Page 1: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

January 2019

Page 2: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

Table of Contents

General  General Notes ‐ Legend 

PTS 000 – General Standards PTS 001: Maintenance and Protection of Traffic Milled Pavement Differential in Lane PTS 002: Maintenance and Protection of Traffic Binder Pavement Differential in Lane PTS 003: Maintenance and Protection of Traffic Pavement Differential on Right Shoulder PTS 004: Maintenance and Protection of Traffic Pavement Differential in Median Shoulder PTS 005: Trailer‐Mounted Equipment Placement PTS 006: Inlet Delineation PTS 007: Traffic Pace / Stoppage 

PTS 900 – Long‐Term Wide Median Standards PTS 900‐1 Notes: General Notes PTS 900‐2A: Mobile Operation for 2 Lanes – Right Lane and Shoulder Work Zone PTS 900‐2B: Mobile Operation for 2 Lanes – Left Lane and Median Work Zone PTS 900‐3A: Mobile Operation for 3 Lanes – Right and Center Lane Work Zone PTS 900‐3B: Mobile Operation for 3 Lanes – Left and Center Lane Work Zone  PTS 900‐4: Single Lane Traffic Pattern PTS 900‐5: Single Lane Traffic Pattern for 3 Lane Section PTS 900‐6: Lane Closure Traffic Pattern for Interchange and Service Plaza Areas PTS 900‐7: Mobile Shoulder Operation PTS 900‐8: Stationary Shoulder Closure with Channelizing Devices PTS 900‐9: Stationary Shoulder Closure with Temporary Concrete Barrier PTS 900‐10A: Lanes Narrow Detail – 2 Lanes Narrow (W ≤ 2.5 FT. and A < 24 FT.) PTS 900‐10B: Lanes Narrow Detail – 3 Lanes Narrow (W ≤ 3.75 FT. and A < 36 FT.) PTS 900‐11A: Lanes Shift Detail – 2 Lanes Shift (W > 2.5 FT. and A = 24 FT.) PTS 900‐11B: Lanes Shift Detail – 3 Lanes Shift (W > 3.75 FT. and A = 36 FT.) PTS 900‐12A: Emergency Pull‐Off – Type I in Temporary Concrete Barrier PTS 900‐12B: Emergency Pull‐Off – Type III PTS 900‐12C: Opening in Temporary Concrete Barrier for Access to Construction Area  PTS 900‐12D: Combined Emergency Pull‐Off – Type I and Opening in Temporary Concrete Barrier for Access to Construction Area PTS 900‐13: Opening in Temporary Concrete Barrier with Truck Crossing PTS 900‐14: 3 Lane to 2 Lane Long‐Term Lane Closure PTS 900‐15: Crossover Traffic Pattern  

PTS 905 – Long‐Term Narrow Median Standards PTS 905‐1 Notes: General Notes PTS 905‐2A: Mobile Operation for 2 Lanes – Right Lane and Shoulder Work Zone PTS 905‐2B: Mobile Operation for 2 Lanes – Left Lane and Median Work Zone PTS 905 3A: Mobile Operation for 3 Lanes – Right and Center Lane Work Zone  PTS 905‐3B: Mobile Operation for 3 Lanes – Left and Center Lane Work Zone PTS 905‐4: Single Lane Traffic Pattern PTS 905‐5: Single Lane Traffic Pattern for 3 Lane Section 

Page 3: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

Table of Contents

PTS 905‐6: Lane Closure Traffic Pattern for Interchange and Service Plaza Areas PTS 905‐7: Mobile Shoulder Operation PTS 905‐8: Stationary Shoulder Closure with Channelizing Devices  PTS 905‐9: Stationary Shoulder Closure with Temporary Concrete Barrier PTS 905‐10A: Lanes Narrow Detail – 2 Lanes Narrow (W < 2.5 FT. and A < 24 FT.) PTS 905‐10B: Lanes Narrow Detail – 3 Lanes Narrow (W < 3.75 FT. and A < 36 FT.) PTS 905‐11A: Lanes Shift Detail – 2 Lanes Shift (W > 2.5 FT. and A = 24 FT.) PTS 905‐11B: Lanes Shift Detail – 3 Lanes Shift (W > 3.75 FT. and A = 36 FT.) PTS 905 12A: Miscellaneous Details – Emergency Pull–Off Type I in Temporary Concrete Barrier PTS 905 12B: Emergency Pull‐Off –  Type III PTS 905‐12C: Opening in Temporary Concrete Barrier for Access to Construction Area  PTS 905‐12D: Combined Emergency Pull‐Off – Type I and Opening in Temporary Concrete Barrier for Access to Construction Area PTS 905‐13: Opening in Temporary Concrete Barrier with Truck Crossing  PTS 905‐14: 3 Lane to 2 Lane Long Term Closure  PTS 905‐15: Crossover Traffic Pattern  PTS 905‐16: Tunnel Crossover Pattern  

PTS 910 – Short‐Term Wide Median Standards PTS 910‐1 Notes: General Notes PTS 910‐2A: Mobile Operation for 2 Lanes – Right Lane and Shoulder Work Zone PTS 910‐2B: Mobile Operation for 2 Lanes – Left Lane and Median Work Zone PTS 910‐3A: Mobile Operation for 3 Lanes – Right and Center Lane Work Zone PTS 910‐3B: Mobile Operation for 3 Lanes – Left and Center Lane Work Zone PTS 910‐4: Single Lane Traffic Pattern  PTS 910‐5: Single Lane Traffic Pattern for 3 Lane Section  PTS 910‐6: Lane Closure Traffic Pattern for Interchange and Service Plaza Areas PTS 910‐7: Mobile Shoulder Operations PTS 910‐8: Stationary Shoulder Closure with Channelizing Devices PTS 910‐9: Survey Work Along Shoulder PTS 910‐10: Utility Work Along Shoulder PTS 910‐11A: Traffic Line Painting Operation – Right Lane PTS 910‐11B: Traffic Line Painting Operation – Left Lane 

 

PTS 915 – Short‐Term Narrow Median Standards PTS 915‐1 Notes: General Notes PTS 915‐2A: Mobile Operation for 2 Lanes – Right Lane and Shoulder Work Zone  PTS 915‐2B: Mobile Operation for 2 Lanes – Left Lane and Median Work Zone  PTS 915‐3A: Mobile Operation for Three Lanes – Right and Center Lane Work Zone PTS 915‐3B: Mobile Operation for Three Lanes – Left and Center Lane Work Zone PTS 915‐4: Single Lane Traffic Pattern  PTS 915‐5: Single Lane Traffic Pattern for 3 Lane Section  PTS 915‐6: Lane Closure Traffic Pattern for Interchange and Service Plaza Areas  PTS 915‐7: Mobile Shoulder Operations  PTS 915‐8: Stationary Shoulder Closure with Channelizing Devices 

Page 4: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

Table of Contents

PTS 915‐9: Survey Work Along Shoulder PTS 915‐10: Utility Work Along Shoulder PTS 915‐11A: Traffic Line Painting Operation – Right Lane  PTS 915‐11B: Traffic Line Painting Operation – Left Lane  PTS 915‐12: Tunnel Crossover Pattern    

PTS 940 – Interchange Operation Standards PTS 940‐1 Notes: Interchange Operations – General Notes PTS 940‐2: Toll Plaza Right Lane Closure Operations Less Than 8 Hours PTS 940‐3: Toll Plaza Right Lane Closure Operations Between 8 and 72 Hours PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations Less Than 8 Hours PTS 940‐6: Toll Plaza Center Lane Closure Operations Between 8 and 72 Hours PTS 940‐7: Toll Plaza Center Plane Closure Operations More Than 72 Hours PTS 940‐8: Advance Warning Signs for Work on Ramps PTS 940‐9: Ramp Bridge Crossover PTS 940‐10A: Work Zone on Ramp – Shoulder Closure  PTS 940‐10B: Work Zone on Ramp – Lane Narrows  PTS 940‐11: Two‐Lane Ramp, One Lane Closure PTS 940‐12A: E‐ZPass Only Slip Ramp – Lane Addition Closure PTS 940‐12B: E‐ZPass Only Slip Ramp – Lane Closure PTS 940‐13A: Express E‐ZPass Single Lane Closure  PTS 940‐13B: Express E‐ZPass Double Lane Closure PTS 940‐14A: Express E‐ZPass Single Lane Closure‐Median Width Less than 15 Feet PTS 940‐14B: Express E‐ZPass Double Lane Closure‐Median Width Less than 15 Feet PTS 940‐15: Traffic Line Painting Operation for Interchange Ramps 

 

Appendix Appendix A: Sign Index in Nomenclature Order 

 

 

 

   

 

Page 5: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

Application

Pennsylvania Turnpike Commission (PTC) Maintenance and Protection of Traffic Standards applies to contractors; utilities; Federal, State, County, and Municipal governments; and others performing construction, maintenance, emergency, permit work, utility work, or any other type of work on highway or so closely adjacent to a highway that workers, equipment, or materials encroach on the roadway or interfere with the normal movement of traffic. This also includes any special event that necessitates the need for temporary traffic control. Refer to 67 Pa Code §212.402 for a complete list of types of work that are exempt from the requirements contained in this standard and the Manual on Uniform Traffic Control Devices (MUTCD).

The PTC Maintenance and Protection of Traffic Standard drawings mentioned hereafter will be referenced as PTS (Example: PTS 910-7).

PTC Maintenance and Protection of Traffic Standards have precedence over information found in PennDOT Publication 213 and the MUTCD. Furthermore, the PTS drawings shall be utilized in lieu of a Publication 213 or MUTCD Typical Application drawing when roadway conditions are similar (For example PTS 900-3, PTS 905-3, PTS 910-3, and PTS 915-3 would have precedence over PATA 306, PATA 603, and MUTCD TA-35 for a mobileoperation on a multi-lane highway). PTS Applications (000 series) are general in nature and meant to be a possible component of temporary traffic control zones shown in most PTS drawings (900 through 940 series). Multiple PTS drawings (900-940 series) may be combined to create a customized temporary traffic control zone, however, customized traffic control setups shall be approved by the PTC prior to implementation. Install traffic control devices as shown on an approved customized traffic control plan if a PTS, Publication 213, or MUTCD Typical Application drawing does not apply.

The traffic control schemes shown in this standard are normally applicable for both urban and rural areas. Since it is not practical to provide detailed guidelines for all the situations that may conceivably arise, applications are presented for only the most common situations. These are minimum desirable applications for normal situations, and additional protection may be needed when special complexities or potential hazards prevail. The protection prescribed for each situation shall be consistent with the general provisions found in the most recent editions of 67 Pa Code, Chapter 212, Official Traffic Control Devices and the MUTCD as issued by the Federal Highway Administration and should be based on common sense; engineering judgment; thespeed and volume of traffic; the duration of the operation; the exposure to potential hazards; the physical features of the highway including horizontal alignment, vertical alignment, and the presence of intersections and driveways; and other important factors.

Page 6: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

General Notes Definitions (Page 1 of 2)Buffer Zone - Area that separates traffic flow from the work zone. Buffer zones must remain clear ofequipment, vehicles, workers, and materials. The length of longitudinal buffer zone is defined on the PTS figures and may be increased for downgrades or other conditions that affect stopping sight distance.

• Longitudinal buffer zone is located in advance of and after the work zone.• Lateral buffer zone is located between flowing traffic and the work area.

Long-Term – Work that occupies a location for more than 12 hours for more than three (3) consecutive days.

Mobile Operation - An operation where the work zone beginning and ending points move as the work activity moves. Work that moves intermittently or continuously for up to 24 hours.

PATA (Pennsylvania Typical Application) - Drawings within PennDOT Publication 213 that depict temporary traffic control conditions.

Portable Sign Post - Rigid device with steel posts for mounting temporary traffic control devices where minimum mounting heights of at least 5’ are required. Refer to PennDOT Publication 111, Traffic Control –Pavement Markings and Signing Standards TC-8717, for details.

Portable Sign Support - A folding, collapsible, or telescoping device for posting temporary traffic control devices where minimum mounting heights of 1’ are acceptable.

Roadway - That portion of a highway improved, designed, or ordinarily used for vehicular travel, exclusive of the sidewalk, berm, or shoulder.

Runout - Length of the taper of a series of channelizing devices for the purpose of moving into the normal path. Located immediately after the end of the work zone.

Shadow Vehicle - A vehicle positioned within the activity in advance of the work zone and work vehicles. The primary purpose of the shadow vehicle is to provide advance information to approaching drivers whileprotecting workers and work vehicles. Shadow vehicles without a truck mounted attenuator must be a 33,000 lb GVW (Gross Vehicle Weight) or larger vehicle and loaded to weigh a minimum of 22,000 lbs., or as indicated on the Standard Drawings, in addition to meeting the requirements of PennDOT Publication 212. Vehicle must be equipped with a flashing, oscillating, or revolving amber warning light which is visible from any direction (360° visibility) and is not being used as a work vehicle. The amber warning light must be activated within an active work zone.

Short-Term - Work that occupies a location for less than 12 hours for three (3) or less consecutive days.

Shoulder - The part of a highway adjacent to the roadway which has a surface constructed with the same or similar material as the roadway. Shoulder width is measured from the center of the painted edge line to the outside edge of pavement, concrete, or finished surface.

Taper - A series of channelizing devices and/or paint lines installed for the purpose of moving traffic out of or into the normal path. Various taper types have differing minimum lengths, most of which are based upon an 'L' distance. The formula to determine distance L is shown on the corresponding PTS notes page. It should be noted that the taper length is a distance per lane; so if a single taper covers two lanes, the total taper length will be double the calculated or minimum distance.

• Merging Taper - Used when drivers in multiple lanes are required to merge into acommon road space. Minimum length is L.• Shifting Taper - Used when a lateral shift is needed. Minimum length required isdistance 1/2 L, unless traffic is approaching a one-lane, two-way condition; in this casethe minimum length is 50'.• Shoulder Taper - Required when closing a paved shoulder having a width of 8' ormore; optional in other conditions. Minimum length is 1/3 L, unless traffic is approachinga one-lane, two-way condition; in this case the minimum length is 25'.• Downstream Taper - Used in the termination area to provide a visual cue to the driverthat access is available back into the original lane or path that was closed. Minimumdistance is 50' per lane.

Truck Mounted Attenuators (TMA) - Shall be mandatory for placement on shadow vehicles utilized on freeways and expressways, including exit and entrance ramps. When a TMA is used, the weight of the shadow vehicle must be greater than the minimum weight specified by the TMA manufacturer.

Warning Lights – Yellow, White or Red lights that operate in steady burn or flashing mode. Warning lights on authorized vehicles may flash or revolve. Type A, B, C, and D warning lights are portable, powered, lens-directed enclosed lights.

Page 7: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

General Notes Definitions (Page 2 of 2)

Worker - A person on foot whose duties place him or her within the right-of-way of a highway, such as highway construction and maintenance forces, survey crews, utility crews, responders to incidents, and law enforcement personnel when directing traffic, investigating crashes, and handling lane closures, obstructed roadways, and disasters within the right-of-way of a highway.

Work Vehicle - A vehicle available for use by workers within an activity area. All work vehicles shall be located outside of the buffer space and roll ahead space for shadow vehicles. Work vehicles being used in an active work zone must utilize the flashing, oscillating, or revolving amber warning lights which are visible from any direction (360° visibility).

Work Zone - The area of a highway where construction, maintenance, or utility work activities are being conducted, and in which traffic control devices are required in accordance with Title 67, Chapter 212.

Page 8: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

Work Zone

Buffer Zone (No vehicles, equipment, material or workers in this area)

Milled pavement

Direction of traffic flow (Arrows)

Work vehicle with activated amberwarning light

Channelizing Device

Shadow vehicle with truck mounted attenuator and activated amber warninglight

Shadow vehicle with an activated amber warning light

Sign & Support

Supply Vehicle

Line Painting Machine

Type B White Flasher

Type B Yellow Flasher

Type B Red Flasher

Solid White Line/ Width

Broken White Line/ Width

Type III Baricade

Light Plant / Projected Light

General Notes - Legend for Pennsylvania Turnpike Commission Standard Drawings

W

Arrow Panel

Arrow Panel in Cautions Mode

Arrow Panel in Merge Mode

Temporary Concrete Barrier

Temporary Concrete Barrierwith glare screen

Inlet

Temporary impact attenuator

Flagger

Rock construction entrance or pavedsurface

Toll Lane

PennDOT approved 28" traffic cone

E-ZPass Gantry

Trailer-Mounted Equipment

or

W/4"

BW/4"

JANUARY 2019

Page 9: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

(PTS 000 Series)

General Standards

JANUARY 2019

Page 10: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 001Maintenance and Protection of TrafficMilled Pavement Differential in Lane

3,780'

1,140'

500'

SPEEDLIMIT

55

WORKZONE

PCMS 2

Phase 1 Phase 2

UNEVENLANES

1,000'

55SPEEDLIMIT

UNEVENLANES

W8-11

W3-5

Place at 1 mile intervals through pavement

differential

W8-11

Place at 1/2 mile intervals throughpavement differential

G20-5AP/R2-1

Interchange, service plaza,maintenance shed,

or access ramp

Location as directedby the Representative

UNEVENLANES

W8-11

Provide a paved 1 inch perfoot wedge to remove vertical

drop-off at the entrancesand exits to interchanges, service plazas, maintenance sheds, and access ramps

for the full length of the ramps.

500'END

ROAD WORK

SPEEDLIMIT

XX

G20-2

R2-1

500'

PCMS 1

Phase 1 Phase 2

PCMS 2

PCMS 1

2,640'

JANUARY 2019

MOTORCYCLESUSE

CAUTION

RIGHT / LEFT LANE

MILLED

UNEVEN LANESNEXT

XX MILES

STAYIN

LANE

NOTES:1. Completely cover conflicting signs

and turn off PCMS when the milledpavement is within a closed lane.

2. See Appendix A for sign descriptionsand sizes.

Page 11: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 002Maintenance and Protection of TrafficBinder Pavement Differential in Lane

3,780'

1,140'

500'

SPEEDLIMIT

55

WORKZONE

UNEVENLANES

1,000'

55SPEEDLIMIT

UNEVENLANES

W8-11

W3-5

Place at 1 mile intervals through

pavement differential

W8-11

Place at 1/2 mile intervals throughpavement differential

G20-5AP/R2-1

Interchange, service plaza,maintenance shed,

or access ramp

Location as directedby the Representative

UNEVENLANES

W8-11

Provide a paved 1 inch perfoot wedge to remove vertical

drop-off at the entrancesand exits to interchanges, service plazas, maintenance sheds, and access ramps

for the full length of the ramps.

500'END

ROAD WORK

SPEEDLIMIT

XX

G20-2

R2-1

500'

PCMS 2

PCMS 1

2,640'

PCMS 2

Phase 1 Phase 2

PCMS 1

Phase 1 Phase 2

MOTORCYCLESUSE

CAUTION

RIGHT / LEFT LANELOW

UNEVEN LANESNEXT

XX MILES

STAYIN

LANE

JANUARY 2019

NOTES:1. Completely cover conflicting signs

and turn off PCMS when the lowpavement is within a closed lane.

2. See Appendix A for sign descriptionsand sizes.

Page 12: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 003Maintenance and Protection of Traffic

Pavement Differential on Right Shoulder

3,780'

1,140'

1,500'

PCMS 1

Phase 1 Phase 2

Place at 1/2 mile intervals

through pavementdifferential

Interchange, service plaza,maintenance shed,

or access ramp

Location as directedby the Representative

LOWSHOULDER

LOWSHOULDER

LOWSHOULDER

W8-9

W8-9

W8-9

ENDROAD WORK

G20-2500'

RIGHTSHOULDER

LOW

MOTORCYCLESUSE

CAUTION

JANUARY 2019

NOTES:1. Completely cover conflicting signs

and turn off PCMS when the lowpavement is within a closed laneor shoulder.

2. See Appendix A for sign descriptionsand sizes.

Page 13: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 004Maintenance and Protection of Traffic

Pavement Differential in Median Shoulder

3,780'

1,140'

1,500'

Place at 1/2 mile intervals

through pavementdifferential

Interchange, service plaza,maintenance shed,

or access ramp

Location as directedby the Representative

LEFTSHOULDER

LOW

LEFTSHOULDER

LOW

LEFTSHOULDER

LOW

MPT-38

MPT-38

MPT-38

ENDROAD WORK

G20-2500'

PCMS 1

Phase 1 Phase 2LEFT

SHOULDERLOW

MOTORCYCLESUSE

CAUTION

JANUARY 2019

NOTES:1. Completely cover conflicting signs

and turn off PCMS when the lowpavement is within a closed laneor shoulder.

2. See Appendix A for sign descriptionsand sizes.

Page 14: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 005 - NotesTrailer-Mounted Equipment Placement

2826201422201610

2622181420161410

221612101614108

3030282026242014

3028241822201612

Designspeed

DesignADT 1V:6H or

Flatter

Foreslope

1V:5H or Steeper 1V:3H

1V:5H to1V:4H

1V:6H orFlatter

Backslope

55MPH

<750750-1,500

1,500-6,000>6,000

70MPH

<750750-1,500

1,500-6,000>6,000

1. Clear Zone width in feet is shown on the table below.

2. Delineation is required for trailer-mounted equipment located within the clear zone, except when protected by barrier. Cones may be used if the trailer will remain in place for less than 24 hours. Vertical panels shall be used when the trailer will be in place for more then 24 hours.

3. Place trailers in the safest locations that will provide maximum performance. The trailer hitch shall be on the opposite side of traffic approaching in the nearest lane as shown on the drawings.

4. Placement and delineation requirements apply to all trailer-mounted equipment such as Portable Changeable Message Signs (PCMS), Speed Display Trailer, Portable Cameras, etc.

5. PCMS shown on drawings; applicable to all trailer-mounted equipment.

JANUARY 2019

Clear Zone Width(In Feet from Edge of Traveled Way)

Page 15: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 005Trailer-Mounted Equipment Placement

Clear Zone

See Note 1

Clear Zone

See Note 1

See Note 2

45°

5'

5'

4' Min

Guide Rail or Concrete Barrier

JANUARY 2019

Most PreferredTrailer Placed Behind Existing Guide Rail or Barrier or Outside Clear Zone Where Existing

Guide Rail or Barrier is Not Available Delineation Not Required

Where Guide Rail or Barrier Is Not Available Trailer Placed Off Shoulder, But Within Clear Zone

Delineation Is Required

Least PreferredTrailer Placed On Shoulder

Delineation Is Required

Delineation Layout Detail for Trailer Placed Within the Clear Zone

Page 16: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 006Inlet Delineation

5'

5'

45°

1'

JANUARY 2019

Page 17: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 007 - NotesNotes - Traffic Pace / Stoppage

JANUARY 2019

1. If a ramp entrance is between Shadow Vehicle No. 1 and Shadow Vehicles No. 3 and No. 4, install Portable Changeable Message Sign (PCMS) prior to toll plaza with the message displaying the same as Shadow Vehicle No. 1. Provide necessary number of shadow vehicles on ramp (shown as Shadow Vehicle No. 2) to completely block ramp and prevent road users from driving between shadow vehicles.

2. A 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicle No. 1.

3. Position shadow vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

4. Have all shadow vehicles meet PennDOT and PTC requirements.

5. All arrow panels are to be truck mounted.

6. Shadow Vehicle No. 1 may not be located on the median shoulder.

7. All queued traffic shall be cleared and any succeeding traffic pace/stoppage shall not occur until traffic flow has returned to normal pre pace/stoppage conditions.

Page 18: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 007Traffic Pace / Stoppage

250'

No traffic past this pointwhile work is in progress

Pennsylvania StatePolice vehicle

(Optional)

Shadow Vehicle No. 3(See Note 6)

Shadow Vehicle No. 2(See Note 6)

Shadow Vehicle No. 1(See Note 1 and 6)

Shadow Vehicle No. 4(See Note 6)

PCMS 1

Phase 1 Phase 2STOPPEDTRAFFICAHEAD

BEPREPAREDTO STOP

300'

1 Mile

1,500'

JANUARY 2019

Page 19: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

JANUARY 2019

(PTS 900 Series)

Standards for Long-Term Median Widths Greater

Than or Equal to 15 Feet

Page 20: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-1 - NotesGeneral Notes

Median Widths Greater Than or Equal to 15 Feet 1. Remove all traffic control signs and devices immediately upon the completion of the work unless otherwise specified in the special provisions.

2. Place all traffic control devices and have them inspected by the Representative before work begins.

3. Cover or remove from the site all signs not in use. Remove from the Turnpike right-of-way construction signs not needed or used for a period of two (2) or more weeks.

4. Maintain a minimum spacing of 200 feet between all regulatory, warning and destination signs.

5. Provide at minimum a 40 feet width beyond the edge of the travel lane free of obstacles and drop-offs greater than 2 inches in depth in work zone(s) during non-working hours or separate work zone(s) from motorists with temporary concrete barrier. Separation of work zone(s) is incidental to the MPT.

6. Details for the signs and devices can be found in these drawings, PennDOT Publication 236, PennDOT Publication 212 and are to be manufactured by a Department of Transportation approved manufacturer as listed in PennDOT Publication 35.

7. Use PennDOT approved Type XI reflectorized material for signs. Do not use metal or wood signs in median.

8. These plans are not intended to relieve the contractor of the responsibility for the protection of the public and the construction personnel. The standards prescribed are minimum and additional protection may be needed if problems are encountered during the term of the contract. The contractor will be expected to constantly review this plan for adequacy and to recommend changes for the Representative's approval when inadequacies are discovered.

9. Signs and devices may be adjusted to fit field conditions.

10. Concrete barrier details are to be according to PennDOT Standards for Roadway Construction, RC-57M, RC-59M, and PTC Standards for Roadway Construction.

11. Establish work zone speed limit of 55 MPH in all construction zones.

Establish work zone speed limit by installing 55 MPH work zone speed limit signs in median and shoulder 1/2 mile in advance of construction area access openings and truck crossings as shown on PTS 900-12C, PTS 900-12D, and PTS 900-13.

Establish work zone speed limit of 55 MPH when a pavement differential exists between any of the lanes.

Normal posted speed limit signs within 2 mile advanced signing area for work zones are to remain uncovered.

Cover or remove work zone speed limit signs when all normal lanes and all normal median and shoulder are available for the affected direction(s). Cover or remove work zone speed limit signs when temporary concrete barrier closes the median or shoulder.

12. Vehicles, equipment, material and workers are not to be located in the buffer zone.

13. Post the G20-2 (END ROAD WORK) sign and the normal speed limit for the area (55 MPH or 70 MPH) at the end of the work zone. If the physical work zone is followed by another physical work zone within 2 miles, then G20-2 sign is not to be used and the R2-1 sign at the end of the first work zone is to be 55 MPH.

14. Type B light is to be mounted on the side closest to traffic as shown on PTS 980 (Sheet 30 of 32).

15. Existing R2-2-2, "WORK ZONE SPEED LIMIT 55 MPH", signs may only be used for the remainder of their serviceable life.

16. Type B yellow flashing warning lights may be used in conjunction with warning signs, unless otherwise indicated on the drawings.

17. Use only for wide median areas greater than or equal to 15 feet in width. Median width is defined as the distance between the yellow edge lines for the opposing travel lanes. Refer to PTS 905 details for narrow median areas less than 15 feet in width.

18. If work zone, including advance signing area, includes median widths of both less than 15 feet and greater than 15 feet, follow PTS 905 details for entire work zone.

JANUARY 2019

Page 21: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

Maintenance and Protection of TrafficMobile Operation For Two Lanes

1. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicle No. 2. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, use a Single Lane Traffic Pattern as shown on PTS 900-8.

2. A 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicle No. 1.

3. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

4. Have all shadow vehicles meet PennDOT and PTC requirements.

5. All arrow panels and PCMS are to be truck mounted.

6. The spacing between the work vehicles and the shadow vehicles, and between each shadow vehicle should be minimized to deter road users from driving in between, based on field conditions.

