LSA deployment 26/11/2007

Status LSA has been deployed:

LEIR SPS transfer lines: TT40, CNGS, TI8, TI2 Hardware Commissioning LHC power converter tests SM18

Database is in good shape Technology well established Core software in place, tested and deployed Looking forward towards the LHC…

Page 3: LSA Deployment for LHC

LSA deployment 36/11/2007

Requirements Core Functionality

Settings management etc. etc. as detailed

Equipment Instrumentation Measurements Operational exploitation Timing On-line Models

MADX, FIDEL, Aperture

Mode, data distribution Applied LSA applications

Orbit, luminosity scans etc.

Page 4: LSA Deployment for LHC

LSA Core in action

Page 5: LSA Deployment for LHC

LSA deployment 56/11/2007

Settings Management Complex Parameter Space

Momentum, Tune, Chromaticity, OrbitMagnet strengths, Multipole Errors, Decay,

Snapback..Power converter currents inc. nested tripletsKnobsKickers, Collimators, TDI…Spectrometer compensationCrossing angle Separation bumps

■ - at least partially addressed

Page 6: LSA Deployment for LHC

LSA deployment 66/11/2007

Settings management Injection plateau

Subset or all PCs Correctors for energy stability Multipole error compensation

Prepare ramp Incorporation Calculation of snapback depth, adjustment of ramp functions

Ramp Snapback, Stop Power Converters, RF, Collimators, Feedback

Squeeze Q,Q’, stop, adjust, continue, collimators, feedback

Feed-forward & Feedback From feedback systems From reference magnet systems

Page 7: LSA Deployment for LHC

LSA deployment 76/11/2007

Optics

• ramp and squeeze tests in all LHC IRs

• power converters in short circuit

• 7-8 for real

• Including running MAD, uploading optics etc

Page 8: LSA Deployment for LHC

LSA deployment 86/11/2007

Ramp

Page 9: LSA Deployment for LHC

LSA deployment 96/11/2007

Squeeze

Page 10: LSA Deployment for LHC

LSA deployment 106/11/2007

Squeeze

Page 11: LSA Deployment for LHC

LSA deployment 116/11/2007

FiDeL

Import of coefficients on to staging tables Extraction to LSA tables Invocation of FiDel@LSA to produce

Calibration curves Harmonic curves

Settings generation Injection/decay Ramp/snapback

Page 12: LSA Deployment for LHC

LSA deployment 126/11/2007

Settings Pre-cycle configuration and generation Injection plateau Standard LHC ramp

FiDeL deployed under LSA and tested: Transfer functions (Calibration curves) Static harmonics Decay Snapback & correction…

Page 13: LSA Deployment for LHC

LSA deployment 136/11/2007

Parameter space

Settings for dipole & correctors in terms of

• Momentum

• Strength

• Current

• Cn

Point to the two available power converters as necessary

Page 14: LSA Deployment for LHC

LSA deployment 146/11/2007

Decay

Page 15: LSA Deployment for LHC

LSA deployment 156/11/2007

Snapback – b3

Page 16: LSA Deployment for LHC

LSA deployment 166/11/2007

Snapback - current

Page 17: LSA Deployment for LHC

Equipment

Page 18: LSA Deployment for LHC

LSA deployment 186/11/2007

INJECTION KICKERS X X X X X X

BEAM DUMP X X X X X X

POWER CONVERTERS X X X X

COLLIMATORS X X X X X

RF X X X X X

LFB X X X X X

TFB X X X X

MAGNETS X X

MKQA X X X X

WARM MAGNETS X X X X

RADIATION MONITORS X X

SPECTROMETERS X X X

Ap

plic

atio

n

XP

OC

An

alo

gA

cqu

isit

ion

Ala

rms

So

ftw

are

Inte

rlo

cks

Cri

tica

lS

etti

ng

s

Po

stM

ort

em

Tim

ing

Page 19: LSA Deployment for LHC

LSA deployment 196/11/2007

Collimators & Absorbers Parameter space, functions and actual settings, trim (σ etc.) & drive in place plus application (c/o Stefano)

Beam Dump GUI -

Beam dump XPOC Spec out. V0.1 prototype in place

Power converters Parameter space, functions, actual settings, trim, drive in place and tested.

Radio Frequency V0.1 slow control application. Requirement spec in.

