includes ramp improvements, new signals and signal upgrades, drainage improvements and utility relocations. By shifting vehicles to the opposite side of the road, this design eliminates traditional left turns that cross over oncoming traffic. The DDI improves safety by reducing the number of spots where vehicles could collide and can handle more than 600 left-turn movements per hour, twice the capacity of a conventional interchange. Virginia’s first DDI opened in 2014 at the I-64/Route 15 interchange at Zion Crossroads in Louisa County.

Estimated project cost: $18.4 million; Engineering of roadway plans: $2.3 million; Right of way acquisition and utility relocation: $1.1 million; Construction: $15 million

State Project: 0250-002-956,P101, R201, C501; Federal Project: NHPP-002-7(051); UPC: 111814

This project will convert the intersection of Route 20 (Stony Point Road), Route 649 (Proffit Road) and Route 1494 (Riggory Ridge Road) to a single-lane roundabout to improve safety and traffic flow.

Estimated project cost: $4 million; Engineering of roadway plans: $700,000; Right of way acquisition and utility relocation: $1 million; Construction: $2.3 million

State Project: 0020-002-953,P101, R201, C501; Federal Project: STP-5104(267); UPC: 111733

This project involves adding an option lane — through/right-merge lane — at the Fontaine Avenue exit from northbound Route 29. The project will ease current weaving issues and remove conflict points.

Estimated project cost: $2.9 million; Engineering of roadway plans: $600,000; Right of way acquisition and utility relocation: $300,000; Construction: $2 million

State Project: 0029-002-955,P101, R201, C501; Federal Project: NHPP-002-7(050); UPC: 111813

This project will construct a quarter-mile, two-lane road to connect Rio Mills Road to the recently completed Berkmar Drive Extended. The work will include a sidewalk and shared-use path that connects to the bicycle and pedestrian facilities on Berkmar Drive Extended.

Estimated project cost: $3.8 million; Engineering of roadway plans: $850,000; Right of way acquisition and utility relocation: $500,000; Construction: $2.45 million

State Project: 9999-002-941,P101, R201, C501; UPC: 109397

1: I-64 at Exit 118 Interchange Modifications

4: Construction of Roundabout at Routes 250 and 151

The construction of all six projects in Albemarle County will not require the displacement of any families, businesses or non-profit organizations.

As the projects are further developed, additional right of way for utility relocation or construction may be required beyond the proposed limits shown on the public hearing plans. The property owners will be informed of the exact location of the easements during the right of way acquisition process and prior to construction.

Information about right of way purchase is discussed in VDOT’s Right of Way and Utilities brochure, “A Guide for Property Owners and Tenants.” Copies of this brochure are available on the VDOT website and from any VDOT Right of Way agent.

After the public hearing, information regarding right of way may be obtained from the Right of Way contact listed on the back of this brochure.

Right of Way

VDOT’s Culpeper District Environmental office has performed environmental reviews and coordination to obtain information about environmental resources in the project vicinity; to provide natural and historic resource agencies an opportunity to review and comment on the project during its development; and to identify opportunities for avoidance, minimization and mitigation of potential environmental impacts.

State Environmental Review Process (SERP) documentation and National Environmental Policy Act (NEPA) forms have been developed in cooperation with the Federal Highway Administration and in accordance with federal guidelines. The NEPA document includes information from various technical reviews including those related to natural resources, water quality, threatened and endangered species, air quality and noise.

In compliance with the National Historic Preservation Act, Section 106 and 36 CFR Part 800, information concerning the potential effects of the proposed projects on properties listed in or eligible for listing in the National Register of Historic Places is also provided in the environmental documentation.

The projects will continue to be coordinated with the appropriate federal, state and local agencies as part of environmental review and approval processes required throughout project development and construction. All required environmental clearances and permits will be obtained prior to commencement of construction. Strict compliance with all environmental conditions and commitments resulting from regulatory approvals and implementation of VDOT’s specifications and standard best management practices will protect the environment during construction.

Representatives are available to discuss this information and to answer questions.

The following schedule has been proposed:

Request for qualifications released: July 11, 2018

Public hearings: October 9,10,11, 2018

Public comment period ends: October 21, 2018

Release request for proposals: Anticipated late October 2018

Technical proposals due: Anticipated April 2019

Price proposals due: Anticipated May 2019

Design-build contract award: June 2019

Construction start: Winter 2019

Construction completion: Spring 2023

Project schedule is subject to change.

VDOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964. If you need more information with regard to your civil rights on these projects or special assistance for persons with disabilities or limited English proficiency, contact the project manager listed on the back of this brochure.

Environmental Review

Anticipated Schedule

Civil Rights

Estimated total cost: $35,900,000

Engineering of roadway plans: $5,700,000

Right of way acquisition and utility relocation: $3,700,000

Construction: $26,500,000

Cost is subject to change as the design is developed.

Estimated Total Cost for Six Projects

Page 3: LOCATION AND DESIGN PUBLIC HEARINGS Design-Build ...Oct 21, 2018  · Anticipated Cost – The total cost for all six projects is $35.9 million. Location – Six locations in Albemarle

1: I-64 at Exit 118 Interchange Modifications

2: I-64 at Exit 124 Diverging Diamond Interchange (DDI)

3: Fontaine Avenue Ramp Improvements

Page 4: LOCATION AND DESIGN PUBLIC HEARINGS Design-Build ...Oct 21, 2018  · Anticipated Cost – The total cost for all six projects is $35.9 million. Location – Six locations in Albemarle

4: Construction of Roundabout at Routes 250 and 151

5: Construction of Roundabout at Routes 20, 649 and 1494

6: Rio Mills Road/Berkmar Drive Connection