LSA Deployment for LHC
Mike Lamont on behalf of the LSA team
LSA deployment 26/11/2007
Status LSA has been deployed:
LEIR SPS transfer lines: TT40, CNGS, TI8, TI2 Hardware Commissioning LHC power converter tests SM18
Database is in good shape Technology well established Core software in place, tested and deployed Looking forward towards the LHC…
LSA deployment 36/11/2007
Requirements Core Functionality
Settings management etc. etc. as detailed
Equipment Instrumentation Measurements Operational exploitation Timing On-line Models
MADX, FIDEL, Aperture
Mode, data distribution Applied LSA applications
Orbit, luminosity scans etc.
LSA Core in action
LSA deployment 56/11/2007
Settings Management Complex Parameter Space
Momentum, Tune, Chromaticity, OrbitMagnet strengths, Multipole Errors, Decay,
Snapback..Power converter currents inc. nested tripletsKnobsKickers, Collimators, TDI…Spectrometer compensationCrossing angle Separation bumps
■ - at least partially addressed
LSA deployment 66/11/2007
Settings management Injection plateau
Subset or all PCs Correctors for energy stability Multipole error compensation
Prepare ramp Incorporation Calculation of snapback depth, adjustment of ramp functions
Ramp Snapback, Stop Power Converters, RF, Collimators, Feedback
Squeeze Q,Q’, stop, adjust, continue, collimators, feedback
Feed-forward & Feedback From feedback systems From reference magnet systems
LSA deployment 76/11/2007
Optics
• ramp and squeeze tests in all LHC IRs
• power converters in short circuit
• 7-8 for real
• Including running MAD, uploading optics etc
LSA deployment 86/11/2007
Ramp
LSA deployment 96/11/2007
Squeeze
LSA deployment 106/11/2007
Squeeze
LSA deployment 116/11/2007
FiDeL
Import of coefficients on to staging tables Extraction to LSA tables Invocation of FiDel@LSA to produce
Calibration curves Harmonic curves
Settings generation Injection/decay Ramp/snapback
LSA deployment 126/11/2007
Settings Pre-cycle configuration and generation Injection plateau Standard LHC ramp
FiDeL deployed under LSA and tested: Transfer functions (Calibration curves) Static harmonics Decay Snapback & correction…
LSA deployment 136/11/2007
Parameter space
Settings for dipole & correctors in terms of
• Momentum
• Strength
• Current
• Cn
Point to the two available power converters as necessary
LSA deployment 146/11/2007
Decay
LSA deployment 156/11/2007
Snapback – b3
LSA deployment 166/11/2007
Snapback - current
Equipment
LSA deployment 186/11/2007
INJECTION KICKERS X X X X X X
BEAM DUMP X X X X X X
POWER CONVERTERS X X X X
COLLIMATORS X X X X X
RF X X X X X
LFB X X X X X
TFB X X X X
MAGNETS X X
MKQA X X X X
WARM MAGNETS X X X X
RADIATION MONITORS X X
SPECTROMETERS X X X
Ap
plic
atio
n
XP
OC
An
alo
gA
cqu
isit
ion
Ala
rms
So
ftw
are
Inte
rlo
cks
Cri
tica
lS
etti
ng
s
Po
stM
ort
em
Tim
ing
LSA deployment 196/11/2007
Collimators & Absorbers Parameter space, functions and actual settings, trim (σ etc.) & drive in place plus application (c/o Stefano)
Beam Dump GUI -
Beam dump XPOC Spec out. V0.1 prototype in place
Power converters Parameter space, functions, actual settings, trim, drive in place and tested.
Radio Frequency V0.1 slow control application. Requirement spec in.
Longitudinal Feedback ditto
Transverse Feedback ditto
Injection Kickers V0.1 application in place
Q & aperture kicker, AC dipole -
EquipmentGeneric equip state and equip monitor in place
Instrumentation
LSA deployment 216/11/2007
Instrumentation
BPMs X X X 1
BLMs X X X X 1
BCT X 1
BTV X X X X 1
Rest Gas X X X X 3
Sync. Rad X X X X 1
Wire Scanners X X X 2
Luminosity X 1
Tune etc. X X X X 1
AGM X 2
Schottky X 2
Wall Current X 2
BST 1
Co
nce
ntr
ati
on
Set
tin
gs
Pri
ori
ty
Cri
tica
lS
etti
ng
s
Lo
gg
ing
Po
stM
ort
em
SW
Inte
rlo
cks
Sta
te
GU
I
LSA deployment 226/11/2007
For all systems assume:
Fixed display standard unless otherwise stated
Logging Standard
SDDS Complex measurements Shot-by-shot data
Post Mortem Standard API Analysis tools – necessity driven
Standard fitting routines Work in progress
LSA deployment 236/11/2007
Measurements
All measurements to be recorded together with measurement parameters
Standard facilities for display, browsing and analysis Archiving, references etc. Access for post-mortem, post-run analysis, web access
etc. Standard data format Interface to analysis tools
SDDS
LSA deployment 246/11/2007
BLMLHC – Beam Loss Monitors
Concentration and re-publish Prototype in place
Threshold Management/ Database configuration Work in progress (Trim… Drive to crate.. management… MCS…
expert app)
Triggered acquisition of snapshot buffer Triggered acquisition of XPOC buffer Dedicated fixed display/application Expert Application Logging
Heavy filtering required, tests ongoing
LSA deployment 256/11/2007
BPMLHC
Capture, CO, PM, FIFO, XPOC Capture, CO, FIFO
Concentration & re-publish done Capture – Multi-turn: write to SDDS done
Multi-turn application done Beta beating
Work in progress
Correction YASP – alive and kicking – actual trim
Real-time Work in progress APIs to LSA (Twiss, corrections, etc.)
