LOWER WESTCHESTER BRIDGEBUNDLE
PIN 8101.46, Contract D900049
DB CONTRACT DOCUMENTS
PART 6RFP PLANS
Draft September 16, 2019
This page is intentionally left blank
New York State Department of Transportation
Lower Westchester Bridge Bundle i Part 6 - RFP PlansPIN 8101.46, Contract D900049 Draft September 16, 2019
DIRECTIVE PLANS
GN-01
DIRECTIVE NOTES:
SAW MILL RIVER PARKWAY NY ROUTE 987D FLOOD MITIGATION (BINS 5500839 AND 5500859)
DIRECTIVE NOTES
DESCRIPTION OF WORK AND SPECIFIC REQUIREMENTS
ROUTE 1 OVER THE MAMARONECK RIVER (BIN 1000040)
(BINS 5500100 AND 3348300)
HUTCHINSON RIVER PARKWAY FLOOD MITIGATION IN THE VICINITY OF THE EAST LINCOLN AVENUE
3.2. MILL AND RESURFACE LIMITS ARE SHOWN ON DWG RTE-01. THIS WORK INCLUDES CONSTRUCTION OF NEW DRAINAGE.
AS SHOWN ON DWG RTE-02.
3.1. EXISTING ISLAND SHALL BE REMOVED AND ADA COMPLIANT RAMPS SHALL BE INSTALLED AT THE NEW CROSSWALKS
3. INTERSECTION OF US ROUTE 1 AND MAMARONECK AVENUE
CONSTRUCTION IN ACCORDANCE WITH PART 4.
2.2. THE EXISTING 66" SANITARY SEWER MUST BE MAINTAINED AND PROTECTED THROUGHOUT THE DURATION OF
SIDEWALK, AND BRIDGE BARRIER.
SIMILAR RADIUS TO THE EXISTING ARCH. THIS WORK INCLUDES CONSTRUCTION OF NEW CURBS, UNDERDRAINS,
2.1. DEMOLISH EXISTING BIN 1000040 AND CONSTRUCT NEW CONCRETE STRUCTURE WITH ARCH APPEARANCE OF
2. BIN 1000040
RECONSTRUCTION AND CONSTRUCTION OF NEW DRAINAGE, CURBS, UNDERDRAINS, AND SIDEWALK.
1.3. PAVEMENT RECONSTRUCTION LIMITS ARE SHOWN ON DWG RTE-01. THIS WORK INCLUDES COMPLETE PAVEMENT
DWG RTE-01.
LIMITS OF SIDEWALK RECONSTRUCTION, INCLUDING CONSTRUCTION OF NEW CURBS AND UNDERDRAINS, ARE SHOWN ON
1.2. MILL AND RESURFACE LIMITS ARE SHOWN ON DWG RTE-01. THIS WORK INCLUDES CONSTRUCTION OF NEW DRAINAGE.
UP TO ORIGINAL GRADE. RECONSTRUCT THE HARBOUR ISLAND PARK AS SHOWN ON DWGS LAP-01 AND LAP-02.
OF ROUTE 1 AND MAMARONECK AVE. INSTALL NEW RETAINING WALL AND BACKFILL TO BRING THE GRADE BACK
1.1. REMOVE THE EXISTING STRUCTURE SUPPORTING THE PARK AT THE SOUTHEAST QUADRANT OF THE INTERSECTION
1. GENERAL
BRIDGE RAIL.
ABUTMENT FACE TO ABUTMENT FACE. THIS WORK INCLUDES CONSTRUCTION OF NEW CONCRETE MEDIAN BARRIER AND
3.1. DEMOLISH EXISTING BIN 5500859 AND CONSTRUCT NEW STRUCTURE WITH MINIMUM HORIZONTAL OPENING OF 58' FROM
3. BIN 5500859
BRIDGE RAIL.
ABUTMENT FACE TO ABUTMENT FACE. THIS WORK INCLUDES CONSTRUCTION OF NEW CONCRETE MEDIAN BARRIER AND
2.1. DEMOLISH EXISTING BIN 5500839 AND CONSTRUCT NEW STRUCTURE WITH MINIMUM HORIZONTAL OPENING OF 110' FROM
2. BIN 5500839
EMBANKMENTS AND TURF SHALL BE IN ACCORDANCE WITH DESIGN BUILDER'S DESIGN SOLUTION.
RECONSTRUCTION AND CONSTRUCTION OF NEW DRAINAGE, CURBS, UNDERDRAINS, GUIDE RAIL, AND CONCRETE MEDIAN BARRIER.
1.5. PAVEMENT RECONSTRUCTION LIMITS ARE SHOWN ON DWGS SMR-01 TO SMR-12. THIS WORK INCLUDES COMPLETE PAVEMENT
OF NEW DRAINAGE, CURBS, UNDERDRAINS, CONCRETE MEDIAN BARRIER, AND GUIDE RAIL.
1.4. MILL AND RESURFACE LIMITS ARE SHOWN ON DWGS SMR-01 TO SMR-12. THIS WORK INCLUDES THE CONSTRUCTION
1.3. SUBGRADE STABILIZATION LIMITS ARE SHOWN ON DWGS SMR-09 TO SMR-11.
APPROXIMATELY STA 924+22 TO STA 931+26 AND REPLACE WITH A GRADED DITCH.
1.2. REMOVE EXISTING RCP ELLIPTICAL CULVERT ON THE EAST SIDE OF THE SAW MILL RIVER PARKWAY FROM
LIMITS AS SHOWN ON DWGS SMR-01 TO SMR-12.
1.1. RECONSTRUCT THE SAW MILL RIVER PARKWAY ABOVE THE Q100 FLOOD ELEVATION WITHIN THE PROJECT
1. GENERAL
8.1. MILL AND RESURFACE LIMITS ARE SHOWN ON DWG HRP-01.
8. WILSON WOODS PARK ROAD
RAIL AND CONSTRUCTION OF NEW DRAINAGE.
