RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 1 of 17 Roads and Roads and Roads and Roads and Maritime Services Maritime Services Maritime Services Maritime Services BRIEF COMPRISING BRIEF COMPRISING BRIEF COMPRISING BRIEF COMPRISING OF OF OF OF THE THE THE THE SCOPE SCOPE SCOPE SCOPE AND REQUIREMENTS AND REQUIREMENTS AND REQUIREMENTS AND REQUIREMENTS OF OF OF OF THE THE THE THE WORK WORK WORK WORK FOR FOR FOR FOR Maintenance Works Maintenance Works Maintenance Works Maintenance Works Civil & Maintenance works at Daroobalgi Civil & Maintenance works at Daroobalgi Civil & Maintenance works at Daroobalgi Civil & Maintenance works at Daroobalgie HVIS e HVIS e HVIS e HVIS Sth Bound Sth Bound Sth Bound Sth Bound Compliance Operations Branch Compliance Operations Branch Compliance Operations Branch Compliance Operations Branch Document No: Version: 1.0 Issue Date: 26 Feb 2018 E18-0736-AS-7-1-PR0004 Volume 16.2 1

Maintenance Works MMaintenance Works Maintenance Works

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 1 of 17

Roads and Roads and Roads and Roads and Maritime Services Maritime Services Maritime Services Maritime Services

BRIEF COMPRISINGBRIEF COMPRISINGBRIEF COMPRISINGBRIEF COMPRISING OFOFOFOF THETHETHETHE

SCOPE SCOPE SCOPE SCOPE AND REQUIREMENTS AND REQUIREMENTS AND REQUIREMENTS AND REQUIREMENTS OF OF OF OF THE THE THE THE WORKWORKWORKWORK

FORFORFORFOR

Maintenance Works Maintenance Works Maintenance Works Maintenance Works Civil & Maintenance works at DaroobalgiCivil & Maintenance works at DaroobalgiCivil & Maintenance works at DaroobalgiCivil & Maintenance works at Daroobalgie HVISe HVISe HVISe HVIS

Sth BoundSth BoundSth BoundSth Bound

Compliance Operations BranchCompliance Operations BranchCompliance Operations BranchCompliance Operations Branch

Document No: Version: 1.0 Issue Date: 26 Feb 2018

E18-0736-AS-7-1-PR0004

Volume 16.2 1

Page 2: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 2 of 17

RECORD OF AMENDMENTS

Version Summary Date Approved

1.0 Initial draft 26 Feb 2018

E18-0736-AS-7-1-PR0004

Volume 16.2 2

Page 3: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 3 of 17

CONTENTS

DEFINITION AND GLOSSARY OF TERMS ......................................................................................................... 4

1 INTRODUCTION .............................................................................................................................................. 5

2 STANDARDS AND SPECIFICATIONS ........................................................................................................ 5

2.1 AUSTRALIAN STANDARDS .......................................................................................................................... 5

2.2 RMS SPECIFICATIONS AND DOCUMENTS ................................................................................................. 5

2.3 ISSUES OF STANDARDS, SPECIFICATIONS AND DRAWINGS ...................................................................... 6

2.4 COMPLIANCE WITH SPECIFICATIONS ......................................................................................................... 6

2.5 PRECEDENCE OF SPECIFICATIONS ............................................................................................................ 6

3 LOCATIONS ..................................................................................................................................................... 7

4 SCOPE OF WORK ........................................................................................................................................... 7

5 PROJECT SCHEDULE ................................................................................................................................... 9

6 GENERAL WORK MANAGEMENT REQUIREMENTS ............................................................................. 9

6.1 MANAGEMENT OF THE WORK .................................................................................................................... 9

6.2 ACCESS TO SITES .................................................................................................................................... 10

6.3 INDUSTRIAL RELATIONS MANAGEMENT .................................................................................................. 10

7 STATEMENT OF WORK .............................................................................................................................. 11

7.1 PROJECT DELIVERABLES ......................................................................................................................... 11

7.2 PROJECT MANAGEMENT PLAN ................................................................................................................ 12

7.3 PROJECT PROGRAM ................................................................................................................................ 12

7.4 RISK MANAGEMENT PLAN ....................................................................................................................... 12

7.5 INSTALLATION MANAGEMENT PLAN......................................................................................................... 13

7.6 PROGRESS REPORT REQUIREMENT ....................................................................................................... 13

7.7 QUALITY ASSURANCE .............................................................................................................................. 13

8 WARRANTY .................................................................................................................................................... 13

9 DOCUMENTATION ........................................................................................................................................ 14

10 APPENDIX A ................................................................................................................................................... 16

E18-0736-AS-7-1-PR0004

Volume 16.2 3

Page 4: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 4 of 17

DEFINITION AND GLOSSARY OF TERMS

The following definitions and abbreviations shall apply to this Specification.

AS Australian Standard

Authority, or the Authority

The Roads and Maritime Services of New South Wales

DMP Design Management Plan

IEC International Electro technical Commission

ISO International Organization for Standardization

NZS New Zealand Standard

OEM Operational Engineering Maintenance

OH&S Occupational Health and Safety

PMP Project Management Plan

RFQ Request for Quotation

RFT Request for Tender

RMP Risk Management Plan

RMS Roads and Maritime Services, NSW

ROL Road Occupancy Licences

TMC Traffic Management Centre

WAE Work As Executed

RMS representative RMS Project Manager

E18-0736-AS-7-1-PR0004

Volume 16.2 4

Page 5: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 5 of 17

1 INTRODUCTION

The intent of this document is to provide the Service Provider with a summary of what this project

requires to tender for the job.

The HVIS site at Daroobalgie carried out enforcement operations intercepting Heavy Vehicles on the

Newell Highway. There currently exists two sites, north and south bound. Both sites are currently

manned by two inspectors each approximately 16 hours a day, split between two hour shifts.

RMS is seeking to facilitate an amenities building to one HVIS site at the current moment, it is

envisages that this amenities building is used exclusively by the Heavy Vehicles inspectors on site

and not by the public.

Water connections are believed to be present on site, however an onsite inspection can verify the

exact amount of excavation required from the connection point to the location of the amenities

building.

The exact location of the amenities building will be decided on site by the RMS PM, an indicative

location is shown within the attached schematic diagrams.

The type of system to be installed is also specified within the attached specifications, the REF is

being completed by RMS and the approval is based on the type of system specified within this RFT.

STANDARDS AND SPECIFICATIONS

1.1 Australian Standards

All work shall comply with the following standards.

AS/NZS 3000 Electrical installations (known as the Australian/New Zealand Wiring Rules)

AS/NZS 1768:2007 Lightning Protection Including Risk assessment

AS/NZS ISO 9001 Quality management system - Requirements

AS/NZS 4360 Risk Management

AS/NZS ISO 14000 Environmental Management Standards

AS/NZS 4801 Occupational Health & Safety Management System

1.2 RMS Specifications and Documents

All work shall comply with the following RMS Specifications and Documents.

This document shall be used in conjunction with the referencing documents. The following documents are referenced in this specification and shall be considered to form part of this specification: Document Title AS-1074: Steel Tubes And Tubular For Ordinary Service

E18-0736-AS-7-1-PR0004

Volume 16.2 5

Page 6: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 6 of 17

AS-1289: Methods of Testing Soils for Engineering Purposes AS-1165: Acoustics - Rating of sound absorption - Materials and systems AS-2053: Conduits and Fittings for Electrical Installations AS-3000: Electrical installations-buildings, structures and premises (known as the SAA Wiring Rules) Specification AS-3080: Telecommunications Installations – Integrated telecommunications cabling systems for

commercial premises AS-3084: Telecommunications Installations – Telecommunications pathways and spaces for commercial

buildings AS-3085: Telecommunications Installations – Administration of communications cabling systems – Basic

requirements AS-3600: Concrete Structures AS-3996: Metal Access Covers, Road Grates and Frames RMS3051: Specification for the Supply and Delivery of Base and Sub-Base Materials for Surfaced Roads

Pavements RMS R41: Clearing RMS R57: Design of Reinforced Soil Walls RMS G10: Control of Traffic RMS G21/G22 RMS’s Occupational Health & Safety (OH&S) RMS G35/G36 Guide to QA Specifications – Environmental Protection RMS PCF2 Equipment Specification – Pit covers and frames

1.3 Issues of Standards, Specifications and Drawings

All Standards, Specifications and Drawings shall be the versions that are current seven (7) days prior to

the close of quotations, including errata, amendments and addenda that may be issued from time to time.

It shall be the responsibility of the Service Provider to obtain the relevant versions of such documents,

specifications and drawings referred to in this Specification from the relevant issuing bodies.

1.4 Compliance with Specifications

All equipments and materials, where not specified otherwise, shall be in accordance with Australian/New

Zealand Standard Specifications, where such exist, and in their absence, with appropriate IEC or ISO

Specifications.

Electrical installation works shall comply with the safety requirements of the National Electrical Codes

AS/NZS 3000 and AS/NZS 3100.

All installation and commissioning works shall comply with the requirements of the NSW Occupational

Health and Safety Act.

1.5 Precedence of Specifications

In the event of any conflict between the referenced specifications, the order of precedence shall be as

follows:

• this Scope and Statement of Work document;

• Australian Standards; and

• IEC and ISO Specifications

E18-0736-AS-7-1-PR0004

Volume 16.2 6

Page 7: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 7 of 17

2 LOCATIONS

Refer to Appendix A for diagram

3 SCOPE OF WORK

Roads and Maritime is requesting the submission of a lump sum fee estimate for the

installation of Amenities block on the Sth bound site, concrete pad on the sth side approach to

the weighbridge at Daroobalgie HVIS on the Newell High way.

The works involve the following:

- Transportation of Amenities to site- Provision of utility surveys- Provision of plant equipment which includes, Excavator, truck with Hiab, sweeper and bobcat.- Installation of Septic pump tanks as per attached designs and specifications at Daroobalgie Nth

bound site. Septic to be a 5L system, RMS to provide specification.- Installation of amenities block Sth bound, exact location shown in images within appendix, block

also shown on attached design.- Excavation for council water supply- Dumping of unwanted materials- Connection of water supply by a licenced plumber.- Excavation and dumping of 15 meters of flexible pavement to a depth of 350mm and allowance

for dumping costs at both Daroobalgie Nth and Sth.- Formwork, provision of steel and concreting 13m long by 6 m wide to a depth of 250mm, cross

section drawing to be provided at both Daroobalgie Nth and Sth.- Line marking of areas around the newly installed concrete pad in addition to the installation a

5mx5m stop sign at both Nth and Sth bound sites pior to the weighbridge.( Current stop marker isfaded)

- Installation of two stop signs with posts- Cleaning of the area and make good.

Site information and scope will be further provided below.

The scope of the works also includes the below items but is not limited to:

• Management of the work including project management, coordination with RMS PM and other

stakeholders according to the requirements of this document;

• Management of OH&S strategies and plans for the entire project including submitting Traffic

Management Plans used at the Sites where safety to workers and the public is at risk and where

potential disruptions to traffic are likely to occur, as required by RMS;

• Works carried out shall be based on the site-specific inspection as well as General Site Layout

Drawings if required, consultation with and approval from RMS’s representative is required prior

to any works commencing.

• The contractor shall prepare and submit plans for RMS to review and approve prior to

implementation if RMS’s representative deems necessary for that particular body of works.

E18-0736-AS-7-1-PR0004

Volume 16.2 7

Page 8: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 8 of 17

• The contractor shall prepare and submit construction plans for review and approve prior to

implementation;

• The contractor shall co-ordinate and manage the use of lifting machinery, any other equipment,

and any site related activities with accordance to Australian OH&S Requirements & Australian

Standards;

• The contractor will organise searches for underground utility services report, and obtain

Geotechnical report if required;

• RMS representative will liaise with Environmental Services Branch to prepare the Minor Works

REF (Review of Environmental Services) if required;

• RMS representative will liaise with Infrastructure Communications to consult and develop / issue

notifications to local residences.

• The contractor will organise and obtain agreement with relevant utility companies for

underground / aboveground work relocation works;

• The contractor will provision all site coordination works, all required equipment and materials and

compliance with relevant requirements from the local council and other authorities when and as

required for all sites;

• Submission of application for Service Mark;

• Trenching, Conducting and Cabling for Power (Orange) and Comms (White), as per Construction

of Underground Cableways Specification

• Provision of Site Acceptance Tests with the witness of RMS staff if required;

• Provision of Commissioning Test with the witness of RMS staff if required;

• Provision of As-Built drawings and O&M Documents if required;

• Submit regular weekly progress reports according to the requirements of the Statement of the

Work document;

• The contractor shall attend, along with other stakeholders ( as required) , Monthly Project Review

meetings; and discuss/resolve site issues ( as part of table provided) , any drawings, equipment,

installation and test issues, defects or any other issue relating to the project and list of works;

• The contractor will endeavour to minimise the number of NCR(s) identified during Final

Inspection. If NCR(s) are identified, NCR(s) are to be resolved within 30 business days.

• Once all NCR have been resolved for a site, The contractor is to provide RMS all handover

documentation including as built drawings, photos, SWMS documentation, risk reports, as per

within 30 business days.

ANY Additional works requested by RMS for the above to be considered as a

variation

E18-0736-AS-7-1-PR0004

Volume 16.2 8

Page 9: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 9 of 17

4 PROJECT SCHEDULE

The program milestone is as shown below:

Deliverables Due Date

1 Award Tender 2 March 2018

2 Risk Management Workshop

4 Utility checks and relocation if required

5 As-built drawings and O&M documents

6 Handover to RMS

7 Project completion

8

9

10

11

12

13

14

15

16

17

18

Table 2: Project deliverables

5 GENERAL WORK MANAGEMENT REQUIREMENTS

5.1 Management of the Work

The Service Provider shall have a management system in place for the purpose of removal of site work

supervision and management, coordination, and monitoring of all work under this RFQ.

The project manager shall be a suitably qualified person with the following minimum qualifications:

E18-0736-AS-7-1-PR0004

Volume 16.2 9

Page 10: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 10 of 17

a) Good working knowledge of OH&S Regulations;

b) Extensive experience in facilitating and ensuring safe working on public roadways;

c) Demonstrable ability to lead a team of multi-discipline staff; and

d) Extensive experience in managing the maintenance works and installation of roadside devices

projects.

e) The Service Provider’s personnel who are going to undertake works such as traffic control, or

operating elevated work platforms, lifting cranes, back-hoes, boring machines or other

machinery, shall have the relevant accreditation training and be in possession of an appropriate

current and valid licence for the work.

5.2 Access to Sites

a) Where necessary, possession of the Site must be coordinated with RMS. Road Occupancy

Licences (ROL) must be obtained from the TMC prior to commencement of work if work

undertaken will impact on traffic conditions and road safety. The TMC will require a minimum of

15 days notification on any ROL.

b) The Service Provider must notify RMS representative if they cause damage to the Site or are

being prevented from accessing the Site.

c) The Service Provider must follow safe working practices to ensure the safety of the public and

workers as per NSW Government & the RMS OH&S guidelines and requirements. The Service

Provider must submit a Safe Work Method Statement prior to commencing work.

d) The Service Provider must follow environmental working practices as per RMS and EPA

guidelines and requirements.

e) The Service Provider must conduct risk assessments of the Site and report any unsafe matters

associated with the installation, testing, commissioning and/or removal of equipment and

mounting structures.

5.3 Industrial Relations Management

The Service Provider shall comply with the NSW Government Industrial Relations Management

Guidelines and requirements.

The industrial relations management requirements in this Quotation may be in addition to, but are not in

substitution for, any other requirement of legislation or regulations and do not limit the powers of the

RMS’s Representative or the liabilities and responsibilities.

a) Before starting work on the site, in accordance with the NSW Government Industrial Relations

Management Guidelines, the Service Provider shall prepare and submit:

b) Evidence of compliance with all employment and legal obligations in the previous twelve months;

E18-0736-AS-7-1-PR0004

Volume 16.2 10

Page 11: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 11 of 17

c) The location of time and wage records and other documents that are required to be kept to verify

ongoing compliance with all employment and legal obligations;

d) The names of Federal or NSW awards that are likely to cover subcontractors and other

contractors on the project;

e) The names of those responsible for coordinating industrial relations on the project; and outline of:

• Consultation and communications mechanisms;

• Measures to coordinate the interface with subcontractors, other contractors and unions;

• Measures for assessing subcontractors; and

• Measures to monitor and verify ongoing compliance.

6 STATEMENT OF WORK

6.1 Project Deliverables

The project management methodologies that shall be utilised by the Service Provider for this project shall

be in line with the nominated standards and shall be clearly explained in the Project Management Plan.

As a minimum the following are the required deliverables and/or outcomes for this project.

a) Project Management Plan (PMP) (see below) if and when required ( pending of works being

carried out, RMS to advise)

b) Project Program (see below)

c) Risk Management Plan, risk register and risk assessment report for the project (see below). This

can form an independent section of the PMP

d) Installation Management Plan (see below) if required

e) Quality Management Plan

f) OH&S Plan

g) Environmental Management Plan if required

h) Site Management Plan if required

i) Work-As-Executed drawings

j) Regular Fortnightly Progress Report (see below)

E18-0736-AS-7-1-PR0004

Volume 16.2 11

Page 12: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 12 of 17

6.2 Project Management Plan

The Project Management Plan shall address and include the following project related issues:

a) Project schedule, project change management, project risks management, and procurement

management.

b) Include project organisation and responsibilities and communication process and protocol

between different stakeholders including RMS and any external stakeholders,

c) Include details of the removal activities, deliverables, documentation and reviews ,

d) Include details of the installation activities, deliverables, documentation and reviews ,

e) Identify the interdependencies between the deliverables and milestones,

f) Include all activities to be undertaken,

6.3 Project Program

The Project Program shall:

a) Include resource requirements and resource allocations, including the identification of people

and responsibilities;

b) Identify the interdependencies between the stages, deliverables and milestones, and activities;

c) Include all activities to be undertaken.

6.4 Risk Management Plan

The strategy and approach for delivering project as a whole and the different stages of the project shall

be integrated with risk assessment and management processes.

The risk assessment and management processes and procedures shall be based on AS/NZS 4360:1999.

The RMP shall be supported by a risk register that is updated throughout the Project term. The following

issues must be dealt with in this process.

a) Assess the risks of the timing of the deliverables and processes; and

b) Provide specific treatment and mitigation action plans to address high or significant development

and integration risks.

E18-0736-AS-7-1-PR0004

Volume 16.2 12

Page 13: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 13 of 17

6.5 Installation Management Plan

The Service Provider shall deliver the documentation listed in this document or decided in the early stage

of the project to the satisfaction of RMS representative in a timely manner.

6.6 Progress Report Requirement

Reports provided by the Service Provider to RMS shall consist of:

a) The updated Project Program to reflect the latest status of the project, milestones, deliverables

and resources.

b) All changes to the scope since the last period, which may impact the Project Program;

c) The current version of the risk register, which shall be up-to-date;

d) Details of actual progress compared with the planned time and resource estimates in quantifiable

amounts (not perceived percentages);

6.7 Quality Assurance

The Service Provider and its subcontractors (if any) shall follow the ISO9001 Quality Assurance

standards in performing the work activities.

The Service Provider shall conduct periodic audits to ensure quality assurance and safety standards are

being followed by its personnel and subcontractors personnel.

RMS will conduct quality audit of the Service Provider’s and subcontractors’ quality system for the works.

This requires the cooperation of the Service Provider and support of the audit by providing the necessary

records and documentation when requested by RMS.

The Service Provider shall rectify all the non conformance cases within the agreed timeframe and submit

a report on the remedial actions that have been taken.

7 WARRANTY

The Service Provider shall provide a warranty against poor workmanship, work defects, equipment

defects and any other causes of malfunctions for a period of 1 year commencing from the date of

acceptance by and handover to RMS The Service Provider shall bear all costs to rectify the above during

the warranty period.

E18-0736-AS-7-1-PR0004

Volume 16.2 13

Page 14: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 14 of 17

8 DOCUMENTATION

The Service Provider shall provide all necessary documentation for the project, including:

• Project Management and other related plans;

• Work-As-Executed Drawings; and

E18-0736-AS-7-1-PR0004

Volume 16.2 14

Page 15: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 15 of 17

E18-0736-AS-7-1-PR0004

Volume 16.2 15

Page 16: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 16 of 17

9 APPENDIX A

The following Annexure and Schedules form part of this quote:

E18-0736-AS-7-1-PR0004

Volume 16.2 16

Page 17: Maintenance Works MMaintenance Works Maintenance Works

RFQ Scope of Work (Ref No. ) Copyright RMS COB HV Projects 2017 Page 17 of 17

ANNEXURE & SCHEDULE

E18-0736-AS-7-1-PR0004

Volume 16.2 17

Page 18: Maintenance Works MMaintenance Works Maintenance Works

Nuix-defined Metadata File Size 451947 File Type application/pdf GUID 8b099277-4d3f-4ba2-8729-10520597a2f5 Item Date 2018-02-26T14:46:27.850+11:00 MD5 Digest 4e25e4afbe5a798569b1eee23b85f504

Path Name

/E18-0736-AS-7-1-PR-0004/E18-0736-AS-7-1-PR-0004.E01/[Unnamed Disk Image]/Local Disk/[File System Root]/Users/duboisa/Desktop/to be transfered/Daroolgabie HVIS/Amenities Installation RFQ Sth bound

Shannon Entropy 7.984882624078964 User-defined Evidence Metadata Property Source E18-0736-AS-7-1-PR-0004 Properties Application Created 2018-02-26T14:46:27.000Z

Application Modified 2018-02-26T14:46:27.000Z

Author DuboisA Compressed false File Accessed 2018-02-26T03:46:41.313Z File Changed 2018-02-26T03:46:27.850Z File Created 2018-02-26T03:46:41.270Z File Group Domain Users (S-1-5-21-1629583213-1224749553-1844936127-513) File Group SID S-1-5-21-1629583213-1224749553-1844936127-513File Modified 2018-02-26T03:46:27.850ZFile Offset 80696811520File Owner S-1-5-21-1629583213-1224749553-1844936127-63909File Owner SID S-1-5-21-1629583213-1224749553-1844936127-63909File Start Cluster 19701370 File Start Sector 157610960 Name RFQ Scope of Work Amenities 26022018.pdf

NTFS ACE 1 Access Mask

{Read,Write,Write,Read Extended Attributes,Write Extended Attributes,Execute File,Delete Child,Read Attributes,Write Attributes,Delete,Read Security Descriptor,Write DACL,Write Owner,Synchronize}

NTFS ACE 1 Flags Unknown Flags: 0x10 NTFS ACE 1 Raw Access Mask 2032127

NTFS ACE 1 Raw Flags 16

E18-0736-AS-7-1-PR0004

Volume 16.2 18

Page 19: Maintenance Works MMaintenance Works Maintenance Works

NTFS ACE 1 SID S-1-5-18 NTFS ACE 1 SID Name Local System

NTFS ACE 1 Type Allow

NTFS ACE 2 Access Mask

{Read,Write,Write,Read Extended Attributes,Write Extended Attributes,Execute File,Delete Child,Read Attributes,Write Attributes,Delete,Read Security Descriptor,Write DACL,Write Owner,Synchronize}

NTFS ACE 2 Flags Unknown Flags: 0x10 NTFS ACE 2 Raw Access Mask 2032127

NTFS ACE 2 Raw Flags 16

NTFS ACE 2 SID S-1-5-32-544 NTFS ACE 2 SID Name BUILTIN\Administrators

NTFS ACE 2 Type Allow

NTFS ACE 3 Access Mask

{Read,Write,Write,Read Extended Attributes,Write Extended Attributes,Execute File,Delete Child,Read Attributes,Write Attributes,Delete,Read Security Descriptor,Write DACL,Write Owner,Synchronize}

NTFS ACE 3 Flags Unknown Flags: 0x10 NTFS ACE 3 Raw Access Mask 2032127

NTFS ACE 3 Raw Flags 16

NTFS ACE 3 SID S-1-5-21-1629583213-1224749553-1844936127-63909 NTFS ACE 3 SID Name S-1-5-21-1629583213-1224749553-1844936127-63909

NTFS ACE 3 Type Allow

NTFS ACE 4 Access Mask

{Read,Write,Write,Read Extended Attributes,Write Extended Attributes,Execute File,Delete Child,Read Attributes,Write Attributes,Delete,Read Security Descriptor,Write DACL,Write Owner,Synchronize}

NTFS ACE 4 Flags Unknown Flags: 0x10 NTFS ACE 4 Raw Access Mask 2032127

NTFS ACE 4 Raw Flags 16

NTFS ACE 4 SID S-1-5-21-1629583213-1224749553-1844936127-12471 NTFS ACE 4 SID Name S-1-5-21-1629583213-1224749553-1844936127-12471

NTFS ACE 4 Type Allow NTFS Attributes Archive

E18-0736-AS-7-1-PR0004

Volume 16.2 19

Page 20: Maintenance Works MMaintenance Works Maintenance Works

NTFS File Name Attribute DOS File Accessed

2018-02-26T03:46:41.313Z

NTFS File Name Attribute DOS File Changed

2018-02-26T03:46:41.313Z

NTFS File Name Attribute DOS File Created

2018-02-26T03:46:41.270Z

NTFS File Name Attribute DOS File Modified

2018-02-26T03:46:41.313Z

NTFS File Name Attribute DOS File Name

RFQSCO~1.PDF

NTFS File Name Attribute Win32 File Accessed

2018-02-26T03:46:41.313Z

NTFS File Name Attribute Win32 File Changed

2018-02-26T03:46:41.313Z

NTFS File Name Attribute Win32 File Created

2018-02-26T03:46:41.270Z

NTFS File Name Attribute Win32 File Modified

2018-02-26T03:46:41.313Z

NTFS File Name Attribute Win32 File Name

RFQ Scope of Work Amenities 26022018.pdf

NTFS Hard Links 2 NTFS LogFile Sequence Number 33258150676

NTFS MFT Index 177371 NTFS MFT Resident false

NTFS Parent MFT Index 194546

Page Count 17 PDF Certification Level Not Certified

PDF Contains Annotations false

PDF Contains Comments false

PDF Creator PScript5.dll Version 5.2.2

E18-0736-AS-7-1-PR0004

Volume 16.2 20

Page 21: Maintenance Works MMaintenance Works Maintenance Works

PDF Encryption Level None

PDF Images JPEG 2 PDF Javascript Present false

PDF Metadata Encrypted false

PDF Portfolio false PDF Producer GPL Ghostscript 8.15 PDF Version 4 Physical Start Sector 158622672

Title Microsoft Word - RFQ Scope of Work Amenities 26022018.doc

E18-0736-AS-7-1-PR0004

Volume 16.2 21

Page 22: Maintenance Works MMaintenance Works Maintenance Works

Daroobalgie Sth Amenities and VSLS signsDaroobalgie Sth Amenities and VSLS signsFrom:From: DUBOIS Alexandre <"/o=rta/ou=exchange administrative group

(fydibohf23spdlt)/cn=recipients/cn=alexandu">To:To: DUBOIS Alexandre <[email protected]>Bcc:Bcc: Cbf Projec o@ >, info@ , oz corp civil

<admin@ >Date:Date: Mon, 26 Feb 2018 14:47:32 +1100Attachments:Attachments: 3550L Septic Tank with 10,000L Collection Well.pdf (263.22 kB); NSW Accreditation -

Septic Tanks and Collection Wells.pdf (2.98 MB)

Good afternoon,

RMS is seeking the quotation for the installation of Amenities block at Daroobalgie, RFQ attached

Can you please provide the quotation by COB 2nd of March.

