Page 1: Los Angeles River Watershed

Los Angeles River Watershed

Terri GrantPrincipal EngineerLos Angeles County Flood Control District

Page 2: Los Angeles River Watershed

LACFCD MapLACFCD Map

Page 3: Los Angeles River Watershed

Big Tujunga Dam

Page 5: Los Angeles River Watershed

Sun Valley Park

Page 6: Los Angeles River Watershed

Rory M. Shaw Wetlands Park

IN DESIGN

Page 7: Los Angeles River Watershed

1996

Los Angeles River Master Plan

Page 8: Los Angeles River Watershed

Tujunga Wash Greenway

Page 9: Los Angeles River Watershed

Dominguez Gap Wetlands

Page 10: Los Angeles River Watershed

Los Angeles River Cooperation Committee

Page 11: Los Angeles River Watershed

Los Angeles River Headwaters Project

IN CONSTRUCTION

Page 12: Los Angeles River Watershed

IN CONSTRUCTION

Los Angeles River North Valleyheart Riverwalk Project

Page 13: Los Angeles River Watershed

Universal Studios Bike Path

Project LimitsWhitsett Av to Riverside Dr

IN PLANNING

Page 14: Los Angeles River Watershed

LA Basin Study

LA Basin Study Objectives

• Evaluate existing water conservation system

• Evaluate potential for new facilities and operational changes for

increased capture and recharge to address future conditions

Key Considerations

• Account for projected climate change

• Population growth

Page 15: Los Angeles River Watershed

Clean Water, Clean Beaches Measure

Proposed New Parcel Fee To Finance• Stormwater Quality and Water Supply Projects

New Revenue of ~$300 million annually

Public Hearing Held January – March 2013• No majority protest (5.16% of properties protested)

• Strong concerns from schools, businesses, and some municipalities

• Board of Supervisors Decided to not move forward at this time

Next Steps• Investigating opportunities for partnership with sanitation agencies (dry weather flow)

• League of Cities & California Contract Cities developing recommendations report

Page 16: Los Angeles River Watershed

Questions?

Terri GrantPrincipal EngineerLos Angeles County Flood Control District