7.1. MILL AND RESURFACE LIMITS ARE SHOWN ON DWGS HRP-01 TO HRP-04. THIS WORK INCLUDES REPLACEMENT OF EXISTING GUIDE
7. RAMP S
FIRST AVE.
6.4.1. NEW PATH SHALL BE ASPHALT FROM EXISTING PATH TO NEW STRUCTURE AND CONCRETE FROM NEW STRUCTURE TO
CONSTRUCTED ON RIVER SIDE ALONG THE LIMITS OF THE NEWLY CONSTRUCTED PATH.
FROM FIRST AVE TO EXISTING PATH ON WEST SIDE OF HUTCHINSON RIVER AS SHOWN ON DWG HRP-02. RAIL SHALL BE
6.4. WESTCHESTER COUNTY OWNED PEDESTRIAN PATH BRIDGE SHALL BE REMOVED AND NEW 5' WIDE PATH SHALL BE CONSTRUCTED
PEDESTRIAN PATH CONNECTION AS SHOWN ON DWG HRP-02 AND STANDARD BRIDGE GUIDE RAIL.
6.3.1. NEW STRUCTURE SHALL INCLUDE 5' WIDE MIN. SIDEWALK ON SOUTH SIDE EXTENDING FROM FIRST AVE TO PROPOSED
SPAN OF 30'.
6.3. DEMOLISH EXISTING CULVERT (CULVERT C890715) SPANNING HUTCHINSON RIVER AND CONSTRUCT NEW STRUCTURE WITH MINIMUM
GUIDE RAIL.
RECONSTRUCTION, CONSTRUCTION OF NEW DRAINAGE, CURBS, UNDERDRAINS, AND SIDEWALK, AND REPLACEMENT OF EXISTING
6.2. PAVEMENT RECONSTRUCTION LIMITS ARE SHOWN ON DWGS HRP-01 TO HRP-04. THIS WORK INCLUDES COMPLETE PAVEMENT
GUIDE RAIL AND CONSTRUCTION OF NEW DRAINAGE.
6.1. MILL AND RESURFACE LIMITS ARE SHOWN ON DWGS HRP-01 TO HRP-04. THIS WORK INCLUDES REPLACEMENT OF EXISTING
6. RAMP R
DRAINAGE, CURBS, AND UNDERDRAINS.
5.1. MILL AND RESURFACE LIMITS ARE SHOWN ON DWGS HRP-01 TO HRP-04. THIS WORK INCLUDES THE CONSTRUCTION OF NEW
5. RAMP T
4.2. EXISTING GUIDE RAIL BETWEEN RAMP U AND RAMP T SHALL BE REPLACED WITH NEW CONCRETE MEDIAN BARRIER.
DRAINAGE, CURBS, AND UNDERDRAINS.
4.1. MILL AND RESURFACE LIMITS ARE SHOWN ON DWGS HRP-01 TO HRP-4. THIS WORK INCLUDES THE CONSTRUCTION OF NEW
4. RAMP U
RAMPS SHALL BE INSTALLED AT THE CROSSWALK.
3.2. CURB AND SIDEWALK SHALL BE RECONSTRUCTED AT FIRST AVENUE AND LINCOLN AVENUE INTERSECTION. ADA COMPLIANT
AND ASPHALT DRIVEWAY APRONS, ARE SHOWN ON DWGS HRP-01 TO HRP-04.
NEW WEST SIDE GUIDE RAIL. LIMITS OF SIDEWALK RECONSTRUCTION, INCLUDING CONSTRUCTION OF NEW CURBS, UNDERDRAINS,
3.1. MILL AND RESURFACE LIMITS ARE SHOWN ON DWGS HRP-01 TO HRP-04. THIS WORK INCLUDES THE CONSTRUCTION OF
3. FIRST AVENUE
THE FUTURE EXPANSION TO 6 LANES WITH SHOULDERS.
2.2.3. THE MINIMUM VERTICAL CLEARANCE OVER THE HRP SHALL BE 14.0 FT ACROSS THE ENTIRE ROADWAY, INCLUDING
2.2.2. NEW STRUCTURE SHALL HAVE AN ARCHED APPEARANCE OF SIMILAR RADIUS TO THE EXISTING ARCH.
ABUTMENT FACE TO ABUTMENT FACE.
THE HRP-SOUTHBOUND TO WILSON WOODS PARK RD. THE MINIMUM HORIZONTAL OPENING SHALL BE 112' FROM
EXPANSION OF THE HRP TO 6 LANES OF THROUGH TRAFFIC, SHOULDERS AND STANDARD DECELERATION LANE FROM
2.2.1. THE PROPOSED STRUCTURE SHALL SPAN THE HRP AND THE HUTCHINSON RIVER WHILE ACCOMODATING FUTURE
2.2. BINS 5500100 AND 3348300 SHALL BE DEMOLISHED IN THEIR ENTIRETY AND REPLACED WITH ONE 2-SPAN STRUCTURE.
ALONG FIRST AVE.
BE REPLACED IN KIND FROM THE EASTERN LIMIT OF THE NEW BRIDGE RAIL TO THE EXISTING TERMINATION POINTS
2.1.4. EXISTING NATURAL STONE WALLS AT THE NORTHWEST AND SOUTHWEST INTERSECTIONS WITH FIRST AVE (FA) SHALL
SIDE GUIDE RAIL.
PAVEMENT RECONSTRUCTION AND CONSTRUCTION OF NEW DRAINAGE, CURBS, UNDERDRAINS, SIDEWALK AND SOUTH
2.1.3. PAVEMENT RECONSTRUCTION LIMITS ARE SHOWN ON DWGS HRP-01 TO HRP-04. THIS WORK INCLUDES COMPLETE
AND UNDERDRAINS, ARE SHOWN ON DWGS HRP-01 TO HRP-04.