Thank you

Regards,

Alex DuboisProject ManagerCompliance System mpliance Operations Branch | Compliance and Regulatory ServicesT 02 88370636 | M 6 298www.rms.nsw.gov.a

Roads and Maritime Services99 Phillip st Parramatta NSW 2150

E18-0736-AS-7-1-PR0004

Volume 16.2 22

Page 23: Maintenance Works MMaintenance Works Maintenance Works

FINISHEDGROUNDLEVEL

SEPTIC TANK TO BE 100mm OUT OF GROUND

1=1 I 1=1 It—ri— i—r

INLET

<

T*lT~T~~r'l I j*

yiLIFTING EYE

□<OUTLET

PROVIDE 75mm OF 10mm BLUE METAL BASE OR SAND BASET~I l-r-r-rl I l-r-r-rl I l-r-r-rl I l-r-r-rn~T=rr

<

SWIFT LIFT POINT 2.5t

SUCTION DISCHARGE PIPE ASSEMBLY SUPPLIED BY PLUMBER

r;---------- 1 H :

I I sI i

},INLET*-^ 1 •• ' \

rJ': * 1 |

KAMLOK GATE AND CAP VALVE

FINISHEDGROUNDLEVEL

80mmHOLE

SWIFT LIFT POINT 2.51- '

WHEN COLLECTION WELL IS USED AS A SULLAGE PUMP OUT TANK IT IS RECOMMENDED TO RETAIN THE TANK WITH A 2.0Cu Mtr CONCRETE RING TO PREVENT THE TANK FLOATING IN SATURATED GROUND

<

><l_ IX

PROVIDE 75mm OF 10mm BLUE METAL BASE OR SAND BASE

11 i=i 11

EXCAVATION TO BE AT LEAST 300mm CLEAR OF TANK ALL AROUND. EXCAVATION TO COMPLY WITH ALL LOCAL COUNCIL AND BUILDING CODE REQUIREMENTS

300 TANK DIAMETER 1935 300 300 TANK DIAMETER 2810 300

EXCAVATION WIDTH 2535 x 2535 EXCAVATION WIDTH 3410 x 3100

DIAGRAMMATIC SECTION DETAILISSUE DATE AMENDMENTS

A 23.02.16 ORIGINAL ISSUE PROPOSED LAYOUT FOR BIOSEPTIC PUMP OUT SYSTEM

3550L SEPTIC TANK & 10.000L COLLECTION WELL

APPROVED

THESE DRAWINGS ^DESIGNS ARE THE PROPERTY OF BIOSEPTIC PTY LTD AND MUST NOT BE COPIED OR USED WITHOUT BIOSEPTIC'S WRITTEN PERMISSION.

DRAWN

ISSUED

O.Rios APPROVED BY DATE:

23.02.16RECORD OF ISSUE

SHEET 1 OF 1

NAME:

SIGNATURE

BioSeptic Pty Ltd1 - 5 Anzac Rd, Smeaton Grange Rd

Smeaton Grange, NSW 2567Phone: (02) 4629 6666 Fax: (02) 4629 6655

Email: [email protected] SEWAGE SYSTEMS

E18-0736-AS-7-1-PR0004

Volume 16.2 23

Page 24: Maintenance Works MMaintenance Works Maintenance Works

EXCAVATION WIDTH 5800

WATER TIGHT MANHOLE COVER WEIGHT LOADING ^ 510KGSINLET OUTLET INLET

WATER 7-*ftjgSEPTVf-

80mm

ISSUE DATE AMENDMENTSPROPOSED LAYOUT FOR

BIOSEPTIC PUMP OUT SYSTEM3550L SEPTIC TANK & 10,0001 COLLECTION WELL

DRAWN O.Rios APPROVED BY I DATE: BioSeptic Pty Ltd1 - 5 Anzac Rd, Smeaton Grange Rd

Smeaton Grange, NSW 2567Phone: (02) 4629 6666 Fax: (02) 4629 6655

Email: [email protected] SEWAGE SYSTEMS

A 23.02.16 ORIGINAL ISSUE APPROVEDNAME:ISSUED 23.02.16

RECORD OF ISSUE

SIGNATURE

A

THESE DRAWINGS 1DESIGNS ARE THE PROPERTY OF BIOSEPTIC PTY LTD AND MUST NOT BE COPIED OR USED WITHOUT BIOSEPTIC'S WRITTEN PERMISSION. SHEET 1 OF 1

E18-0736-AS-7-1-PR0004

Volume 16.2 24

Page 25: Maintenance Works MMaintenance Works Maintenance Works

tee NSW GOVERNMENT

Health

Certificate of Accreditation

Septic Tanks & Collection Wells

This Certificate of Accreditation is hereby issued by the Director-General of the NSW Ministry of Health pursuant to Clause 41(1) of the Local Government (General) Regulation 2005.

Manufacturer: BioSeptic Pty Ltd

Of 1-5 Anzac Avenue, Smeaton Grange, Narellan, NSW, 2567

This is to certii5) that the septic tanks and collection wells, as described in the attached Schedule, have been accredited as a sewage management facility for use in single domestic premises in NSW. The septic tanks and collection wells are manufactured to the Australian/New Zealand Standard AS/NZS 1546.1:2008 — On-site domestic wastewater treatment units — Septic Tanks.

A/Director, Environmental Health Branch for Director-General (delegation PH335)

Date of Issue: 11 September 2013 Certificate No: 003-21556

This Certificate of Accreditation is in force until 31 December 2018

E18-0736-AS-7-1-PR0004

Volume 16.2 25

Page 26: Maintenance Works MMaintenance Works Maintenance Works

.kto. A I I 1/0 NSGOVERNMENT Health

Accreditation Schedule The Certificate of Accreditation applies to the following

septic tanks and collection wells.

Model Description Size

Septic Tank Vertical axis type, cylindrical precast steel fibre reinforced concrete,

3550 L

with lid, access cover, inlet and outlet fittings.

Collection Well Vertical axis type, cylindrical precast 3750 L steel fibre reinforced concrete, 7200 L

with lid, access cover and inlet fitting. 3800 L

Certification applies only to the construction 5000 L of the tank, lid and access cover. 6100 L

It does not include internal fittings or partitions. 10,000 L

Pump Well Vertical axis type, cylindrical precast steel fibre reinforced concrete.

1100L

Combined Vertical axis type, cylindrical precast 2300 L/4700 L Septic tank/ steel fibre reinforced concrete,

Collection well with lid, access cover and inlet fitting. 2750 L/5500 L

Certification applies only to the construction of the tank, lid and access cover.

It does not include internal fittings or partitions.

2300 L/6000 L

Date of Issue: 11 September 2013 Certificate No: 003-21556

This Certificate of Accreditation is in force until 31 December 2018

E18-0736-AS-7-1-PR0004

Volume 16.2 26

Page 27: Maintenance Works MMaintenance Works Maintenance Works

LIFTING EYE

INLET

LJ

•zi

VE

RT

HE

IGH

T

\ \

TANK DIAMETER 1935

Long Warranty Period Provides Peace of Mind

Wet Cast 40mpa Fibre Steel Reinforced Concrete Construction with Integrated Baffle

Concrete is the Traditional Material for Septic Tanks & Has Been Proven to Last

Supplied with Stainless Steel Outlet Filter and Two Outlet Squares

Prevents the Carry Over of Sludge & Suspended Solids to the Trench or ETA Bed to extend its Life

1300 658 111 I Fax: (02) 296 655 I [email protected] I www.bioseptic.com.au 1-5 Anzac Avenue, Smeaton Grange, NSW, 2567 PO Box 3250, Narellan, NSW, 2567

BioSentic Pty Ltd ABN 95 056 461 226

3550L SEPTIC TANK

2000L Per Day Capacity

SPECIFICATIONS

OUTLET,

Septic Tank Capacity

3550L

Primary Chamber Capacity 2367L

Secondary Chamber Capacity 1183L

Stainless Steel Outlet Filter

Yes

Lid Load Limit

510kg

Tank Weight

3600kg

NSW Health Accredited 003-21556

AS1546.1 Lb c SMKH 21560

3550 Litre Baffled Septic Tank

Australian Manufactured & Accredited to AS/NZS 1546.1:2008 - Septic Tanks

Quality Assured by SAI Global, Lic. No SMKH21556

NSW Health Certification of Accreditation 003-21556

30 Years Warranty on Concrete Components

New Generation Lockable Composite Resin Access Covers

Prevents Access by Children. Stronger than Steel of the Same Weight

Suitable for Domestic & Small Commercial Applications 510kgs Access Cover Loading

No.

BIO septic

OnsiteDetention Tanks

AI I. rc • crq re, ■, 1 IMI MARTINSGROUP

FSiirs Grates SEWAGE SYSTEMS

E18-0736-AS-7-1-PR0004

Volume 16.2 27

Page 28: Maintenance Works MMaintenance Works Maintenance Works

200L

1500kg TAN

K H

EIG

HT

212

5

INV

ERT

HE

IGH

T 1

605

850L

1100L pill

WHEN BACKFILL IS SUITABLY PLACED AND COMPACTED IN ACCORDANCE WITH AS 3798-2007 THE PUMP STATION WILL HAVE A RESISTANCE TO FLOATING OF 3 KN. Anti Floatation Foot

1,

TANK DIAMETER WITH FEET 1100

TANK DIAMETER 1000 AS1546.1

Lic SMKH 21556

FEATURE are 5ewage tJectIon ump station

Australian Manufactured & Accredited to AS/NZS 1546.1:2008 - Septic Tanks

Quality Assured by SAI Global, Lic, No SMKH21556

NSW Health Certification of Accreditation 003-21556

BioSeptic has it's OWN Service Division for After Sales Service

Suitable for Domestic & Small Commercial Applications

Wet Cast 40mpa Fibre Steel Reinforced Concrete Construction

New Generation Lockable 8, Sealed Composite Resin Access Cover, Weighing only 9 Kgs

510kgs Access Cover Loading Access Cover has 660mm Clear Opening

Centrifugal Grinder Pump. Non Return and Gate Shut Off Valve

High Water AudioNisual Alarm with Mute Facility Mute Facility Resets after 2 Hours

Concrete is the Traditional Material for Septic Tanks & has been Proven to Last

Prevents Access by Children. Stronger than Steel of the Same Weight

Easy to Lift. Provides good WHS compliance

HARTINSGROUP WaterT4qcs

BIO septic

1100L PUMP STATION

1300 658 111 I Fax: (02) 296 655 I [email protected] I www.bioseptic.com.au 1-5 Anzac Avenue, Smeaton Grange, NSW, 2567 I PO Box 3250, Narellan, NSW, 2567

BioSeptic Pty Ltd ABN 95 056 461 226

SW1-46 SWT - 41

°nsiteDeten"°n Pits Grates Tanks SEWAGE SYSTEMS

E18-0736-AS-7-1-PR0004

Volume 16.2 28

Page 29: Maintenance Works MMaintenance Works Maintenance Works

Euro Civil & Maintenance Pty Ltd QuoteQuality is Our Goal

Date

PO #

Quote #

Customer ID

ABN: 26 604 934 698

Subtotal $ 218,750.00

Discount

Sales Tax Rate

Sales Tax

Total inc GST $ 240,625.00

BSB: 112879 Account Number : 6 088

Hiring of 120 meters of temporary fencing for excavated areas around the toilet / change room and concreting lead up pavement

Excavation of 15 meters of flexible pavement to a depth of 350mm at Sth BoundFormwork13m long by 6m wide to Nth & Sth Bound for concrete pads

Line Marking the perimeter of the newly installed concrete to match current weighbridge line markingPaint 5x5 meters stop sign at the Sth bound sites prior to weighbridge

Excavate level & compact blinding pad for solid base of rainwater tank

Hire truck with Hiab (crane) for transportation of cubicle from Westmead NSW to Daroobalgie HVIS

Supply sweeper to clean site and prep for line marking

Supply 9 cubic meter skip bin for removal of rubbish

Carry out utility surveys and DBYD

Print Name Date

Trench and excavate from septic tank 25m for installation of overflow retention pit

Please confirm your acceptance of this quote by signing this document

Once signed, please Fax, mail or e-mail it to the provided address.

Supply Aggregate concrete for piers and footings

Supply pf 10,000L Collection Well

February 28, 2018

ECMQ00303

RMS

Roads and Maritime Services

Attention: Alexandre Dubois

Customer: Quote/Project Description

The works Quote involved the following : Daroobalgie

Payment will be collected in prior to provision of services/goods described in this quote.

