12
12x8 R 8"Ø 12x8 RA SA SUPPLY AIR RETURN AIR R - RISE, D - DROP DUCT SIZE, RECTANGULAR, FLEXIBLE CONNECTION ELBOW, RECTANGULAR(r=1.5W) ACOUSTICAL INSULATION LINING HVAC LEGEND DUCT SIZE, ROUND DUCT SECTION, SUPPLY DUCT SECTION, RETURN OR EXHAUST CHANGE OF ELEVATION FIRST FIGURE IS SIDE SHOWN MA EA EXHAUST AIR MAKE-UP AIR R - RISE, D - DROP CHANGE OF ELEVATION AD ACOUSTICAL INSULATION LINING Ex. OA OUTDOOR AIR EXISTING VD TEE, RECTANGULAR MAIN AND TAP, FOT - FLAT ON TOP, FOB - FLAT ON BOTTOM TEE, RECTANGULAR MAIN AND TAP VOLUME DAMPER TEE RECTANGULAR TRANSITIONS ELBOW, WITH VANES, RECTANGULAR(r=1.5W) WITH DAMPER ELBOW, WITH VANES, RECTANGULAR WYE, RECTANGULAR TYPE CFM SIZE CEILING OR REGISTER DESIGNATION CEILING RETURN GRILLE FD WALL SUPPLY GRILLE OR REGISTER FIRE DAMPER WALL EXHAUST/RETURN GRILLE OF REGISTER CEILING SUPPLY DIFFUSER 24"x24" 'S1' 100 T H THERMOSTAT HUMIDISTAT C CONTROLLER, AS INDICATED S THERMOSTAT REMOTE SENSOR FLOOR OR CEILING SUPPLY FLOOR OR CEILING EXHAUST/RETURN GRILLE OR REGISTER GRILLE OR REGISTER SAN PLUMBING LEGEND SS SS SS SV SD SD SD ABBREVIATION SYMBOL DESCRIPTION SAN VENT STM STM WCO SANITARY DRAIN ABOVE FLOOR/GRADE SANITARY DRAIN BELOW FLOOR/GRADE SANITARY VENT STORM DRAIN ABOVE FLOOR/GRADE STORM DRAIN BELOW FLOOR/GRADE WALL CLEANOUT FCO FLOOR CLEANOUT SS SS LCO LINE CLEANOUT GCO GRADE CLEANOUT DCW DOMESTIC COLD WATER DHW DOMESTIC HOT WATER oo oo STANDPIPE - DHWR DOMESTIC HOT WATER RETURN GAS NATURAL GAS GAS MECHANICAL NOTES MECHANICAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER DRAWINGS FOR THIS PROJECT. 1 GENERAL: .1 CONFORM WITH APPLICABLE REQUIREMENTS OF THE MINISTRY OF LABOUR, AND THE OCCUPATIONAL HEALTH AND SAFETY ACT AND REGULATIONS FOR CONSTRUCTION PROJECTS. .2 DO COMPLETE INSTALLATION IN ACCORDANCE WITH THE FOLLOWING: .1 ONTARIO BUILDING CODE (OBC); .2 NATURAL GAS AND PROPANE INSTALLATION CODE (GAS CODE)/INSTALLATION CODE FOR OIL BURNING EQUIPMENT; .3 ASHRAE; .4 SMACNA; .5 NFPA; .6 ALL OTHER RELEVANT CODES AND STANDARDS, AS APPLICABLE. .3 OBTAIN ALL PERMITS REQUIRED FOR THE INSTALLATION OF MECHANICAL TRADES WORK, ARRANGE FOR INSPECTIONS AND TESTS, AND PAY ALL FEES AND COSTS FOR THE PERMITS, INSPECTIONS AND FEES. OBTAIN PERMITS IMMEDIATELY AFTER NOTIFICATION OF AWARD OF CONTRACT. .4 PROVIDE THREE COPIES OF COMPLETE OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT FURNISHED UNDER THIS CONTRACT. BIND INSTRUCTIONS IN 3-RING BINDERS. INCLUDE THE FOLLOWING: .1 SCHEMATIC DIAGRAM OF ELECTRICAL SYSTEMS. .2 CONTROL SHOP DRAWINGS AND OPERATING SEQUENCE INCLUDING WIRING OF COMPONENTS. .3 WIRING DIAGRAM OF CONTROL PANELS. .4 OPERATING INSTRUCTIONS, INCLUDING START-UP AND SHUT-DOWN PROCEDURE. .5 MAINTENANCE INSTRUCTIONS INCLUDING PREVENTIVE MAINTENANCE INSTRUCTIONS FOR COMPONENTS OF THE EQUIPMENT. .6 COMPLETE PARTS LIST OF ASSEMBLIES AND THEIR COMPONENT PARTS, SHOWING MANUFACTURER'S NAME, CATALOGUE NUMBER, AND NEAREST REPLACEMENT SOURCE. .7 LIST OF RECOMMENDED SPARE PARTS AND QUANTITY OF EACH ITEM TO BE STOCKED. .8 MANUFACTURERS' WARRANTIES AND GUARANTEES. .5 CLEAN ALL MECHANICAL SYSTEMS AT PROJECT COMPLETION. .6 COMPLETE AS-BUILT DRAWINGS SHOWING ALL CHANGES AS WORK PROGRESSES. 2 CONTRACTOR QUALIFICATIONS: .1 ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE “TRADE QUALIFICATION AND APPRENTICESHIP ACT” AND REGULATIONS, BY PERSONS WHO HOLD THE FOLLOWING CERTIFICATES OF QUALIFICATION (AS APPLICABLE): .1 PLUMBER; .2 REFRIGERATION & AIR CONDITIONING SYSTEMS MECHANIC; .3 RESIDENTIAL AIR CONDITIONING SYSTEMS MECHANIC; .4 SHEET METAL WORKER; .5 SPRINKLER & FIRE PROTECTION INSTALLER. .2 ALL FUELS-RELATED WORK TO BE CARRIED OUT IN ACCORDANCE WITH TSSA REQUIREMENTS AND ONTARIO REGULATION 215/01, “FUEL INDUSTRY CERTIFICATES” BY PERSONS WHO HOLD THE APPROPRIATE CERTIFICATES FOR THE WORK BEING PERFORMED. 3 EXISTING FACILITIES AND DEMOLITION: .1 LOCATE AND PROTECT ALL EXISTING EXTERIOR SITE SERVICES. .2 RETAIN AND PROTECT ALL EXISTING INTERIOR SERVICES AND BUILDING FABRIC. MAKE GOOD ANY AND ALL DAMAGE RESULTING FROM THIS WORK. .3 CONNECTIONS TO EXISTING SERVICES SHALL BE COORDINATED WITH THE OWNER. .4 EXECUTE WORK WITH LEAST POSSIBLE INTERFERENCE OR DISTURBANCE TO NORMAL USE OF THE EXISTING BUILDING. 4 FIXTURES AND EQUIPMENT: .1 ALL ALTERNATE PRODUCTS PROPOSED AS “APPROVED EQUALS” SHALL BE SUBMITTED FOR APPROVAL PRIOR TO TENDER CLOSING. .2 PROVIDE SHOP DRAWINGS AND PRODUCT DATA FOR ALL MECHANICAL FIXTURES AND EQUIPMENT FOR APPROVAL, PRIOR TO PROCUREMENT. .3 INSTALL ALL MECHANICAL FIXTURES AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. .4 LOCATE ALL EQUIPMENT WITH CLEARANCES, AS REQUIRED BY THE MANUFACTURER, THE FUEL CODES, AND ALL OTHER CODES AND REGULATIONS, INCLUDING THE FOLLOWING CLEARANCES: .1 TO PERMIT PROPER EQUIPMENT OPERATION; .2 TO PERMIT SUFFICIENT AIRFLOW AROUND EQUIPMENT; .3 FOR EQUIPMENT SERVICE; .4 SUFFICIENT DISTANCE FROM COMBUSTIBLE MATERIAL; .5 WITH SUFFICIENT VENT CLEARANCES; .6 SUFFICIENT DISTANCE FROM ROOF EDGES OR OTHER HAZARDS. 5 EQUIPMENT SUPPLIED BY OTHERS: .1 MAKE ALL MECHANICAL SERVICE CONNECTIONS TO EQUIPMENT SUPPLIED BY OTHERS. .2 CONFIRM ALL SERVICE CONNECTIONS WITH MANUFACTURER AND SUPPLIER, PRIOR TO INSTALLATION. THIS SHALL INCLUDE ALL CONNECTION SIZES, LOCATIONS AND DETAILS, AND SHALL TAKE INTO ACCOUNT EQUIPMENT CLEARANCES AND INSTALLATION REQUIREMENTS. 6 PIPING AND ESCUTCHEONS: .1 PROVIDE DIELECTRIC UNIONS AT ALL PIPING LOCATIONS WHERE DISSIMILAR METALS ARE JOINED. .2 PROVIDE ESCUTCHEONS ON ALL PIPES PASSING THROUGH WALLS, PARTITIONS, FLOORS AND CEILINGS, CHROME, NICKEL PLATED BRASS OR TYPE 302 STAINLESS STEEL. 7 ACCESS DOORS: .1 SUPPLY ACCESS DOORS, AS REQUIRED IN DUCTWORK AND WALL/CEILING ASSEMBLIES, TO ALL CONCEALED MECHANICAL EQUIPMENT AND OPERATING DEVICES. ACCESS DOORS IN WALL/CEILING ASSEMBLIES TO BE INSTALLED BY OTHER TRADES. .2 ACCESS DOORS SHALL BE FIRE-RATED TYPE, WHERE USED IN FIRE-RATED ASSEMBLIES, AND SHALL MATCH THE RATING OF THE ASSEMBLY. 8 PIPE INSULATION: .1 INSTALL IN ACCORDANCE WITH THERMAL INSULATION ASSOCIATION OF CANADA (TIAC) NATIONAL STANDARDS. .2 MAX. FLAME SPREAD RATING: 25. .3 MAX. SMOKE DEVELOPED RATING: 50. .4 DOMESTIC COLD WATER (DCW): .1 1” RIGID MOULDED MINERAL FIBRE WITH VAPOUR RETARDER JACKET. .2 INSULATE ALL PIPING IN FLOORS, WALLS AND CEILINGS, TO POINT OF FIXTURE CONNECTIONS. .5 DOMESTIC HOT WATER (DHW): .1 1” RIGID MOULDED MINERAL FIBRE FOR PIPING UP TO 1-1/4” SIZE .2 1-1/2” RIGID MOULDED MINERAL FIBRE FOR PIPING 1-1/2” TO 3” SIZE. .3 INSULATE ALL PIPING IN FLOORS, WALLS AND CEILINGS, TO POINT OF FIXTURE CONNECTIONS. .6 ROOF DRAINS: .1 1” RIGID MOULDED MINERAL FIBRE WITH VAPOUR RETARDER JACKET. .2 INSULATE ALL STORM PIPING ABOVE GROUND. .7 OUTER JACKET: .1 CONCEALED LOCATIONS: ALL SERVICE JACKET. .2 EXPOSED LOCATIONS: PVC JACKET. .3 MECHANICAL/SERVICE ROOMS: PVC JACKET. 9 WATER SERVICE AND WATER SUPPLY PIPING: .1 COORDINATE WATER SERVICE INSTALLATION WITH SUPPLY AUTHORITY: .1 MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE WATER ENTRY INSTALLATION, FROM A POINT 1M BEYOND THE BUILDING EXTERIOR. .2 OBTAIN, SUPPLY AND INSTALL ALL WATER METER(S) IN ACCORDANCE WITH THE REQUIREMENTS OF THE MUNICIPALITY, INCLUDING REMOTE READING DEVICES AND WIRING. .3 SUPPLY AND INSTALL THRUST RESTRAINT (OBC 7.3.4.9.) FOR ALL WATER SERVICE PIPES 4” OR MORE IN SIZE. .4 SUPPLY AND INSTALL PREMISE ISOLATION BACKFLOW PREVENTER IN ACCORDANCE WITH OBC 7.6.2.6. AND CSA B64.10. .1 MODERATE HAZARD. .2 ABOVE GROUND: COPPER TUBE, HARD DRAWN, TYPE L. CAN. OR US MANUFACTURE, INCLUDING FITTINGS. LEAD-FREE SOLDER. .3 WATER SUPPLY PIPING IS SHOWN SCHEMATICALLY. INSTALL TUBING CLOSE TO BUILDING STRUCTURE TO MINIMIZE FURRING, CONSERVE HEADROOM AND SPACE. GROUP EXPOSED PIPING AND RUN PARALLEL TO WALLS. .4 ISOLATE ALL EQUIPMENT, FIXTURES AND BRANCHES WITH VALVES. .5 TEST WATER SYSTEM AT 1½ TIMES SYSTEM OPERATING PRESSURE OR MINIMUM 860 KPA, WHICHEVER IS GREATER. TEST PRESSURE AND TIMEFRAME SHALL BE AS REQUIRED BY OBC 7.3.7.2. .6 FLUSH OUT, DISINFECT AND RINSE SYSTEM, PRIOR TO CONSTRUCTION COMPLETION. .7 WATER HEATERS: .1 SHALL BE PIPED WITH HEAT TRAPS ON THE INLET AND OUTLET PIPING, AS CLOSE AS PRACTICAL TO THE TANK, IN ACCORDANCE WITH OBC 12.3.1.4. .2 TEMPERATURE AND PRESSURE RELIEF VALVES: .1 MAXIMUM TEMPERATURE SETTING OF 210F (99F); .2 MAXIMUM PRESSURE SETTING OF 150 PSI; .3 DISCHARGE PER OBC 7.6.1.12.: .1 TERMINATE WITH AN INDIRECT CONNECTION PIPED TO FLOOR DRAIN, SUMP OR OTHER SAFE LOCATION, WITH A 300MM AIR BREAK; OR .2 TERMINATE AT A DISTANCE NOT LESS THAN 150MM AND NOT MORE THAN 300MM FROM A FLOOR AND DISCHARGE VERTICALLY DOWN, .8 TRAP SEAL PRIMERS AND ACCESS TO THEM, SHALL BE LOCATED IN THE WASHROOM OR AREA THAT THEY SERVE. .9 SUPPLY AND INSTALL WATER HAMMER ARRESTORS AT THE MIDPOINT AND END OF RUNS OF WATER SUPPLY PIPING AS REQUIRED BY OBC 7.6.1.14. 10 DRAINAGE, WASTE AND VENT PIPING: .1 COORDINATE SANITARY AND STORM SERVICE INSTALLATIONS WITH SUPPLY AUTHORITY. .2 APPROXIMATE SUB-FLOOR PIPING ELEVATIONS HAVE BEEN INDICATED ON THE DRAWINGS. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SETTING FINAL INVERTS BASED ON SITE CONDITIONS. .3 BELOW GROUND/FLOOR: .1 ABS DWV SOLID WALL SCHEDULE 40, CERTIFIED TO CAN/CSA STANDARD B181.1. .2 PVC DWV SOLID WALL SCHEDULE 40, CERTIFIED TO CAN/CSA STANDARD B181.2. .3 PVC DWV, TYPE SDR26 SDR35. .4 ABOVE GROUND: .1 CAST IRON, TYPE DWV. .2 COPPER, TYPE DWV. .3 PVC DWV SOLID WALL SCHEDULE 40, CERTIFIED TO CAN/CSA STANDARD B181.2, FOR NONCOMBUSTIBLE CONSTRUCTION (FLAME-SPREAD RATING NOT MORE THAN 25 PER CAN/ULC-S102.2). .5 PVC DWV SOLID WALL SCHEDULE 40, CERTIFIED TO CAN/CSA STANDARD B181.2, FOR NONCOMBUSTIBLE CONSTRUCTION (FLAME-SPREAD RATING NOT MORE THAN 25 AND SMOKE DEVELOPED CLASSIFICATION NOT MORE THAN 50 PER CAN/ULC-S102.2 - PLENUMS AND HIGH BUILDINGS). .5 PROVIDE CLEANOUTS AS REQUIRED BY THE ONTARIO BUILDING CODE. .6 VENT COMPLETE PLUMBING SYSTEM IN ACCORDANCE WITH THE ONTARIO BUILDING CODE. 11 NATURAL GAS PIPING: .1 COORDINATE NATURAL GAS SERVICE INSTALLATION WITH SUPPLY AUTHORITY. .2 STEEL PIPE, SCHEDULE 40, SEAMLESS, SCREWED FITTINGS. .3 PROVIDE SEISMICALLY ACTUATED SHUT-OFF VALVE (EARTHQUAKE VALVE) WHERE PIPING LEAVES NATURAL GAS METER. .4 SLOPE PIPING DOWN IN DIRECTION OF FLOW TO LOW POINTS. .5 TEST SYSTEM IN ACCORDANCE WITH NATURAL GAS AND PROPANE INSTALLATION CODE. 12 DUCTWORK: .1 RECTANGULAR DUCT: .1 RIGID GALVANIZED STEEL, LOCK FORMING QUALITY TO ASTM A653/A653M .2 THICKNESS, FABRICATION, REINFORCEMENT AND SUPPORT/ATTACHMENT TO ASHRAE OR SMACNA. .2 ROUND DUCT: .1 RIGID GALVANIZED STEEL, LOCK FORMING QUALITY TO ASTM A653/A653M .2 THICKNESS, FABRICATION, REINFORCEMENT AND SUPPORT/ATTACHMENT TO ASHRAE OR SMACNA. .3 FLEXIBLE BRANCH DUCT, PERMITTED WITHIN 2M/6FT FROM OUTLET, IN CONCEALED LOCATIONS: .1 ALL METAL TYPE: TRIPLE LOCK, ALUMINUM CORRUGATED DUCT, MANUFACTURED USING AN ALUMINUM STRIP, WHICH IS SPIRALLY WOUND AND MECHANICALLY JOINED TOGETHER FORMING AN AIR TIGHT AND LEAKPROOF SEAM. .3 SEAL CLASSIFICATION: .1 CLASS A: LONGITUDINAL SEAMS, TRANSVERSE JOINTS, DUCT WALL PENETRATIONS AND CONNECTIONS MADE AIRTIGHT WITH SEALANT AND TAPE. .4 FITTINGS .1 FABRICATION: TO SMACNA. .2 RADIUSED ELBOWS. .1 RECTANGULAR: STANDARD WITH CENTRELINE RADIUS 1.5 TIMES DUCT DIMENSION, WITH SINGLE THICKNESS TURNING VANES. .2 ROUND: FIVE PIECE WITH CENTRELINE RADIUS 1.5 TIMES DIAMETER. .3 MITRED ELBOWS, RECTANGULAR: WITH DOUBLE THICKNESS TURNING VANES. .5 BRANCHES: .1 RECTANGULAR MAIN AND BRANCH: WITH RADIUS ON BRANCH 1.5 TIMES WIDTH OF DUCT 45 DEGREES ENTRY ON BRANCH. .2 ROUND MAIN AND BRANCH: ENTER MAIN DUCT AT 45 DEGREES WITH CONICAL CONNECTION. .3 PROVIDE VOLUME CONTROL DAMPER IN BRANCH DUCT NEAR CONNECTION TO MAIN DUCT. .4 MAIN DUCT BRANCHES: WITH SPLITTER DAMPER. .6 TRANSITIONS: .1 DIVERGING: 20 DEGREES MAXIMUM INCLUDED ANGLE. .2 CONVERGING: 30 DEGREES MAXIMUM INCLUDED ANGLE. .7 FIRE STOPPING .1 RETAINING ANGLES AROUND DUCT, ON BOTH SIDES OF FIRE SEPARATION IN ACCORDANCE WITH SECTION. .2 FIRE STOPPING MATERIAL AND INSTALLATION MUST NOT DISTORT DUCT. .8 DAMPERS: .1 MANUFACTURE TO SMACNA STANDARDS. .2 SINGLE BLADE DAMPERS: .1 FABRICATE FROM SAME MATERIAL AS DUCT, BUT ONE SHEET METAL THICKNESS HEAVIER. V_GROOVE STIFFENED. .2 SIZE AND CONFIGURATION TO RECOMMENDATIONS OF SMACNA. .3 LOCKING QUADRANT (WITH SHAFT EXTENSION TO ACCOMMODATE INSULATION THICKNESS, IF REQUIRED). .4 INSIDE AND OUTSIDE NYLON END BEARINGS. .5 CHANNEL FRAME OF SAME MATERIAL AS ADJACENT DUCT, COMPLETE WITH ANGLE STOP. .9 DUCT LEAKAGE: IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. .10 ALL DUCT AND SEAL MATERIALS TO HAVE A FLAME SPREAD RATING OF LESS THAN 25 AND A SMOKE DEVELOPED CLASSIFICATION OF LESS THAN 50. .11 PROVIDE FLEXIBLE CONNECTIONS AT ALL EQUIPMENT DUCT CONNECTION POINTS. 13 ROOF CURBS: .1 ALL ROOF CURBS SHALL: .1 BE SEISMICALLY DESIGNED; .2 BE SLOPED TO ACCOMMODATE ROOF SLOPE, AS REQUIRED; .3 EXTEND A MINIMUM OF 14” ABOVE THE FINISHED ROOF SURFACE. 14 DUCT INSULATION: .1 REFER TO DRAWING FOR DUCT THAT IS IDENTIFIED TO BE INSULATED. .2 INSTALL IN ACCORDANCE WITH THERMAL INSULATION ASSOCIATION OF CANADA (TIAC) NATIONAL STANDARDS. .3 MAX. FLAME SPREAD RATING: 25. .4 MAX. SMOKE DEVELOPED RATING: 50. .5 THERMAL INSULATION - RECTANGULAR DUCT: .1 1” (R4.3) RIGID MINERAL FIBRE BOARD WITH VAPOUR RETARDER JACKET. .2 ALUMINUM JACKET WITH MOISTURE BARRIER. 