STA LA 5+50 AND LA 6+45. LIMITS OF SIDEWALK RECONSTRUCTION, INCLUDING CONSTRUCTION OF NEW CURBS
OF NEW NORTH SIDE HAND RAIL BETWEEN STA LA 5+50 AND LA 6+45, AND SOUTH SIDE GUIDE RAIL BETWEEN
2.1.2. MILL AND RESURFACE LIMITS ARE SHOWN ON DWGS HRP-01 TO HRP-04. THIS WORK INCLUDES THE CONSTRUCTION
TO TIE INTO THE NEWLY RECONSTRUCTED BRIDGE ELEVATIONS AND IN ACCORDANCE WITH PROJECT REQUIREMENTS.
2.1.1. RECONSTRUCT THE LINCOLN AVENUE (LA) APPROACHES AND ANY LOCAL STREETS AND INTERSECTIONS AS NECESSARY
2.1. GENERAL
2. EAST LINCOLN AVENUE
1.4. ROADWAY WIDENING SHALL MATCH ADJACENT PAVEMENT SECTIONS, INCLUDING TYPE AND DEPTH.
STA. HRP 111+00 TO HRP 111+55.
1.3. ROADWAY WIDENING MAY REQUIRE THE RELOCATION OF A RETAINING WALL AND A HEAD WALL FROM APPROXIMATE
1.2. THE MAINLINE OF THE HRP SHALL NOT BE LOWERED.
THE ROADWAY.
DRAINAGE, CURBS, AND UNDERDRAINS, REPLACEMENT OF EXISTING GUIDE RAIL, AND WIDENING AND RESURFACING OF
WITHIN THE PROJECT LIMITS SHOWN ON DWGS HRP-01 TO HRP-04. THIS WORK INCLUDES CONSTRUCTION OF NEW
DRAINAGE SYSTEM AND PREVENT INUNDATION OF THE ROADWAY FOR NO LESS THAN THE 50-YEAR STORM EVENTS
1.1. THE HUTCHINSON RIVER PARKWAY (HRP) SHALL BE RECONSTRUCTED TO CORRECT THE DEFICIENCIES IN THE HIGHWAY
1. HUTCHINSON RIVER PARKWAY
ALL DRAWINGS REFERENCED ARE LOCATED IN PART 6, DIRECTIVE DRAWINGS.
THIS REQUIREMENT REQUIRES AN APPROVED ATC.
DEPTH OF T&L SHALL NOT EXCEED 8". A RAISE IN GRADE EXCEEDING 8" REQUIRES FULL RECONSTRUCTION. DEVIATION FROM
MILL AND RESURFACE AREAS MAY REQUIRE TRUING AND LEVELING (T&L) TO MEET REQUIRED GRADES AND OR CROSS SLOPES.
REQUIRED.
IF THE PROPOSED DESIGN SOLUTION REQUIRES PAVEMENT RECONSTRUCTION IN LIEU OF MILL & RESURFACE, AN ATC IS NOT
REQUIREMENTS AND DEPARTMENT'S STANDARDS.
FOR ALL AFFECTED PAVEMENT AREAS, THE DESIGN-BUILDER SHALL ENGINEER ROADWAY PROFILES TO MEET THE CONTRACT
ALL EXISTING GUIDE RAIL WITHIN THE LIMITS OF WORK SHALL BE REPLACED.
UTILITY RELOCATIONS AND IMPACT TO EXISTING UTILITIES SHALL BE IN ACCORDANCE WITH PART 4.
AESTHETIC REQUIREMENTS SHALL BE IN ACCORDANCE WITH PART 3, SECTION 14.3.2.
BRIDGES THAT ARE TO BE DEMOLISHED AND RECONSTRUCTED WILL BE ASSIGNED NEW BINS.
ALL STATIONING IN DIRECTIVE NOTES IS APPROXIMATE.
INDICATIVE / DIRECTIVE PLAN SHEETS ARE NOT REPRESENTATIVE OF ALL PROJECT REQUIREMENTS.
ESTABLISHMENT OF ADJACENT AREAS IN ACCORDANCE WITH DEPARTMENT STANDARDS.
VERTICAL ALIGNMENTS ARE NOT DIRECTIVE. MODIFICATIONS TO VERTICAL PROFILE MAY REQUIRE REGRADING AND TURF
ALL HORIZONTAL ALIGNMENTS SHALL CONFORM TO THE DIRECTIVE PLANS.
LIGHTING AND STRIPING WITHIN LIMITS OF WORK SHALL BE REPLACED UNLESS OTHERWISE NOTED.
AND ALL OTHER STRUCTURAL COMPONENTS FOR EACH SITE LISTED BELOW SHALL COMPLY WITH THE RFP. ALL EXISTING
APPLY. NEW CONCRETE DECK, CONCRETE BARRIER, STRUCTURAL STEEL, BEARINGS, BEARING PEDESTAL, PIERS, COLUMNS
FOLLOWING IS A DESCRIPTION OF THE WORK ASSOCIATED WITH EACH SITE ALONG WITH SPECIFIC REQUIREMENTS THAT
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
16-S
EP-2
019 13:17
x847314
_cph_gnn_01_
PH
2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
PHOPHOPHOPHORFM
C
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
16-S
EP-2
019 13:4
4
x847314
_cph_gnp_01H
utc
hPkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
WW 1+00
WW 2+00
WW 3+00
WW 4+00
LA 7+00
LA 6+00
LA 5+00
LA 4+00
R 98+95.39PI
HRP 96+00
HRP 97+00
HRP 98+00HRP 99+00 HRP 100+00 HRP 101+00 HRP 102+00 HRP 103+00
HRP 96+29.1
7
PC
HRP 100+73.7
1
PT
T 92+00
T 93+00
T 94+00
T 95+00
T 96+00
T 97+00
T 94+09.36
PC
T 96+22.9
0
PCC
T 96+83.3
1
PT
T 95+29.0
5PI
24+0025+00
26+00
U 27+00
U 28+00
U 29+00U 29+11
U 29+11
25+58.2
0
PC
U 27
+71.09
PT
U 28
+25.17
PC U 29+08.9
7
PT
U 29+11.0
7
POE
U 27+38.52PI
U 28+76.9
3PI
EQNAHD U 26+05.0
0
EQNBK26+05.0
0
P.O.L. STA. WW 2+04.21
EQNAHD T 91+92.88 =
EQNBK 91+92.88
P.O.B. STA.
