Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
DETEN
TION
PON
D
350'185'
735'
340'
856'
DETENTIONPOND
185'
252,
750
SF
283,040 SF
huff lane
harm
ony ro
ad
DEVELOPER: AGENT:
N
AVAILABLE FOR LEASE
Harmony Road: 252,750 SF | Huff Lane: 283,040 SF
EAST GREENWICH LOGISTICS CENTER
DETENTIONPOND
±252,750 SF 350'
185'
735'
Property Area: 38.63 acres
Building Size: 252,750 square feet
Building Dimensions: 735’ x 350’
Ceiling Height: 36’ min (measured at underside of structural joist at first column)
Drive-in Doors: 2 (14’ x 16’ drive-in doors on ramp)
Loading Doors: 38 (9 x 10’ tailgate height)
Car Parking: 208 spaces (expandable to 311)
Trailer Parking: 79 stalls
Truck Courts: 185’
Column Spacing: 54’ x 48’-4” (60’ in loading bay)
Truck Aprons: +/- 60’ concrete aprons of 6” concrete in dock high truck courts
Construction Type: Exterior painted tilt-up concrete panels
Floor: 7” thick, 4,000 PSI concrete slab on grade with two coats sealer. Floor load designed to average 500 lbs/SF
Roof: Fully adhered 45 mil EPDM roof with 22 gauge steel decking and R-20 rigid insulation
Building Systems: Fire Protection: ESFR compliant with NFPA-13 standards.
Electric System: 2,000 amp, 277/480 volt, 3-phase service
Lighting System: LED energy efficient lights to provide 30 foot candles at 36” above finished floor.
Heating System: Gas fired space heaters, minimum 8 BTU/SF for freeze protection.
Dock Equipment: 40,000 lb, mechanical pit levelers with “Z” guard door track protection, bumpers and seals
Water: 2” domestic supply
Sewer: 6” gravity flow waste lines under slab
HARMONY ROAD 196 Harmony Road, East Greenwich Township, NJ
Construction Detail:
EAST GREENWICH LOGISTICS CENTER
SITE PLANS & SPECIFICATIONS
±283,040 SF 340'
856'
60'46'-8"
54'
DETENTIONPOND
185'
:
Construction Type: Exterior painted tilt-up concrete panels
Floor: 7” thick, 4,000 PSI concrete slab on grade with two coats sealer. Floor load designed to average 500 lbs/SF
Roof: Fully adhered 45 mil EPDM roof with 22 gauge steel decking and R-20 rigid insulation
Building Systems: Fire Protection: ESFR compliant with NFPA-13 standards.
Electric System: 2,000 amp, 277/480 volt, 3-phase service
Lighting System: LED energy efficient lights to provide 30 foot candles at 36” above finished floor.
Heating System: Gas fired space heaters, minimum 8 BTU/SF for freeze protection.
Dock Equipment: 40,000 lb, mechanical pit levelers with “Z” guard door track protection, bumpers and seals
Water: 2” domestic supply
Sewer: 6” gravity flow waste lines under slab
HUFF LANE150 Huff Lane, East Greenwich Township, NJ
1,000+ SF of Frontage on
Construction Type: Exterior painted tilt-up concrete panels
Floor: 7” thick, 4,000 PSI concrete slab on grade with two coats sealer. Floor load designed to average 500 lbs/SF
Roof: Fully adhered 45 mil EPDM roof with 22 gauge steel decking and R-20 rigid insulation
Building Systems: Fire Protection: ESFR compliant with NFPA-13 standards.
Electric System: 2,000 amp, 277/480 volt, 3-phase service
Lighting System: LED energy efficient lights to provide 30 foot candles at 36” above finished floor.
Heating System: Gas fired space heaters, minimum 8 BTU/SF for freeze protection.
Dock Equipment: 40,000 lb, mechanical pit levelers with “Z” guard door track protection, bumpers and seals
Water: 2” domestic supply
Sewer: 6” gravity flow waste lines under slab
Property Area: 23.09 acres
Building Size: 283,040 square feet
Building Dimensions: 856’ x 340’
Ceiling Height: 36’ min (measured at underside of structural joist at first column)
Drive-in Doors: 2 (14’ x 16’ drive-in doors on ramp)
Loading Doors: 43 (9 x 10’ tailgate height)
Car Parking: 187 spaces
Trailer Parking: 60 stalls
Truck Courts: 185’
Column Spacing: 54’ x 46’-8” (60’ in loading bay)
Truck Aprons: +/- 60’ concrete aprons of 6” concrete in dock high truck courts
Construction Detail:
Delaware
Pennsylvania
New Jersey
Cherry Hill
TRENTON
Wilmington
Jackson
Howell
Toms River
Lakewood
Camden
Bensalem
Abington
Barnegat
Stafford
Deptford
Logan Township
Bayville
Newark
Marlboro
Chester
Winslow
Cheltenham
Freehold Township
Voorhees
Warminster
Springfield
Pennsauken
Lacey
Medford
Mount Laurel
Pottstown
Horsham
Radnor
Warrington
Norristown
Marple
West Goshen
Willingboro
Burlington
Moorestown
Manalapan
Manchester
LawrenceEwing
PHILADELPHIA
West Deptford
Dean Torosian Senior Vice President Tel: [email protected]
Nate Demetsky Senior Managing DirectorTel: [email protected]
LEASED BY:
PHILADELPHIA INTERNATIONAL
AIRPORT
PACKER MARINE ERMINAL
HIGHWAYSI-295 – Exit 17 immediate access
NJ Turnpike – Exit 2 6 miles
NJ Turnpike – Exit 3 19 miles
POPULATION CENTERSPhiladelphia CBD 19 miles
Wilmington CBD 22 miles
Trenton CBD 48 miles
New York City CBD 102 miles
LOGISTICS HUBSPHL International Airport 7 milesPhilaPort 9 miles
Port of Newark 95 miles
DRIVING DISTANCES
BEN FRANKLIN BRIDGE
WALT WHITMAN BRIDGE
BETSY ROSS BRIDGE
COMMODORE BARRY BRIDGE
TACONY-PALMYRA BRIDGE
BURLINGTON-BRISTOL BRIDGE
TIOGA MARINE TERMINAL
Jones Lang LaSalle220 Lake Drive East
Suite 102Cherry Hill, New Jersey 08002
EAST GREENWICH LOGISTICS CENTER LOCATION