3
SunRail Transit Oriented Development Workshop Sketchbook 53 Sanford Lake Mary Longwood Winter Park Florida Hospital Maitland Altamonte Springs Lynx Central Meadow Woods Osceola Parkway Kissimmee Poinciana Orlando/Amtrak Sand Lake Road Church Street DeLand DeBary LYNX CENTRAL TOD CONCEPT The addition of SunRail to the LYNX Central Station is the next step in the evolution of downtown Orlando’s Central Business District and main transit hub, supporting area infill and redevelopment, stimulating job creation and investment, and strengthening connections between downtown and the region. The addition of SunRail increases the existing station’s transit capacity and activity, supporting the many existing and proposed uses in the area including the Orange County and Federal Courthouses, Amway Center, the “Creative Village” development to the west, and the 5.64 acre “400 North Orange” development proposed immediately to the east with 350 hotel rooms, a 25,000 sq. ft. conference center, 600,000 sq. ft. of office, 50,000 sq. ft. of retail, and 400 residential units. Area parking structures will be set back from the station to allow development closest to the platform. The historic grid of streets will be augmented by pedestrian improvements that will facilitate connection and crossings of N. Orange Avenue and under Interstate 4. Potential desirable next steps include careful coordination with the City of Orlando, area developers, and the Florida Department of Transportation to assure that projects complement one another and create pedestrian friendly streets. Artist’s rendering looking west towards LYNX Central Station, Interstate 4, and Creative Village.

LYNX CENTRAL TOD CONCEPT - SunRailcorporate.sunrail.com/wp-content/uploads/2014/11/TOD-Sketchbook-2...LYNX CENTRAL TOD CONCEPT The addition of SunRail to the LYNX Central Station is

Embed Size (px)

Citation preview

Page 1: LYNX CENTRAL TOD CONCEPT - SunRailcorporate.sunrail.com/wp-content/uploads/2014/11/TOD-Sketchbook-2...LYNX CENTRAL TOD CONCEPT The addition of SunRail to the LYNX Central Station is

S u n R a i l T r a n s i t O r i e n t e d D e v e l o p m e n t W o r k s h o p S k e t c h b o o k53

Sanford

Lake Mary

Longwood

Winter ParkFlorida Hospital

Maitland

Altamonte Springs

Lynx Central

Meadow Woods

Osceola Parkway

KissimmeePoinciana

Orlando/Amtrak

Sand Lake Road

Church Street

DeLand

DeBary

LYN

X C

ENT

RAL

TOD

CO

NC

EPT

The addition of SunRail to the LYNX Central Station is the next step in the evolution of downtown Orlando’s Central Business District and main transit hub, supporting area infill and redevelopment, stimulating job creation and investment, and strengthening connections between downtown and the region.

The addition of SunRail increases the existing station’s transit capacity and activity, supporting the many existing and proposed uses in the area including the Orange County and Federal Courthouses, Amway Center, the “Creative Village” development to the west, and the 5.64 acre “400 North Orange” development proposed immediately to the east with 350 hotel rooms, a 25,000 sq. ft. conference center, 600,000 sq. ft. of office, 50,000 sq. ft. of retail, and 400 residential units.

Area parking structures will be set back from the station to allow development closest to the platform. The historic grid of streets will be augmented by pedestrian improvements that will facilitate connection and crossings of N. Orange Avenue and under Interstate 4.

Potential desirable next steps include careful coordination with the City of Orlando, area developers, and the Florida Department of Transportation to assure that projects complement one another and create pedestrian friendly streets.

Artist’s rendering looking west towards LYNX Central Station, Interstate 4, and Creative Village.

Page 2: LYNX CENTRAL TOD CONCEPT - SunRailcorporate.sunrail.com/wp-content/uploads/2014/11/TOD-Sketchbook-2...LYNX CENTRAL TOD CONCEPT The addition of SunRail to the LYNX Central Station is

54LY

NX

CEN

TRA

L TO

D S

TAT

ION

CO

NC

EPT

LYNX Central TOD Station Concept

TransitTransit StationParkingBus Drop-off

Urban FormActive Building EdgeProposed BuildingsProposed Parking Structure

Areas of ChangeMixed-UseCreative Village Concept Plan

Parks and Open SpaceTransit PlazaParkLandscape Buffer

Access and ConnectivityPedestrian and Street EnhancementsNew Street Connection

Crossing ImprovementsImproved Underpass CrossingLYMMO Circulator Proposed Pedestrian and Bike ConnectionSunRail

TP

B

B

P

P

PP

PPPPPPPPPPPPPPPPPPPPPPPPPPP

P

P

PPPPPPPPPPPPP

T

1111/////44444 mmmmm

iiiillleee

::: 5555mmmiinnuutteeewwwwaaaalllkkkkk

6660000000 f

ODDDpppppriiiooo

StStStSSaatttt

ee StSttS

.