0 25 50 75 100'25
1" = 50'
GRID
NO
RT
H
HRP-01
AT E. LINCOLN AVENUE
HUTCHINSON RIVER PARKWAY
DIRECTIVE PLAN
HUTCHINSON RIVER PARKWAY
MA
TC
H
LIN
E
SE
E
DR
AWIN
G
NO.
HR
P-03
MATCH LINE SEE DRAWING NO. HRP-02
8101.46
3348300
5500100 C890715
PROJECT LIMIT
LIN
COL
N
AVE
NUE
WILSON WOODS PARK ROAD
HUTCHINSON RIVER PARKWAYRA
MP U
RAMP T
�APPR
OX.
ST
A
HRP 95+05
PR
OJE
CT LIMIT
MILL AND RESURFACE
SIDEWALK RECONSTRUCTION
BRIDGE / PAVEMENT RECONSTRUCTION
LEGEND:
BIN 5500100
HANDRAIL
NEW
BARRIER
MEDIAN
CONCRETE
NEW
RFM
C
FA 2+00
FA 1+00
FA 3+00
FA 4+00
FA 5+00
LA 11+00
LA 10+00
LA 9+00
LA 8+00
R 96+34R 96+34
R 97+00
R 98+00
R 99+00
R 100+00
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
16-S
EP-2
019 13:2
6
x847314
_cph_gnp_02H
utc
hPkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
0 25 50 75 100'25
1" = 50'
GRID
NO
RT
H
AT E. LINCOLN AVENUE
HUTCHINSON RIVER PARKWAY
DIRECTIVE PLANHRP-02
HUTCHINSON RIVER PARKWAY
MA
TC
H
LIN
E
SE
E
DR
AWIN
G
NO.
HR
P-03
MATCH LINE SEE DRAWING NO. HRP-01
8101.46
3348300
5500100 C890715
�APPR
OX.
ST
A
HRP 95+05
PR
OJE
CT LIMIT
AVENUE
FIRST
RAM
P R
MILL AND RESURFACE
SIDEWALK RECONSTRUCTION
BRIDGE / PAVEMENT RECONSTRUCTION
LEGEND:
BIN 3348300
CIN 890
715
LIMIT
PR
OJECT
OWNED PEDESTRIAN BRIDGE
REMOVE WESTCHESTER COUNTY
R 98+00
LIMIT
PROJECT
PHOPHOPHOPHORFM
RFM
0 25 50 75 100'25
1" = 50'
GRID
NO
RT
H
HRP-03
AT E. LINCOLN AVENUE
HUTCHINSON RIVER PARKWAY
DIRECTIVE PLAN
HUTCHINSON RIVER PARKWAY
MA
TC
H
LIN
E
SE
E
DR
AWIN
G
NO.
HR
P-04
8101.46
3348300
5500100 C890715
MA
TC
H
LIN
E
SE
E
DR
AWIN
G
NO
S.
HR
P-01
AN
D
HR
P-02
LIMIT
PROJECT
RAMP
SBIN 55
2345
0
MILL AND RESURFACE
SIDEWALK RECONSTRUCTION
BRIDGE / PAVEMENT RECONSTRUCTION
LEGEND:
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Vasq
uez
10-S
EP-2
019 12:0
3
x847314
_cph_gnp_03H
utc
hPkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
FA 6+00
FA 7+00
FA 7+40
HRP 103+00 HRP 104+00 HRP 105+00 HRP 106+00HRP 107+00
HRP 108+00
HRP 109+00
HRP 110+00
HRP 105+69.6
8
PC
HRP 108+63.1
4PI
16+00
17+00
18+00
19+0020+0021+0022+0023+00
20+35.4
5
PT
17+40.3
2
PI
S 104+00
S 10
5+00
S 10
6+00
S 107+00
S 108+00
S 109+00
S 110+00
S 10
4+48.82
PC
S 106+32.3
5PT
S 106+32.4
6PC
S 108+27.5
3
PT
S 108+31.4
1
PC
S 105+44.02
PI
S 107+30.9
9
PI
S 109+94.3
8PI
P.O.L.
ST
A.
FA 6+46.0
5
EQ
NA
HD S 103+40.2
5 =
EQ
NB
K 103+40.2
5
P.O.B.
ST
A.
P.O.L. STA. WW 2+04.21
EQNAHD T 91+92.88 =
EQNBK 91+92.88
P.O.B. STA.
PHOPHOPHOPHO0 25 50 75 100'25
1" = 50'
GRID
NO
RT
H
HUTCHINSON RIVER PARKWAY
HRP-04
AT E. LINCOLN AVENUE
HUTCHINSON RIVER PARKWAY
DIRECTIVE PLAN
MA
TC
H
LIN
E
SE
E
DR
AWIN
G
NO.