1- Installation of toilet cubicle/meeting room and civil works

Tel: 7 738 Fax: E-mail: info@

(02) 8849 2633

Thank you for your business!

Donaldson St,

Supply 90mm storm water piping and plumb up from cubicle to tank

Signature

Supply 1 x 3500L Bio Septic tank

Carry out utility surveys and DBYD

Should you have any enquiries concerning this quote, please contact Barry Haden on 7 738

Above information is not an invoice and only an estimate of services/goods described above.

10.00%

Supply Galvanized steel chains and install in concreted piers for anchorage of cubicle

2- Installation concrete pads for weighbridge at Daroobalgie SthABN: 76 236 371 088

110 George St, Parramatta NSW 2150

Special Notes and Instructions

Hiring of crane to install cubicle over new footing and anchored down.

Plumb water pipe from water meter to cubicle Supply and install 3.5 kw air-conditioning split system as requested to toilet/meeting room

Supply truck & Dog to remove unwanted materials

Hiring of 80 meters of water filled barriers to block entry to site Sth bound

Line Total

Hire 5 tone Excavator with auger and rock breaker Auger of piers and trenching of footings for new location of site toilet / change room

Supply 100mm sewerage pipes for installation from cubicle to septic tank & overflow

Excavate and formwork for footpath

Finish concrete and screed to RMS requirements for weighing

Supply and install electric water pump to cubicle

Excavate 25m trench and hole for installation of septic tank in ground

Supply 1x 1100 L pump station

Supply 100m of 1 inch copper pipe

Supply re-enforced steel mesh and rio bars times two layers to Sth bound weighbridge sites

1- Installation of toilet cubicle/meeting room and civil works

2- Installation concrete pads for weighbridge at Daroobalgie Sth

Supply concrete and finish footpath to enter cubicleSupply truck & Dog to remove unwanted materials

Travel, labor hire, accommodation, fuel and expenses

Supply approx 20 cubic meters of aggregate to each Nth& Sth bound concrete pads = total of 40 cubes

Engage surveyor to ensure concreting together with weighbridge meet the Cat 1 requirements

Excavate 100m trench to depth of 600mm

Install 2 x stop signs with post before weighbridge

Travel, labor hire, accommodation, fuel and expenses

E18-0736-AS-7-1-PR0004

Volume 16.2 29

Page 30: Maintenance Works MMaintenance Works Maintenance Works

Nuix-defined Metadata

File Size 141312 File Type application/vnd.ms-excel GUID a907669a-53fc-41be-9c2b-e0e5433a2e1a Item Date 2018-06-04T10:50:11.000+10:00 MD5 Digest 3f2fef44ae619afa5576d9dfbe758cc6

Path Name /E18-0736-AS-7-9-PR-0032-UsersFolder/E18-0736-AS-7-9-PR-0032-UsersFolder.Lx01/cbfprojectsptyltd/Desktop/invoice folder

Shannon Entropy 6.5356099945826465 User-defined Evidence Metadata

Property Source E18-0736-AS-7-9-PR-0032 Properties

Application Version 983040

AppName Microsoft Macintosh Excel Author Euro Maintenance and Civil CLSID {00020820-0000-0000-C000-000000000046} Company Euro Maintenance and Civil Contains Comments false

Copyright © 2013 Spreadsheet123 LTD Created 2009-07-28T19:11:35.000Z DocSecurity 0 Excel Freeze Panes false

Excel Hidden Columns true

Excel Hidden Rows true

Excel Hidden Sheets false

Excel Hidden Sheets Count 0

Excel Hidden Workbook false

Excel Pivot Tables false

Excel Print Areas true Excel Protected Sheets false

E18-0736-AS-7-1-PR0004

Volume 16.2 30

Page 31: Maintenance Works MMaintenance Works Maintenance Works

Excel Very Hidden Sheets false

Excel Very Hidden Sheets Count

0

Excel Workbook BIFF Info VI=0x10 VN=0x506 Build=28109 Year=1996

Excel Workbook BIFF Version 7

Excel Workbook Write Protected false

File Accessed 2018-08-10T01:39:18.000Z File Changed 2018-06-08T01:59:21.000Z File Created 2018-02-28T02:48:42.000Z File Modified 2018-06-04T00:50:11.000Z Hyperlinks Changed false

Last Author Microsoft Office User Last Printed 2017-12-20T05:46:01.901Z Last Saved 2018-06-04T00:50:11.764Z Links Dirty false Name ECM Daroobalgie Quote Sth Bound.xls Original MD5 Digest 3f2fef44ae619afa5576d9dfbe758cc6

Scale Crop false Shared Document false Title Price Quote Version 1.0.1

E18-0736-AS-7-1-PR0004

Volume 16.2 31

Page 32: Maintenance Works MMaintenance Works Maintenance Works

Euro Civil & Maintenance Pty Ltd QuoteQuality is Our Goal

Date

PO #

Quote #

Customer ID

ABN: 26 604 934 698

Subtotal $ 218,750.00

Discount

Sales Tax Rate

Sales Tax

Total inc GST $ 240,625.00

BSB: 112879 Account Number : 6 088

Travel, labor hire, accommodation, fuel and expenses

Supply approx 20 cubic meters of aggregate to each Nth& Sth bound concrete pads = total of 40 cubes

Engage surveyor to ensure concreting together with weighbridge meet the Cat 1 requirements

Excavate 100m trench to depth of 600mm

Install 2 x stop signs with post before weighbridge

Travel, labor hire, accommodation, fuel and expenses

1- Installation of toilet cubicle/meeting room and civil works

2- Installation concrete pads for weighbridge at Daroobalgie Sth

Supply concrete and finish footpath to enter cubicleSupply truck & Dog to remove unwanted materials

Supply re-enforced steel mesh and rio bars times two layers to Sth bound weighbridge sites

Excavate 25m trench and hole for installation of septic tank in ground

Supply 1x 1100 L pump station

Supply 100m of 1 inch copper pipe

Supply 100mm sewerage pipes for installation from cubicle to septic tank & overflow

Excavate and formwork for footpath

Finish concrete and screed to RMS requirements for weighing

Supply and install electric water pump to cubicle

Supply and install 3.5 kw air-conditioning split system as requested to toilet/meeting room

Supply truck & Dog to remove unwanted materials

Hiring of 80 meters of water filled barriers to block entry to site Sth bound

Line Total

Hire 5 tone Excavator with auger and rock breaker Auger of piers and trenching of footings for new location of site toilet / change room

Special Notes and Instructions

Hiring of crane to install cubicle over new footing and anchored down.

Plumb water pipe from water meter to cubicle

2- Installation concrete pads for weighbridge at Daroobalgie SthABN: 76 236 371 088

110 George St, Parramatta NSW 2150

Carry out utility surveys and DBYD

Should you have any enquiries concerning this quote, please contact Barry Haden on 7 738

Above information is not an invoice and only an estimate of services/goods described above.

10.00%

Supply Galvanized steel chains and install in concreted piers for anchorage of cubicle

Payment will be collected in prior to provision of services/goods described in this quote.

1- Installation of toilet cubicle/meeting room and civil works

Tel: 7 738 Fax: E-mail: info@

(02) 8849 2633

Thank you for your business!

Donaldson St,

Supply 90mm storm water piping and plumb up from cubicle to tank

Signature

Supply 1 x 3500L Bio Septic tank

February 28, 2018

ECMQ00303

RMS

Roads and Maritime Services

Attention: Alexandre Dubois

Customer: Quote/Project Description

The works Quote involved the following : Daroobalgie

Supply Aggregate concrete for piers and footings

Supply pf 10,000L Collection Well

Print Name Date

Trench and excavate from septic tank 25m for installation of overflow retention pit

Please confirm your acceptance of this quote by signing this document

Once signed, please Fax, mail or e-mail it to the provided address.

Hiring of 120 meters of temporary fencing for excavated areas around the toilet / change room and concreting lead up pavement

Excavation of 15 meters of flexible pavement to a depth of 350mm at Sth BoundFormwork13m long by 6m wide to Nth & Sth Bound for concrete pads

Line Marking the perimeter of the newly installed concrete to match current weighbridge line markingPaint 5x5 meters stop sign at the Sth bound sites prior to weighbridge

Excavate level & compact blinding pad for solid base of rainwater tank

Hire truck with Hiab (crane) for transportation of cubicle from Westmead NSW to Daroobalgie HVIS

Supply sweeper to clean site and prep for line marking

Supply 9 cubic meter skip bin for removal of rubbish

Carry out utility surveys and DBYD

E18-0736-AS-7-1-PR0004

Volume 16.2 32

Page 33: Maintenance Works MMaintenance Works Maintenance Works

Nuix-defined Metadata

File Size 141312 File Type application/vnd.ms-excel GUID 4806b4bb-5fb0-4bf5-8b36-16b3bf9ee09a Item Date 2018-02-28T16:02:54.000+11:00 MD5 Digest 203833a5e60362f6d2ad914b1be6fdef

Path Name /E18-0736-AS-7-1-PR-0072/E18-0736-AS-7-1-PR-0072.E01/[Unnamed Disk Image]/Lexar/[File System Root]/blue usb/new Quotes

Shannon Entropy 6.534615812908199 User-defined Evidence Metadata

Property Source E18-0736-AS-7-1-PR-0072 Properties

Application Version 983040

AppName Microsoft Macintosh Excel Author Euro Maintenance and Civil CLSID {00020820-0000-0000-C000-000000000046} Company Euro Maintenance and Civil Contains Comments false

Copyright © 2013 Spreadsheet123 LTD Created 2009-07-28T19:11:35.000Z DocSecurity 0 Excel Freeze Panes false Excel Hidden Columns true

Excel Hidden Rows true Excel Hidden Sheets false

Excel Hidden Sheets Count 0

Excel Hidden Workbook false

Excel Pivot Tables false Excel Print Areas true Excel Protected Sheets false

Excel Very Hidden Sheets false

E18-0736-AS-7-1-PR0004

Volume 16.2 33

Page 34: Maintenance Works MMaintenance Works Maintenance Works

Excel Very Hidden Sheets Count 0

Excel Workbook BIFF Info VI=0x10 VN=0x506 Build=28109 Year=1996

Excel Workbook BIFF Version 7

Excel Workbook Write Protected false

FAT Directory Index 11

FAT Short File Name ECMDAR~1.XLS

File Accessed 2019-11-27T00:00:00.000+11:00 File Created 2018-02-28T22:52:09.530+11:00 File Modified 2018-02-28T16:02:54.000+11:00 File Offset 2178408448 File Start Cluster 66362 File Start Sector 4254704 Hyperlinks Changed false

Last Author Microsoft Office User Last Printed 2017-12-20T05:46:01.901Z Last Saved 2018-02-28T05:02:54.878Z Links Dirty false MS-DOS Archive true MS-DOS Hidden false MS-DOS Read-only false

MS-DOS System false Name ECM Daroobalgie Quote Sth Bound.xls Physical Start Sector 4263232

Scale Crop false Shared Document false Title Price Quote Version 1.0.1

E18-0736-AS-7-1-PR0004

Volume 16.2 34

Page 35: Maintenance Works MMaintenance Works Maintenance Works

Euro Civil & Maintenance Pty Ltd QuoteQuality is Our Goal

Date

PO #

Quote #

Customer ID

ABN: 26 604 934 698

Subtotal $ 218,750.00

Discount

Sales Tax Rate

Sales Tax

Total inc GST $ 240,625.00

BSB: 112879 Account Number : 6 088

Hiring of 120 meters of temporary fencing for excavated areas around the toilet / change room and concreting lead up pavement

Excavation of 15 meters of flexible pavement to a depth of 350mm at Sth BoundFormwork13m long by 6m wide to Nth & Sth Bound for concrete pads

Line Marking the perimeter of the newly installed concrete to match current weighbridge line markingPaint 5x5 meters stop sign at the Sth bound sites prior to weighbridge

Excavate level & compact blinding pad for solid base of rainwater tank

Hire truck with Hiab (crane) for transportation of cubicle from Westmead NSW to Daroobalgie HVIS

Supply sweeper to clean site and prep for line marking

Supply 9 cubic meter skip bin for removal of rubbish

Carry out utility surveys and DBYD

Print Name Date

Trench and excavate from septic tank 25m for installation of overflow retention pit

Please confirm your acceptance of this quote by signing this document

Once signed, please Fax, mail or e-mail it to the provided address.

Supply Aggregate concrete for piers and footings

Supply pf 10,000L Collection Well

February 28, 2018

ECMQ00303

RMS

Roads and Maritime Services

Attention: Alexandre Dubois

Customer: Quote/Project Description

The works Quote involved the following : Daroobalgie

Payment will be collected in prior to provision of services/goods described in this quote.

1- Installation of toilet cubicle/meeting room and civil works

Tel: 7 738 Fax: E-mail: info@

(02) 8849 2633

Thank you for your business!

Donaldson St,

Supply 90mm storm water piping and plumb up from cubicle to tank

Signature

Supply 1 x 3500L Bio Septic tank

Carry out utility surveys and DBYD

Should you have any enquiries concerning this quote, please contact Barry Haden on 7 738

Above information is not an invoice and only an estimate of services/goods described above.

10.00%

Supply Galvanized steel chains and install in concreted piers for anchorage of cubicle

2- Installation concrete pads for weighbridge at Daroobalgie SthABN: 76 236 371 088

110 George St, Parramatta NSW 2150

Special Notes and Instructions

Hiring of crane to install cubicle over new footing and anchored down.

Plumb water pipe from water meter to cubicle Supply and install 3.5 kw air-conditioning split system as requested to toilet/meeting room

Supply truck & Dog to remove unwanted materials

Hiring of 80 meters of water filled barriers to block entry to site Sth bound

Line Total

Hire 5 tone Excavator with auger and rock breaker Auger of piers and trenching of footings for new location of site toilet / change room

Supply 100mm sewerage pipes for installation from cubicle to septic tank & overflow

Excavate and formwork for footpath

Finish concrete and screed to RMS requirements for weighing

Supply and install electric water pump to cubicle

Excavate 25m trench and hole for installation of septic tank in ground

Supply 1x 1100 L pump station

Supply 100m of 1 inch copper pipe

Supply re-enforced steel mesh and rio bars times two layers to Sth bound weighbridge sites

1- Installation of toilet cubicle/meeting room and civil works

2- Installation concrete pads for weighbridge at Daroobalgie Sth

Supply concrete and finish footpath to enter cubicleSupply truck & Dog to remove unwanted materials

Travel, labor hire, accommodation, fuel and expenses

Supply approx 20 cubic meters of aggregate to each Nth& Sth bound concrete pads = total of 40 cubes

Engage surveyor to ensure concreting together with weighbridge meet the Cat 1 requirements

Excavate 100m trench to depth of 600mm

Install 2 x stop signs with post before weighbridge

Travel, labor hire, accommodation, fuel and expenses

E18-0736-AS-7-1-PR0004

Volume 16.2 35

Page 36: Maintenance Works MMaintenance Works Maintenance Works

Nuix-defined Metadata

File Size 37271 File Type application/pdf GUID f52ab3f6-825b-4232-8432-1157849bc5bd Item Date 2018-03-01T09:40:00.000+11:00 MD5 Digest c5a98543168078939ccc6687d58e9de1

Path Name /E18-0736-AS-7-9-PR-0022/E18-0736-AS-7-9-PR-0022.E01/[Unnamed Disk Image]/[Unnamed Partition]/[File System Root]

Shannon Entropy 7.876113750069638 User-defined Evidence Metadata

Property Source E18-0736-AS-7-9-PR-0022 Properties

Application Created 2018-02-28T22:40:01.000Z Application Modified 2018-02-28T22:40:01.000Z FAT Directory Index 91 FAT Short File Name ECMDAR~1.PDF File Accessed 2019-11-27T00:00:00.000+11:00 File Created 2018-03-01T09:40:01.090+11:00 File Modified 2018-03-01T09:40:00.000+11:00 File Offset 21102592 File Start Cluster 823 File Start Sector 41216 MS-DOS Archive true MS-DOS Hidden false MS-DOS Read-only false MS-DOS System false Name ECM Daroobalgie Quote Sth Bound.pdf Page Count 1 PDF AAPL:Keywords [] PDF Certification Level Not Certified

PDF Contains Annotations false

PDF Contains Comments false

PDF Creator Excel PDF Encryption Level None PDF Images JPEG 1

E18-0736-AS-7-1-PR0004

Volume 16.2 36

Page 37: Maintenance Works MMaintenance Works Maintenance Works

PDF Javascript Present false

PDF Metadata Encrypted false

PDF Portfolio false PDF Producer Mac OS X 10.12.6 Quartz PDFContext PDF Version 3 Physical Start Sector 41248 Title ECM Daroobalgie Quote Sth Bound

E18-0736-AS-7-1-PR0004

Volume 16.2 37

Page 38: Maintenance Works MMaintenance Works Maintenance Works

ECM Quote Daroobalgie Sth boundECM Quote Daroobalgie Sth boundFrom:From: info@To:To: DUBOIS Alexandre <[email protected]>Date:Date: Thu, 01 Mar 2018 09:43:00 +1100Attachments:Attachments: ECM Daroobalgie Quote Sth Bound.pdf (37.27 kB)

Hi Alexandre

Please find attached quote for daroobalgie HVIS sth bound Quote

Kind Regards,

Barry HadenDirector

Donaldson St

E: info@M: +61 7 738

This email is confidential and intended solely for the use of the individual to whom it is addressed.Any views oropinions presented are solelythose of the authorand do not necessarily represent those of ECM. if you are notthe intended recipient, please be advised that forwarding, printing or copying of this emailis strictly prohibited.if you have recieved this email in error please notify our admin on +61 7 738

E18-0736-AS-7-1-PR0004

Volume 16.2 38

Page 39: Maintenance Works MMaintenance Works Maintenance Works

Euro Civil & Maintenance Pty Ltd QuoteQuality is Our Goal

Date

PO #

Quote #

Customer ID

ABN: 26 604 934 698

Subtotal $ 218,750.00

Discount

Sales Tax Rate

Sales Tax

Total inc GST $ 240,625.00

BSB: 112879 Account Number : 6 088

Hiring of 120 meters of temporary fencing for excavated areas around the toilet / change room and concreting lead up pavement

Excavation of 15 meters of flexible pavement to a depth of 350mm at Sth BoundFormwork13m long by 6m wide to Nth & Sth Bound for concrete pads

Line Marking the perimeter of the newly installed concrete to match current weighbridge line markingPaint 5x5 meters stop sign at the Sth bound sites prior to weighbridge

Excavate level & compact blinding pad for solid base of rainwater tank

Hire truck with Hiab (crane) for transportation of cubicle from Westmead NSW to Daroobalgie HVIS

Supply sweeper to clean site and prep for line marking

Supply 9 cubic meter skip bin for removal of rubbish

Carry out utility surveys and DBYD

Print Name Date

Trench and excavate from septic tank 25m for installation of overflow retention pit

Please confirm your acceptance of this quote by signing this document

Once signed, please Fax, mail or e-mail it to the provided address.

Supply Aggregate concrete for piers and footings

Supply pf 10,000L Collection Well

February 28, 2018

ECMQ00303

RMS

Roads and Maritime Services

Attention: Alexandre Dubois

Customer: Quote/Project Description

The works Quote involved the following : Daroobalgie

Payment will be collected in prior to provision of services/goods described in this quote.

1- Installation of toilet cubicle/meeting room and civil works

Tel: 7 738 Fax: E-mail: info@

(02) 8849 2633

Thank you for your business!

Donaldson St,

Supply 90mm storm water piping and plumb up from cubicle to tank

Signature

Supply 1 x 3500L Bio Septic tank

Carry out utility surveys and DBYD

Should you have any enquiries concerning this quote, please contact Barry Haden on 7 738

Above information is not an invoice and only an estimate of services/goods described above.

10.00%

Supply Galvanized steel chains and install in concreted piers for anchorage of cubicle

2- Installation concrete pads for weighbridge at Daroobalgie SthABN: 76 236 371 088

110 George St, Parramatta NSW 2150

Special Notes and Instructions

Hiring of crane to install cubicle over new footing and anchored down.

Plumb water pipe from water meter to cubicle Supply and install 3.5 kw air-conditioning split system as requested to toilet/meeting room

Supply truck & Dog to remove unwanted materials

Hiring of 80 meters of water filled barriers to block entry to site Sth bound

Line Total

Hire 5 tone Excavator with auger and rock breaker Auger of piers and trenching of footings for new location of site toilet / change room

Supply 100mm sewerage pipes for installation from cubicle to septic tank & overflow

Excavate and formwork for footpath

Finish concrete and screed to RMS requirements for weighing

Supply and install electric water pump to cubicle

Excavate 25m trench and hole for installation of septic tank in ground

Supply 1x 1100 L pump station

Supply 100m of 1 inch copper pipe

Supply re-enforced steel mesh and rio bars times two layers to Sth bound weighbridge sites

1- Installation of toilet cubicle/meeting room and civil works

2- Installation concrete pads for weighbridge at Daroobalgie Sth

Supply concrete and finish footpath to enter cubicleSupply truck & Dog to remove unwanted materials

Travel, labor hire, accommodation, fuel and expenses

Supply approx 20 cubic meters of aggregate to each Nth& Sth bound concrete pads = total of 40 cubes

Engage surveyor to ensure concreting together with weighbridge meet the Cat 1 requirements

Excavate 100m trench to depth of 600mm

Install 2 x stop signs with post before weighbridge

Travel, labor hire, accommodation, fuel and expenses

E18-0736-AS-7-1-PR0004

Volume 16.2 39

Page 40: Maintenance Works MMaintenance Works Maintenance Works

QuoteDATE March 1, 2018

Luxford Road Quote # 173

ABN: 37 607 800 895 Phone: 2 468

Bill To:Att: Alex DuboisRoads and Maritime Services 110 George Street Parramatta NSW 215002 8837 0636

Comments or special instructions:

Description AMOUNT

TOTAL Ex GST 227,550.00$

TOTAL Inc. GST 250,305.00$ If you have any questions concerning this quotation, KrisTui, 2 468, E-mail: admin

This Quote is for Daroobalgie Heavy Vehichle Inspection Bay

OZ CORP CIVIL

Scope of works as per RFQ sent on 26/2/2018

Accomodation

Daroobalgie South Bound HVIS

Travel Allowances + incidentals

THANK YOU FOR YOUR BUSINESS!

E18-0736-AS-7-1-PR0004

Volume 16.2 40

Page 41: Maintenance Works MMaintenance Works Maintenance Works

Nuix-defined Metadata

File Size 344576 File Type application/vnd.ms-excel GUID 5c9a8bfd-9992-4f3e-82f1-554e218e93cd Item Date 2018-02-28T13:53:36.000+11:00 MD5 Digest c2053f9bbba7cd2c1576670c91b00f63

Path Name /E18-0736-AS-7-9-PR-0021/E18-0736-AS-7-9-PR-0021.E01/[Unnamed Disk Image]/STORE N GO/[File System Root]/.Trashes/501/ozcorp items(

Shannon Entropy 7.882230462170328 User-defined Evidence Metadata

Property Source E18-0736-AS-7-9-PR-0021 Properties

APAuthor 191 APEditor 92 Application Version 983040

Applications 79;#Template 12;#184;#Office 2000;#182;#Office XP;#23;#Microsoft Office Excel 2007;#22;#Excel 2003

AppName Microsoft Macintosh Excel AppVer

APTrustLevel 1.00000000000000 AssetId TS006207086 AssetType TP Author Microsoft Corporation AuthoringAssetId TP006207086 BugNumber GTM: 2/13. GTM Batch 1. 498563 CLSID {00020820-0000-0000-C000-000000000046} Company Microsoft Corporation Contains Comments false

Content Type OOFile

ContentTypeId 0x0101006025706CF4CD034688BEBAE97A2E701D020200C3831ACA17D8814887A164412888521E

Created 2000-07-27T22:24:14.000Z display_urn:schemas-microsoft-com:office:office#APAuthor

REDMOND\cynvey

display_urn:schemas-microsoft- REDMOND\v-luannv

E18-0736-AS-7-1-PR0004

Volume 16.2 41

Page 42: Maintenance Works MMaintenance Works Maintenance Works

com:office:office#APEditor DocSecurity 0 Excel Freeze Panes false Excel Hidden Columns false

Excel Hidden Rows false

Excel Hidden Sheets false

Excel Hidden Sheets Count 0

Excel Hidden Workbook false

Excel Pivot Tables false Excel Print Areas false Excel Protected Sheets false

Excel Very Hidden Sheets false

Excel Very Hidden Sheets Count 0

Excel Workbook BIFF Info VI=0x10 VN=0x506 Build=28109 Year=1996

Excel Workbook BIFF Version 7

Excel Workbook Write Protected false

FAT Directory Index 277

FAT Short File Name ?ZCO~280.XLS

File Accessed 2019-01-14T00:00:00.000+11:00 File Created 2018-02-28T13:53:37.310+11:00 File Modified 2018-02-28T13:53:36.000+11:00 File Offset 36110336 File Start Cluster 1691 File Start Sector 70528 Hyperlinks Changed false

IsDeleted 0 IsSearchable 0 Last Author Microsoft Office User Last Printed 2017-12-20T05:47:48.558Z

E18-0736-AS-7-1-PR0004

Volume 16.2 42

Page 43: Maintenance Works MMaintenance Works Maintenance Works

Last Saved 2018-02-28T02:53:36.585Z Links Dirty false Markets en-us Milestone Continuous MS-DOS Archive true MS-DOS Hidden false MS-DOS Read-only false

MS-DOS System false Name Ozcorp Daroobalgie South bound HVIS.xls NumericAssetId

NumericId -1.00000000000000 OpenTemplate 1 Physical Start Sector 78592

PrimaryImageGen 1 Provider EY006220130 PublishStatusLookup 253516

PublishTargets OfficeOnline Scale Crop false Shared Document false ShowIn Show everywhere SourceTitle Price quotation without tax TemplateStatus Complete Title Price quotation without tax TPApplication Excel TPAppVersion 11 TPClientViewer Microsoft Office Excel TPCommandLine {XL} /t {FilePath} TPComponent EXCELFiles TPFriendlyName Price quotation without tax TPInstallLocation {My Templates} TPLaunchHelpLink

TPLaunchHelpLinkType Template

TPNamespace EXCEL TrustLevel Microsoft Managed Content UALocRecommendation Localize

UANotes 389015P. LEGACY FROM TOW; June 2003 retrofit. 447517P

E18-0736-AS-7-1-PR0004

Volume 16.2 43

Page 44: Maintenance Works MMaintenance Works Maintenance Works

E18-0736-AS-7-1-PR0004

Volume 16.2 44

Page 45: Maintenance Works MMaintenance Works Maintenance Works

QuoteDATE March 1, 2018

Luxford Road Quote # 173

ABN: 37 607 800 895 Phone: 2 468

Bill To:Att: Alex DuboisRoads and Maritime Services 110 George Street Parramatta NSW 215002 8837 0636

Comments or special instructions:

Description AMOUNT

TOTAL Ex GST 227,550.00$

TOTAL Inc. GST 250,305.00$ If you have any questions concerning this quotation, KrisTui, 2 468, E-mail: admin@

This Quote is for Daroobalgie Heavy Vehichle Inspection Bay

OZ CORP CIVIL

Scope of works as per RFQ sent on 26/2/2018

Accomodation

Daroobalgie South Bound HVIS

Travel Allowances + incidentals

THANK YOU FOR YOUR BUSINESS!

E18-0736-AS-7-1-PR0004

Volume 16.2 45

Page 46: Maintenance Works MMaintenance Works Maintenance Works

Nuix-defined Metadata

File Size 344576 File Type application/vnd.ms-excel GUID ff3bc1bb-4992-4b49-a25e-22cfc9efc0ee Item Date 2018-02-28T14:04:38.000+11:00 MD5 Digest 511ec65a09287c6953375b037cc8a3ab

Path Name /E18-0736-AS-7-1-PR-0072/E18-0736-AS-7-1-PR-0072.E01/[Unnamed Disk Image]/Lexar/[File System Root]/blue usb/new Quotes

Shannon Entropy 7.882187833191645 User-defined Evidence Metadata

Property Source E18-0736-AS-7-1-PR-0072 Properties

APAuthor 191 APEditor 92 Application Version 983040

Applications 79;#Template 12;#184;#Office 2000;#182;#Office XP;#23;#Microsoft Office Excel 2007;#22;#Excel 2003

AppName Microsoft Macintosh Excel AppVer

APTrustLevel 1.00000000000000 AssetId TS006207086 AssetType TP Author Microsoft Corporation AuthoringAssetId TP006207086 BugNumber GTM: 2/13. GTM Batch 1. 498563 CLSID {00020820-0000-0000-C000-000000000046} Company Microsoft Corporation Contains Comments false

Content Type OOFile

ContentTypeId 0x0101006025706CF4CD034688BEBAE97A2E701D020200C3831ACA17D8814887A164412888521E

Created 2000-07-27T22:24:14.000Z display_urn:schemas-microsoft-com:office:office#APAuthor

REDMOND\cynvey

display_urn:schemas-microsoft- REDMOND\v-luannv

E18-0736-AS-7-1-PR0004

Volume 16.2 46

Page 47: Maintenance Works MMaintenance Works Maintenance Works

com:office:office#APEditor DocSecurity 0 Excel Freeze Panes false Excel Hidden Columns false

Excel Hidden Rows false

Excel Hidden Sheets false

Excel Hidden Sheets Count 0

Excel Hidden Workbook false

Excel Pivot Tables false Excel Print Areas false Excel Protected Sheets false

Excel Very Hidden Sheets false

Excel Very Hidden Sheets Count 0

Excel Workbook BIFF Info VI=0x10 VN=0x506 Build=28109 Year=1996

Excel Workbook BIFF Version 7

Excel Workbook Write Protected false

FAT Directory Index 27

FAT Short File Name OZCORP~3.XLS

File Accessed 2019-11-27T00:00:00.000+11:00 File Created 2018-02-28T22:52:09.690+11:00 File Modified 2018-02-28T14:04:38.000+11:00 File Offset 2178867200 File Start Cluster 66376 File Start Sector 4255600 Hyperlinks Changed false

IsDeleted 0 IsSearchable 0 Last Author Microsoft Office User Last Printed 2017-12-20T05:47:48.558Z

E18-0736-AS-7-1-PR0004

Volume 16.2 47

Page 48: Maintenance Works MMaintenance Works Maintenance Works

Last Saved 2018-02-28T03:04:39.165Z Links Dirty false Markets en-us Milestone Continuous MS-DOS Archive true MS-DOS Hidden false MS-DOS Read-only false

MS-DOS System false Name Ozcorp Daroobalgie South bound HVIS.xls NumericAssetId

NumericId -1.00000000000000 OpenTemplate 1 Physical Start Sector 4264128

PrimaryImageGen 1 Provider EY006220130 PublishStatusLookup 253516

PublishTargets OfficeOnline Scale Crop false Shared Document false ShowIn Show everywhere SourceTitle Price quotation without tax TemplateStatus Complete Title Price quotation without tax TPApplication Excel TPAppVersion 11 TPClientViewer Microsoft Office Excel TPCommandLine {XL} /t {FilePath} TPComponent EXCELFiles TPFriendlyName Price quotation without tax TPInstallLocation {My Templates} TPLaunchHelpLink

TPLaunchHelpLinkType Template

TPNamespace EXCEL TrustLevel Microsoft Managed Content UALocRecommendation Localize

UANotes 389015P. LEGACY FROM TOW; June 2003 retrofit. 447517P

E18-0736-AS-7-1-PR0004

Volume 16.2 48

Page 49: Maintenance Works MMaintenance Works Maintenance Works

E18-0736-AS-7-1-PR0004

Volume 16.2 49

Page 50: Maintenance Works MMaintenance Works Maintenance Works

QuoteDATE March 1, 2018

Luxford Road Quote # 174

ABN: 37 607 800 895 Phone: 2 468

Bill To:Att: Alex DuboisRoads and Maritime Services 110 George Street Parramatta NSW 215002 8837 0636

Comments or special instructions:

Description AMOUNT

TOTAL Ex GST 225,000.00$

TOTAL Inc. GST 247,500.00$ If you have any questions concerning this quotation, KrisTui, 2 468, E-mail: admin@

Travel Allowances + incidentals

- Excavation and dumping of 30 tonnes of flexible pavement to a depth of 350mm Daroobalgie Sthbound screening lane

- Site establishment

- Excavation for council water supply

Installation of septic pump tanks as per attached designs and specification at Daroobalgie Sth boundsite

OZCORP CIVIL

- Line marking of areas around newly installed concrete pad in addition to installation a 5mx5mthermal plastic stop sign on ground prior to weighbridge

Scope of works as per RFQ sent on 26/2/2018

Cleaning of site and make good

- Transportation of Amenities to site

Accommodation

Daroobalgie South Bound HVIS

- Provision of barricading site with temporary fencing and warning signage

- Provision of utility surveys

- Provision of plant equipment which includes, Excavator, truck with Hiab, sweeper and bobcat.

- Installation of amenities block, exact location to be finalized on site by RMS, Indicative location oftanks and blocks shown on attached design

This Quote is for Daroobalgie Heavy Vehicle Inspection Bay

- Formwork, provisions of steel and concreting 13m long by 6m wide to a depth of 250mm

- Connection of water supply by licensed plumber

- Dumping of unwanted materials

THANK YOU FOR YOUR BUSINESS!

E18-0736-AS-7-1-PR0004

Volume 16.2 50

Page 51: Maintenance Works MMaintenance Works Maintenance Works

Nuix-defined Metadata

File Size 25024 File Type application/pdf GUID 2d5fe812-2318-441a-b6de-c975ebdcc86b Item Date 2018-03-01T12:07:44.000+11:00 MD5 Digest a8a718f742bf9457600f5389c9ff59b9

Path Name /E18-0736-AS-7-9-PR-0022/E18-0736-AS-7-9-PR-0022.E01/[Unnamed Disk Image]/[Unnamed Partition]/[File System Root]/?RASHE~1.J2Z/?01

Shannon Entropy 7.745450740318571 User-defined Evidence Metadata

Property Source E18-0736-AS-7-9-PR-0022 Properties

Application Created 2018-03-01T01:07:45.000Z Application Modified 2018-03-01T01:07:45.000Z FAT Directory Index 209 FAT Short File Name ?ZCO~212.PDF File Accessed 2019-01-09T00:00:00.000+11:00 File Created 2018-03-01T12:07:45.710+11:00 File Modified 2018-03-01T12:07:44.000+11:00 File Offset 26771456 File Start Cluster 1169 File Start Sector 52288 MS-DOS Archive true MS-DOS Hidden false MS-DOS Read-only false MS-DOS System false Name Ozcorp Daroobalgie South bound HVIS.pdf Page Count 1 PDF AAPL:Keywords []

PDF Certification Level Not Certified

PDF Contains Annotations false

PDF Contains Comments false

PDF Creator Excel PDF Encryption Level None

E18-0736-AS-7-1-PR0004

Volume 16.2 51

Page 52: Maintenance Works MMaintenance Works Maintenance Works

PDF Javascript Present false

PDF Metadata Encrypted false

PDF Portfolio false PDF Producer Mac OS X 10.11.6 Quartz PDFContext PDF Version 3 Physical Start Sector 52320 Title Ozcorp Daroobalgie South bound HVIS

E18-0736-AS-7-1-PR0004

Volume 16.2 52

Page 53: Maintenance Works MMaintenance Works Maintenance Works

Ozcorp Civil Daroobalgie Sth Bound QuoteOzcorp Civil Daroobalgie Sth Bound QuoteFrom:From: oz corp civil <admin@ >To:To: DUBOIS Alexandre <[email protected]>Date:Date: Thu, 01 Mar 2018 12:13:17 +1100Attachments:Attachments: Ozcorp Daroobalgie South bound HVIS.pdf (25.02 kB)

Hi Alexandre

Please find ozcorp civil Quote for Daroobalgie Sth Bound HVIB

Regards,

Kris TuiDirectorMOB: 5 965EMAIL: Admin@

IMPORTANT: The contents of this email and any attachments are confidential.They are intended for the namedrecipient(s) only.If you have received this email by mistake, please notify the sender immediately and do not thecontents to anyone or make copies thereof.

E18-0736-AS-7-1-PR0004

Volume 16.2 53

Page 54: Maintenance Works MMaintenance Works Maintenance Works

QuoteDATE March 1, 2018

Luxford Road Quote # 174

ABN: 37 607 800 895 Phone: 2 468

Bill To:Att: Alex DuboisRoads and Maritime Services 110 George Street Parramatta NSW 215002 8837 0636

Comments or special instructions:

Description AMOUNT

TOTAL Ex GST 225,000.00$

TOTAL Inc. GST 247,500.00$ If you have any questions concerning this quotation, KrisTui, 2 468, E-mail: admin@

Travel Allowances + incidentals

- Excavation and dumping of 30 tonnes of flexible pavement to a depth of 350mm Daroobalgie Sth bound screening lane

- Site establishment

- Excavation for council water supply

Installation of septic pump tanks as per attached designs and specification at Daroobalgie Sth bound site

OZCORP CIVIL

- Line marking of areas around newly installed concrete pad in addition to installation a 5mx5m thermal plastic stop sign on ground prior to weighbridge

Scope of works as per RFQ sent on 26/2/2018

Cleaning of site and make good

- Transportation of Amenities to site

Accommodation

Daroobalgie South Bound HVIS

- Provision of barricading site with temporary fencing and warning signage

- Provision of utility surveys

- Provision of plant equipment which includes, Excavator, truck with Hiab, sweeper and bobcat.

- Installation of amenities block, exact location to be finalized on site by RMS, Indicative location of tanks and blocks shown on attached design

This Quote is for Daroobalgie Heavy Vehicle Inspection Bay

- Formwork, provisions of steel and concreting 13m long by 6m wide to a depth of 250mm

- Connection of water supply by licensed plumber

- Dumping of unwanted materials

THANK YOU FOR YOUR BUSINESS!

E18-0736-AS-7-1-PR0004

Volume 16.2 54

Page 55: Maintenance Works MMaintenance Works Maintenance Works

Date: March 2, 2018Quote #: Q305

ABN: 78 159 482 210

To:

Mob: 6 298 Ph: 8837 0636 Fax : 8849 2522

ABN 76 236 371 088

Job Payment Terms

Qty Unit Unit Price Line Total

EA

Plant Equipment

Daroobalgie Inspection station Sth bound

Project manager: A. Dubois

EstablishmentDaroobalgie

SalespersonChahid Chahine

Email: [email protected]

Elouera Crescent

Road and Maritime Services

Parramatta NSW 215099 Phillip St

Amenities Installation

Hiring of Crane for the delivery of Septic tank within the excavated area

Truck and Dog for the removal of unwanted materials

Hiring of Bobcat with sweeper to clean site once septic and collection well have been installed

CBF PROJECTS PTY LTD Quote

Description

Telephone: (02) 8462Mobile: 4 333

Concrete

Supply and lay concrete for base of septic tank

Supply water filled barriers to ensure Nth and Sth bound sites are closed off for the entire work period, approx 14 days has been provisioned

Supply approx 80 cubes of concrete for the weighbridge pads MaterialsProcure and install steel re-enforced bars to concrete pads Supply Formwork for concrete weighbridge pad and concrete footpath to amenities building

Temporary fence all excavated areas - allowance has been made for approx 150m

supply thermal plastic paint and install 5 x 5 meter stop signs at both Nth and Sth bound sites prior to weighbridgeSupply 2 x stop signs with post and install

E18-0736-AS-7-1-PR0004

Volume 16.2 55

Page 56: Maintenance Works MMaintenance Works Maintenance Works

Subtotal 229,500.00$ G.S.T 22,950.00$

Total 252,450.00$

Tip fees

pour and finish concrete pad to Sth Weighbridge

Install 1100L Pump station as per RFQ

Install Formwork and concrete footpaths to enter amenities

Remove all unwanted materials and dispose of at tip

Use bobcat with sweeper to clean site

Trench for council water supply and connect to

Install 2 x stop signs with post and install

Line marking to new concrete works

Install thermal plastic paint and install 5 x 5 meter stop signs to Sth bound sites prior to weighbridge

Excavate and auger blinding pad and footings for installation of amenities

Travel fees and accommodation Allowances:

Install Formwork and install concrete mesh for weighbridge pads

Installation and civil workSupply of plumbing materials

Install 10,000L collection well as per RFQ

DBYD and utility survey checks to be carried out

pour and finish concrete for footpath

Install plumbing from main to amenityInstall 3550L septic tank are per RFQ

E18-0736-AS-7-1-PR0004

Volume 16.2 56

Page 57: Maintenance Works MMaintenance Works Maintenance Works

Nuix-defined Metadata

File Size 35328 File Type application/vnd.ms-excel GUID 07677973-04dc-4078-a104-21367703067c Item Date 2018-02-28T11:25:40.000+11:00 MD5 Digest b6dde52553993d0fb963598fb364d1e0

Path Name /E18-0736-AS-7-9-PR-0024/E18-0736-AS-7-9-PR-0024.E01/[Unnamed Disk Image]/[Unnamed Partition]/[File System Root]

Shannon Entropy 5.060899707274054 User-defined Evidence Metadata

Property Source E18-0736-AS-7-9-PR-0024 Properties

_AdHocReviewCycleID -2109409232 _AuthorEmail [email protected] _AuthorEmailDisplayName DUBOIS Alexandre _EmailSubject Armco _NewReviewCycle

_ReviewingToolsShownOnce

_TemplateID TC101514371033 Application Version 983040 AppName Microsoft Macintosh Excel Author

CLSID {00020820-0000-0000-C000-000000000046} Comments

Company Microsoft Corporation Contains Comments false Created 2006-01-23T19:37:33.000Z DocSecurity 0 Excel Freeze Panes false Excel Hidden Columns false Excel Hidden Rows false Excel Hidden Sheets false Excel Hidden Sheets Count 0 Excel Hidden Workbook false Excel Pivot Tables false Excel Print Areas true Excel Protected Sheets false Excel Very Hidden Sheets false Excel Very Hidden Sheets Count 0

E18-0736-AS-7-1-PR0004

Volume 16.2 57

Page 58: Maintenance Works MMaintenance Works Maintenance Works

Excel Workbook BIFF Info VI=0x10 VN=0x506 Build=28109 Year=1996 Excel Workbook BIFF Version 7

Excel Workbook Write Protected false

FAT Directory Index 187 File Accessed 2018-02-28T00:00:00.000+11:00 File Created 2018-02-18T13:07:10.220+11:00 File Modified 2018-02-28T11:25:40.000+11:00 File Offset 24379392 File Start Cluster 1023 File Start Sector 47616 Hyperlinks Changed false Keywords

Last Author Microsoft Office User Last Printed 2017-12-20T05:39:28.653Z Last Saved 2018-02-28T03:03:57.949Z Links Dirty false Manager

MS-DOS Archive true MS-DOS Hidden false MS-DOS Read-only false MS-DOS System false Name ?CFD3A00 Physical Start Sector 47648 Scale Crop false Shared Document false Subject

Title

E18-0736-AS-7-1-PR0004

Volume 16.2 58

Page 59: Maintenance Works MMaintenance Works Maintenance Works

Date: March 2, 2018Quote #: Q305

ABN: 78 159 482 210

To:

Mob: 6 298 Ph: 8837 0636 Fax : 8849 2522

ABN 76 236 371 088

Job Payment Terms

Qty Unit Unit Price Line Total

EA

Plant Equipment

supply thermal plastic paint and install 5 x 5 meter stop signs at both Nth and Sth bound sites prior to weighbridgeSupply 2 x stop signs with post and install

Concrete

Supply and lay concrete for base of septic tank

Supply water filled barriers to ensure Nth and Sth bound sites are closed off for the entire work period, approx 14 days has been provisioned

Supply approx 80 cubes of concrete for the weighbridge pads MaterialsProcure and install steel re-enforced bars to concrete pads Supply Formwork for concrete weighbridge pad and concrete footpath to amenities building

Temporary fence all excavated areas - allowance has been made for approx 150m

CBF PROJECTS PTY LTD Quote

Description

Telephone: 8462Mobile: 4 333

Elouera Crescent

Road and Maritime Services

Parramatta NSW 215099 Phillip St

Amenities Installation

Hiring of Crane for the delivery of Septic tank within the excavated area

Truck and Dog for the removal of unwanted materials

Hiring of Bobcat with sweeper to clean site once septic and collection well have been installed

SalespersonChahid Chahine

Email: [email protected]

Daroobalgie Inspection station Sth bound

Project manager: A. Dubois

EstablishmentDaroobalgie

E18-0736-AS-7-1-PR0004

Volume 16.2 59

Page 60: Maintenance Works MMaintenance Works Maintenance Works

Subtotal 229,500.00$ G.S.T 22,950.00$

Total 252,450.00$

Install 10,000L collection well as per RFQ

DBYD and utility survey checks to be carried out

pour and finish concrete for footpath

Install plumbing from main to amenityInstall 3550L septic tank are per RFQ

Installation and civil workSupply of plumbing materials

Install Formwork and install concrete mesh for weighbridge pads

Travel fees and accommodation Allowances:

Excavate and auger blinding pad and footings for installation of amenities

Use bobcat with sweeper to clean site

Trench for council water supply and connect to

Install 2 x stop signs with post and install

Line marking to new concrete works

Install thermal plastic paint and install 5 x 5 meter stop signs to Sth bound sites prior to weighbridge

pour and finish concrete pad to Sth Weighbridge

Install 1100L Pump station as per RFQ

Install Formwork and concrete footpaths to enter amenities

Remove all unwanted materials and dispose of at tip

Tip fees

E18-0736-AS-7-1-PR0004

Volume 16.2 60

Page 61: Maintenance Works MMaintenance Works Maintenance Works

Nuix-defined Metadata

File Size 33792 File Type application/vnd.ms-excel GUID 17348176-ad90-4658-8dc2-8c501c8c810c Item Date 2018-02-28T13:56:18.000+11:00 MD5 Digest a21a3da07bece8ce53d6a14e98f727d7

Path Name /E18-0736-AS-7-9-PR-0032-UsersFolder/E18-0736-AS-7-9-PR-0032-UsersFolder.Lx01/cbfprojectsptyltd/Documents

Shannon Entropy 4.9427967950761165 User-defined Evidence Metadata

Property Source E18-0736-AS-7-9-PR-0032 Properties

_AdHocReviewCycleID -2109409232 _AuthorEmail [email protected] _AuthorEmailDisplayName DUBOIS Alexandre _EmailSubject Armco _NewReviewCycle

_ReviewingToolsShownOnce

_TemplateID TC101514371033 Application Version 983040 AppName Microsoft Macintosh Excel Author

CLSID {00020820-0000-0000-C000-000000000046} Comments

Company Microsoft Corporation Contains Comments false Created 2006-01-23T19:37:33.000Z DocSecurity 0 Excel Freeze Panes false Excel Hidden Columns false Excel Hidden Rows false Excel Hidden Sheets false Excel Hidden Sheets Count 0 Excel Hidden Workbook false Excel Pivot Tables false Excel Print Areas true Excel Protected Sheets false Excel Very Hidden Sheets false Excel Very Hidden Sheets Count 0

Excel Workbook BIFF Info VI=0x10 VN=0x506 Build=28109 Year=1996

E18-0736-AS-7-1-PR0004

Volume 16.2 61

Page 62: Maintenance Works MMaintenance Works Maintenance Works

Excel Workbook BIFF Version 7

Excel Workbook Write Protected false

File Accessed 2018-10-25T22:38:04.000Z File Changed 2018-02-28T02:56:18.000Z File Created 2018-02-28T02:56:18.000Z File Modified 2018-02-28T02:56:18.000Z Hyperlinks Changed false Keywords

Last Author Microsoft Office User Last Printed 2017-12-20T05:39:28.653Z Last Saved 2018-02-28T02:56:18.720Z Links Dirty false Manager

Name CBF Daroobalgie Sthbound Quote.xls Original MD5 Digest a21a3da07bece8ce53d6a14e98f727d7 Scale Crop false Shared Document false Subject

Title

E18-0736-AS-7-1-PR0004

Volume 16.2 62

Page 63: Maintenance Works MMaintenance Works Maintenance Works

Date: March 2, 2018Quote #: Q305

ABN: 78 159 482 210

To:

Mob: 6 298 Ph: 8837 0636 Fax : 8849 2522

ABN 76 236 371 088

Job Payment Terms

Qty Unit Unit Price Line Total

EA

Plant Equipment

Daroobalgie Inspection station Sth bound

Project manager: A. Dubois

EstablishmentDaroobalgie

SalespersonChahid Chahine

Email: [email protected]

Elouera Crescent

Road and Maritime Services

Parramatta NSW 215099 Phillip St

Amenities Installation

Hiring of Crane for the delivery of Septic tank within the excavated area

Truck and Dog for the removal of unwanted materials

Hiring of Bobcat with sweeper to clean site once septic and collection well have been installed

CBF PROJECTS PTY LTD Quote

Description

Telephone: 8462Mobile: 4 333

Concrete

Supply and lay concrete for base of septic tank

Supply water filled barriers to ensure Nth and Sth bound sites are closed off for the entire work period, approx 14 days has been provisioned

Supply approx 80 cubes of concrete for the weighbridge pads MaterialsProcure and install steel re-enforced bars to concrete pads Supply Formwork for concrete weighbridge pad and concrete footpath to amenities building

Temporary fence all excavated areas - allowance has been made for approx 150m

supply thermal plastic paint and install 5 x 5 meter stop signs at both Nth and Sth bound sites prior to weighbridgeSupply 2 x stop signs with post and install

E18-0736-AS-7-1-PR0004

Volume 16.2 63

Page 64: Maintenance Works MMaintenance Works Maintenance Works

Subtotal 229,500.00$ G.S.T 22,950.00$

Total 252,450.00$

Tip fees

pour and finish concrete pad to Sth Weighbridge

Install 1100L Pump station as per RFQ

Install Formwork and concrete footpaths to enter amenities

Remove all unwanted materials and dispose of at tip

Use bobcat with sweeper to clean site

Trench for council water supply and connect to

Install 2 x stop signs with post and install

Line marking to new concrete works

Install thermal plastic paint and install 5 x 5 meter stop signs to Sth bound sites prior to weighbridge

Excavate and auger blinding pad and footings for installation of amenities

Travel fees and accommodation Allowances:

Install Formwork and install concrete mesh for weighbridge pads

Installation and civil workSupply of plumbing materials

Install 10,000L collection well as per RFQ

DBYD and utility survey checks to be carried out

pour and finish concrete for footpath

Install plumbing from main to amenityInstall 3550L septic tank are per RFQ

E18-0736-AS-7-1-PR0004

Volume 16.2 64

Page 65: Maintenance Works MMaintenance Works Maintenance Works

Nuix-defined Metadata

File Size 33792 File Type application/vnd.ms-excel GUID d1c31dc9-25b1-4149-a462-b017ca67b4fe Item Date 2018-02-28T14:03:56.000+11:00 MD5 Digest c788766aa4e87c7c72c5f956c8ac045b

Path Name /E18-0736-AS-7-1-PR-0072/E18-0736-AS-7-1-PR-0072.E01/[Unnamed Disk Image]/Lexar/[File System Root]/blue usb/new Quotes

Shannon Entropy 4.945017997859453 User-defined Evidence Metadata

Property Source E18-0736-AS-7-1-PR-0072 Properties

_AdHocReviewCycleID -2109409232 _AuthorEmail [email protected] _AuthorEmailDisplayName DUBOIS Alexandre _EmailSubject Armco _NewReviewCycle

_ReviewingToolsShownOnce

_TemplateID TC101514371033 Application Version 983040 AppName Microsoft Macintosh Excel Author

CLSID {00020820-0000-0000-C000-000000000046} Comments

Company Microsoft Corporation Contains Comments false Created 2006-01-23T19:37:33.000Z DocSecurity 0 Excel Freeze Panes false Excel Hidden Columns false Excel Hidden Rows false Excel Hidden Sheets false Excel Hidden Sheets Count 0 Excel Hidden Workbook false Excel Pivot Tables false Excel Print Areas true Excel Protected Sheets false Excel Very Hidden Sheets false Excel Very Hidden Sheets Count 0

E18-0736-AS-7-1-PR0004

Volume 16.2 65

Page 66: Maintenance Works MMaintenance Works Maintenance Works

Excel Workbook BIFF Info VI=0x10 VN=0x506 Build=28109 Year=1996 Excel Workbook BIFF Version 7

Excel Workbook Write Protected false

FAT Directory Index 31 FAT Short File Name CBFDAR~1.XLS File Accessed 2019-11-27T00:00:00.000+11:00 File Created 2018-02-28T22:52:09.750+11:00 File Modified 2018-02-28T14:03:56.000+11:00 File Offset 2179227648 File Start Cluster 66387 File Start Sector 4256304 Hyperlinks Changed false Keywords

Last Author Microsoft Office User Last Printed 2017-12-20T05:39:28.653Z Last Saved 2018-02-28T03:03:57.949Z Links Dirty false Manager