7. Shadow Vehicle No. 1 may be located on the median shoulder where the median shoulder width is a minimum of 12 feet.

PTS 900-2 - NotesMobile Operation for 2 Lanes

Median Widths Greater Than or Equal to 15 Feet

JANUARY 2019

Page 22: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-2AMobile Operation for 2 Lanes - Right Lane and Shoulder Work Zone

Median Widths Greater Than or Equal to 15 Feet

NOTES:See PTS 900-2 - Notes for applicablenotes to this drawing

Work Vehicle(s)

250' Min - 350' Max

Shadow Vehicle No. 3

300' Min - 1,000' Max

Shadow Vehicle No. 2

1,000' Min - 2,500' Max

Phase 1 Phase 2

PCMS 1Shadow Vehicle No. 1

RIGHTLANE

CLOSED

MERGELEFT

JANUARY 2019

Page 23: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-2BMobile Operation for 2 Lanes - Left Lane and Median Work Zone

Median Widths Greater Than or Equal to 15 Feet

Work Vehicle(s)

Shadow Vehicle No. 3

300' Min - 1,000' Max

Shadow Vehicle No. 2

1,000' Min - 2,500' Max

Phase 1 Phase 2

PCMS 1 Shadow Vehicle No. 1

(See Note 7)

LEFTLANE

CLOSED

MERGERIGHT

JANUARY 2019

250' Min - 350' Max

NOTES:See PTS 900-2 - Notes for applicablenotes to this drawing

Page 24: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicles No. 3 and 6. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, use a Single Lane Traffic Pattern as shown on PTS 900-4.

2. A 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicles No. 1 and 2.

3. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

4. Have all shadow vehicles meet PennDOT and PTC requirements.

5. All arrow panels and PCMS are to be truck mounted.

6. The spacing between the work vehicles and the shadow vehicles, and between each shadow vehicle should be minimized to deter road users from diving in between, based on field conditions.

7. Shadow Vehicles No. 1 and 2 may be located on the median shoulder where the median shoulder width is a minimum of 12 feet.

PTS 900-3 - NotesMobile Operation for 3 Lanes

Median Widths Greater Than or Equal to 15 Feet

JANUARY 2019

Page 25: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-3AMobile Operation for 3 Lanes - Right and Center Lane Work Zone

Median Widths Greater Than or Equal to 15 Feet

Work Vehicle(s)

250' Min - 350' Max

Shadow Vehicle No. 6

Shadow Vehicle No. 4

Shadow Vehicle No. 7

Shadow Vehicle No. 3

Phase 1 Phase 2

PCMS 3Shadow Vehicle No. 5

Phase 1 Phase 2

PCMS 1Shadow Vehicle No. 1

Phase 1 Phase 2

PCMS 2Shadow Vehicle No. 2

RIGHT2 LANESCLOSED

MERGELEFT

RIGHT2 LANESCLOSED

MERGELEFT

ROADWORKAHEAD

RIGHT2 LANESCLOSED

JANUARY 2019

1,000' Min - 2,500' Max

1,000' Min - 2,500' Max

300' Min - 1,000' Max

300' Min - 1,000' Max

250' Min - 500' Max

300' Min - 500' Max

NOTES:See PTS 900-3 - Notes for applicablenotes to this drawing

Page 26: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-3BMobile Operation for 3 Lanes - Left and Center Lane Work Zone

Median Widths Greater Than or Equal to 15 Feet

Work Vehicle(s)

250' Min - 350' Max

Shadow Vehicle No. 6

300' Min - 1,000' Max

Shadow Vehicle No. 4

300' Min - 500' Max

250' Min - 500' Max

300' Min - 1,000' Max

1,000' Min - 2,500' Max

1,000' Min - 2,500' Max

Shadow Vehicle No. 7

Shadow Vehicle No. 3

Phase 1 Phase 2

PCMS 3Shadow Vehicle No. 5

Phase 1 Phase 2

PCMS 2 Shadow Vehicle No. 2

(See Note 7)

Phase 1 Phase 2

PCMS 1Shadow Vehicle No. 1

(See Note 7)

LEFT2 LANESCLOSED

MERGERIGHT

LEFT2 LANESCLOSED

MERGERIGHT

ROADWORKAHEAD

LEFT2 LANESCLOSED

JANUARY 2019

NOTES:See PTS 900-3 - Notes for applicablenotes to this drawing

Page 27: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. For interchange and service plaza ramp signing within the work zone, see PTS 900-6.

2. For left lane work zone, use the same sign spacing, location, and pattern but with the signs and PCMS indicating a left lane closure.

3. Use channelizing devices with PennDOT approved sequential warning lights in the transition area for patterns used during hours of darkness.

4. Establish single lane traffic pattern only during active work periods. Shorten length of single lane pattern to only the length needed for construction operation. Work zone should not exceed four (4) miles in length.

5. Single lane should be established a minimum of 1,000 feet in advance of deceleration ramp or beyond acceleration ramp at interchanges and service plazas.

6. Install W3-5 sign only in the areas where the normal speed limit is 70 MPH.

7. Cover the Active Work Zone When Flashing (W21-19) sign and deactivate white Type B light when workers are not present on the roadway, berm, or shoulder for 60 minutes.

8. Speed Display Sign shall only be used if the length of the physical work zone is greater than or equal to 500 feet.

9. Compute the minimum desirable taper length for reduction in lanes using the following formula:L= S x WWhere L = Minimum desirable taper length in feet

W = Width of offset in feetS = Normal speed limit in miles per hour

PTS 900-4 - NotesSingle Lane Traffic Pattern

Median Widths Greater Than or Equal to 15 Feet

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19---FT

AHEAD

W4-2R/W16-103P

55SPEEDLIMIT

W3-5

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

SPEEDLIMIT

XXR2-1

ENDROAD WORK

G20-2

RIGHT LANECLOSED

----

W20-5Ror

W20-5L

NOTE: See Appendix A for sign descriptions and dimensions.

xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAYSIGN

JANUARY 2019

Distance and Spacing Quick Reference Chart

Signs

L = Transition1/3L = Shoulder TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED L 1/3 L BZ WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet Feet FeetMile(s) L 1/3 L BZ WZ R660840

220280

500 (Min) 4 (Max)4 (Max)

300300

5050

5050

100100

100100

5050750 (Min)

Page 28: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-4Single Lane Traffic Pattern

Median Widths Greater Than or Equal to 15 Feet

SPEEDLIMIT

55

WORKZONE

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

RIGHT LANECLOSED2 MILES

RIGHT LANECLOSED1 MILE

55SPEEDLIMIT

SPEEDLIMIT

55

WORKZONE

1000 FTAHEAD

RIGHT LANECLOSED1/2 MILE

RIGHT LANECLOSED1500 FT

ENDROAD WORK

SPEEDLIMIT

XX

Phase 1 Phase 2

PCMS 1

250' Min1,000' Max

5,280'

640'

640'

500'

1,000'

500'

500'

500'

500'

500'

BZ

WZ

500'

500'

1/3 L

500' Min900' max

1/2 WZ

1/2 WZW

ACTIVEWORK ZONE

WHENFLASHING

INCREASED PENALTIES

See Note 7

R

LxxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

SPEEDLIMIT

55

WORKZONE

RIGHTLANE

CLOSED

MERGELEFT

JANUARY 2019

NOTES:See PTS 900-4 - Notes for applicablenotes to this drawing

2,640' Min5,280' Max

See Note 8

Arrow Panel

See Note 6

Page 29: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. For interchange and service plaza signing within the work zone, see PTS 900-6.

2. For left and center lane work zone, use the same spacing, location, and pattern but with the signs and PCMS indicating a left and center lane closure.

3. Use channelizing devices with PennDOT approved sequential warning lights in the transition areas for patterns used during hours of darkness.

4. Establish single lane pattern only during active work periods. Shorten length of single lane pattern to only the length needed for the construction operation. Work zone should not exceed four (4) miles in length.

5. Single lane should be established a minimum of 1,000 feet in advance of deceleration ramp or beyond acceleration ramp at interchanges and service plazas.

6. Install W3-5 sign only in areas where the normal speed limit is 70 MPH.

7. Cover the Active Work Zone When Flashing (W21-19) sign and deactivate white Type B light when workers are not present on the roadway, berm, or shoulder for 60 minutes.

8. Speed Display Sign shall only be used if the length of the physical work zone is greater than or equal to 500 feet.

9. Compute the minimum desirable taper length for reduction in lanes using the following formula:L= S x WWhere L = Minimum desirable taper length in feet

W = Width of offset in feetS = Normal speed limit in miles per hour

PTS 900-5 - NotesSingle Lane Traffic Pattern for 3 Lane Section

Median Widths Greater Than or Equal to 15 Feet

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19

RIGHT TWO LANES

CLOSED----

W20-5ARor

W20-5AL

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

SPEEDLIMIT

XXR2-1

ENDROAD WORK

G20-2

55SPEEDLIMIT

W3-5xx

YOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAYSIGN

----AHEAD

W4-2R/W16-103P

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

L = Transition1/3 L = Shoulder TransitionBZ 1 = Buffer Zone 1BZ 2 = Buffer Zone 2WZ = Work ZoneR = Runout

SPEED L 1/3 L BZ 1 WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet Feet FeetMile(s) L 1/3 L BZ 1 WZ R660840

220280

1,320 (Min) 4 (Max)4 (Max)

600600

5050

5050

100100

100100

5050

BZ 2Feet

500 (Min)750 (Max)1,680 (Min)

100100

BZ 2

Distance and Spacing Quick Reference Chart

Page 30: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-5Single Lane Traffic Pattern for 3 Lane Section

Median Widths Greater Than or Equal to 15 Feet

1000 FTAHEADRIGHT

TWO LANESCLOSED1500 FT

RIGHT TWO LANES

CLOSED1/2 MILE

RIGHT TWO LANES

CLOSED 2 MILES WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

1000FEET

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

ENDROAD WORK

SPEEDLIMIT

XX

55SPEEDLIMIT

5,280'

500'

L

BZ 1

WZ

R

500'

500'

L

BZ 2

1/3 L

Phase 1 Phase 2

PCMS 1

500' Min900' Max

2,640' Min5,280' Max

1/2 WZ

1/2 WZ

1,000'

RIGHTTWO LANES

CLOSED1 MILE

640'

640'

500'

1,000'

500'

500'

500'

500'

250' Min1,000' Max

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

RIGHT2 LANESCLOSED

MERGELEFT

See Note 6

JANUARY 2019

NOTES:See PTS 900-5 - Notes for applicablenotes to this drawing

See Note 8

See Note 7

Arrow Panel

Arrow Panel

Page 31: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Single lane should be established a minimum of 1,000 feet in advance of deceleration ramp or beyond acceleration ramp.

2. MPT-05 and MPT-06 signs:A. Use for interchange ramp only.B. Cover or remove from the site when not in use.

3. MPT-07 and MPT-08 signs:A. Use for service plaza ramp only.B. Cover or remove from the site when not in use.

4. Existing MPT-07 and MPT-08 signs may only be used for remainder of their serviceable life.

5. Channelizing devices spaced at 100 feet except where noted.

PTS 900-6 - NotesLane Closure Traffic Pattern for

Interchange and Service Plaza AreasMedian Widths Greater Than or Equal to 15 Feet

G20-5AP/R2-1

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

W20-1

ROADWORKAHEAD

W20-1W3-1W3-1R4-1A

NOPASSING

ZONEAHEAD

R4-1AR1-1-2/R1-1

STOPRAMP

R1-1-2/R1-1

W3-2W3-2

MPT-07

NEXT RIGHT

EXIT

MPT-06

EXITNEXTRIGHT

MPT-05

STOPRAMP

R1-1-3R1-2

YIELD

R1-2

MPT-08

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 32: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

EXIT

PTS 900-6Lane Closure Traffic Pattern for Interchange and Service Plaza Areas

Median Widths Greater Than or Equal to 15 Feet

NOPASSING

ZONEAHEAD

NOPASSING

ZONEAHEAD

STOP

EXITNEXTRIGHT

Channelizing devices spaced at 50'

200'

or

or200'

500'200'

RAMP

ROADWORKAHEAD

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

NEXT RIGHT

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

ROADWORKAHEAD

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

STOPRAMP

or

YIELD

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

Channelizing devices spaced at 50'

JANUARY 2019

NOTES:See PTS 900-6 - Notes for applicablenotes to this drawing

Page 33: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. All arrow panels and PCMS are to be truck mounted.

2. Have all shadow vehicles meet PennDOT and PTC requirements.

3. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicle No. 2. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, use either a Stationary Shoulder Closure with Channelizing Devices as shown on PTS 900-8 or a Single Lane Traffic Pattern as shown on PTS 900-4.

4. Mobile shoulder operations may be used on the median shoulder where the median shoulder width is a minimum of 12 feet.

5. A 7,000 lbs GVW (Gross Vehicle Weight) or larger pickup truck loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicle No. 1.

6. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

SHOULDERCLOSED

MPT-34MPT-34

PTS 900-7 - NotesMobile Shoulder Operation

Median Widths Greater Than or Equal to 15 Feet

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 34: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-7Mobile Shoulder Operation

Median Widths Greater Than or Equal to 15 Feet

SHOULDERCLOSED

Phase 1 Phase 2

1,000' Min1 Mile Max

Work Vehicles

250'

SHOULDERCLOSEDAHEAD

USECAUTION

JANUARY 2019

NOTES:See PTS 900-7 - Notes for applicablenotes to this drawing

Shadow Vehicle No. 2

PCMS 1Shadow Vehicle No. 1

See Note 6

Page 35: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Arrow panel in caution mode to be used when vehicles, equipment, materials, or workers are on the paved shoulder. Channelizing devices to remain in place until work is completed. Maintain normal traffic. Stationary shoulder closure with channelizing devices only permitted during allowable working hours.

2. For median operations where the median shoulder is less than 12 feet wide, use Single Lane Traffic Pattern per PTS 900-4, left lane closed. Single lane traffic pattern to remain in place until work is completed.

3. For left shoulder work zone in wide median areas use the same sign spacing, location, and pattern but with the signs indicating a left shoulder closure. Install signs in the median and right shoulder.

4. Install W3-5 sign only in areas where the normal speed limit is 70 MPH.

5. All arrow panels are to be truck mounted.

6. Have all shadow vehicles meet PennDOT and PTC requirements.

7. Cover the Active Work Zone When Flashing (W21-19) sign and deactivate white Type B light when workers are not present on the roadway, berm, or shoulder for 60 minutes.

PTS 900-8 - NotesStationary Shoulder Closure with Channelizing Devices

Median Widths Greater Than or Equal to 15 Feet

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19

ENDROAD WORK

G20-2

SPEEDLIMIT

XXR2-1

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

55SPEEDLIMIT

W3-5

RIGHTSHOULDER

CLOSED----

W21-5BRor

W21-5BL

ROADWORKAHEAD

W20-1

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

1/3L = Shoulder TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED 1/3 L BZ WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet FeetMile(s) 1/3 L BZ WZ R220280

250 4 (Max)4 (Max)

100100

5050

100100

100100

5050250

Distance and Spacing Quick Reference Chart

Page 36: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-8Stationary Shoulder Closure with Channelizing Devices

Median Widths Greater Than or Equal to 15 Feet

55SPEEDLIMIT

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

RIGHTSHOULDER

CLOSED1000 FT

ENDROAD WORK

SPEEDLIMIT

XX

ROADWORKAHEAD

2,000'

500'

1,500'

1,000'

1/3L

BZ

WZ

R

500'

500'

See Note 7

Varies withChannelizing Devices

50' Apart

SPEEDLIMIT

55

WORKZONE

JANUARY 2019

NOTES:See PTS 900-8 - Notes for applicablenotes to this drawing

250' Min1,000' Max

See Note 4

Shadow VehicleNo. 1

Page 37: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-9 - NotesStationary Shoulder Closure with Temporary Concrete Barrier

Median Widths Greater Than or Equal to 15 Feet

ENDROAD WORK

G20-2

RIGHTSHOULDER

CLOSED----

W21-5BR

ROADWORKAHEAD

W20-1

NO SHOULDER NEXT _ _ _ MILES

MPT-31

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Shoulder = Shoulder TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED Shoulder BZ WZ R Channelizing Device Spacing (Feet)MPH5570

Rate Feet FeetMile(s) Shoulder BZ WZ R30:130:1

100 4 (Max)4 (Max)

100100

N/A100 N/A

N/AN/A

N/AN/A

N/AN/A

1. For left shoulder work zone in areas with a median greater than 15 feet use the same sign spacing, location, and pattern but with the signs indicating a left shoulder closure. Install signs in the median and right shoulder.

2. Provide proper end treatment for barrier, by tapering barrier and burying, tapering barrier and connect to guide rail per PTS-135 or barrier, or tapering barrier and provide temporary impact attenuator.

3. For multiple stationary shoulder closures with temporary concrete barrier located within 1 mile of each other, install advanced signing prior to the first stationary shoulder closure only, with distance displayed on the MPT-31 sign as the length from the beginning of the first stationary shoulder closure to the end of the last stationary shoulder closure. The G20-2 sign is to be installed after the last stationary shoulder closure.

4. MPT-31 sign shall only be used if the length of the work zone is greater than 1 mile.

5. If the length of the work zone is greater than 1 mile and no construction accesses are active, provide G20-5AP / R2-1 signs to the right of traffic 1,500 feet before the beginning of the temporary concrete barrier and at 1 mile intervals throughout the shoulder closure.

6. Completely cover signs used with the pattern when the right lane is closed to traffic per PTS 900-4 or PTS 900-5

Distance and Spacing Quick Reference Chart

Page 38: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-9Stationary Shoulder Closure with Temporary Concrete Barrier

Median Widths Greater Than or Equal to 15 Feet

ROADWORKAHEAD

RIGHT SHOULDER

CLOSED1000 FT

ENDROAD WORK

BZ

R

1,600'

500'

Taper as perPennDOT RC-57M

30:1 Taper

WZ

500'

500'

NO SHOULDER NEXT _ _ _ MILES

250' Min1,000' Max

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

1'

JANUARY 2019

24' Min

NOTES:See PTS 900-9 - Notes for applicablenotes to this drawing

See Note 2

See Note 4

Page 39: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-10 - NotesLanes Narrow

Median Widths Greater Than or Equal to 15 Feet

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

LANESNARROW

----

W5-4-1

NO SHOULDER NEXT _ _ _ MILES

MPT-31

ENDROAD WORK

G20-2 W21-19

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

ROADWORK

----

W20-1

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAYSIGN

SPEEDLIMIT

XXR2-1

1. Use the two lane detail when W ≤ 2.5 FT. and A < 24 FT. Use the three lane detail when W ≤ 3.75 FT. and A < 36 FT.

2. When lanes narrow within a work zone use only W5-4-1(1000') and W5-4-1 (500').

3. Provide emergency pull-offs at a spacing of approximately 1 mile each direction through work zone when full 12 feet of shoulder is not available.

4. Taper 30:1 to outside edge of paved shoulder. From outside edge of paved shoulder, taper as per RC-57M. When lanes narrow to the right and a full taper is not feasible in median, then see Note 5.

5. Provide proper end treatment for barrier, by tapering barrier and burying, tapering barrier and connect to guide rail per PTS-135 or barrier, or tapering barrier and provide temporary impact attenuator.

6. From this point, provide G20-5AP / R2-1 signs to the right of traffic at 2 mile maximum intervals through the narrow lane(s) pattern.

7. Erect the Active Work Zone When Flashing (W21-19) sign and active white Type B light when construction access areas are active. Sign shall be covered and light shall be deactivated when construction access is not in use for 60 minutes.

8. MPT-31 sign shall only be used if the length of the work zone is greater than 1 mile.

9. Speed Display Sign shall only be used if the length of the physical work zone is greater than or equal to 500 feet.

10. Compute the minimum desirable transition / shift length for reduction in lanes using the following formula.

Lanes Narrow Variables:L = S x WL = Minimum desirable transition/shift length in feetW = Width of offset in feetS = Work Zone speed limit in miles per hour

WZ

WZ

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Shoulder = Shoulder TransitionL = TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED Shoulder BZ WZ Channelizing Device Spacing (Feet)MPH5570

Rate Feet Mile(s) Shoulder BZ WZL30:130:1

660 4 (Max)4 (Max)

100100

N/A840 N/A

N/AN/A

N/AN/A

N/AN/A

LFeet

RFeet100100

RN/AN/A

Distance and Spacing Quick Reference Chart

Page 40: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-10ALanes Narrow Detail - 2 Lanes Narrow (W ≤ 2.5 FT. and A < 24 FT.)

Median Widths Greater Than or Equal to 15 Feet

150'

A

150' BZW

R

W

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

ROADWORK

2 MILES

ROADWORK1 MILE

LANES NARROW1000 FT

LANESNARROW

500 FT

ENDROAD WORK

SPEEDLIMIT

XX

BW/4"

250' Min1,000' Max

5,280'

1,820'

1,000'

500'

L

500'

500'

LW/4"

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

1,460'

2,640' Min5,280' Max

500' Min900' Max

1/2 WZ

See Note 7

See Note 6

250'

250'

NO SHOULDER NEXT _ _ _ MILES

150'

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

See Note 8

JANUARY 2019

NOTES:See PTS 900-10 - Notes for applicablenotes to this drawing

See Note 9

See Note 4See Note 5

W/4" or W/6" (on barrier)

W/4"

1/2 WZ

W/4"

Page 41: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-10BLanes Narrow Detail - 3 Lanes Narrow (W ≤ 3.75 FT. and A < 36 FT.)

Median Widths Greater Than or Equal to 15 Feet

250' Min1,000' Max

5,280'

1,820'

1,000'

500'

L

500'

500'

L

LANES NARROW

500 FT

LANES NARROW1000 FT

ROADWORK1 MILE

ROADWORK

2 MILES

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

SPEEDLIMIT

XXEND

ROAD WORK

W/4"

150'

ABW/4"

150'

W/4"

150'

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

R

BZ

2,640' Min5,280' Max

500' Min900' Max

1/2 WZ

1/2 WZ

1,460'

See Note 7

See Note 6

250'

250'NO SHOULDER

NEXT _ _ _ MILES

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

See Note 8

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

JANUARY 2019

NOTES:See PTS 900-10 - Notes for applicablenotes to this drawing

See Note 9W

W

See Note 4See Note 5

W/4" or W/6" (on barrier)

W/4"

Page 42: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-11 - NotesLanes Shift Detail

Median Widths Greater Than or Equal to 15 Feet1. Use the two lane detail when W > 2.5 FT. or W < 2.5 FT. and A = 24 FT. Use the three lane detail when W > 3.75 FT. and A = 36 FT. Shift traffic prior to and after work zone.

2. When lanes shift to the right, replace either W1-4BL with W1-4BR or W1-4CL with W1-4CR.

3. W24-1AL and W24-1AR signs may be used in lieu of the W1-4BL and W1-4BR signs when the tangent distance for the shifted traffic makes it difficult to install a second set of two lane reverse curve signs (W1-4B series). W24-1BL and W24-1BR signs may be used in lieu of the W1-4CL and W1-4CR signs when the tangent distance for the shifted traffic makes it difficult to install a second set of three lane reverse curve signs (W1-4C series).

4. Provide emergency pull-offs at a spacing of approximately 1 mile each direction through work zone when full shoulder is not available.

5. Taper 30:1 to outside edge of paved shoulder. From outside edge of paved shoulder, taper as per RC-57M. If full taper is not feasible in median, then see Note 6.

6. Provide proper end treatment for barrier, by tapering barrier and burying, tapering barrier and connect to guide rail per PTS-135 or barrier, or tapering barrier to provide temporary impact attenuator.

7. From this point, provide G20-5AP / R2-1 signs to the right of traffic at 2 mile maximum intervals through the lane(s) shift pattern.

8. Erect the Active Work Zone When Flashing (W21-19) sign and activate white Type B light when construction access areas are active. Sign shall be covered and light shall be deactivated when construction access is not in use for 60 minutes.

9. MPT-31 sign shall only be used if the length of the work zone is greater than 1 mile.

10. Speed Display Sign shall only be used if the length of the physical work zone is greater than or equal to 500 feet.

11. Compute the minimum desirable transition / shift length for reduction in lanes using the following formula.

W24-1AL W24-1AR

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

ROADWORK

----

W20-1

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19

ENDROAD WORK

G20-2

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

SPEEDLIMIT

XXR2-1

----AHEAD

W1-4BL/W16-103P

----AHEAD

W1-4BR/W16-103P

----AHEAD

W1-4CR/W16-103P

----AHEAD

W1-4CL/W16-103P

NO SHOULDER NEXT _ _ _ MILES

MPT-31xx

YOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAYSIGN

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Lanes Shift Variables:

L = S x WL = Minimum desirable transition/shift length in feetW = Width of offset in feetS = Work Zone speed limit in miles per hourWZ

WZ

Signs

L = TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED WZ Channelizing Device Spacing (Feet)MPH5570

Mile(s) WZL660 4 (Max)

4 (Max)840N/AN/A

N/AN/A

LFeet

BZ RFeet Feet100100

100100

BZN/AN/A

RN/AN/A

Distance and Spacing Quick Reference Chart

Page 43: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-11ALanes Shift Detail - 2 Lanes Shift (W > 2.5 FT. and A = 24 FT.)

Median Widths Greater Than or Equal to 15 Feet

150'

BZ

R

500'

500'

150'

ROADWORK1 MILE

ROADWORK

2 MILES

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

SPEEDLIMIT

XXEND

ROAD WORK

500 FTAHEAD

1000 FTAHEAD

1000 FTAHEAD

500 FTAHEAD

250' Min1,000' Max

5,280'

1,820'

1,460'

1,000'

500'

500'

L

500'

500'

L

See Note 5See Note 6

W/4"

150'

ABW/4"

150'

W/4"

W

W

1/2 WZ

2,640' Min5,280' Max

500' Max900' Max

Y/4" or Y/6" (on barrier)

W/4" orW/6"

(on barrier) See Note 8

See Note 7

NO SHOULDER NEXT _ _ _ MILES

250'

250'

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

See Note 9

JANUARY 2019

NOTES:See PTS 900-11 - Notes for applicablenotes to this drawing

1/2 WZ

See Note 10

Page 44: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-11BLanes Shift Detail - 3 Lanes Shift (W > 3.75 FT. and A = 36 FT.)

Median Widths Greater Than or Equal to 15 Feet

W BZ

RW

150'

150'

A

ROADWORK1 MILE

ROADWORK

2 MILES

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

BW/4"

ENDROAD WORK

SPEEDLIMIT

XX

W/4"

1000 FTAHEAD

500 FTAHEAD

500 FTAHEAD

1000 FTAHEAD

250' Min1,000' Max

5,280'

1,820'

1,460'

1,000'

500'

500'

L

LW/4"

500'

500'

150'

1/2 WZ

1/2 WZ

2,640' Min5,280' Max

500' Max900' Max

Y/4" or Y/6" (on barrier)

See Note 8

W/4" orW/6"

(on barrier)

See Note 7

250'

250'NO SHOULDER

NEXT _ _ _ MILES

500'

500'

150'

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

JANUARY 2019

NOTES:See PTS 900-11 - Notes for applicablenotes to this drawing

See Note 10

See Note 5

See Note 6

See Note 9

Page 45: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-12AB - NotesEmergency Pull-Off

Median Widths Greater Than or Equal to 15 Feet

1. Space emergency pull-offs at approximately 1 mile each direction to the right side of traffic.

2. Emergency Pull-Off - Type II uses an existing wide area with a minimum size as indicated for Type III. Sign according to Emergency Pull-Off - Type III requirements.

3. Relocate nearest tenth mile marker to each emergency pull-off. Locate to maximize visibility for the motorist and as approved by the representative.

4. Erect D12-14A, "EMERGENCY CELLULAR SIGN (*11)" within each emergency pull-off. Locate to maximize visibility for the motorist and as approved by the representative.