HR
P-03
8101.46
3348300
5500100 C890715
LIMIT
PROJECT
MILL AND RESURFACE
SIDEWALK RECONSTRUCTION
BRIDGE / PAVEMENT RECONSTRUCTION
LEGEND:
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
05-S
EP-2
019 16:4
4
x847314
_cph_gnp_04H
utc
hPkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
HRP 111+00
HRP 112+00
HRP 113+00
HRP 114+00
HRP 115+00
HRP 116+00
HRP 117+00
HRP 111+55.3
0
PT
HRP 116+18.1
0
PC
HRP 117+92.2
6
PCC
10+00
11+00
12+00
13+00
14+00
15+00
10+00.0
0
POB
10+54.1
0
PI
12+34.5
8 PI
12+46.1
4
PI
14+43.8
9 PC
S 111+00
S 112+00
S 113+00
S 114+00
S 115+00
S 116+00S 116+22
S 111+57.1
3
PT
S 111+66.3
5PC
S 112+65.5
1
PT
S 113+60.6
5
PC
S 114+69.7
3
PT
S 116+22.2
6
POE
S 112+15.9
4
PI
S 114+15.2
0PI
P.O.L. STA. WW 2+04.21
EQNAHD T 91+92.88 =
EQNBK 91+92.88
P.O.B. STA.
SAW MI
LL RI
VER
NB
0 25 50 75 100'25
1" = 50'
GRID N
ORT
H
SMR-01
MAT
CH LIN
E SEE
DR
AWIN
G
NO.
SM
R-02
SAW MILL RIVER PARKWAY
DIRECTIVE PLAN5500859
5500842
5500841
5500839
SH9486 SAW MILL RIVER PARKWAY - TACONIC STATE PARKWAY
TO 6481 VILLAGE OF PLEASANTVILLE
TOWN OF MOUNT PLEASANT
8216.84
SB876+00
877+00878+00
879+00880+00
881+00882+00
883+00
FLOW
PROJECT LIMIT
SOUTHERN
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
11-S
EP-2
019 13:0
7
x847314
_cph_gnp_10 S
MR
Pkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
LEGEND:
SUBGRADE STABILIZATION
MILL AND RESURFACE
BRIDGE / PAVEMENT RECONSTRUCTION
8'
11'
11'
11'
11'
8'
YAWKRAP REVIR LLIM WAS
SAW MILL RIVER
SAW MILL RIVER
LEGEND:
SUBGRADE STABILIZATION
NB
FLOW
FLOW
SB
884+00 885+00886+00
887+00
888+00
889+00
890+00
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
11-S
EP-2
019 13:10
x847314
_cph_gnp_11 S
MR
Pkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
0 25 50 75 100'25
1" = 50'
GRID N
ORT
H
SMR-025500859
5500842
5500841
5500839
MAT
CH LIN
E SEE
DR
AWIN
G
NO.
SM
R-01
SH9486 SAW MILL RIVER PARKWAY - TACONIC STATE PARKWAY
TO 6481 VILLAGE OF PLEASANTVILLE
TOWN OF MOUNT PLEASANT
MAT
CH LIN
E SEE
DR
AWIN
G
NO.
SM
R-03
SAW MILL RIVER PARKWAY
DIRECTIVE PLAN
8216.84
MILL AND RESURFACE
BRIDGE / PAVEMENT RECONSTRUCTION
YAWKRAP REVIR LLIM WAS
SAW MILL RIVER
LEGEND:
SUBGRADE STABILIZATION
NB NB
0 25 50 75 100'25
1" = 50'
GRID
NO
RT
H
SMR-03
MAT
CH LIN
E SEE
DR
AWIN
G
NO.
SM
R-02
MAT
CH LIN
E SEE
DR
AWIN
G
NO.
SM
R-04
5500859
5500842
5500841
5500839
SH9486 SAW MILL RIVER PARKWAY - TACONIC STATE PARKWAY
TO 6481 VILLAGE OF PLEASANTVILLE
TOWN OF MOUNT PLEASANT
SAW MILL RIVER PARKWAY
DIRECTIVE PLAN
8216.84
FLOW
SBSB
891+00
892+00
893+00 894+00895+00
896+00
897+00
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
11-S
EP-2
019 13:13
x847314
_cph_gnp_12 S
MR
Pkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
MILL AND RESURFACE
BRIDGE / PAVEMENT RECONSTRUCTION
YAWKRAP REVIR LLIM WAS
YAWKRAP REVIR LLIM WAS
LEGEND:
SUBGRADE STABILIZATION
NB
0 25 50 75 100'25
1" = 50'
GRID
NO
RT
H
SMR-04
MATC
H LIN
E SEE
DR
AWIN
G
NO.
SM
R-03
MATC
H LIN
E SEE
DR
AWIN
G
NO.
SM
R-05
5500859
5500842
5500841
5500839
SH9486 SAW MILL RIVER PARKWAY - TACONIC STATE PARKWAY
TO 6481 VILLAGE OF PLEASANTVILLE
TOWN OF MOUNT PLEASANT
SAW MILL RIVER PARKWAY
DIRECTIVE PLAN
8216.84
SB
898+00
899+00
900+00
901+00 902+00
903+00
904+00
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
11-S
EP-2
019 13:15
x847314
_cph_gnp_13 S
MR
Pkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
MILL AND RESURFACE
BRIDGE / PAVEMENT RECONSTRUCTION
YAWKRAP REVIR LLIM WAS
SAW MILL RIVER
SAW MILL RIVER
SAW MILL RIVER
LEGEND:
SUBGRADE STABILIZATION
NB
0 25 50 75 100'25
1" = 50'
GRID
NO
RT
H
MATC
H LIN
E SEE
DR
AWIN
G
NO.
SM
R-04
MATC
H LIN
E SEE
DR
AWIN
G
NO.