15 MECHANICAL FIRE PROTECTION: .1 REFER TO ARCHITECTURAL DRAWINGS, TO VERIFY LOCATION OF ALL FIRE SEPARATIONS AND FIRE-RATED MEMBRANES. .2 ALL PIPING SHALL BE TIGHTLY FITTED AND SEALED WITH FIRESTOPPING MATERIAL AT ALL FIRE SEPARATIONS AND FIRE-RATED MEMBRANES. .3 FIRE DAMPERS: .1 FIRE DAMPERS SHALL BE CAN/ULC-S112 (STANDARD METHOD OF FIRE TEST OF FIRE DAMPER ASSEMBLIES) LISTED AND LABELED. .2 FIRE DAMPERS SHALL BE NFPA 80 (STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES), NFPA 90A (STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS), AND NFPA 101 (LIFE SAFETY CODE) COMPLIANT. .3 DUCTWORK SHALL BE FITTED WITH FIRE DAMPERS AT ALL FIRE SEPARATIONS AND FIRE-RATED MEMBRANES. .4 SUPPLY AND INSTALL ACCESS DOORS IN ARCHITECTURAL FINISH (WALL, CEILING OR FLOOR) TO ACCESS DUCT, IN COMMON AREA WHERE POSSIBLE. .5 SUPPLY AND INSTALL TIGHTLY-FITTED ACCESS DOOR IN DUCT TO ACCESS, INSPECT AND RESET FIRE DAMPER. .6 TYPES: DYNAMIC - FOR USE IN AIR HANDLING SYSTEMS THAT DO NOT SHUTDOWN UPON FIRE ALARM. .7 RATING: 1-1/2 HR (30MIN TO 2HR FIRE RESISTANCE RATING). .4 FIRE DAMPER AND DUCT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS REQUIREMENTS, AND SHALL BE SEALED WITH FIRESTOPPING MATERIAL. .5 ALL MECHANICAL MATERIALS USED WITHIN CEILING RETURN AIR PLENUMS SHALL FLAME-SPREAD RATING NOT MORE THAN 25 AND SMOKE DEVELOPED CLASSIFICATION NOT MORE THAN 50 PER CAN/ULC-S102.2. .6 MOCK-UPS: .1 PREPARE MOCK-UPS OF TYPICAL FIRESTOP INSTALLATION OF THE FOLLOWING, FOR REVIEW AND APPROVAL BY THE OWNER, ENGINEER AND MUNICIPAL BUILDING INSPECTOR: .1 SANITARY PIPING - WALL AND CEILING/FLOOR FIRE SEPARATION; .2 STORM PIPING - WALL AND CEILING/FLOOR FIRE SEPARATION; .3 SPRINKLER PIPING - WALL AND CEILING/FLOOR FIRE SEPARATION; .4 DCW AND DHW PIPING - WALL AND CEILING/FLOOR FIRE SEPARATION; .5 FIRE DAMPER INSTALLATION - WALL AND CEILING/FLOOR FIRE SEPARATION. .2 ALL FIRESTOP INSTALLATIONS SHALL BE COMPLETED IN ACCORDANCE WITH THE APPROPRIATE PRODUCT INSTALLATION INSTRUCTIONS, AND THE REFERENCED UL/ULC LISTING AND/OR TEST STANDARD. .3 SUPPLY A COPY OF THE PRODUCT INSTALLATION INSTRUCTIONS WITH ULC LISTING AND/OR TEST STANDARD REFERENCE, FOR EACH INSTALLATION. .4 MOCK-UP MAY REMAIN AS PART OF WORK. 16 COMMERCIAL KITCHEN EXHAUST AND FIRE PROTECTION: .1 SYSTEM SHALL BE CONFIGURED FOR COMMERCIAL KITCHEN EXHAUST SYSTEM. .2 DESIGN AND INSTALLATION SHALL CONFORM TO NFPA 96 - STANDARD FOR VENTILATION CONTROL AND FIRE PROTECTION OF COMMERCIAL COOKING OPERATIONS. .3 HOOD TYPES (ASHRAE HVAC APPLICATIONS, CHAPTER 33): .1 DUTY: MEDIUM DUTY (400F). .2 CONFIGURATION: .1 WALL MOUNTED CANOPY: MEDIUM DUTY - 200 TO 300 CFM PER LINEAL FOOT. .4 HOOD: .1 SHALL BE UL/ULC LISTED: TYPE I - OVER EQUIPMENT THAT PRODUCES GREASE VAPORS OR SMOKE. .2 SHALL HAVE A 6” MINIMUM OVERHANG ON ALL SIDES OF COOKING EQUIPMENT. .3 SHALL HAVE A UL/ULC LISTED GREASE COLLECTOR AND GREASE FILTERS, LOCATED NOT LESS THAN 18” FROM THE COOKING SURFACE, OR NOT LESS THAN 48” FROM CHARCOAL TYPE COOKING SURFACES. .4 LIGHTING UNITS IN HOODS SHALL BE UL/ULC LISTED FOR USE OVER COMMERCIAL COOKING APPLIANCES. .5 EXHAUST DUCT AND FAN: .1 EXHAUST FANS SHALL BE UL/ULC LISTED, FOR COMMERCIAL KITCHEN / RESTAURANT EXHAUST USE. .2 EXHAUST FANS SHALL HAVE A MINIMUM OF 3.05M (10 FT.) OF CLEARANCE FROM THE OUTLET TO ADJACENT BUILDINGS, PROPERTY LINES, GRADE LEVEL PERMITTED TO BE LOWERED IN A SECURE AREA IF ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION), COMBUSTIBLE CONSTRUCTION, ELECTRICAL EQUIPMENT OR LINES, AND THE CLOSEST POINT OF ANY AIR INTAKE OR OPERABLE DOOR OR WINDOW. .3 EXHAUST DUCT AIR VELOCITY SHALL BE NOT LESS THAN 1200 FT/MIN. .4 HOOD EXHAUST FAN(S) SHALL CONTINUE TO OPERATE AFTER THE FIRE EXTINGUISHING SYSTEM HAS BEEN ACTIVATED UNLESS FAN SHUTDOWN IS REQUIRED BY A LISTED COMPONENT OF THE VENTILATION SYSTEM OR BY THE DESIGN OF THE EXTINGUISHING SYSTEM. .5 ALL DUCTWORK SHALL BE PITCHED TO DRAIN THE GREASE BACK INTO THE HOOD. .6 EXHAUST AND REPLACEMENT AIR FANS SHALL BE INTER-LOCKED, AND SHALL HAVE VARIABLE SPEED CONTROL. .7 ACCESS PANELS: .1 ACCESS OR ACCESS PANELS SHALL BE PROVIDED IN HOOD, DUCT, AND EXHAUST FAN FOR COMPLETE ACCESS, INSPECTION AND CLEANING OF THE SYSTEM. .2 OPENINGS SHALL BE PROVIDED AT THE SIDES OR AT THE TOP OF THE DUCT, WHICHEVER IS MORE ACCESSIBLE, AND AT CHANGES OF DIRECTION. .3 ACCESS PANELS SHALL BE OF THE SAME MATERIAL AND THICKNESS AS THE DUCT, WITH A GASKET OR SEALANT THAT IS RATED FOR 815.6C (1500F) AND SHALL BE GREASE-TIGHT. .4 FASTENERS, SUCH AS BOLTS, WELD STUDS, LATCHES, OR WING NUTS, USED TO SECURE THE ACCESS PANELS SHALL BE CARBON STEEL OR STAINLESS STEEL AND SHALL NOT PENETRATE DUCT WALLS. .6 REPLACEMENT AIR: .1 WHEN ITS FIRE-EXTINGUISHING SYSTEM DISCHARGES, MAKEUP AIR SUPPLIED INTERNALLY TO A HOOD SHALL BE SHUT OFF. .7 CLEARANCE REQUIREMENTS: .1 THE CLEARANCE REQUIREMENTS OR CLEARANCE REDUCTION SYSTEMS FOR HOODS, GREASE REMOVAL DEVICES, EXHAUST FANS AND DUCTS, OUTLINED IN CHAPTER 4 OF NFPA 96 SHALL BE FOLLOWED. .2 THE CLEARANCE REQUIREMENTS FROM DUCT TO THE INTERIOR SURFACE OF ENCLOSURES OUTLINED IN CHAPTER 7 OF NFPA 96 SHALL BE FOLLOWED. .8 AUTOMATIC FIRE-EXTINGUISHING SYSTEM: .1 GENERAL: .1 FIRE-EXTINGUISHING EQUIPMENT, WITH BOTH AUTOMATIC AND MANUAL ACTIVATION, SHALL BE INSTALLED IN THE COMMERCIAL KITCHEN EXHAUST HOOD. .2 THE AUTOMATIC FIRE-EXTINGUISHING SYSTEM SHALL COMPLY WITH STANDARD UL 300, STANDARD FOR FIRE TESTING OF FIRE EXTINGUISHING SYSTEMS FOR PROTECTION OF RESTAURANT COOKING AREAS, OR OTHER EQUIVALENT STANDARDS AND SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE LISTING. .3 SYSTEM SHALL BE PRE-ENGINEERED TYPE, WITH A FIXED NOZZLE EXTINGUISHING AGENT DISTRIBUTION. .2 FUEL SHUT-OFF: .1 UPON ACTIVATION OF THE FIRE-EXTINGUISHING SYSTEM, ALL SOURCES OF FUEL AND ELECTRIC POWER TO ALL EQUIPMENT UNDER THE HOOD SHALL AUTOMATICALLY SHUT OFF. .2 SHUTOFF DEVICES SHALL REQUIRE MANUAL RESET. .3 ACTIVATION: .1 EXTINGUISHING AGENT SHALL BE DELIVERED THROUGH REGULATED RELEASE NOZZLES. .2 AUTOMATIC ACTIVATION SHALL BE BY FUSIBLE LINK DETECTION. .3 A READILY ACCESSIBLE MEANS FOR MANUAL ACTIVATION SHALL BE LOCATED BETWEEN 1067MM AND 1219MM (42IN AND 48IN) ABOVE THE FLOOR, BE ACCESSIBLE IN THE EVENT OF A FIRE, BE LOCATED IN A PATH OF EGRESS, AND CLEARLY IDENTIFY THE HAZARD PROTECTED. .4 THE AUTOMATIC AND MANUAL MEANS OF SYSTEM ACTIVATION EXTERNAL TO THE CONTROL HEAD OR RELEASING DEVICE SHALL BE SEPARATE AND INDEPENDENT OF EACH OTHER SO THAT FAILURE OF ONE WILL NOT IMPAIR THE OPERATION OF THE OTHER. THE MANUAL MEANS OF SYSTEM ACTIVATION SHALL BE PERMITTED TO BE COMMON WITH THE AUTOMATIC MEANS IF THE MANUAL ACTIVATION DEVICE IS LOCATED BETWEEN THE CONTROL HEAD OR RELEASING DEVICE AND THE FIRST FUSIBLE LINK. .5 THE MEANS FOR MANUAL ACTIVATION SHALL BE MECHANICAL. ELECTRICAL POWER SHALL BE PERMITTED TO BE USED FOR MANUAL ACTIVATION IF A STANDBY POWER SUPPLY IS PROVIDED OR IF SUPERVISION IS PROVIDED. .4 SYSTEM ANNUNCIATION: .1 UPON ACTIVATION OF THE AUTOMATIC FIRE-EXTINGUISHING SYSTEM, AN AUDIBLE ALARM OR VISUAL INDICATOR SHALL BE PROVIDED TO SHOW THAT THE SYSTEM HAS ACTIVATED. .2 WHERE A FIRE ALARM SYSTEM IS INSTALLED, THE ACTIVATION OF THE AUTOMATIC FIRE-EXTINGUISHING SYSTEM SHALL ACTIVATE THE FIRE ALARM SYSTEM. .5 SYSTEM SUPERVISION: .1 WHERE ELECTRICAL POWER IS REQUIRED TO OPERATE THE AUTOMATIC FIRE-EXTINGUISHING SYSTEM, IT SHALL BE MONITORED BY A SUPERVISORY ALARM, WITH A STANDBY POWER SUPPLY PROVIDED. .9 SYSTEM SHALL BE TESTED TO VERIFY THAT THE EXHAUST AIR AND REPLACEMENT AIR VOLUMES, AND NEGATIVE PRESSURE CREATED IN THE COOKING AREA MEET THE REQUIREMENTS OF NFPA 96. TEST REPORT SHALL BE SUBMITTED UPON THE COMPLETION OF THE INSTALLATION. 17 SPRINKLER AND STANDPIPE SYSTEM: .1 SPRINKLER SYSTEM DESIGN AND INSTALLATION SHALL CONFORM TO NFPA 13 - INSTALLATION OF SPRINKLER SYSTEMS. .2 STANDPIPE SYSTEM DESIGN AND INSTALLATION SHALL CONFORM TO NFPA 14 - INSTALLATION OF STANDPIPE AND HOSE SYSTEMS. .3 SYSTEM INSPECTION AND TESTING SHALL CONFORM TO NFPA 25 - INSPECTION TESTING AND MAINTENANCE OF WATER-BASED FIRE PROTECTION SYSTEMS. .4 PROVIDE DESIGN, LAYOUT, DRAWINGS AND CALCULATIONS FOR COMPLETE SPRINKLER SYSTEM, SEALED BY PROFESSIONAL ENGINEER IN THE PROVINCE OF ONTARIO. .5 PROVIDE BACKFLOW FROM FIRE PROTECTION SYSTEMS IN ACCORDANCE WITH THE ONTARIO BUILDING CODE (OBC 7.6.2.4) AND CAN/CSA-B64 SERIES-07 - BACKFLOW PREVENTERS AND VACUUM BREAKERS. .6 SPRINKLER SYSTEM MONITORING STATION CONNECTION SHALL NOTIFY THE FIRE DEPARTMENT BY WAY OF SIGNALS TO A CENTRAL STATION CONFORMING TO CAN/ULC-S561 “INSTALLATION AND SERVICES FOR FIRE SIGNAL RECEIVING CENTRES AND SYSTEMS”. FOR FIRE ALARM SYSTEM MONITORING, THE CONTRACTOR SHALL: .1 COORDINATE WITH OWNER'S MONITORING COMPANY; .2 SUPPLY AND INSTALL COMMUNICATION MODULE REQUIRED FOR MONITORING; .3 SUPPLY AND INSTALL CABLING AND TERMINATION BOX FROM COMMUNICATION MODULE TO BUILDING TELEPHONE SERVICE SPACE, OR OTHER SERVICE SPACE, AS IDENTIFIED BY THE OWNER'S MONITORING COMPANY. 18 MECHANICAL IDENTIFICATION: .1 IDENTIFY MECHANICAL EQUIPMENT WITH LAMICOID NAMEPLATES. .2 LABEL ALL PIPING AT LEAST ONCE IN EVERY ROOM, AND AT NO MORE THAN 25 FT CENTERS. 19 EARTHQUAKE LOAD: .1 ALL MECHANICAL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE EARTHQUAKE LOAD AND EFFECTS REQUIRED BY THE ONTARIO BUILDING CODE. .2 MECHANICAL ELEMENTS AND COMPONENTS (EQUIPMENT, PIPES, DUCTS, ETC.), AND THEIR CONNECTIONS TO THE BUILDING SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SMACNA/ANSI SEISMIC RESTRAINT MANUAL OR OTHER GUIDELINE REFERENCED IN THE ONTARIO BUILDING CODE. .3 PROVIDE SHOP DRAWINGS FOR SUPPORT, CONNECTIONS AND SEISMIC RESTRAINT OF ALL MECHANICAL EQUIPMENT, PIPES AND DUCTS, INCLUDING, BUT NOT LIMITED TO: .1 ROOFTOP HVAC EQUIPMENT; .2 TYPICAL DUCT SUPPORTING SYSTEM; .3 TYPICAL SAN, STM, DCW, DHW AND SPRINKLER PIPE SUPPORTING SYSTEM; .4 TYPICAL NATURAL GAS PIPE SUPPORTING SYSTEM. THESE SHOP DRAWINGS SHALL BE DESIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE PROVINCE OF ONTARIO, WITH EXPERIENCE IN SEISMIC ENGINEERING. .4 FOLLOWING PROJECT COMPLETION, SEISMIC ENGINEER SHALL PROVIDE A LETTER OF FINAL SITE REVIEW. .5 CONTRACTOR SHALL CARRY THE COST OF THE SEISMIC ENGINEERING, INCLUDING SITE REVIEWS, DESIGN AND SHOP DRAWING PREPARATION. 20 EQUIPMENT AND MATERIALS SUPPORT: .1 ALL MECHANICAL EQUIPMENT, PIPING, DUCTWORK, AND RELATED ITEMS SHALL BE SECURELY SUPPORTED, ATTACHED AND FASTENED TO BUILDING STRUCTURE. .2 PIPE HANGERS AND SUPPORTS SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH MSS STANDARD SP-58, PIPE HANGERS AND SUPPORTS - MATERIALS, DESIGN, MANUFACTURE, SELECTION, APPLICATION, AND INSTALLATION. 21 COORDINATION: .1 INFORMATION INVOLVING ACCURATE DIMENSIONING OF THE BUILDING SHALL BE TAKEN FROM SITE BY CONTRACTOR. .2 DRAWINGS ARE IN DIAGRAMMATIC FORM, INTENDED TO CONVEY THE SCOPE OF WORK AND GENERAL ARRANGEMENT FOR EQUIPMENT. COORDINATE PHYSICAL LOCATION OF ALL EQUIPMENT WITH OTHER TRADES AND ALLOW FOR ANY ADDITIONAL PIPING, DUCTING, FITTINGS, SUPPORTS, ETC., IN ORDER TO AVOID INTERFERENCE AND FACILITATE THE WORK. .3 CONTRACTOR TO MAKE ANY NECESSARY MODIFICATIONS OR ADDITIONS, WITHOUT CHARGE, TO ACCOMMODATE SITE CONDITIONS AND COORDINATION. .4 COORDINATE ALL MECHANICAL EQUIPMENT WIRING, INCLUDING LOW VOLTAGE CONTROL WIRING, WITH ELECTRICAL TRADES. 22 START-UP, COMMISSIONING AND TRAINING: .1 COMMISSIONING: .1 START-UP AND COMMISSION THE FOLLOWING SYSTEMS: .1 PLUMBING FIXTURES; .2 HVAC; .3 COMMERCIAL KITCHEN EXHAUST AND FIRE PROTECTION; .4 SPRINKLER SYSTEM. .2 PERFORM SYSTEMATIC TESTS, PROCEDURES AND CHECKS ON SYSTEMS, AS FOLLOWS: .1 TO VERIFY OPERATION IN ACCORDANCE WITH CONTRACT DOCUMENTS, DESIGN CRITERIA AND INTENT, AND MANUFACTURER'S REQUIREMENTS; .2 TO ENSURE APPROPRIATE DOCUMENTATION IS PROVIDED; .3 TO EFFECTIVELY TRAIN BUILDING OPERATIONAL STAFF. .4 SYSTEMS ARE TO BE OPERATED AT FULL CAPACITY, WITH CORRECTION OF ALL DEFICIENCIES AND ADJUSTMENTS TO MEET OPTIMUM PERFORMANCE. .5 PROVIDE WRITTEN REPORT AT END OF COMMISSIONING OUTLINING EQUIPMENT OPERATIONAL CONDITIONS AND PARAMETERS. .2 TESTING, ADJUSTING AND BALANCING: .1 TEST, ADJUST AND BALANCE (TAB) ALL PLUMBING AND HVAC EQUIPMENT AND SYSTEMS; INCLUDING THE FOLLOWING: .1 ROOFTOP PACKAGED HVAC UNITS. .2 TAB PROCEDURE SHALL BE COMPLETED IN ACCORDANCE WITH ASHRAE STANDARD 111, MEASUREMENT, TESTING, ADJUSTING AND BALANCING OF BUILDING HVAC SYSTEMS. .3 PROVIDE DETAILED REPORT AT END OF TAB, IN ACCORDANCE WITH THE REPORTING PROCEDURES OF ASHRAE STANDARD 111. .3 DEMONSTRATION AND TRAINING: .1 DEMONSTRATE OPERATION AND MAINTENANCE OF EQUIPMENT AND SYSTEMS TO OWNER'S PERSONNEL ONE WEEK PRIOR TO DATE OF FINAL INSPECTION .2 PRIOR TO DEMONSTRATION AND TRAINING, ENSURE THAT EQUIPMENT HAS BEEN INSPECTED AND PUT INTO OPERATION, INCLUDING COMPLETION OF COMMISSIONING AND TESTING, ADJUSTING, AND BALANCING. .3 DEMONSTRATE START_UP, OPERATION, CONTROL, ADJUSTMENT, TROUBLE_SHOOTING, SERVICING, AND MAINTENANCE OF EACH ITEM OF EQUIPMENT. .4 INSTRUCT PERSONNEL IN PHASES OF OPERATION AND MAINTENANCE USING OPERATION AND MAINTENANCE MANUALS AS BASIS OF INSTRUCTION. REVIEW CONTENTS OF MANUAL IN DETAIL TO EXPLAIN ASPECTS OF OPERATION AND MAINTENANCE. Project Title: 75 Neelin St, Carleton Place, Ontario CARLETON PLACE ARENA ADDITION Architect Larry Gaines Tel: (613) 256-3630 Fax: (613) 256-0615 e-mail: [email protected] 14 Bridge Street Almonte, ON K0A 1A0 Telephone: (613) 499-2077 68 William St. Suite 200 Brockville, Ont. Facsimile: (613) 345-0008 Telephone: (613) 345-0400 Suite 207 Brockville, Ont. K6V 5J9 100 Strowger Blvd www.EastEng.com ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THE COP<RIGHT PROPERT< OF THE ENGINEER AND MUST BE RETURNED UPON RE4UEST. REPRODUCTION OF DRAWINGS, SPECIFICATIONS, AND RELATED DOCUMENTS IN PART OR WHOLE IS FORBIDDEN WITHOUT THE ENGINEERS' WRITTEN PERMISSION. THE CONTRACTOR MUST CHECK AND VERIF< ALL DIMENSIONS ON THE JOB PRIOR TO START OF CONSTRUCTION. DRAWINGS ARE NOT TO BE SCALED Drawing Title: MECHANICAL NOTES & LEGENDS Professional Seal: Revisions Date By No. 1 GB 2020-03-23 REVISIONS, FOR REVIEW 0 GB 2020-02-20 FOR REVIEW 2 GB 2020-04-01 3 GB 2020-05-01 FOR PERMIT REVISIONS, FOR TENDER REV DATE: Drawing No.: 5/4/2020 Design: Drawn: Approved: Date: Project No.: Scale: MM MM GB 2020-02-16 1/8" - 1'-0" 9107 M001