5. Emergency pull-offs may be used by the contractor to access construction areas only if the emergency pull-off is unoccupied. The Commission assumes no liability for the frequency of emergency pull-off use by its customers. If emergency pull-off is used by the contractor to access construction area, see Combined Emergency Pull-Off - Type I and Opening in Temporary Concrete Barrier for Access to Construction Area detail.

6. Show the actual distance, based on field conditions, on the sign.

EMERGENCYPULL-OFF

G30-2G30-3

EMERGENCYPULL-OFF

----

G30-2G30-1

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 46: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-12A Emergency Pull-Off - Type I

in Temporary Concrete BarrierMedian Widths Greater Than or Equal to 15 Feet

300'

EMERGENCYPULL-OFF

1500 FT

EMERGENCYPULL-OFF

4" Temporary Solid WhiteEdge Line

1,500'See Note 6

12' Min

240' Min

Temporary Concrete Barrier

20:1 Taper

20:1

Tap

er24

0' M

in

Temporary Impact Attenuator,

Type V,Test Level 3

780' Min

Varies

JANUARY 2019

NOTES:See PTS 900-12AB - Notes for applicablenotes to this drawing

100'

Page 47: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

300'

PTS 900-12BEmergency Pull-Off - Type III

Median Widths Greater Than or Equal to 15 Feet

EMERGENCYPULL-OFF

1500 FT

12' Min

25' TYP

4" Temporary Solid White Edge Lineat back of Shoulder

240' Min

20:1 Taper

EMERGENCYPULL-OFF

20:1

Tape

r24

0' M

in

780' Min

1,500'See Note 6

JANUARY 2019

NOTES:See PTS 900-12AB - Notes for applicablenotes to this drawing

100'

Page 48: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Close construction openings with temporary concrete barrier when not required for more than two weeks. This work is incidental to the MPT.

2. Location subject to approval by Representative.

3. Station flagger at access points when access area is active. Equip flagger with PennDOT approved, like new, stop/slow paddle with entire "STOP" panel covered. Provide a platform as necessary to allow the flagger to view oncoming traffic.

4. PCMS is incidental to MPT.

5. Post G20-2 sign at the end of the final work zone.

6. When area is not in use for construction access for 60 minutes, place channelizing devices as shown to completely close off access to the construction area, cover signs, turn off Type B light, and turn off PCMS.

PTS 900-12C - NotesOpening in Temporary Concrete Barrier

for Access to Construction AreaMedian Widths Greater Than or Equal to 15 Feet

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19

ENDROAD WORK

G20-2

CONSTRUCTION ENTRANCE

AHEAD

W25-5

JANUARY 2019

W21-20or

ENDACTIVEWORKZONE

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 49: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

300'

PTS 900-12COpening in Temporary Concrete Barrier

for Access to Construction Area Median Widths Greater Than or Equal to 15 Feet

CONSTRUCTION ENTRANCE

AHEAD

240' Min

20:1 Taper

Varies

4" Temporary SolidWhite Edge Line

Temporary ConcreteBarrier

12' Min

25' TYP

Phase 1 Phase 2

PCMS 1 (See Note 4)

240'

Min

20:1

Tap

er

ENDROAD WORK

500'

2,640'

Channelizing Devices to be movedas required for access (TYP)

Temporary Impact Attenuator,

Type V,Test Level 3

TRUCKSENTERING

AND EXITING

REDUCESPEEDAHEAD

1,000'

1,000'

990'

780'

JANUARY 2019

ENDACTIVEWORKZONE

or

NOTES:See PTS 900-12C - Notes for applicablenotes to this drawing

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

SPEEDLIMIT

55

WORKZONE

See Note 5

200'

150'

Page 50: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-12D - NotesCombined Emergency Pull-Off - Type I and Opening in Temporary

Concrete Barrier for Access to Construction AreaMedian Widths Greater Than or Equal to 15 Feet

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19

EMERGENCYPULL-OFF

----

G30-1G30-1

CONSTRUCTION ENTRANCE

AHEAD

W25-5W25-5G30-2

EMERGENCYPULL-OFF

G30-2

JANUARY 2019

ENDROAD WORK

G20-2

W21-20or

ENDACTIVEWORKZONE

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

1. Space emergency pull-offs at approximately 1 mile each direction.

2. Emergency Pull-Off - Type II uses an existing wide area with a minimum size as indicated for Type III. Sign according to Emergency Pull-Off - Type III requirements.

3. Relocate nearest tenth mile marker to each emergency pull-off. Locate to maximize visibility for the motorist and as approved by the representative.

4. Erect D12-14A, "EMERGENCY CELLULAR SIGN (*11)" within each emergency pull-off. Locate to maximize visibility for the motorist and as approved by the representative.

5. Emergency pull-offs may be used by the contractor to access construction areas only if the emergency pull-off is unoccupied. The Commission assumes no liability for the frequency of emergency pull-off use by its customers. If emergency pull-off is used by the contractor to access construction area, see Combined Emergency Pull-Off - Type I And Opening In Temporary Concrete Barrier For Access To Construction Area detail.

6. Show the actual distance, based on field conditions, on the sign.

7. Close construction openings with temporary concrete barrier when not required for more than two weeks. This work is incidental to the MPT.

8. Location subject to approval by Representative.

9. Station flagger at access points when access area is active. Equip flagger with PennDOT approved, like new, stop/slow paddle with entire "STOP" panel covered. Provide a platform as necessary to allow the flagger to view oncoming traffic.

10. PCMS is incidental to MPT.

11. Post G20-2 sign at the end of the final work zone.

12. When combined area is not in use for construction access for 60 minutes, place channelizing devices as shown to completely close off access to the construction area, cover W25-5, G20-2, G20-5AP/R2-1, W21-19, and W21-20 turn off Type B light, and turn off PCMS.

Page 51: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-12DCombined Emergency Pull-Off - Type I and Opening in Temporary Concrete Barrier

for Access to Construction AreaMedian Widths Greater Than or Equal to 15 Feet

300'

Varies

EMERGENCYPULL-OFF

1500 FT

EMERGENCYPULL-OFF

CONSTRUCTION ENTRANCE

AHEAD

240' Min

20:1 Taper

4" Temporary SolidWhite Edge Line

Temporary ConcreteBarrier

Phase 1 Phase 2

PCMS 1 (See Note 10)

12' Min

(See Note 6)

240' Min

20:1

Tape

r

ENDROAD WORK

500'

200'W

ACTIVEWORK ZONE

WHENFLASHING

INCREASED PENALTIES

Temporary Impact Attenuator,

Type V,Test Level 3

SPEEDLIMIT

55

WORKZONE

TRUCKSENTERING

AND EXITING

REDUCESPEEDAHEAD

2,640'

780' Min

100'

50'

1,000'

500'

500'

990'

JANUARY 2019

ENDACTIVEWORKZONE

or

NOTES:See PTS 900-12D - Notes for applicablenotes to this drawing

See Note 11

Page 52: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

Maintenance and Protection of TrafficMobile Operation For Two Lanes

1. Close construction openings with temporary concrete barrier when not required for more than two weeks. This work is incidental to the MPT.

2. All lanes of traffic at Light Plant 1 location must be visible to flagger and unobstructed for a distance of 2,000 feet. Location subject to approval by Representative.

3. Station flagger with light plant illuminating the flagger 150 feet in advance of access points when truck crossing is active. Flagger shall be in constant communication with any vehicles using truck crossing. Equip flagger with PennDOT approved, like new, stop/slow paddle with entire "STOP" panel covered. Provide a platform as necessary to allow the flagger to view oncoming traffic.

4. PCMS is incidental to MPT.

5. Post G20-2 sign at the end of the final work zone.

6. Provide a light plant 2000 feet in advance of flagger for truck crossings active during hours of darkness. Light plant shall illuminate travel lanes at this location, but shall not be directed at oncoming traffic.

Provide a blank 48" x 48" diamond orange sign mounted on Type III barricades 2000 feet in advance of flagger for truck crossings active during hours of daylight. Sign is to face flagger and not be visible to oncoming traffic.

If a vehicle is between Light Plant 1 or blank sign and the crossing location, trucks are not permitted to cross the travel lanes.

7. Rock construction entrances shall be placed at both sides of the roadway as shown. Additional rock to maintain the rock construction entrances shall be stockpiled on site. Rock construction entrance not required if paved surface is present.

8. When truck crossing is not in use for 60 minutes, place channelizing devices as shown to completely close off the access points, cover MPT-36, G20-2, G20-5AP/R2-1, W21-19, and W21-20 turn off Type B lights, and turn off PCMS.

9. Truck crossings to be active only during allowable working hours and during satisfactory weather conditions as determined by the Representative. Truck crossings are not permitted to be active during holiday periods.

PTS 900-13 - NotesOpening in Temporary Concrete Barrier with Truck Crossing

Median Widths Greater Than or Equal to 15 Feet

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19G20-5AP/R2-1

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

MPT-36

HEAVYEQUIPMENTCROSSING

MPT-36

JANUARY 2019

ENDROAD WORK

G20-2

W21-20or

ENDACTIVEWORKZONE

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 53: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1,000'

500'

150'

500'

HEAVYEQUIPMENTCROSSING

Channelizing Devices to be movedas required for access (TYP)

Rock Construction entranceor paved surface

PCMS 1

Light Plant 2

Temporary Impact Attenuator,Type V, Test Level 3

Rock Construction entranceor paved surface

PTS 900-13Opening in Temporary Concrete Barrier with Truck Crossing

Median Widths Greater Than or Equal to 15 Feet

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

200'

ENDROAD WORK

SPEEDLIMIT

55

WORKZONE

CAUTIONTRUCKS

CROSSING

JANUARY 2019

ENDACTIVEWORKZONE

or

NOTES:See PTS 900-13 - Notes for applicablenotes to this drawing

500'

500'

500'

1,000'

200'

150'

12' TYP 12' TYP24' (Min) 24' (Min)

4" Temporary solid whiteedge line

Temporary Concrete Barrier

Light Plant 1See Notes 2 and 6

500'

Page 54: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. For left lane work zone, use the same sign spacing, locations, and pattern but with the signs and PCMS indicating a left lane closure.

2. Provide emergency pull-offs at a spacing of approximately 1 mile each direction through work zone when full right shoulder is not available.

3. Remove conflicting white line between the center lane and right lane for a right lane closure or the left lane and center lane for a left lane closure.

4. Taper 30:1 to outside edge of paved shoulder. From outside edge of paved shoulder, taper as per RC-57M.

5. Provide proper end treatment for barrier by tapering barrier and burying, tapering barrier and connecting to guide rail per PTS-135 or barrier, or taper barrier and provide temporary impact attenuator.

6. From this point, provide G20-5AP / R2-1 signs to the right of traffic at 2 mile maximum intervals through the long term lane closure pattern.

7. Erect the Active Work Zone When Flashing (W21-19) sign and active white Type B light when construction access areas are active. Sign shall be covered and light shall be deactivated when construction access is not in use for 60 minutes.

PTS 900-14 - Notes3 Lane to 2 Lane Long-Term Closure

Median Widths Greater Than or Equal to 15 Feet

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22 1R22-1

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19

ENDROAD WORK

G20-2

SPEEDLIMIT

XXR2-1

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

----AHEAD

W4-2R or W4-2L /

W16-103P

xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAYSIGN

RIGHT LANE CLOSED

----

W20-5Ror

W20-5L

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Shoulder = Shoulder TransitionL = Buffer ZoneWZ = Work ZoneR = Runout

SPEED Shoulder L WZ R Channelizing Device Spacing (Feet)MPH5570

Rate FeetMile(s) Shoulder L WZ R30:130:1

4 (Max)4 (Max)

300300

N/AN/A

N/AN/A

N/AN/A

5050

Rate100:1100:1

Distance and Spacing Quick Reference Chart

Page 55: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-143 Lane to 2 Lane Long-Term Lane Closure

Median Widths Greater Than or Equal to 15 Feet

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

ENDROAD WORK

SPEEDLIMIT

XX

RIGHT LANE CLOSED1/2 MILE

RIGHT LANE CLOSED1500 FT

1000 FTAHEAD

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

250' Min1,000' Max

5,280'

1,000'

500'

500'

500'

500'

500'

500'

500'

L

Phase 1 Phase 2

PCMS 1

1/2 WZ

500' Min900' Max

2,640' Min5,280' Max

100'

100'

WZ

RIGHT LANE CLOSED1 MILE

RIGHT LANE CLOSED2 MILES

Temp W/4" or W/6"(on barrier)

890'

890'

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

R

RIGHTLANE

CLOSED

MERGELEFT

JANUARY 2019

NOTES:See PTS 900-14 - Notes for applicablenotes to this drawing

1/2 WZ

See Note 4See Note 5

Arrow PanelSee Note 7

See Note 6

Page 56: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-15 - NotesCrossover Traffic Pattern

Median Widths Greater Than or Equal to 15 Feet1. Provide sufficient Type III barricades to close off the entire road.

2. Provide proper end treatment for barrier, by tapering barrier and burying, tapering barrier and connect to guide rail per PTS-135 or barrier, or tapering barrier and provide temporary impact attenuator.

3. Use channelizing devices with PennDOT approved sequential warning lights in the transition areas for patterns used during hours of darkness.

4. Single lane should be established a minimum of 1,000 feet in advance of deceleration ramp or beyond acceleration ramp at interchanges and service plazas.

5. For interchanges and service plaza ramp signing within the work zone, see PTS 900-6.

6. From this point, provide G20-5AP/ R2-1 signs to the right of traffic at 2 mile maximum intervals through the crossover traffic pattern.

7. Erect the Active Work Zone When Flashing (W21-19) sign and activate white Type B light when construction access areas are active. Sign shall be covered and light shall be deactivated when construction access is not used for 60 minutes.

Lane Shift Variables:L = S x WL = S x WL = Minimum desirable transition/shift length in feetW = Width of offset in feetS = Work Zone speed limit in miles per hour

1

WZ2

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

MPT-03

CROSSOVER

1500 FT

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19W1-4Rand

W1-4L

----AHEAD

W4-2R or W4-2L/

W16-103P

MPT-01

CROSSOVER500 FT

W20-5Rand

W20-5L

RIGHT LANE CLOSED

----ROAD

CLOSEDR11-2

ENDROAD WORK

G20-2

SPEEDLIMIT

XXR2-1

xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAYSIGN

WZ

NOTE: See Appendix A for sign descriptions and dimensions.

JANUARY 2019

Signs

L 1 = Transition 1L 2 = Transition 21/3 L = Shoulder TransitionBZ = Buffer Zone WZ = Work ZoneR = Runout

SPEED L 1 1/3 L1 BZ WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet Feet FeetMile(s) L 11/3 L1 L 2 WZ R660840

220280

1,320 (Min) 4 (Max)4 (Max)

300300

5050

5050

5050

100100

50501,680 (Min)

100100

BZL 2

Feet660660

Distance and Spacing Quick Reference Chart

Page 57: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-15Crossover Traffic Pattern Detail (Drawing 1 of 3)Median Widths Greater Than or Equal to 15 Feet

W/4"

See Note 2

100'

100'

L1

1/3 L1

Remove conflictingpavment markings

Y/4"

See Note 1

W/4"

Remove conflictingpavement markings

Remove conflictingpavement markingsand median barrier

BZ

WZ

R

L1

BZ

Remove conflictingpavement markingsand median barrier

See Note 2

L2

Y/4" or Y/6"(on barrier)

W/4"

L2

JANUARY 2019

PCMS 2

CROSSOVER

PCMS 3

CROSSOVER

Arrow Panel

Arrow Panel

See PTS 900-15 Drawing 2 of 3and 3 of 3 for signing layout.

NOTES:See PTS 900-15 - Notes for applicablenotes to this drawing

Temporary Impact Attenuator, Type V,Test Level 3

Page 58: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-15 Crossover Traffic Pattern Detail (Drawing 2 of 3)Median Widths Greater Than or Equal to 15 Feet

SPEEDLIMIT

XX

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

ROADCLOSED

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

1000 FTAHEAD

ENDROAD WORK

RIGHT LANE CLOSED1/2 MILE

RIGHT LANE CLOSED1500 FT

Phase 1 Phase 2

PCMS 1

250' Min1,000' Max

5,280'

890'

890'

1,000'

500'

500'

500'

500'

250'

500'

500'

500'Remove conflictingpavement markings

PCMS 2

CROSSOVER

1500 FT

CROSSOVER500 FT

500' Min900' Max

2,640' Min5,280' max

100'

RIGHT LANE CLOSED1 MILE

RIGHT LANE CLOSED2 MILES

Y/4" or Y/6"(on barrier)

W/4"

SEE PTS 900-15 (Drawing 3 of 3)

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55xx

YOUR SPEED

SPEEDLIMIT

55

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

RIGHTLANE

CLOSED

MERGELEFT

CROSSOVER

250'

1,000'

JANUARY 2019

NOTES:See PTS 900-15 - Notes for applicablenotes to this drawing

Place at midpointof physical work zone

Remove conflictingpavement markings

See Note 2

See Note 6

Arrow Panel

See Note 7

(See Note 1)

Page 59: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 900-15Crossover Traffic Pattern Detail (Drawing 3 of 3)Median Widths Greater Than or Equal to 15 Feet

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

LEFT LANECLOSED2 MILES

SPEEDLIMIT

XX

ENDROAD WORK

1000 FTAHEAD

ARROW PANEL

500'

500'

1,000'

Phase 1 Phase 2

PCMS 4

Remove conflictingpavement markings

See Note 2

Work Zone rightand left lanes closed

to traffic

Arrow Panel

PCMSPCMS 3

CROSSOVER500 FT

CROSSOVER

1500 FT

500' Min900' Max

2,640' Min5,280' Max

LEFT LANECLOSED1 MILE

LEFT LANECLOSED1/2 MILE

LEFT LANECLOSED

1500 FEET

See Note 6

W/4"

Y/4" or Y/6"(on barrier)

W/4"

Y/4"

SEE PTS 900-15 (Drawing 2 of 3)

890'

890'

1,000'

500'

500'

500'

250'

250'

Remove Conflictingpavement markings

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

LEFTLANE

CLOSED

MERGERIGHT

CROSSOVER

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

250' Min1,000' Max

5,280'

500'

500'

JANUARY 2019

NOTES:See PTS 900-15 - Notes for applicablenotes to this drawing

Page 60: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

JANUARY 2019

Standards for Long-TermMedian Widths Less Than

15 Feet (PTS 905 Series)

Page 61: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-1 - NotesGeneral Notes

Median Widths Less Than 15 Feet 1. Remove all traffic control signs and devices immediately upon the completion of the work unless otherwise specified in the special provisions.

2. Place all traffic control devices and have them inspected by the Representative before work begins.

3. Cover or remove from the site all signs not in use. Remove from the Turnpike right-of-way construction signs not needed or used for a period of two (2) or more weeks.

4. Maintain a minimum spacing of 200 feet between all regulatory, warning and destination signs.

5. Provide at minimum a 40 feet width beyond the edge of the travel lane free of obstacles and drop-offs greater than 2 inches in depth in work zone(s) during non-working hours or separate work zone(s) from motorists with temporary concrete barrier. Separation of work zone(s) is incidental to the MPT.

6. Details for the signs and devices can be found in these drawings, PennDOT Publication 236, PennDOT Publication 212 and are to be manufactured by a Department of Transportation approved manufacturer as listed in PennDOT Publication 35.

7. Use PennDOT approved Type XI reflectorized material for signs.

8. These plans are not intended to relieve the contractor of the responsibility for the protection of the public and the construction personnel. The standards prescribed are minimum and additional protection may be needed if problems are encountered during the term of the contract. The contractor will be expected to constantly review this plan for adequacy and to recommend changes for the Representative's approval when inadequacies are discovered.

9. Signs and devices may be adjusted to fit field conditions.

10. Concrete barrier details are to be according to PennDOT Standards for Roadway Construction, RC-57M, RC-59M, and PTC Standards for Roadway Construction.

11. Establish work zone speed limit of 55 MPH in all construction zones except when using tunnel cross-over traffic pattern establish work zone speed limit of 40 MPH.

Establish work zone speed limit by installing 55 MPH work zone speed limit signs on the right shoulder 1/2 mile in advance of construction area access openings and truck crossings as indicated on PTS 905-12 and 905-13.

Establish work zone speed limit of 55 MPH when a pavement differential exists between any of the lanes.

Normal posted speed limit signs within the 2 mile advanced signing area for work zones are to remain uncovered.

Cover or remove work zone speed limit signs when all normal lanes and all normal median and shoulder are available for the affected direction(s). Cover or remove work zone speed limit signs when temporary concrete barrier closes the median or shoulder.

12. Vehicles, equipment, material and workers are not to be located in the buffer zone.

13. Post the G20-2 (END ROAD WORK) sign and the normal speed limit for the area (55 MPH or 70 MPH) at the end of the work zone. If the physical work zone is followed by another physical work zone within 2 miles, then the G20-2 sign is not to be used and the R2-1 sign at the end of the first work zone is to be 55 MPH.

14. Type B light is to be mounted on the side closest to traffic as shown on PTS-980 (Sheet 30 of 32).

15. Existing R2-2-2, "WORK ZONE SPEED LIMIT 55 MPH", signs may only be used for the remainder of their serviceable life.

16. Type B yellow flashing warning lights may be used in conjunction with warning signs, unless otherwise indicated on the drawing.

17. Use only for narrow median areas less than 15 feet in width. Do not use median signs. Median width is defined as the distance between the yellow edge lines for the opposing travel lanes. Refer to PTS 900 details for median areas greater than or equal to 15 feet in width.

18. If work zone, including advance signing area, includes median widths of both less than 15 feet and greater than 15 feet, follow PTS 905 details for entire work zone.

JANUARY 2019

Page 62: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicle No. 2. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, use a Single Lane Traffic Pattern as shown on PTS 905-4.

2. 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck loaded to weigh a minimum of 5,500 lbs.

3. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

4. Have all shadow vehicles meet PennDOT and PTC requirements.

5. All arrow panels and PCMS are to be truck mounted.

6. The spacing between the work vehicles and the shadow vehicles, and between each shadow vehicle should be minimized to deter road users from driving in between, based on field conditions.

7. Shadow Vehicle No. 1 may be located on the median shoulder where the median shoulder width is a minimum of 12 feet.

PTS 905-2 - NotesMobile Operation for 2 Lanes

Median Widths Less Than 15 Feet

JANUARY 2019

Page 63: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-2AMobile Operation for 2 Lanes - Right Lane and Shoulder Work Zone

Median Widths Less Than 15 Feet

Work Vehicle(s)

250' Min - 350' Max

Shadow Vehicle No. 3

300' Min - 1,000' Max

Shadow Vehicle No. 2

1,000' Min - 2,500' Max

Phase 1 Phase 2

PCMS 1Shadow Vehicle No. 1

RIGHTLANE

CLOSED

MERGELEFT

JANUARY 2019

NOTES:See PTS 905-2 - Notes for applicablenotes to this drawing

Page 64: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-2BMobile Operation for 2 Lanes - Left Lane and Median Work Zone

Median Width Less Than 15 Feet

NOTES:See PTS 905-2 - Notes for applicablenotes to this drawing

Work Vehicle(s)

Shadow Vehicle No. 3

300' Min - 1,000' Max

Shadow Vehicle No. 2

1,000' Min - 2,500' Max

Phase 1 Phase 2

PCMS 1 Shadow Vehicle No. 1

(See Note 7)

LEFTLANE

CLOSED

MERGERIGHT

JANUARY 2019

250' Min - 350' Max

Page 65: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicles No. 3 and 6. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, use a Single Lane Traffic Pattern as shown on PTS 905-4.

2. A 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicles No. 1 and 2.

3. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

4. Have all shadow vehicles meet PennDOT and PTC requirements.

5. All arrow panels and PCMS are to be truck mounted.

6. The spacing between the work vehicles and the shadow vehicles, and between each shadow vehicle should be minimized to deter road users from diving in between, based on field conditions.

7. Shadow Vehicles No. 1 and 2 may be located on the median shoulder where the median shoulder width is a minimum of 12 feet.

PTS 905-3 - NotesMobile Operation for 3 Lanes

Median Widths Less Than 15 Feet

JANUARY 2019

Page 66: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-3AMobile Operation for 3 Lanes - Right and Center Lane Work Zone

Median Widths Less Than 15 Feet

Work Vehicle(s)

250' Min - 350' Max

Shadow Vehicle No. 6

300' Min - 1,000' Max

Shadow Vehicle No. 4

300' Min - 500' Max

250' Min - 500' Max

300' Min - 1,000' Max

1,000' Min - 2,500' Max

1,000' Min - 2,500' Max

Shadow Vehicle No. 7

Shadow Vehicle No. 3

Phase 1 Phase 2

PCMS 3Shadow Vehicle No. 5

Phase 1 Phase 2

PCMS 1Shadow Vehicle No. 1

Phase 1 Phase 2

PCMS 2Shadow Vehicle No. 2

RIGHT2 LANESCLOSED

MERGELEFT

RIGHT2 LANESCLOSED

MERGELEFT

ROADWORKAHEAD

RIGHT2 LANESCLOSED

JANUARY 2019

NOTES: See PTS 905-3 - Notes for applicablenotes to this drawing

Page 67: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-3BMobile Operation for 3 Lanes - Left and Center Lane Work Zone

Median Widths Less Than 15 Feet

Work Vehicle(s)

250' Min - 350' Max

Shadow Vehicle No. 6

300' Min - 1,000' Max

Shadow Vehicle No. 4

300' Min - 500' Max

250' Min - 500' Max

300' Min - 1,000' Max

1,000' Min - 2,500' Max

1,000' Min - 2,500' Max

Shadow Vehicle No. 7

Shadow Vehicle No. 3

Phase 1 Phase 2

PCMS 3Shadow Vehicle No. 5

Phase 1 Phase 2

PCMS 2 Shadow Vehicle No. 2

(See Note 8)

Phase 1 Phase 2

PCMS 1 Shadow Vehicle No. 1

(See Note 7)

LEFT2 LANESCLOSED

MERGERIGHT

LEFT2 LANESCLOSED

MERGERIGHT

ROADWORKAHEAD

LEFT2 LANESCLOSED

JANUARY 2019

NOTES:See PTS 905-3 - Notes for applicablenotes to this drawing

Page 68: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-4 - NotesSingle Lane Traffic Pattern

Median Widths Less Than 15 Feet 1. For interchange and service plaza ramp signing within the work zone, see PTS 905-6.

2. For left lane work zone, use the same sign spacing, location, and pattern but with the signs and PCMS indicating a left lane closure.

3. Use channelizing devices with PennDOT approved sequential warning lights in the transition area for patterns used during hours of darkness.

4. Establish single lane traffic pattern only during active work periods. Shorten length of single lane pattern to only the length needed for construction operation. Work zone should not exceed four (4) miles in length.

5. Single lane should be established a minimum of 1,000 feet in advance of deceleration ramp or beyond acceleration ramp at interchanges and service plazas.

6. Install W3-5 sign only in the areas where the normal speed limit is 70 MPH.

7. Cover the Active Work Zone When Flashing (W21-19) sign and deactivate white Type B light when workers are not present on the roadway, berm, or shoulder for 60 minutes.