Longitudinal Feedback ditto

Transverse Feedback ditto

Injection Kickers V0.1 application in place

Q & aperture kicker, AC dipole -

EquipmentGeneric equip state and equip monitor in place

Page 20: LSA Deployment for LHC

Instrumentation

Page 21: LSA Deployment for LHC

LSA deployment 216/11/2007

Instrumentation

BPMs X X X 1

BLMs X X X X 1

BCT X 1

BTV X X X X 1

Rest Gas X X X X 3

Sync. Rad X X X X 1

Wire Scanners X X X 2

Luminosity X 1

Tune etc. X X X X 1

AGM X 2

Schottky X 2

Wall Current X 2

BST 1

Co

nce

ntr

ati

on

Set

tin

gs

Pri

ori

ty

Cri

tica

lS

etti

ng

s

Lo

gg

ing

Po

stM

ort

em

SW

Inte

rlo

cks

Sta

te

GU

I

Page 22: LSA Deployment for LHC

LSA deployment 226/11/2007

For all systems assume:

Fixed display standard unless otherwise stated

Logging Standard

SDDS Complex measurements Shot-by-shot data

Post Mortem Standard API Analysis tools – necessity driven

Standard fitting routines Work in progress

Page 23: LSA Deployment for LHC

LSA deployment 236/11/2007

Measurements

All measurements to be recorded together with measurement parameters

Standard facilities for display, browsing and analysis Archiving, references etc. Access for post-mortem, post-run analysis, web access

etc. Standard data format Interface to analysis tools

SDDS

Page 24: LSA Deployment for LHC

LSA deployment 246/11/2007

BLMLHC – Beam Loss Monitors

Concentration and re-publish Prototype in place

Threshold Management/ Database configuration Work in progress (Trim… Drive to crate.. management… MCS…

expert app)

Triggered acquisition of snapshot buffer Triggered acquisition of XPOC buffer Dedicated fixed display/application Expert Application Logging

Heavy filtering required, tests ongoing

Page 25: LSA Deployment for LHC

LSA deployment 256/11/2007

BPMLHC

Capture, CO, PM, FIFO, XPOC Capture, CO, FIFO

Concentration & re-publish done Capture – Multi-turn: write to SDDS done

Multi-turn application done Beta beating

Work in progress

Correction YASP – alive and kicking – actual trim

Real-time Work in progress APIs to LSA (Twiss, corrections, etc.)

Page 26: LSA Deployment for LHC

LSA deployment 266/11/2007

BQBBQLHC

Tune: FFT Continuous FFT PLL (Feedback)

Chromaticity Frequency modulation/PLL

V3 requirements spec in circulation (LAFS) Daemon mode

Page 27: LSA Deployment for LHC

LSA deployment 276/11/2007

Beam Loss Monitors acquisition & concentration Ongoing, deployed, tests

Beam Loss Monitors – display v2 Prototype

Beam Loss Monitors – detailed app. To spec

Beam Loss Monitors – MCS – configuration & tests Threshold tables in place, application to be done

Bunch Current Transformers acq & display BCTDCLHC & BCTFDLHC & BCTFRLHC

Fixed display in place

Instrumentation

Page 28: LSA Deployment for LHC

LSA deployment 286/11/2007

First beam in LHC

Page 29: LSA Deployment for LHC

LSA deployment 296/11/2007

Instrumentation

BPM: acquisition & concentration & publish V0.1 in place

BPM: trajectory display Proto in place

BPM: trajectory and orbit correction YASP

BPM: multi-turn analysis V1 in place

BPM: beta beating analysis Work in progress

BPMDLHC - dump line BPM -

BPMITLHC – interlocked BPMs -

BTVI/BTVMLHC Screens (matching monitors) Extension of existing

Page 30: LSA Deployment for LHC

LSA deployment 306/11/2007

Instrumentation

Radmon – acq –conc - display proto done

BQHTLHC – head-tail Chromaticity BI

BSRALHC Abort gap monitor

BSRTFLHC/BSRTSLHC Synchrotron radiation monitors

LAFS – first version in place

BGILHC – Rest Gas Monitor LAFS

BWSLHC Wire Scanner LAFS – first version in place

Wall Current Monitors (RF)

BQSLLHC - Schottky LAFS - specification

BRASCLHC/BRASGLHC - Luminosity monitors

Page 31: LSA Deployment for LHC

LSA deployment 316/11/2007

LHC BLM concentrator & display

Page 32: LSA Deployment for LHC

LSA deployment 326/11/2007

Synchrotron radiation monitors

Page 33: LSA Deployment for LHC

LSA deployment 336/11/2007

Wire scanner

Page 34: LSA Deployment for LHC

LSA deployment 346/11/2007

BPM Concentration

Page 35: LSA Deployment for LHC

LSA deployment 356/11/2007

CMS Luminosity

Page 36: LSA Deployment for LHC

LSA deployment 366/11/2007

TIMING

ms Timing: APIs for events, event tables, telegrams

In place, preliminary tests performed

Client API In place

CBCM: Injection request API Waiting

Timing application: add, edit, load tables. Send events etc.