M001 · 2020. 6. 16. · .1manufacture to smacna standards..2single blade dampers:.1fabricate from same material as duct, but one sheet metal thickness heavier. v_groove stiffened..2size

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • 12x8

    R

    8"Ø

    12x8

    RASA SUPPLY AIR

    RETURN AIR

    R - RISE, D - DROP

    DUCT SIZE, RECTANGULAR,

    FLEXIBLE CONNECTION

    ELBOW, RECTANGULAR(r=1.5W)

    ACOUSTICAL INSULATION LINING

    HVAC LEGEND

    DUCT SIZE, ROUND

    DUCT SECTION, SUPPLY

    DUCT SECTION, RETURN OR EXHAUST

    CHANGE OF ELEVATION

    FIRST FIGURE IS SIDE SHOWN

    MAEA EXHAUST AIR

    MAKE-UP AIR

    R - RISE, D - DROPCHANGE OF ELEVATIONAD

    ACOUSTICAL INSULATION LINING

    Ex.OA OUTDOOR AIR

    EXISTING

    VD

    TEE, RECTANGULAR MAIN AND TAP,

    FOT - FLAT ON TOP, FOB - FLAT ON BOTTOM

    TEE, RECTANGULAR MAIN AND TAP

    VOLUME DAMPER

    TEE RECTANGULAR

    TRANSITIONS

    ELBOW, WITH VANES, RECTANGULAR(r=1.5W)

    WITH DAMPER

    ELBOW, WITH VANES, RECTANGULAR

    WYE, RECTANGULAR

    TYPE

    CFM

    SIZECEILING OR REGISTER DESIGNATION

    CEILING RETURN GRILLE

    FD

    WALL SUPPLY GRILLE OR REGISTER

    FIRE DAMPER

    WALL EXHAUST/RETURN GRILLE OF REGISTER

    CEILING SUPPLY DIFFUSER

    24"x24"'S1' 100

    T

    H

    THERMOSTAT

    HUMIDISTAT

    C CONTROLLER, AS INDICATED

    S THERMOSTAT REMOTE SENSOR

    FLOOR OR CEILING SUPPLY

    FLOOR OR CEILING EXHAUST/RETURN

    GRILLE OR REGISTER

    GRILLE OR REGISTER

    SAN

    PLUMBING LEGEND

    SS

    SS SS

    SV

    SD

    SD SD

    ABBREVIATIONSYMBOL DESCRIPTION

    SAN

    VENT

    STM

    STM

    WCO

    SANITARY DRAIN ABOVE FLOOR/GRADE

    SANITARY DRAIN BELOW FLOOR/GRADE

    SANITARY VENT

    STORM DRAIN ABOVE FLOOR/GRADE

    STORM DRAIN BELOW FLOOR/GRADE

    WALL CLEANOUT

    FCO FLOOR CLEANOUT

    SS SS LCO LINE CLEANOUT

    GCO GRADE CLEANOUT

    DCW DOMESTIC COLD WATER

    DHW DOMESTIC HOT WATER

    oo oo STANDPIPE-

    DHWR DOMESTIC HOT WATER RETURN

    GAS NATURAL GASGAS

    MECHANICAL NOTES

    MECHANICAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHERDRAWINGS FOR THIS PROJECT.

    1 GENERAL:.1 CONFORM WITH APPLICABLE REQUIREMENTS OF THE MINISTRY OF LABOUR,

    AND THE OCCUPATIONAL HEALTH AND SAFETY ACT AND REGULATIONS FORCONSTRUCTION PROJECTS.

    .2 DO COMPLETE INSTALLATION IN ACCORDANCE WITH THE FOLLOWING:.1 ONTARIO BUILDING CODE (OBC);.2 NATURAL GAS AND PROPANE INSTALLATION CODE (GAS

    CODE)/INSTALLATION CODE FOR OIL BURNING EQUIPMENT;.3 ASHRAE;.4 SMACNA;.5 NFPA;.6 ALL OTHER RELEVANT CODES AND STANDARDS, AS APPLICABLE.

    .3 OBTAIN ALL PERMITS REQUIRED FOR THE INSTALLATION OF MECHANICALTRADES WORK, ARRANGE FOR INSPECTIONS AND TESTS, AND PAY ALL FEESAND COSTS FOR THE PERMITS, INSPECTIONS AND FEES. OBTAIN PERMITSIMMEDIATELY AFTER NOTIFICATION OF AWARD OF CONTRACT.

    .4 PROVIDE THREE COPIES OF COMPLETE OPERATING AND MAINTENANCEINSTRUCTIONS FOR EQUIPMENT FURNISHED UNDER THIS CONTRACT. BINDINSTRUCTIONS IN 3-RING BINDERS. INCLUDE THE FOLLOWING:.1 SCHEMATIC DIAGRAM OF ELECTRICAL SYSTEMS..2 CONTROL SHOP DRAWINGS AND OPERATING SEQUENCE INCLUDING

    WIRING OF COMPONENTS..3 WIRING DIAGRAM OF CONTROL PANELS..4 OPERATING INSTRUCTIONS, INCLUDING START-UP AND SHUT-DOWN

    PROCEDURE..5 MAINTENANCE INSTRUCTIONS INCLUDING PREVENTIVE MAINTENANCE

    INSTRUCTIONS FOR COMPONENTS OF THE EQUIPMENT..6 COMPLETE PARTS LIST OF ASSEMBLIES AND THEIR COMPONENT PARTS,

    SHOWING MANUFACTURER'S NAME, CATALOGUE NUMBER, ANDNEAREST REPLACEMENT SOURCE.

    .7 LIST OF RECOMMENDED SPARE PARTS AND QUANTITY OF EACH ITEM TOBE STOCKED.

    .8 MANUFACTURERS' WARRANTIES AND GUARANTEES..5 CLEAN ALL MECHANICAL SYSTEMS AT PROJECT COMPLETION..6 COMPLETE AS-BUILT DRAWINGS SHOWING ALL CHANGES AS WORK

    PROGRESSES.

    2 CONTRACTOR QUALIFICATIONS:.1 ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE “TRADE

    QUALIFICATION AND APPRENTICESHIP ACT” AND REGULATIONS, BY PERSONSWHO HOLD THE FOLLOWING CERTIFICATES OF QUALIFICATION (ASAPPLICABLE):.1 PLUMBER;.2 REFRIGERATION & AIR CONDITIONING SYSTEMS MECHANIC;.3 RESIDENTIAL AIR CONDITIONING SYSTEMS MECHANIC;.4 SHEET METAL WORKER;.5 SPRINKLER & FIRE PROTECTION INSTALLER.

    .2 ALL FUELS-RELATED WORK TO BE CARRIED OUT IN ACCORDANCE WITH TSSAREQUIREMENTS AND ONTARIO REGULATION 215/01, “FUEL INDUSTRYCERTIFICATES” BY PERSONS WHO HOLD THE APPROPRIATE CERTIFICATES FORTHE WORK BEING PERFORMED.

    3 EXISTING FACILITIES AND DEMOLITION:.1 LOCATE AND PROTECT ALL EXISTING EXTERIOR SITE SERVICES..2 RETAIN AND PROTECT ALL EXISTING INTERIOR SERVICES AND BUILDING FABRIC.

    MAKE GOOD ANY AND ALL DAMAGE RESULTING FROM THIS WORK..3 CONNECTIONS TO EXISTING SERVICES SHALL BE COORDINATED WITH THE

    OWNER..4 EXECUTE WORK WITH LEAST POSSIBLE INTERFERENCE OR DISTURBANCE TO

    NORMAL USE OF THE EXISTING BUILDING.

    4 FIXTURES AND EQUIPMENT:.1 ALL ALTERNATE PRODUCTS PROPOSED AS “APPROVED EQUALS” SHALL BE

    SUBMITTED FOR APPROVAL PRIOR TO TENDER CLOSING..2 PROVIDE SHOP DRAWINGS AND PRODUCT DATA FOR ALL MECHANICAL

    FIXTURES AND EQUIPMENT FOR APPROVAL, PRIOR TO PROCUREMENT..3 INSTALL ALL MECHANICAL FIXTURES AND EQUIPMENT IN ACCORDANCE WITH

    MANUFACTURER'S INSTRUCTIONS..4 LOCATE ALL EQUIPMENT WITH CLEARANCES, AS REQUIRED BY THE

    MANUFACTURER, THE FUEL CODES, AND ALL OTHER CODES ANDREGULATIONS, INCLUDING THE FOLLOWING CLEARANCES:.1 TO PERMIT PROPER EQUIPMENT OPERATION;.2 TO PERMIT SUFFICIENT AIRFLOW AROUND EQUIPMENT;.3 FOR EQUIPMENT SERVICE;.4 SUFFICIENT DISTANCE FROM COMBUSTIBLE MATERIAL;.5 WITH SUFFICIENT VENT CLEARANCES;.6 SUFFICIENT DISTANCE FROM ROOF EDGES OR OTHER HAZARDS.

    5 EQUIPMENT SUPPLIED BY OTHERS:.1 MAKE ALL MECHANICAL SERVICE CONNECTIONS TO EQUIPMENT SUPPLIED BY

    OTHERS..2 CONFIRM ALL SERVICE CONNECTIONS WITH MANUFACTURER AND SUPPLIER,

    PRIOR TO INSTALLATION. THIS SHALL INCLUDE ALL CONNECTION SIZES,LOCATIONS AND DETAILS, AND SHALL TAKE INTO ACCOUNT EQUIPMENTCLEARANCES AND INSTALLATION REQUIREMENTS.

    6 PIPING AND ESCUTCHEONS:.1 PROVIDE DIELECTRIC UNIONS AT ALL PIPING LOCATIONS WHERE DISSIMILAR

    METALS ARE JOINED..2 PROVIDE ESCUTCHEONS ON ALL PIPES PASSING THROUGH WALLS, PARTITIONS,

    FLOORS AND CEILINGS, CHROME, NICKEL PLATED BRASS OR TYPE 302STAINLESS STEEL.

    7 ACCESS DOORS:.1 SUPPLY ACCESS DOORS, AS REQUIRED IN DUCTWORK AND WALL/CEILING

    ASSEMBLIES, TO ALL CONCEALED MECHANICAL EQUIPMENT AND OPERATINGDEVICES. ACCESS DOORS IN WALL/CEILING ASSEMBLIES TO BE INSTALLED BYOTHER TRADES.

    .2 ACCESS DOORS SHALL BE FIRE-RATED TYPE, WHERE USED IN FIRE-RATEDASSEMBLIES, AND SHALL MATCH THE RATING OF THE ASSEMBLY.

    8 PIPE INSULATION:.1 INSTALL IN ACCORDANCE WITH THERMAL INSULATION ASSOCIATION OF

    CANADA (TIAC) NATIONAL STANDARDS..2 MAX. FLAME SPREAD RATING: 25..3 MAX. SMOKE DEVELOPED RATING: 50..4 DOMESTIC COLD WATER (DCW):

    .1 1” RIGID MOULDED MINERAL FIBRE WITH VAPOUR RETARDER JACKET.

    .2 INSULATE ALL PIPING IN FLOORS, WALLS AND CEILINGS, TO POINT OFFIXTURE CONNECTIONS.

    .5 DOMESTIC HOT WATER (DHW):.1 1” RIGID MOULDED MINERAL FIBRE FOR PIPING UP TO 1-1/4” SIZE.2 1-1/2” RIGID MOULDED MINERAL FIBRE FOR PIPING 1-1/2” TO 3” SIZE..3 INSULATE ALL PIPING IN FLOORS, WALLS AND CEILINGS, TO POINT OF

    FIXTURE CONNECTIONS..6 ROOF DRAINS:

    .1 1” RIGID MOULDED MINERAL FIBRE WITH VAPOUR RETARDER JACKET.

    .2 INSULATE ALL STORM PIPING ABOVE GROUND..7 OUTER JACKET:

    .1 CONCEALED LOCATIONS: ALL SERVICE JACKET.

    .2 EXPOSED LOCATIONS: PVC JACKET.

    .3 MECHANICAL/SERVICE ROOMS: PVC JACKET.

    9 WATER SERVICE AND WATER SUPPLY PIPING:.1 COORDINATE WATER SERVICE INSTALLATION WITH SUPPLY AUTHORITY:

    .1 MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETEWATER ENTRY INSTALLATION, FROM A POINT 1M BEYOND THE BUILDINGEXTERIOR.

    .2 OBTAIN, SUPPLY AND INSTALL ALL WATER METER(S) IN ACCORDANCEWITH THE REQUIREMENTS OF THE MUNICIPALITY, INCLUDING REMOTEREADING DEVICES AND WIRING.

    .3 SUPPLY AND INSTALL THRUST RESTRAINT (OBC 7.3.4.9.) FOR ALL WATERSERVICE PIPES 4” OR MORE IN SIZE.

    .4 SUPPLY AND INSTALL PREMISE ISOLATION BACKFLOW PREVENTER INACCORDANCE WITH OBC 7.6.2.6. AND CSA B64.10..1 MODERATE HAZARD.

    .2 ABOVE GROUND: COPPER TUBE, HARD DRAWN, TYPE L. CAN. OR USMANUFACTURE, INCLUDING FITTINGS. LEAD-FREE SOLDER.

    .3 WATER SUPPLY PIPING IS SHOWN SCHEMATICALLY. INSTALL TUBING CLOSE TOBUILDING STRUCTURE TO MINIMIZE FURRING, CONSERVE HEADROOM ANDSPACE. GROUP EXPOSED PIPING AND RUN PARALLEL TO WALLS.

    .4 ISOLATE ALL EQUIPMENT, FIXTURES AND BRANCHES WITH VALVES.

    .5 TEST WATER SYSTEM AT 1½ TIMES SYSTEM OPERATING PRESSURE ORMINIMUM 860 KPA, WHICHEVER IS GREATER. TEST PRESSURE ANDTIMEFRAME SHALL BE AS REQUIRED BY OBC 7.3.7.2.

    .6 FLUSH OUT, DISINFECT AND RINSE SYSTEM, PRIOR TO CONSTRUCTIONCOMPLETION.

    .7 WATER HEATERS:.1 SHALL BE PIPED WITH HEAT TRAPS ON THE INLET AND OUTLET PIPING, AS

    CLOSE AS PRACTICAL TO THE TANK, IN ACCORDANCE WITH OBC 12.3.1.4..2 TEMPERATURE AND PRESSURE RELIEF VALVES:

    .1 MAXIMUM TEMPERATURE SETTING OF 210F (99F);

    .2 MAXIMUM PRESSURE SETTING OF 150 PSI;

    .3 DISCHARGE PER OBC 7.6.1.12.:.1 TERMINATE WITH AN INDIRECT CONNECTION PIPED TO FLOOR

    DRAIN, SUMP OR OTHER SAFE LOCATION, WITH A 300MM AIRBREAK; OR

    .2 TERMINATE AT A DISTANCE NOT LESS THAN 150MM AND NOTMORE THAN 300MM FROM A FLOOR AND DISCHARGEVERTICALLY DOWN,

    .8 TRAP SEAL PRIMERS AND ACCESS TO THEM, SHALL BE LOCATED IN THEWASHROOM OR AREA THAT THEY SERVE.

    .9 SUPPLY AND INSTALL WATER HAMMER ARRESTORS AT THE MIDPOINT ANDEND OF RUNS OF WATER SUPPLY PIPING AS REQUIRED BY OBC 7.6.1.14.

    10 DRAINAGE, WASTE AND VENT PIPING:.1 COORDINATE SANITARY AND STORM SERVICE INSTALLATIONS WITH SUPPLY

    AUTHORITY..2 APPROXIMATE SUB-FLOOR PIPING ELEVATIONS HAVE BEEN INDICATED ON THE

    DRAWINGS. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SETTINGFINAL INVERTS BASED ON SITE CONDITIONS.

    .3 BELOW GROUND/FLOOR:.1 ABS DWV SOLID WALL SCHEDULE 40, CERTIFIED TO CAN/CSA STANDARD

    B181.1..2 PVC DWV SOLID WALL SCHEDULE 40, CERTIFIED TO CAN/CSA STANDARD

    B181.2..3 PVC DWV, TYPE SDR26 SDR35.

    .4 ABOVE GROUND:.1 CAST IRON, TYPE DWV..2 COPPER, TYPE DWV..3 PVC DWV SOLID WALL SCHEDULE 40, CERTIFIED TO CAN/CSA STANDARD

    B181.2, FOR NONCOMBUSTIBLE CONSTRUCTION (FLAME-SPREAD RATINGNOT MORE THAN 25 PER CAN/ULC-S102.2).

    .5 PVC DWV SOLID WALL SCHEDULE 40, CERTIFIED TO CAN/CSA STANDARDB181.2, FOR NONCOMBUSTIBLE CONSTRUCTION (FLAME-SPREAD RATINGNOT MORE THAN 25 AND SMOKE DEVELOPED CLASSIFICATION NOT MORETHAN 50 PER CAN/ULC-S102.2 - PLENUMS AND HIGH BUILDINGS).

    .5 PROVIDE CLEANOUTS AS REQUIRED BY THE ONTARIO BUILDING CODE.

    .6 VENT COMPLETE PLUMBING SYSTEM IN ACCORDANCE WITH THE ONTARIOBUILDING CODE.

    11 NATURAL GAS PIPING:.1 COORDINATE NATURAL GAS SERVICE INSTALLATION WITH SUPPLY AUTHORITY..2 STEEL PIPE, SCHEDULE 40, SEAMLESS, SCREWED FITTINGS..3 PROVIDE SEISMICALLY ACTUATED SHUT-OFF VALVE (EARTHQUAKE VALVE)

    WHERE PIPING LEAVES NATURAL GAS METER..4 SLOPE PIPING DOWN IN DIRECTION OF FLOW TO LOW POINTS..5 TEST SYSTEM IN ACCORDANCE WITH NATURAL GAS AND PROPANE

    INSTALLATION CODE.

    12 DUCTWORK:.1 RECTANGULAR DUCT:

    .1 RIGID GALVANIZED STEEL, LOCK FORMING QUALITY TO ASTMA653/A653M

    .2 THICKNESS, FABRICATION, REINFORCEMENT ANDSUPPORT/ATTACHMENT TO ASHRAE OR SMACNA.

    .2 ROUND DUCT:.1 RIGID GALVANIZED STEEL, LOCK FORMING QUALITY TO ASTM

    A653/A653M.2 THICKNESS, FABRICATION, REINFORCEMENT AND

    SUPPORT/ATTACHMENT TO ASHRAE OR SMACNA..3 FLEXIBLE BRANCH DUCT, PERMITTED WITHIN 2M/6FT FROM OUTLET, IN

    CONCEALED LOCATIONS:.1 ALL METAL TYPE: TRIPLE LOCK, ALUMINUM CORRUGATED DUCT,

    MANUFACTURED USING AN ALUMINUM STRIP, WHICH IS SPIRALLYWOUND AND MECHANICALLY JOINED TOGETHER FORMING AN AIRTIGHT AND LEAKPROOF SEAM.

    .3 SEAL CLASSIFICATION:.1 CLASS A: LONGITUDINAL SEAMS, TRANSVERSE JOINTS, DUCT WALL

    PENETRATIONS AND CONNECTIONS MADE AIRTIGHT WITH SEALANT ANDTAPE.

