Upload
jb10
View
17
Download
0
Embed Size (px)
DESCRIPTION
Low Voltage MDI meter
Citation preview
5/21/2018 LT (CE 17 01)
1/2
THREE PHASE
FOURWIRE
ELECTRONIC
ENERGYMETER
CREATIVE ELECTRONICS (PVT) LTD
OFFICE & WORKS
Www.creative.com.pk
Creative Electronics Pvt LtdPlot # 476,Sundar Industrial Estate
Raiwind,Lahore(Pakistan)
35298601-3Ph: (92-42)
Three Phasefourwire connection.
3230/400V50Hz5(10)A
10000impulse/kWh, 10000impulse/kvarh
Specification complies with WAPDAstandard and with the Internationalstandard IEC 62052 for class 1, staticenergy meters
Tempering information along with dateandtime stamp is recorded
Works under individual phase failure andr e c or d s A c t i ve , R e a ct i v e e n e rg i e sconsumedcorrectly evenon low voltage.
All electronic design without any movingparts.
Micro-processor based using advancedtechnology for higher accuracy, reliability,programming flexibility and upgradeability.
Built-in power linetransient protection.
High frequency sampling to maintainaccuracy even with distorted line voltageand current.
Ideal for Commercial and Industrialenergy meteringrequirements
Zero reset-able for periodic energymanagement.
Independent of mounting style/orientation
Not effectedby partial orfully earthedload
Not effectedby magnetictampering.
OPENED indication on the LCD in case of
MeterTopCoverOpening.
FEATURES
STATIC MULTI RATE 3 PHASE (T.O.U) ENERGY METER
1 00 00 i mp /k va rh 1 00 00 i mp /k Wh
LTClass: 2.0 Class: 1.0
3 X 230 / 400 V
3 X 5(10) A 50HZ YEAR
P.O. NO.:
Sr. No.
Warranty upto
CREATIVE ELECTRONICS PVT LTD
DISCO
MADE IN PAKISTAN
MODELCE-17-01 YEAR 2014
STATIC MULTI RATE 3 PHASE (T.O.U) ENERGY METER
10000 imp/kvarh 10000 imp/kWh
LTClass: 2.0 Class: 1.0
3 X 230 / 400 V
3 X 5(10) A 50HZ YEAR
P.O. NO.:
Sr. No.
Warranty upto
CREATIVE ELECTRONICS PVT LTD
DISCO
MADE IN PAKISTAN
MODEL CE-17-01 YEAR 2014
5/21/2018 LT (CE 17 01)
2/2
Date
TIME OF USE
A
B
C
D
SEASON T1 T2
1st December - End Feb.
1st March - 31st May
1st June - 31st August
1st September - 30th Nov.
17-21
18-22
19-23
18-22
21-17
22-18
23-19
22-18
(Peak Hours) (Off Peak Hours)
* Press upper scrolling button for 3sec to enter in ALTERNATE MODE.
Multiplying factorFor actual reading use the following Formula:
Actual Reading =Reading on LCDX (CTRatio)e.g. For 100/5CT, CTRatio is 20
LCDReading is 10kWh
Actual Reading =10 X (20) =200 kWh
:
CODE: A0.01(20)
RAM self diagnose failure
Info flash diagnose failure
Flash self diagnose failure
FRAM self diagnose failure
1st EEPROM self diagnose failure
2nd EEPROM self diagnose failure
00000001
00000010
00000100
00001000
00010000
00100000
CODE: E0.01(19)
Error Description Error Code
1st EEPROM Fai lure 00000100
2nd EEPROM Failure 00001000
000011001st EEPROM &2nd EEPROM Failure
ERRORS & CODES
CODE: A0.02(21)
Under VoltageOver Voltage
Reverse Energy
Phase/Line Exchange
Bypass
Reverse Phase Sequence
Demand Overload
0000000100000010
00000100
00001000
00010000
00100000
01000000
CODE: A0.03Un-Programmed Meter 10000000
TotalAverage P.F of Prev 1 Month
Tariff 1 Average P.F of Prev 1 Month
Tariff 2 Average P.F of Prev 1 Month
TEST MODE
** In ALTERNATE MODE Press upper scrolling button for 3sec toenter in TEST MODE.
*
**
1.
2.
3.
NORMAL MODE ALTERNATE MODE ALTERNATE MODE
No.1.
2.
3.