78
Richard Rivkin President & CEO of Saf-T-Gard International, Inc. Northbrook Illinois OSHA Regulations and ASTM Specifications for the Inspection, Testing and Care of Rubber Insulating Products

M nspection, ber cts

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: M nspection, ber cts

Richard RivkinPresident & CEO of Saf-T-Gard International, Inc. Northbrook Illinois

OSHA Regulations and ASTM Specifications for the Inspection,

Testing and Care of Rubber Insulating Products

Page 2: M nspection, ber cts

The Power of ELECTRICITY

ELECTRICITY KILLS!

Page 3: M nspection, ber cts

SHOCKING News

Page 4: M nspection, ber cts

SHOCKING News

Page 5: M nspection, ber cts

SHOCKING News

Page 6: M nspection, ber cts

SHOCKING News

Page 7: M nspection, ber cts
Page 8: M nspection, ber cts

SHOCKING News

Page 9: M nspection, ber cts

Electrical Burns Are SERIOUS

Entrance Wound

Page 10: M nspection, ber cts

Electrical Burns Are SERIOUS

Exit Wound

Page 11: M nspection, ber cts

OSHA Regulations and ASTM

Page 12: M nspection, ber cts

Type of Equipment When to TestRubber insulating line hose Upon indication that insulating value is suspect

and after repair.Rubber insulating covers Upon indication that insulating value is suspect

and after repair.Rubber insulating blankets Before first issue and every 12 months thereafter.

1 upon indication that insulating value is suspectand after repair.

Rubber insulating gloves Before first issue and every 6 months thereafter. 1 upon indication that insulating value is suspectand after repair.

Rubber insulating sleeves Before first issue and every 12 months thereafter. 1 upon indication that insulating value is suspectand after repair.

OSHA Regulations and ASTM

1 If the insulating equipment has been electrically tested but not issued for service, the insulating equipment may not be placed into service unless it has been electrically tested within the previous 12 months.

TABLE I-5 RUBBER INSULATING EQUIPMENT, TEST INTERVALS

Page 13: M nspection, ber cts

NFPA 70E® STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE

Page 14: M nspection, ber cts

NFPA 70E® TRAINING

Low Voltage Qualified Electrical Safety Training

An 8-hour low voltage qualified course focuses on electrical safety training for employees who work on 600V and below.

Ideal for:• Safety directors• Electrical contractors• Maintenance electricians• Linemen• Owners and managers• Supervisors working directly

with 480V or greater equipment or overseeing personnel who do

Page 15: M nspection, ber cts

NFPA 70E® STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE

NFPA 70E®

Page 16: M nspection, ber cts

NFPA 70E® STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE

Page 17: M nspection, ber cts

NFPA 70E® STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE

NFPA 70E®

Page 18: M nspection, ber cts

What Does This Mean for Your Workplace?

50 Volts AC

Page 19: M nspection, ber cts

Glove Selection

1. Assess the hazard for shock first.

2. Assess the arc flash hazard from a realistic distance from the hazard.

When selecting gloves for arc flash exposures, two considerations

must be followed:

Page 20: M nspection, ber cts

1. “Heavy duty leather gloves” for arc flash protection (NFPA 70E Standard for Electrical Safety in the Workplace requires these for jobs without shock hazards). When there was no arc rating test method for gloves, they were required to be of a certain thickness. Now the gloves can be made thinner and still meet the required arc protection.

2. To replace “heavy duty leather gloves” when they are inadequate for other multiple threats. Non-leather gloves are being worn in more workplaces today. Non-leather specialty gloves that grip when wet or oily can be engineered to make the gloves more task-specific and ergonomically designed. Now these gloves can also be arc rated so a machine operator who is operating a disconnect will have no need to change gloves for arc flash, and the glove can also be cut-resistant para-aramid.

3.The 2015 NFPA 70E Table 130.7(C)(16) Personal Protective Equipment requires “arc rated gloves” for tasks under PPE categories 3 and 4; Now there will be “arc rated gloves” for the non-shock hazard tasks which have arc flash potential. [Note (3) states: “The combination of rubber insulating gloves with leather protectors satisfies the arc flash protection requirement.”]

Glove Selection

Arc rated gloves without rubber insulating gloves can only be used in

three circumstances

Page 21: M nspection, ber cts

Steps for Protection#1. Analysis

Page 22: M nspection, ber cts

Steps for Protection#2. Awareness

Page 23: M nspection, ber cts

Steps for Protection#3. Training

Page 24: M nspection, ber cts

Steps for Protection

#4. Lockout Tagout

Page 25: M nspection, ber cts

Steps for Protection

#5. Dress for Safety

in Daily Wear

=

Page 26: M nspection, ber cts

Steps for Protection

#6. Use

Insulated Tools

Page 27: M nspection, ber cts

Steps for Protection

#7.Use A

Voltage Detector

Page 28: M nspection, ber cts

Steps for Protection

#8.Wear

Rubber Insulating

Gloves

Page 29: M nspection, ber cts

Rubber Insulating Gloves

Page 30: M nspection, ber cts

Rubber Insulating Gloves

Page 31: M nspection, ber cts

Rubber Insulating Gloves

Designation: F696 Standard Specification for Leather Protectors for Rubber Insulating Gloves and Mittens1