    .4 FITTINGS.1 FABRICATION: TO SMACNA..2 RADIUSED ELBOWS.

    .1 RECTANGULAR: STANDARD WITH CENTRELINE RADIUS 1.5 TIMESDUCT DIMENSION, WITH SINGLE THICKNESS TURNING VANES.

    .2 ROUND: FIVE PIECE WITH CENTRELINE RADIUS 1.5 TIMES DIAMETER..3 MITRED ELBOWS, RECTANGULAR: WITH DOUBLE THICKNESS TURNING

    VANES..5 BRANCHES:

    .1 RECTANGULAR MAIN AND BRANCH: WITH RADIUS ON BRANCH 1.5 TIMESWIDTH OF DUCT 45 DEGREES ENTRY ON BRANCH.

    .2 ROUND MAIN AND BRANCH: ENTER MAIN DUCT AT 45 DEGREES WITHCONICAL CONNECTION.

    .3 PROVIDE VOLUME CONTROL DAMPER IN BRANCH DUCT NEARCONNECTION TO MAIN DUCT.

    .4 MAIN DUCT BRANCHES: WITH SPLITTER DAMPER..6 TRANSITIONS:

    .1 DIVERGING: 20 DEGREES MAXIMUM INCLUDED ANGLE.

    .2 CONVERGING: 30 DEGREES MAXIMUM INCLUDED ANGLE..7 FIRE STOPPING

    .1 RETAINING ANGLES AROUND DUCT, ON BOTH SIDES OF FIRE SEPARATIONIN ACCORDANCE WITH SECTION.

    .2 FIRE STOPPING MATERIAL AND INSTALLATION MUST NOT DISTORT DUCT..8 DAMPERS:

    .1 MANUFACTURE TO SMACNA STANDARDS.

    .2 SINGLE BLADE DAMPERS:.1 FABRICATE FROM SAME MATERIAL AS DUCT, BUT ONE SHEET METAL

    THICKNESS HEAVIER. V_GROOVE STIFFENED..2 SIZE AND CONFIGURATION TO RECOMMENDATIONS OF SMACNA..3 LOCKING QUADRANT (WITH SHAFT EXTENSION TO ACCOMMODATE

    INSULATION THICKNESS, IF REQUIRED)..4 INSIDE AND OUTSIDE NYLON END BEARINGS..5 CHANNEL FRAME OF SAME MATERIAL AS ADJACENT DUCT, COMPLETE

    WITH ANGLE STOP..9 DUCT LEAKAGE: IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE

    TEST MANUAL..10 ALL DUCT AND SEAL MATERIALS TO HAVE A FLAME SPREAD RATING OF LESS

    THAN 25 AND A SMOKE DEVELOPED CLASSIFICATION OF LESS THAN 50..11 PROVIDE FLEXIBLE CONNECTIONS AT ALL EQUIPMENT DUCT CONNECTION

    POINTS.

    13 ROOF CURBS:.1 ALL ROOF CURBS SHALL:

    .1 BE SEISMICALLY DESIGNED;

    .2 BE SLOPED TO ACCOMMODATE ROOF SLOPE, AS REQUIRED;

    .3 EXTEND A MINIMUM OF 14” ABOVE THE FINISHED ROOF SURFACE.

    14 DUCT INSULATION:.1 REFER TO DRAWING FOR DUCT THAT IS IDENTIFIED TO BE INSULATED..2 INSTALL IN ACCORDANCE WITH THERMAL INSULATION ASSOCIATION OF

    CANADA (TIAC) NATIONAL STANDARDS..3 MAX. FLAME SPREAD RATING: 25..4 MAX. SMOKE DEVELOPED RATING: 50..5 THERMAL INSULATION - RECTANGULAR DUCT:

    .1 1” (R4.3) RIGID MINERAL FIBRE BOARD WITH VAPOUR RETARDER JACKET.

    .2 ALUMINUM JACKET WITH MOISTURE BARRIER.

    15 MECHANICAL FIRE PROTECTION:.1 REFER TO ARCHITECTURAL DRAWINGS, TO VERIFY LOCATION OF ALL FIRE

    SEPARATIONS AND FIRE-RATED MEMBRANES.

    .2 ALL PIPING SHALL BE TIGHTLY FITTED AND SEALED WITH FIRESTOPPINGMATERIAL AT ALL FIRE SEPARATIONS AND FIRE-RATED MEMBRANES.

    .3 FIRE DAMPERS:.1 FIRE DAMPERS SHALL BE CAN/ULC-S112 (STANDARD METHOD OF FIRE

    TEST OF FIRE DAMPER ASSEMBLIES) LISTED AND LABELED..2 FIRE DAMPERS SHALL BE NFPA 80 (STANDARD FOR FIRE DOORS AND

    OTHER OPENING PROTECTIVES), NFPA 90A (STANDARD FOR THEINSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS), ANDNFPA 101 (LIFE SAFETY CODE) COMPLIANT.

    .3 DUCTWORK SHALL BE FITTED WITH FIRE DAMPERS AT ALL FIRESEPARATIONS AND FIRE-RATED MEMBRANES.

    .4 SUPPLY AND INSTALL ACCESS DOORS IN ARCHITECTURAL FINISH (WALL,CEILING OR FLOOR) TO ACCESS DUCT, IN COMMON AREA WHEREPOSSIBLE.

    .5 SUPPLY AND INSTALL TIGHTLY-FITTED ACCESS DOOR IN DUCT TO ACCESS,INSPECT AND RESET FIRE DAMPER.

    .6 TYPES: DYNAMIC - FOR USE IN AIR HANDLING SYSTEMS THAT DO NOTSHUTDOWN UPON FIRE ALARM.

    .7 RATING: 1-1/2 HR (30MIN TO 2HR FIRE RESISTANCE RATING)..4 FIRE DAMPER AND DUCT SHALL BE INSTALLED IN ACCORDANCE WITH

    MANUFACTURERS REQUIREMENTS, AND SHALL BE SEALED WITH FIRESTOPPINGMATERIAL.

    .5 ALL MECHANICAL MATERIALS USED WITHIN CEILING RETURN AIR PLENUMSSHALL FLAME-SPREAD RATING NOT MORE THAN 25 AND SMOKE DEVELOPEDCLASSIFICATION NOT MORE THAN 50 PER CAN/ULC-S102.2.

    .6 MOCK-UPS:.1 PREPARE MOCK-UPS OF TYPICAL FIRESTOP INSTALLATION OF THE

    FOLLOWING, FOR REVIEW AND APPROVAL BY THE OWNER, ENGINEERAND MUNICIPAL BUILDING INSPECTOR:.1 SANITARY PIPING - WALL AND CEILING/FLOOR FIRE SEPARATION;.2 STORM PIPING - WALL AND CEILING/FLOOR FIRE SEPARATION;.3 SPRINKLER PIPING - WALL AND CEILING/FLOOR FIRE SEPARATION;.4 DCW AND DHW PIPING - WALL AND CEILING/FLOOR FIRE SEPARATION;.5 FIRE DAMPER INSTALLATION - WALL AND CEILING/FLOOR FIRE

    SEPARATION..2 ALL FIRESTOP INSTALLATIONS SHALL BE COMPLETED IN ACCORDANCE

    WITH THE APPROPRIATE PRODUCT INSTALLATION INSTRUCTIONS, ANDTHE REFERENCED UL/ULC LISTING AND/OR TEST STANDARD.

    .3 SUPPLY A COPY OF THE PRODUCT INSTALLATION INSTRUCTIONS WITHULC LISTING AND/OR TEST STANDARD REFERENCE, FOR EACHINSTALLATION.

    .4 MOCK-UP MAY REMAIN AS PART OF WORK.

    16 COMMERCIAL KITCHEN EXHAUST AND FIRE PROTECTION:.1 SYSTEM SHALL BE CONFIGURED FOR COMMERCIAL KITCHEN EXHAUST SYSTEM..2 DESIGN AND INSTALLATION SHALL CONFORM TO NFPA 96 - STANDARD FOR

    VENTILATION CONTROL AND FIRE PROTECTION OF COMMERCIAL COOKINGOPERATIONS.

    .3 HOOD TYPES (ASHRAE HVAC APPLICATIONS, CHAPTER 33):.1 DUTY: MEDIUM DUTY (400F)..2 CONFIGURATION:

    .1 WALL MOUNTED CANOPY: MEDIUM DUTY - 200 TO 300 CFM PERLINEAL FOOT.

    .4 HOOD:.1 SHALL BE UL/ULC LISTED: TYPE I - OVER EQUIPMENT THAT PRODUCES

    GREASE VAPORS OR SMOKE..2 SHALL HAVE A 6” MINIMUM OVERHANG ON ALL SIDES OF COOKING

    EQUIPMENT..3 SHALL HAVE A UL/ULC LISTED GREASE COLLECTOR AND GREASE FILTERS,

    LOCATED NOT LESS THAN 18” FROM THE COOKING SURFACE, OR NOTLESS THAN 48” FROM CHARCOAL TYPE COOKING SURFACES.

    .4 LIGHTING UNITS IN HOODS SHALL BE UL/ULC LISTED FOR USE OVERCOMMERCIAL COOKING APPLIANCES.

    .5 EXHAUST DUCT AND FAN:.1 EXHAUST FANS SHALL BE UL/ULC LISTED, FOR COMMERCIAL KITCHEN /

    RESTAURANT EXHAUST USE..2 EXHAUST FANS SHALL HAVE A MINIMUM OF 3.05M (10 FT.) OF

    CLEARANCE FROM THE OUTLET TO ADJACENT BUILDINGS, PROPERTYLINES, GRADE LEVEL PERMITTED TO BE LOWERED IN A SECURE AREA IFACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION), COMBUSTIBLECONSTRUCTION, ELECTRICAL EQUIPMENT OR LINES, AND THE CLOSESTPOINT OF ANY AIR INTAKE OR OPERABLE DOOR OR WINDOW.

    .3 EXHAUST DUCT AIR VELOCITY SHALL BE NOT LESS THAN 1200 FT/MIN.

    .4 HOOD EXHAUST FAN(S) SHALL CONTINUE TO OPERATE AFTER THE FIREEXTINGUISHING SYSTEM HAS BEEN ACTIVATED UNLESS FAN SHUTDOWNIS REQUIRED BY A LISTED COMPONENT OF THE VENTILATION SYSTEM ORBY THE DESIGN OF THE EXTINGUISHING SYSTEM.

    .5 ALL DUCTWORK SHALL BE PITCHED TO DRAIN THE GREASE BACK INTO THEHOOD.

    .6 EXHAUST AND REPLACEMENT AIR FANS SHALL BE INTER-LOCKED, ANDSHALL HAVE VARIABLE SPEED CONTROL.

    .7 ACCESS PANELS:.1 ACCESS OR ACCESS PANELS SHALL BE PROVIDED IN HOOD, DUCT,

    AND EXHAUST FAN FOR COMPLETE ACCESS, INSPECTION ANDCLEANING OF THE SYSTEM.

    .2 OPENINGS SHALL BE PROVIDED AT THE SIDES OR AT THE TOP OF THEDUCT, WHICHEVER IS MORE ACCESSIBLE, AND AT CHANGES OFDIRECTION.

    .3 ACCESS PANELS SHALL BE OF THE SAME MATERIAL AND THICKNESSAS THE DUCT, WITH A GASKET OR SEALANT THAT IS RATED FOR815.6C (1500F) AND SHALL BE GREASE-TIGHT.

    .4 FASTENERS, SUCH AS BOLTS, WELD STUDS, LATCHES, OR WING NUTS,USED TO SECURE THE ACCESS PANELS SHALL BE CARBON STEEL ORSTAINLESS STEEL AND SHALL NOT PENETRATE DUCT WALLS.

    .6 REPLACEMENT AIR:.1 WHEN ITS FIRE-EXTINGUISHING SYSTEM DISCHARGES, MAKEUP AIR

    SUPPLIED INTERNALLY TO A HOOD SHALL BE SHUT OFF..7 CLEARANCE REQUIREMENTS:

    .1 THE CLEARANCE REQUIREMENTS OR CLEARANCE REDUCTION SYSTEMSFOR HOODS, GREASE REMOVAL DEVICES, EXHAUST FANS AND DUCTS,OUTLINED IN CHAPTER 4 OF NFPA 96 SHALL BE FOLLOWED.

    .2 THE CLEARANCE REQUIREMENTS FROM DUCT TO THE INTERIOR SURFACEOF ENCLOSURES OUTLINED IN CHAPTER 7 OF NFPA 96 SHALL BEFOLLOWED.

    .8 AUTOMATIC FIRE-EXTINGUISHING SYSTEM:.1 GENERAL:

    .1 FIRE-EXTINGUISHING EQUIPMENT, WITH BOTH AUTOMATIC ANDMANUAL ACTIVATION, SHALL BE INSTALLED IN THE COMMERCIALKITCHEN EXHAUST HOOD.

    .2 THE AUTOMATIC FIRE-EXTINGUISHING SYSTEM SHALL COMPLY WITHSTANDARD UL 300, STANDARD FOR FIRE TESTING OF FIREEXTINGUISHING SYSTEMS FOR PROTECTION OF RESTAURANTCOOKING AREAS, OR OTHER EQUIVALENT STANDARDS AND SHALL BEINSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THELISTING.

    .3 SYSTEM SHALL BE PRE-ENGINEERED TYPE, WITH A FIXED NOZZLEEXTINGUISHING AGENT DISTRIBUTION.

    .2 FUEL SHUT-OFF:.1 UPON ACTIVATION OF THE FIRE-EXTINGUISHING SYSTEM, ALL

    SOURCES OF FUEL AND ELECTRIC POWER TO ALL EQUIPMENT UNDERTHE HOOD SHALL AUTOMATICALLY SHUT OFF.

    .2 SHUTOFF DEVICES SHALL REQUIRE MANUAL RESET..3 ACTIVATION:

    .1 EXTINGUISHING AGENT SHALL BE DELIVERED THROUGH REGULATEDRELEASE NOZZLES.

    .2 AUTOMATIC ACTIVATION SHALL BE BY FUSIBLE LINK DETECTION.

    .3 A READILY ACCESSIBLE MEANS FOR MANUAL ACTIVATION SHALL BELOCATED BETWEEN 1067MM AND 1219MM (42IN AND 48IN) ABOVETHE FLOOR, BE ACCESSIBLE IN THE EVENT OF A FIRE, BE LOCATED INA PATH OF EGRESS, AND CLEARLY IDENTIFY THE HAZARDPROTECTED.

    .4 THE AUTOMATIC AND MANUAL MEANS OF SYSTEM ACTIVATIONEXTERNAL TO THE CONTROL HEAD OR RELEASING DEVICE SHALL BESEPARATE AND INDEPENDENT OF EACH OTHER SO THAT FAILURE OFONE WILL NOT IMPAIR THE OPERATION OF THE OTHER. THEMANUAL MEANS OF SYSTEM ACTIVATION SHALL BE PERMITTED TOBE COMMON WITH THE AUTOMATIC MEANS IF THE MANUALACTIVATION DEVICE IS LOCATED BETWEEN THE CONTROL HEAD ORRELEASING DEVICE AND THE FIRST FUSIBLE LINK.

    .5 THE MEANS FOR MANUAL ACTIVATION SHALL BE MECHANICAL.ELECTRICAL POWER SHALL BE PERMITTED TO BE USED FOR MANUALACTIVATION IF A STANDBY POWER SUPPLY IS PROVIDED OR IFSUPERVISION IS PROVIDED.

    .4 SYSTEM ANNUNCIATION:.1 UPON ACTIVATION OF THE AUTOMATIC FIRE-EXTINGUISHING

    SYSTEM, AN AUDIBLE ALARM OR VISUAL INDICATOR SHALL BEPROVIDED TO SHOW THAT THE SYSTEM HAS ACTIVATED.

    .2 WHERE A FIRE ALARM SYSTEM IS INSTALLED, THE ACTIVATION OFTHE AUTOMATIC FIRE-EXTINGUISHING SYSTEM SHALL ACTIVATE THEFIRE ALARM SYSTEM.

    .5 SYSTEM SUPERVISION:.1 WHERE ELECTRICAL POWER IS REQUIRED TO OPERATE THE

    AUTOMATIC FIRE-EXTINGUISHING SYSTEM, IT SHALL BE MONITOREDBY A SUPERVISORY ALARM, WITH A STANDBY POWER SUPPLYPROVIDED.

    .9 SYSTEM SHALL BE TESTED TO VERIFY THAT THE EXHAUST AIR ANDREPLACEMENT AIR VOLUMES, AND NEGATIVE PRESSURE CREATED IN THECOOKING AREA MEET THE REQUIREMENTS OF NFPA 96. TEST REPORT SHALLBE SUBMITTED UPON THE COMPLETION OF THE INSTALLATION.

    17 SPRINKLER AND STANDPIPE SYSTEM:.1 SPRINKLER SYSTEM DESIGN AND INSTALLATION SHALL CONFORM TO NFPA 13 -

    INSTALLATION OF SPRINKLER SYSTEMS..2 STANDPIPE SYSTEM DESIGN AND INSTALLATION SHALL CONFORM TO NFPA 14

    - INSTALLATION OF STANDPIPE AND HOSE SYSTEMS..3 SYSTEM INSPECTION AND TESTING SHALL CONFORM TO NFPA 25 - INSPECTION

    TESTING AND MAINTENANCE OF WATER-BASED FIRE PROTECTION SYSTEMS..4 PROVIDE DESIGN, LAYOUT, DRAWINGS AND CALCULATIONS FOR COMPLETE

    SPRINKLER SYSTEM, SEALED BY PROFESSIONAL ENGINEER IN THE PROVINCE OFONTARIO.

    .5 PROVIDE BACKFLOW FROM FIRE PROTECTION SYSTEMS IN ACCORDANCE WITHTHE ONTARIO BUILDING CODE (OBC 7.6.2.4) AND CAN/CSA-B64 SERIES-07 -BACKFLOW PREVENTERS AND VACUUM BREAKERS.

    .6 SPRINKLER SYSTEM MONITORING STATION CONNECTION SHALL NOTIFY THEFIRE DEPARTMENT BY WAY OF SIGNALS TO A CENTRAL STATION CONFORMINGTO CAN/ULC-S561 “INSTALLATION AND SERVICES FOR FIRE SIGNAL RECEIVINGCENTRES AND SYSTEMS”. FOR FIRE ALARM SYSTEM MONITORING, THECONTRACTOR SHALL:.1 COORDINATE WITH OWNER'S MONITORING COMPANY;.2 SUPPLY AND INSTALL COMMUNICATION MODULE REQUIRED FOR

    MONITORING;.3 SUPPLY AND INSTALL CABLING AND TERMINATION BOX FROM

    COMMUNICATION MODULE TO BUILDING TELEPHONE SERVICE SPACE, OROTHER SERVICE SPACE, AS IDENTIFIED BY THE OWNER'S MONITORINGCOMPANY.

    18 MECHANICAL IDENTIFICATION:.1 IDENTIFY MECHANICAL EQUIPMENT WITH LAMICOID NAMEPLATES..2 LABEL ALL PIPING AT LEAST ONCE IN EVERY ROOM, AND AT NO MORE THAN 25

    FT CENTERS.

    19 EARTHQUAKE LOAD:.1 ALL MECHANICAL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE

    EARTHQUAKE LOAD AND EFFECTS REQUIRED BY THE ONTARIO BUILDING CODE..2 MECHANICAL ELEMENTS AND COMPONENTS (EQUIPMENT, PIPES, DUCTS,

    ETC.), AND THEIR CONNECTIONS TO THE BUILDING SHALL BE CONSTRUCTED INACCORDANCE WITH THE SMACNA/ANSI SEISMIC RESTRAINT MANUAL OROTHER GUIDELINE REFERENCED IN THE ONTARIO BUILDING CODE.

    .3 PROVIDE SHOP DRAWINGS FOR SUPPORT, CONNECTIONS AND SEISMICRESTRAINT OF ALL MECHANICAL EQUIPMENT, PIPES AND DUCTS, INCLUDING,BUT NOT LIMITED TO:.1 ROOFTOP HVAC EQUIPMENT;.2 TYPICAL DUCT SUPPORTING SYSTEM;.3 TYPICAL SAN, STM, DCW, DHW AND SPRINKLER PIPE SUPPORTING

    SYSTEM;.4 TYPICAL NATURAL GAS PIPE SUPPORTING SYSTEM.THESE SHOP DRAWINGS SHALL BE DESIGNED AND SEALED BY A PROFESSIONALENGINEER IN THE PROVINCE OF ONTARIO, WITH EXPERIENCE IN SEISMICENGINEERING.

    .4 FOLLOWING PROJECT COMPLETION, SEISMIC ENGINEER SHALL PROVIDE ALETTER OF FINAL SITE REVIEW.

    .5 CONTRACTOR SHALL CARRY THE COST OF THE SEISMIC ENGINEERING,INCLUDING SITE REVIEWS, DESIGN AND SHOP DRAWING PREPARATION.

    20 EQUIPMENT AND MATERIALS SUPPORT:.1 ALL MECHANICAL EQUIPMENT, PIPING, DUCTWORK, AND RELATED ITEMS

    SHALL BE SECURELY SUPPORTED, ATTACHED AND FASTENED TO BUILDINGSTRUCTURE.

