25
Improving Process Efficiency Lou-Rich, Inc. Carter Tollefson Advisor: Jon Vanyo Company Supervisor: Lee Gulbrandson

Lou-Rich final presentation

Embed Size (px)

Citation preview

Page 1: Lou-Rich final presentation

Improving Process Efficiency Lou-Rich, Inc.

Carter Tollefson

Advisor: Jon VanyoCompany Supervisor: Lee Gulbrandson

Page 2: Lou-Rich final presentation

Company Overview

• Contract engineering and manufacturing

• Based in Albert Lea, MN

• Provides services to original equipment manufacturers (OEMs) in ag., medical device, food service, and many more

• Services include: engineering design for manufacturing services, material sourcing, welding, assembling, testing, CNC machining, fabrication, powder/liquid coatings, assembly, aluminum extrusions

Page 3: Lou-Rich final presentation

Albert Lea

Page 4: Lou-Rich final presentation

Process Description• 5 different freezers made – all follow similar processes

• Components (coils, flanges, and tubes) made

Page 5: Lou-Rich final presentation

Process Continued• Washed

• Welding tube and flange

Page 6: Lou-Rich final presentation

Process Continued• Soldering coil to tube

• *Base and inlet welding

Page 7: Lou-Rich final presentation

Process Continued• Machining Processes

• Foaming

Page 8: Lou-Rich final presentation

Incentives to Change

• Commitment to process improvement

• Investigate process efficiency opportunities

• Source reduction opportunities in washing system

Page 9: Lou-Rich final presentation

Reasons for MnTAP Assistance

• Investigate/implement lean opportunities

• Look for opportunities to improve operator processes

• Determine opportunities for chemical and water savings

• Reduction of inventory in work cells

Page 10: Lou-Rich final presentation

Approach

• Monitored and gained understanding of processes

• Documented own ideas for improvement

• Held brainstorming sessions and documented ideas for improvement • Identified the types of waste and where is it was occurring