SM
R-06
SH9486 SAW MILL RIVER PARKWAY - TACONIC STATE PARKWAY
TO 6481 VILLAGE OF PLEASANTVILLE
TOWN OF MOUNT PLEASANT5500859
5500842
5500841
5500839
SAW MILL RIVER PARKWAY
DIRECTIVE PLANSMR-05
8216.84
FLOW
FLO
W
FLOW
FLOW
SB
905+00
906+00
907+00
908+00909+00
910+00
911+00
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
11-S
EP-2
019 13:17
x847314
_cph_gnp_14 S
MR
Pkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
YAWKRAP REVIR LLIM WAS
MILL AND RESURFACE
BRIDGE / PAVEMENT RECONSTRUCTION
YAWKRAP REVIR LLIM WAS
9380055 NIB
C
LEGEND:
SUBGRADE STABILIZATION
NB
NB
0 25 50 75 100'25
1" = 50'GRID
NORTH
MATCH LIN
E SEE DRA
WIN
G NO.
SM
R-05
MATC
H LIN
E SEE
DR
AWIN
G
NO.
SM
R-07
SH9486 SAW MILL RIVER PARKWAY - TACONIC STATE PARKWAY
TO 6481 VILLAGE OF PLEASANTVILLE
TOWN OF MOUNT PLEASANT5500859
5500842
5500841
5500839
SMR-06SAW MILL RIVER PARKWAY
DIRECTIVE PLAN
8216.84
SB
SB
912+00
913+00
914+00
915+00916+00
917+00
918+00
SB DECEL LANE
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
11-S
EP-2
019 13:19
x847314
_cph_gnp_15 S
MR
Pkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
YAWKRAP REVIR
LLIM WAS
MILL AND RESURFACE
BRIDGE / PAVEMENT RECONSTRUCTION
14
80
05
5
NIB
24
80
05
5
NIB
YAWKRAP REVIR LLIM WAS
SAW MIL
L RIV
ER
SAW MILL RIVER
LEGEND:
SUBGRADE STABILIZATION
NB
9580055 NIB
0 25 50 75 100'25
1" = 50'
GRID
NORTH
MATC
H LIN
E SEE
DR
AWIN
G
NO.
SM
R-06
MAT
CH LIN
E SEE
DR
AWIN
G
NO.
SM
R-08
5500859
5500842
5500841
5500839
SH9486 SAW MILL RIVER PARKWAY - TACONIC STATE PARKWAY
TO 6481 VILLAGE OF PLEASANTVILLE
TOWN OF MOUNT PLEASANT
SAW MILL RIVER PARKWAY
DIRECTIVE PLANSMR-07
8216.84
SB
919+00
920+00921+00
922+00
923+00
924+00925+00
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
13-S
EP-2
019 10:0
5
x847314
_cph_gnp_16 S
MR
Pkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
MILL AND RESURFACE
BRIDGE / PAVEMENT RECONSTRUCTION
YAWKRAP REVIR LLIM WAS
38" x 60" RCP
LEGEND:
SUBGRADE STABILIZATION
NB
0 25 50 75 100'25
1" = 50'
GRID
NORTH
MATC
H LIN
E SEE
DR
AWIN
G
NO.
SM
R-07
MATC
H LIN
E SEE
DR
AWIN
G
NO.
SM
R-09
SH9486 SAW MILL RIVER PARKWAY - TACONIC STATE PARKWAY
TO 6481 VILLAGE OF PLEASANTVILLE
TOWN OF MOUNT PLEASANT5500859
5500842
5500841
5500839
SAW MILL RIVER PARKWAY
DIRECTIVE PLANSMR-08
8216.84
FLOW
FLOW
SB
926+00
927+00
928+00
929+00
930+00
931+00
932+00
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
13-S
EP-2
019 10:0
6
x847314
_cph_gnp_17 S
MR
Pkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
MILL AND RESURFACE
BRIDGE / PAVEMENT RECONSTRUCTION
SAW MILL RIVER
YAWKRAP REVIR LLIM WAS
38" x 60" RCP
LEGEND:
SUBGRADE STABILIZATION
NB
0 25 50 75 100'25
1" = 50'
GRID
NORT
H
MATC
H LIN
E SEE
DR
AWIN
G
NO.
SM
R-08
MAT
CH LIN
E SEE
DR
AWIN
G
NO.
SM
R-10
SMR-09SAW MILL RIVER PARKWAY
DIRECTIVE PLAN
SH9486 SAW MILL RIVER PARKWAY - TACONIC STATE PARKWAY
TO 6481 VILLAGE OF PLEASANTVILLE
TOWN OF MOUNT PLEASANT5500859
5500842
5500841
5500839
8216.84
FLO
W
FLOW
933+00
934+00
935+00
936+00 937+00
938+00
939+00
936+47.4
3PI
SB
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
11-S
EP-2
019 13:2
3
x847314
_cph_gnp_18 S
MR
Pkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
MILL AND RESURFACE
BRIDGE / PAVEMENT RECONSTRUCTION
SAW MILL RIVER
SAW MILL RIVER PARKWAY
LEGEND:
SUBGRADE STABILIZATION
NB
NB
0 25 50 75 100'25
1" = 50'
GRID
NO
RT
H
MAT
CH LIN
E SEE
DR
AWIN
G
NO.
SM
R-09
SH9486 SAW MILL RIVER PARKWAY - TACONIC STATE PARKWAY
TO 6481 VILLAGE OF PLEASANTVILLE
TOWN OF MOUNT PLEASANT5500859
5500842
5500841
5500839
SAW MILL RIVER PARKWAY
DIRECTIVE PLANSMR-10
MAT
CH LIN
E SEE
DR
AWIN
G
NO.