8. Speed Display Sign shall only be used if the length of the physical work zone is greater than or equal to 500 feet.

9. Compute the minimum desirable taper length for reduction in lanes using the following formula:L= S x WWhere L = Minimum desirable taper length in feet

W = Width of offset in feetS = Normal speed limit in miles per hour

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19

----AHEAD

W4-2R or W4-2L/

W16-103P

55SPEEDLIMIT

W3-5

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

SPEEDLIMIT

XXR2-1

ENDROAD WORK

G20-2

RIGHT LANECLOSED

----

W20-5Ror

W20-5L

xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAY SIGN

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

L = Transition1/3L = Shoulder TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED L 1/3 L BZ WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet Feet FeetMile(s) L 1/3 L BZ WZ R660840

220280

500 (Min) 4 (Max)4 (Max)

300300

5050

5050

100100

100100

5050750 (Min)

Distance and Spacing Quick Reference Chart

Page 69: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-4Single Lane Traffic Pattern

Median Widths Less Than 15 Feet

55SPEEDLIMIT

1000 FTAHEAD

ENDROAD WORK

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

RIGHT LANECLOSED2 MILES

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

SPEEDLIMIT

XX

RIGHT LANECLOSED1/2 MILE

PCMS 1

Phase 1 Phase 2

PCMS 2

Phase 1 Phase 2

PCMS 3

Phase 1 Phase 2

250' Min1,000' Max

1,570'

3,710'

640'

640'

500'

1,000'

500'

500'

500'

BZ

WZ

R

500'

500'

1/3 L

2,640' Min5,280' Max

1/2 WZ

1/2 WZ

RIGHT LANECLOSED1 MILE

500'

500'

L

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

SPEEDLIMIT

55

WORKZONE

RIGHTLANE

CLOSED

MERGELEFT

RIGHTLANE

CLOSED

MERGELEFT

RIGHTLANE

CLOSED

1 1/2MILESAHEAD

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

JANUARY 2019

NOTES:See PTS 905-4 - Notes for applicablenotes to this drawing

500' Min900' max

See Note 8

See Note 7

Arrow Panel

See Note 6

Page 70: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-5 - NotesSingle Lane Traffic Pattern for 3 Lane Section

Median Widths Less Than 15 Feet1. For interchange and service plaza signing within the work zone, see PTS 905-6.

2. For left and center lane work zone, use the same spacing, location, and pattern but with the signs and PCMS indicating a left and center lane closure.

3. Use channelizing devices with PennDOT approved sequential warning lights in the transition areas for patterns used during hours of darkness.

4. Establish single lane pattern only during active work periods. Shorten length of single lane pattern to only the length needed for the construction operation. Work zone should not exceed four (4) miles in length.

5. Single lane should be established a minimum of 1,000 feet in advance of deceleration ramp or beyond acceleration ramp at interchanges and service plazas.

6. Install W3-5 sign only in areas where the normal speed limit is 70 MPH.

7. Cover the Active Work Zone When Flashing (W21-19) sign and deactivate white Type B light when workers are not present on the roadway, berm, or shoulder for 60 minutes.

8. Speed Display Sign shall only be used if the length of the physical work zone is greater than or equal to 500 feet.

9. Compute the minimum desirable taper length for reduction in lanes using the following formula:L= S x WWhere L = Minimum desirable taper length in feet

W = Width of offset in feetS = Normal speed limit in miles per hour

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19

RIGHT TWO LANES

CLOSED----

W20W20-5ARor

W20-5AL

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

SPEEDLIMIT

XXR2-1

ENDROAD WORK

G20-2

55SPEEDLIMIT

W3-5xx

YOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAYSIGN

----AHEAD

W4-2R/W16-103P

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

L = Transition1/3 L = Shoulder TransitionBZ 1 = Buffer Zone 1BZ 2 = Buffer Zone 2WZ = Work ZoneR = Runout

SPEED L 1/3 L BZ 1 WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet Feet FeetMile(s) L 1/3 L BZ 1 WZ R660840

220280

1,320 (Min) 4 (Max)4 (Max)

600600

5050

5050

100100

100100

5050

BZ 2Feet

500 (Min)750 (Min)1,680 (Min)

100100

BZ 2

Distance and Spacing Quick Reference Chart

Page 71: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-5Single Lane Traffic Pattern for 3 Lane Section

Median Widths Less Than 15 Feet

640'

640'

500'

1,000'

500'

500'

500'

500'

500'

3,710'

250' Min1,000' Max

500'

1,570'

WZ

ENDROAD WORK

SPEEDLIMIT

XX

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

55SPEEDLIMIT

RIGHT TWO LANES

CLOSED1/2 MILE

500'

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

PCMS 1

Phase 1 Phase 2

PCMS 2

Phase 1 Phase 2

PCMS 3

Phase 1 Phase 2

1/3 L

Arrow Panel

1,000'BZ 1

L

L

BZ 2

WZ

R

RIGHT TWO LANES

CLOSED1 MILE

RIGHT TWO LANES

CLOSED2 MILES

500' Min900' Max

2,640' Min5,280' Max

1/2 WZ

1/2 WZ

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

RIGHT2 LANESCLOSED

MERGELEFT

RIGHT2 LANESCLOSED

MERGELEFT

RIGHT2 LANESCLOSED

1 1/2 MILES

AHEAD

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

1000 FTAHEAD

1000 FTAHEAD

JANUARY 2019

NOTES:See PTS 905-5 - Notes for applicablenotes to this drawing

See Note 8

See Note 7

Arrow Panel

See Note 6

Page 72: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Single lane should be established a minimum of 1,000 feet in advance of deceleration ramp or beyond acceleration ramp.

2. MPT-05 and MPT-06 signs:A. Use for interchange ramp only.B. Cover or remove from the site when not in use.

3. MPT-07 and MPT-08 signs:A. Use for service plaza ramp only.B. Cover or remove from the site when not in use.

4. Existing MPT-07 and MPT-08 signs may only be used for remainder of their serviceable life.

5. Channelizing devices spaced at 100 feet except where noted.

PTS 905-6 - NotesLane Closure Traffic Pattern for Interchange and Service Plaza Areas

Median Widths Less Than 15 Feet

G20-5AP/R2-1

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

W20-1

ROADWORKAHEAD

W20-1W3-1W3-1R4-1A

NOPASSING

ZONEAHEAD

R4-1AR1-1-2/R1-1

STOPRAMP

R1-1-2/R1-1

W3-2W3-2

MPT-08MPT-07

NEXT RIGHT

EXIT

MPT-06

EXITNEXTRIGHT

MPT-05

STOPRAMP

R1-1-3 R1-2

YIELD

R1-2

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 73: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-6Lane Closure Traffic Pattern for Interchange and Service Plaza Areas

Median Widths Less Than 15 Feet

JANUARY 2019

NOTES:See PTS 905-6 - Notes for applicablenotes to this drawing

EXIT

NOPASSING

ZONEAHEAD

NOPASSING

ZONEAHEAD

STOP

EXITNEXTRIGHT

Channelizing devices spaced at 50'

200'

or

or200'

500'200'

RAMP

ROADWORKAHEAD

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

NEXT RIGHT

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

ROADWORKAHEAD

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

STOPRAMP

or

YIELD

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

Channelizing devices spaced at 50'

Page 74: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

SHOULDERCLOSED

MPT-34MPT-34

PTS 905-7 - NotesMobile Shoulder Operation

Median Width Less Than 15 Feet

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

1. All arrow panels and PCMS are to be truck mounted.

2. Have all shadow vehicles meet PennDOT and PTC requirements.

3. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicle No. 2. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, use either a Stationary Shoulder Closure with Channelizing Devices as shown on PTS 905-8 or a Single Lane Traffic Pattern as shown on PTS 905-4.

4. A 7,000 lbs GVW (Gross Vehicle Weight) or larger pickup truck loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicle No. 1.

5. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

Page 75: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-7Mobile Shoulder Operation

Median Widths Less Than 15 Feet

SHOULDERCLOSED

Work Vehicle(s)

Shadow Vehicle No. 2

PCMS 1Shadow Vehicle No. 1

(See Note 5)

Phase 1 Phase 2

250'

1,000' Min1 Mile Max

SHOULDERCLOSEDAHEAD

USE CAUTION

JANUARY 2019

NOTES:See PTS 905-7 - Notes for applicablenotes to this drawing

Page 76: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-8 - NotesStationary Shoulder Closure with Channelizing Devices

Median Widths Less Than 15 Feet

1. Arrow panel in caution mode to be used when vehicles, equipment with Channelizing Devices, materials, or workers are on the paved shoulder. Channelizing devices to remain in place until work is completed. Maintain normal traffic. Stationary shoulder closure with channelizing devices only permitted during allowable working hours.

2. For median operations, use Single Lane Traffic Pattern per PTS 905-4, left lane closed. Single lane traffic pattern to remain in place until work is completed.

3. Install W3-5 sign only in areas where the normal speed limit is 70 MPH.

4. All arrow panels are to be truck mounted.

5. Have all shadow vehicles meet PennDOT and PTC requirements.

6. Cover the Active Work Zone When Flashing (W21-19) sign and deactivate white Type B light when workers are not present on the roadway, berm, or shoulder for 60 minutes.

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19

ENDROAD WORK

G20-2

SPEEDLIMIT

XXR2-1

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

55SPEEDLIMIT

W3-5

RIGHTSHOULDER

CLOSED----

W21-5BR

ROADWORKAHEAD

W20-1

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

1/3L = Shoulder TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED 1/3 L BZ WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet FeetMile(s) 1/3 L BZ WZ R220280

250 4 (Max)4 (Max)

100100

5050

100100

100100

5050250

Distance and Spacing Quick Reference Chart

Page 77: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-8 Stationary Shoulder Closure with Channelizing Devices

Median Widths Less Than 15 Feet

55SPEEDLIMIT

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

RIGHTSHOULDER

CLOSED1000 FT

ENDROAD WORK

SPEEDLIMIT

XX

ROADWORKAHEAD

Shadow Vehicle No. 1

250' Min1,000' Max

2,000'

500'

1,500'

1,000'

1/3L

BZ

WZ

R

500'

500'

See Note 6

Varies withChannelizing Devices

50' Apart

SPEEDLIMIT

55

WORKZONE

See Note 3

JANUARY 2019

NOTES:See PTS 905-8 - Notes for applicablenotes to this drawing

Page 78: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-9 - NotesStationary Shoulder Closure with Temporary Concrete Barrier

Median Widths Less Than 15 Feet

ENDROAD WORK

G20-2

RIGHTSHOULDER

CLOSED----

W21-5BR

ROADWORKAHEAD

W20-1

NO SHOULDER NEXT _ _ _ MILES

MPT-31

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

1. Provide proper end treatment for barrier, by tapering barrier and burying, tapering barrier and connect to guide rail per PTS-135 or barrier, or tapering barrier and provide temporary impact attenuator.

2. For multiple stationary shoulder closures with temporary concrete barrier located within 1 mile of each other, install advanced signing prior to the first stationary shoulder closure only, with distance displayed on the MPT-31 sign as the length from the beginning of the first stationary shoulder closure to the end of the last stationary shoulder closure. The G20-2 sign is to be installed after the last stationary shoulder closure.

3. MPT-31 sign shall only be used if the length of the work zone is greater than 1 mile.

4. If the length of the work zone is greater than 1 mile and no construction accesses are active, provide G20-5AP /R2-1 signs to the right of traffic 1,500 feet before the beginning of the temporary concrete barrier and at 1 mile intervals throughout the shoulder closure.

5. Completely cover signs used with this pattern when the right lane is closed to traffic per PTS 905-4 or PTS 905-5.

Shoulder = Shoulder TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED Shoulder BZ WZ R Channelizing Device Spacing (Feet)MPH5570

Rate Feet FeetMile(s) Shoulder BZ WZ R30:130:1

100 4 (Max)4 (Max)

100100

N/A100 N/A

N/AN/A

N/AN/A

N/AN/A

Distance and Spacing Quick Reference Chart

Page 79: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-9Stationary Shoulder Closure with Temporary Concrete Barrier

Median Widths Less Than 15 Feet

ROADWORKAHEAD

RIGHT SHOULDER

CLOSED1000 FT

ENDROAD WORK

BZ

R

1,600'

Taper as perPennDOT RC-57M

30:1 Taper

WZ

500'

1'

500'

NO SHOULDER NEXT _ _ _ MILES

250' Min1,000' Max

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

JANUARY 2019

24' Min

NOTES:See PTS 905-9 - Notes for applicablenotes to this drawing

500'

See Note 3

See Note 1

Page 80: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-10 - NotesLanes Narrow

Median Widths Less Than 15 Feet 1. Use the two lane detail when W ≤ 2.5 FT. and A < 24 FT. Use the three lane detail when W ≤ 3.75 FT. and A < 36 FT.

2. When lanes narrow within a work zone use only W5-4-1(1,000') and W5-4-1 (500').

3. Provide emergency pull-offs at a spacing of approximately 1 mile each direction through work zone when full 12 feet of right shoulder is not available.

4. Taper 30:1 to outside edge of paved shoulder. From outside edge of paved shoulder, taper as per RC-57M. When lanes narrow to the right and a full taper is not feasible in median, then see Note 5.

5. Provide proper end treatment for barrier, by tapering barrier and burying, tapering barrier and connect to guide rail per PTS-135 or barrier, or tapering barrier and provide temporary impact attenuator.

6. From this point provide G20-5AP / R2-1 signs to the right of traffic at 2 mile maximum intervals through the narrow lane(s) pattern.

7. Erect the Active Work Zone When Flashing (W21-19) sign and activate white Type B light when construction access areas are active. Sign shall be covered and light shall be deactivated when construction access is not in use for 60 minutes.

8. MPT-31 sign shall only be used if the length of the work zone is greater than 1 mile.

9. Compute the minimum desirable transition / shift length for reduction in lanes using the following formula:

R2-1/SPEED

DISPLAYSIGN

Lanes Narrow Variables:L = S x WL = Minimum desirable transition/shift length in feetW = Width of offset in feetS = Work Zone speed limit in miles per hour

ENDROAD WORK

G20-2

SPEEDLIMIT

XXR2-1 W21-19

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

ROADWORK

----

W20-1

LANESNARROW

----

W5-4-1

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

xxYOUR SPEED

SPEEDLIMIT

55

WZ

WZ

NO SHOULDER NEXT _ _ _ MILES

MPT-31

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Shoulder = Shoulder TransitionL = TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED Shoulder BZ WZ Channelizing Device Spacing (Feet)MPH5570

Rate Feet Mile(s) Shoulder BZ WZL30:130:1

660 4 (Max)4 (Max)

100100

N/A840 N/A

N/AN/A

N/AN/A

N/AN/A

LFeet

RFeet100100

RN/AN/A

Distance and Spacing Quick Reference Chart

Page 81: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-10ALanes Narrow Detail - 2 Lanes Narrow (W < 2.5 FT. and A < 24 FT.)

Median Widths Less Than 15 Feet

BZ

R

ROADWORK

2 MILES

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

ROADWORK1 MILE

LANE NARROWS

1000FT

LANE NARROWS

500FT

ENDROAD WORK

SPEEDLIMIT

XX

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

250' Min1,000' Max

1,570'

3,710'

730'

1,000'

L

See Note 5

A

W

W

150'

150'

500'

500'

500'

L

PCMS 2

Phase 1 Phase 2

PCMS 1

Phase 1 Phase 2

1,820'

730'

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

LANESNARROW

1 1/2MILESAHEAD

LANESNARROW

1/2MILE

AHEAD

250'

250'NO SHOULDER

NEXT _ _ _ MILES

JANUARY 2019

NOTES:See PTS 905-10 - Notes for applicablenotes to this drawing

See Note 4See Note 5

W/4"

W/4" orW/6" (on barrier)

BW/4"

W/4"

See Note 6

See Note 8

See Note 7

2,640' Min5,280' Max

500' Min900' Max

1/2 WZ

1/2 WZ

Page 82: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-10BLanes Narrow Detail - 3 Lanes Narrow (W < 3.75 FT. and A < 36 FT.)

Median Widths Less Than 15 Feet

250' Min1,000' Max

730'

1,000'

250'

500'

L

500'

500'

L

730'

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

ROADWORK

2 MILES

ROADWORK1 MILE

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

ENDROAD WORK

SPEEDLIMIT

XX

PCMS 1

Phase 1 Phase 2

PCMS 2

Phase 1 Phase 2

A

150'

150'

150'

R

BZ

LANES NARROW

500FT

1,820'

1,570'

3,710'

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

LANESNARROW

1/2MILE

AHEAD

LANESNARROW

1 1/2MILESAHEAD

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

250'LANES

NARROW1000FT

NO SHOULDER NEXT _ _ _ MILES

JANUARY 2019

NOTES:See PTS 905-10 - Notes for applicablenotes to this drawing

W

W

See Note 4See Note 5

W/4"

W/4" orW/6" (on barrier)

BW/4"

W/4"

See Note 6

See Note 8

See Note 7

2,640' Min5,280' Max

500' Min900' Max

1/2 WZ

1/2 WZ

Page 83: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-11 - Notes Lanes Shift Detail

Median Widths Less Than 15 Feet1. Use the two lane detail when W > 2.5 FT. or W < 2.5 FT. and A = 24 FT. Use the three lane detail when W > 3.75 FT. and A = 36 FT. Shift traffic prior to and after work zone.

2. When lanes shift to the right, replace either W1-4BL with W1-4BR or W1-4CL with W1-4CR.

3. W24-1AL and W24-1AR signs may be used in lieu of the W1-4BL and W1-4BR signs when the tangent distance for the shifted traffic makes it difficult to install a second set of two lane reverse curve signs (W1-4B series). W24-1BL and W24-1BR signs may be used in lieu of the W1-4CL and W1-4CR signs when the tangent distance for the shifted traffic makes it difficult to install a second set of three lane reverse curve signs (W1-4C series).

4. Provide emergency pull-offs at a spacing of approximately 1 mile each direction through work zone when full shoulder is not available.

5. Taper 30:1 to outside edge of paved shoulder. From outside edge of paved shoulder, taper as per RC-57M. If full taper is not feasible in median, then see Note 6.

6. Provide proper end treatment for barrier, by tapering barrier and burying, tapering barrier and connect to guide rail per PTS-135 or barrier, or tapering barrier to provide temporary impact attenuator.

7. From this point, provide G20-5AP / R2-1 signs to the right of traffic at 2 mile maximum intervals through the lane(s) shift pattern.

8. Erect the Active Work Zone When Flashing (W21-19) sign and activate white Type B light when construction access areas are active. Sign shall be covered and light shall be deactivated when construction access is not in use for 60 minutes.

9. MPT-31 sign shall only be used if the length of the work zone is greater than 1 mile.

10. Compute the minimum desirable transition / shift length for reduction in lanes using the following formula:

Lanes Shift Variables:L = S x WL = Minimum desirable transition/shift length in feetW = Width of offset in feetS = Work Zone speed limit in miles per hour

W24-1AL W24-1AR

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

ROADWORK

----

W20-1

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19

ENDROAD WORK

G20-2

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

SPEEDLIMIT

XXR2-1

----AHEAD

W1-4BL/W16-103P

----AHEAD

W1-4BR/W16-103P

----AHEAD

W1-4CR/W16-103P

----AHEAD

W1-4CL/W16-103P

xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAY SIGN

NO SHOULDER NEXT _ _ _ MILES

MPT-31

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

L = TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED WZ Channelizing Device Spacing (Feet)MPH5570

Mile(s) WZL660 4 (Max)

4 (Max)840N/AN/A

N/AN/A

LFeet

BZ RFeet Feet100100

100100

BZN/AN/A

RN/AN/A

Distance and Spacing Quick Reference Chart

Page 84: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-11ALanes Shift Detail - 2 Lanes Shift (W > 2.5 FT. and A = 24 FT. )

Median Widths Less Than 15 Feet

ENDROAD WORK

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

ROADWORK

2 MILES

ROADWORK1 MILE

500 FTAHEAD

SPEEDLIMIT

XX

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

1000 FTAHEAD

250' Min1,000' Max

1,570'

3,710'

1,820'

730'

1,000'

500'

500'

500'

PCMS 2

Phase 1 Phase 2

PCMS 1

Phase 1 Phase 2

730'

500'

L

L

A'

W'

W'

1000 FTAHEAD

500 FTAHEAD

R

BZ

150'

150'

150'500'

500'

150'

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

LANESSHIFT

1/2MILE

AHEAD

LANESSHIFT

1 1/2MILESAHEAD

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

250'

250'NO SHOULDER

NEXT _ _ _ MILES

See Note 9

JANUARY 2019

NOTES:See PTS 905-11 - Notes for applicablenotes to this drawing

See Note 5See Note 6

W/4"

W/4" or W/6" (on barrier)

BW/4"

W/4"

See Note 7

See Note 8

Y/4" or Y/6"(on barrier)

500' Min900' Max

2,640' Min5,280' Max

1/2 WZ

1/2 WZ

Page 85: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-11BLanes Shift Detail - 3 Lanes Shift (W > 3.75 FT. and A = 36 FT.)

Median Widths Less Than 15 Feet

BZ

R500'

500'

150'

150'

ROADWORK

2 MILES

ENDROAD WORK

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

ROADWORK1 MILE

500 FTAHEAD

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

SPEEDLIMIT

XX

500 FTAHEAD

1000 FTAHEAD

1000 FTAHEAD

PCMS 2

Phase 1 Phase 2

PCMS 1

Phase 1 Phase 2

250' Min1,000' Max

1,570'

3,710'

1,820'

730'

1,000'

500'

500'

730'

500'

L

L

150'

A

W

W

150'

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

LANESSHIFT

1/2MILE

AHEAD

LANESSHIFT

1 1/2MILES

AHEAD

NO SHOULDER NEXT _ _ _ MILES 500'

JANUARY 2019

NOTES:See PTS 905-11 - Notes for applicablenotes to this drawing

See Note 9

See Note 5

See Note 6

W/4"

W/4" or W/6" (on barrier)

BW/4"

W/4"

See Note 7

See Note 8

Y/4" or Y/6"(on barrier)

500' Min900' Max

2,640' Min5,280' Max

1/2 WZ

1/2 WZ

250'

250'

Page 86: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-12AB - NotesEmergency Pull-Off

Median Widths Less Than 15 Feet1. Space emergency pull-offs at approximately 1 mile each direction to the right side of traffic.

2. Emergency Pull-Off - Type II uses an existing wide area with a minimum size as indicated for Type III. Sign according to Emergency Pull-Off - Type III requirements.

3. Relocate nearest tenth mile marker to each emergency pull-off. Locate to maximize visibility for the motorist and as approved by the Representative.

4. Erect D12-14A, "EMERGENCY CELLULAR SIGN (*11)" sign within each emergency pull-off. Locate to maximize visibility for the motorist and as approved by the Representative.

5. Emergency pull-offs may be used by the contractor to access construction areas only if the emergency pull-off is unoccupied. The Commission assumes no liability for the frequency of emergency pull-off use by its customers. If emergency pull-off is used by the contractor to access construction area, see Combined Emergency Pull-Off - Type I and Opening in Temporary Concrete Barrier for Access to Construction Area detail.

6. Show the actual distance, based on field conditions, on the sign.

EMERGENCYPULL-OFF

G30-3

EMERGENCYPULL-OFF

----

G30-2G30-1

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 87: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-12AEmergency Pull-Off - Type I

in Temporary Concrete BarrierMedian Widths Less Than 15 Feet

JANUARY 2019

NOTES:See PTS 905-12AB - Notes for applicablenotes to this drawing

300'

EMERGENCYPULL-OFF

1500 FT

EMERGENCYPULL-OFF

4" Temporary Solid WhiteEdge Line

1,500'See Note 6

12' Min

240' Min

Temporary Concrete Barrier

20:1 Taper

20:1

Tap

er24

0' M

in

Temporary Impact Attenuator,

Type V,Test Level 3

780' Min

Varies

100'

Page 88: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-12BEmergency Pull-Off - Type III

Median Widths Less Than 15 Feet

JANUARY 2019

NOTES:See PTS 905-12AB - Notes for applicablenotes to this drawing

300'

EMERGENCYPULL-OFF

1500 FT

12' Min

25' TYP

4" Temporary Solid White Edge Lineat back of Shoulder

240' Min

20:1 Taper

EMERGENCYPULL-OFF

20:1

Tape

r24

0' M

in

780' Min

1,500'See Note 6

100'

Page 89: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Close construction openings with temporary concrete barrier when not required for more than two weeks. This work is incidental to the MPT.

2. Location subject to approval by Representative.

3. Station flagger at access points when access area is active. Equip flagger with PennDOT approved, like new, stop/slow paddle with entire "STOP" panel covered. Provide a platform as necessary to allow the flagger to view oncoming traffic.

4. PCMS is incidental to MPT.

5. Post G20-2 sign at the end of the final work zone.

6. When area is not in use for construction access for 60 minutes, place channelizing devices as shown to completely close off access to the construction area, cover signs, turn off Type B light and turn off PCMS.

PTS 905-12C - NotesOpening in Temporary Concrete Barrier

for Access to Construction Area Median Widths Less Than 15 Feet

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19

CONSTRUCTION ENTRANCE

AHEAD

W25-5

JANUARY 2019

ENDROAD WORK

G20-2

W21-20or

ENDACTIVEWORKZONE

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 90: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-12COpening in Temporary Concrete Barrier

for Access to Construction AreaMedian Widths Less Than 15 Feet

JANUARY 2019

NOTES:See PTS 905-12C - Notes for applicablenotes to this drawing

300'

CONSTRUCTION ENTRANCE

AHEAD

240' Min

20:1 Taper

Varies

4" Temporary SolidWhite Edge Line

Temporary ConcreteBarrier

12' Min

25' TYP

Phase 1 Phase 2

PCMS 1 (See Note 4)

240'

Min

20:1

Tap

er

ENDROAD WORK

500'

2,640'

Channelizing Devices to be movedas required for access (TYP)

Temporary Impact Attenuator,

Type V,Test Level 3

TRUCKSENTERING

AND EXITING

REDUCESPEEDAHEAD

1,000'

1,000'

990'

780'

ENDACTIVEWORKZONE

or

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

SPEEDLIMIT

55

WORKZONE

See Note 5

200'

150'

Page 91: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-12D - NotesCombined Emergency Pull-Off - Type I and Opening in Temporary

Concrete Barrier for Access to Construction AreaMedian Widths Less Than 15 Feet

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19

EMERGENCYPULL-OFF

----

G30-1G30-1

CONSTRUCTION ENTRANCE

AHEAD

W25-5W25-5G30-2

EMERGENCYPULL-OFF

G30-2

JANUARY 2019

ENDROAD WORK

G20-2

W21-20or

ENDACTIVEWORKZONE

NOTE: See Appendix A for sign descriptions and dimensions.

1. Space emergency pull-offs at approximately 1 mile each direction.

2. Emergency Pull-Off - Type II uses an existing wide area with a minimum size as indicated for Type III. Sign according to Emergency Pull-Off - Type III requirements.

3. Relocate nearest tenth mile marker to each emergency pull-off. Locate to maximize visibility for the motorist and as approved by the Representative.

4. Erect D12-14A, "EMERGENCY CELLULAR SIGN (*11)" sign within each emergency pull-off. Locate to maximize visibility for the motorist and as approved by the Representative.

5. Emergency pull-offs may be used by the contractor to access construction areas only if the emergency pull-off is unoccupied. The Commission assumes no liability for the frequency of emergency pull-off use by its customers. If emergency pull-off is used by the contractor to access construction area, see Combined Emergency Pull-Off - Type I And Opening In Temporary Concrete Barrier For Access To Construction Area detail.

6. Show the acutal distance, based on field conditions, on the sign.

7. Close construction openings with temporary concrete barrier when not required for more than two weeks. This work is incidental to the MPT.

8. Location subject to approval by Representative.

9. Station flagger at access points when access area is active. Equip flagger with PennDOT approved, like new, stop/slow paddle with entire "STOP" panel covered. Provide a platform as necessary to allow the flagger to view oncoming traffic.

10. PCMS is incidental to MPT.

11. Post G20-2 sign at the end of the final work zone.

12. When combined area is not in use for construction access for 60 minutes, place channelizing devices as shown to completely close off access to the construction area, cover W25-5, G20-2, G20-5AP/R2-1, W21-19, and W21-20, turn off Type B light, and turn off PCMS.