Page 32: M nspection, ber cts

Rubber Insulating Gloves

Class 00 and 0 ½ inchClass 1 1 inchClass 2 2 inchesClass 3 3 inchesClass 4 4 inches

Page 33: M nspection, ber cts

Manufacturing & Acceptance

Designation: D120 Standard Specification for Rubber Insulating Gloves

Page 34: M nspection, ber cts

Helpful ASTM Documents

Page 35: M nspection, ber cts

Rubber Insulating Gloves –every 6 months except telecom can increase to 9 months

Other Rubber Products –according to OSHA Table I-5or when field inspection or company policy warrant

Insulated Tools –every 2 years

Re-Testing Intervals

Minimum Specified Re-Test Intervals:

Designation F496

Standard Specification for In-Service Careof Insulating Gloves and Sleeves1

Page 36: M nspection, ber cts

Type of Equipment When to TestRubber insulating line hose Upon indication that insulating value is suspect

and after repair.Rubber insulating covers Upon indication that insulating value is suspect

and after repair.Rubber insulating blankets Before first issue and every 12 months thereafter.

1 upon indication that insulating value is suspectand after repair.

Rubber insulating gloves Before first issue and every 6 months thereafter. 1 upon indication that insulating value is suspectand after repair.

Rubber insulating sleeves Before first issue and every 12 months thereafter. 1 upon indication that insulating value is suspectand after repair.

Re-Testing Intervals

1 If the insulating equipment has been electrically tested but not issued for service, the insulating equipment may not be placed into service unless it has been electrically tested within the previous 12 months.

TABLE I-5 RUBBER INSULATING EQUIPMENT, TEST INTERVALS

Page 37: M nspection, ber cts

In-Service Standards

Page 38: M nspection, ber cts

In-Service Care – In the Field

Page 39: M nspection, ber cts

In-Service Care – In the Field

Page 40: M nspection, ber cts

In-Service Care – In the Field

Page 41: M nspection, ber cts

In-Service Care – In the Field

Page 42: M nspection, ber cts

In-Service Care – In the Field

Page 43: M nspection, ber cts

In-Service Care – In the Field

Page 44: M nspection, ber cts

In-Service Care – In the Field

Page 45: M nspection, ber cts

In-Service Care – In the Field

Page 46: M nspection, ber cts

In-Service Care – In the Field

Page 47: M nspection, ber cts

In-Service Care – In the Field

Page 48: M nspection, ber cts

In-Service Care – In the Field

Page 49: M nspection, ber cts

In-Service Care – In the Field

Page 50: M nspection, ber cts

In-Service Care – In the Field

Page 51: M nspection, ber cts

In-Service Care – In the FieldNO!

Page 52: M nspection, ber cts

In-Service Care – In the Field

Page 53: M nspection, ber cts

In-Service Care – In the Field

Page 54: M nspection, ber cts

In-Service Care – In the Field

Page 55: M nspection, ber cts

In-Service Care – In the Field

Page 56: M nspection, ber cts

At The Electrical Testing Facility

Page 57: M nspection, ber cts

At The Electrical Testing Facility

Page 58: M nspection, ber cts

At The Electrical Testing Facility

Page 59: M nspection, ber cts

At The Electrical Testing Facility

Page 60: M nspection, ber cts

At The Electrical Testing Facility

Page 61: M nspection, ber cts

At The Electrical Testing Facility

Page 62: M nspection, ber cts

At The Electrical Testing Facility

Page 63: M nspection, ber cts

At The Electrical Testing Facility

Page 64: M nspection, ber cts

At The Electrical Testing Facility

Page 65: M nspection, ber cts

At The Electrical Testing Facility

Page 66: M nspection, ber cts

At The Electrical Testing Facility

Page 67: M nspection, ber cts

At The Electrical Testing Facility

Page 68: M nspection, ber cts

At The Electrical Testing Facility

Page 69: M nspection, ber cts

At The Electrical Testing Facility

Page 70: M nspection, ber cts

Review

Page 71: M nspection, ber cts

Review

1. Analysis2. Awareness3. Training4. Lockout Tagout5. Suit Up in Proper Daily Wear6. Use Insulated Tools7. Use A Voltage Detector8. Glove Up and Go for It!

Steps for Protection:

Page 72: M nspection, ber cts

Review

Page 73: M nspection, ber cts

Review

Page 74: M nspection, ber cts

Review

Page 75: M nspection, ber cts

Review

Designation F496

Standard Specification for In-Service Care of Insulating Gloves and Sleeves1

Page 76: M nspection, ber cts

Review

Page 77: M nspection, ber cts

Review

Page 78: M nspection, ber cts

Thank You!Richard Rivkin, President & CEO

Saf-T-Gard International, Inc.205 Huehl Road • Northbrook IL 60062Tel: 1-800-548-GARD • (847) 291-1600Fax: 1-888-548-GARD • (847) 291-1610

Website: http://www.saftgard.com

© 2018 Saf-T-Gard International, Inc.

For More Information Contact: