City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

2  

Lyndale Drive Retaining Wall Study Public Meeting Registration: 6:00 - 6:30 Presentation and Discussion: 6:30 - 8:30 pm Tuesday, February 2nd, 2016

Page 2: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

3  

Welcome

Thank you for attending tonight’s public meeting for the Lyndale Drive

Retaining Wall Study. This meeting is intended to provide you with a greater

understanding of the project, to facilitate group discussions, and to hear back from the community on possible study outcomes.

Page 3: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

4  

Project Manager: Cam Ward, City of Winnipeg

Consultant Team: James Blatz, TREK Geotechnical Michael Van Helden, TREK Geotechnical Bill Ebenspanger, Morrison Hershfield Glen Manning, HTFC Planning & Design Maureen Krauss, HTFC Planning & Design Rachelle Kirouac, HTFC Planning & Design

Introductions

Page 4: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

5  

Project Process & Timeline

Public Meeting #1 February 2016

Develop preferred option taking public input into consideration

Preliminary Cost Estimates March 2016

Public Event #2 Review Conceptual Design

April 2016

Final Preliminary Design Report

May 2016

Data Collection and Assessments

January 2016

Study Commencement December 2015

City of Winnipeg Review Period

Page 5: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

6  

1.  Study Background 2.  Primary Study Considerations

-  Guiding factors in determining study outcomes

3.  Riverbank Stability Explained -  Geotech 101

4.  Possible Outcomes - What can be done?

5.  REFRESHMENT BREAK 6.  Facilitated Discussion Tables

- Conversation tables to discuss possible outcomes and receive input

6. Summary of Presentation and Discussion Table Input

 

Tonight’s Agenda

Page 6: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

7  

The section of Lyndale Drive between Claremont Avenue and Gauvin Street has had a history of riverbank instabilities. Ongoing riverbank movements and deterioration of the retaining wall pose a risk to the road, dike, sewers, and other infrastructure at the top of the riverbank.

Study Background

Tac

he

Ave

Mo

nck

Ave

Cra

wfo

rd A

ve

Ch

and

os

Ave G

auvin St

Lyndale Cla

rem

on

t A

ve

Drive

EXISTING TIMBER RETAINING WALL

St. Mary's Rd

RED RIVER

Page 7: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

8  

Existing Conditions:

Study Background

Page 8: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

9  

Lyndale  Drive  –  Road  failures     Exis=ng  Timber  Retaining  Wall  

Page 9: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

10  

•  Riverbank Stabilization

•  Safety and Accessibility

•  Bikes and Pedestrians

•  Local Traffic and Parking Impacts

•  Cost

•  Construction Process (road blockages, traffic etc)

•  Maintenance (snow clearing, mowing, trash pick-up)

•  Appearance (Plantings, Materials, Views)

•  Environmental Impacts

Primary Study Considerations

Page 10: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

11  

Riverbank Stability Explained – Geotech 101

BoGom  of  Slope  at  Red  River   Lyndale  Drive  Riverbank  

Page 11: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

12  

2013 Riverbank Instability – Monck to Tache

APRIL 2013 Pavement Cracks Appeared

Page 12: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

13  

2013 Riverbank Instability – Monck to Tache

APRIL 2013 Pavement Cracks Appeared

“Head Scarp” for riverbank instability that initiated the movement

Page 13: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

14  

2013 Riverbank Instability – Monck to Tache

APRIL 2013 Pavement Cracks Appeared

Page 14: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

15  

Retaining Wall

Clay (Weak Soil)

Till (Strong Soil)

Stable Slope Angle

Riverbank Stability Explained

Page 15: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

16  

Clay (Weak Soil)

Till (Strong Soil)

Erosion eats away soil near shoreline

Riverbank Stability Explained

Page 16: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

17  

Clay (Weak Soil)

Till (Strong Soil)

Unstable: Slope angle becomes steeper than the stable

slope angle

Riverbank Stability Explained

Page 17: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

18  

Clay (Weak Soil)

Till (Strong Soil)

Riverbank Instability: Imbalance in forces causes the

riverbank to move

Riverbank Stability Explained

Page 18: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

19  

Clay (Weak Soil)

Till (Strong Soil)

Riverbank Instability: Imbalance in forces causes a

“slide mass” to move Steep Drop “Head Scarp”

Toe Bluge “Upthrust”

“Physics” of Riverbank Stability

Page 19: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

20  

Clay (Weak Soil)

Till (Strong Soil)

Riverbank movement can cause wall movement if not addressed

Wall movement

Riverbank Stability Explained

Page 20: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

21  

Clay (Weak Soil)

Till (Strong Soil)

“Retrogression” is when the head scarp moves farther from river

Riverbank Stability Explained

Page 21: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

22  

Topic 1: Riverbank Stabilization

Possible Outcomes

Page 22: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

23  

Clay (Weak Soil)

Till (Strong Soil)

Fill Placement Steepens Slope Angle Reduces Stability

Riverbank Stabilization

Page 23: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

24  

Clay (Weak Soil)

Till (Strong Soil)

Fill Placement Steepens Slope Angle Reduces Stability

Riverbank Stabilization

Page 24: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

25  

Clay (Weak Soil)

