8 5/8 3200
3200
19.23 1811
Mud Wt. Mud Grad. MACP Mud Wt. Mud Grad. MACP Mud Wt. Mud Grad. MACP Mud Wt.
ppg psi ppg psi ppg psi ppg
8.40 0.437 1802 9.40 0.489 1636 10.40 0.541 1469 11.408.50 0.442 1786 9.50 0.494 1619 10.50 0.546 1453 11.508.60 0.447 1769 9.60 0.499 1603 10.60 0.551 1436 11.608.70 0.452 1752 9.70 0.504 1586 10.70 0.556 1420 11.708.80 0.458 1736 9.80 0.510 1569 10.80 0.562 1403 11.808.90 0.463 1719 9.90 0.515 1553 10.90 0.567 1386 11.909.00 0.468 1702 10.00 0.520 1536 11.00 0.572 1370 12.009.10 0.473 1686 10.10 0.525 1519 11.10 0.577 1353 12.109.20 0.478 1669 10.20 0.530 1503 11.20 0.582 1336 12.209.30 0.484 1652 10.30 0.536 1486 11.30 0.588 1320 12.30
Insufficient Mud Density Drilling BreakImproper Hole Filling Mud Contamination After Drilling a metre or less into a porous Zone
Swabbing Erratic Table Torque Prior to Tripping the Drilling StringLost Circulation Variation in String Force While Tripping (any Warning Signs)
Mud Contamination Variation in Pump Pressure or Pump Speed After POOH 5% of D.P. StandsEquipment Failure Pit Gain or Loss Half Way OutAbnormal Pressure Loss Circulation At the Last D.P. Stand Before D.C.
Hole Does not Take Correct Fill-up Volume While Out of the Hole every 30minPipe Pulls Wet After Pulling Dry When in Doubt !!!
1 Position Tool Joint at Table, Release Elevators2 Install Stabbing Valve Open, then Close3 Install Kelly, Open Stabbing Valve4 Open HCR Valve to an Open Choke & Degasser5 Close Hydril6 Close Choke Slowly7 Record: SICP, SIDPP & Pit gain every 2min.8 Do not Exceed MACP
TIME TIME TIME
NOTES:
MAXIMUM ALLOWABLE CASING PRESSUREWell Name: Location: Rig: Engineer:
Casing Size, in Vertical Csg Shoe Depth, ft Leak Off Gradient, psi/ft
Well MTD, ft Well TVD, ft Csg Shoe Frac Press, psi
Csg Shoe Fracture Mud Wt. ppg MACP with WATER filled Csg, psi
psi/ft psi/ft psi/ft
CAUSES of KICKS WARNING SIGNS FLOW CHECKWhile Drilling (Any Warning Signs)
FLOW CHECK PROCEDURESCALL ALERT ( If while Out of the Hole Proceed from: Ensure Hole is Full… )
Hoist Kelly above R. Table and shut-off the pump. (If Tripping, position tool joint above table, install Stabbing Valveproperly, Ensure Hole is Full and Shut off Hole fill pump.) Divert flow to Trip tank. Zero trip tank volume indicator.Monitor tank for flow for 5 to 10 minutes. If the Well is Flowing Shut it in Immediately. Record any Trip tank Gains.
PROCEDURES FOR SOFT SHUT-IN THE WELLCALL ALERT
While Drilling While Tripping1 Position Kelly Above Table2 Shut off Mud Pump3 Open HCR Valve to an Open Choke & Degasser4 Close Hydril5 Close Choke Slowly6 Record: SICP, SIDPP & Pit gain every 2min.7 Do not Exceed MACP
Personnel on Location, No SHUT-IN WELL DATA Baryte on Location, sacks
Total MTD, ft TVD, ft Mud Wt. ppg Baryte to Order, sacks
Mud Viscosity: Total Circ. Mud Volume, BBLs Other Mud Chem. to Order:D.P.P. psi C.P. psi Pit Gain bbls D.P.P. psi C.P. psi Pit Gain bbls D.P.P. psi
99-11-23
1.00
Mud Grad. MACP
psi
0.593 13030.598 12860.603 12700.608 12530.614 12360.619 12200.624 12030.629 11870.634 11700.640 1153
After Drilling a metre or less into a porous ZonePrior to Tripping the Drilling StringWhile Tripping (any Warning Signs)
After POOH 5% of D.P. StandsHalf Way Out
At the Last D.P. Stand Before D.C. While Out of the Hole every 30min
When in Doubt !!!
Position Tool Joint at Table, Release Elevators Install Stabbing Valve Open, then Close Install Kelly, Open Stabbing Valve Open HCR Valve to an Open Choke & Degasser
Record: SICP, SIDPP & Pit gain every 2min.
Date:
psi/ft
LOW CHECKWhile Drilling (Any Warning Signs)
position tool joint above table, install Stabbing Valvensure Hole is Full and Shut off Hole fill pump.) Divert flow to Trip tank. Zero trip tank volume indicator.