Version 1 in place

Transfer synchronization: pre-pulses - diagnostics

To be tested

Synchronized actuation/measurement Spec in place

CTG high level diagnostics and monitoring

BOBR/BSTLHC Timing section’s responsibility

Page 37: LSA Deployment for LHC

LSA deployment 376/11/2007

Timing

Page 38: LSA Deployment for LHC

Other stuff

Page 39: LSA Deployment for LHC

LSA deployment 396/11/2007

MAD & FIDEL

Page 40: LSA Deployment for LHC

LSA deployment 406/11/2007

On-line models

On-line Model

- Requirements spec- Implementation spec- Prototype in place (trim & knob generation)

FIDEL Prototype in place, magnet tests in progress

Aperture model Prototyping in progress

Page 41: LSA Deployment for LHC

LSA deployment 416/11/2007

OM

Page 42: LSA Deployment for LHC

LSA deployment 426/11/2007

Machine Sequencer Ongoing, many tests performed

Injection Sequencing Timing API in place – to be tested

State machine implementation First prototype in place.

Shot Data Analysis On hold

Exploitation

Page 43: LSA Deployment for LHC

LSA deployment 436/11/2007

Page 44: LSA Deployment for LHC

LSA deployment 446/11/2007

Specific Applications

Orbit, threading, closure etc. etc. Done and dusted

Multi-turn analysis, beating etc. Work in progress

Luminosity optimization et al Spec’ing

K-modulation SLAC

Collimator scans Work in progress

Measurement procedures: aperture, dynamic aperture, matching, scans

Page 45: LSA Deployment for LHC

DEPLOYMENT AND TESTING

Page 46: LSA Deployment for LHC

LSA deployment 466/11/2007

Page 47: LSA Deployment for LHC

LSA deployment 476/11/2007

Individual system deployment

BPMs Crates as available: concentration etc. Now

BLMs Crates as available: concentration etc. Now

Stand alone BI systems

As available Now++

RF Slow control, settings, timing, monitoring as tests progress.

Collimators Track tests and system commissioning Now++

Kickers Control, timing, analog acquisition Now

Beam dump XPOC, track system commissioning (essentially passive).

Now

Core LSA as required

Page 48: LSA Deployment for LHC

LSA deployment 486/11/2007

HWC shadowing

LSA: settings, trim Ramp, squeeze, experiments’ magnets, bumps, full parameter space

Power converters As implied in the above plus PM, monitoring etc. etc.

Magnets FIDEL as implied in the above

Page 49: LSA Deployment for LHC

LSA deployment 496/11/2007

Dry injection - DecemberOptics As usual

Settings Power converters, RF, Kickers, Collimators, Bumps, injection point steering

FIDEL 450 GeV – decay, transfer functions

Timing BST, GMT, timing tables, events, telegrams, injection request, application, sequencer

Kickers Timing, control, analog acquisition

RF Pre-pulse

Standard facilities Mode, FD, logging, alarms

Collimators FSM, settings, monitoring

Screens Control, acquisition

BPMs, BLMs, WS, SRMs Event triggered acquisition,

Drive Injection sequence

Page 50: LSA Deployment for LHC

LSA deployment 506/11/2007

Dry sector test

Drive full sector (cold magnets) through full operational cycle Large scale test of FIDEL, power converters, timing [QPS, EE, cryogenics, PIC, PM]

Extend to cover Beam instrumentation Collimators (if available) Kickers TDI LHCb …

Etc…

Page 51: LSA Deployment for LHC

LSA deployment 516/11/2007

Conclusions

For a large part, the implementation of LSA functionality has been successfully performed.

Move to exploitation phase where we harness that functionality to meet LHC requirements

The requisite software needs to be deployed and tested over the coming months

Staged approached Individual systems HWC shadowing Dry runs

Injection Sector N*sector