Maa-20.3530 Shared Project B, Land Economy V (6 cr)
Spring 2013Creating a development plan for Veromies
General course and contact information• Questions regarding course administration, contact:
Riikka Kyrö, [email protected] (until 4 Feb)
Susanna Kari, [email protected] (after 4 Feb)• Questions regarding the project, contact:
Miro Ristimäki, [email protected]• Any questions regarding a scpecific lecture, contact the
lecturer directly
• All course materials (lecture slides and additional readings) will be available at Noppa after each lecture.
Timetable Spring 2013
• Thursdays at 12.15, Gentti 3
• Thu 24 January 2013 Introduction to the course.
First part of the project work given.
Feedback from Shared Project A.
• Thu 31 January 2013Introduction to Real Estate Development (RED). Laura Yrjänä
Commercial RED and valuation methods. Laura Yrjänä
Market Analysis. James Culley
Timetable Spring 2013
• Thu 7 February 2013Independent work. Working with the first part of the project.
• Thu 14 February 2013Independent work. Working with the first part of the project.
Deadline for the first part of the project is on Friday 15 Feb 2013.
• Thu 21 February 2013The role of the public sector in RED. Professor Kauko Viitanen
Feedback from the first part of the project.
Timetable Spring 2013
• Thu 28 February 2013• Life Cycle Leadership in Real Estate Development. Miro Ristimäki
Second part of the project work given.
• Thu 14 March 2013Independent work. Working with the second part of the project.
• Thu 21 March 2013Independent work. Working with the second part of the project.
Deadline for the second part of the project is on Friday 22 March 2013.
Timetable Spring 2013
• Thu 28 March 2013Feedback from the second part of the project.
Third and final part of the project given.
Possibility to get tutoring for the project.
• Thu 4 April 2013Urban structure and climate change. Dr Jukka Heinonen
Brownfields and other environmental aspects in RED. Riikka Kyrö
• Thu 11 April 2013Independent work. Working with the third part of the project.
Timetable Spring 2013
• Thu 18 April 2013Independent work. Working with the third part of the project.
Deadline for the third and final part of the project is on Friday 19 April 2013.
• Thu 25 April 2013 in VantaaPresentation of the group project. Representatives of the City of Vantaa will be present.
• Fri 26 April 2013Final deadline for submitting the group project report!
Groups for Spring 2013• Group 1
– Anwar Bina– Haajanen Antti– Zhang Yi
• Group 2– Firew Tsegaye– Munia Hafsa– Salo Reetta– Virenius Otto
• Group 3– Snell Ross– Ullah Waqar– Viinikka Jussi– Wu Fei
Group ProjectPhase 1: Sections 1 and 2• The first part of the project will comprise Sections 1 and
2 of a development plan for Veromies• Independent work 7 Feb and 14 Feb• Deadline for the first part is on Friday 15 Feb. Submit to:
SECTION 1: GROWTH SCENARIOS FOR THE HELSINKI METROPOLITAN AREA
• The Finnish Economy– Government– Population– Industrial base– Currency– GDP and its development– Employment figures– International relationships
SECTION 1: GROWTH SCENARIOS FOR THE HELSINKI METROPOLITAN AREA
• The regional structure of the Helsinki Metropolitan Area– Municipal structure– Population and its development (past, current, and future) – Role of HMA in Finland– Location of HMA in Finland, international location and
connections– Traffic connections – Area development (past and future)– Policies regarding e.g. the environment, population, traffic, and
businesses
SECTION 1: GROWTH SCENARIOS FOR THE HELSINKI METROPOLITAN AREA
• Demand and supply of business premises – past, current, and future:– location of different types of business premises, and potential
trends in locating businesses– demand and supply (D&S) figures for business premises, and
identified trends in D&S– number of jobs andidentified trends– construction activities and identified trends
SECTION 1: GROWTH SCENARIOS FOR THE HELSINKI METROPOLITAN AREA
• D&S of housing – past, current, and future– location of housing and trends in locating– demand and supply figures and trends – tenure (ownership type)– construction activities and trends
• D&S of commercial services – past, current, and future– location of different commercial services and trends in locating– demand and supply figures and identified trends– construction activities and identified trends
SECTION 2: DESCRIPTION OF THE VEROMIES AREA
General– History– Development – Plans
Street plan– Connections– Importance– Current
situation– Development
and future
SECTION 2: DESCRIPTION OF THE VEROMIES AREA
Rail traffic– Connections– Importance– Current situation– Development and
future
Buses– Connections– Importance– Current situation– Development and
future
SECTION 2: DESCRIPTION OF THE VEROMIES AREA
Reputation and image– Business operations– Other activities– Building stock– Residents– Future developments– Overall image
Real Estate Development
• ….is the process of transforming a plot of land from one state to another. The main motive is usually financial profit.
• Keep in mind the perspective of real estate economy throughout the course!
Grading
• will be based solely on the project (activeness during the course, written development plan, oral presentation), and each member of the group will end up with the same final grade.
• In other words, you will have to work as a team!