Record any Trip tank Gains.
ripping
Baryte on Location, sacks
Baryte to Order, sacks
C.P. psi Pit Gain bbls
TIME Pump Strokes TIME Pump Strokes
1 31
2 32
3 33
4 34
5 35
6 36
7 37
8 38
9 39
10 40
11 41
12 42
13 43
14 44
15 45
16 46
17 47
18 48
19 49
20 50
21 51
22 52
23 53
24 54
25 55
26 56
27 57
28 58
29 59
30 60
GENERAL PROBLEM DRILL PIPE PRESSURE CASING PRESSURE PUMP SPEEDPARTIAL CIRCULATION LOSS MAJOR DECREASE DECREASE INCREASE
TOTAL CIRCULATION LOSS MAJOR DECREASE MAJOR DECREASE INCREASE
DRILLSTRING WASHOUT MAJOR DECREASE NO CHANGE INCREASE
WELL PLUGGED NOZZLE MAJOR INCREASE NO CHANGE DECREASE
CONTROL CHOKE WASHOUT MAJOR DECREASE MAJOR DECREASE INCREASE
METHODS CHOKE PLUGGING MAJOR INCREASE MAJOR INCREASE DECREASE
PROBLEM SOLUTION
WELL CONTROL RECORD SHEET Well TD ft Well TVD ft Slow Pump Pressure psi
MACP (Orig. Mud Wt.) psi MACP (Kill Mud Wt.) psi Slow Pump Speed Strokes/min
P. Strokes to Bit: to Csg Shoe: to Surface: Total H. Strokes: Total C. Strokes:
D.P.P. psi C.P. psi Pits Vol. bbls D.P.P. psi C.P. psi
PROBLEMS AND SIGNS
FOR ALL
SIGNS (Mainly for Driller's Method First Step)
DPP INCREASES DRASTICALLY. CP REDUCES SLIGHTLY AND PUMP SPEED DECREASE.
PLUGGED NOZZLE
DPP INCREASES: SLOWLY IF ABOVE GAS, RAPIDLY IF BELOW GAS. CP DECREASES AND FLUCTUATES. PUMP SPEED DECREASES SLOWLY.
FLUID RETURNS DECREASE. FLARE DECREASE OR DIES.
DPP DECREASES.CP AND PUMP SPEED REMAIN THE SAME OR INCREASE SLIGHTLY.
UNPLUGGED NOZZLE
BRIDGE
SHUT DOWN AND RE-ESTABLISH ACCURATE SHUT-IN PRESSURES, THEN RE-ESTABLISH NEW CIRCULATING
PRESSURES.
DPP AND CP DECREASE EQUALLY.PUMP SPEED RETURNS TO NORMAL.
UNPLUGGED CHOKE
PLUGGEDCHOKE
TRY WORK/FREE PIPE WITHOUT APPLYING EXCESSIVE PUMP PRESSURE.
RE-ESTABLISH LAST ACCURATE CP AND MAINTAIN NEW REDUCED DPP.
SHUT-IN WELL. SWITCH CHOKES. ESTABLISH NEW CIRCULATING PRESSURES. ISOLATE PLUGGED CHOKE.
CORRELATE PRESSURE GAUGES.
DPP AND CP INCREASE CONTINUALLY. PUMP SPEED DECREASES SLIGHTLY.
NO TANK INCREASE. FLARE GOES OUT IF GAS TO SURFACE.
SHUT-IN WELL. SWITCH CHOKES.ESTABLISH NEW CIRCULATING PRESSURES.
DPP AND CP DECREASE EQUALLY.PUMP SPEED RETURNS TO NORMAL.
UNPLUGGED CHOKE
SHUT-IN WELL. SWITCH CHOKES.ESTABLISH NEW CIRCULATING PRESSURES.
PUMP SPEEDINCREASE
INCREASE
INCREASE
DECREASE
INCREASE
DECREASE
SOLUTION
Pits Vol. bbls
SHUT DOWN AND RE-ESTABLISH ACCURATE SHUT-IN PRESSURES, THEN RE-ESTABLISH NEW CIRCULATING
PRESSURES.
TRY WORK/FREE PIPE WITHOUT APPLYING EXCESSIVE PUMP PRESSURE.
RE-ESTABLISH LAST ACCURATE CP AND MAINTAIN NEW REDUCED DPP.
SHUT-IN WELL. SWITCH CHOKES. ESTABLISH NEW CIRCULATING PRESSURES. ISOLATE PLUGGED CHOKE.
CORRELATE PRESSURE GAUGES.
SHUT-IN WELL. SWITCH CHOKES.ESTABLISH NEW CIRCULATING PRESSURES.
SHUT-IN WELL. SWITCH CHOKES.ESTABLISH NEW CIRCULATING PRESSURES.