Signs

Page 92: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-12DCombined Emergency Pull-Off - Type I and Opening in Temporary Concrete Barrier

for Access to Construction AreaMedian Widths Less Than 15 Feet

NOTES:See PTS 905-12D - Notes for applicablenotes to this drawing

300'

Varies

EMERGENCYPULL-OFF

1500 FT

EMERGENCYPULL-OFF

CONSTRUCTION ENTRANCE

AHEAD

240' Min

20:1 Taper

4" Temporary SolidWhite Edge Line

Temporary ConcreteBarrier

Phase 1 Phase 2

PCMS 1 (See Note 10)

12' Min

(See Note 6)

240' Min

20:1

Tape

r

ENDROAD WORK

500'

200'W

ACTIVEWORK ZONE

WHENFLASHING

INCREASED PENALTIES

Temporary Impact Attenuator,

Type V,Test Level 3

SPEEDLIMIT

55

WORKZONE

TRUCKSENTERING

AND EXITING

REDUCESPEEDAHEAD

2,640'

780' Min

100'

50'

1,000'

500'

500'

990'

JANUARY 2019

ENDACTIVEWORKZONE

or

See Note 11

Page 93: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

Maintenance and Protection of TrafficMobile Operation For Two Lanes

1. Close construction openings with temporary concrete barrier when not required for more than two weeks. This work is incidental to the MPT.

2. All lanes of traffic at Light Plant 1 location must be visible to flagger and unobstructed for a distance of 2,000 feet. Location subject to approval by Representative.

3. Station flagger with light plant illuminating the flagger 150 feet in advance of access points when truck crossing is active. Flagger shall be in constant communication with any vehicles using truck crossing. Equip flagger with PennDOT approved, like new, stop/slow paddle with entire "STOP" panel covered. Provide a platform as necessary to allow the flagger to view oncoming traffic.

4. PCMS is incidental to MPT.

5. Post G20-2 sign at the end of the final Work Zone.

6. Provide a light plant 2,000 feet in advance of flagger for truck crossings active during hours of darkness. Light plant shall illuminate travel lanes at this location, but shall not be directed at oncoming traffic.

Provide a blank 48" x 48" diamond orange sign mounted on Type III barricades 2,000 feet in advance of flagger for truck crossings active during hours of daylight. Sign is to face flagger and not be visible to oncoming traffic.

If a vehicle is between Light Plant 1 or blank sign and the crossing location, trucks are not permitted to cross the travel lanes.

7. Rock construction entrances shall be placed at both sides of the roadway as shown. Additional rock to maintain the rock construction entrances shall be stockpiled on site. Rock construction entrance not required if paved surface is present.

8. When truck crossing is not in use for 60 minutes, place channelizing devices as shown to completely close off the access points, cover MPT-36, G20-2, G20-5AP / R2-1, W21-19, and W21-20 turn off Type B light, and turn off PCMS.

9. Truck crossings to be active only during allowable working hours and during satisfactory weather conditions as determined by the Representative. Truck crossings are not permitted to be active during holiday periods.

PTS 905-13 - NotesOpening in Temporary Concrete Barrier with Truck Crossing

Median Widths Less Than 15 feet

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19G20-5AP/R2-1

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

MPT-36

HEAVYEQUIPMENTCROSSING

MPT-36

JANUARY 2019

ENDROAD WORK

G20-2

W21-20or

ENDACTIVEWORKZONE

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 94: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-13Opening in Temporary Concrete Barrier with Truck Crossing

Median Widths Less Than 15 Feet

JANUARY 2019

NOTES:See PTS 905-13 - Notes for applicablenotes to this drawing

1,000'

500'

150'

500'

HEAVYEQUIPMENTCROSSING

Channelizing Devices to be movedas required for access (TYP)

Rock Construction entranceor paved surface

PCMS 1

Light Plant 2

Temporary Impact Attenuator,Type V, Test Level 3

Rock Construction entranceor paved surface

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

200'

ENDROAD WORK

SPEEDLIMIT

55

WORKZONE

CAUTIONTRUCKS

CROSSING

ENDACTIVEWORKZONE

or

500'

500'

500'

1,000'

200'

150'

12' TYP 12' TYP24' (Min) 24' (Min)

4" Temporary solid whiteedge line

Temporary Concrete Barrier

Light Plant 1See Notes 2 and 6

500'

Page 95: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-14 - Notes3 Lane to 2 Lane Long Term Closure

Median Widths Less Than 15 Feet

1. For left lane work zone, use the same sign spacing, location, and pattern but with the signs and PCMS indicating a left lane closure.

2. Provide emergency pull-offs at a spacing of approximately 1 mile each direction through work zone when full right shoulder is not available.

3. Remove conflicting white line between the center lane and right lane for a right lane closure or the left lane and center lane for a left lane closure.

4. Taper 30:1 to outside edge of paved shoulder. From outside edge of paved shoulder, taper as per RC-57M.

5. Provide proper end treatment for barrier by tapering barrier and burying, tapering barrier and connecting to guide rail per PTS-135 or barrier, or tapering barrier and providing temporary impact attenuator.

6. From this point, provide G20-5AP / R2-1 signs to the right of traffic at 2 mile maximum intervals through the long-term lane closure pattern.

7. Erect the Active Work Zone When Flashing (W21-19) sign and active white Type B light when construction access areas are active. Sign shall be covered and light shall be deactivated when construction access is not in use for 60 minutes.

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22 1R22-1

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19

ENDROAD WORK

G20-2

SPEEDLIMIT

XXR2-1

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

RIGHT LANE CLOSED

----

W20-5Ror

W20-5L

----AHEAD

W4-2R or W4-2L /

W16-103P

xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAY SIGN

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Shoulder = Shoulder TransitionL = Buffer ZoneWZ = Work ZoneR = Runout

SPEED Shoulder L WZ R Channelizing Device Spacing (Feet)MPH5570

Rate FeetMile(s) Shoulder L WZ R30:130:1

4 (Max)4 (Max)

300300

N/AN/A

N/AN/A

N/AN/A

5050

Rate100:1100:1

Distance and Spacing Quick Reference Chart

Page 96: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-143 Lane to 2 Lane Long Term Lane Closure

Median Widths Less Than 15 Feet

ENDROAD WORK

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

RIGHT LANE CLOSED1 MILE

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

SPEEDLIMIT

XX

RIGHT LANECLOSED1/2 MILE

1000 FTAHEAD

L

PCMS 1

Phase 1 Phase 2

PCMS 2

Phase 1 Phase 2

PCMS 3

Phase 1 Phase 2

250' Min1,000' Max

1,570'

3,710'

890'

890'

1,000'

500'

500'

500'

500'

500'

500'

500'

100'

100'

RIGHT LANE CLOSED2 MILES

R

WZ

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

RIGHTLANE

CLOSED

MERGELEFT

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

RIGHTLANE

CLOSED

1 1/2MILESAHEAD

RIGHTLANE

CLOSED

MERGELEFT

JANUARY 2019

NOTES:See PTS 905-14 - Notes for applicablenotes to this drawing

Temp W/4" or W/6"(on barrier)1/2 WZ

See Note 4

See Note 5

Arrow Panel

See Note 7

See Note 6

1/2 WZ

500' Min900' Max

2,640' Min5,280' Max

Page 97: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-15 - NotesCrossover Traffic Pattern

Median Widths Less Than 15 Feet

L = S x WL = S x WL = Minimum desirable transition/shift length in feetW = Width of offset in feetS = Normal speed limit in miles per hourS = Work Zone speed limit in miles per hour

1

WZ

2

SPEEDLIMIT

55

WORKZONE

G20-5AP/R2-1

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

SPEEDLIMIT

XXR2-1MPT-03

CROSSOVER

1500 FT

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19W1-4Rand

W1-4L

----AHEAD

W4-2R or W4-2L/

W16-103P

MPT-01

CROSSOVER500 FT

RIGHT LANE CLOSED

----

W20-5Rand

W20-5L

ROADCLOSED

R11-2

ENDROAD WORK

G20-2

xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAY SIGN

WZ

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

L 1 = Transition 1L 2 = Transition 21/3 L = Shoulder TransitionBZ = Buffer Zone WZ = Work ZoneR = Runout

SPEED L 1 1/3 L1 BZ WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet Feet FeetMile(s) L 11/3 L1 L 2 WZ R660840

220280

1,320 (Min) 4 (Max)4 (Max)

300300

5050

5050

5050

100100

50501,680 (Min)

100100

BZL 2

Feet660660

Distance and Spacing Quick Reference Chart

1. Provide sufficient Type III barricades to close off the entire road.

2. Provide proper end treatment for barrier, by tapering barrier and burying, tapering barrier and connect to guide rail per PTS-135 or barrier, or tapering barrier and provide temporary impact attenuator.

3. Use channelizing devices with PennDOT approved sequential warning lights in the transition areas for patterns used during hours of darkness.

4. Single lane should be established a minimum of 1,000 feet in advance of deceleration ramp or beyond acceleration ramp at interchanges and service plazas.

5. For interchanges and service plaza ramp signing within work zone, see PTS 905-6.

6. From this point, provide G20-5AP/ R2-1 signs to the right of traffic at 2 mile maximum intervals through the crossover traffic pattern.

7. Erect the Active Work Zone When Flashing (W21-19) sign and activate white Type B light when construction access areas are active. Sign shall be covered and light shall be deactivated when construction access is not used for 60 minutes.

8. Compute the minimum desirable transition / shift length for reduction in lanes using the following formula:

Page 98: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-15Crossover Traffic Pattern Detail (Drawing 1 of 3)

Median Widths Less Than 15 Feet

JANUARY 2019See PTS 905-15 Drawing 2 of 3and 3 of 3 for signing layout.

NOTES:See PTS 905-15 - Notes for applicablenotes to this drawing

W/4"

See Note 2

100'

100'

L1

1/3 L1

Remove conflictingpavment markings

Y/4"

See Note 1

W/4"

Remove conflictingpavement markings

Remove conflictingpavement markingsand median barrier

BZ

WZ

R

L1

BZ

Remove conflictingpavement markingsand median barrier

See Note 2

L2

Y/4" or Y/6"(on barrier)

W/4"

L2

PCMS 4

CROSSOVER

PCMS 5

CROSSOVER

Arrow Panel

Arrow Panel

Temporary Impact Attenuator, Type V,Test Level 3

Page 99: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-15Crossover Traffic Pattern Detail (Drawing 2 of 3)

Median Widths Less Than 15 Feet

ROADCLOSED

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

CROSSOVER

1500 FT

CROSSOVER500 FT

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

ENDROAD WORK

SPEEDLIMIT

XX

RIGHT LANECLOSED1/2 MILE

1000 FTAHEAD

Remove Conflicting pavement markingsand median barrier

Remove Conflictingpavement markings

500'

PCMS 4

Phase 1 Phase 2

PCMS 1

Phase 1 Phase 2

PCMS 3

Phase 1 Phase 2

PCMS 2

1,570'

1,000'

500'

500'

500'

1,000'

250' Min1,000' Max

Place at midpointof physical work zone

RIGHT LANECLOSED1 MILE

RIGHT LANECLOSED2 MILES

Y/4" or Y/6"(on barrier)

W/4"

SEE PTS 905-15 (Drawing 3 of 3)

250'

500'

500'

890'

890'

3,710

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55xx

YOUR SPEED

SPEEDLIMIT

55

CROSSOVER

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

RIGHTLANE

CLOSED

MERGELEFT

RIGHTLANE

CLOSED

MERGELEFT

RIGHTLANE

CLOSED

1 1/2MILESAHEAD

250'

100'

JANUARY 2019

NOTES:See PTS 905-15 - Notes for applicablenotes to this drawing

500'

2,640' Min5,280' Max

See Note 2

500' Min900' Max

See Note 6

Arrow Panel

See Note 1See Note 7

Page 100: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-15Crossover Traffic Pattern Detail (Drawing 3 of 3)

Median Widths Less Than 15 Feet

CROSSOVER500 FT

CROSSOVER

1500 FT

SPEEDLIMIT

XXEND

ROAD WORK

LEFT LANECLOSED2 MILES

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

LEFT LANECLOSED1/2 MILE

1000 FTAHEAD

SEE PTS 905-15 (Drawing 3 of 3)

Remove conflictingpavement markingsand median barrier

See Note 2

Remove Conflictingpavement markings

Arrow Panel

Phase 1 Phase 2

PCMS 8

Phase 1 Phase 2

PCMS 6 (See Note 7)

Phase 1 Phase 2

PCMS 7

1,000'

500'

500'

500'

500'

500'

2,640' Min5,280' Max

PCMS 5500' Min900' Max

LEFT LANECLOSED1 MILE

See Note 6

W/4"

Y/4" or Y/6"(on barrier)

W/4"

250' Min1,000' Max

1,570'

3,710'

890'

890'

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

LEFTLANE

CLOSED

1 1/2 MILESAHEAD

LEFTLANE

CLOSED

MERGERIGHT

LEFTLANE

CLOSED

MERGERIGHT

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

SPEEDLIMIT

55

WORKZONE

CROSSOVER

JANUARY 2019

NOTES:See PTS 905-15 - Notes for applicablenotes to this drawing

1,000'

250'

250'

500'

500'

W/4"

Y/4"

Page 101: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Provide sufficient Type III barricades to close off the entire road.

2. Use existing "DO NOT CROSS CENTER LINE" sign and existing traffic control signal at portal.

3. Westbound approach to Allegheny Tunnel requires left or right and center lane closure as indicated on PTS 905-5.

4. Use channelizing devices with PennDOT approved sequential warning lights in the transition areas for patterns used during hours of darkness.

5. Cover the Active Work Zone when Flashing (W21-19) sign and deactivate white Type B light when workers are not present on the roadway, berm, or shoulder for 60 minutes.

PTS 905-16 - Notes Tunnel Crossover Pattern

Median Widths Less Than 15 Feet

CROSSOVER500 FT

MPT-01

NOPASSING

ZONEAHEAD

R4-1A

DONOTPASS

R4-1

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

W21-19W6-3

ENDROAD WORK

G20-2

RIGHT LANECLOSED

----

W20-5Rand

W20-5L

SPEEDLIMIT

40

WORKZONE

G20-5AP/R2-1

W1-4Rand

W1-4L

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

ROADCLOSED

R11-2

SPEEDLIMIT

XXR2-1

xxYOUR SPEED

SPEEDLIMIT

40

R2-1/SPEED

DISPLAY SIGN

40SPEEDLIMIT

W3-5

----AHEAD

W4-2R or W4-2L/

W16-103P

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

L = Transition1/3L = Shoulder TransitionBZ = Buffer ZoneR = Runout

SPEED L 1/3 L BZ R Channelizing Device Spacing (Feet)MPH55

Feet Feet Feet Feet L 1/3 L BZ R660 220 1,320 (Min) 300 50 50 100 50

Signs

Distance and Spacing Quick Reference Chart

Page 102: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-16 Tunnel Crossover Pattern

Median Widths Less Than 15 Feet

TRAFFIC CONTROL BETWEENBLUE MOUNTAIN AND KITTATINNY TUNNELS

LAN

ES

CLO

SED

TO

TR

AFF

IC

DONOTPASS

DONOTPASS

Tubular markers50' apart

200'

50'

200'

50'

Tunnel Portal

Tunnel Portal

JANUARY 2019

Page 103: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 905-16Tunnel Crossover Pattern (Drawing 1 of 2)

Median Widths Less Than 15 Feet

ROADCLOSED

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

1000FEET

NOPASSING

ZONEAHEAD

ENDROAD WORK

SPEEDLIMIT

XX

500'

500'

500'

3,710'

1,570'250' Min

1,000' Max

280'

50'10'

500'

500'

100'

TUNNEL PORTAL

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

DONOTPASS

DONOTPASS

CROSSOVER500 FT

Arrow Panel

Phase 1

Phase 2

250'

250'

1/3L

L

BZ

50'

Tubularmarker 50' apart

150'

Channelizing devices 50' apart

R

PCMS 1

PCMS 4

PCMS 2 & 3

See Note 1

PCMS 3

Phase 1

Phase 2

PCMS 1

LAN

ES C

LOSE

D T

O T

RAF

FIC

See Note 5

PCMS 2 40SPEEDLIMIT

1,000'

500'

500'

780'

RIGHT LANECLOSED2 MILES

500'

RIGHT LANECLOSED1/2 MILE

RIGHT LANECLOSED1 MILE

xxYOUR SPEED

SPEEDLIMIT

40

xxYOUR SPEED

SPEEDLIMIT

40

SPEEDLIMIT

40

WORKZONE

1 1/2MILESAHEAD

SPEEDLIMIT

40

WORKZONE

MERGELEFT

RIGHTLANE

CLOSED

RIGHTLANE

CLOSED

CROSSOVER

SPEEDLIMIT

40

WORKZONE

SPEEDLIMIT

40

WORKZONE

JANUARY 2019

NOTES:See PTS 905-16 - Notes for applicablenotes to this drawing

2,640' Min5,280' Max

500' Min900' Max

Page 104: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

500'

500'

500'

500'

500'

10'

BZ

Varies channelizing devices 50' apart

Varies tubularmarkers 50' apart

100'

50'150'

TUNNEL PORTAL

PTS 905-16Tunnel Crossover Pattern (Drawing 2 of 2)

Median Widths Less Than 15 Feet

500'

500'

250' Min1,000' Max

LAN

ES

CLO

SED

TO

TR

AFFI

C

WACTIVE

WORK ZONEWHEN

FLASHINGINCREASED PENALTIES

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

DONOTPASS

L

1,570'

3,710'

1000FEET

NOPASSING

ZONEAHEAD

SPEEDLIMIT

XXEND

ROAD WORK

CROSSOVER500 FTDO

NOTPASS

Arrow Panel

500' Min900' Max

2,640' Min5,280' Max

See Note 5

R

PCMS 6

40SPEEDLIMIT

500'

500'

1,000'

PCMS 8

PCMS 7

500'

LEFT LANECLOSED1 MILE

LEFT LANECLOSED1/2 MILE

LEFT LANECLOSED2 MILES

xxYOUR SPEED

SPEEDLIMIT

40

xxYOUR SPEED

SPEEDLIMIT

40

SPEEDLIMIT

40

WORKZONE

SPEEDLIMIT

40

WORKZONE

Phase 1

Phase 2

PCMS 6 & 7

Phase 1

Phase 2

PCMS 8

1 1/2MILESAHEAD

MERGERIGHT

LEFTLANE

CLOSED

LEFTLANE

CLOSED

SPEEDLIMIT

40

WORKZONE

50'

JANUARY 2019

PCMS 5

CROSSOVER

NOTES:See PTS 905-16 - Notes for applicable notes to this drawing

Page 105: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

JANUARY 2019

Standards for Short-TermMedian Widths Greater Than

or Equal to 15 Feet (PTS 910 Series)

Page 106: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Remove all traffic control signs and devices immediately upon the completion of the work unless otherwise specified in the special provisions.

2. Place all traffic control devices and have them inspected by the Representative before work begins.

3. Cover or remove from the site all signs not in use. Remove from the Turnpike right-of-way construction signs not needed or used for a period of two (2) or more weeks.

4. Maintain a minimum spacing of 200 feet between all regulatory, warning and destination signs.

5. Provide at minimum a 40 feet width beyond the edge of the travel lane free of obstacles and drop-offs greater than 2 inches in depth in work zone(s) during non-working hours or separate work zone(s) from motorists with temporary concrete barrier. Separation of work zone(s) is incidental to the MPT.

6. Details for the signs and devices can be found in these drawings, PennDOT Publication 236, PennDOT Publication 212 and are to be manufactured by a Department of Transportation approved manufacturer as listed in PennDOT Publication 35.

7. Use PennDOT approved Type XI reflectorized material for signs. Do not use metal or wood signs in median.

8. These plans are not intended to relieve the contractor of the responsibility for the protection of the public and the construction personnel. The standards prescribed are minimum and additional protection may be needed if problems are encountered during the term of the contract. The contractor will be expected to constantly review this plan for adequacy and to recommend changes for the Representative's approval when inadequacies are discovered.

9. Signs and devices may be adjusted to fit field conditions.

10. Concrete barrier details are to be according to PennDOT Standards for Roadway Construction, RC-57M, RC-59M, and PTC Standards for Roadway Construction.

11. Establish work zone speed limit of 55 MPH in all construction zones.

Establish work zone speed limit of 55 MPH when a pavement differential exists between any of the lanes.

Normal posted speed limit signs within 2 mile advanced signing area for work zones are to remain uncovered.

Cover or remove work zone speed limit signs when all normal lanes and all normal median and shoulder are available for the affected direction(s).

12. Vehicles, equipment, material, and workers are not to be located in the buffer zone.

13. Post the G20-2 (END ROAD WORK) sign at the end of the work zone. If the physical work zone is followed by another physical work zone within 2 miles, then the G20-2 sign is not to be used at the end of the first work zone.

14. Type B light is to be mounted on the side closest to traffic as shown on PTS 980 (Sheet 30 of 32).

15. Existing R2-2-2, "WORK ZONE SPEED LIMIT 55 MPH', signs may only be used for the remainder of their serviceable life.

16. Type B yellow flashing lights may be used in conjunction with warning signs unless otherwise indicated on the drawings.

17. Channelizing devices may be temporarily relocated to the minimum offset to allow for work to be performed, as directed by the Representative. The channelizing devices must remain between traffic and the work zone. Relocate channelizing devices to original position as work progresses.

18. Install, reset, relocate, and remove any permanent and / or temporary concrete barrier so that no blunt end of the barrier is exposed to oncoming traffic.

19. Except for MPT-09, MPT-10, MPT-11, and R22-1 signs, all other signs may be mounted on PennDOT approved portable supports, x-frame, with a minimum height of 1 foot from the pavement surface to the bottom of the signs. Portable supports and signs must be removed from the roadway during non-working hours.

20. Median width is defined as the distance between the yellow edge lines for the opposing travel lanes. Refer to PTS 915 details for narrow median areas less than 15 feet in width.

21. If work zone, including advance signing area, includes median widths of both less than 15 feet and greater than 15 feet, follow PTS 915 details for entire work zone.

PTS 910-1 - NotesGeneral Notes

Median Widths Greater Than or Equal to 15 Feet

JANUARY 2019

Page 107: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-2 - NotesMobile Operation For 2 Lanes

Median Widths Greater Than or Equal to 15 Feet

1. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicle No. 2. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, use a Single Lane Traffic Pattern as shown on PTS 910-4.

2. A 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicle No. 1 .

3. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

4. Have all shadow vehicles meet PennDOT and PTC requirements.

5. All arrow panels and PCMS are to be truck mounted.

6. The spacing between the work vehicles and the shadow vehicles, and between each shadow vehicle should be minimized to deter road users from driving in between, based on field conditions.

7. Shadow Vehicle No. 1 may be located on the median shoulder where the median width is a minimum of 12 feet.

JANUARY 2019

Page 108: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-2AMobile Operation for 2 Lanes - Right Lane and Shoulder Work Zone

Median Widths Greater Than or Equal to 15 Feet

Work Vehicle(s)

PCMS 1 Shadow Vehicle No. 1

Phase 1 Phase 2

250' Min - 350' Max

Shadow Vehicle No. 3

300' Min - 1,000' Max

Shadow Vehicle No. 2

1,000' Min - 2,500' Max

RIGHTLANE

CLOSED

MERGELEFT

JANUARY 2019

NOTES:See PTS 910-2 - Notes for applicablenotes to this drawing

Page 109: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-2BMobile Operation for 2 Lanes - Left Lane and Part Median Work Zone

Median Widths Greater Than or Equal to 15 Feet

Work Vehicle(s)

PCMS 1 Shadow Vehicle No. 1

(See Note 7)

Phase 1 Phase 2

Shadow Vehicle No. 3

300' Min - 1,000' Max

Shadow Vehicle No. 2

LEFTLANE

CLOSED

MERGERIGHT

JANUARY 2019

1,000' Min - 2,500' Max

250' Min - 350' Max

NOTES:See PTS 910-2 - Notes for applicablenotes to this drawing

Page 110: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicles No. 3 and 6. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, use a Single Lane Traffic Pattern as shown on PTS 910-4.

2. A 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicles No. 1 and 2.

3. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

4. Have all shadow vehicles meet PennDOT and PTC requirements.

5. All arrow panels and PCMS are to be truck mounted.

6. The spacing between the work vehicles and the shadow vehicles, and between each shadow vehicle should be minimized to deter road users from driving in between, based on field conditions.

7. Shadow Vehicles No. 1 and 2 may be located on the median shoulder where the median shoulder width is a minimum of 12 feet.

PTS 910-3 - NotesMobile Operation for 3 Lanes

Median Widths Greater Than or Equal to 15 Feet

JANUARY 2019

Page 111: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-3AMobile Operation for 3 Lanes - Right and Center Lane Work Zone

Median Widths Greater Than or Equal to 15 Feet

Work Vehicle(s)

250' Min - 350' Max

300' Min - 500' Max

250' Min - 500' Max

300' Min - 1,000' Max

300' Min - 1,000' Max

1,000' Min - 2,500' Max

1,000' Min - 2,500' Max

PCMS 1 Shadow Vehicle No. 1

Phase 1 Phase 2

Shadow Vehicle No. 7

Shadow Vehicle No. 6

Shadow Vehicle No. 4

Shadow Vehicle No. 3

PCMS 2 Shadow Vehicle No. 2

Phase 1 Phase 2

PCMS 3Shadow Vehicle No. 5

Phase 1 Phase 2RIGHT

2 LANESCLOSED

MERGELEFT

ROADWORKAHEAD

RIGHT2 LANESCLOSED

RIGHT2 LANESCLOSED

MERGELEFT

JANUARY 2019

NOTES:See PTS 910-3 - Notes for applicablenotes to this drawing

Page 112: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-3BMobile Operation for 3 Lanes - Left and Center Lane Work Zone

Median Widths Greater Than or Equal to 15 Feet

Work Vehicle(s)

300' Min - 500' Max

250' Min - 500' Max

300' Min - 1,000' Max

300' Min - 1,000' Max

1,000' Min - 2,500' Max

1,000' Min - 2,500' Max

PCMS 1 Shadow Vehicle No. 1

(See Note 7)

Phase 1 Phase 2

Shadow Vehicle No. 7

Shadow Vehicle No. 6

Shadow Vehicle No. 4

Shadow Vehicle No. 3

PCMS 2Shadow Vehicle No. 2

(See Note 7)

Phase 1 Phase 2

PCMS 3 Shadow Vehicle No. 5

Phase 1 Phase 2LEFT

2 LANESCLOSED

MERGERIGHT

ROADWORKAHEAD

LEFT2 LANESCLOSED

LEFT2 LANESCLOSED

MERGERIGHT

JANUARY 2019

250' Min - 350' Max

NOTES:See PTS 910-3 - Notes for applicablenotes to this drawing

Page 113: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-4 - NotesSingle Lane Traffic Pattern

Median Widths Greater Than or Equal to 15 Feet 1. This pattern is to be used for short-term operations which occupy a location for less than 12 hours for three (3) or less consecutive days.

2. For interchange and service plaza ramp signing within the work zone, see PTS 910-6.

3. For left lane work zone use the same sign spacing, location, and pattern but with the signs and PCMS indicating a left lane closure.

4. Use channelizing devices with PennDOT approved sequential warning lights in the transition areas for patterns used during hours of darkness.

5. Establish single lane traffic pattern only during active work periods. Shorten length of single lane pattern to only the length needed for the construction operation. Work zone should not exceed three (3) miles in length, unless approved by the Representative.

6. Single lane should be established a minimum of 1000 feet in advance of deceleration ramp or beyond acceleration ramp at interchanges and service plazas, or as directed by the Representative.

7. Install W3-5 sign only in areas where the normal speed limit is 70 MPH.

8. Speed Display Sign shall only be used if the length of the physical work zone is greater the or equal to 500 feet.

9. Speed Display Sign not required for PTC Maintenance Operations.

10. During high traffic volume periods and as directed by the Representative, change the message on PCMS 1 to read: Phase 1 "RIGHT / LANE / CLOSED", Phase 2 "USE / BOTH / LANES".