    .2 PIPE HANGERS AND SUPPORTS SHALL BE FABRICATED AND INSTALLED INACCORDANCE WITH MSS STANDARD SP-58, PIPE HANGERS AND SUPPORTS -MATERIALS, DESIGN, MANUFACTURE, SELECTION, APPLICATION, ANDINSTALLATION.

    21 COORDINATION:.1 INFORMATION INVOLVING ACCURATE DIMENSIONING OF THE BUILDING SHALL

    BE TAKEN FROM SITE BY CONTRACTOR..2 DRAWINGS ARE IN DIAGRAMMATIC FORM, INTENDED TO CONVEY THE SCOPE

    OF WORK AND GENERAL ARRANGEMENT FOR EQUIPMENT. COORDINATEPHYSICAL LOCATION OF ALL EQUIPMENT WITH OTHER TRADES AND ALLOWFOR ANY ADDITIONAL PIPING, DUCTING, FITTINGS, SUPPORTS, ETC., IN ORDERTO AVOID INTERFERENCE AND FACILITATE THE WORK.

    .3 CONTRACTOR TO MAKE ANY NECESSARY MODIFICATIONS OR ADDITIONS,WITHOUT CHARGE, TO ACCOMMODATE SITE CONDITIONS ANDCOORDINATION.

    .4 COORDINATE ALL MECHANICAL EQUIPMENT WIRING, INCLUDING LOWVOLTAGE CONTROL WIRING, WITH ELECTRICAL TRADES.

    22 START-UP, COMMISSIONING AND TRAINING:.1 COMMISSIONING:

    .1 START-UP AND COMMISSION THE FOLLOWING SYSTEMS:.1 PLUMBING FIXTURES;.2 HVAC;.3 COMMERCIAL KITCHEN EXHAUST AND FIRE PROTECTION;.4 SPRINKLER SYSTEM.

    .2 PERFORM SYSTEMATIC TESTS, PROCEDURES AND CHECKS ON SYSTEMS,AS FOLLOWS:.1 TO VERIFY OPERATION IN ACCORDANCE WITH CONTRACT

    DOCUMENTS, DESIGN CRITERIA AND INTENT, ANDMANUFACTURER'S REQUIREMENTS;

    .2 TO ENSURE APPROPRIATE DOCUMENTATION IS PROVIDED;

    .3 TO EFFECTIVELY TRAIN BUILDING OPERATIONAL STAFF..4 SYSTEMS ARE TO BE OPERATED AT FULL CAPACITY, WITH CORRECTION OF

    ALL DEFICIENCIES AND ADJUSTMENTS TO MEET OPTIMUMPERFORMANCE.

    .5 PROVIDE WRITTEN REPORT AT END OF COMMISSIONING OUTLININGEQUIPMENT OPERATIONAL CONDITIONS AND PARAMETERS.

    .2 TESTING, ADJUSTING AND BALANCING:.1 TEST, ADJUST AND BALANCE (TAB) ALL PLUMBING AND HVAC EQUIPMENT

    AND SYSTEMS; INCLUDING THE FOLLOWING:.1 ROOFTOP PACKAGED HVAC UNITS.

    .2 TAB PROCEDURE SHALL BE COMPLETED IN ACCORDANCE WITH ASHRAESTANDARD 111, MEASUREMENT, TESTING, ADJUSTING AND BALANCINGOF BUILDING HVAC SYSTEMS.

    .3 PROVIDE DETAILED REPORT AT END OF TAB, IN ACCORDANCE WITH THEREPORTING PROCEDURES OF ASHRAE STANDARD 111.

    .3 DEMONSTRATION AND TRAINING:.1 DEMONSTRATE OPERATION AND MAINTENANCE OF EQUIPMENT AND

    SYSTEMS TO OWNER'S PERSONNEL ONE WEEK PRIOR TO DATE OF FINALINSPECTION

    .2 PRIOR TO DEMONSTRATION AND TRAINING, ENSURE THAT EQUIPMENTHAS BEEN INSPECTED AND PUT INTO OPERATION, INCLUDINGCOMPLETION OF COMMISSIONING AND TESTING, ADJUSTING, ANDBALANCING.

    .3 DEMONSTRATE START_UP, OPERATION, CONTROL, ADJUSTMENT,TROUBLE_SHOOTING, SERVICING, AND MAINTENANCE OF EACH ITEM OFEQUIPMENT.

    .4 INSTRUCT PERSONNEL IN PHASES OF OPERATION AND MAINTENANCEUSING OPERATION AND MAINTENANCE MANUALS AS BASIS OFINSTRUCTION. REVIEW CONTENTS OF MANUAL IN DETAIL TO EXPLAINASPECTS OF OPERATION AND MAINTENANCE.

    Project Title:

    75 Neelin St,Carleton Place, Ontario

    CARLETON PLACEARENA ADDITIONArchitect

    Larry Gaines

    Tel: (613) 256-3630Fax: (613) 256-0615

    e-mail: [email protected]

    14 Bridge StreetAlmonte, ON

    K0A 1A0 Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.

    Facsimile: (613) 345-0008Telephone: (613) 345-0400

    Suite 207Brockville, Ont. K6V 5J9

    100 Strowger Blvd

    www.EastEng.com

    ALL DRAWINGS, SPECIFICATIONS ANDRELATED DOCUMENTS ARE THE

    COP RIGHT PROPERT OF THE ENGINEERAND MUST BE RETURNED UPON RE UEST.

    REPRODUCTION OF DRAWINGS,SPECIFICATIONS, AND RELATED

    DOCUMENTS IN PART OR WHOLE ISFORBIDDEN WITHOUT THE ENGINEERS'

    WRITTEN PERMISSION.

    THE CONTRACTOR MUST CHECK ANDVERIF ALL DIMENSIONS ON THE JOBPRIOR TO START OF CONSTRUCTION.

    DRAWINGS ARE NOT TO BE SCALED

    Drawing Title:

    MECHANICALNOTES & LEGENDS

    Professional Seal:

    RevisionsDateByNo.

    1 GB 2020-03-23 REVISIONS, FOR REVIEW

    0 GB 2020-02-20 FOR REVIEW

    2 GB 2020-04-01

    3 GB 2020-05-01

    FOR PERMIT

    REVISIONS, FOR TENDER

    REV DATE:

    Drawing No.:

    5/4/2020

    Design:

    Drawn:

    Approved:

    Date:

    Project No.:

    Scale:

    MM

    MM

    GB

    2020-02-16

    1/8" - 1'-0"

    9107M001

  • BACKFLOW PROTECTION TO BE REDUCEDPRESSURE (TO OBC 7.6.2.4.)

    MAIN SUPPLY VALVE

    EXPANDED METAL MESH SECUREDOVER TOP OF FROST BOX CASING

    SERVICE FROMWATER MAIN

    UNDISTURBED EARTH

    THRUST RESTRAINT ASREQUIRED (OBC 7.3.4.9.)

    FINISHED FLOOR

    START OF FIRE PROTECTIONCONTRACT

    SLEEVE THROUGHFOUNDATION WALL

    AUTOMATIC SPRINKLER WATER SERVICE DETAIL

    EXTEND CULVERT 6" (150mm)ABOVE FINISHED FLOOR

    SCALE: NTS

    SUPERVISED VALVE SUPPLIED BYFIRE PROTECTION CONTRACTOR &

    INSTALLED BY PLUMBINGCONTRACTOR

    4" (100mm) HUB DRAIN TOACCOMMODATE SPRINKLER DRAIN

    PS

    P

    TO F/A

    TO DRAIN

    TO DRAIN(TYPICAL)

    ITSFS

    WET PIPE ALARM CHECKVALVE ASSEMBLY

    START OF PLUMBING CONTRACT1m FROM FOUNDATION WALL

    S

    S

    SSS

    SPRINKLER CONTRACTOR SHALL CONFIRM:· FINAL SYSTEM SIZING & CONFIGURATION;· WATER SERVICE SIZE, FLOW RATE AND

    PRESSURE.

    ZONE 1 - NEW ADDITION GND. FLR

    FIRE DEPARTMENTCONNECTION (FDC)

    FDCSLOPE 1%

    SYSTEM - WET PIPECLASSIFICATION - ORDINARY

    HAZARD

    WATER METERM

    SS TO DOMESTICWATER SERVICE

    BACKFLOWPROTECTION

    ITSFS

    S

    ZONE 2 - NEW ADDITION 2ND. FLRSYSTEM - WET PIPECLASSIFICATION - ORDINARY

    HAZARD

    Project Title:

    75 Neelin St,Carleton Place, Ontario

    CARLETON PLACEARENA ADDITIONArchitect

    Larry Gaines

    Tel: (613) 256-3630Fax: (613) 256-0615

    e-mail: [email protected]

    14 Bridge StreetAlmonte, ON

    K0A 1A0 Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.

    Facsimile: (613) 345-0008Telephone: (613) 345-0400

    Suite 207Brockville, Ont. K6V 5J9

    100 Strowger Blvd

    www.EastEng.com

    ALL DRAWINGS, SPECIFICATIONS ANDRELATED DOCUMENTS ARE THE

    COP RIGHT PROPERT OF THE ENGINEERAND MUST BE RETURNED UPON RE UEST.

    REPRODUCTION OF DRAWINGS,SPECIFICATIONS, AND RELATED

    DOCUMENTS IN PART OR WHOLE ISFORBIDDEN WITHOUT THE ENGINEERS'

    WRITTEN PERMISSION.

    THE CONTRACTOR MUST CHECK ANDVERIF ALL DIMENSIONS ON THE JOBPRIOR TO START OF CONSTRUCTION.

    DRAWINGS ARE NOT TO BE SCALED

    Drawing Title:

    MECHANICALSCHEDULES & DETAILS

    Professional Seal:

    RevisionsDateByNo.

    1 GB 2020-03-23 REVISIONS, FOR REVIEW

    0 GB 2020-02-20 FOR REVIEW

    2 GB 2020-04-01

    3 GB 2020-05-01

    FOR PERMIT

    REVISIONS, FOR TENDER

    REV DATE:

    Drawing No.:

    5/4/2020

    Design:

    Drawn:

    Approved:

    Date:

    Project No.:

    Scale:

    MM

    MM

    GB

    2020-02-16

    1/8" - 1'-0"

    9107M002

  • K-2861HUDSONC_LAVATORYCAST IRON

    K-2861HUDSONC_LAVATORYCAST IRON

    EXISTINGMENS WC

    EXISTINGWOMENS WC

    ELEVATOR

    MACHINEROOM

    NEW KITCHENLCOATION

    MECHANICALROOM

    MECHANICALROOM

    SKATESHARPENING

    REFEREECHANGEROOM

    OFFICE

    FILES

    OFFICE

    JANITOR /STORAGE

    MECHANICALROOM

    JANITORS ROOMJANITORS ROOM

    UP

    EXISTINGWOMENS WC

    EXISTINGMENS WC DRESSING ROOM E DRESSING ROOM F CANADIANS CANADIANS CANADIANS

    MECHANICALROOM

    STAIRS STAIRS STAIRS STAIRS STAIRS STAIRSSEATING SEATING SEATING SEATING SEATING SEATING

    ICE SURFACE185'-0" X 85'-0"

    PLAYERS BENCHPLAYERS BENCH PENALTY BOX

    10'-0" VERTICAL LIFT

    10'-0" OVERHEAD

    UPUP UP

    EXISTINGMENS WC

    EXISTINGWOMENS WC

    ELEVATOR

    MACHINEROOM

    NEW KITCHENLCOATION

    MECHANICALROOM

    MECHANICALROOM

    SKATESHARPENING

    REFEREECHANGEROOM

    OFFICE

    FILES

    OFFICE

    JANITOR /STORAGE

    MECHANICALROOM

    JANITORS ROOMJANITORS ROOM

    UP

    EXISTINGWOMENS WC

    EXISTINGMENS WC DRESSING ROOM E DRESSING ROOM F CANADIANS CANADIANS CANADIANS

    MECHANICALROOM

    STAIRS STAIRS STAIRS STAIRS STAIRS STAIRSSEATING SEATING SEATING SEATING SEATING SEATING

    ICE SURFACE185'-0" X 85'-0"

    PLAYERS BENCHPLAYERS BENCH PENALTY BOX

    10'-0" VERTICAL LIFT

    10'-0" OVERHEAD

    UPUP UP

    DISCONNECT & REMOVEEXISTING EXHAUST FAN & DUCTWORK,

    INFILL & REPAIR WALL OPENINGS

    DISCONNECT & REMOVEEXISTING EA 18x10"

    DISCONNECT & REMOVEEXISTING EA DUCT &

    GRILLES, REPAIR CEILING

    DISCONNECT & REMOVEEXISTING EA DUCT &

    GRILLES, REPAIR CEILING

    DISCONNECT & REMOVEEXISTING FIRE

    SUPPRESSION SYSTEM

    DISCONNECT & REMOVEEXISTING FRYER

    REINSTATE UNDER NEW HOOD

    DISCONNECT & REMOVEEXISTING KITCHEN HOOD

    DISCONNECT & REMOVEEXISTING WARMERREINSTATE UNDER NEW HOOD

    DISCONNECT & REMOVEEXISTING KITCHEN MUA DUCT

    DISCONNECT & REMOVEEXISTING 2" WATERSERVICE & METER

    M

    DISCONNECT & REMOVEALL SA REGISTERS & BRANCH

    DUCTS FROM FURNACE

    DISCONNECT & REMOVEEXISTING THERMOSTAT

    DISCONNECT & REMOVEALL SA DIFFUSERS &BRANCH DUCT FROMFURNACE (TYP. OF 7)

    DISCONNECT & REMOVE EXISTINGSA DUCT FROM FURNACE

    DISCONNECT & REMOVEEXISTING RA DUCT DOWNWALL & RA INLET GRILLEPATCH & REPAIR WALL

    DISCONNECT & REMOVEEXISTING SINKRECESS, CAP & SEAL EXISTING SAN, VENT, DCW& DHWSERVICES TO PERMIT COVER BY NEW ARCHITECTURAL FINISHES

    RETAIN EXISTING RA 24"x10"DUCT AT U/S OF CEILING

    RETAIN EXISTING NATURAL GAS FURNACEKEEPRITE # N9MSB1202420C120 MBTU/HR INPUT

    T

    DISCONNECT & REMOVEALL SA REGISTERS & BRANCH

    DUCTS FROM FURNACE

    DISCONNECT & REMOVEEXISTING KITCHEN EA 10x8" DUCT, FAN & HOOD

    INFILL & REPAIR WALL OPENINGS

    CONNECT NEW 2" DCW SUPPLYTO EXISTING WITH VALVE

    EXISTING COATS

    EXISTINGSTAIRCASE EXISTING

    STAIRCASE

    STAIRS SEATING

    DISCONNECT & REMOVEEXISTING WATERCLOSET, LAVATORY & FLOOR DRAINRECESS, CAP & SEAL EXISTING SAN, VENT, DCW& DHWSERVICES TO PERMIT COVER BY NEW ARCHITECTURAL FINISHES

    SCALE: 18" = 1'-0"

    PARTIAL SECOND FLOOR PLAN

    Project Title:

    75 Neelin St,Carleton Place, Ontario

    CARLETON PLACEARENA ADDITIONArchitect

    Larry Gaines

    Tel: (613) 256-3630Fax: (613) 256-0615

    e-mail: [email protected]

    14 Bridge StreetAlmonte, ON

    K0A 1A0 Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.

    Facsimile: (613) 345-0008Telephone: (613) 345-0400

    Suite 207Brockville, Ont. K6V 5J9

    100 Strowger Blvd

    www.EastEng.com

    ALL DRAWINGS, SPECIFICATIONS ANDRELATED DOCUMENTS ARE THE

    COP RIGHT PROPERT OF THE ENGINEERAND MUST BE RETURNED UPON RE UEST.

    REPRODUCTION OF DRAWINGS,SPECIFICATIONS, AND RELATED

    DOCUMENTS IN PART OR WHOLE ISFORBIDDEN WITHOUT THE ENGINEERS'

    WRITTEN PERMISSION.

    THE CONTRACTOR MUST CHECK ANDVERIF ALL DIMENSIONS ON THE JOBPRIOR TO START OF CONSTRUCTION.

    DRAWINGS ARE NOT TO BE SCALED

    Drawing Title:

    MECHANICALGROUND FLOOR PLAN

    & SECOND FLOOR PLANDEMOLITION

    Professional Seal:

    RevisionsDateByNo.

    1 GB 2020-03-23 REVISIONS, FOR REVIEW

    0 GB 2020-02-20 FOR REVIEW

    2 GB 2020-04-01

    3 GB 2020-05-01

    FOR PERMIT

    REVISIONS, FOR TENDER

    REV DATE:

    Drawing No.:

    5/4/2020

    Design:

    Drawn:

    Approved:

    Date:

    Project No.:

    Scale:

    MM

    MM

    GB

    2020-02-16

    1/8" - 1'-0"

    9107M100PROJECT NORTH

  • K-2861HUDSONC_LAVATORYCAST IRON

    K-2861HUDSONC_LAVATORYCAST IRON

    STAIRS STAIRS STAIRS STAIRS STAIRS STAIRSSEATING SEATING SEATING SEATING SEATING SEATING

    ICE SURFACE185'-0" X 85'-0"

    PLAYERS BENCHPLAYERS BENCHPENALTY BOX

    10'-0" VERTICAL LIFT

    10'-0" OVERHEAD10'-0" OVERHEAD

    34" DHWR (INSUL)WITH VALVE, CHECK VALVE &CIRCUIT BALANCING VALVE

    BUILDINGSAN. CLEANOUTAPPROX INV. 131.76m

    SH-1

    FD-1

    SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS

    SH-1

    SH-2

    SH-1

    WC-1

    WC-1

    UR-1

    LA-1

    LA-1

    UR-1

    FCO

    SSSSSSSS

    SH-1

    SH-1

    SH-1

    SH-2

    SH-1

    SH-1

    SH-2

    SH-1

    SH-1

    SH-1

    SH-1

    SH-2

    FD-1FD-1FD-1

    FCO

    SSSSSSSS

    WC-1

    WC-1

    UR-1

    LA-1

    LA-1 U

    R-1

    M

    DHW

    R

    DCW DHW

    4" STM STACKWITH BASE CLEANOUT

    APPROXINV.132.44m

    FCO

    WT-1WATER STORAGE TANK80 Gal, BRADFORD WHITEWITH TEMP. / PRESS. RELIEF VALVE

    EXPANSIONTANK

    P-1CIRCULATINGPUMP

    P-2CIRCULATING

    PUMP

    FCO

    FCO

    SK-1

    4" SAN. @1:100 4" SAN. @1:100 4" SAN. @1:100

    2" DCW (INSUL)34" DHW (INSUL)34" DHWR (INSUL)

    112" DCW (INSUL)1" DHW (INSUL)34" DHWR (INSUL)

    112" DCW (INSUL)112" DHW (INSUL)1" DHWR (INSUL)

    112" DCW (INSUL)114" DHW (INSUL)34" DHWR (INSUL)

    112" DCW (INSUL)114" DHW (INSUL)34" DHWR (INSUL)

    112" DCW (INSUL)114" DHW (INSUL)34" DHWR (INSUL)

    114" DCW (INSUL)1" DHW (INSUL)34" DHWR (INSUL)

    114" DCW (INSUL)1" DHW (INSUL)34" DHWR (INSUL)

    NEW 6" WATER SERVICEVERIFY SIZE WITH SPRINKLER CONTRACTOR

    COORDINATE NEW WATER SERVICE WITHSUPPLY AUTHORITY.

    (REFER TO SITE PLAN)

    NEWPRESSURE TANK

    NEW 4" STM @ 1%COORDINATE WITH SUPPLY AUTHORITY(REFER TO SITE PLAN)

    SSSS

    FD-1

    FD-1

    FD-1

    FD-1

    NEW 5" SAN. SERVICECOORDINATE WITH SUPPLY AUTHORITY(REFER TO SITE PLAN)

    FINNISH FLOORELEV:-133.26m

    FINNISH FLOORELEV:-132.85m

    FINNISH FLOORELEV:-133.22m

    SS-1

    NEWSPRINKLER SYSTEM(REFER TO WATER SERVICE DETAIL)

    NEW3" WATER SERVICE & METERNEW 3" BACKFLOW PREVENTER(REFER TO WATER SERVICE DETAIL)

    CONNECT NEW WATER SERVICE TOEXISTING 2" WATER SERVICE TOEXISTING BUILDING

    CONNECT NEW SAN.TO EXISTING

    DHW

    R

    DC

    W

    DHW

    SCALE: 12" = 1'-0"

    ENLARGED PLUMBING PLAN

    112" DHW (INSUL)WITH UNION & VALVE

    112" DHW RETURN (INSUL)WITH UNION & VALVE

    112" DHW SUPPLY (INSUL)WITH UNION & VALVE

    P-1CIRCULATING PUMPWITH UNIONS, VALVE& CHECK VALVE10 GPM, WITH TIMER

    112" DCW (INSUL) WITH CHECKVALVE, VALVE & EXPANSION TANK

    P-2DHW RECIRC. PUMP

    WITH UNIONS, VALVE& CHRCK VALVE

    WATER HEATERBRADFORD WHITE #EF

    ULTRA HIGH EFFICIENCY100 US. GAL.

