LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ENFORCEMENT REPORT May 2019 The Enforcement Report for May 2019 includes data for March 2019 in the following tab les*: Tables 1- 3 Enforcement Summary by Action: Shows enforcement actions taken by all Regional Programs. Table 4 EPLs Issued (March 2019) Six (6) EPLs were issued in March 2019, for a total of $111,000 Table 5 EPLs Settl ed (March 2019): Seven (7) EPLs were settled in March 2019, for a total of $213,000 Table 6 Violations Subject to MMP's 37 cases with 337 violations subject to MMPs remain (March 2019) unresolved. Table 7 EPL Progress (NPDES): FY 18/19 $777,000 in penalties were collected to date. (March 2019 data) Stormwater Program The attached table lists Notices of Non-Compliance Table 8 Notices of Non-Compliance {NNC) issued in this reporting period and tracks the status of issued in March 2019 comoliance. Stormwater Program The attached table lists Notices of Violation issued in Table 9 Notices of Viol ation {NOV) this reporting period and tracks the status of issued in March 2019 comolianc e. Stormwater Program The attached table lists Notices to Comply issued in Table 10 Notices to Comply {NTC) this reporting period and tracks the status of issued in March 2019 comoliance Stormwater Compliance Unit Outstanding The attached table lists all outstanding Stormwater Table 11 Enforcement Items NOVs dated after January 2019 and trac ks the status of comoliance. * Tabl es 1-3 summari ze enforce ment actions taken by all Regional Programs. Ta bles 4-11 list enforcement acti ons t aken by the Enforcement Section.

LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD

ENFORCEMENT REPORT May 2019

The Enforcement Report for May 2019 includes data for March 2019 in the fol lowing tables*:

Tables 1- 3 Enforcement Summary by Action: Shows enforcement actions taken by all Regional Programs.

Table 4 EPLs Issued (March 2019) Six (6) EPLs were issued in March 2019, for a total of $111,000

Table 5 EPLs Settled (March 2019): Seven (7) EPLs were settled in March 2019, for a total of $213,000

Table 6 Violations Subject to MMP's 37 cases with 337 violations subject to MMPs remain

(March 2019) unresolved.

Table 7 EPL Progress (NPDES): FY 18/19

$777,000 in penalties were collected to date. (March 2019 data)

Stormwater Program The attached table lists Notices of Non-Compliance Table 8 Notices of Non-Compliance {NNC) issued in this reporting period and tracks the status of

issued in March 2019 comoliance. Stormwater Program The attached table lists Notices of Violation issued in

Table 9 Notices of Violation {NOV) this reporting period and tracks the status of issued in March 2019 comoliance. Stormwater Program The attached table lists Notices to Comply issued in

Table 10 Notices to Comply {NTC) this reporting period and tracks the status of issued in March 2019 comoliance

Stormwater Compliance Unit Outstanding The attached table lists all outstanding Stormwater Table 11

Enforcement Items NOVs dated after January 2019 and tracks the status of comoliance.

* Tables 1-3 summarize enforcement actions taken by all Regional Programs. Tables 4-11 list enforcement actions t aken by the Enforcement Section.

Page 2: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

NPDES Facility Inspections:

ENFORCEMENT SECTION March 2019 Data

The Enforcement Unit NPDES inspector conducted inspections at 7 faci lities w ith NP DES permits. Inspection of the facilities is a required part of the NPDES Program.

Stormwater Facility Inspections:

The Stormwater Unit inspectors conducted inspections at 90 facilities with Construction and Industrial Stormwater Permits. Inspection of these facilities is a required part of the Stormwater Program.

EPLs Settled:

Seven (7) EPLs were settled collecting $213,000 in penalties in this reporting period. The Settlement Offers were issued fo r alleged effluent and/or late reporting violations of NPDES Permits. Please refer to Table 5 for a list of specific Settlement Offers and amounts.

Notices of Non-Compliance:

Ninety-eight (98) Notices of Non-Compliance were issued during this reporting period a discharger for fai ling to recertify under the new Industria l Genera l Permit or failing to submit annual reports. Please refer to Table 8 for a list of specific NNCs and their status.

Notices of Violation:

Fifteen (15) Notices of Violation were issued in this report ing period to dischargers for failing to submit annual reports and for BMP Violations. Please refer to Table 9 for a list of specific NOVs and their status.

Notices to Comply:

Four (4) Notices to Comply were issued in this reporting period to a discharger fo r fa iling to submit annua l reports and for BMP Violations. Please refer to Table 10 for a list of specific NOVs and their status.

