3
1 of 3 Mahmoud.F.Taha Address: Sheraton Helioplice, Cairo, Egypt Contact Tel : 0020-100105-8282 E-mail:[email protected] Profile: Architect Objective: To enhance my skills of Construction management and to be able to contribute some of my knowledge to the company. Education 2003 to 2008 Bachelor of Architecture Engineering & Environmental Design. The Arab Academy for Science, Technology & Maritime transport “AASTMT”- Cairo, Egypt. Work Experience Company Name: Saad Hanna Sons Co. for Trade and Contracting Client : Soreal for real estate investment S.A.E Consultant office: Shaker consultancy Group Main Contractor : Saad Hanna Sons Full time Oct.,2016 up to date Project: Villette, residential compound at 5th distract, new Cairo, Egypt Title: Senior Quantity surveyor. Tasks & responsibilities:- Managing workload on projects Run all the commercial and financial aspects of projects being carried out Prepare requests for subcontractors and ensure each subcontractor accepted for a project is inducted accurately and efficiently Client contact and cost reporting Site visits for pre-programming and during construction Managing variations and claims Company Name: Saudi-Binladin Group for construction Architectural & Building Construction - Mega Projects Division “SBG-ABCD Full time Sept.,2010 up Aug.2015 Project: Prophet’s Mosque Expansion – Head office-Jeddah, Saudi, Arabia. Title: Project Controller. The largest expansion of the Prophet's Mosque: The expansion will add about 1,300,000 m 2 to the existing 400,000 m 2 , and will increase the mosque’s capacity to more than 1.6 million visitors after its completion. The project will apply modern construction systems and advanced technology and will be associated with heavy works to upgrade and modernize the central Madinah area. Estimated value’s 2,000,000,000$ Tasks & responsibilities:- Understand method statements and work priorities related to Architecture packages. Follow up the technical packages according the update design drawings (submittals),with the material finishing schedule. Review the architecture design drawings with workshop drawings.. Review the material list in corresponding to the updated finishing schedule. Estimate quantities and do take-offs related to his discipline according to MasterFormat coding. Link drawings to procurement packages; specifications and technical submittals to work packages.

Mahmoud.F.Taha _c.v_

Embed Size (px)

Citation preview

Page 1: Mahmoud.F.Taha _c.v_

1 of 3

Mahmoud.F.Taha

Address: Sheraton Helioplice, Cairo, Egypt

Contact

Tel : 0020-100105-8282 E-mail:[email protected]

Profile: Architect

Objective: To enhance my skills of Construction management and to be able to contribute some of my knowledge to the company.

Education

2003 to 2008 Bachelor of Architecture Engineering & Environmental Design.

The Arab Academy for Science, Technology & Maritime transport “AASTMT”- Cairo, Egypt.

Work Experience Company Name: Saad Hanna Sons Co. for Trade and Contracting

Client : Soreal for real estate investment S.A.E Consultant office: Shaker consultancy Group

Main Contractor : Saad Hanna Sons

Full timeOct.,2016 up to date

Project: Villette, residential compound at 5th distract, new Cairo, Egypt Title: Senior Quantity surveyor. Tasks & responsibilities:-

Managing workload on projects

Run all the commercial and financial aspects of projects being carried out

Prepare requests for subcontractors and ensure each subcontractor accepted for a project is inducted accurately and efficiently

Client contact and cost reporting

Site visits for pre-programming and during construction

Managing variations and claims

Company Name: Saudi-Binladin Group for construction Architectural & Building Construction - Mega Projects Division “SBG-ABCD

Full timeSept.,2010 up Aug.2015

Project: Prophet’s Mosque Expansion – Head office-Jeddah, Saudi, Arabia. Title: Project Controller.

The largest expansion of the Prophet's Mosque: The expansion will add about 1,300,000 m2 to the existing 400,000 m2, and will increase the mosque’s capacity to more than 1.6 million visitors after its completion. The project will apply modern construction systems and advanced technology and will be associated with heavy works to upgrade and modernize the central Madinah area.

Estimated value’s 2,000,000,000$

Tasks & responsibilities:- Understand method statements and work priorities related to Architecture packages.

Follow up the technical packages according the update design drawings (submittals),with the material finishing schedule.

Review the architecture design drawings with workshop drawings..

Review the material list in corresponding to the updated finishing schedule.

Estimate quantities and do take-offs related to his discipline according to MasterFormat coding.

Link drawings to procurement packages; specifications and technical submittals to work packages.

Page 2: Mahmoud.F.Taha _c.v_

2 of 3

Report Incidents to Data Management Group (DMG) and propose corrective and preventive actions.