    199.9 MBTU / HR INPUT112" DCW (INSUL) WITH UNION & VALVE112" DHW (INSUL) WITH UNION & VALVE

    TEMP./PRESS. RELIEF VALVE PIPED TO FLOOR

    Project Title:

    75 Neelin St,Carleton Place, Ontario

    CARLETON PLACEARENA ADDITIONArchitect

    Larry Gaines

    Tel: (613) 256-3630Fax: (613) 256-0615

    e-mail: [email protected]

    14 Bridge StreetAlmonte, ON

    K0A 1A0 Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.

    Facsimile: (613) 345-0008Telephone: (613) 345-0400

    Suite 207Brockville, Ont. K6V 5J9

    100 Strowger Blvd

    www.EastEng.com

    ALL DRAWINGS, SPECIFICATIONS ANDRELATED DOCUMENTS ARE THE

    COP RIGHT PROPERT OF THE ENGINEERAND MUST BE RETURNED UPON RE UEST.

    REPRODUCTION OF DRAWINGS,SPECIFICATIONS, AND RELATED

    DOCUMENTS IN PART OR WHOLE ISFORBIDDEN WITHOUT THE ENGINEERS'

    WRITTEN PERMISSION.

    THE CONTRACTOR MUST CHECK ANDVERIF ALL DIMENSIONS ON THE JOBPRIOR TO START OF CONSTRUCTION.

    DRAWINGS ARE NOT TO BE SCALED

    Drawing Title:

    MECHANICALPLUMBING

    PROPOSED GROUNDFLOOR PLAN

    Professional Seal:

    RevisionsDateByNo.

    1 GB 2020-03-23 REVISIONS, FOR REVIEW

    0 GB 2020-02-20 FOR REVIEW

    2 GB 2020-04-01

    3 GB 2020-05-01

    FOR PERMIT

    REVISIONS, FOR TENDER

    REV DATE:

    Drawing No.:

    5/4/2020

    Design:

    Drawn:

    Approved:

    Date:

    Project No.:

    Scale:

    MM

    MM

    GB

    2020-02-16

    1/8" - 1'-0"

    9107M101PROJECT NORTH

  • K-2861HUDSONC_LAVATORYCAST IRON

    K-2861HUDSONC_LAVATORYCAST IRON

    STAIRS STAIRS STAIRS STAIRS STAIRS STAIRSSEATING SEATING SEATING SEATING SEATING SEATING

    ICE SURFACE185'-0" X 85'-0"

    PLAYERS BENCHPLAYERS BENCHPENALTY BOX

    10'-0" VERTICAL LIFT

    10'-0" OVERHEAD10'-0" OVERHEAD

    SA 12"ØSA 14"ØSA 12"Ø SA 14"Ø

    DRA 12"Ø RA 14"Ø

    DRA 12"ØRA 14"Ø

    D D DD

    DDDD

    500R124x10

    250S112x6 250S1

    12x6250S1

    12x6

    250S112x6250S1

    12x6

    250S112x6

    500R124x10

    500R124x10

    500R124x10

    250S112x6

    250S112x6

    SA 12"ØSA 14"ØSA 12"Ø SA 14"Ø

    DRA 12"Ø RA 14"Ø

    DRA 12"ØRA 14"Ø

    D D DD

    DDDD

    500R124x10

    250S112x6 250S1

    12x6250S1

    12x6

    250S112x6250S1

    12x6

    250S112x6

    500R124x10

    500R124x10

    500R124x10

    250S112x6

    250S112x6

    EXHAUST FAN10x4" DUCT (INSUL.)TO EXTERIOR WALL

    EF-1EXHAUST FAN

    10x4" DUCT (INSUL.)TO EXTERIOR WALL

    EF-1EXHAUST FAN10x4" DUCT (INSUL.)TO EXTERIOR WALL

    EF-1EXHAUST FAN

    10x4" DUCT (INSUL.)TO EXTERIOR WALL

    EF-1NEWNAT. GAS SERVICE & METERCOORDINATE LOCATION &INSTALLATION WITH SUPPLYAUTHORITY

    EXHAUST FAN WITHEXHAUST AIR DUCTTO WALL CAP

    ROUTE INJOIST SPACE

    EA 8x8" (INSUL.)

    ROUTE INJOIST SPACE

    EA 8x8" (INSUL.)

    FIRE SUPPRESSION SYSTEMINTERLOCK WITH FUEL SUPPLY(GAS & ELECTRIC) TO FRYER & WARMER

    MANUAL ACTIVATION OFFIRE EXTINGUISHING SYSTEM

    COMMERCIAL KITCHENEXHAUST HOOD

    MUA 12x10" (INSUL.)EA 12x12" WELDED STEELCONSTRUCTION WITH FIRE-RATEDWRAP THROUGH SECOND FLOOR TOROOF MOUNTED COMMERCIALKITCHEN EXHAUST FANROUTE IN VERTICAL SERVICE SPACEOF SHAFT WALL CONSTRUCTION

    HOOD

    DSA 8

    DSA 8

    D

    SA 8

    SA 10x10" SA 8x10"

    SA 12x10"

    RA 12x12"

    200S224x24

    200S224x24

    200S224x24

    EXISTING FURNACEWITH 2 - 3" COMB/VENT AIR ATAPPROX10'-4" ABOVE FLOORROUTE COMB/VENT AIR TO NEW ROOF

    EXISTING HEAT RECOVERY VENTILATORROUTE OUTDOOR & EXHAUST AIR DUCTSTO NEW ROOF 2 DUCT AT 6"Ø (INSUL) NEW DUCT FROM EXISTING HEAT RECOVERY

    VENTILATOR, OUTDOOR & EXHAUST AIRDUCTS TO EXTERIOR WALL, 2 - 6"Ø

    HRV OA 6"Ø (INSUL)TO GOOSENECK

    HRV EA 6"Ø (INSUL)TO WALL CAP

    EA 5"Ø TOWALL CAP

    EXISTING EXHAUST FAN WITH 5" DUCT TOEXTERIOR AT APPROX. 7' ABOVE MAIN FLOOR

    RE-ROUTE EXHAUST TOEND WALL OF CORRIDOR

    EF-2

    CONDENSING UNIT WITHMATCHING INDOOR COILFOR EXISTING FURNACE

    CU-1

    EXISTING FURNACESUPPLY & INSTALL NEWSUPPLY AIR DUCT, REFRIG COIL & THERMOSTAT

    EXHAUST FAN WITHEXHAUST AIR DUCTTO WALL CAP

    EF-2

    150S124x24

    220S124x24

    220S124x24

    220S124x24

    220S124x24

    220S124x24

    220S124x24

    220S124x24

    150S124x24

    D

    D

    DDDDDD

    DSA 18x10

    SA 2

    4x1

    0

    EXISTINGRA 24x10

    NEWTHERMOSTAT

    T

    SA 8

    SA 8

    SA 8

    SA 8

    SA 8

    SA 8

    SA 8"Ø

    SA 8"Ø

    SA 8"Ø

    R136x12

    DSA 8"Ø

    150S124x24

    WH-1WATER HEATER199.9 MBTU/HR INPUT34" NAT. GAS CONNECTIONWITH UNION, ISOLATING VALVE & DRIP LEG

    GAS

    GAS

    GAS

    GAS

    GAS

    EXHAUST FANWITH EXHAUST AIRDUCT TO WALL CAP

    EF-2

    EA 8

    x8" (IN

    SUL.)

    EXHAUST FANWITH EXHAUST AIRDUCT TO WALL CAP

    EF-2

    EA 8

    x8" (IN

    SUL.)

    EA 8

    x8" (IN

    SUL.)

    EA 8

    x8" (IN

    SUL.)

    EXHAUST FANWITH EXHAUST AIRDUCT TO WALL CAP

    EF-2

    Project Title:

    75 Neelin St,Carleton Place, Ontario

    CARLETON PLACEARENA ADDITIONArchitect

    Larry Gaines

    Tel: (613) 256-3630Fax: (613) 256-0615

    e-mail: [email protected]

    14 Bridge StreetAlmonte, ON

    K0A 1A0 Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.

    Facsimile: (613) 345-0008Telephone: (613) 345-0400

    Suite 207Brockville, Ont. K6V 5J9

    100 Strowger Blvd

    www.EastEng.com

    ALL DRAWINGS, SPECIFICATIONS ANDRELATED DOCUMENTS ARE THE

    COP RIGHT PROPERT OF THE ENGINEERAND MUST BE RETURNED UPON RE UEST.

    REPRODUCTION OF DRAWINGS,SPECIFICATIONS, AND RELATED

    DOCUMENTS IN PART OR WHOLE ISFORBIDDEN WITHOUT THE ENGINEERS'

    WRITTEN PERMISSION.

    THE CONTRACTOR MUST CHECK ANDVERIF ALL DIMENSIONS ON THE JOBPRIOR TO START OF CONSTRUCTION.

    DRAWINGS ARE NOT TO BE SCALED

    Drawing Title:

    MECHANICALHVAC

    PROPOSED GROUNDFLOOR PLAN

    Professional Seal:

    RevisionsDateByNo.

    1 GB 2020-03-23 REVISIONS, FOR REVIEW

    0 GB 2020-02-20 FOR REVIEW

    2 GB 2020-04-01

    3 GB 2020-05-01

    FOR PERMIT

    REVISIONS, FOR TENDER

    REV DATE:

    Drawing No.:

    5/4/2020

    Design:

    Drawn:

    Approved:

    Date:

    Project No.:

    Scale:

    MM

    MM

    GB

    2020-02-16

    1/8" - 1'-0"

    9107M102PROJECT NORTH

  • NEW3" NAT. GAS

    PIPING TO ROOF

    COMMERCIAL KITCHENEXHAUST FANMOUNTED ON ROOF

    EF-3

    EA 12x12" WELDEDSTEEL CONSTRUCTIONWITH FIRE-RATED WRAP

    ROOFTOP HVAC UNIT12' NAT. GAS CONNECTIONWITH UNION, ISOLATINGVALVE & DRIP LEG

    RTU-2ROOFTOP HVAC UNIT12' NAT. GAS CONNECTIONWITH UNION, ISOLATINGVALVE & DRIP LEG

    RTU-3

    SDSDSDSDSDSDSDSDSDSD

    SDSD

    SDSD

    RD-1 3" RD-13"

    4" STM @ 1:100IN CEILING SPACE

    4" STM @ 1:100IN CEILING SPACE

    GAS

    GAS

    GAS

    GAS

    GAS

    GAS

    GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

    3" NAT. GAS ON ROOFMOUNTING BLOCKS

    1" NAT. GAS ON ROOFMOUNTING BLOCKS

    150S224x24210S2

    24x24

    210S224x24

    SA 10x10"D

    D

    DSA 10x10"

    SA 8

    SA 8

    SA 8

    GAS

    GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

    GAS

    GAS

    GAS

    GAS

    100S224x24

    D

    SA 8

    100S224x24

    D

    SA 8

    SA 12x10"THROUGH FLOOR

    WITH FIRE DAMPER

    RA 12x12"THROUGH FLOOR

    WITH FIRE DAMPER

    4" STMSTACK

    NEW1" NAT. GAS PIPINGTO UPPER ROOF

    NEW3" NAT. GAS INCEILING SPACE

    NEWOUTDOOR & EXHAUST AIR HOODSFROM EXISTING HEAT RECOVERY

    VENTILATOR

    NEWCOMB/VENT AIR HOODSROOF TERMINATION FROMEXISTING FURNACE

    NEWCOMB/VENT AIR HOODS

    ROOF TERMINATION FROMEXISTING FURNACE

    NEWWATER HEATER

    COMB/VENT AIR ROOFTERMINATIONS

    2" NAT. GASTO WATER HEATERS

    Project Title:

    75 Neelin St,Carleton Place, Ontario

    CARLETON PLACEARENA ADDITIONArchitect

    Larry Gaines

    Tel: (613) 256-3630Fax: (613) 256-0615

    e-mail: [email protected]

    14 Bridge StreetAlmonte, ON

    K0A 1A0 Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.

    Facsimile: (613) 345-0008Telephone: (613) 345-0400

    Suite 207Brockville, Ont. K6V 5J9

    100 Strowger Blvd

    www.EastEng.com

    ALL DRAWINGS, SPECIFICATIONS ANDRELATED DOCUMENTS ARE THE

    COP RIGHT PROPERT OF THE ENGINEERAND MUST BE RETURNED UPON RE UEST.

    REPRODUCTION OF DRAWINGS,SPECIFICATIONS, AND RELATED

    DOCUMENTS IN PART OR WHOLE ISFORBIDDEN WITHOUT THE ENGINEERS'

    WRITTEN PERMISSION.

    THE CONTRACTOR MUST CHECK ANDVERIF ALL DIMENSIONS ON THE JOBPRIOR TO START OF CONSTRUCTION.

    DRAWINGS ARE NOT TO BE SCALED

    Drawing Title:

    MECHANICALPLUMBING & HVAC

    PROPOSED SECONDFLOOR PLAN

    Professional Seal:

    RevisionsDateByNo.

    1 GB 2020-03-23 REVISIONS, FOR REVIEW

    0 GB 2020-02-20 FOR REVIEW

    2 GB 2020-04-01

    3 GB 2020-05-01

    FOR PERMIT

    REVISIONS, FOR TENDER

    REV DATE:

    Drawing No.:

    5/4/2020

    Design:

    Drawn:

    Approved:

    Date:

    Project No.:

    Scale:

    MM

    MM

    GB

    2020-02-16

    1/8" - 1'-0"

    9107M103PROJECT NORTH

  • EXTERIOR LIGHTING CONTROL SCHEMATIC

    120V, CCT. P1 - 10

    TC

    PHOTOCELLC

    CELL

    CCT. P1 - 8LIGHTING

    CONTACTOR

    TIMECLOCK

    SPARE

    SPARE

    SPARE P-1

    ELECTRICAL LEGEND

    DESIGNATIONS

    DISTRIBUTION

    LIGHTING

    M

    3

    M

    NOTE: HEIGHT IS FROM FINISHED FLOOR TO CENTRELINE OF EQUIPMENT, UNLESS OTHERWISE NOTED.

    HEIGHT

    GFCIAFCIACAFFWP

    GROUND FAULT CIRCUIT INTERRUPTERARC FAULT CIRCUIT INTERRUPTERABOVE COUNTERABOVE FINISHED FLOORWEATHERPROOF

    MOTION SENSOR CONTROL - (CEILING)

    DUPLEX RECEPTACLE (WALL) - 15A/120V 12"/300mm

    DUPLEX RECEPTACLE (SPLIT) - 15A/120V

    DUPLEX RECEPTACLE (1/2 SWITCH) - 15A/120V

    NON-STANDARD RECEPTACLE AS NOTED

    DIRECT EQUIPMENT CONNECTION

    NON-FUSED DISCONNECT SWITCH 54"/1370mm

    FUSED DISCONNECT SWITCH

    MOTOR STARTER

    BRANCH CIRCUIT

    BRANCH CIRCUIT, SWITCHED

    BRANCH CIRCUIT, HOMERUNS TO PANEL

    12"/300mm

    12"/300mm

    AS NOTED

    54"/1370mm

    FLUORESCENT LIGHT FIXTURE - RECESSED

    FLUORESCENT LIGHT FIXTURE - SURFACE

    LIGHT FIXTUREF - FLUORESCENTH - HIGH INTENSITY DISCHARGEL - LED

    DATA COMMUNICATIONSTELEPHONE OUTLET (WALL)

    TELEPHONE OUTLET (FLOOR)

    DATA OUTLET (WALL)

    DATA OUTLET (FLOOR)

    DATA & TELEPHONE OUTLET (WALL)

    12"/300mm

    12"/300mm

    12"/300mm

    EXIT & EMERGENCY LIGHTING

    EL1

    EL2

    EL3

    90"/2300mm

    90"/2300mm

    90"/2300mm

    90"/2300mm

    EXIT LIGHT, SURFACE MOUNTED, SINGLE FACE

    COMBINATION EXIT & EMERGENCY LIGHT

    EMERGENCY LIGHT, BATTERY PACK

    EMERGENCY LIGHT, DOUBLE REMOTE

    EMERGENCY LIGHT, SINGLE REMOTE

    E2

    E1

    SINGLE POLE TOGGLE SWITCH - 20A/120V 35.5" / 900mm

    3-WAY TOGGLE SWITCH - 20A/120V TO

    DISTRIBUTION PANEL 72"/1825mm (TOP)

    MOTION SENSOR CONTROL - (SWITCH) 43.3 / 1100mm

    ELECTRICAL NOTES

    ELECTRICAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER DRAWINGS FOR THIS PROJECT.

    1 GENERAL:.1 CONFORM WITH APPLICABLE REQUIREMENTS OF THE MINISTRY OF LABOUR, AND THE OCCUPATIONAL HEALTH

    AND SAFETY ACT AND REGULATIONS FOR CONSTRUCTION PROJECTS..2 DO COMPLETE INSTALLATION IN ACCORDANCE WITH THE FOLLOWING:

    .1 ONTARIO ELECTRICAL SAFETY CODE;

    .2 ELECTRICAL SAFETY AUTHORITY..3 SUBMIT TO ELECTRICAL SAFETY AUTHORITY AND SUPPLY AUTHORITY NECESSARY NUMBER OF DRAWINGS AND

    SPECIFICATIONS FOR APPROVAL PRIOR TO COMMENCEMENT OF WORK..4 COORDINATE AND OBTAIN ELECTRICAL SERVICE LAYOUT FROM THE SUPPLY AUTHORITY..5 PAY ALL ELECTRICAL PERMIT AND INSPECTION FEES..6 GROUND COMPLETE SYSTEM IN ACCORDANCE WITH THE ONTARIO ELECTRICAL SAFETY CODE AND ELECTRICAL

    SAFETY AUTHORITY..7 IDENTIFICATION AND LABELLING:

    .1 IDENTIFY ELECTRICAL EQUIPMENT WITH LAMICOID NAMEPLATES, INCLUDING AMPERAGE, VOLTAGE, PHASEAND POWER SOURCE.

    .2 PROVIDE TYPEWRITTEN PANEL DIRECTORIES.

    .3 PROVIDE ADHESIVE LABEL ON ALL SWITCH, RECEPTACLE AND DEVICE COVER PLATES INDICATING SUPPLYCIRCUIT DESIGNATION.

    .8 PROVIDE THREE COPIES OF COMPLETE OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENTFURNISHED UNDER THIS CONTRACT. BIND INSTRUCTIONS IN 3-RING BINDERS. INCLUDE THE FOLLOWING:

    .1 SCHEMATIC DIAGRAM OF ELECTRICAL SYSTEMS.

    .2 CONTROL SHOP DRAWINGS AND OPERATING SEQUENCE INCLUDING WIRING OF COMPONENTS.

    .3 WIRING DIAGRAM OF CONTROL PANELS.

    .4 OPERATING INSTRUCTIONS, INCLUDING START-UP AND SHUT-DOWN PROCEDURE.

    .5 MAINTENANCE INSTRUCTIONS INCLUDING PREVENTIVE MAINTENANCE INSTRUCTIONS FOR COMPONENTS OFTHE EQUIPMENT.

    .6 COMPLETE PARTS LIST OF ASSEMBLIES AND THEIR COMPONENT PARTS, SHOWING MANUFACTURER'S NAME,CATALOGUE NUMBER, AND NEAREST REPLACEMENT SOURCE.

    .7 LIST OF RECOMMENDED SPARE PARTS AND QUANTITY OF EACH ITEM TO BE STOCKED.

    .8 MANUFACTURERS' WARRANTIES AND GUARANTEES..9 CLEAN ALL ELECTRICAL SYSTEMS AT PROJECT COMPLETION..10 COMPLETE AS-BUILT DRAWINGS SHOWING ALL CHANGES AS WORK PROGRESSES.

    2 CONTRACTOR QUALIFICATIONS:.1 ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE “TRADES QUALIFICATION AND APPRENTICESHIP ACT”

    AND REGULATIONS, BY PERSONS WHO HOLD THE FOLLOWING CERTIFICATES OF QUALIFICATION (AS APPLICABLE):.1 ELECTRICIAN: CONSTRUCTION & MAINTENANCE.

    .2 ALL FIRE ALARM SYSTEM WORK SHALL BE PERFORMED BY PERSONS WHO HOLD ELECTRICIAN QUALIFICATIONS(ABOVE), AND IN ADDITION, WHO HOLD THE FOLLOWING CURRENT REGISTRATION WITH THE CANADIAN FIREALARM ASSOCIATION (CFAA):

    .1 FIRE ALARM TECHNICIAN.

    3 EXISTING FACILITIES AND DEMOLITION:.1 LOCATE AND PROTECT ALL EXISTING EXTERIOR SITE SERVICES..2 RETAIN AND PROTECT ALL EXISTING INTERIOR SERVICES AND BUILDING FABRIC. MAKE GOOD ANY AND ALL

    DAMAGE RESULTING FROM THIS WORK..3 CONNECTIONS TO EXISTING SERVICES SHALL BE COORDINATED WITH THE OWNER..4 EXECUTE WORK WITH LEAST POSSIBLE INTERFERENCE OR DISTURBANCE TO NORMAL USE OF THE EXISTING

    BUILDING.