Page 3: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

Table 1- Informal Enforcement Actions

Action March 2019 FY

2018/2019 Notices of Violation 12 141

Total 141

Table 2 - Formal Enforcement Actions

Action March 2019 FY

2018/2019 Administrative Civil Liability 3 24 13267 Orders 11 130 Clean Up and Abatement 8 112 Orders/ Amendments

Total 266

Table 3 - Compliance Inspections

Program March 2019 FY

2018/2019 NPDES (Major Permits) 2 16 NPDES (Minor Individual Permits) 0 7 NPDES (Minor General Permits) 5 31 Stormwater (Construction) 34 265 Stormwater (Industrial) 56 283 Stormwater (Municipal) 0 0

Total 602

Table 4 - EPLs Issued {March 2019)

Owner/Facility Date Issued Type of Alleged

Amount Violation

Los Angeles Turf Club/Santa Anita Park 3-29-2019 Effluent $21,000

Pacific M arina Venture/4637 Admiralty Way 3-29-2019 Effluent $9,000

100 N. Crescent LLC/100 North Crescent Drive 3-5-2019 Effluent $30,000

City of Cerritos/Civic Center Parking Facility 3-5-2019 Effluent $15,000

Hudson 11601 Wilshire, LLC/Hudson 11601 Wilshire, LLC 3-29-2019 Effluent $6,000

lnterActive Corporation/Office Building 3-29-2019 Effluent 30,000

Total $111,000

Page 4: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

Table 5 - EPLs Settled {March 2019}

Type of Date

Date Stipulated Owner /Facility Issued

Alleged Order

Date Paid Amount Violation

Issued California Department of Water

10-23-2018 Effluent 3-1-2019 3-27-2019 $12,000 Resources/Wil liam E. Warne Power Plant CA Department of Transportation District

10-23-2018 Effluent 1-28-2019 3-27-2019 $45,000 7 / Route 105 Dewatering Project Ralphs Grocery Co./Ralphs Grocery Co. Store

10-23-2018 Effluent 3-1-2019 12-17-2018 $3,000 289

UTA Plaza, LLC/UTA Plaza 10-23-2018 Effluent 3-1-2019 1-18-2019 $6,000

Duesenberg Investment Company/Gateway East 10-23-2018 Effluent 3-1-2019 1-3-2019 $3,000

County of Los Angeles/Hall of Justice 3-26-2018 Effluent 3-1-2019 12-18-2018 $84,000

Los Angeles City DWP/Castaic Power Plant 5-3-2018 Effluent 3-1-2019 3-11-2019 $48,000

Total $213,000

Table 6 - Violations Subject to MMPs (March 2019}

No. of Facilities No. of Violations

Pending 37 337

Table 7 - EPL Progress - NPDES Fiscal 18/19- (with March 2019 Data)

No. of EPLs No. of Violations No. of EPLs No. Violations

Action Type March 2019 March 2019

Fiscal Year Fiscal Year {18/19} {18/19}

EPLs Issued 6 37 34 205

EPLs Resolved 7 71 37 259

EPLs Withdrawn 0 0 3 5 Total Amount Collected to

Dat e $777,000

Page 5: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

Table 8

Notices of Non-Compliance (NNC) issued in March 2019

FACILITY NNC ISSUE

NNC PERMIT

FACILITY NAME ADDRESS (WITH DATE

RESPONSE TYPE

VIOLATIONS STATUS CITY} DUE DATE

10630 Painter Failure to Obta in Premium

3/4/19 5/10/19 Response

Avenue, Santa Fe IGP Coverage Under the Sandblasting rece ived

Springs NPDES General Permit

Failure to Obtain Cee Bee 11511 Bellinger

3/4/19 5/10/19 Response

IGP Coverage Under the Manufacturing Street, Lynwood

NPDES General Permit not yet due

FirstClass Foods 12500 Inglewood Failure to Obtain

Avenue, 3/4/19 5/10/19 IGP Coverage Under the Response

Trojan, Inc. Hawthorne NPDES General Permit

received

Fa ilure to Obtain Alosta Brewing 692 Arrow Grand

3/4/19 5/10/19 Response

IGP Coverage Under the Company Circle, Covina

NPDES General Permit received

9706 Bell Ranch Failure to Obtain World Packaging

Drive, Sa nta Fe 3/4/19 5/10/19 IGP Coverage Under the Response

West not yet due Springs NPDES Genera l Permit

13400 Saticoy Failure to Obtain BKB Automotive Response

Street, Suite 35, 3/4/19 5/10/19 IGP Coverage Under the Cosmetics, Inc. rece ived