WWWWW. CoCoCoCConcncnncooorrrd d d StStStSt. ..

To E

xist

ing

Nei

ghbo

rhoo

ds

To F

utur

e Cr

eativ

e Vi

llage

N.

N.

NN OO OOO

rararararangngngngng

e e eeAAAAvvvvvAAAAAA

e.e.eeeWWWWWWWWWWWWWWWWWW LLLL vvvvvvvviv ggggggggggggggggggssss. LiLiLiLiLiLiLiiivvvvvvvivivvviv ngngngngngngnggnggnggsssssss. vLiv gngstttttttttttttttttttttooooo SSSSSttt....onononononononnnnnn S SS S S S SS S S ttttt.t.t.t.t.ttttnn tSt

WWWWWWWWWWWWWWWWWWWWWWWWWWWWW........ .. ... AmAmAmAmmAmAmAmAmmAmAmAmAmAmmAmAmAmmAmAmAmAmAmAmAmAmAmAmAmmAmmAmmmmmmmmmmmeleleleleleeleleeleleeleeeleeeeeeeeelleeeeeeeeee iaiaiaiaiaiaiaiaaiiaiaaiaiaiiaaiaiaaiaaaiaaaaaaaaaiaaaa SSSSS SSSSS SSS SSSSS SSS SS S ttttttt.tttttt.t.t.ttttttttttttt.t.ttttt.tAA eme aia tSt

To Church Street Station

To Florida Hospital Station

0 200 400

WWWWW. RRRRobobobobininininsososososon n n n n StStStStSt....t N.

NNN MMMM

agagagagagnononono

lilila a aaAAAAAAvvvvvAAAAA

e.ee.

N.

N GGGG

eeeN

GN

Grrt

rtruddududd

e ee AAAA

vvvvvAAAAAeeeee

4

OrOrOrOranananangegegegee CoCoCoCoununununntytytytyty

thththouououssesess

LLYNYYNXXXLLL

4

NN.

NN G G

araalalal

ndndnddd AAA

vvAAAee

N.

N.

N.

N. RRRR

ososososalalalala

ininindd ddd

AAAAAvvvvvAAAAAAAAAe.e.

N.

N. MM

agagnono

ililaa AAA

vvvvAAAAAAee.e.e.e

Hu

Huug

hghghghgheeeeey

y y yAAAAvvvvAAAA

e.e..ee.

B

B

Traffic Calming

P

P

P

Page 3: LYNX CENTRAL TOD CONCEPT - SunRailcorporate.sunrail.com/wp-content/uploads/2014/11/TOD-Sketchbook-2...LYNX CENTRAL TOD CONCEPT The addition of SunRail to the LYNX Central Station is

S u n R a i l T r a n s i t O r i e n t e d D e v e l o p m e n t W o r k s h o p S k e t c h b o o k55LY

NX

CEN

TRA

L TO

D N

EXT

STEP

S

Lynx Central is strategically located to serve key redevelopment station parcels immediately adjacent to the station and “Creative Village” to the west, on the other side of I-4. The station is one of two downtown scale TODs on the SunRail corridor and planned to be the second most intensively developed station on the system. The City of Orlando’s Downtown Development Board (DDB), as the agency responsible for the revitalization of the City’s core area, has the tools, staff and experience to leverage the coming of SunRail. Capitalizing on these key sites underscores the importance of following the TOD Principles presented earlier in the report. Next steps so the development is truly a TOD include:

• Linking the station and the development in a spectacular manner - paying careful attention to pedestrian flows, active ground floor uses and a quality pedestrian realm through the site to help assure success.

• Assuring development is transit-supportive in terms of parking, density, mix and building orientation.• Moving to transit-friendly parking ratios on both sites to help leverage access to SunRail. District parking,

a technique which allows phasing and reducing parking over time, may be quite appropriate here. • Creating a product mix and design for the two planned developments that takes advantage of the location,

which can be a win-win.• Traffic calming and enhanced pedestrian connections on Livingston Street under I-4 to expand the influence

area of the station.

Aerial photo of existing conditions.