    4 FIXTURES AND EQUIPMENT:.1 ALL ALTERNATE PRODUCTS PROPOSED AS “APPROVED EQUALS” SHALL BE SUBMITTED FOR APPROVAL PRIOR TO

    TENDER CLOSING..2 PROVIDE SHOP DRAWINGS AND PRODUCT DATA FOR ALL ELECTRICAL FIXTURES AND EQUIPMENT FOR APPROVAL,

    PRIOR TO PROCUREMENT..3 INSTALL ALL ELECTRICAL FIXTURES AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS..4 EQUIPMENT AND MATERIAL TO BE CSA CERTIFIED. WHERE THERE IS NO ALTERNATIVE TO SUPPLYING EQUIPMENT

    WHICH IS NOT CSA CERTIFIED, OBTAIN SPECIAL APPROVAL FROM ELECTRICAL SAFETY AUTHORITY.

    5 EQUIPMENT SUPPLIED BY OTHERS:.1 MAKE ALL ELECTRICAL SERVICE CONNECTIONS TO EQUIPMENT SUPPLIED BY OTHERS..2 CONFIRM ALL SERVICE CONNECTIONS WITH MANUFACTURER AND SUPPLIER, PRIOR TO INSTALLATION. THIS SHALL

    INCLUDE ALL CONNECTION SIZES, LOCATIONS AND DETAILS, AND SHALL TAKE INTO ACCOUNT EQUIPMENTCLEARANCES AND INSTALLATION REQUIREMENTS.

    6 CONDUITS:.1 RIGID GALVANIZED STEEL, WITH THREADED FITTINGS, WHERE SUBJECT TO MECHANICAL INJURY, IN SERVICE AREAS

    ONLY..2 ELECTRICAL METALLIC TUBING (EMT), HOT DIPPED GALVANIZED STEEL, WITH THREADED CONNECTORS AND

    COUPLINGS, WHERE NOT SUBJECT TO MECHANICAL INJURY, IN SERVICE AREAS ONLY..3 RIGID PVC CONDUIT BELOW FLOOR AND IN CORROSIVE AREAS.

    7 WIRES AND CABLE:.1 VOLTAGE DROP:

    .1 FEEDER CONDUCTORS SHALL BE SIZED FOR A MAXIMUM VOLTAGE DROP OF 2% AT DESIGN LOAD.

    .2 BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED FOR A MAXIMUM VOLTAGE DROP OF 3% AT DESIGN LOAD..2 BUILDING WIRES:

    .1 COMMERCIAL PROJECTS - IN CONDUIT SYSTEMS TO BE STRANDED COPPER CONDUCTORS FOR 10 AWG ANDLARGER, MINIMUM SIZE 12 AWG, TYPE RW90.

    .3 BUILDING WIRES IN CONCEALED LOCATIONS TO BE COPPER, MINIMUM SIZE 12 AWG, TYPE AC90.

    .4 ALL WIRING SHALL BE CONCEALED IN WALLS AND CEILINGS, UNLESS OTHERWISE NOTED OR APPROVED.

    8 DATA AND TELEPHONE:.1 DATA/TELEPHONE: .1 DATA AND TELEPHONE WIRES CAT 6..2 DATA AND TELEPHONE OUTLETS SHALL BE PROVIDED IN SEPARATE OUTLET BOXES AND SEPARATE CONDUIT..3 SUPPLY, INSTALL AND TERMINATE DATA AND TELEPHONE OUTLETS, AS FOLLOWS:

    .1 1 PORT WALL PLATE - PANDUIT #CFG1WH;

    .2 FACE PLATE JACK - PANDUIT #CJ5E88TG, 2 COLOURS, COLOURS SELECTED BY OWNER'S IT REPRESENTATIVE;

    .3 COVER PLATE - LEVITON #80401-W, 2 COLOURS, COLOURS SELECTED BY OWNER'S IT REPRESENTATIVE..4 SUPPLY, INSTALL AND TERMINATE DATA AND TELEPHONE CABLES IN IT ROOM.

    9 SERVICE EQUIPMENT:.1 ELECTRICAL SERVICE EQUIPMENT, PANELBOARDS AND DISCONNECT SWITCHES SHALL BE PRODUCT OF ONE

    MANUFACTURER THROUGHOUT PROJECT - CUTLER-HAMMER, SIEMENS OR SQUARE D..2 LOW-VOLTAGE DRY-TYPE DISTRIBUTION TRANSFORMERS SHALL MEET THE MINIMAL NOMINAL EFFICIENCY LEVELS

    OF ASHRAE 90.1 (TABLE 8.4.4.)..3 CIRCUIT BREAKERS SHALL BE BOLT-ON TYPE..4 WORKING SPACE ABOUT ELECTRICAL EQUIPMENT SHALL BE PROVIDED IN ACCORDANCE WITH THE ONTARIO

    ELECTRICAL SAFETY CODE, INCLUDING THE FOLLOWING:.1 WORKING SPACE OF 3'4” (1M) WITH SECURE FOOTING;.2 MINIMUM HEADROOM OF 7'3” (2.2M).

    .5 SPRINKLERED AREAS: SERVICE EQUIPMENT SHALL BE PROTECTED WITH NON-COMBUSTIBLE HOODS OR SHIELDS.

    10 WIRING DEVICES:.1 WIRING DEVICES OF ONE MANUFACTURER THROUGHOUT PROJECT - HUBBELL OR LEVITON..2 COMMERCIAL PROJECTS:

    .1 OUTLET BOXES:.1 GANG BOXES WHERE WIRING DEVICES ARE GROUPED..2 BLANK COVER PLATES FOR BOXES WITHOUT WIRING DEVICES.

    .2 SWITCHES:.1 HEAVY DUTY, 20A/120V;.2 SINGLE POLE, AND THREE-WAY, AS APPLICABLE;.3 COLOUR: SELECTED BY OWNER/ARCHITECT.

    .3 DUPLEX RECEPTACLES:.1 EXTRA HARD USE, CSA TYPE 5-15 R, 15A/125V;.2 GFI (GROUND FAULT CIRCUIT INTERRUPTER) WITH DETECT AND TRIP ON GROUND FAULT, STATUS

    INDICATOR LIGHT AND TEST SWITCH;.3 COLOUR: SELECTED BY OWNER/ARCHITECT.

    .4 COVER PLATES:.1 STAINLESS STEEL.

    11 LIGHTING:.1 GENERAL LIGHTING:

    .1 SUPPORT ALL LIGHTING IN ACCORDANCE WITH THE ONTARIO ELECTRICAL SAFETY CODE AND BULLETINS.

    .2 LIGHT FIXTURES SUPPORTED BY SUSPENDED CEILING SYSTEMS SHALL HAVE ADDITIONAL SUPPORT TOBUILDING STRUCTURE IN ACCORDANCE WITH ONTARIO ELECTRICAL SAFETY CODE BULLETIN #30-4-11.

    .2 FUNCTIONAL TESTING OF LIGHTING CONTROL, IN ACCORDANCE WITH ASHRAE 90.1 (9.4.3):.1 LIGHTING CONTROL DEVICES AND CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT CONTROL

    HARDWARE AND SOFTWARE ARE CALIBRATED, ADJUSTED, PROGRAMMED, AND IN PROPER WORKINGCONDITION IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS AND MANUFACTURER'S INSTALLATIONINSTRUCTIONS.

    .3 EXIT AND EMERGENCY LIGHTING:.1 CONNECT DC CIRCUIT FROM EMERGENCY LIGHT BATTERY PACK TO ALL EXIT AND EMERGENCY LIGHTS..2 SIZE EMERGENCY LIGHTING POWER PACK TO PROVIDE FULL LOAD POWER FOR 1 HR PERIOD..3 EMERGENCY LIGHT BATTERY PACKS (UNIT EQUIPMENT) SHALL BE INSTALLED IN SUCH A MANNER THAT IT

    WILL BE AUTOMATICALLY ACTUATED UPON FAILURE OF THE POWER SUPPLY TO THE NORMAL LIGHTING INTHE AREA COVERED BY THAT UNIT EQUIPMENT PER OESC 46-304(4).

    12 FIRE ALARM SYSTEM:.1 FIRE ALARM SYSTEM VERIFICATION CONTRACTOR SHALL REVIEW THE DRAWINGS AND SHALL NOTE ALL AREAS

    OF DEVICE DEFICIENCY, PRIOR TO COMPLETION OF EQUIPMENT AND WIRING ROUGH-IN..2 FIRE ALARM SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH CAN/ULC-S524, “INSTALLATION OF FIRE ALARM

    SYSTEMS”..3 FIRE ALARM SYSTEM SHALL BE VERIFIED IN ACCORDANCE WITH CAN/ULC-S537, “VERIFICATION OF FIRE ALARM

    SYSTEMS”..4 FIRE ALARM SYSTEM SHALL BE PROVIDED WITH AN EMERGENCY POWER SUPPLY, WITH IMMEDIATE AUTOMATIC

    TRANSFER, IN ACCORDANCE WITH OBC 3.2.7.8..5 FIRE ALARM CONTROL AND ANNUNCIATOR PANEL SHALL HAVE SUFFICIENT POWER FOR UP TO 25% ADDITIONAL

    AUDIBLE DEVICES.

    13 COMMERCIAL KITCHEN EXHAUST AND FIRE PROTECTION:.1 SYSTEM SHALL BE CONFIGURED FOR COMMERCIAL KITCHEN EXHAUST SYSTEM..2 DESIGN AND INSTALLATION SHALL CONFORM TO NFPA 96 - STANDARD FOR VENTILATION CONTROL AND FIRE

    PROTECTION OF COMMERCIAL COOKING OPERATIONS..3 REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL DETAILS.

    14 FIRE PROTECTION:.1 REFER TO ARCHITECTURAL DRAWINGS, TO VERIFY LOCATION OF ALL FIRE SEPARATIONS AND FIRE-RATED

    MEMBRANES..2 ALL CABLING AND CONDUIT SHALL BE TIGHTLY FITTED AND SEALED WITH FIRESTOPPING MATERIAL AT ALL FIRE

    SEPARATIONS AND FIRE-RATED MEMBRANES..3 THE FOLLOWING CONDUCTORS SHALL BE PROTECTED IN ACCORDANCE WITH OBC 3.2.7.10(2), AND SHALL

    CONFORM TO ULC-S139 “FIRE TEST EVALUATION OF INTEGRITY OF ELECTRICAL CABLES”, TO PROVIDE A CIRCUITINTEGRITY RATING OF NOT LESS THAN 1 HOUR (2 HOUR FOR TALL BUILDINGS OR CONTAINED USE AREAS ORINTERCONNECTED FLOOR SPACES):.1 ELECTRICAL FEEDER CONDUCTORS WHICH SERVE THE HOUSE AND COMMERCIAL ELECTRICAL PANELS;.2 BRANCH CIRCUIT CONDUCTORS WHICH SERVE THE FIRE ALARM SYSTEM;.3 BRANCH CIRCUIT CONDUCTORS WHICH SERVE EXIT AND EMERGENCY LIGHTING.

    .4 ALL MATERIALS WITHIN THE PLENUM SHALL A FLAME-SPREAD RATING NOT MORE THAN 25 AND A SMOKEDEVELOPED CLASSIFICATION NOT MORE THAN 50.

    .5 MOCK-UPS:.1 PREPARE MOCK-UPS OF TYPICAL FIRESTOP INSTALLATION OF THE FOLLOWING, FOR REVIEW AND APPROVAL

    BY THE OWNER, ENGINEER AND MUNICIPAL BUILDING INSPECTOR:.1 CONDUIT AND CABLING - WALL AND CEILING/FLOOR FIRE SEPARATION.

    .2 ALL FIRESTOP INSTALLATIONS SHALL BE COMPLETED IN ACCORDANCE WITH THE APPROPRIATE PRODUCTINSTALLATION INSTRUCTIONS, AND THE REFERENCED UL/ULC LISTING AND/OR TEST STANDARD.

    .3 SUPPLY A COPY OF THE PRODUCT INSTALLATION INSTRUCTIONS WITH ULC LISTING AND/OR TEST STANDARDREFERENCE, FOR EACH INSTALLATION.

    .4MOCK-UP MAY REMAIN AS PART OF WORK.

    15 EARTHQUAKE LOAD:.1 ALL ELECTRICAL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE EARTHQUAKE LOAD AND EFFECTS

    REQUIRED BY THE ONTARIO BUILDING CODE..2 ELECTRICAL ELEMENTS AND COMPONENTS (FIXTURES, EQUIPMENT, CONDUIT, ETC.), AND THEIR CONNECTIONS TO

    THE BUILDING SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SMACNA/ANSI SEISMIC RESTRAINT MANUALOR OTHER GUIDELINE REFERENCED IN THE ONTARIO BUILDING CODE.

    .3 PROVIDE SHOP DRAWINGS FOR SUPPORT, CONNECTIONS AND SEISMIC RESTRAINT OF ALL ELECTRICAL FIXTURES,EQUIPMENT, AND CONDUIT, INCLUDING, BUT NOT LIMITED TO:.1 SERVICE AND DISTRIBUTION EQUIPMENT;.2 TRANSFORMERS;.3 LIGHT FIXTURES;.4 TYPICAL CONDUIT AND CABLE SUPPORTING SYSTEM.

    THESE SHOP DRAWINGS SHALL BE DESIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE PROVINCE OFONTARIO, WITH EXPERIENCE IN SEISMIC ENGINEERING..4 FOLLOWING PROJECT COMPLETION, SEISMIC ENGINEER SHALL PROVIDE A LETTER OF FINAL SITE REVIEW..5 CONTRACTOR SHALL CARRY THE COST OF THE SEISMIC ENGINEERING, INCLUDING SITE REVIEWS, DESIGN AND SHOP

    DRAWING PREPARATION.

    16 LOAD BALANCE:.1 MEASURE PHASE CURRENT TO PANELBOARDS WITH NORMAL LOADS (LIGHTING) OPERATING AT TIME OF

    ACCEPTANCE. ADJUST BRANCH CIRCUIT CONNECTIONS AS REQUIRED TO OBTAIN BEST BALANCE OF CURRENTBETWEEN PHASES AND RECORD CHANGES.

    .2 SUBMIT, AT COMPLETION OF WORK, REPORT LISTING PHASE AND NEUTRAL CURRENTS ON PANELBOARDS,OPERATING UNDER NORMAL LOAD. STATE HOUR AND DATE ON WHICH EACH LOAD WAS MEASURED, ANDVOLTAGE AT TIME OF TEST.

    17 EQUIPMENT SUPPORT:.1 ALL ELECTRICAL EQUIPMENT, CONDUIT, WIRING, LIGHTING, DEVICES, AND RELATED ITEMS SHALL BE SECURELY

    SUPPORTED, ATTACHED AND FASTENED TO BUILDING STRUCTURE..2 HANGERS AND SUPPORTS SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH MSS STANDARD SP-58,

    PIPE HANGERS AND SUPPORTS - MATERIALS, DESIGN, MANUFACTURE, SELECTION, APPLICATION, ANDINSTALLATION.

    .3 PLATFORMS SHALL BE FABRICATED FROM STRUCTURAL GRADE STEEL MEETING THE REQUIREMENTS OF THEONTARIO BUILDING CODE, INCLUDING CSA STANDARD W59 WELDED STEEL CONSTRUCTION, AND THEREQUIREMENTS OF THE CANADIAN WELDING BUREAU.

    18 COORDINATION:.1 INFORMATION INVOLVING ACCURATE DIMENSIONING OF THE BUILDING SHALL BE TAKEN FROM SITE BY

    CONTRACTOR..2 DRAWINGS ARE IN DIAGRAMMATIC FORM, INTENDED TO CONVEY THE SCOPE OF WORK AND GENERAL

    ARRANGEMENT FOR EQUIPMENT. COORDINATE PHYSICAL LOCATION OF ALL EQUIPMENT WITH OTHERTRADES AND ALLOW FOR ANY ADDITIONAL CONDUIT, WIRING, FITTINGS, SUPPORTS, ETC., IN ORDER TOAVOID INTERFERENCE AND FACILITATE THE WORK.

    .3 CONTRACTOR TO MAKE ANY NECESSARY MODIFICATIONS OR ADDITIONS, WITHOUT CHARGE, TO ACCOMMODATESITE CONDITIONS AND COORDINATION.

    .4 COORDINATE AND VERIFY ALL ELECTRICAL BRANCH CIRCUIT REQUIREMENTS FOR EQUIPMENT SUPPLIED BYOTHERS, PRIOR TO MATERIAL PROCUREMENT OR INSTALLATION.

    .5 PROVIDE ALL WIRING TO ALL MECHANICAL EQUIPMENT, INCLUDING WIRING BELOW 50V. COORDINATE ALLMECHANICAL EQUIPMENT WIRING WITH MECHANICAL TRADES.

    .6 ALL DEVICE AND OUTLET LOCATIONS SHALL BE CAREFULLY COORDINATED WITH THE GENERAL CONTRACTOR OROWNER, TO ACCOMMODATE ALL FEATURES, INCLUDING PLUMBING FIXTURES, EQUIPMENT AND MILLWORK.

    19 START-UP, COMMISSIONING AND TRAINING:.1 START-UP AND COMMISSION THE FOLLOWING SYSTEMS:

    .1 ELECTRICAL SERVICE EQUIPMENT;

    .2 GENERAL LIGHTING;

    .3 EXIT AND EMERGENCY LIGHTING;

    .4 FIRE ALARM..2 PERFORM SYSTEMATIC TESTS, PROCEDURES AND CHECKS ON SYSTEMS, AS FOLLOWS:

    .1 TO VERIFY OPERATION IN ACCORDANCE WITH CONTRACT DOCUMENTS, DESIGN CRITERIA AND INTENT, ANDMANUFACTURER'S REQUIREMENTS;

    .2 TO ENSURE APPROPRIATE DOCUMENTATION IS PROVIDED;

    .3 TO EFFECTIVELY TRAIN BUILDING OPERATIONAL STAFF..3 SYSTEMS ARE TO BE OPERATED AT FULL CAPACITY, WITH CORRECTION OF ALL DEFICIENCIES AND ADJUSTMENTS TO

    MEET OPTIMUM PERFORMANCE..4 PROVIDE WRITTEN REPORT AT END OF COMMISSIONING OUTLINING EQUIPMENT OPERATIONAL CONDITIONS AND

    PARAMETERS.

    Project Title:

    75 Neelin St,Carleton Place, Ontario

    CARLETON PLACEARENA ADDITIONArchitect

    Larry Gaines

    Tel: (613) 256-3630Fax: (613) 256-0615

    e-mail: [email protected]

    14 Bridge StreetAlmonte, ON

    K0A 1A0 Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.

    Facsimile: (613) 345-0008Telephone: (613) 345-0400

    Suite 207Brockville, Ont. K6V 5J9

    100 Strowger Blvd

    www.EastEng.com

    ALL DRAWINGS, SPECIFICATIONS ANDRELATED DOCUMENTS ARE THE

    COP RIGHT PROPERT OF THE ENGINEERAND MUST BE RETURNED UPON RE UEST.

    REPRODUCTION OF DRAWINGS,SPECIFICATIONS, AND RELATED

    DOCUMENTS IN PART OR WHOLE ISFORBIDDEN WITHOUT THE ENGINEERS'

    WRITTEN PERMISSION.

    THE CONTRACTOR MUST CHECK ANDVERIF ALL DIMENSIONS ON THE JOBPRIOR TO START OF CONSTRUCTION.

    DRAWINGS ARE NOT TO BE SCALED

    Drawing Title:

    ELECTRICALNOTES & LEGENDS

    Professional Seal:

    RevisionsDateByNo.

    1 GB 2020-03-23 REVISIONS, FOR REVIEW

    0 GB 2020-02-20 FOR REVIEW

    2 GB 2020-04-01

    3 GB 2020-05-01

    FOR PERMIT

    REVISIONS, FOR TENDER

    REV DATE:

    Drawing No.:

    5/4/2020

    Design:

    Drawn:

    Approved:

    Date:

    Project No.:

    Scale:

    MM

    MM

    GB

    2020-02-16

    1/8" - 1'-0"

    9107E001

  • FIRE ALARMCONTROL ANDANNUNCIATORPANEL

    MONITORINGSTATIONCONNECTIONTOCAN/ULC-S651

    ELEVATORRECALL

    VERIFY ANDCONFIRM WITHELEVATORSUPPLIER

    PULL STATION

    SMOKEDETECTOR

    HEATDETECTOR

    FIRE ALARM BELL(TO MATCH EXISTING)WITH STROBE LIGHT

    LEGEND:SPRINKLER FLOW - GROUND

    FS

    SPRINKLER FLOW - SECONDFS

    TOP OF ELEVATOR

    ELECTRICAL SUPERVISION OFFIRE SPRINKLER SYSTEM:

    SYSTEM PRESSURE:- WET PIPE WATER PRESSURE

    SUPERVISED SWITCHES:- INCOMING WATER SERVICE- BACKFLOW VALVES- WET PIPE SYSTEM MAIN- LEVEL GROUND- LEVEL SECOND

    VERIFY AND CONFIRM THEABOVE SUPERVISORY ZONESWITH SPRINKLER CONTRACTOR

    GENERAL NOTES:

    1. MAJOR OCCUPANCY CLASSIFICATION (OBC 3.1.2.): GROUPS - A DESCRIPTION - ASSEMBLY

    2. FIRE ALARM SYSTEM TYPE: CLASS A ADDRESSABLE SINGLE STAGE

    3. FIRE ALARM SYSTEM SHALL BE INSTALLED INACCORDANCE WITH CAN/ULC-S524, "INSTALLATION OFFIRE ALARM SYSTEMS".

    4. FIRE ALARM SYSTEM SHALL BE VERIFIED IN ACCORDANCEWITH CAN/ULC-S537-M, "VERIFICATION OF FIRE ALARMSYSTEMS".

    5. ACCEPTABLE PRODUCTS:-EDWARDS, MIRCOM, NOTIFIER, SIMPLEX.

    ALARM - LEVEL GROUND

    FIRE ALARMANNUNCIATORPANEL

    (LOCATED ATMAINENTRANCE)

    LEVEL GROUNDCORR. CORR. CORR.