Till (Strong Soil)

Soil Removal (from top of bank) “Offloads” the riverbank, flattens the slope angle

Improves Stability

Riverbank Stabilization

Page 25: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

26  

Clay (Weak Soil)

Soil Removal (from top of bank) “Offloads” the riverbank, flattens the slope angle

Improves Stability

Riverbank Stabilization

Page 26: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

27  

Clay (Weak Soil)

Till (Strong Soil)

Rockfill Columns or Shear Keys strengthen the soils

Steepens the “stable” slope angle Improves stability

Riverbank Stabilization

Page 27: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

28  

Clay (Weak Soil)

Till (Strong Soil)

Rockfill Columns or Shear Keys strengthen the soils

Steepens the “stable” slope angle Improves stability

Drill out weak soil

“Key in” to strong soil

Riverbank Stabilization

Page 28: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

29  

Clay (Weak Soil)

Till (Strong Soil)

Rockfill Columns or Shear Keys strengthen the soils

Steepens the “stable” slope angle Improves stability

Backfill and Compact Strong Soil (i.e. Gravel / Rockfill)

Riverbank Stabilization

Page 29: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

30  

Clay (Weak Soil)

Till (Strong Soil)

Rockfill Columns or Shear Keys strengthen the soils

Steepens the “stable” slope angle Improves stability

Rockfill adds strength

Riverbank Stability Explained

Page 30: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

31  

Clay (Weak Soil)

Till (Strong Soil)

Rockfill Columns or Shear Keys strengthen the soils

Steepens the “stable” slope angle Improves stability

Slope Becomes Stable

Riverbank Stability Explained

Page 31: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

32  

2013 Emergency Stabilization between Monck and Tache

Rockfill Column Construction

Page 32: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

33  

2013 Emergency Stabilization between Monck and Tache

Rockfill Column Construction

Page 33: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

34  

2013 Emergency Stabilization between Monck and Tache

Rockfill Column Construction

Page 34: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

35  

2013 Emergency Stabilization between Monck and Tache

Rockfill Column Construction

Page 35: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

36  

Potential Solutions  

•  Offload or flatten slope

–  Move wall towards the road

–  Replace soil with lightweight materials

•  Strengthen the slope

–  Rockfill columns

–  Eliminate Retaining Wall

•  New stronger wall

Riverbank Stability Improvement Along Lyndale

Page 36: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

37  

Topic 2: Transition Concepts

Possible Outcomes

Page 37: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

38  

Concept 1: Landscape Wall

Segmental Block Retaining Wall

45° Green Wall

Transition Concepts

Page 38: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

39  

hGp://www.pondnpa=o.com/hardscaping.htm   hGp://nilex.com/sites/default/files/Nilex-­‐Presenta=on-­‐TAC-­‐2014-­‐Suppor=ng-­‐Highway-­‐Infrastructure-­‐on-­‐the-­‐Canadian-­‐Landscape.pdf  

Concept 1: Landscape Wall Segmental Block Retaining Wall

45° Green Wall

Transition Concepts

Page 39: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

40  

Concept 2: Structural Retaining Wall

Transition Concepts

Page 40: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

41  

Transition Concepts

City of Winnipeg Standard Handrail

hGps://www.google.ca/maps/@49.8719215,-­‐97.1248237,3a,75y,216.94h,86.22t/data=!3m6!1e1!3m4!1sEuj3-­‐DXghnD4AMa-­‐CLlH4g!2e0!7i13312!8i6656  

Page 41: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

42  

Concept 3: Vegetated Slope

Transition Concepts

Page 42: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

43  

Topic 3: Pedestrians and Cyclists

Possible Outcomes

Page 43: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

44  

Concept 1: Shared Pedestrian and Cyclist Path

hGps://parkwaystogreenways.wordpress.com/truman-­‐parkway/  

Pedestrians and Cyclists

Page 44: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

45  

Concept 2: Shared Vehicle and Cyclist Roadway

hGp://www.thestar.com/news/gta/2014/08/06/toronto_officials_not_separa=ng_adelaide_bike_lane_despite_council_vote.html  

Pedestrians and Cyclists

Page 45: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

46  

**REFRESHMENT BREAK**

Page 46: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

47  

•  Pedestrian Safety / Handrails

•  Lower Bank Trail - access to and use of the lower bank

•  Crime prevention through Environmental Design

•  Location and type of pedestrian and cycling pathways

•  Landscaping

•  Impacts on Lyndale Drive width and parking considerations

•  Sunday closures, Manitoba Marathon

Things to think about:

Page 47: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

48  

DISCUSSION TABLES

Page 48: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

49  

PRESENTATION SUMMARY AND REVIEW OF GROUP

DISCUSSIONS

Page 49: Lyndale Drive Retaining Wall Study - Winnipeg · Lyndale Drive Retaining Wall! February 2, 2016!! 3 Welcome"! Thank you for attending tonight’s public meeting for the Lyndale Drive

City of Winnipeg���Preliminary Engineering Study for

Lyndale Drive Retaining Wall February 2, 2016

50  

Thank you for your attendance this evening