Make recommendations for improvements to the DM when necessary.

Recently started an analysis about the existing Content Management System.

Project: King Saud bin Abdul Aziz University for Health Sciences -East of Riyadh, Saudi Arabia. Title: Contract Administrator.

Facility Type, Educational:Builtuparea:1,001,784.3 m2 Estimated value’s 2,300,000,000$ Client: National Guard Health affairs Project Manager :Turner Consultant Office:Dar Al-Handasah Shair and Partners Main Contractor: Saudi-Binladin Group. (SBG-ABCD). Tasks & responsibilities:-

Coordinating technical and commercial evaluations.

Manage logistics of completing the project within time and budge.

Monitor costs (supervise sub-contractor).

monitoring cost and commitment through requisition and invoice review

Coordination and regulating various meetings such as project progress review meetings.

Identify and confirm requirements with the Contracts Administrator and the construction Manager to include reporting and invoicing obligations and other items that may affect the project’s set up in Cost point.

Project: Princess Nora University For Women-North of Riyadh, Saudi Arabia. Title: Quantity surveyor. Facility Type, Educational: Land area: 8million sq. Built up area: 3million m2. Estimated packages value’s 4,000,000,000$ Client: Ministry of Higher Education and Ministry of Finance Project Manager: Turner Consultant Office:Dar Al-Handasah Shair and Partners Main Contractor: Package (2& 4).Saudi-Binladin Group. Tasks & responsibilities in package(2&4):-

Develop the manual of the technical specs of the project (Issue the BOQ).

Liaise with design consultants, the client and anyone in convenience by the new installation (Variation order).

Develop the office report of claims to present it to the project owner.

Requests or approves addendum or extension of contracts.

Advises planning and production departments of contractual rights and obligations.

Act as liaison between company and subcontractors.

Company Name: "A-Build Egypt For Contracting S.A.E" Is a market leader specialized contractor in the field of construction protection and repair, It is activity within those of Kabbani Construction Group(KCG) Project: MARASSI resort north coast, Egypt. Title: Site Engineer.

Client : Emaar

Project Manager : Turner

Consultant office: Dar Al Handasah Main Contractor : CONTRACK

Sub-contractor : A-Build

Full timeAug.,2009 toJuly,2010

Page 3: Mahmoud.F.Taha _c.v_

3 of 3

Tasks & responsibilities:-

Construct light weight concrete for whole project.

Preparation work shop drawing and Quantity take off (BOQ).

Handel installation Waterproofing, Damp proofing, Lining and Geo-membranes.

Handel installation Thermal Insulation.

Consultant Engineering office. Title: Architect. Tasks & responsibilities:-

Architecture design of various projects, 2D&3D presentation.

Preparation workshop drawing.

Quantity surveying.

Full TimeApril 2008 to July, 2009

Company Name: SIAC Industrial Construction and Engineering Company Internship

Project: Port Galib Touristic Resorts in Marsa-Allam, Red sea, Egypt. Title: Site Engineer-

Nov.,2006 to Jan,2007

Training Site Engineer, I was involved in several top qualities works (plastering, painting, flooring and ceiling…….etc.) finishes For number of residential units.

(Package value: USD 18,000,000. $)

Basic Information:- Citizenship :Egyptian

Date of Birth :Dec.1984 Marital status :Single

About Education:-

The Arab Academy for Science, Technology & Maritime transport “AASTMT”- Cairo, Egypt The programmed out comes have reference to the National Academic Reference Standards (NARS), and the Royal Institute of British Architects (RIBA) Criteria for validation. The Royal institute of British Architects offered a five years revalidation of accreditation for the B.Sc. and M.SC. Degrees for the college graduate in Architectural Engineering and Environmental Design, hereunder the links. http://www.aast.edu/en/colleges/coe/dept/news_en.php?menutab=36&page=5&unit_id11=46&unit_id=3&last_id=21&get_event_type=1&language_id=$language_id&view=1 http://www.aast.edu/en/colleges/coe_cairo/contenttemp.php?page_id=34600027

Computer skills

Engineering technology programs including but not limited to:-

Autodesk-viz4 AUTOCAD(2008-2014) Adobe In-Design 3Dmax

AdobePhotoshop-CS5 Adobe première Adobe illustrator Windows, Microsoft office

Languages

Arabic(native) English (fluent, ILETS 5.5 Academic) French(basic)

Memberships

: Royal Institute of British Architects (RIBA) chartered member.

:Saudi Council of Engineers :Syndicate of Egyptian Engineers

ALL references are available upon request