Page 11: Lou-Rich final presentation

Determining Solutions

• Timed processes

• Value-stream maps

• Spaghetti diagrams

• Consulting with companies

• Reviewed observations and notes

• Meetings with staff and operators

Page 12: Lou-Rich final presentation

Current Layout and Part Movement

• Opportunities• Excess movement taking parts to and from work cells

• Loading time onto carts and machines

• Solutions• Implement conveyor system between work cells

• Change equipment orientation and locations

• Savings• ~260 hrs/year $7,100/year

Page 13: Lou-Rich final presentation

Washer Location

Wa

sh

er

Co

nve

yo

rC

on

e

yo

r

Unload Bay

HO

OK

CO

VE

RA

GE

ON

HO

IST

OE

C C

art

Scale

HO

OK

CO

VE

RA

GE

ON

HO

IST

Ra

ck

Ra

ck

Load Bay

OE

C C

art

OE

C C

art

OE

C C

art

OE

C C

art

Cardboard Rack

Pa

ck O

ut T

ab

leB

ub

ble

Fo

am

Hooks Hooks

Incoming Lane

OK

to S

hip

16

Su

pp

ly

Ca

bin

et

WA

SH

ER

Resistance Solder

Water

Heater

Old Relic Work

Bench

Wa

sh

er

Insp

ectio

n

Ta

ble

In Feed Table

Water

Pump

Water Main

Post

Power

Brake Pad

Assembly

OEC

Cu

re O

ve

n

OE

C

Copper Tube Rack

StraightenerCopper CoilUnload Table

Coil

Super

Marke

t

Coil

Super

Marke

t

Long

Coils

Short

Coils

Short

Coils

Electrical

Panel

Tank

Heated

Rinse

Tank

Rinse

Venting and Plumbing for tanks

Tank

Rinse

Tank

Rinse

Tank

Soap

Tank

Prepare

Ele

c P

anel

Fix

ture

s

Sm

all

Pa

rts

Tank

with

Vent &

Heat

TankTankTank

Cart

Cart

So

lde

r Sta

tion

Gas Tanks

Te

st

Ta

nk

Nitro

Ta

nk

Drain

Washer

FluidCabinet Cabinet

Ch

ip H

op

pe

r

Electrical

Burnisher

Serrater

Tap DPSpout DP

Co

un

t

er S

ink

Debur

Sta

tion

Counte

rS

ink

DP

Burnisher

8 H

ole

Na

tco

DP

Work Bench

Profilometer

Rack

Rack Rack

Fo

am

Die

s

Storage Rack for Foam

Tubes

Wa

ter L

ea

k

Te

ste

r

Wo

rk

Be

nch

Fo

am

er

Fo

am

er

Fo

am

er

SS

Freezer

Cart

Freezer Rack

Boxes For

Shipping

Packaging Supplies

Packaging Supplies

Boxes For

Shipping

Foamer Pu

mp

Foamer

Fo

am

er

SS

Freezer

Cart

Fre

eze

r R

ack

Fre

eze

r R

ack

Cle

an

ing

Sta

tion

Wo

rk B

en

ch

Raw Saw

Cut Tubes

Raw SS

Drillin

g S

tatio

n

Wo

rk

Be

nch

Ch

ip H

op

pe

r

Electrical

Ch

ip H

op

pe

r

Electrical Tool

Chest

Wo

rk

Be

nch

Base

Flange

Superma

rket

Tubes TubesTubesTubes Tubes

Tube

Superma

rket

Coil

Ba

se

Fla

ng

e

Su

pe

rma

rke

t

Raw SS

Conveyor

Tig

Station

Tig

Welder Ele

c

Pa

ne

l

Rinses

Welding

Fixtures Tool

ChestSolder

Mounts

Long

Coils

Ca

rt

Cabinet

Fre

eze

r R

ack

Fre

eze

r R

ack

Fre

eze

r R

ack

Fre

eze

r R

ack

Tu

be

s

SS

Freezer

Cart

SS

Freezer

Cart

SS

Freezer

Cart

Freezer

Table

SS

Freezer

Cart

SS

Freezer

Cart

Wo

rk B

en

ch

Ele

c

Pa

ne

l

Solder Tank

Fan

Solder

Station Inline

Fluxer

Torch

Tanks

Table

Drai

n

Grat

e

Page 14: Lou-Rich final presentation

Current Layout

Wa

sh

er

Co

nve

yo

rC

on

e

yo

r

Resistance Solder

Water

Heater

Old Relic Work

Bench

Wa

sh

er

Insp

ectio

n

Ta

ble

In Feed Table

Water

Pump

Water Main

Post

Power

Brake Pad

Assembly

OEC

Cu

re O

ve

n

OE

C

Copper Tube Rack

StraightenerCopper CoilUnload Table

Coil

Super

Marke

t

Coil

Super

Marke

t

Long

Coils

Short

Coils

Short

Coils

Electrical

Panel

Tank

Heated

Rinse

Tank

Rinse

Venting and Plumbing for tanks

Tank

Rinse

Tank

Rinse

Tank

Soap

Tank

Prepare

Ele

c P

an

el

Fix

ture

s

Sm

all

Pa

rts

Tank

with

Vent &

Heat

TankTankTank

Cart

Cart

So

lde

r Sta

tion

Gas Tanks

Te

st

Ta

nk

Nitro

Tank

Drain

Washer

FluidCabinet Cabinet

Ch

ip H

op

per

Electrical

Burnisher

Serrater

Tap DPSpout DP

Co

un

t

er S

ink

Debur

Sta

tion

Counte

rS

ink

DP

Burnisher

8 H

ole

Na

tco

DP

Work Bench

Profilometer

Rack

Rack Rack

Fo

am

Die

s

Storage Rack for Foam

Tubes

Wa

ter L

ea

k

Te

ste

r

Wo

rk

Be

nch

Fo

am

er

Fo

am

er

Fo

am

er

SS

Freezer

Cart

Freezer Rack

Boxes For

Shipping

Packaging Supplies

Packaging Supplies

Boxes For

Shipping

Foamer Pu

mp

Foamer

Fo

am

er

SS

Freezer

Cart

Fre

eze

r R

ack

Fre

eze

r R

ack

Cle

an

ing

Sta

tion

Wo

rk B

en

ch

Raw Saw

Cut Tubes

Raw SS

Drilli

ng

Sta

tio

n

Wo

rk

Be

nch

Ch

ip H

op

per

Electrical

Ch

ip H

op

per

Electrical Tool

Chest

Wo

rk

Be

nch

Base

Flange

Superma

rket

Tubes TubesTubesTubes Tubes

Tube

Superma

rket

Coil

Ba

se

Fla

ng

e

Su

pe

rma

rke

t

Raw SS

Conveyor

Tig

Station

Tig

Welder Ele

c

Pa

ne

l

Rinses

Welding

Fixtures Tool

ChestSolder

Mounts

Long

Coils

Ca

rt

Cabinet

Fre

eze

r R

ack

Fre

eze

r R

ack

Fre

eze

r R

ack

Fre

eze

r R

ack

Tu

be

s

SS

Freezer

Cart

SS

Freezer

Cart

SS

Freezer

Cart

Freezer

Table

SS

Freezer

Cart

SS

Freezer

Cart

Wo

rk B

en

ch

Ele

c

Pa

ne

l

Solder Tank

Fan

Solder

Station Inline

Fluxer

Torch

Tanks

Table

Drai

n