North Hollywood NPDES General Permit

5860 Uplander Failure to Obtain

Medtronic PLC 3/4/19 5/10/19 IGP Coverage Under the Response

Way, Cu lver City NPDES General Permit

not yet due

2121 Yates Failure to Obtain Superior Printing Ink

Avenue, 3/4/19 5/10/19 IGP Coverage Under the Response

Company, Inc. received Commerce NPDES Genera l Permit

Flexfirm Products, 2300 North Chico Failure to Obtain

Avenue, South El 3/4/19 5/10/19 IGP Coverage Under the Response

Inc. not yet due Monte NPDES General Permit

13006 Park Street, Failure to Obtain

Duro Roller Company 3/4/19 5/10/19 IGP Coverage Under the Response

Santa Fe Springs NPDES General Permit

received

Failu re to Obtain A-W Engineering 8528 Dice Road,

3/4/19 5/10/19 IGP Coverage Under the Response

Company, Inc. Santa Fe Springs NPDES General Permit

not yet due

Page 6: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

FACILITY NNC ISSUE

NNC PERMIT FACILITY NAME ADDRESS (WITH

DATE RESPONSE

TYPE VIOLATIONS STATUS

CITY) DUE DATE

Electronic Chrome & 9132 Dice Road, Failure to Obtain

3/4/19 5/10/19 IGP Coverage Under the Response

Grinding, Inc. Santa Fe Springs NPDES Genera l Permit

not yet due

2265 East El Failure to Obta in

Millennium Space Segundo 3/4/19 5/10/19 IGP Coverage Under the

Response

Systems Boulevard, El NPDES Genera l Permit

not yet due

Segundo

9311 East Rush Failure to Obtain Hong Kong Motors,

Street, South El 3/4/19 5/10/19 IGP Coverage Under the Response

Inc. not yet due Monte NPDES General Permit

GHT Industrial 10733 Painter Fai lure to Obtain

Machining & Welding Avenue, Santa Fe 3/4/19 5/10/19 IGP Coverage Under the Response

received Company Springs NPDES General Permit

13612 South Failure to Obtain

Perez Engineering Normandie 3/4/19 5/10/ 19 IGP Coverage Under the Response

Avenue, Gardena NPDES General Permit received

Failure to Obtain Scotia Engineering 8440 Secura Way,

3/4/19 5/10/19 IGP Coverage Under the Response

Incorporated Santa Fe Springs NPDES Genera l Permit

not yet due

2416 East 24th Failure to Obtain

G. Gu Meta l LLC Street, Los 3/4/19 5/10/19 IGP Coverage Under the Response

Angeles NP DES General Permit not yet due

Fai lure to Obtain El Monte Plating 11409 Stewart

3/4/19 5/10/19 Coverage Under the Response

IGP Company Street, El Monte

NPDES General Permit not yet due

13039 Crossroads Failure t o Obtain

Eaton Corporation Parkway South, 3/4/19 5/10/19 !GP Coverage Under the Response

received City of Industry NPDES General Permit

28358 Failure to Obtain

Rust-Oleum Constellation 3/4/19 5/10/19

Response IGP Coverage Under the

Corporation Road, Units 600 & NPDES General Permit

received

610, Santa Clarita

5430 West San Failure to Obtain

Golden Road Brewing Fernando Road; 3/4/19 5/10/19 IGP Coverage Under the Response

Los Angeles NPDES Genera l Permit not yet due

Page 7: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

FACILITY NNC ISSUE

NNC PERMIT FACILITY NAME ADDRESS (WITH

DATE RESPONSE

TYPE VIOLATIONS STATUS

CITY) DUE DATE .