11. Existing W20-5R / W20-5L signs may only be used for remainder or their servicable life.

12. Compute the minimum desirable taper length for reduction in lanes using the following formula:L= S x WWhere L = Minimum desirable taper length in feet

W = Width of offset in feetS = Normal speed limit in miles per hour

JANUARY 2019

R2-1

55SPEEDLIMIT

W3-5

ENDROAD WORK

G20-2 W4-2Ror

W4-2L

W20-5Ror

W20-5L

RIGHT LANECLOSED

----xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAY SIGN

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

L = Transition1/3L = Shoulder TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED L 1/3 L BZ WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet Feet FeetMile (s) L 1/3 L BZ WZ R660840

220280

500 (Min) 3 (Max)3 (Max)

300300

5050

5050

100100

100100

5050750 (Min)

Distance and Spacing Quick Reference Chart

SPEEDLIMIT

55

Page 114: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-4Single Lane Traffic Pattern

Median Widths Greater Than or Equal to 15 Feet

500'

1/3 L

ENDROAD WORK

55SPEEDLIMIT

RIGHT LANECLOSED1 MILE

Phase 1 Phase 2

PCMS 1

RIGHT LANECLOSED1/2 MILE

5,280'

660'

660'

1,460'

500'

1,000'

500'

L

BZ

WZ

R

500'

1/2 WZ

1/2 WZ

500' Min900' Max

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

RIGHTLANE

CLOSED

2 MILESAHEAD

JANUARY 2019

NOTES:See PTS 910-4 - Notes for applicablenotes to this drawing

2,640' Min5,280' Max

See Note 8 and 9

See Note 9

See Note 9

Arrow Panel

See Note 6

SPEEDLIMIT

55

SPEEDLIMIT

55

SPEEDLIMIT

55

Page 115: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-5 - NotesSingle Lane Traffic Pattern for 3 Lane Section

Median Widths Greater Than or Equal to 15 Feet

JANUARY 2019

R2-1

55SPEEDLIMIT

W3-5 W20-5ARor

W20-5AL

RIGHTTWO LANES

CLOSED----

W4-2Ror

W4-2L

ENDROAD WORK

G20-2

xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAY SIGN

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

L = Transition1/3 L = Shoulder TransitionBZ 1 = Buffer Zone 1BZ 2 = Buffer Zone 2WZ = Work ZoneR = Runout

SPEED L 1/3 L BZ 1 WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet Feet FeetMile (s) L 1/3 L BZ 1 WZ R660840

220280

1,320 (Min) 3 (Max)3 (Max)

600600

5050

5050

100100

100100

5050

BZ 2Feet

500 (Min)750 (Max)1,680 (Min)

100100

BZ 2

Distance and Spacing Quick Reference Chart

1. This pattern is to be used for short term operations which occupy a location for less than 12 hours for three (3) or less consecutive days.

2. For interchange and service plaza ramp signing within the work zone, see PTS 910-6.

3. For left and center lane work zone, use the same spacing, location, and pattern but with the signs and PCMS indicating a left and center lane closure.

4. Use channelizing devices with PennDOT approved sequential warning lights in the transition areas for patterns used during hours of darkness.

5. Establish single lane pattern only during active work periods. Shorten length of single lane pattern to only the length needed for the construction operation. Work zone should not exceed three (3) miles in length, unless approved by the Representative.

6. Single lane should be established a minimum of 1,000 feet in advance of deceleration ramp or beyond acceleration ramp at interchanges and service plazas, or as directed by the Representative.

7. Install W3-5 sign only in areas where the normal speed limit is 70 MPH.

8. Speed Display Sign shall only be used if the length of the physical work zone is greater the or equal to 500 feet.

9. Speed Display Sign not required for PTC Maintenance Operations.

10. During high traffic volume periods and as directed by the Representative, change the message on PCMS 1 to read: Phase 1 "RIGHT / LANE / CLOSED", Phase 2 "USE / BOTH / LANES".

11. Existing W20-5AR / W20-5AL signs may only be used for remainder of their serviceable life.

12. Compute the minimum desirable taper length for reduction in lanes using the following formula:L= S x WWhere L = Minimum desirable taper length in feet

W = Width of offset in feetS = Normal speed limit in miles per hour

SPEEDLIMIT

55

Page 116: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-5Single Lane Traffic Pattern for 3 Lane Section

Median Widths Greater Than or Equal to 15 Feet

ENDROAD WORK

55SPEEDLIMIT

Phase 1 Phase 2

PCMS 1

RIGHTTWO LANES

CLOSED1 MILE

RIGHTTWO LANES

CLOSED1/2 MILE

5,280'

660'

660'

1,460'

500'

1,000'

L

BZ 1

L

WZ

R

500'

500'

1,000'

1/3 L

500'

1/2 WZ

1/2 WZ

500' Min900' Max

2,640' Min5,280' Max

See Note 6

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

2 MILESAHEAD

RIGHT2 LANESCLOSED

JANUARY 2019

NOTES:See PTS 910-5 - Notes for applicablenotes to this drawing

BZ 2

1/2 WZ

1/2 WZ

2,640' Min5,280' Max

See Note 6

Arrow Panel

Arrow Panel

See Notes 8and 9

See Note 9

See Note 9

SPEEDLIMIT

55

SPEEDLIMIT

55

SPEEDLIMIT

55

Page 117: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-6 - NotesLane Closure Traffic Pattern for Interchange and Service Plaza Areas

Median Widths Greater Than or Equal to 15 Feet

1. Single lane should be established a minimum of 1,000 feet in advance of deceleration ramp or beyond acceleration ramp, or as directed by the Representative.

2. MPT-05 and MPT-06 signs:A. Use for interchange ramp only.B. Cover or remove from the site when not in use.

3. MPT-07 and MPT-08 signs:A. Use for service plaza ramp only.B. Cover or remove from the site when not in use.

4. Existing MPT-07 and MPT-08 signs may only be used for remainder of their serviceable life.

5. Red and yellow Type B lights to be used during hours of darkness.

6. Channelizing devices spaced at 100 feet except where noted.

JANUARY 2019

EXITNEXTRIGHT

MPT-05

EXIT

MPT-06 MPT-07

NEXT RIGHT

MPT-08

W3-2W3-2R1-2

ROADWORKAHEAD

W20-1W3-2W3-1R1-1-3R1-1-3

STOPRAMP

R1-1-2/R1-1

STOPRAMP

R1-1-2/R1-1

YIELD

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

R2-1

SPEEDLIMIT

55

Page 118: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-6Lane Closure Traffic Pattern for Interchange and Service Plaza Areas

Median Widths Greater Than or Equal to 15 Feet

NOTES:See PTS 910-6 - Notes for applicablenotes to this drawing

EXIT

STOP

EXITNEXTRIGHT

Channelizing devices spaced at 50'

200'

or

or200'

500'200'

RAMP

ROADWORKAHEAD

NEXT RIGHT

ROADWORKAHEAD

STOPRAMP

or

YIELD

Channelizing devices spaced at 50'

JANUARY 2019

SPEEDLIMIT

55

SPEEDLIMIT

55

Page 119: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-7 - NotesMobile Shoulder Operations

Median Widths Greater Than or Equal to 15 Feet

MPT-34MPT-34

SHOULDERCLOSED

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

1. All arrow panels and PCMS are to be truck mounted.

2. Have all shadow vehicles meet PennDOT and PTC requirements.

3. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicle No. 2. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, either use a Stationary Shoulder Closure with Channelizing Devices as shown on PTS 910-7 or use a Single Lane Traffic Pattern as shown on PTS 910-4.

4. Mobile shoulder operations may be used on the median shoulder where the median shoulder width is a minimum of 12 feet.

5. A 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicle No. 1.

6. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

7. Shoulder Closed Sign (MPT-34) not required for PTC Maintenance Operations.

Page 120: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1,000' Min1 Mile Max

250'

Work Vehicle(s)

PTS 910-7Mobile Shoulder Operations

Median Widths Greater Than or Equal to 15 Feet

SHOULDERCLOSED

Phase 1 Phase 2SHOULDER

CLOSEDAHEAD

USECAUTION

JANUARY 2019

NOTES:See PTS 910-7 - Notes for applicablenotes to this drawing

Shadow Vehicle No. 2

or

See Note 7

PCMS 1Shadow Vehicle No. 1

See Note 6

Page 121: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-8 - NotesStationary Shoulder Closure with Channelizing Devices

Median Widths Greater Than or Equal to 15 Feet

1. Arrow panel in caution mode to be used when vehicles, equipment, materials, or workers are working on the paved shoulder. Channelizing devices to remain in place until work is completed. Maintain normal traffic.

2. For median operations where the median shoulder is less than 12 feet wide, use Single Lane Traffic Pattern, per PTS 910-4, left lane closed. Single lane traffic pattern to remain in place until work is completed.

3. For left shoulder work zone in wide median areas use the same sign spacing, location, and pattern but with the signs indicating a left shoulder closure. Install signs in the median and right shoulder.

4. This pattern is to be used for short-term operations which occupy a location for less than 12 hours for three (3) or less consecutive days.

5. Install W3-5 sign only in areas where the normal speed limit is 70 MPH.

6. All arrow panels are to be truck mounted.

7. Have all shadow vehicles meet PennDOT and PTC requirements.

W20-1

ROADWORKAHEADEND

ROAD WORK

G20-2

55SPEEDLIMIT

W3-5

RIGHTSHOULDER

CLOSED----

W21-5BRor

W21-5BL

R2-1

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

1/3L = Shoulder TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED 1/3 L BZ WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet FeetMile (s) 1/3 L BZ WZ R220280

500 3 (Max)3 (Max)

100100

5050

100100

100100

5050750

Distance and Spacing Quick Reference Chart

SPEEDLIMIT

55

Page 122: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-8 Stationary Shoulder Closure with Channelizing Devices

Median Widths Greater Than or Equal to 15 Feet

55SPEEDLIMIT

ENDROAD WORK

RIGHTSHOULDER

CLOSED1000 FT

ROADWORKAHEAD

WZ

BZ

2,000'

500'

1,500'

1,000'

1/3L

500'

Varies withChannelizing Devices

50' Apart

R

SPEEDLIMIT

XX500'

JANUARY 2019

NOTES:See PTS 910-8 - Notes for applicablenotes to this drawing

See Note 5

Shadow Vehicle No. 1

or

SPEEDLIMIT

55

Page 123: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-9 - Notes Survey Work Along Shoulder

Median Widths Greater Than or Equal to 15 Feet

1. Vehicles, equipment, material and workers are not to be located in the buffer zone.

2. The figure applies when the survey work is a minimum of 15 minutes.

3. The survey work on shoulder operation may be used on the median shoulder where the median shoulder width is a minimum of 12 feet.

4. For any survey operation where workers are within two (2) feet of any travel lane, use Single Lane Traffic Pattern per PTS 910-4 if median is greater than or equal to 15 feet in width, or PTS 915-4 if median is less than 15 feet in width. Single lane traffic pattern to remain in place until all work within two (2) feet of the travel lanes is complete. Single lane traffic pattern only permitted during provided allowable working hours.

5. This pattern to be used for short-term operations which occupy a location for less than 12 hours for three (3) or less consecutive days.

6. Signs shall be mounted on PennDOT approved portable sign supports, X-frame, with a minimum height of 1 foot from the pavement surface to the bottom of the signs. Portable supports and signs must be removed from the roadway during non-working hours.

ENDROAD WORK

G20-2

SURVEY CREW

W21-6G20-2 W21-6

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 124: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-9Survey Work Along Shoulder

Median Widths Greater Than or Equal to 15 Feet

500'

WZ250' Min

1,750' Max

BZ250'

1,000' Min2,500' Max

SURVEY CREW

ENDROAD WORK

JANUARY 2019

NOTES:See PTS 910-9 - Notes for applicablenotes to this drawing

Page 125: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-10 - Notes Utility Work Along Shoulder

Median Widths Greater Than or Equal to 15 Feet

1. Vehicles, equipment, material and workers are not to be located in the buffer zone.

2. The utility work on shoulder operation may be used on the median shoulder where the median shoulder width is a minimum of 12 feet.

3. Arrow panel in caution mode to be used when vehicles, equipment, material or workers are working on the paved shoulder. PennDOT approved 28" traffic cones to remain in place until work is complete. Maintain normal traffic.

4. For any utility operation where the physical work zone is on the paved shoulder, use Stationary Shoulder Closure with Channelizing Devices per PTS 910-8, if median is greater than or equal to 15 feet in width, PTS 915-8 if median width is less than 15 feet in width. Stationary Shoulder Closure with Channelizing Devices to remain in place until physical work on the paved shoulder is complete. Stationary shoulder closure with channelizing devices only permitted during provided allowable working hours.

5. This pattern to be used for short-term operations which occupy a location for less than 12 hours for three (3) or less consecutive days.

6. All arrow panels are to be truck mounted.

7. Have all shadow vehicles meet PennDOT and PTC requirements.

8. Signs shall be mounted on PennDOT approved portable sign supports, X-frame, with a minimum height of 1 foot from the pavement surface to the bottom of the signs. Portable supports and signs must be removed from the roadway during non-working hours.

ENDROAD WORK

G20-2

UTILITYWORKAHEAD

W21-7G20-2 W21-7

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 126: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-10Utility Work Along Shoulder

Median Widths Greater Than or Equal to 15 Feet

1,000' Min2,500' max

BZ250'

5' (TYP)

WZ

500'

UTILITYWORKAHEAD

ENDROAD WORK

JANUARY 2019

NOTES:See PTS 910-10 - Notes for applicablenotes to this drawing

Shadow Vehicle No. 1

Page 127: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicle No. 3. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, use a Single Lane Traffic Pattern as shown on PTS 910-4.

2. A 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck and loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicle No. 1 and 2.

3. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

4. Have all shadow vehicles meet PennDOT and PTC requirements.

5. All arrow panels and PCMS are to be truck mounted.

6. The spacing between the work vehicles and the shadow vehicles, and between each shadow vehicle should be minimized to deter road users from driving in between, based on field conditions.

7. Shadow Vehicles No. 1 and 2 may be located on the median shoulder where the median shoulder width is a minimum of 12 feet.

8. Shadow Vehicles No. 3, No. 4 and No. 5 must be a single axle or tandem axle dump truck or a stake body truck. Light duty dump and light duty stake bodies are not permitted to be used as Shadow Vehicles No. 3, No. 4, and No. 5.

9. Paint Foreman's vehicle may be located:A. In front of the supply vehicle, orB. Behind the supply vehicle, orC. As a temporary replacement for Shadow Vehicle No. 2.

10. State Police vehicle may be located:A. In front of Shadow Vehicle No. 4, orB. Behind Shadow Vehicle No. 4.

11. All vehicles, with exception of State Police vehicle, are to have an activated amber warning light.

PTS 910-11 - Notes Traffic Line Painting Operation

Median Widths Greater Than or Equal to 15 Feet

JANUARY 2019

Page 128: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-11A Traffic Line Painting Operation - Right Lane

Median Widths Greater Than or Equal to 15 Feet

Line Painting Machine

250' Min - 350' Max

Shadow Vehicle No. 3

1,000' Min - 2,500' MaxPhase 1 Phase 2

PCMS 1Shadow Vehicle No. 1

Phase 1 Phase 2

PCMS 2Shadow Vehicle No. 2

1,000' Min - 2,500' Max

300' Min - 1,000' Max

300' Min - 1,000' Max

300' Min - 1,000' Max

Shadow Vehicle No. 4

Shadow Vehicle No. 5

Supply Vehicle

RIGHTLANE

CLOSED

MERGELEFT

WETPAINT

USECAUTION

JANUARY 2019

NOTES:See PTS 910-11 - Notes for applicablenotes to this drawing

Page 129: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 910-11B Traffic Line Painting Operation - Left Lane

Median Widths Greater Than or Equal to 15 Feet

Line Painting Machine

250' Min - 350' Max

Shadow Vehicle No. 3

1,000' Min - 2,500' Max

Phase 1 Phase 2

PCMS 1Shadow Vehicle No. 1

See Note 7

Phase 1 Phase 2

PCMS 2Shadow Vehicle No. 2

See Note 7

1,000' Min - 2,500' Max

300' Min - 1,000' Max

300' Min - 1,000' Max

300' Min - 1,000' Max

Shadow Vehicle No. 4

Shadow Vehicle No. 5

Supply Vehicle

LEFTLANE

CLOSED

MERGERIGHT

WETPAINT

USECAUTION

JANUARY 2019

NOTES:See PTS 910-11 - Notes for applicablenotes to this drawing

Page 130: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

JANUARY 2019

Standards for Short-Term Median Widths Less

Than 15 Feet(PTS 915 Series)

Page 131: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-1 - NotesGeneral Notes

Median Widths Less Than 15 Feet 1. Remove all traffic control signs and devices immediately upon the completion of the work unless otherwise specified in the special provisions.

2. Place all traffic control devices and have them inspected by the Representative before work begins.

3. Cover or remove from the site all signs not in use. Remove from the Turnpike right-of-way construction signs not needed or used for a period of two (2) or more weeks.

4. Maintain a minimum spacing of 200 feet between all regulatory, warning and destination signs.

5. Provide at minimum a 40 feet width beyond the edge of the travel lane free of obstacles and drop-offs greater than 2 inches in depth in work zone(s) during non-working hours or separate work zone(s) from motorists with temporary concrete barrier. Separation of work zone(s) is incidental to the MPT.

6. Details for the signs and devices can be found in these drawings, PennDOT Publication 236, PennDOT Publication 212 and are to be manufactured by a Department of Transportation approved manufacturer as listed in PennDOT Publication 35.

7. Use PennDOT approved Type XI reflectorized material for signs.

8. These plans are not intended to relieve the contractor of the responsibility for the protection of the public and the construction personnel. The standards prescribed are minimum and additional protection may be needed if problems are encountered during the term of the contract. The contractor will be expected to constantly review this plan for adequacy and to recommend changes for the Representative's approval when inadequacies are discovered.

9. Signs and devices may be adjusted to fit field conditions.

10. Concrete barrier details are to be according to PennDOT Standards for Roadway Construction, RC-57M, RC-59M, and PTC Standards for Roadway Construction.

11. Establish work zone speed limit of 55 MPH in all construction zones except when using tunnel crossover traffic pattern established work zone speed limit of 40 MPH.

Establish work zone speed limit of 55 MPH when a pavement differential exists between any of the lanes.

Normal posted speed limit signs within 2 mile advanced signing area for work zones are to remain uncovered.

Cover or remove work zone speed limit signs when all normal lanes and all normal median and shoulderare available for the affected direction(s).

12. Vehicles, equipment, material, and workers are not to be located in the buffer zone.

13. Post the G20-2 (END ROAD WORK) sign at the end of the work zone. If the physical work zone is followed by another physical work zone within 2 miles, then the G20-2 sign is not to be used at the end of the first work zone.

14. Type B light is to be mounted on the side closest to traffic as shown on PTS 980 (Sheet 30 of 32).

15. Existing R2-2-2, "WORK ZONE SPEED LIMIT 55 MPH", signs may only be used for the remainder of their serviceable life.

16. Type B yellow flashing lights may be used in conjunction with warning signs, unless otherwise indicated on the drawing.

17. Channelizing devices may be temporarily relocated to the minimum offset to allow for work to be performed, as directed by the Representative. The channelizing devices must remain between traffic and the work zone. Relocate channelizing devices to original position as work progresses.

18. Install, reset, relocate, and remove any permanent and / or temporary concrete barrier so that no blunt end of the barrier is exposed to oncoming traffic.

19. Except for MPT-09, MPT-10, MPT-11, and R22-1 signs, all other signs may be mounted on PennDOT approved portable supports, x-frame, with a minimum height of 1 foot from the pavement surface to the bottom of the signs. Portable supports and signs must be removed from the roadway during non-working hours.

20. Use only for short-term operations which occupy a location for less than 12 hours for three (3) or less consecutive days.

21. Use only for narrow medians less than 15 feet in width. Do not used median signs. Median width is defined as the distance between the yellow edge lines for the opposing travel lanes. Refer to PTS 910 details for median areas greater than or equal to 15 feet in width.

22. If work zone, including advance signing area, includes median widths of both less than 15 feet and greater than 15 feet, follow PTS 915 details for entire work zone.

JANUARY 2019

Page 132: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-2 - NotesMobile Operation For 2 Lanes

Median Widths Less Than 15 Feet

1. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicle No. 2. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, use a Single Lane Traffic Pattern as shown on PTS 915-4.

2. A 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicle No. 1 .

3. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

4. Have all shadow vehicles meet PennDOT and PTC requirements.

5. All arrow panels and PCMS are to be truck mounted.

6. The spacing between the work vehicles and the shadow vehicles, and between each shadow vehicle should be minimized to deter road users from driving in between, based on field conditions.

7. Shadow Vehicle No. 1 may be located on the median shoulder where the median width is a minimum of 12 feet.

JANUARY 2019

Page 133: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-2AMobile Operation for 2 Lanes - Right Lane and Shoulder Work Zone

Median Widths Less Than 15 Feet

Work Vehicle(s)

PCMS 1Shadow Vehicle No. 1

Phase 1 Phase 2

Shadow Vehicle No. 3

300' Min - 1,000' Max

Shadow Vehicle No. 2

RIGHTLANE

CLOSED

MERGELEFT

JANUARY 2019

1,000' Min - 2,500' Max

250' Min - 350' Max

NOTES:See PTS 915-2 - Notes for applicablenotes to this drawing

Page 134: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-2BMobile Operation for 2 Lanes - Left Lane and Median Work Zone

Median Widths Less Than 15 Feet

Work Vehicle(s)

PCMS 1 Shadow Vehicle No. 1

(See Note 7)

Phase 1 Phase 2

250' Min - 350' Max

Shadow Vehicle No. 3

300' Min - 1,000' Max

Shadow Vehicle No. 2

LEFTLANE

CLOSED

MERGERIGHT

JANUARY 2019

1,000' Min - 2,500' Max

NOTES:See PTS 915-2 - Notes for applicablenotes to this drawing

Page 135: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicles No. 3 and 6. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, use a Single Lane Traffic Pattern as shown on PTS 915-4.

2. A 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicles No. 1 and 2.

3. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

4. Have all shadow vehicles meet PennDOT and PTC requirements.

5. All arrow panels and PCMS are to be truck mounted.

6. The spacing between the work vehicles and the shadow vehicles, and between each shadow vehicle should be minimized to deter road users from driving in between, based on field conditions.

7. Shadow Vehicles No. 1 and 2 may be located on the median shoulder where the median shoulder width is a minimum of 12 feet.

PTS 915-3 - NotesMobile Operation for 3 Lanes

Median Widths Less Than 15 Feet

JANUARY 2019

Page 136: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-3AMobile Operation For 3 Lanes - Right and Center Lane Work Zone

Median Widths Less Than 15 Feet

Work Vehicle(s)

250' Min - 350' Max

300' Min - 500' Max

250' Min - 500' Max

300' Min - 1,000' Max

300' Min - 1,000' Max

1,000' Min - 2,500' Max

1,000' Min - 2,500' Max

PCMS 1 Shadow Vehicle No. 1

Phase 1 Phase 2

Shadow Vehicle No. 7

Shadow Vehicle No. 6

Shadow Vehicle No. 4

Shadow Vehicle No. 3

PCMS 2 Shadow Vehicle No. 2

Phase 1 Phase 2

PCMS 3 Shadow Vehicle No. 5

Phase 1 Phase 2RIGHT

2 LANESCLOSED

MERGELEFT

ROADWORKAHEAD

RIGHT2 LANESCLOSED

RIGHT2 LANESCLOSED

MERGELEFT

JANUARY 2019

NOTES:See PTS 915-3 - Notes for applicablenotes to this drawing

Page 137: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-3BMobile Operation for 3 Lanes - Left and Center Lane Work Zone

Median Widths Less Than 15 Feet

Work Vehicle(s)

250' Min - 350' Max

300' Min - 500' Max

250' Min - 500' Max

300' Min - 1,000' Max

300' Min - 1,000' Max

1,000' Min - 2,500' Max

1,000' Min - 2,500' Max

PCMS 1Shadow Vehicle No. 1

(See Note 7)

Phase 1 Phase 2

Shadow Vehicle No. 7

Shadow Vehicle No. 6

Shadow Vehicle No. 4

Shadow Vehicle No. 3

PCMS 2 Shadow Vehicle No. 2

(See Note 7)

Phase 1 Phase 2

PCMS 3 Shadow Vehicle No. 5

Phase 1 Phase 2LEFT

2 LANESCLOSED

MERGERIGHT

ROADWORKAHEAD

LEFT2 LANESCLOSED

LEFT2 LANESCLOSED

MERGERIGHT

JANUARY 2019

NOTES:See PTS 915-3 - Notes for applicablenotes to this drawing

Page 138: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-4 - NotesSingle Lane Traffic Pattern

Median Widths Less Than 15 Feet

1. For interchange and service plaza ramp signing within the work zone, see PTS 915-6.

2. For left lane work zone use the same sign spacing, location, and pattern but with the signs and PCMS indicating a left lane closure.

3. Use channelizing devices with PennDOT approved sequential warning lights in the transition areas for patterns used during hours of darkness.

4. Establish single lane traffic pattern only during active work periods. Shorten length of single lane pattern to only the length needed for the construction operation. Work zone should not exceed three (3) miles in length, unless approved by the Representative.

5. Single lane should be established a minimum of 1,000 feet in advance of deceleration ramp or beyond acceleration ramp at interchanges and service plazas, or as directed by the Representative.

6. Install W3-5 sign only in areas where the normal speed limit is 70 MPH.

7. This pattern is to be used for short-term operations which occupy a location for less than 12 hours for three (3) or less consecutive days.

8. Speed Display Sign shall only be used if the length of the physical work zone is greater the or equal to 500 feet.

9. Speed Display Sign not required for PTC Maintenance Operations.

10. Except for 55 MPH Speed Limit signs, MPT-09, MPT-10, MPT-11, W8-11, and W8-9 signs, all other signs may be mounted on PennDOT approved portable sign supports, X-frame, with a minimum height of 1 foot from the pavement surface to the bottom of the signs. Portable supports and signs must be removed from the roadway during non-working hours.

11. During high traffic volume periods and as directed by the Representative, change the message on the PCMS to read: PCMS 1 - Phase 1 "USE / BOTH / LANES", Phase 2 "TO / MERGE / POINT"; PCMS 2 - Phase 1 "RIGHT/ LANE / CLOSED", Phase 2 "USE / BOTH/ LANES"; PCMS 3 - Phase 1 "RIGHT / LANE / CLOSED", Phase 2 "MERGE / LEFT / 1500 FT".

12. Existing W20-5R / W20-5L signs may only be used for remainder of their serviceable life.

13. Compute the minimum desirable taper length for reduction in lanes using the following formula:L= S x WWhere L = Minimum desirable taper length in feet

W = Width of offset in feetS = Normal speed limit in miles per hour

JANUARY 2019

ENDROAD WORK

G20-2 W4-2Ror

W4-2L

RIGHT LANECLOSED

----

W20-5Ror

W20-5L

55SPEEDLIMIT

W3-5

SPEEDLIMIT

55R2-1

xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAY SIGN

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

L = Transition1/3L = Shoulder TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED L 1/3 L BZ WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet Feet FeetMile (s) L 1/3 L BZ WZ R660840

220280

500 (Min) 3 (Max)3 (Max)

300300

5050

5050

100100

100100

5050750 (Min)

Distance and Spacing Quick Reference Chart

Page 139: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-4Single Lane Traffic Pattern

Median Widths Less Than 15 Feet

500'

500'

1,000'

500'

500'

500'

500'

500'

500'

5,280'

1/3 L

L

BZ

WZ

R

ENDROAD WORK

780'

55SPEEDLIMIT

SPEEDLIMIT

55

RIGHT LANECLOSED1/2 MILE

RIGHT LANE CLOSED1 MILE

Phase 1 Phase 2

PCMS 1

Phase 1 Phase 2

PCMS 2

Phase 1 Phase 2

PCMS 3

1/2 WZ

1/2 WZ

500' Min900' Max

2,640' Min5,280' Max

See Note 6

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

RIGHTLANE

CLOSED

MERGELEFT

RIGHTLANE

CLOSED

2 MILESAHEAD

RIGHTLANE

CLOSED

MERGELEFT

See Note 9

JANUARY 2019

NOTES:See PTS 915-4 - Notes for applicablenotes to this drawing

See Note 8 and 9

See Note 9

Arrow Panel

See Note 6

SPEEDLIMIT

55

SPEEDLIMIT

55

Page 140: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-5 - Notes Single Lane Traffic Pattern for 3 Lane Section

Median Widths Less Than 15 Feet 1. For interchange and service plaza ramp signing within the work zone, see PTS 915-6.