Grat

e

Page 15: Lou-Rich final presentation

Proposed Layout

Foamer

Raw Saw

Cut Tubes

Water

Heater

Inspection

Table

In Feed Table

Water

Pump

Water Main

Post

Power

Ra

w S

S

Drilling Station

Wo

rk

Be

nch

Electrical

Panel

Tank

Heated

Rinse

Tank

Rinse

Venting and Plumbing for tanks

Tank

Rinse

Tank

Rinse

Tank

Soap

Tank

Prepare

Ele

c P

an

el

Fix

ture

s

Sm

all

Pa

rts

Tank

with

Vent &

Heat

TankTankTank

Cart

Cart

So

lde

r Sta

tion

Gas Tanks

Te

st

Ta

nk

Nitro

Ta

nk

Drain

Wo

rk B

en

ch

Ele

c

Pa

ne

l

Solder Tank

Rack

Rack

Rack

Packaging SuppliesPackaging Supplies

Pu

mp

Ch

ip H

op

per

Electrical

Sh

ort

Co

ils

Ch

ip H

op

per

Electrical

Ch

ip H

op

per

Electrical

Rinses

We

ldin

g

Fix

ture

s

Cabinet Cabinet

CabinetTool

Chest

To

ol

Ch

est

Solder

Mounts

Walkway

Rin

se

r

Wo

rk

Be

nch

ConveyorMove

able

Table

Cabinet

Conveyor

Foam DiesStorage Rack for Foam

Tubes

Water Leak

Tester

Work Bench

Foam

er

Foamer

Fo

am

er

Fre

eze

r Ra

ck

Boxes For

Shipping

Boxes For

Shipping

FoamerFoamer

CabinetTool

ChestCabinetTool

Chest

Solder

StationInline

Fluxer

Torch

TanksU-Shaped Washer

Copper Tube R

ack

Straightener Copper CoilUnload Table

CoilCoil

Tw

o w

ay-C

on

ve

yo

r

Tig

Station

Tig

Welder Ele

c

Pa

ne

l

Cle

an

ing

Sta

tion

Wo

rk B

en

ch

Raw Saw

Cut Tubes

Raw SS

Proposed Scotsman Layout

Burnisher

SerraterTap DPSpout DP C

ount

er S

ink

Debur

Sta

tion

Counte

rS

ink

DP

Burnisher

8 H

ole

Na

tco

DP

Work Bench

Profilometer

Washer

Conveyor

Conveyor

Grat

e

Double Conveyor with Bases and

Flanges

Co

ils

Tu

be

s

Fla

ng

es +

Ba

se

s

Page 16: Lou-Rich final presentation

Spaghetti DiagramsCurrent Movement Proposed Movement

Page 17: Lou-Rich final presentation

Coiling and Foaming Processes

• Opportunities• Inventory build up between process steps (non value adding time)

• Excess inventory

• Waiting

• Order of operations efficiency

• Solutions• Creation of standard work documents

• Training and explanation to operators

• Savings• ~420 hrs/year $11,500/year

Page 18: Lou-Rich final presentation

Current State Part Washing Process

• Coil Washer• Not performing up to washing standards

• Chemical and water go straight to drain after one cycle

• Hallway Washer• Wash, Rinse, Blow off

• Operators paid to load and unload parts

• Parts from different areas washed in same washer

Page 19: Lou-Rich final presentation

Proposed Improvements

• Remove coil washer• Power, water, and chemical savings

• No chemical and water being wasted

• Purchase New Washer and Place in Freezer Area• Dual-rinse and overflow system to conserve water and reduce operator

attention

• U-shaped design

• Current operators will be reassigned

• No waiting for non-freezer parts

• Elimination of forklifts and operator time transporting parts

Page 20: Lou-Rich final presentation

Improvement Savings• Savings

Coil Washer

• ~1,270 kWh/year $100/year

• ~19,200 gal/year $120/year

• Chemicals - 866 gal/year $13,000/year

New Washer

• ~280 hrs/year $7,700/year

• ~29,300 gal/year $180/year

• Not using forklifts $1,750/year

• Not paying operators $2,550/year

Page 21: Lou-Rich final presentation

Part and Finished Product Storage

• Opportunity• Large amount of inventory between work cells (space, $)• Trouble adjusting to order fluctuations (change-overs, shipping dates, part

moving and storage)• Distance and time to bring components needed to assembly areas

• Solution• Install finished goods supermarket (buffer for changes) • Part supermarket (ordered and proximity to cells)

• Pull system based on demand rather than push based on predictions

• Savings• ~50 hrs/year $1,400/year

Page 22: Lou-Rich final presentation

Recommended Changes

Recommendation Water (gpy) Operators

(hrs/year)

Net savings

($/year)

Implementation

cost

Payback

period

Status

Layout and Conveyor

System0 260 $7,100 $5,000 8.5 months Proposed

Implement Standard

Work0 420 $11,500 0 Immediate Implemented

Implement New Washer 29,300 280 $12,180 $130,000 10.8 years Proposed

Remove Coil Washer 19,200 0 $13,220 $500 13 days Proposed

Implement Supermarkets 0 50 $1,400 $1,000 8.7 months Proposed

Totals 48,500 1010 $45,400 $136,500 ~3 years

Page 23: Lou-Rich final presentation

Additional/Possible Future Projects

• Compressed Air System• Opportunity

-Air leaks and processes

• Solution

-Documentation of usage at in each area

-Ultrasonic leak tester to detect leaks on fixtures

• Rinse Water Disposal• Opportunity

-$2.50/lb to dispose of water which was $26,000 over last 2 months

• Solution

-Water treatment system

-Evaporator

-Change flux type

Page 24: Lou-Rich final presentation

Personal Benefits

• Real-world experience and application of education

• Knowledge of lean manufacturing principals

• Independent learning

• Communication with operators and staff

• Communication with other companies

• Teamwork

• Cost/benefit analysis

Page 25: Lou-Rich final presentation

Questions?