Failure to Obtain 1232 West 135th

3/4/19 5/10/ 19 Coverage Under the Response Aris Natural Foods IGP

Street, Gardena NPDES General Permit

not yet due

13249 South Failure to Obtain

Seth Parks Glass Western Avenue, 3/4/19 5/10/19 IGP Coverage Under the Response

received Unit B, Gardena NPDES General Permit

210 West Arrow Failure to Obtain Pro-Dex, Inc. dba

Highway, Suite C, 3/6/19 5/12/19 IGP Coverage Under the Response

Fineline Molds rece ived Sa n Dimas NPDES General Permit

Failure to Obtain Nanoprecision 411 Coral Circle,

3/6/19 5/ 12/ 19 IGP Coverage Under the Response

Products Unit B, El Segundo NPDES General Permit

not yet due

1129 Canal Failure to Obtain l<air Harbor Express

Avenue,Long 3/6/19 5/12/19 IGP Coverage Under the Response

LLC not yet due Beach NPDES Genera l Permit

Failure to Obtain 15345 Allen

3/6/19 5/12/19 Coverage Under the Response Cebe, Inc. IGP

Street, Paramount received NPDES General Permit

2017 Camfield Fa ilure to Obtain Reynaldo's Mexican

Avenue, 3/6/19 5/12/19 IGP Coverage Under the Response

Food Company received Commerce NPDES General Permit

National Plastic 15505 Cornet Fai lure to Obtain

Company of Street, Santa Fe 3/6/19 5/12/19 IGP Coverage Under the Response

received Ca lifornia Springs NPDES General Permit

Failure t o Obtain Able Aerospace 25032 Anza Drive,

3/6/19 5/12/19 IGP Coverage Under the Response

Adhesives Valencia NPDES Genera l Permit

not yet due

4826 4th Street, Failure to Obtain

1/0 Contro ls 3/6/19 5/12/19 IGP Coverage Under the

Response Corporation Irwindale not yet due

NPDES General Permit

20100 South Failure to Obtain

Harbor Green Gra in Alameda Street, 3/6/19 5/12/19 IGP Coverage Under the Response

Compton NPDES General Permit not yet due

Failure to Obtain

Z Manufacturing 2679 Sierra Way,

3/6/19 5/12/19 IGP Coverage Under the Response

La Ve rne received NPD ES General Permit

Page 8: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

FACILITY NNC ISSUE

NNC PERMIT FACILITY NAME ADDRESS (WITH

DATE RESPONSE

TYPE VIOLATIONS STATUS

CITY) DUE DATE

2534 East 53rd Failure to Obtain Chunwei, Inc. Street, 3/6/19 5/12/19 IGP Coverage Under the

Response

received Huntington Park NPDES General Permit

11640 Failure to Obtain

Santa Fe Mold Washington 3/6/ 19 5/12/19 Coverage Under the

Response IGP

Company Boulevard, NPDES General Permit

not yet due Whittier

R. J. Machine Failure to Obtain 173 Gentry Street,

3/6/19 5/12/19 Coverage Under the Response

IGP Products Pomona received

NPDES General Permit

Failure to Obtain

Crysta l Craft 2044 Wright

3/6/19 5/ 12/ 19 IGP Coverage Under the Response

Street, La Verne NPDES General Permit

not yet due

American Failure to Obtain 1758 Brackett

3/6/19 5/12/19 Response Thermoform IGP Coverage Under the

Street La Verne received Corporation NPDES General Permit

Freedom Failure to Obta in 16540 South Main 3/ 6/19 5/12/19 Coverage Under the

Response Performance IGP

Exhaust, Inc. Street, Carson

NPDES General Permit not yet due

Failure to Obtain Superprint 8332 Secura Way,

3/6/19 5/12/19 IGP Coverage Under the Response

Lithographic Santa Fe Springs received NPDES Genera l Permit

1935 McKin ley Failure t o Obtain Performance Engines Avenue, Suite C, 3/6/19 5/12/19 IGP Coverage Under the

Response

La Verne NPDES General Permit not yet due

Failure t o Obtain

AM G Torrance 2535 Maricopa

3/6/19 5/12/19 IGP Coverage Under the Response

Street , Torrance NPDES General Permit

not yet due

4238 Union Failure to Obtain

M Dye House Pacific Avenue, 3/6/19 5/12/19 IGP Coverage Under t he Respon se

Los Angeles NPDES General Permit not yet due

7032 Alondra Failure to Obtain Top Line

Bou levard, 3/6/19 5/12/19 IGP Coverage Under the Response

Manufacturing not yet due Paramount NPDES Genera l Permit

Page 9: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

FACILITY NNC ISSUE

NNC PERMIT FACILITY NAME ADDRESS {WITH

DATE RESPONSE

TYPE VIOLATIONS STATUS

CITY} DUE DATE

Denial of No Exposure

Certification and

PSI Bearings 2175 Union Place,

3/8/19 5/7/19 IGP Failure to Enroll Under Response

Simi Valley the NPDES General

not yet due

Permit

Denia l of No Exposure

1839 East 42nd Certification and

Mao Foods, Inc. Street, Los 3/8/19 5/7/19 IGP Failure to Enroll Under Response

Ange les the NPDES Genera l not yet due

Permit

Denial of No Exposure

Certification and

Bemco, Inc. 2255 Union Place,

3/8/19 5/7/19 IGP Failure to Enroll Under Response

Simi Va lley the NPDES General

not yet due

Permit

Denial of No Exposure

Va riety Bedding 1622 Nadeau Certification and Manufacturing Street, Los 3/8/19 5/7/19 IGP Failure to Enroll Under

