Lunar Reconnaissance Orbiter Flat Sat Michael Wright NASA Goddard Space Flight Center Flight Systems Integration & Test https://ntrs.nasa.gov/search.jsp?R=20080040717 2020-04-05T23:36:43+00:00Z

Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

Lunar Reconnaissance Orbiter Flat Sat

Michael Wright NASA Goddard Space Flight Center

Flight Systems Integration & Test

https://ntrs.nasa.gov/search.jsp?R=20080040717 2020-04-05T23:36:43+00:00Z

Page 2: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

FlatSat Purpose

Allows early ITOS proc & procedure development for I&T and flight ops - Development of functionallinterface tests, CPT, and other system-level tests

- Procedure validation

Preliminary hardwarelsoftware verifications can be performed with ETU's

Platform for system-level testing of flight software

Platform for troubleshooting during flight I&T

Testbed for personnel training (engineers, test conductors, technicians)

Post-launch flight ops support (following delivery to MOC after launch)

Flatsat provides substantial risk reduction for I&T,

and for flight operations

Page 3: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

Facility Requirements

ESD Control - Room modifications (e.g., floor stripping)

- Certified ESD benches and equipment

- Personnel certifications (IAW NASA-STD-8739.7)

Cleanliness - Lab: Standard cleanliness

General cleanliness implemented IAW LRO Contamination Control Plan

Weekly cleaning and garment change-out by CC personnel

Periodic monitoring by QA to ensure cleanliness is maintained

- Bench: Visibly clean Periodic cleaning by CC personnel, as required

Power - Facility 1 101208, with UPS backup - Outlets and ground plate added to existing room

Page 4: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

LRO FlatSat Lab (Bldg 5, Rm W050)

(Room Dims: Approx 21 x 23 ft.) ' - N

(ESD Contrd Area)

* - - *

Page 5: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

Flatsat Component Diagram

Page 6: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

Flat Sat Functional Configuration

r > FLATSAT Table

--

PSE Transient Componets .- I SWCIII Y w m I I I T " s

mmwer,Pa . -

ACS Compnenta I

\ -- f CLDH

I Ka b o d Simulator ETU I

-

PDE W - l m d m

&,(NqlwPmt &.-lrplw 2 m-,ip*w, IIM.*WWI

, I I I 2 , ~ W a u l Mow.?-

-- --

Umbica DPC P o w r

PGSE Double Rack

ACS Component

LO&

Soar Array P w r

Battery Simulaton

LO& Smulat~on

E-NET BOrl m smCw Simulator

Load SlmulaLor

L M S Hlgh Rate I 6 0 Channel Data

Command CloskS Data

Telemetry Data 2 Mbps Max

4 60~10es Avaable

LAMP lnrtrument Slmulatlon

- .

GDS #5

Transient GSE I

MAC Analog Inputs

7 PPS

4 PDE lntertace DeployatMm

( Umbilical 1 Front End Rack I

I s~mulata Box I

ITOS IHlgh Data Rate Sewerl

PC1 Cda I (CMDLTLUlmtencc) t

S1mulalad1553 Bur 4 llntrument ntc- 1

Page 7: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

FlatSat Plate Layout (Typical)

Page 8: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

Operational Documentation

Released drawings for Flatsat components Approved WOA's and procedures ITOS scripts and procedures Logbooks - Test conductor logbook - Mateldemate logbook

As-run archives Problem reporting - Problem records for minor anomalies - Problern/Failure Reports (PIFR's) for major

problems Configuration Change Requests/Notices - For changes to delivered hardwarelsoftware - For changes to Flatsat system

Page 9: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

Facility Scheduling

FlatSat schedule based on initial inputs from deliverable providers

Use of facility for use of lab prescheduled through Lab Manager - Use of online scheduling system - For subsystem, instrument, and system-level testing - For GSE and facility work

Changes to schedule tracked on a daily basis

Schedule coordinated with project schedule, I&T manager, and systems engineering

Page 10: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

Typical FlatSat I&T Schedule

.a - - , 3 : .

,. ,,# . .,.:, . 1, - .,. 0 '

, ,,: . -.>,.. ,,, ........ (.I - .. " I . '

* / - , .s . ',I - . ',. I , - ,... I , ' ,.('

. . a . - ,..a

8 , - , i s

. ,: . .I(. '

. . . . . . ) / , '. .

# > .. , , .,, .. ,.,,< $ 8 , .. ,. t

. ,*, .. ( $ 8 . . . . . 0 , ...... , J S l .1 . . .,! -1 .< , ( .

. .a3 ., .. L:

. i > , -1 .. 8 . '

, x , ., - .. ' <.I ., .i.

. ,,: .; .,* ,

. , , z ., -, , I , -1 L 1 : .

. 51, - 7 ..t! '

, .,. .> ,,:~ . ,,t - 3 ;<.. , . I . I , . . . .

1, -7 .'.. ' ,, ., .'.<

, 5 , .: a <

. , I , . . . I , ?

,:,?.w, u...:*: ,........ ............ . . , . , . , . a,* .,A .. P ..... .T 38 .: ,.- 3

' 2 % ;.LC>-: .!,,I L ,.,*qd:., ::tt ., 2 3 , ,: ,. 7

' ?, ,.z.s tr1:c. ,. L * L : , i,, ' I . . ..... " 1 : .............................. , - . . : !,.-: 11.1 1..;1'1 C. -,.i l,. ' 1 1%. ,, .. - < , '

,: t>,:, . !.$.,*, .-- ' .,, s7 . . . . . . . . .

Page 11: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

Deliverables

Furniture: workstations, lab benches, cabinets Harness Mounting plates GSE: Solar Array Sim., Goddard Dynamic Sim., C&DH ITOS (ground station) workstations Scripts and displays I&T procedures Subsystem ETU's: C&DH, PSE, PDE, Gyro, ST, RWA, RF Flight Software w/ C&T database Instrument ETU's & Simulators Transient GSE: ACS, RF, timing, instruments

Page 12: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

Flatsat Cost Mitigating Factors

Facility - Temporary, so space and comfort not as critical - Flatsat system planned for relocation to Mission Ops Control Center

ETU's and Simulators - Designed to support only one mission (i.e., not like HST or STS) - ETU "loaners" only required for short-term (from vendors, other projects)

GSE - Some required anyway for flight I&T and as spares (e.g., RF GSE) - Some used for multiple-project support (e.g., DVM's, scopes) - Some acquired from previous projects (UPS, racks, tools)

Furniture - Not required for long-term use - Most obtained from excess (desks, chairs, shelves, conference table)

Page 13: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

Current Configuration

Page 14: Lunar Reconnaissance Orbiter Flat Sat - NASA · Issues & Lesson Learned Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations

Issues & Lesson Learned

Institutional support and available facilities were limited for LRO Flatsat - Due to limited budget and allocations previously assigned to other high-priority

projects. - More intra-center support and earlier communication regarding facility and support

requirements is recommended.

Some Flatsat I&T occurred in parallel with subsystem development and flight I&T - Projects in general should plan & arrange for more robust support to parallel operations.

Flatsat ETU's and GSE were occassionally deintegrated from Flatsat for use in development labs - Although unanticipated troubleshooting may require high-fidelity units, the impacts of

removing elements from the system testbed environment must be hl ly assessed by systems engineering.

- However, having multiple ETU's to support in parallel both subsystem development and Flatsat system-level testing was an advantage.

Concurrent requests for lab use and delays in ETU deliveries resulted in lab scheduling challenges - Having a centralized scheduling system, and resident lab manager for real-time

rescheduling, facilitated effective lab utilization.