2. For left and center lane work zone, use the same spacing, location, and pattern but with the signs and PCMS indicating a left and center lane closure.

3. Use channelizing devices with PennDOT approved sequential warning lights in the transition areas for patterns used during hours of darkness.

4. Establish single lane pattern only during active work periods. Shorten length of single lane pattern to only the length needed for the construction operation. Work zone should not exceed three (3) miles in length, unless approved by the Representative.

5. Single lane should be established a minimum of 1,000 feet in advance of deceleration ramp or beyond acceleration ramp at interchanges and service plazas, or as directed by the Representative.

6. Install W3-5 sign only in areas where the normal speed limit is 70 MPH.

7. This pattern is to be used for short term operations which occupy a location for less than 12 hours for three (3) or less consecutive days.

8. Speed Display Sign shall only be used if the length of the physical work zone is greater the or equal to 500 feet.

9. Speed Display Sign not required for PTC Maintenance Operations.

10. Except for 55 MPH Speed Limit signs, MPT-09, MPT-10, MPT-11, W8-11, and W8-9 signs, all other signs may be mounted on PennDOT approved portable sign supports, X-frame, with a minimum height of 1 foot from the pavement surface to the bottom of the signs. Portable supports and signs must be removed from the roadway during non-working hours.

11. During high traffic volume periods and as directed by the Representative, change the message on the PCMS to read: PCMS 1 - Phase 1 "USE / BOTH / LANES", Phase 2 "TO / MERGE / POINT"; PCMS 2 - Phase 1 "RIGHT / LANE / CLOSED", Phase 2 "USE / BOTH / LANES"; PCMS 3 - Phase 1 "RIGHT / LANE / CLOSED", Phase 2 "MERGE / LEFT / 1500 FT".

12. Existing W20-5AR / W20-5AL signs may only be used for remainder of their serviceable life.

JANUARY 2019

RIGHTTWO LANES

CLOSED----

W20-5ARor

W20-5AL

ENDROAD WORK

G20-2 W4-2Ror

W4-2L

SPEEDLIMIT

55R2-1

55SPEEDLIMIT

W3-5

xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAY SIGN

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

L = Transition1/3 L = Shoulder TransitionBZ 1 = Buffer Zone 1BZ 2 = Buffer Zone 2WZ = Work ZoneR = Runout

SPEED L 1/3 L BZ 1 WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet Feet FeetMile (s) L 1/3 L BZ 1 WZ R660840

220280

1,320 (Min) 3 (Max)3 (Max)

600600

5050

5050

100100

100100

5050

BZ 2Feet

500 (Min)750 (Min)1,680 (Min)

100100

BZ 2

Distance and Spacing Quick Reference Chart

Page 141: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-5Single Lane Traffic Pattern for 3 Lane Section

Median Widths Less Than 15 Feet

1,000'

500'

1/3 L

L

L

BZ 2

R

WZ

BZ 1

RIGHT TWO LANES

CLOSED1/2 MILE

SPEEDLIMIT

55

55SPEEDLIMIT

SPEEDLIMIT

55

5,280'

780'

500'

500'

1,000'

500'

500'

500'

500'

ENDROAD WORK

RIGHT TWO LANES

CLOSED1 MILE

SPEEDLIMIT

55

Phase 1 Phase 2

PCMS 1

Phase 1 Phase 2

PCMS 2

Phase 1 Phase 2

PCMS 3

Arrow panel

1/2 WZ

1/2 WZ

2,640' Min5,280' Max

500' Min900' Max

500'

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

RIGHT2 LANESCLOSED

MERGELEFT

RIGHT2 LANESCLOSED

MERGELEFT

RIGHT2 LANESCLOSED

2 MILESAHEAD

JANUARY 2019

xxYOUR SPEED

SPEEDLIMIT

55

NOTES:See PTS 915-5 - Notes for applicablenotes to this drawing

See Note 9

See Note 8 and 9

See Note 9

Arrow Panel

See Note 6

Arrow Panel

Page 142: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-6 - NotesLane Closure Traffic Pattern for

Interchange and Service Plaza AreasMedian Widths Less Than 15 Feet

1. Single lane should be established a minimum of 1,000 feet in advance of deceleration ramp or beyond acceleration ramp, or as directed by the Representative.

2. MPT-05 and MPT-06 signs:A. Use for interchange ramp only.B. Cover or remove from the site when not in use.

3. MPT-07 and MPT-08 signs:A. Use for service plaza ramp only.B. Cover or remove from the site when not in use.

4. Existing MPT-07 and MPT-08 signs may only be used for remainder of their serviceable life.

5. Red and yellow Type B lights to be used during hours of darkness.

6. Channelizing devices spaced at 100 feet except where noted.

EXITNEXTRIGHT

MPT-05

EXIT

MPT-06 MPT-07

NEXT RIGHT

MPT-08

W3-2W3-2R1-2

ROADWORKAHEAD

W20-1W3-2W3-1R1-1-3R1-1-3

STOPRAMP

R1-1-2/R1-1

STOPRAMP

R1-1-2/R1-1

YIELD

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

R2-1

SPEEDLIMIT

55

Page 143: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-6Lane Closure Traffic Pattern for Interchange and Service Plaza Areas

Median Widths Less Than 15 Feet

JANUARY 2019

NOTES:See PTS 915-6 - Notes for applicablenotes to this drawing

EXIT

STOP

EXITNEXTRIGHT

Channelizing devices spaced at 50'

200'

or

or200'

500'200'

RAMP

ROADWORKAHEAD

NEXT RIGHT

ROADWORKAHEAD

STOPRAMP

or

YIELD

SPEEDLIMIT

55

SPEEDLIMIT

55

Channelizing devices spaced at 50'

Page 144: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

SHOULDERCLOSED

MPT-34MPT-34

PTS 915-7 - Notes Mobile Shoulder Operations

Median Widths Less Than 15 Feet

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

1. This pattern is to be used for short-term operations which occupy a location for less than 12 hours for three (3) or less consecutive days.

2. All arrow panels and PCMS are to be truck mounted.

3. Have all shadow vehicles meet PennDOT and PTC requirements.

4. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicle No. 2. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, either use a Stationary Shoulder Closure with Channelizing Devices as shown on PTS 915-8 or use a Single Lane Traffic Pattern, as shown on PTS 915-4.

5. A 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicle No. 1.

6. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

7. Shoulder Closed Sign (MPT-34) not required for PTC Maintenance Operations.

Page 145: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-7 Mobile Shoulder Operations

Median Widths Less Than 15 Feet

SHOULDERCLOSED

Phase 1 Phase 2

PCMS 1Shadow Vehicle No. 1

(See Note 6)

1,000' Min1 Mile Max

Work Vehicle(s)

250'

Shadow Vehicle No. 2

SHOULDERCLOSEDAHEAD

USECAUTION

JANUARY 2019

See Note 7

or

NOTES:See PTS 915-7 - Notes for applicablenotes to this drawing

Page 146: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-8 - NotesStationary Shoulder Closure with Channelizing Devices

Median Widths Less Than 15 Feet1. Arrow panel in caution mode to be used when workers, vehicles, equipment, and materials are working on the paved shoulder. Channelizing devices to remain in place until work is completed. Maintain normal lane traffic. Stationary shoulder closure with channelizing devices only permitted during allowable working hours.

2. For median operations where the median shoulder is less than 12 feet wide use Single Lane Traffic Pattern, per PTS 910-4, left lane closed. Single lane traffic pattern to remain in place until work is completed.

3. This pattern is to be used for short-term operations which occupy a location for less than 12 hours for three (3) or less consecutive days.

4. Install W3-5 sign only in areas where the normal speed limit is 70 MPH.

5. All arrow panels are to be truck mounted.

6. Have all shadow vehicles meet PennDOT and Pennsylvania Turnpike Commission requirements.

7. Except for 55 MPH Speed Limit signs, MPT-09, MPT-10, MPT-11, W8-11, and W8-9 signs, all other signs may be mounted on PennDOT approved portable sign supports, X-frame, with a minimum height of 1 foot from the pavement surface to the bottom of the signs. Portable supports and signs must be removed from the roadway during non-working hours.

8. This detail to only be used in areas where the median width is less than 15 feet.

SPEEDLIMIT

55R2-1

55SPEEDLIMIT

W3-5

RIGHTSHOULDER

CLOSED----

W21-5BRor

W21-5BL

ROADWORKAHEAD

W20 1W20-1

ENDROAD WORK

G20-2

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

1/3L = Shoulder TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED 1/3 L BZ WZ R Channelizing Device Spacing (Feet)MPH5570

Feet Feet FeetMile (s) 1/3 L BZ WZ R220280

250 (Min) 3 (Max)3 (Max)

100100

5050

100100

100100

5050250 (Min)

Distance and Spacing Quick Reference Chart

Page 147: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-8Stationary Shoulder Closure with Channelizing Devices

Median Widths Less Than 15 Feet

JANUARY 2019

NOTES:See PTS 915-8 - Notes for applicablenotes to this drawing

55SPEEDLIMIT

ENDROAD WORK

RIGHTSHOULDER

CLOSED1000 FT

ROADWORKAHEAD

WZ

BZ

2,000'

500'

1,500'

1,000'

1/3L

500'

Varies withChannelizing Devices

50' Apart

R

500'

See Note 4

Shadow Vehicle No. 1

or

SPEEDLIMIT

55

Page 148: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-9 - NotesSurvey Work Along Shoulder

Median Widths Less Than 15 Feet

1. Vehicles, equipment, material and workers are not to be located in the buffer zone.

2. The figure applies when the survey work is a minimum of 15 minutes.

3. The survey work on shoulder operation may be used on the median shoulder where the median shoulder width is a minimum of 12 feet.

4. For any survey operation where workers are within two (2) feet of any travel lane, use Single Lane Traffic Pattern per PTS 910-4 if median is greater than or equal to 15 feet in width, or PTS 915-4 if median is less than 15 feet in width. Single lane traffic pattern to remain in place until all work within two (2) feet of the travel lanes is complete. Single lane traffic pattern only permitted during provided allowable working hours.

5. Signs shall be mounted on PennDOT approved portable sign supports, X-frame, with a minimum height of 1 foot from the pavement surface to the bottom of the signs. Portable supports and signs must be removed from the roadway during non-working hours.

ENDROAD WORK

G20-2

SURVEY CREW

W21-6G20-2 W21-6

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 149: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-9Survey Work Along Shoulder

Median Widths Less Than 15 Feet

500'

WZ250' Min

1,750' Max

BZ250'

1,000' Min2,500' Max

SURVEY CREW

ENDROAD WORK

JANUARY 2019

NOTES:See PTS 915-9 - Notes for applicablenotes to this drawing

Page 150: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-10 - Notes Utility Work Along Shoulder

Median Widths Less Than 15 Feet

1. Vehicles, equipment, material and workers are not to be located in the buffer zone.

2. The utility work on shoulder operation may be used on the median shoulder where the median shoulder width is a minimum of 12 feet.

3. Arrow panel in caution mode to be used when vehicles, equipment, material or workers are working on the paved shoulder. PennDOT approved 28" traffic cones to remain in place until work is complete. Maintain normal traffic.

4. For any utility operation where the physical work zone is on the paved shoulder, use Stationary Shoulder Closure with Channelizing Devices per PTS 910-8, if median is greater than or equal to 15 feet in width, PTS 915-8 if median width is less than 15 feet in width. Stationary Shoulder Closure with Channelizing Devices to remain in place until physical work on the paved shoulder is complete. Stationary shoulder closure with channelizing devices only permitted during provided allowable working hours.

5. This pattern to be used for short-term operations which occupy a location for less than 12 hours for three (3) or less consecutive days.

6. All arrow panels are to be truck mounted.

7. Have all shadow vehicles meet PennDOT and PTC requirements.

8. Signs shall be mounted on PennDOT approved portable sign supports, X-frame, with a minimum height of 1 foot from the pavement surface to the bottom of the signs. Portable supports and signs must be removed from the roadway during non-working hours.

ENDROAD WORK

G20-2

UTILITYWORKAHEAD

W21-7G20-2 W21-7

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 151: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-10Utility Work Along Shoulder

Median Widths Less Than 15 Feet

1,000' Min2,500' max

BZ250'

5' (TYP)

WZ

500'

Shadow Vehicle No. 1

UTILITYWORKAHEAD

ENDROAD WORK

JANUARY 2019

or

NOTES:See PTS 915-10 - Notes for applicablenotes to this drawing

Page 152: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-11 - Notes Traffic Line Painting OperationMedian Widths Less Than 15 Feet

1. This figure applies where the operation moves intermittently or continuously at an average speed of more than 1 MPH (88 FT./MIN.). The operator is to be the only occupant of Shadow Vehicle No. 3. When the operation moves intermittently, the maximum time of stationary work is 15 minutes. If these conditions cannot be met, use a single lane traffic pattern as shown on PTS 910-4.

2. A 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck and loaded to weigh a minimum of 5,500 lbs may be used as Shadow Vehicle No. 1 and 2.

3. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

4. Have all shadow vehicles meet PennDOT and PTC requirements.

5. All arrow panels and PCMS are to be truck mounted.

6. The spacing between the work vehicles and the shadow vehicles, and between each shadow vehicle should be minimized to deter road users from driving in between, based on field conditions.

7. Shadow Vehicles No. 1 and 2 may be located on the median shoulder where the median shoulder width is a minimum of 12 feet.

8. Shadow Vehicles No. 3, No. 4 and No. 5 must be a single axle or tandem axle dump truck or a stake body truck. Light duty dump and light duty stake bodies are not permitted to be used as Shadow Vehicles No. 3, No. 4, and No. 5.

9. Paint Foreman's vehicle may be located:A. In front of the supply vehicle, orB. Behind the supply vehicle, orC. As a temporary replacement for Shadow Vehicle No. 2.

10. State Police vehicle may be located:A. In front of Shadow Vehicle No. 4, orB. Behind Shadow Vehicle No. 4.

11. All vehicles, with exception of State Police vehicle, are to have an activated amber warning light.

JANUARY 2019

Page 153: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-11A Traffic Line Painting Operation - Right Lane

Median Widths Less Than 15 Feet

Line Painting Machine

250' Min - 350' Max

Shadow Vehicle No. 3

1,000' Min - 2,500' Max

Phase 1 Phase 2

PCMS 1Shadow Vehicle No. 1

Phase 1 Phase 2

PCMS 2Shadow Vehicle No. 2

1,000' Min - 2,500' Max

300' Min - 1,000' Max

300' Min - 1,000' Max

300' Min - 1,000' Max

Shadow Vehicle No. 4

Shadow Vehicle No. 5

Supply Vehicle

RIGHTLANE

CLOSED

MERGELEFT

WETPAINT

USECAUTION

JANUARY 2019

NOTES:See PTS 915-11 - Notes for applicablenotes to this drawing

Page 154: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-11B Traffic Line Painting Operation - Left Lane

Median Widths Less Than 15 Feet

Line Painting Machine

250' Min - 350' Max

Shadow Vehicle No. 3

1,000' Min - 2,500' Max

Phase 1 Phase 2

PCMS 1Shadow Vehicle No. 1

See Note 7

Phase 1 Phase 2

PCMS 2Shadow Vehicle No. 2

See Note 7

1,000' Min - 2,500' Max

300' Min - 1,000' Max

300' Min - 1,000' Max

300' Min - 1,000' Max

Shadow Vehicle No. 4

Shadow Vehicle No. 5

Supply Vehicle

LEFTLANE

CLOSED

MERGERIGHT

WETPAINT

USECAUTION

JANUARY 2019

NOTES:See PTS 915-11 - Notes for applicablenotes to this drawing

Page 155: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Provide sufficient Type III barricades to close off the entire road.

2. Use existing "DO NOT CROSS CENTER LINE" sign and existing traffic control signal at portal.

3. Westbound approach to Allegheny Tunnel requires left or right and center lane closure as indicated on PTS 915-5.

4. Use channelizing devices with PennDOT approved sequential warning lights in the transition areas for patterns used during hours of darkness.

5. Speed Display Sign not required for PTC Maintenance Operations.

6. During high traffic volume periods and as directed by the Representative, change the message on the PCMS to read: PCMS 1 and 8 - Phase 1 "USE / BOTH / LANES", Phase 2 "TO / MERGE / POINT"; PCMS 2 - Phase 1 "RIGHT / LANE / CLOSED", Phase 2 "USE / BOTH / LANES"; PCMS 3 - Phase 1 "RIGHT / LANE / CLOSED", Phase 2 "MERGE / LEFT / 1500 FT"; PCMS 7 - Phase 1 "LEFT / LANE / CLOSED", Phase 2 "USE / BOTH / LANES"; PCMS 6 - Phase 1 "LEFT / LANE / CLOSED", Phase 2 "MERGE / RIGHT / 1500 FT".

7. Existing W20-5R / W20-5L signs may only be used for remainder of their serviceable life.

PTS 915-12 - NotesTunnel Crossover Pattern

Median Widths Less Than 15 Feet

ENDROAD WORK

G20-2

RIGHT LANECLOSED

----

W20-5Rand

W20-5L

W6-3W3-5

40SPEEDLIMIT

W4-2Ror

W4-2L

NOPASSING

ZONEAHEAD

R4-1AMPT-01

CROSSOVER500 FT

W1-4Rand

W1-4L

DONOTPASS

R4-1

ROADCLOSED

R11-2

xxYOUR SPEED

SPEEDLIMIT

40

R2-1/SPEED

DISPLAY SIGN

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

L = Transition1/3L = Shoulder TransitionBZ = Buffer ZoneR = Runout

SPEED L 1/3 L BZ R Channelizing Device Spacing (Feet)MPH55

Feet Feet Feet Feet L 1/3 L BZ R660 220 1,320 (Min) 300 50 50 100 50

Distance and Spacing Quick Reference Chart

SPEEDLIMIT

40R2-1

Page 156: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 915-12Tunnel Crossover Pattern

Median Widths Less Than 15 Feet

TRAFFIC CONTROL BETWEENBLUE MOUNTAIN AND KITTATINNY TUNNELS

JANUARY 2019

LAN

ES

CLO

SE

D T

O T

RA

FFIC

DONOTPASS

DONOTPASS

Tubular markers50' apart

200'

50'

200'

50'

Tunnel Portal

Tunnel Portal

Page 157: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

TUNNEL PORTAL

PTS 915-12Tunnel Crossover Pattern (Drawing 1 of 2)

Median Widths Less Than 15 Feet

50'

LAN

ES C

LOSE

D T

O T

RAF

FIC

NOPASSING

ZONEAHEAD

CROSSOVER500 FT

ROADCLOSED

SPEEDLIMIT

40

SPEEDLIMIT

40

ENDROAD WORK

DONOTPASS

40SPEEDLIMIT

RIGHT LANECLOSED1/2 MILE

100'

50'150'

Tubularmarkers 50' apart

Channelizing devices 50' apart

R

500'10'

50' PCMS 4

250'

L

1/3 L

280'

500'

500'

500'

500'

1000'

500'

500'

780'

5,280'

Phase 1 Phase 2

PCMS 3

Phase 1

Phase 2

PCMS 2

Phase 1

PCMS 1

500' Min900' Max

SPEEDLIMIT

40

xxYOUR SPEED

SPEEDLIMIT

40

xxYOUR SPEED

SPEEDLIMIT

40RIGHTLANE

CLOSED

MERGELEFT

RIGHTLANE

CLOSED

MERGELEFT

RIGHTLANE

CLOSED

CROSSOVER

JANUARY 2019

BZ

RIGHT LANECLOSED1 MILE

PCMS 1

PCMS 2

Phase 22 MILESAHEAD

NOTES:See PTS 915-12 - Notes for applicablenotes to this drawing

2,640' Min5,280' Max

See Note 5

See Note 5

See Note 1

SPEEDLIMIT

40

Arrow Panel

Page 158: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

LAN

ES

CLO

S ED

TO

TR

AFFI

C

TUNNEL PORTAL

PTS 915-12Tunnel Crossover Pattern (Drawing 2 of 2)

Median Widths Less Than 15 Feet

NOPASSING

ZONEAHEAD

ENDROAD WORK

DONOTPASS

DONOTPASS

CROSSOVER500 FT

LEFT LANECLOSED1/2 MILE

40SPEEDLIMIT

LEFT LANECLOSED1 MILE

500'

500'

500'

500'

500'

1000'

500'

500'

780'

5,280'

Varies tubularmarkers 50' apart

Varies channelizing devices 50' apart

BZ

L

PCMS 5

100'

50'

10'

150'100'

50'

Phase 2Phase 1

PCMS 8Phase 2Phase 1

PCMS 7

Phase 2Phase 1

PCMS 6

250'

xxYOUR SPEED

SPEEDLIMIT

40

xxYOUR SPEED

SPEEDLIMIT

40

LEFTLANE

CLOSED

2 MILESAHEAD

CROSSOVER

LEFTLANE

CLOSED

MERGERIGHT

LEFTLANE

CLOSED

MERGERIGHT

JANUARY 2019

NOTES:See PTS 915-12 - Notes for applicablenotes to this drawing

See Note 5

SPEEDLIMIT

40

SPEEDLIMIT

40

SPEEDLIMIT

40

See Note 5

Arrow Panel

500' Min900' Max

500'

2,640' Min5,208' Max

Page 159: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

JANUARY 2019

Standards for Interchange Operations(PTS 940 Series)

Page 160: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Remove all traffic control signs and devices immediately upon the completion of the work unless otherwise specified in the special provisions.

2. Place all traffic control devices and have them inspected by the Representative before work begins.

3. Median areas less than 15 feet in width do not use median signs. Median width is defined as the distance between the yellow edge lines for the opposing travel lanes.

4. Cover or remove from the site all signs not in use. Remove from the Turnpike right-of-way construction signs not needed or used for a period of two (2) or more weeks.

5. Maintain a minimum spacing of 200 feet between all regulatory, warning and destination signs.

6. Provide at minimum a 40 feet width beyond the edge of the travel lane free of obstacles and drop-offs greater than 2 inches in depth in work zone(s) during non-working hours or separate work zone(s) from motorists with temporary concrete barrier. Separation of work zone(s) is incidental to the MPT.

7. Details for the signs and devices can be found in these plans, PennDOT Publication 236, PennDOT Publication 212 and are to be manufactured by a Department of Transportation approved manufacturer as listed in PennDOT Publication 35.

8. Use PennDOT approved Type XI reflectorized material for signs. Do not use metal or wood signs in median.

9. These plans are not intended to relieve the contractor of the responsibility for the protection of the public and the construction personnel. The standards prescribed are minimum and additional protection may be needed if problems are encountered during the term of the contract. The contractor will be expected to constantly review this plan for adequacy and to recommend changes for the Representative's approval when inadequacies are discovered.

10. Compute the minimum desirable taper length for reduction in lanes on ramps using the following formula:

Where L = Minimum desirable taper length in feetW = Width of offset in feetS = Normal speed in miles per hour

11. Signs and devices may be adjusted to fit field conditions.

12. Concrete barrier details are to be according to PennDOT Standards for Roadway Construction, RC-57M, RC-59M, and PTC Standards for Roadway Construction.

13. Vehicles, equipment, material and workers are not to be located in the buffer zone.

14. Type B light is to be mounted on the side closest to traffic as shown on PTS 980 (Sheet 30 of 32).

15. Type B Yellow flashing warning lights maybe used in conjunction with warning signs unless otherwise indicated on the drawings.

16. Channelizing devices may be temporarily relocated to the minimum offset to allow for work to be performed, as directed by the Representative. The channelizing devices must remain between traffic and the work zone. Relocate channelizing devices to original position as work progresses.

17. Install, reset, relocate, remove any permanent and / or temporary concrete barrier so that no blunt end of the barrier is exposed to oncoming traffic.

18. Except for MPT-09, MPT-10, MPT-11, and R22-1 signs, all other signs may be mounted on PennDOT approved portable supports, x-frame, with a minimum height of 1 foot from the pavement surface to the bottom of thesigns. Portable supports and signs must be removed from the roadway during non-working hours.

19. If Express E-ZPass closure work zone includes median widths of both less than 15 feet and greater than 15 feet, follow PTS 940-14 for entire work zone.

PTS 940-1 - NotesInterchange Operations - General Notes

L = W x S 260

JANUARY 2019

Page 161: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. This pattern to be used for short-term operations which occupy a location for less than 8 hours.

2. Overhead lane control to display red signal and "Lane Closed" white on red background, if available.

3. Place channelizing devices at 10 feet apart across parking access.

4. Sign locations may be adjusted to fit field conditions.

5. All channelizing devices spaces at 10 feet unless otherwise noted.

PTS 940-2 - NotesToll Plaza Right Lane ClosureOperations Less Than 8 Hours

LANECLOSED

PTC-LC

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 162: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

LANECLOSED

LANECLOSED

PTS 940-2Toll Plaza Right Lane ClosureOperations Less Than 8 Hours

50'

50'

JANUARY 2019

NOTES:See PTS 940-2 - Notes for applicablenotes to this drawing

WZ

BZ30' Min

WZ

BZ30' Min

See Note 3

50'

50'

Page 163: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. This pattern to be used for short-term operations which occupy a location for 8 to 72 hours.

2. Overhead lane control to display red signal and "Lane Closed" white on red background, if available.

3. Place channelizing devices at 10 feet apart across parking access.

4. If multiple ramps provide entrance to toll plaza, place PTC-LCA signs on each ramp as necessary.

5. Sign locations may be adjusted to fit field conditions.

6. All channelizing devices spaced at 10 feet unless otherwise noted.

PTS 940-3 - NotesToll Plaza Right Lane Closure

Operations Between 8 and 72 Hours

G20-2

ENDROAD WORK

G20-2 PTC-LCA

LANECLOSED

LANECLOSEDAHEAD

PTC-LC

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 164: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

50'

PTS 940-3Toll Plaza Right Lane Closure

Operations Between 8 and 72 Hours

LANECLOSED

LANECLOSED

500'

LANECLOSEDAHEAD

ENDROAD WORK

LANECLOSEDAHEAD

LANECLOSEDAHEAD

ENDROAD WORK

See Note 3

See Note 4

30' Min

30' Min

JANUARY 2019

50'

NOTES:See PTS 940-3 - Notes for applicablenotes to this drawing

500'

50'

BZ30' Min

WZ

WZ

BZ30' Min

See Note 4

Page 165: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. This pattern to be used for operations which occupy a location more than 72 hours.

2. Overhead lane control to display red signal and "LANE CLOSED" white on red background, if available.

3. If distance to intersecting roadway does not allow sign placement as shown, place MPT-10 sign 50' min from intersection to roadway and space PTC-LCA sign equally between MPT-10 and beginning of transition.