Response

Corporation Angeles the NPDES General not yet due

Permit

Denial of No Exposure

Certification and Freedom Designs, 2241 Madera

3/8/19 5/7/19 Failure to Enrol l Under Response

IGP Inc. Road, Simi Va lley

the NPDES General not yet due

Permit

Failure to Obtain 15500 Blackburn

3/18/ 19 5/24/19 Coverage Under the Response

Advanced Sealing LLC IGP Avenue, Norwalk

NP DES Genera l Permit not yet due

6415 Regent Fa i lure to Obtain

Greek Industry Street, 3/18/19 5/24/19 IGP Coverage Under the Response

Huntington Park NPDES General Permit not yet due

Failure t o Obtain 2001 Hawkins 3/18/19 5/24/19 Coverage Under the

Response HGL, Inc. IGP

Circle, Los Angeles NPDES General Permit

not yet due

Failure to Obtain 7355 Adams

3/18/19 5/24/19 Coverage Under the Response Flores Machine Shop IGP

Street , Paramount NPDES General Permit

not yet due

13543 Alondra Failure to Obtain Response Lenton Metal Works

Boulevard, Santa 3/18/ 19 5/24/19 IGP Coverage Under the not Incorporated

Fe Springs NPDES General Permit received

Page 10: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

FACILITY NNC ISSUE

NNC PERMIT FACILITY NAME ADDRESS (WITH

DATE RESPONSE

TYPE VIOLATIONS STATUS

CITY) DUE DATE

24844 Avenue Failure to Obtain Simplify Optics Rockefeller, Santa 3/18/ 19 5/24/19 IGP Coverage Under the

Response

Clarita NPDES General Permit not yet due

24836 Avenue Failure to Obtain Choe-Art LLC dba 3/18/ 19 5/24/19

Response Rockefe ller, IGP Coverage Under the Choco lates A La Carte not yet due Va lencia NPDES General Permit

Aero Engineering and Fa ilure to Obtain 28217 Avenue Response Manufacturing 3/18/19 5/24/19 IGP Coverage Under the

Company Crocker, Valencia

NPDES General Perm it not yet due

2423 Ea st 53th Failure to Obtain Mario's Finishing, Inc. 3/18/19 5/24/19 IGP Coverage Under the

Response

Street, Vernon NP DES General Permit

not yet due

2417 Ea st 54th Failure to Obtain Sew Good Jeans, Inc. 3/18/19 5/24/19 IGP Coverage Under the

Response Street, Vernon

NPDES General Permit not yet due

2198 Pomona Fa ilure t o Obtain Roe-Aire Corporation Boulevard, 3/18/19 5/24/19 IGP Coverage Under the

Response

Pomona NPDES General Permit not yet due

Fa ilure to Obta in Anson Woodworking 189 Stare Street, 3/18/19 5/24/19 IGP Coverage Und.er the