LSA deployment 266/11/2007
BQBBQLHC
Tune: FFT Continuous FFT PLL (Feedback)
Chromaticity Frequency modulation/PLL
V3 requirements spec in circulation (LAFS) Daemon mode
LSA deployment 276/11/2007
Beam Loss Monitors acquisition & concentration Ongoing, deployed, tests
Beam Loss Monitors – display v2 Prototype
Beam Loss Monitors – detailed app. To spec
Beam Loss Monitors – MCS – configuration & tests Threshold tables in place, application to be done
Bunch Current Transformers acq & display BCTDCLHC & BCTFDLHC & BCTFRLHC
Fixed display in place
Instrumentation
LSA deployment 286/11/2007
First beam in LHC
LSA deployment 296/11/2007
Instrumentation
BPM: acquisition & concentration & publish V0.1 in place
BPM: trajectory display Proto in place
BPM: trajectory and orbit correction YASP
BPM: multi-turn analysis V1 in place
BPM: beta beating analysis Work in progress
BPMDLHC - dump line BPM -
BPMITLHC – interlocked BPMs -
BTVI/BTVMLHC Screens (matching monitors) Extension of existing
LSA deployment 306/11/2007
Instrumentation
Radmon – acq –conc - display proto done
BQHTLHC – head-tail Chromaticity BI
BSRALHC Abort gap monitor
BSRTFLHC/BSRTSLHC Synchrotron radiation monitors
LAFS – first version in place
BGILHC – Rest Gas Monitor LAFS
BWSLHC Wire Scanner LAFS – first version in place
Wall Current Monitors (RF)
BQSLLHC - Schottky LAFS - specification
BRASCLHC/BRASGLHC - Luminosity monitors
LSA deployment 316/11/2007
LHC BLM concentrator & display
LSA deployment 326/11/2007
Synchrotron radiation monitors
LSA deployment 336/11/2007
Wire scanner
LSA deployment 346/11/2007
BPM Concentration
LSA deployment 356/11/2007
CMS Luminosity
LSA deployment 366/11/2007
TIMING
ms Timing: APIs for events, event tables, telegrams
In place, preliminary tests performed
Client API In place
CBCM: Injection request API Waiting
Timing application: add, edit, load tables. Send events etc.
Version 1 in place
Transfer synchronization: pre-pulses - diagnostics
To be tested
Synchronized actuation/measurement Spec in place
CTG high level diagnostics and monitoring
BOBR/BSTLHC Timing section’s responsibility
LSA deployment 376/11/2007
Timing
Other stuff
LSA deployment 396/11/2007
MAD & FIDEL
LSA deployment 406/11/2007
On-line models
On-line Model
- Requirements spec- Implementation spec- Prototype in place (trim & knob generation)
FIDEL Prototype in place, magnet tests in progress
Aperture model Prototyping in progress
LSA deployment 416/11/2007
OM
LSA deployment 426/11/2007
Machine Sequencer Ongoing, many tests performed
Injection Sequencing Timing API in place – to be tested
State machine implementation First prototype in place.
Shot Data Analysis On hold
Exploitation
LSA deployment 436/11/2007
LSA deployment 446/11/2007
Specific Applications
Orbit, threading, closure etc. etc. Done and dusted
Multi-turn analysis, beating etc. Work in progress
Luminosity optimization et al Spec’ing
K-modulation SLAC
Collimator scans Work in progress
Measurement procedures: aperture, dynamic aperture, matching, scans
DEPLOYMENT AND TESTING
LSA deployment 466/11/2007
LSA deployment 476/11/2007
Individual system deployment
BPMs Crates as available: concentration etc. Now
BLMs Crates as available: concentration etc. Now
Stand alone BI systems
As available Now++
RF Slow control, settings, timing, monitoring as tests progress.
Collimators Track tests and system commissioning Now++
Kickers Control, timing, analog acquisition Now
Beam dump XPOC, track system commissioning (essentially passive).
Now
Core LSA as required
LSA deployment 486/11/2007
HWC shadowing
LSA: settings, trim Ramp, squeeze, experiments’ magnets, bumps, full parameter space
Power converters As implied in the above plus PM, monitoring etc. etc.
Magnets FIDEL as implied in the above
LSA deployment 496/11/2007
Dry injection - DecemberOptics As usual
Settings Power converters, RF, Kickers, Collimators, Bumps, injection point steering
FIDEL 450 GeV – decay, transfer functions
Timing BST, GMT, timing tables, events, telegrams, injection request, application, sequencer
Kickers Timing, control, analog acquisition
RF Pre-pulse
Standard facilities Mode, FD, logging, alarms
Collimators FSM, settings, monitoring
Screens Control, acquisition
BPMs, BLMs, WS, SRMs Event triggered acquisition,
Drive Injection sequence
LSA deployment 506/11/2007
Dry sector test
Drive full sector (cold magnets) through full operational cycle Large scale test of FIDEL, power converters, timing [QPS, EE, cryogenics, PIC, PM]
Extend to cover Beam instrumentation Collimators (if available) Kickers TDI LHCb …
Etc…
LSA deployment 516/11/2007
Conclusions
For a large part, the implementation of LSA functionality has been successfully performed.
Move to exploitation phase where we harness that functionality to meet LHC requirements
The requisite software needs to be deployed and tested over the coming months
Staged approached Individual systems HWC shadowing Dry runs
Injection Sector N*sector