    STAFF

    CORR. CORR. CORR.

    LEVEL SECONDCORR

    TOP OF STAIR

    DUCT SMOKEDETECTOR

    CORR.

    ELECTROMAGNETICDOORHOLDER

    DH

    ELECTRICALSUPPLY

    FROMPRIMARY

    PANEL -15A/1P

    TYPICAL CIRCUITWIRING DIAGRAM

    DEVICEDEVICEDEVICE

    ALL WIRING SHALL BE CLASS A, ADDRESSABLESO THAT AN OPEN CIRCUIT SHALL NOT IMPAIRTHE OPERATION OF ANY OTHER DEVICE

    DEVICE

    DRESSINGRm. A

    DRESSINGRm. B

    DRESSINGRm. C

    DRESSINGRm. D

    CORR. CORR. CORR.

    CORR.CORR.CORR.

    DRESSINGRm. A

    DRESSINGRm. B

    DRESSINGRm. C

    DRESSINGRm. D

    FIRE ALARMSCHEMATIC DIAGRAM

    OLD CHANGE ROOMS& MAIN FLOOR AREA

    OLD SECOND FLOORHALL

    STAIRWELLCOMMON TO HALLS

    FLOW / TAMPERSWITCH

    STAIRWELL OFFNEW 2ND FLR HALL

    NEW MAINT.GARAGE

    NEW BUILDINGGROUND FLOOR

    NEW 2ND FLR HALL

    EXISTINGANNUNCIATORZONES

    EXISTING ALARMZONES

    Project Title:

    75 Neelin St,Carleton Place, Ontario

    CARLETON PLACEARENA ADDITIONArchitect

    Larry Gaines

    Tel: (613) 256-3630Fax: (613) 256-0615

    e-mail: [email protected]

    14 Bridge StreetAlmonte, ON

    K0A 1A0 Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.

    Facsimile: (613) 345-0008Telephone: (613) 345-0400

    Suite 207Brockville, Ont. K6V 5J9

    100 Strowger Blvd

    www.EastEng.com

    ALL DRAWINGS, SPECIFICATIONS ANDRELATED DOCUMENTS ARE THE

    COP RIGHT PROPERT OF THE ENGINEERAND MUST BE RETURNED UPON RE UEST.

    REPRODUCTION OF DRAWINGS,SPECIFICATIONS, AND RELATED

    DOCUMENTS IN PART OR WHOLE ISFORBIDDEN WITHOUT THE ENGINEERS'

    WRITTEN PERMISSION.

    THE CONTRACTOR MUST CHECK ANDVERIF ALL DIMENSIONS ON THE JOBPRIOR TO START OF CONSTRUCTION.

    DRAWINGS ARE NOT TO BE SCALED

    Drawing Title:

    ELECTRICALSCHEDULES, PANELS

    & DETAILS

    Professional Seal:

    RevisionsDateByNo.

    1 GB 2020-03-23 REVISIONS, FOR REVIEW

    0 GB 2020-02-20 FOR REVIEW

    2 GB 2020-04-01

    3 GB 2020-05-01

    FOR PERMIT

    REVISIONS, FOR TENDER

    REV DATE:

    Drawing No.:

    5/4/2020

    Design:

    Drawn:

    Approved:

    Date:

    Project No.:

    Scale:

    MM

    MM

    GB

    2020-02-16

    1/8" - 1'-0"

    9107E002

  • K-2861HUDSONC_LAVATORYCAST IRON

    K-2861HUDSONC_LAVATORYCAST IRON

    EXISTINGMENS WC

    EXISTINGWOMENS WC

    ELEVATOR

    MACHINEROOM

    NEW KITCHENLCOATION

    MECHANICALROOM

    MECHANICALROOM

    SKATESHARPENING

    REFEREECHANGEROOM

    OFFICE

    FILES

    OFFICE

    JANITOR /STORAGE

    MECHANICALROOM

    JANITORS ROOM ROOMJANITORS ROOM ROOM

    UP

    EXISTINGWOMENS WC

    EXISTINGMENS WC DRESSING ROOM E DRESSING ROOM F CANADIANS CANADIANS CANADIANS

    MECHANICALROOM

    STAIRS STAIRS STAIRS STAIRS STAIRS STAIRSSEATING SEATING SEATING SEATING SEATING SEATING

    ICE SURFACE185'-0" X 85'-0"

    PLAYERS BENCHPLAYERS BENCH PENALTY BOX

    10'-0" VERTICAL LIFT

    10'-0" OVERHEAD

    UPUP UP

    EXISTINGMENS WC

    EXISTINGWOMENS WC

    ELEVATOR

    MACHINEROOM

    NEW KITCHENLCOATION

    MECHANICALROOM

    MECHANICALROOM

    SKATESHARPENING

    REFEREECHANGEROOM

    OFFICE

    FILES

    OFFICE

    JANITOR /STORAGE

    MECHANICALROOM

    JANITORS ROOM ROOMJANITORS ROOM ROOM

    UP

    EXISTINGWOMENS WC

    EXISTINGMENS WC DRESSING ROOM E DRESSING ROOM F CANADIANS CANADIANS CANADIANS

    MECHANICALROOM

    STAIRS STAIRS STAIRS STAIRS STAIRS STAIRSSEATING SEATING SEATING SEATING SEATING SEATING

    ICE SURFACE185'-0" X 85'-0"

    PLAYERS BENCHPLAYERS BENCH PENALTY BOX

    10'-0" VERTICAL LIFT

    10'-0" OVERHEAD

    UPUP UP

    DISCONNECT & REMOVEEXISTING FIRE ALARM CONTROL PANELEDWARDSCONNECT EXISTING ANNUNCIATION & ALARMZONES TO NEW FIRE ALARM SYSTEM

    DISCONNECT & REMOVEALL EXISTINGELECTRICAL RECEPTACLES & DEVICESIN WALLS TO BE REMOVED

    DISCONNECT & REMOVEELECTRICAL SUPPLY TOEXISTING EXHAUST FAN

    INCLUDING BOX,CONDUIT & WIRING BACK

    TO BOX

    DISCONNECT & REMOVEALL EXISTINGLIGHT FIXTURES, RECEPTACLES& ELECTRICAL DEVICES INAREA OF DEMOLITION

    EXISTING MAIN ELECTRICAL SERVICE600A, 600/347 VCUTLER HAMMER No. CMD-A1

    EXISTING MAIN ELECTRICAL DISTRIBUTION PANELCUTLER HAMMER No. PL-3ASUPPLY & INSTALL THE FOLLOWING:NEW ELECTRICAL BRANCH CIRCUIT & FEEDER

    - 45A / 3P - ELECTRICAL PANEL 'P1'

    DISCONNECT & REMOVEEXISTING LIGHT FIXTUREABOVE DOOR

    DISCONNECT, REMOVE &RELOCATE EXISTING FIREALARM PULL STATION

    DISCONNECT & REMOVEEXISTING LIGHT FIXTUREABOVE DOOR

    DISCONNECT, REMOVE &RELOCATE EXISTING FIREALARM PULL STATION

    DISCONNECT & REMOVE EXISTINGELECTRICAL OUTLETS INCLUDING BOX,CONDUIT & WIRING BACK TO SOURCE

    DISCONNECT & REMOVE ELECTRICALSUPPLY TO EXISTING EXHAUST FANS

    EXISTING ELECTRICALTRANSFORMER

    SP

    SP

    SP

    SP

    DISCONNECT, REMOVE & REPLACEEXISTING ELEC. PANEL 'LOBBY'FEDERAL PIONEER # NBLP225A, 120/208V, 3PH, 4W, 30 CCT

    · DISCONNECT & REMOVE ALL EXISTING LIGHTFIXTURES & SPEAKERS IN AREA

    · DISCONNECT, REMOVE & RELOCATE ALLEXISTING FIRE ALARM DEVICES AS NOTED

    · DISCONNECT & REMOVE ALL EXISTINGSWITCHES, RECEPTICALS & ELECTRICALDEVICES IN WALLS TO BE REMOVED(DASHED) (UNLESS OTHERWISE NOTED)

    DISCONNECT & REMOVEEXISTING KITCHEN ELECTRICAL PANELSQUARE D #QU100A, 120/208V, 1PH, 3W, 8 CCT

    T

    DISCONNECT &REMOVE EXISTING

    DOOR OPERATORS

    RETAIN EXISTINGBASEBOARD HEATER

    RETAIN EXISTINGBASEBOARD HEATER

    E

    RELOCATE FIREALARM DEVICE

    TO WALL

    RELOCATE FIRE ALARMDEVICE TO WALL

    RELOCATE FIRE ALARMDEVICE TO NEW CEILING

    DISCONNECT &REMOVE EXISTING FIREALARM ANNUNCIATOR

    PANELEDWARDS

    RELOCATE FIRE ALARMDEVICE TO NEW CEILING

    RELOCATE FIREALARM DEVICE TO

    NEW CEILING

    RELOCATE FIREALARM DEVICE TO

    NEW CEILING

    RELOCATE FIRE ALARMDEVICE TO NEW CEILING

    P-1

    ELECTRICAL LEGEND

    DESIGNATIONS

    DISTRIBUTION

    LIGHTING

    M

    3

    M

    NOTE: HEIGHT IS FROM FINISHED FLOOR TO CENTRELINE OF EQUIPMENT, UNLESS OTHERWISE NOTED.

    HEIGHT

    GFCIAFCIACAFFWP

    GROUND FAULT CIRCUIT INTERRUPTERARC FAULT CIRCUIT INTERRUPTERABOVE COUNTERABOVE FINISHED FLOORWEATHERPROOF

    MOTION SENSOR CONTROL - (CEILING)

    DUPLEX RECEPTACLE (WALL) - 15A/120V 12"/300mm

    DUPLEX RECEPTACLE (SPLIT) - 15A/120V

    DUPLEX RECEPTACLE (1/2 SWITCH) - 15A/120V

    NON-STANDARD RECEPTACLE AS NOTED

    DIRECT EQUIPMENT CONNECTION

    NON-FUSED DISCONNECT SWITCH 54"/1370mm

    FUSED DISCONNECT SWITCH

    MOTOR STARTER

    BRANCH CIRCUIT

    BRANCH CIRCUIT, SWITCHED

    BRANCH CIRCUIT, HOMERUNS TO PANEL

    12"/300mm

    12"/300mm

    AS NOTED

    54"/1370mm

    FLUORESCENT LIGHT FIXTURE - RECESSED

    FLUORESCENT LIGHT FIXTURE - SURFACE

    LIGHT FIXTUREF - FLUORESCENTH - HIGH INTENSITY DISCHARGEL - LED

    DATA COMMUNICATIONSTELEPHONE OUTLET (WALL)

    TELEPHONE OUTLET (FLOOR)

    DATA OUTLET (WALL)

    DATA OUTLET (FLOOR)

    DATA & TELEPHONE OUTLET (WALL)

    12"/300mm

    12"/300mm

    12"/300mm

    EXIT & EMERGENCY LIGHTING

    EL1

    EL2

    EL3

    90"/2300mm

    90"/2300mm

    90"/2300mm

    90"/2300mm

    EXIT LIGHT, SURFACE MOUNTED, SINGLE FACE

    COMBINATION EXIT & EMERGENCY LIGHT

    EMERGENCY LIGHT, BATTERY PACK

    EMERGENCY LIGHT, DOUBLE REMOTE

    EMERGENCY LIGHT, SINGLE REMOTE

    E2

    E1

    SINGLE POLE TOGGLE SWITCH - 20A/120V 35.5" / 900mm

    3-WAY TOGGLE SWITCH - 20A/120V TO

    DISTRIBUTION PANEL 72"/1825mm (TOP)

    MOTION SENSOR CONTROL - (SWITCH) 43.3 / 1100mm

    DISCONNECT & REMOVEALL EXISTING

    ELECTRICAL RECEPTACLES & DEVICESIN WALLS TO BE REMOVED

    Project Title:

    75 Neelin St,Carleton Place, Ontario

    CARLETON PLACEARENA ADDITIONArchitect

    Larry Gaines

    Tel: (613) 256-3630Fax: (613) 256-0615

    e-mail: [email protected]

    14 Bridge StreetAlmonte, ON

    K0A 1A0 Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.

    Facsimile: (613) 345-0008Telephone: (613) 345-0400

    Suite 207Brockville, Ont. K6V 5J9

    100 Strowger Blvd

    www.EastEng.com

    ALL DRAWINGS, SPECIFICATIONS ANDRELATED DOCUMENTS ARE THE

    COP RIGHT PROPERT OF THE ENGINEERAND MUST BE RETURNED UPON RE UEST.

    REPRODUCTION OF DRAWINGS,SPECIFICATIONS, AND RELATED

    DOCUMENTS IN PART OR WHOLE ISFORBIDDEN WITHOUT THE ENGINEERS'

    WRITTEN PERMISSION.

    THE CONTRACTOR MUST CHECK ANDVERIF ALL DIMENSIONS ON THE JOBPRIOR TO START OF CONSTRUCTION.

    DRAWINGS ARE NOT TO BE SCALED

    Drawing Title:

    ELECTRICALGROUND FLOOR PLAN

    DEMOLITION

    Professional Seal:

    RevisionsDateByNo.

    1 GB 2020-03-23 REVISIONS, FOR REVIEW

    0 GB 2020-02-20 FOR REVIEW

    2 GB 2020-04-01

    3 GB 2020-05-01

    FOR PERMIT

    REVISIONS, FOR TENDER

    REV DATE:

    Drawing No.:

    5/4/2020

    Design:

    Drawn:

    Approved:

    Date:

    Project No.:

    Scale:

    MM

    MM

    GB

    2020-02-16

    1/8" - 1'-0"

    9107E100PROJECT NORTH

  • STAIRS STAIRS STAIRS STAIRS STAIRS STAIRSSEATING SEATING SEATING SEATING SEATING SEATING

    ICE SURFACE185'-0" X 85'-0"

    PLAYERS BENCHPLAYERS BENCHPENALTY BOX

    10'-0" VERTICAL LIFT

    DISCONNECT & REMOVEALL EXISTINGELECTRICAL RECEPTACLES & DEVICESIN WALLS TO BE REMOVED

    Project Title:

    75 Neelin St,Carleton Place, Ontario

    CARLETON PLACEARENA ADDITIONArchitect

    Larry Gaines

    Tel: (613) 256-3630Fax: (613) 256-0615

    e-mail: [email protected]

    14 Bridge StreetAlmonte, ON

    K0A 1A0 Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.

    Facsimile: (613) 345-0008Telephone: (613) 345-0400

    Suite 207Brockville, Ont. K6V 5J9

    100 Strowger Blvd

    www.EastEng.com

    ALL DRAWINGS, SPECIFICATIONS ANDRELATED DOCUMENTS ARE THE

    COP RIGHT PROPERT OF THE ENGINEERAND MUST BE RETURNED UPON RE UEST.

    REPRODUCTION OF DRAWINGS,SPECIFICATIONS, AND RELATED

    DOCUMENTS IN PART OR WHOLE ISFORBIDDEN WITHOUT THE ENGINEERS'

    WRITTEN PERMISSION.

    THE CONTRACTOR MUST CHECK ANDVERIF ALL DIMENSIONS ON THE JOBPRIOR TO START OF CONSTRUCTION.

    DRAWINGS ARE NOT TO BE SCALED

    Drawing Title:

    ELECTRICALSECOND FLOOR PLAN

    DEMOLITION

    Professional Seal:

    RevisionsDateByNo.

    1 GB 2020-03-23 REVISIONS, FOR REVIEW

    0 GB 2020-02-20 FOR REVIEW

    2 GB 2020-04-01

    3 GB 2020-05-01

    FOR PERMIT

    REVISIONS, FOR TENDER

    REV DATE:

    Drawing No.:

    5/4/2020

    Design:

    Drawn:

    Approved:

    Date:

    Project No.:

    Scale:

    MM

    MM

    GB

    2020-02-16

    1/8" - 1'-0"

    9107E101PROJECT NORTH

  • K-2861HUDSONC_LAVATORYCAST IRON

    K-2861HUDSONC_LAVATORYCAST IRON

    STAIRS STAIRS STAIRS STAIRS STAIRS STAIRSSEATING SEATING SEATING SEATING SEATING SEATING

    ICE SURFACE185'-0" X 85'-0"

    PLAYERS BENCHPLAYERS BENCHPENALTY BOX

    10'-0" VERTICAL LIFT

    10'-0" OVERHEAD10'-0" OVERHEAD

    EXHAUST FAN

  • EXISTING BARSTORAGE

    EXISTING BAR

    KITCHEN

    STORAGE

    FR

    EXISTING HALL

    EXISTINGELEVATOR

    EXISTING HALL

    EXISTING COATS

    EXISTINGSTAIRCASE EXISTING

    STAIRCASE

    OFFICEVCT

    OFFICEVCT

    OFFICEVCT

    OFFICEVCT

    CORRIDORVCT

    CORRIDORVCT

    STAIRS STAIRS STAIRS STAIRS STAIRS STAIRSSEATING SEATING SEATING SEATING SEATING SEATING

    ICE SURFACE185'-0" X 85'-0"

    PLAYERS BENCHPLAYERS BENCHPENALTY BOX

    10'-0" VERTICAL LIFT

    ONE STOREY ROOF BELOW

    F4D

    F4

    F4

    F4

    F4

    F4

    F4

    F4

    DM

    M

    M

    COMMERCIAL KITCHEN EXHAUST FAN12HP, 208V/1PHON ROOF WITH WEATHERPROOFDISC. SWITCH

    EF-3

    ROOFTOP HVAC UNIT26 MCA, 208V/3PHWITH WEATHERPROOF DISC.SWITCH & RECEPTACLE

    ROOFTOP HVAC UNIT26 MCA, 208V/3PHWITH WEATHERPROOF DISC.SWITCH & RECEPTACLE

    RTU-2 RTU-3

    WPGFI

    WPGFI

    ROOFTOP HVAC UNIT14 MCA, 208V/3PHON ROOF ABOVEWITH WEATHERPROOF DISC.SWITCH & RECEPTACLE

    RTU-1

    F4

    F4

    DM

    F4

    F4

    DM

    EL1

    EL2

    F4 F4 F4

    F4

    Project Title:

    75 Neelin St,Carleton Place, Ontario

    CARLETON PLACEARENA ADDITIONArchitect

    Larry Gaines

    Tel: (613) 256-3630Fax: (613) 256-0615

    e-mail: [email protected]

    14 Bridge StreetAlmonte, ON

    K0A 1A0 Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.

    Facsimile: (613) 345-0008Telephone: (613) 345-0400

    Suite 207Brockville, Ont. K6V 5J9

    100 Strowger Blvd

    www.EastEng.com

    ALL DRAWINGS, SPECIFICATIONS ANDRELATED DOCUMENTS ARE THE

    COP RIGHT PROPERT OF THE ENGINEERAND MUST BE RETURNED UPON RE UEST.

    REPRODUCTION OF DRAWINGS,SPECIFICATIONS, AND RELATED

    DOCUMENTS IN PART OR WHOLE ISFORBIDDEN WITHOUT THE ENGINEERS'

    WRITTEN PERMISSION.

    THE CONTRACTOR MUST CHECK ANDVERIF ALL DIMENSIONS ON THE JOBPRIOR TO START OF CONSTRUCTION.

    DRAWINGS ARE NOT TO BE SCALED

    Drawing Title:

    ELECTRICALPROPOSED SECOND

    FLOOR PLAN

    Professional Seal:

    RevisionsDateByNo.

    1 GB 2020-03-23 REVISIONS, FOR REVIEW

    0 GB 2020-02-20 FOR REVIEW

    2 GB 2020-04-01

    3 GB 2020-05-01

    FOR PERMIT

    REVISIONS, FOR TENDER

    REV DATE:

    Drawing No.:

    5/4/2020

    Design:

    Drawn:

    Approved:

    Date:

    Project No.:

    Scale:

    MM

    MM

    GB

    2020-02-16

    1/8" - 1'-0"

    9107E103PROJECT NORTH

    Sheets and Views9107 - M&E-M0019107 - M&E-M0029107 - M&E-M1009107 - M&E-M1019107 - M&E-M1029107 - M&E-M1039107 - M&E-E0019107 - M&E-E0029107 - M&E-E1009107 - M&E-E1019107 - M&E-E1029107 - M&E-E103