Response Incorporated Pomona not yet due

NPDES Genera l Permit

9144 Deering Failure to Obtain Acuity Brands

Avenue, 3/18/19 5/24/19 IGP Coverage Under the Response

Lighting, Inc. Chatsworth NPDES Genera l Permit

not yet due

2444 East 57th Fa ilure t o Obtain

Mario's Finishing, Inc. 3/18/19 5/24/19 IGP Coverage Under the Response

Street, Vernon NPDES Genera l Permit

not yet due

2509 East 56th Failure to Obtain Rodriguez Fashion,

Street, 3/18/19 5/24/19 IGP Coverage Under the Response

Inc. not yet due Huntington Park NPDES Genera l Permit

2618 East 54th Fai lure to Obtain

Lea l Furniture Street, 3/18/19 5/24/19 IGP Coverage Under the Response

Huntington Park NPDES Genera l Pe rmit not yet due

Failure t o Obtain

Cosmic Plastics, Inc. 28410 Industry

3/18/19 5/24/19 IGP Coverage Under the Response

Drive, Va lencia NPDES Genera l Permit

received

Page 11: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

FACILITY NNC ISSUE

NNC PERMIT FACILITY NAME ADDRESS (WITH

DATE RESPONSE

TYPE VIOLATIONS STATUS

CITY) DUE DATE

18831 Laurel Park Failure to Obtain

Puratos Corporation Road,Rancho 3/18/19 5/24/19 IGP Coverage Under the Response

Dominguez NPDES Genera l Permit not yet due

Failure to Obta in Bright Glow Cand le 110 Erie Street,

3/18/19 5/24/19 IGP Coverage Under the Response

Company Pomona not yet due NPDES General Permit

207 North Aspan Failure to Obta in West Coast Response

Avenue, Unit 5, 3/20/19 5/26/19 IGP Coverage Under the Hardware not yet due

Azusa NPDES General Permit

730 Epperson Failure to Obtain C & S Transportation,

Drive, City of 3/20/19 5/26/ 19 IGP Coverage Under the Response

Inc. Industry NPDES General Permit

not yet due

Failure to Obtain Dalou Corporation 741 North Coney

3/20/19 5/26/19 IGP Coverage Under the Response

dba Tomco Products Avenue, Azusa received NPDES Genera l Permit

Nippon Express NEC 18615 Ferris Failure to Obtain

Logistics America, Place, Rancho 3/20/19 5/26/19 IGP Coverage Under the Response

Inc. Dominguez NPDES General Permit not yet due

Failure to Obta in 7955 Haskell

3/20/19 5/26/ 19 Response Elite Euro Parts IGP Coverage Under the

Avenue, Van Nuys NPDES General Pe rmit

not yet due

Fa ilure to Obtain Nut Butter Concepts 4439 lsh Drive,

3/20/19 5/26/19 IGP Coverage Under the Respon se

LLC Simi Valley not yet due NPDES Genera l Permit

1461 Lawrence Fa ilure to Obtain

Kavlico CST Drive, Thousand 3/20/19 5/26/19 IGP Coverage Under the Response

Oaks NPDES General Permit not yet due

1167 Lawrence Fa ilure to Obtain Follmer

Drive, Newbury 3/20/19 5/26/19 Coverage Under the Response

IGP Development, Inc.

Park NPDES General Permit not yet due

The Research Council Failure to Obtain

of Makeup Artists, 2380 Shasta Way,

3/20/19 5/26/19 IGP Coverage Under the Response

Inc. Simi Va lley

NPDES General Permit not yet due

743 Cochran Failure to Obtain CJS Woodworking

Street, Unit B, 3/20/19 5/26/19 IGP Coverage Under the Response

and Design, Inc. Simi Va lley NPDES Genera l Permit

not yet due

Page 12: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

FACILITY NNC ISSUE

NNC PERMIT

FACILITY NAME ADDRESS (WITH DATE

RESPONSE TYPE

VIOLATIONS STATUS CITY) DUE DATE

Failure to Obtain

Ca lifornia Lasers, Inc. 2255 Agate Court,

3/20/19 5/26/19 IGP Coverage Under the Response

Simi Va lley received NPDES General Permit

2280 Shasta Way, Fa ilure to Obtain

Scribner's Ink Unit 108, Simi 3/20/19 5/26/19 IGP Coverage Under the Response

Valley NPDES General Permit not yet due

4545 East Failure to Obtain V-Tech Machining,

Industrial Street, 3/20/19 5/26/19 IGP Coverage Under the Response

Inc. not yet due Suite SD NPDES General Permit

501 North Failure to Submit

Beverly Gardens Park Camden Drive, 3/8/19 5/7/19 CGP 2017-18 Annua l Response

Beverly Hills Report not yet due

Failure to Submit 3910 Sierra

3/8/19 5/7/19 Response

Acton Retail Center CGP 2017-18 Annual Highway, Acton

Report not yet due

6865 Escondido Failure to Submit Single Family

Canyon Road, 3/8/19 5/7/19 CGP 2017-18 Annual Response

Residence not yet due Acton Report

Ojai Valley Failure to Submit

Continuing Care 1306 Maricopa

3/8/19 5/7/19 CGP 2017-18 Annual Response

Center Avenue, Ojai

Report not yet due

3708 Cypress Failure to Submit 12 DETACHED Response

Avenue, Eagle 3/8/19 5/7/19 CGP 2017-18 Annual HOMES not yet due

Mountain Report

Failure to Obtain

Valence Surface 2605 Industry 3/12/19

Coverage Under the In 5/13/19 IGP

Technologies Way, Lynwood Stormwater General Compliance

Permit

Failure to Obtain

Va lence Surface 2588 Industry 3/12/19 5/13/19

Coverage Under the In IGP

Technologies Way, Lynwood Stormwater General Compl iance

Permit

Failure to Obtain

Pavement Coatings 736 Mission Rock 3/22/19 4/23/19

Coverage Under t he Response IGP

Co. Road, Santa Paula Stormwater General not yet due

Permit

Page 13: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

FACILITY NNC FACILITY NAME ADDRESS (WITH

NNC ISSUE PERMIT DATE

RESPONSE VIOLATIONS STATUS CITY) DUE DATE

TYPE

2524 Townsgate Fai lure to Obtain

The Printing Press Road, Westlake 3/29/19 5/28/19 IGP Coverage Under the Response