SM
R-11
8216.84
FLOW
FLOW
SB
SB
940+00
941+00
942+00943+00 944+00
945+00
946+00
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
11-S
EP-2
019 13:2
4
x847314
_cph_gnp_19 S
MR
Pkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
MILL AND RESURFACE
BRIDGE / PAVEMENT RECONSTRUCTION
SA
W
MIL
L RIV
ER
SAW MILL R
IVER
SAW MILL RIVER PARKWAY
YAWKRAP REVIR LLIM WAS
LEGEND:
SUBGRADE STABILIZATION
NB
0 25 50 75 100'25
1" = 50'
GRID
NO
RT
H
MAT
CH LIN
E SEE
DR
AWIN
G
NO.
SM
R-10
SH9486 SAW MILL RIVER PARKWAY - TACONIC STATE PARKWAY
TO 6481 VILLAGE OF PLEASANTVILLE
TOWN OF MOUNT PLEASANT5500859
5500842
5500841
5500839
SAW MILL RIVER PARKWAY
DIRECTIVE PLANSMR-11
8216.84
MAT
CH LIN
E SEE
DR
AWIN
G
NO.
SM
R-12
SB
947+00
948+00
949+00
950+00
951+00
952+00
953+00
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
11-S
EP-2
019 13:2
4
x847314
_cph_gnp_20 S
MR
Pkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
MILL AND RESURFACE
BRIDGE / PAVEMENT RECONSTRUCTION
SAW MILL R
IVER
SAW MILL RIVER
YAWKRAP REVIR LLIM WAS
LEGEND:
SUBGRADE STABILIZATION
NB
0 25 50 75 100'25
1" = 50'
GRID
NO
RT
H
SH9486 SAW MILL RIVER PARKWAY - TACONIC STATE PARKWAY
TO 6481 VILLAGE OF PLEASANTVILLE
TOWN OF MOUNT PLEASANT5500859
5500842
5500841
5500839
SAW MILL RIVER PARKWAY
DIRECTIVE PLANSMR-12
8216.84
MAT
CH LIN
E SEE
DR
AWIN
G
NO.
SM
R-11 FLOW
FLOW
SB
954+00 955+00
956+00
957+00
PROJECT LIMITNORTHERN
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
11-S
EP-2
019 13:2
5
x847314
_cph_gnp_21 S
MR
Pkwy_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
MILL AND RESURFACE
BRIDGE / PAVEMENT RECONSTRUCTION
SAW MILL RIVER
YAWKRAP REVIR LLIM WAS
MA
MAR
ONEC
K
AVE
ROUTE 1
RTE-01
0 20 40 60 80'20
1" = 40'
GRIDNORTH
ROUTE 1 OVER MAMARONECK RIVER
DIRECTIVE PLAN
ROUTE 1 OVER MAMARONECK RIVER
1000040
8473.14
LAP-02
LAP-01 AND
SEE DWGS
ISLAND PARK
HARBOR
MILL AND RESURFACE
SIDEWALK RECONSTRUCTION
BRIDGE / PAVEMENT RECONSTRUCTION
LEGEND:
DWG RTE-02
MODIFICATION, SEE
FOR INTERSECTION
~~
5+00
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
10-S
EP-2
019 12:4
8
x847314
_cph_gnp_07 R
oute
1_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
4+00
5+00
6+007+00 8+00
9+00
10+00
1269
0 15 30 45 60'15
1" = 30'
GRID
NORTH
INSTALL NEW STOP BAR, TYP.
US 1
US 1
MA
MARO
NECK A
VEN
UE
INSTALL CROSSWALK TYPE LS (TYP.)
CROSSWALK (TYP.)
REMOVE EXISTING
ABANDON PULLBOX
ISLAND
REMOVE EXISTING
PED POLE
REMOVE EXISTING
ON BREAKAWAY BASE (TYP.)
INSTALL PEDESTRIAN POLE
PED POLE
REMOVE EXISTING
AVEN
UE
MA
MARO
NECK
BASE TRAFFIC SIGNAL POLE
REMOVE EXISTING ANCHOR
AND INSTALL GRASS BUFFER
REMOVE EXISTING SIDEWALK
REMOVE EXISTING EMBEDDED TRAFFIC SIGNAL POLE
REMOVE EXISTING ANCHOR BASE TRAFFIC SIGNAL POLE
RELOCATE PARKING SIGN
ROUTE 1 OVER MAMARONECK RIVER
DIRECTIVE PLAN
1000040
ROUTE 1 OVER MAMARONECK RIVER
AND CABLES
WIRE, SIGNALS HEADS
REMOVE EXISTING SPAN
BASE
SIGN ON BREAKAWAY
POLE WITH STREET
INSTALL PEDESTRIAN
ON BREAKAWAY BASE
WITH STREET SIGN
INSTALL PEDESTRIAN POLE
NEW STOP BAR (TYP.)
REMOVE EXISTING STRIPING BEYOND
PED BUTTON AND SIGN
PED SIGNAL INDICATION AND APS
INSTALL TRAFFIC SIGNAL POLE WITH
RTE-02
CONTROLLER CABINET AND CONCRETE WORK PAD
INSTALL TRAFFIC SIGNAL POLE, POLE-MOUNTED
8216.84
CABLES
SIGNAL HEADS AND
INSTALL SPAN WIRE
LEGEND:
CURB RAMP AND SIDEWALK
NEW ADA ACCESSIBLE
BRIDGES CULVERTSPIN
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
ALTERED BY:
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
08
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
DE
SIG
NC
HE
CK
DR
AF
TIN
GC
HE
CK
PR
OJ
EC
T
MA
NA
GE
R
Capone
10-S
EP-2
019 13:0
5
x847314
_cph_gnp_08 R
oute
1_P
H2.d
gn
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
COUNTY: WESTCHESTER
ON:
AFFIX SEAL:
C
REMOVE EXISTING STOP BAR (TYP.)