4. Place channelizing devices at 10' apart across parking access.

5. If multiple ramps provide entrance to toll plaza, place MPT-10 and PTC-LCA signs on each ramp as necessary.

6. Sign locations may be adjusted to fit field conditions.

7. All channelizing devices spaced at 10 feet unless otherwise noted.

PTS 940-4 - NotesToll Plaza Right Lane Closure

Operations More Than 72 Hours

TOLL PLAZAAREA

CONSTRUCTION

MPT-10G20-2

ENDROAD WORK

G20-2 PTC-LCAMPT-10

LANECLOSEDAHEAD

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 166: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

500'See Note 3

500'See Note 3

500'

PTS 940-4Toll Plaza Right Lane Closure

Operations More Than 72 Hours

See Note 3

500' See Note 3

TOLL PLAZAAREA

CONSTRUCTION

TOLL PLAZAAREA

CONSTRUCTION

TOLL PLAZAAREA

CONSTRUCTION

50'

LANECLOSEDAHEAD

LANECLOSEDAHEAD

LANECLOSEDAHEAD

30' Min

30' Min

ENDROAD WORK

ENDROAD WORK

JANUARY 2019

50'

500' See Note 3

NOTES:See PTS 940-4 - Notes for applicablenotes to this drawing

WZ

BZ30' Min

WZ

BZ30' Min

Arrow Panel

50'

See Note 5

See Note 5

Arrow Panel

See Note 4

See Note 5

Page 167: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. This pattern to be used for short-term operations which occupy a location for less than 8 hours

2. Overhead lane control to display red signal and "LANE CLOSED" white on red background, if available.

3. Sign locations may be adjusted to fit field conditions.

4. All channelizing devices spaced at 10 feet unless otherwise noted.

PTS 940-5 - NotesToll Plaza Center Lane ClosureOperations Less Than 8 Hours

PTC-LC

LANECLOSED

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 168: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 940-5Toll Plaza Center Lane ClosureOperations Less Than 8 hours

LANECLOSED

LANECLOSED

BZ30' Min

50'

50'

JANUARY 2019

NOTES:See PTS 940-5 - Notes for applicablenotes to this drawing

WZ

BZ30' Min

WZ

Page 169: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. This pattern to be used for short-term operations which occupy a location for 8 to 72 hours.

2. Overhead lane control to display red signal and "LANE CLOSED" white on red background, if available.

3. If multiple ramps provide entrance to toll plaza, place PTC-LCA signs on each ramp as necessary.

4. Sign locations may be adjusted to fit field conditions.

5. All channelizing devices spaced at 10 feet unless otherwise noted.

PTS 940-6 - NotesToll Plaza Center Lane Closure

Operations Between 8 and 72 Hours

W20-101G20-2

ENDROAD WORK

G20-2 PTC-LCA

LANECLOSEDAHEAD

PTC-LC

LANECLOSED

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 170: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 940-6Toll Plaza Center Lane Closure

Operations Between 8 and 72 Hours

LANECLOSED

LANECLOSED

500'

LANECLOSEDAHEAD

ENDROAD WORK

LANECLOSEDAHEAD

LANECLOSEDAHEAD

ENDROAD WORK

See Note 3

JANUARY 2019

NOTES:See PTS 940-6 - Notes for applicablenotes to this drawing

BZ30' Min

BZ30' Min

WZ

50'

50'50'

50'

WZ

BZ30' Min

BZ30' Min

50'

50'

500'

See Note 3

See Note 3

Page 171: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. This pattern to be used for operations which occupy a location for more than 72 hours.

2. Overhead lane control to display red signal and "LANE CLOSED" white on red background, if available.

3. If distance to intersecting roadway does not allow sign placement as shown, place MPT-10 sign 50' min from intersection to roadway and space PTC-LCA sign equally between MPT-10 and beginning of transition.

4. If multiple ramps provide entrance to toll plaza, place MPT-10 and PTC-LCA signs on each ramp as necessary.

5. Sign location may be adjusted to fit field conditions.

6. All channelizing devices spaced at 10 feet unless otherwise noted.

PTS 940-7 - NotesToll Plaza Center Lane ClosureOperations More than 72 Hours

TOLL PLAZAAREA

CONSTRUCTION

MPT-10G20-2

ENDROAD WORK

G20-2 MPT-10 W20-101PTC-LCA

LANECLOSEDAHEAD

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 172: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

500'See Note 3

500'See Note 3

PTS 940-7Toll Plaza Center Lane ClosureOperations More than 72 Hours

500'See Note 3

500' See Note 3

TOLL PLAZAAREA

CONSTRUCTION

TOLL PLAZAAREA

CONSTRUCTION

TOLL PLAZAAREA

CONSTRUCTION

See Note 4

See Note 4

See Note 4

Arrow Panel

Arrow Panel

LANECLOSEDAHEAD

LANECLOSEDAHEAD

LANECLOSEDAHEAD

30' Min

JANUARY 2019

30' Min

ENDROAD WORK

ENDROAD WORK

50'

50'

500' See Note 3

NOTES:See PTS 940-7 - Notes for applicablenotes to this drawing

BZ30' Min

WZ

WZ

50'

BZ30' Min

BZ30' Min

50'

Page 173: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Sign locations may be adjusted to fit field conditions.

2. Place MPT-09 sign 500' (min.) in advance of ramp or 500' (min.) in advance of W21-101 sign, whichever is greater.

3. Place W20-7 signs on every other toll island, if applicable.

PTS 940-8 - NotesAdvance Warning Signs for Work on Ramps

ENDROAD WORK

INTERCHANGEAREA

CONSTRUCTION

G20-2 MPT-09

BE PREPARED

TO STOP

W3-4

RAMPWORKAHEAD

W21-101W20-7

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

SERVICE PLAZAAREA

CONSTRUCTION

MPT-11

or

Signs

Page 174: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

500'

500'

500'

500'

500'

500'

Location of flagger

PTS 940-8Advance Warning Signs for Work on Ramps

500'

500'

Location of flagger

ENDROAD WORK

ENDROAD WORK

ENDROAD WORK

INTERCHANGEAREA

CONSTRUCTION

RAMPWORKAHEAD

BE PREPARED

TO STOP

RAMPWORKAHEAD

BE PREPARED

TO STOP

INTERCHANGEAREA

CONSTRUCTION

RAMPWORKAHEAD

RAMPWORKAHEAD

See Note 2

See Note 3

See Note 2 JANUARY 2019

NOTES:See PTS 940-8 - Notes for applicablenotes to this drawing

Page 175: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Place channelizing devices at 10 feet apart to close off barrier opening during non-working hours.

2. Use channelizing devices with PennDOT approved sequential warning lights in the transition areas for patterns used during hours of darkness.

3. Compute the minimum desirable taper length for reduction in lanes on ramps using the following formula:

Where L = Minimum desirable taper length in feetW = Width of offset in feetS = Normal speed in miles per hour

PTS 940-9 - Notes Ramp Bridge Crossover

L = W x S 2

60

STOP

SLOWW21-10W21-10

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

Page 176: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

50'

PTS 940-9Ramp Bridge Crossover

Type V Temporary ImpactAttenuator Test Level III

See Note 1

Transitionchannelizing devices 25' apart

(See Note 3)

Type V TemporaryImpact Attenuator

Test Level II

Flagger with walkie talkie

Toll Plaza Area

See advanced signing detailon PTS 940-8

Temporary barrieropening 150' Min

See Note 1

Flagger withwalkie talkie

Removeexisting barrier STOP

SLOW

STOP

SLOW

See advanced signing detailon PTS 940-8

Seeadvanced

signing detail

on PTS 940-8

Shoulder transitionchannelizing devices 25' apart

See Note 3

See advanced

signing detailon PTS 940-8

Shoulder Transition Channelizing devices 25' apart

See Note 3

TransitionChannelizing devices 25' apart

See Note 3

See Note 1

JANUARY 2019

NOTES:See PTS 940-9 - Notes for applicablenotes to this drawing

WZ

Page 177: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Use channelizing devices with PennDOT approved sequential warning lights in the transition areas for patterns used during hours of darkness.

2. Compute the minimum desirable taper length for reduction in lanes on ramps using the following formula:

Where L = Minimum desirable taper length in feetW = Width of offset in feetS = Normal speed in miles per hour

PTS 940-10 - Notes Work Zone on Ramp

L = W x S 2

60

RAMPWORKAHEADINTERCHANGE

AREACONSTRUCTION

ENDROAD WORK

G20-2 W21-101MPT-09 W21-5BR

RIGHT SHOULDER

CLOSEDAHEAD

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

SERVICE PLAZAAREA

CONSTRUCTION

MPT-11

or

Signs

L = Transition1/3L = Shoulder TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED 1/3 L BZ R Channelizing Device Spacing (Feet)MPH55

Feet Feet Feet 1/3 L BZ R220 100 100 25 25 25

Distance and Spacing Quick Reference Chart

WZFeetVaries

WZ25

Page 178: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

100'

BZ

WZ

PTS 940-10AWork Zone on Ramp - Shoulder Closure

500'

500'

500'(Min)

ENDROAD WORK

INTERCHANGEAREA

CONSTRUCTION

Arrow Panel in caution mode

Shadow Vehicle No. 1

Shoulder Transition 1/3 LSee Note 2

25'(TYP)

RIGHT SHOULDER

CLOSEDAHEAD

RAMPWORKAHEAD

50'

JANUARY 2019

SERVICE PLAZAAREA

CONSTRUCTION

or

or

NOTES:See PTS 940-10 - Notes for applicablenotes to this drawing

R

Page 179: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

50'

R

100'

BZ

Transition LSee Note 2

Shoulder Transition 1/3 LSee Note 2

WZ

PTS 940-10BWork Zone on Ramp - Lane Narrows

500'

500'

500'(Min)

10' Min travel lane

ENDROAD WORK

INTERCHANGEAREA

CONSTRUCTION

RAMPWORKAHEAD

RAMP NARROWS

Shadow Vehicle No. 1

JANUARY 2019

25'(TYP)

NOTES:See PTS 940-10 - Notes for applicablenotes to this drawing

SERVICE PLAZAAREA

CONSTRUCTION

or

Page 180: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. For right lane work zone, use the same sign spacing, location, and pattern but with the signs indicating a right lane closure.

2. Use channelizing devices with PennDOT approved sequential warning lights in the transition area for patterns used during hours of darkness.

3. Establish single lane traffic pattern only during active work periods. Shorten length of single lane pattern to only the length needed for construction operation.

4. Compute the minimum desirable taper length for reduction in lanes on ramps using the following formula:

Where L = Minimum desirable taper length in feetW = Width of offset in feetS = Normal speed in miles per hour

PTS 940-11 - NotesTwo-Lane Ramp, One Lane Closure

L = W x S 2

60

INTERCHANGEAREA

CONSTRUCTIONEND

ROAD WORK

RAMPWORKAHEAD

MPT-09G20-2 W4-2L orW4-2R

W21-101

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

L = Transition1/3L = Shoulder TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED 1/3 L BZ R Channelizing Device Spacing (Feet)MPH55

Feet Feet Feet 1/3 L BZ R220 100 100 25 25 25

Distance and Spacing Quick Reference Chart

WZFeetVaries

WZ25

Page 181: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

R

100'

BZ

Transition LSee Note 4

Shoulder Transition 1/3 LSee Note 4

500'

500'

WZ

PTS 940-11Two-Lane Ramp, One Lane Closure

ENDROAD WORK

INTERCHANGEAREA

CONSTRUCTION

RAMPWORKAHEAD

500 FTAHEAD

500'(Min)

Shadow Vehicle No. 1

JANUARY 2019

50'

25'(TYP)

NOTES:See PTS 940-11 - Notes for applicablenotes to this drawing

Page 182: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Tie into shoulder at lane diverge.

2. Place MPT-09 sign 500' (min.) in advance of ramp or 500' (min.) in advance of W21-101 sign, whichever is greater.

3. Use channelizing devices with PennDOT approved sequential warning lights in the transition areas for patterns used during hours of darkness.

4. Compute the minimum desirable taper length for reduction in lanes on ramps using the following formula:

Where L = Minimum desirable taper length in feetW = Width of offset in feetS = Normal speed in miles per hour

L = W x S 2

60

PTS 940-12 - NotesE-ZPass Only Slip Ramp

INTERCHANGEAREA

CONSTRUCTIONEND

ROAD WORK

RAMPWORKAHEAD

W20 101G20-2 W21-101MPT-09 W4-2L W4-2R

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

L = Transition1/3L = Shoulder TransitionBZ = Buffer ZoneWZ = Work ZoneR = Runout

SPEED 1/3 L BZ R Channelizing Device Spacing (Feet)MPH55

Feet Feet Feet 1/3 L BZ R220 100 100 25 25 25

Distance and Spacing Quick Reference Chart

WZFeetVaries

WZ25

Page 183: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

500'

500'

25'(TYP)

PTS 940-12AE-ZPass Only Slip Ramp - Lane Addition Closure

100'

WZ

R

50'

BZ

125'

ENDROAD WORK

RAMPWORKAHEAD

500 FTAHEAD

500' MinSee Note 2

Shadow Vehicle No. 1

INTERCHANGEAREA

CONSTRUCTION

JANUARY 2019

TransitionSee Note 1

NOTES:See PTS 940-12 - Notes for applicablenotes to this drawing

Page 184: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

100'

500'

500'

125'

BZ

Transition LSee Note 4

WZ

R

50'

25'(TYP)

PTS 940-12BE-ZPass Only Slip Ramp - Lane Closure

ENDROAD WORK

INTERCHANGEAREA

CONSTRUCTION

RAMPWORKAHEAD

500 FTAHEAD

Shadow Vehicle No. 1

See Note 2

JANUARY 2019

NOTES:See PTS 940-12 - Notes for applicablenotes to this drawing

Page 185: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. If distances for first shoulder transition, merge transition and buffer zone exceed development of additional express lane, extend buffer zone to express lane diverge taper. Provide arrow board only at transition area.

2. Place additional PCMS at existing Express E-ZPass signs with the following message:

Express KeepE-ZPass RightClosed

3. In locations where permanent DMS are available, display message as shown in Note 2.

4. Use channelizing devices with PennDOT approved sequential warning lights in the transition area for patterns used during hours of darkness.

5. Compute the minimum desirable taper length for reduction in lanes on mainline using the following formula:

L = S x W

Where L = Minimum desirable taper length in feet W = Width of offset in feetS = Normal speed limit in miles per hour

6. Single lane should be established a minimum of 1,000 feet in advance or beyond ramps at interchanges and service plazas.

7. Install W3-5 sign only in areas where the normal speed limit is 70 MPH.

8. Median areas less than 15 feet in width do not use median signs. Refer to PTS 940-14.

9. Speed Display Sign not required for PTC Maintenance Operations.

10. Post G20-2 sign 500 feet from the end of the work zone.

PTS 940-13 - NotesExpress E-ZPass Lane Closure

xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAY SIGN

ENDROAD WORK

G20-2

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

55SPEEDLIMIT

W3-5 W4-2L

LEFTTWO LANES

CLOSED----

W20-5AL

LEFT LANECLOSED

----

W20-5L

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

Signs

L = Transition1/3 L = Shoulder TransitionBZ 1 = Buffer Zone 1BZ 2 = Buffer Zone 2WZ = Work Zone

SPEED L 1/3 L BZ 1 WZ Channelizing Device Spacing (Feet)MPH55

Feet Feet Feet Mile (s) L 1/3 L BZ 1 WZ660 220 1,320 (Min) 4 (Max) 50 50 100 100

BZ 2Feet

500 (Min) 100BZ 2

SPEEDLIMIT

55R2-1

Distance and Spacing Quick Reference Chart

Page 186: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

500'

500'

500'

500'

500'

1,000'

640'

640'

5,280'

PTS 940-13A Express E-ZPass Single Lane Closure

250' Min1,000' Max WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

LEFT LANECLOSED2 MILES

55SPEEDLIMIT

SPEEDLIMIT

55

ENDROAD WORK

Phase 1 Phase 2

PCMS 1

500' Min900' Max

2,640' Min5,280' Max

LEFT LANE

CLOSED

MERGERIGHT

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

500'SPEEDLIMIT

55

LEFT LANECLOSED1 MILE

LEFT LANECLOSED1/2 MILE

LEFT LANECLOSED1500 FT

JANUARY 2019

NOTES:See PTS 940-13 - Notes for applicablenotes to this drawing

SPEEDLIMIT

55

WZ

See Note 9

See Note 1

See Note 9

LSee Note 1

1/3 L

BZ 1See Note 1

See Note 10

Page 187: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 940-13B Express E-ZPass Double Lane Closure

ENDROAD WORK

NOTES:See PTS 940-13 - Notes for applicablenotes to this drawing

See Note 10

500'

500'

500'

500'

1,000'

500'

1,000'

500'

640'

5,280'

250' Min1,000' Max WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

55SPEEDLIMIT

1/3 LSee Note 1

LSee Note 1

BZ 1See Note 1

LSee Note 1

BZ 2See Note 1

SPEEDLIMIT

55

640'

See Note 1

Phase 1 Phase 2

PCMS 1

500' Min900' Max

2,640' Min5,280' Max

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

LEFT 2 LANESCLOSED

MERGERIGHT

LEFTTWO LANES

CLOSED2 MILES

LEFTTWO LANES

CLOSED1 MILE

JANUARY 2019

WZ

See Note 9

See Note 1

See Note 1

See Note 9

LEFTTWO LANES

CLOSED1/2 MILE

SPEEDLIMIT

55

LEFTTWO LANES

CLOSED1500 FT SPEED

LIMIT

55

Page 188: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. Use only for narrow medians less than 15 feet in width. Do not use median signs.

2. If distances for first shoulder transition, merge transition and buffer zone exceed development of additional express lane, extend buffer zone to express lane diverge taper. Provide arrow board only at transition area.

3. Place additional PCMS at existing Express E-ZPass locations with the following message:

Express KeepE-ZPass RightClosed

4. In locations where permanent DMS are available, display message as shown in Note 2.

5. Use channelizing devices with PennDOT approved sequential warning lights in the transition area for patterns used during hours of darkness.

6. Compute the minimum desirable taper length for reduction in lanes on mainline using the following formula:

L = S x W

Where L = Minimum desirable taper length in feet W = Width of offset in feetS = Normal speed limit in miles per hour

7. Single lane should be established a minimum of 1,000 feet in advance or beyond ramps at interchanges and service plazas.

8. Install W3-5 sign only in areas where the normal speed limit is 70 MPH.

9. Speed Display Sign not required for PTC Maintenance Operations.

10. Post G20-2 sign 500 feet from the end of the work zone

PTS 940-14 - Notes Express E-ZPassLane Closure - Median Width Less than 15 Feet

xxYOUR SPEED

SPEEDLIMIT

55

R2-1/SPEED

DISPLAY SIGN

SPEEDLIMIT

55R2-1

ENDROAD WORK

G20-2

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

R22-1

LEFTTWO LANES

CLOSED----

W20-5AL

55SPEEDLIMIT

W3-5 W4-2L

JANUARY 2019

NOTE: See Appendix A for sign descriptions and dimensions.

LEFT LANECLOSED

----

W20-5L

Signs

L = Transition1/3 L = Shoulder TransitionBZ 1 = Buffer Zone 1BZ 2 = Buffer Zone 2WZ = Work Zone

SPEED L 1/3 L BZ 1 WZ Channelizing Device Spacing (Feet)MPH55

Feet Feet Feet Mile (s) L 1/3 L BZ 1 WZ660 220 1,320 (Min) 3 (Max) 50 50 100 100

BZ 2Feet

660 (Min) 100BZ 2

Distance and Spacing Quick Reference Chart

Page 189: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

500'

500'

500'

500'

500'

1,000'

640'

640'

5,280'

250' Min1,000' Max WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

LEFT LANECLOSED2 MILES

55SPEEDLIMIT

SPEEDLIMIT

55

SPEEDLIMIT

55

ENDROAD WORK

Phase 1 Phase 2

PCMS 1

See Note 1

LSee Note 1

WZ

BZ 1 See Note 1

500' Min900' Max

2,640' Min5,280' Max

LEFT LANE

CLOSED

MERGERIGHT

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

500'

SPEEDLIMIT

55

LEFT LANECLOSED1 MILE

LEFT LANECLOSED1/2 MILE

LEFT LANECLOSED1500 FT

1/3 L

PTS 940-14A Express E-ZPass Single Lane Closure - Median Width Less than 15 Feet

JANUARY 2019

NOTES:See PTS 940-14 - Notes for applicablenotes to this drawing

See Note 9

See Note 9

See Note 10

Page 190: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 940-14B Express E-ZPass Double Lane Closure - Median Width Less than 15 Feet

500'

500'

500'

500'

500'

1,000'

500'

1,000'

640'

640'

1,570'250' Min

1,000' Max

WORK ZONE

HEADLIGHTS

STATE LAW

TURN ON

55SPEEDLIMIT

SPEEDLIMIT

55

LEFTTWO LANES

CLOSED1/2 MILE

SPEEDLIMIT

55

ENDROAD WORK

1/3 LSee Note 1

LSee Note 1

BZ 1See Note 1

LSee Note 1

BZ 2See Note 1

SPEEDLIMIT

55

3,710'

See Note 1

Phase 1 Phase 2

PCMS 1

Phase 1 Phase 2

PCMS 2

Phase 1 Phase 2

PCMS 3

500' Min900' Max

2,640' Min5,280' Max

LEFT 2 LANESCLOSED

1 1/2 MILEAHEAD

xxYOUR SPEED

SPEEDLIMIT

55

xxYOUR SPEED

SPEEDLIMIT

55

LEFT 2 LANESCLOSED

MERGERIGHT

LEFT 2 LANESCLOSED

MERGERIGHT

LEFTTWO LANES

CLOSED2 MILES

LEFTTWO LANES

CLOSED1 MILE

JANUARY 2019

NOTES:See PTS 940-14 - Notes for applicable notes tothis drawing

WZ

See Note 9

See Note 1

See Note 1

See Note 9

See Note 10

Page 191: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

1. This figure applies to single lane ramps where the distances between vehicles required on PTS 910-11 are not available. For traffic line painting operations at interchanges with dual lane ramps, refer to PTS 910-11.

2. A 7,000 lb GVW (Gross Vehicle Weight) or larger pickup truck and loaded to weigh a minimum of 5,500 lb may be used as Shadow Vehicle No. 1.

3. Position Shadow Vehicle No. 1 so that it is visible from behind for a minimum distance of 700 feet.

4. All shadow vehicles are to have an arrow board or a PCMS.

5. For work on the left side side of the ramp, use same vehicles and spacing, but with the PCMS indicating Merge Right.

6. The spacing between the work vehicles and the shadow vehicles, and between each shadow vehicle should be minimized to deter road users from driving in between, based on field conditions.

7. Shadow Vehicle No. 1 may be located on the left shoulder where the left shoulder width is a minimum of 12 feet.

8. Paint Foreman's vehicle may be located:A. In front of the supply vehicle, orB. Behind the supply vehicle.

9. State Police vehicle may be located:A. In front of Shadow Vehicle No. 2, orB. Behind Shadow Vehicle No. 2.

10. All vehicles, with exception of State Police vehicle, are to have an activated amber warning light.

PTS 940-15 - NotesTraffic Line Painting Operation for Interchange Ramps

JANUARY 2019

Page 192: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

PTS 940-15 Traffic Line Painting Operation for Interchange Ramps

Phase 1 Phase 2

PCMS 1 Shadow Vehicle No.1

See Note 7

Shadow Vehicle No. 2

1000'

300'

250'

Supply Vehicle

Line Painting Machine

WETPAINT

MERGELEFT

JANUARY 2019

NOTES:See PTS 940-15 - Notes for applicablenotes to this drawing

Page 193: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

 

 

Appendix A 

 

Sign Index in Nomenclature Order 

Page 194: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

NOMENCLATURE  DESCRIPTION  SIZE 

G20‐2 END ROAD WORK 60"x24"

G20‐5AP  WORK ZONE PLAQUE  48"x36"

G30‐1  EMERGENCY PULL‐OFF 96"x60"

G30‐2  EMERGENCY PULL‐OFF ENTRANCE  96"x60"

MPT‐01 CROSS OVER 500 FT 36"x48"

MPT‐03 CROSS OVER 1500 FT 36"x48"

MPT‐05 EXIT NEXT RIGHT 60"x60"

MPT‐06 EXIT (45 DEGREE ARROW) 60"x60"

MPT‐07 GAS AND FOOD NEXT RIGHT 60"x48"

MPT‐08 GAS AND FOOD (45 DEGREE ARROW) 60"x60"

MPT‐09 INTERCHANGE AREA CONSTRUCTION 96"x48"

MPT‐10 TOLL PLAZA AREA CONSTRUCTION 96"x48"

MPT‐31 NO SHOULDER _ _ MILES 96"x48"

MPT‐34 SHOULDER CLOSED 48"x36"

MPT‐36 HEAVY EQUIPMENT CROSSING 48"x48"

MPT‐38 LEFT SHOULDER LOW 48"x48"

PTC‐LC LANE CLOSED 48"x48"

PTC‐LCA LANE CLOSED AHEAD 48"x48"

R1‐1  STOP  48"x48"

R1‐1‐2  RAMP  48"x24"

R1‐1‐3  RAMP STOP  48"x60"

R1‐2  YIELD  60"x60"

36"x48"*

48"x60"

R4‐1  DO NOT PASS  48"x60"

R4‐1A  NO PASSING ZONE AHEAD  36"x48"

R11‐2 ROAD CLOSED 48"x30"

R22‐1 WORK ZONE ‐ TURN ON HEADLIGHTS 72"x48"

W1‐4L LEFT REVERSE CURVE 48"x48"

W1‐4R RIGHT REVERSE CURVE 48"x48"

* Median Barrier Only with PTS 910, PTS 915, and PTS 940

Appendix ASign Index In Nomenclature Order

R2‐1  SPEED LIMIT 

Page 195: Maintenance & Protection of Traffic Standards (January ...PTS 940‐4: Toll Plaza Right Lane Closure Operations More Than 72 Hours PTS 940‐5: Toll Plaza Center Lane Closure Operations

NOMENCLATURE  DESCRIPTION  SIZE 

Appendix ASign Index In Nomenclature Order

W1‐4BL TWO‐LANE LEFT REVERSE CURVE 48"x48"

W1‐4BR TWO‐LANE RIGHT REVERSE CURVE 48"x48"

W1‐4CL THREE‐LANE LEFT REVERSE CURVE  48"x48"

W1‐4CR THREE‐LANE RIGHT REVERSE CURVE  48"x48"

W3‐1  STOP AHEAD  48"x48"

W3‐2  YIELD AHEAD  48"x48"

W3‐4  BE PREPARED TO STOP  48"x48"

W3‐5  SPEED REDUCTION SIGN  48"x48"

W4‐2L  PAVEMENT WIDTH TRANSITION ‐ LEFT LANE ENDS  48"x48"

W4‐2R  PAVEMENT WIDTH TRANSITION ‐ RIGHT LANE ENDS  48"x48"

W5‐4  RAMP NARROWS  48"x48"

W5‐4‐1  LANES NARROW  48"x48"

W6‐3  TWO‐WAY TRAFFIC  48"x48"

W8‐9  LOW SHOULDER  36"x36"

W8‐11  UNEVEN LANES  48"x48"

W16‐103P  DISTANCE AHEAD PLAQUE  36"x24"

W20‐1  ROAD WORK  48"x48"

W20‐5AL  LEFT TWO LANES CLOSED  48"x48"

W20‐5AR  RIGHT TWO LANES CLOSED  48"x48"

W20‐5L  LEFT LANE CLOSED  48"x48"

W20‐5R  RIGHT LANE CLOSED  48"x48"

W20‐7  FLAGGER SYMBOL  48"x48"

W21‐5BL  LEFT SHOULDER CLOSED 48"x48"

W21‐5BR  RIGHT SHOULDER CLOSED 48"x48"

W21‐6  SURVEY CREW  48"x48"

W21‐7  UTILITY WORK AHEAD  36"x36"

W21‐10  STOP AND SLOW PADDLE 24"x24"

W21‐19  ACTIVE WORK ZONE WHEN FLASHING  48"x48"

W21‐20  END ACTIVE WORK ZONE  48"x48"

W21‐101  RAMP WORK AHEAD  48"x48"

W24‐1AL TWO‐LANE DOUBLE REVERSE CURVE LEFT 48"x48"

W24‐1AR  TWO‐LANE DOUBLE REVERSE CURVE RIGHT 48"x48"

W25‐5  CONSTRUCTION ENTRANCE AHEAD  48"x48"