Village Stormwater Genera l not yet due

Permit

742 Hampsh ire Failure to Obtain

Crane Techno logy Road, Unit B, 3/29/19 5/28/19 IGP Coverage Under the Response

Westlake Vil lage Stormwater General not yet due

Permit

2251 Townsgate Failure to Obtain

Electra Craft Road, Westlake 3/29/19 5/28/19 IGP Coverage Under the Response

Village Stormwater General not yet due

Permit

Kelly Teegarden 742 Hampshire

Failure to Obta in

Organics Road, Unit A, 3/29/19 5/28/19 IGP

Coverage Under the Response

Westlake Vil lage Stormwater General not yet due

Permit

Ka iser Air Failure to Obtain

Conditioning and 600 Pacific Coverage Under the

3/29/19 5/28/19 IGP Response

Sheet Metal Avenue, Oxnard Stormwater General not yet due

Permit

Failure to Obta in

Cosmetic Specialties 550 East Third Coverage Under the

Internationa l LLC 3/29/19 5/28/19 IGP

Respon se

Street, Oxnard Stormwater Genera l not yet due

Permit

2886 East Failure to Obtain

Alpha Printing Thousand Oaks Coverage Under the Response

3/29/19 5/28/19 IGP Boulevard, Stormwater General not yet due

Thousand Oaks Permit

171 East

ARC Document Thousand Oaks Failure to Obtain

Solutions Boulevard Suite 3/29/19 5/28/19 IGP Coverage Under the Response

108, Thousand Stormwater General not yet due

Oaks Permit

Page 14: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

Table 9

Notices of Violation (NOV) Issued in March 2019

FACILITY FACILITY

NOV ISSUE NOV

PERMIT ADDRESS (WITH RESPONSE VIOLATIONS STATUS NAME DATE TYPE

CITY} DUE DATE Failure to Submit the

Ava lon Freight 40 Pebbly Beach Level 1 ERA Report,

Response 3/1/19 4/1/19 IGP Leve l 2 ERA Action

Service, LLC Road, Avalon Plan, and Revised

not rece ived

SWPPP

Failure to Submit the

Everport 389 Terminal

Level 1 ERA Report, Response

Terminal 3/1/19 4/1/19 IGP Level 2 ERA Action Way, San Pedro not received

Services, Inc. Plan, and Revised

SWPPP

Failure to Submit the

Pyramid Auto 9124 De Garmo Leve l 1 ERA Report,

Response 3/1/19 4/1/19 IGP Level 2 ERA Action

Wrecking Street, Sun Valley received Plan, and Revised

SWPPP

Failure to Submit the

5718 Long Beach Leve l 1 ERA Report, Response

Dodge City Avenue, Los 3/1/19 4/1/19 IGP Level 2 ERA Action Ange les Plan, and Revised

received

SWPPP

M.W. 9077 Glenoaks Failure to Submit the

Equipment Boulevard, Sun 3/1/19 4/1/19 IGP Level 2 ERA Action Plan Response

Company Valley and Technical Report not received

Ha rout's Failure to Submit the

Quality Used 12301 Branford

3/1/19 4/1/19 IGP Level 2 ERA Action Plan Response

Auto Street, Sun Val ley

and Technica l Report not received

Failure to Submit t he

4020 Bandini Level 1 ERA Report, Response Baker

Boulevard, 3/1/19 4/1/19 IGP Level 2 ERA Action Commodities

Vernon Plan, and Revised not received

SWPPP

24235 Magic Failu re to Comply with

Pa rk Regent, Mountain 3/20/19 3/20/19 CGP

Requirements of the Response

LLC Parkway, Santa Construction General not received Clarita Permit

Page 15: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

FACILITY FACILITY

NOV ISSUE NOV

PERMIT ADDRESS {WITH RESPONSE VIOLATIONS STATUS NAME DATE TYPE CITY) DUE DATE

Fai lure to Implement

GLC El Monte 10150 Lower

Adequate BMPs, Response Azusa Road, El 3/1/19 3/31/19 CGP

LLC Monte Fa ilure to Mainta in an not received

Adequate SWPPP

Sunrise Ford of 5500 Lankershim Failure to Submit 2017- In

North Boulevard, North 3/6/19 4/5/19 CGP Hollywood Hollywood 18 Annual Report Compliance

South of Failure to Implement

RPD 178 Lot 2 Ponderosa Drive

Adequate BMPs, Response and West of Earl 3/21/19 4/22/19 CGP

ofTract 5671-1 Joseph Drive, Failure to Maintain an not yet due

Camari llo Adequate SWPPP

4th & 400 South

Failure to Submit 2017- Response Broadway, Los 3/21/19 5/20/19 CGP

Broadway Angeles

18 Annua l Report not yet due

SW Corner of Earl Failure to Implement

CUP 350 Tract Joseph Avenue 3/22/19 4/22/19 CGP

Adequate BMPs, Response 5671-1 Lot 4 and Ponderosa Failure to Maintain an not yet due

Drive, Camarillo Adequate SWPPP

2025 2055 2085 Failure to Implement

Lonestar Way 2105 Lonestar 3/22/19 4/23/19 CGP

Adequat e BMPs, Response Residential Way Thousand Failure to Maintain an not yet due

Oaks Adequate SWPPP

Fai lure to Implement 2580 Azurite

Adequate BMPs, Response PC Recycle Circle Newbury 3/29/19 4/29/19 IGP

Park Failure to Maintain an not yet due

Adequate SWPPP

Page 16: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

Table 10

Notices to Comply (NTC) issued in March 2019

NNC NNC PERMIT FACILITY

VIOLATIONS STATUS FACILITY NAME ISSUE RESPONSE TYPE ADDRIVEESS

DATE DUE DATE

2883 East Pico Fa i lure to Implement Response not East Washington

Boulevard, Los 3/6/19 4/5/ 19 IGP Adequate BMPs received Plant

Angeles

Failure to Implement Mana Scrap 3000 East Pico Adequate BMPs, In Recycling Boulevard, Los 3/8/19 3/21/19 IGP

Failure to Mainta in an Compliance Corporation Angeles Adequate SWPPP

Failure to Implement 2825 East 44th Adequate BMPs, In US Growers Cold

3/8/19 3/14/19 CGP Failure to Maintain an Compliance Storage Street, Vernon

Adequate SWPPP

Failure to Implement Mana Scrap 2883 East Pico Adequate BMPs, In Recycling Boulevard, Los 3/8/19 3/21/19 IGP

Failure to Maintain an Compliance Corporation Angeles Adequat e SWPPP

Page 17: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

Table 11. STORMWATER COMPLIANCE UNIT OUTSTANDING ENFORCEMENT ITEMS, MARCH 2019

This table lists stormwater NOVs that are unresolved. The information is arranged by permit type - industrial and construction.

Industrial General Permit

Facility Name Sector Issuance Date Due Date Violation

Torn & Glasser Salted and Roasted Nuts and

1-30-2019 3-4-2019 Deficient BMP Implementation Seeds

Deficient BMP Master Recycling Center Inc. Scrap and Waste Materials 1-31-2019 1-31-2019 Implementation/ Incomplete

SWPPP

Brothers Engine Cores Inc. Motor Vehicle Parts, Used 1-31-2019 3-6-2019 Failure to Obtain Permit

SJ Auto Motor Vehicle Parts, Used 2-1-2019 3-1-2019 Late Level 1 Report

J & H Auto Wrecking Motor Vehicle Parts, Used 2-1-2019 3-1-2019 Late Level 1 Report

Hamrock Incorporated Miscellaneous Structural

2-1-2019 3-1-2019 Late Level 1 Report

Metal Work

Interstate Steel Center Co. Inc. Sheet Metal Work 2-13-2019 3-13-2019 Failure to Obtain Perm it

Electroplating, Plating, DCA Deburring Polishing, Anodizing, and 2-13-2019 3-13-2019 Failure to Obtain Permit

Coloring

Tony's Auto Parts Inc. Motor Vehicle Parts, Used 2-14-2019 2-14-2019 Failure to Obtain Permit

Ha routs Quality Used Auto Motor Vehicle Parts, Used 3-1-2019 4-1-2019 Deficient Report/Late Report

Mw Equipment Co Scrap and Waste Materials 3-1-2019 4-1-2019 Deficient Report/Late Report

Avalon Freight Service LLC Towing and Tugboat Services 3-1-2019 4-1-2019 Late Report

PT Metals Scrap and Waste Materials 3-4-2019 4-4-2019 Late Report

Status

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Page 18: LOS ANGELES REGIONAL WATER QUALITY CONTROL BOARD ... · The Enforcement Report for May 2019 includes data for March 2019 in the following tables*: ... 7 / Route 105 Dewatering Project

Facility Name Sector Issuance Date Due Date Violation Status

Omega Auto Parts and Repair INC Motor Vehicle Parts, Used 3-4-2019 4-4-2019 Late Report Ongoing

AR Annual Reoort BMP Best Management Practices NOT Notice of Termination NOV Notice of Violation SWPPP Stormwater Pollution Prevention Plan NA 2"d NOV- This is a Notice of a Continuing Violation. Immediate compliance is required. NSWD Non-Stormwater Discharge