F1
05-
AU
G-2019 15:0
8
cparsons2
BRIDGES CULVERTSPIN
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
COUNTY:
PR
OJ
EC
T
MA
NA
GE
RD
ESIG
ND
RA
FTIN
GC
HE
CK
CH
EC
K
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
AFFIX SEAL:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
ON:
ALTERED BY:
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
P L A N T
I N G B
E D
P L
A
N T I
N
G
B E
D
EAST
BOSTON
POST
ROAD
MA
MAR
ONECK
AVE
NUE S
EAST BASIN
MAMARONECK RIVER
LAP-01
8473.14
08
847314_c
ph_la
p_01.d
gn
LOCATION IS APPROXIMATE
PROPOSED RETAINING WALL
ABOVE PLANTING BED GRADERETAINING WALL TO BE 18''
SEE PLAN NOTE
PROPOSED FENCE,
STORED AND RESET
EXISTING SIGN TO BE REMOVED,
REPLACED IN KIND
PROPOSED UPLIGHTS TO BE
PLAN
1" = 10'
NOT TO SCALE
CONCRETE SIDEWALK
POLYMERIC SAND SWEPT INTO JOINTS
SUB-SOIL
PRECAST CONCRETE PAVER
ITEM 608.12
2.36"
2" STONE DUST SETTING BED
NOTE: POLYMERIC SAND AND STONE DUST COST INCLUDED IN ITEM 608.12
COMPACTED IN TWO 3" LIFTS
6" SUBBASE
ITEM 304.11000008
NOT TO SCALE
PRECAST CONCRETE PAVER ON STONE DUST SETTING BED
INSTALLED AS SPECIFIED BY THE VILLAGE
PROPOSED SPRINKLER SYSTEM AND HEADS TO BE
0 5 10 15 20'5
1" = 10'
& GIVEN TO VILLAGE. POSTS TO BE DISPOSED OF
EXISTING FENCE PANELS TO BE REMOVED
THE PARK (BROWN COLOR)
COLOR AND STYLE TO MATCH EXISTING FENCING IN
TOP OF NEW RETAINING WALL CAPSTONE.
PROPOSED FENCE TO BE MOUNTED ON
IS ANTICIPATED
TO BE SPECIFIED BY THE VILLAGE. APPROXIMATELY 180 LF
THROUGHOUT PLANTING BED. HOSE TYPE AND COLOR
PROPOSED DRIP IRRIGATION TO BE DISTRIBUTED
CAPSTONE WITH 1'' OVERHANG
PROPOSED STONE OR CONCRETE
SEE DETAIL BELOW.
PAVER WALKWAY
PRECAST CONCRETE
SECTION A - A
A
A
AROUND FLAGPOLE
PROPOSED PAVERS LAID IN RADIAL PATTERN
5'
7'
5'7'
5' 7'
L A W N
PAVERS LAID IN RUNNING BOND PATTERN
PROPOSED PEDESTRIAN WALKWAY
ITEM 610.1602, TURF ESTABLISHMENT - LAWN
ITEM 610.1403, 4'' CLEAN LAWN QUALITY TOPSOIL
SPECIAL PLANTING MIX
ITEM 610.1404, 2' TOPSOIL -
2'' SHREDDED MULCH
ALONG BACK SIDE, INCLUDING THE AREA OF PLANT BEDS.
FINAL DESIGN OF RETAINING WALL SHALL ADDRESS DRAINAGE2.
& DARK BROWN.
MULCH SHALL BE PREMIUM QUALITY, TRIPLE SHREDDED1.
NOTE:
REMOVED, STORED & REINSTALLED
EXISTING FLAGPOLE TO BE
12R
5R
5R
3R
9'
3'
DIRECTIVE PLAN
POCKET PARK
ROUTE 1 MAMARONECK
BRICKS SHALL BE STANDARD DIMENSIONS (SEE DETAIL ABOVE).3.
APPROVED BY VILLAGE.
COLOR: SHALL MATCH EXISTING PAVERS AT THE GAZEBO IN THE VILLAGE. TO BE 2.
BRICKS SURROUNDING FLAGPOLE SHALL BE INSTALLED IN A RADIAL PATTERN.
BRICKS ALONG PATHWAYS SHALL BE INSTALLED IN A RUNNING BOND PATTERN. 1.
NOTE:
29-J
UL-2019 13:1
1
cquin
n2
BRIDGES CULVERTSPIN
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
COUNTY:
PR
OJ
EC
T
MA
NA
GE
RD
ESIG
ND
RA
FTIN
GC
HE
CK
CH
EC
K
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
ON:
AFFIX SEAL:
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
ON:
ALTERED BY:
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION:
EAST
BOSTON
POST
ROAD
MA
MAR
ONECK
AVE
NUE S
EAST BASIN
MAMARONECK RIVER
LAP-02
8473.14
LANDSCAPE ARCHITECTURE PLANS
08
847314_c
ph_la
p_01.d
gn
PLAN
1" = 10'
CONCRETE SIDEWALK
0 5 10 15 20'5
1" = 10'
L A W N
CA-10
RR-2
GR-16
RM-7
SA-16
EP-15
PA-6
NR-8
SA-16
GR-18
BD-14
SA-16
EP-15
PA-6
NR-8SA-16
RM-7
NR-12GR-12
RR-2
CA-16
AND RESERVED FOR ANNUALS
PLANTING BED TO BE MULCHED
RP-2
RP-2PH-10
NR-12
PH-10
NR-10
UP, PRESERVED AND GIVEN TO THE TOWN
EITHER SIDE OF THE SIGN SHALL BE DUG
EXISTING CONCORD BARBERRY PLANTS ON
TM-6
This page is intentionally left blank.
New York State Department of Transportation
Lower Westchester Bridge Bundle i Part 6 - RFP PlansPIN 8101.46, Contract D900049 Draft September 16, 2019
INDICATIVE PLANS
Section not used in Draft RFP.