MS-DOS Archive true MS-DOS Hidden false MS-DOS Read-only false MS-DOS System false Name CBF Daroobalgie Sth bound Quote.xls Physical Start Sector 4264832 Scale Crop false Shared Document false Subject

Title

E18-0736-AS-7-1-PR0004

Volume 16.2 66

Page 67: Maintenance Works MMaintenance Works Maintenance Works

Date: March 1, 2018

Quote #: Q305

To:

Mob: 6 298 Ph: 8837 0636 Fax : 8849 2522

ABN 76 236 371 088

Job Payment Terms

Qty Unit Unit Price Line Total

EA

Plant Equipment

ABN: 78 159 482 210

supply thermal plastic paint and install 5 x 5 meter

stop signs at both Nth and Sth bound sites prior to

weighbridge

Materials

Procure and install steel re-enforced bars to concrete

pads

Supply Formwork for concrete weighbridge pad and

concrete footpath to amenities building

Temporary fence all excavated areas - allowance

has been made for approx 150m

Concrete

Supply and lay concrete for base of septic tank

Supply water filled barriers to ensure Nth and Sth

bound sites are closed off for the entire work period,

approx 14 days has been provisioned

Installation and civil work

Supply of plumbing materials

Supply approx 80 cubes of concrete for the

weighbridge pads

Quote

Description

Telephone: 8462

Mobile: 4 333

Supply 2 x stop signs with post and install

Elouera Crescent

Road and Maritime Services

Parramatta NSW 2150

99 Phillip St

Hiring of Bobcat with sweeper to clean site once

septic and collection well have been installed

Salesperson

Chahid Chahine

Email: [email protected]

Amenities Installation

Hiring of Crane for the delivery of Septic tank within

the excavated area

Truck and Dog for the removal of unwanted materials

Daroobalgie Inspection station Sth bound

Project manager: A. Dubois

Establishment

Daroobalgie

E18-0736-AS-7-1-PR0004

Volume 16.2 67

Page 68: Maintenance Works MMaintenance Works Maintenance Works

$222,500

Subtotal 222,500.00$

G.S.T 22,250.00$

Total 244,750.00$

Install 10,000L collection well as per RFQ

DBYD and utility survey checks to be carried out

Install plumbing from main to amenity

Install 3550L septic tank are per RFQ

Install Formwork and install concrete mesh for

weighbridge pads

pour and finish concrete for footpath

Use bobcat with sweeper to clean site

Install 2 x stop signs with post and install

Line marking to new concrete works

Install thermal plastic paint and install 5 x 5 meter stop

signs to Sth bound sites prior to weighbridge

Travel fees and accommodation Allowances:

Trench for council water supply and connect to

Excavate and auger blinding pad and footings for

installation of amenities

pour and finish concrete pad to Sth Weighbridge

Install 1100L Pump station as per RFQ

Install Formwork and concrete footpaths to enter

amenities

Remove all unwanted materials and dispose of at tip

Tip fees

E18-0736-AS-7-1-PR0004

Volume 16.2 68

Page 69: Maintenance Works MMaintenance Works Maintenance Works

Nuix-defined Metadata

File Size 62464 File Type application/vnd.ms-excel GUID a7c9b042-a878-48bd-b137-36b1521f111d Item Date 2018-03-01T10:53:16.000+11:00 MD5 Digest bde75ab00b56f64b0123499bc358a8ec

Path Name /E18-0736-AS-7-9-PR-0022/E18-0736-AS-7-9-PR-0022.E01/[Unnamed Disk Image]/[Unnamed Partition]/[File System Root]

Shannon Entropy 6.708477550114876 User-defined Evidence Metadata

Property Source E18-0736-AS-7-9-PR-0022 Properties

_AdHocReviewCycleID -2109409232 _AuthorEmail [email protected] _AuthorEmailDisplayName DUBOIS Alexandre _EmailSubject Armco _NewReviewCycle

_ReviewingToolsShownOnce

_TemplateID TC101514371033 Application Version 983040 AppName Microsoft Macintosh Excel Author

CLSID {00020820-0000-0000-C000-000000000046} Comments

Company Microsoft Corporation Contains Comments false Created 2006-01-23T19:37:33.000Z DocSecurity 0 Excel Freeze Panes false Excel Hidden Columns false Excel Hidden Rows false Excel Hidden Sheets false Excel Hidden Sheets Count 0 Excel Hidden Workbook false Excel Pivot Tables false Excel Print Areas true Excel Protected Sheets false Excel Very Hidden Sheets false Excel Very Hidden Sheets Count 0

E18-0736-AS-7-1-PR0004

Volume 16.2 69

Page 70: Maintenance Works MMaintenance Works Maintenance Works

Excel Workbook BIFF Info VI=0x10 VN=0x506 Build=28109 Year=1996 Excel Workbook BIFF Version 7

Excel Workbook Write Protected false

FAT Directory Index 26 FAT Short File Name CBFDAR~1.XLS File Accessed 2019-11-27T00:00:00.000+11:00 File Created 2018-03-01T10:53:16.140+11:00 File Modified 2018-03-01T10:53:16.000+11:00 File Offset 24477696 File Start Cluster 1029 File Start Sector 47808 Hyperlinks Changed false Keywords

Last Author Microsoft Office User Last Printed 2018-02-28T23:51:32.334Z Last Saved 2018-02-28T23:53:16.268Z Links Dirty false Manager

MS-DOS Archive true MS-DOS Hidden false MS-DOS Read-only false MS-DOS System false Name CBF Daroobalgie Sth bound Quote.xls Physical Start Sector 47840 Scale Crop false Shared Document false Subject

Title

E18-0736-AS-7-1-PR0004

Volume 16.2 70

Page 71: Maintenance Works MMaintenance Works Maintenance Works

CBF Quote Daroobalgie SthCBF Quote Daroobalgie SthFrom:From: cbf projects <[email protected]>To:To: DUBOIS Alexandre <[email protected]>Date:Date: Thu, 01 Mar 2018 10:51:51 +1100

Hi Alex

Please find quote attached as per RFQ at Daroobalgie sth Newell Hwy

Regards

Directorchahid chahineC B F projects pty ltd

IMPORTANT NOTICE: This e-mail and any attachment to it are intended only to be read or used bythe named addressee. It is confidential and may contain legally privileged information.No confidentiality or privilege is waived or lost by any mistaken transmission to you. (CBF) is notresponsible for any unauthorised alterations to this e-mail or attachment to it. Views expressed inthis message are those of the individual sender, and are not necessarily the views of CBF. If youreceive this e-mail in error, please immediately delete it from your system and notify the sender.You must not disclose, copy or use any part of this e-mail if you are not the intended recipient.

E18-0736-AS-7-1-PR0004

Volume 16.2 71

Page 72: Maintenance Works MMaintenance Works Maintenance Works

Date: March 1, 2018Quote #: Q305

To:

Mob: 6 298 Ph: 8837 0636 Fax : 8849 2522

ABN 76 236 371 088

Job Payment Terms

Qty Unit Unit Price Line Total

EA

Plant Equipment

ABN: 78 159 482 210

supply thermal plastic paint and install 5 x 5 meter stop signs at both Nth and Sth bound sites prior to weighbridge

Install 10,000L collection well as per RFQ

DBYD and utility survey checks to be carried out

Supply 2 x stop signs with post and install

Install plumbing from main to amenityInstall 3550L septic tank are per RFQ

Concrete

Supply and lay concrete for base of septic tank

Supply water filled barriers to ensure Nth and Sth bound sites are closed off for the entire work period, approx 14 days has been provisioned

Installation and civil workSupply of plumbing materials

Supply approx 80 cubes of concrete for the weighbridge pads

MaterialsProcure and install steel re-enforced bars to concrete pads Supply Formwork for concrete weighbridge pad and concrete footpath to amenities building

Temporary fence all excavated areas - allowance has been made for approx 150m

Quote

Description

Telephone: (02) 4626 8462Mobile: 4 333

Elouera Crescent

Road and Maritime Services

Parramatta NSW 2150

99 Phillip St

Amenities Installation

Hiring of Crane for the delivery of Septic tank within the excavated area

Truck and Dog for the removal of unwanted materials

Hiring of Bobcat with sweeper to clean site once septic and collection well have been installed

SalespersonChahid Chahine

Email: [email protected]

Daroobalgie Inspection station Sth bound

Project manager: A. Dubois

Install 1100L Pump station as per RFQ

EstablishmentDaroobalgie

E18-0736-AS-7-1-PR0004

Volume 16.2 72

Page 73: Maintenance Works MMaintenance Works Maintenance Works

$222,500

Subtotal 222,500.00$ G.S.T 22,250.00$

Total 244,750.00$

pour and finish concrete for footpath

Install Formwork and install concrete mesh for weighbridge pads

Travel fees and accommodation Allowances:

Excavate and auger blinding pad and footings for installation of amenities

Use bobcat with sweeper to clean site

Trench for council water supply and connect to amenities

Install 2 x stop signs with post and install

Line marking to new concrete works

Install thermal plastic paint and install 5 x 5 meter stop signs to Sth bound sites prior to weighbridge

pour and finish concrete pad to Sth Weighbridge

Install Formwork and concrete footpaths to enter amenities

Remove all unwanted materials and dispose of at tip

Tip fees

E18-0736-AS-7-1-PR0004

Volume 16.2 73

Page 74: Maintenance Works MMaintenance Works Maintenance Works

ii1Ji I Transport NSW ~ GOVERNMENT ,or NSW

Roads and Maritime Services Contract Creation & Variation

lsthisaCM21 contract? [Z]Yes 0No Request type: [Z] Create new D Amend existing

Contract variation ONLY details

For contract variation only. Please tick as applicable and fill in details below as required.

D Newvalue

Contract details

New date I

Equip purchase order number OR contract number:

Supplier: Euro Civil and Maintenance

Vendor ABN: 26 604 934 698

Does the Contract require [Z] Yes 0 No ERS/RCTI? (PO purposes) Contract title: (Please include CM21 number on Concrete, Civil works on the title of CM21 contracts)

Effective date: 1 Mar 2018

Supplier No.:

Newell Highway 8th

I Expiry date:

bound WHS issues

30 Jun 2018

Contract type: • council [Z] CM21 • Discrete Supply Agreement [Z] Panel

Payment terms: 30 days from the date of invoice Category:

• Payment claim under Security & Payment Act (15 day payment term - SOPA)

Financial details

Awarded amount (ex GST): $218,750 Initial contract amount:

Contract contingency Expenditure type: Capex (if applicable):

Total Contract amount $218,750 Hierarchical type: Panel (Awarded amount + Contingency:

Material Group (UNSPSC product category}: 72000000

Variation amount (excluding approved contract value):

WBS code: P.0018688.29 Cost centre: 2935

GIL code: 513140

Agency: D Cluster wide - 9000 TfNSW-1000 [Z] RMS - 3000

Purchasing group (Region): Sydney

Notice period (in days) 30 days by default:

Requesting/Requesting Alexandre Dubois officer name:

Internal stakeholder details

Initiator (Business sponsor):

Contract manager: Alexandre Dubois

Procurement owner: Alexandre Dubois

Contractor stakeholder visibility (Team Tab):

Transport Shared Services - Roads and Maritime Services Contract Creation and Variation - Form no. 5399 (June 2017) Page 1 of 2

E18-0736-AS-7-1-PR0004

Volume 16.2 74

Page 75: Maintenance Works MMaintenance Works Maintenance Works

CLID line item details - Min. requirement of 1 line (* Mandatory fields)

Name Line #1 Concrete, Civil works on Newell Highway Sth bound WHS issues (max 40 character limit)*

Description*:

Unit of measure*: Each I Target quantity*: 1. o I Price: $218,750

Long text*:

Supplier part no.* : I Material Group (UNSPSC r2roduct categor:y):

Name Line #2 (max 40 character limit)'

Description*:

Unit of measure*: I Target quantity*: I Price:

Long text*:

Supplier part no.*: I Material Group (UNSPSC r2roduct categor:y):

Name Line #3 (max 40 character limit)*

Description*:

Unit of measure*: I Target quantity*: I Price:

Long text*:

Supplier part no.*: I Material Group (UNSPSC r2roduct categor:y):

To be completed only if any other form of approval documentation not attached such as "Letter of Acceptance"

Requested by : Delegated Approval by: Requester cannot be a Business Partner Delegation must cover the total value of the PO Name: Alexandre Dubois Name: Craig Steyn

Staff ID: 00965213 Staff ID: 00961247 I Delegation 4 Level:

Position: Heavy Vehicle Project & Support Officer Position: Manager Heavy Vehicle Programs

Phone No: 02 8837 0636 Phone No: 02 8837 0687

Signature*: ./ ✓,;?

I Date: ., ,.___,,,,,,,. / · 3. -2Dr..9 r,,r _ _ .P"

I Guidelines This form must be used for:

• Creation and variation of all types of contracts in Equip for RMS • Variation of purchase orders attached to a contract in Equip

All fields are mandatory unless stated "as applicable". Documentation to be attached with the contracts are:

Letter of acceptance • Tender assessment report • Pricing schedules

The form along with the documentation should be forwarded to [email protected]

For assistance in the completion of these forms please contact [email protected]

Transport Shared Services - Roads and Maritime Services Contract Creation and Variation - Form no. 5399 (June 2017) Page 2 of 2

E18-0736-AS-7-1-PR0004

Volume 16.2 75

Page 76: Maintenance Works MMaintenance Works Maintenance Works

Disclosure of Information

Class 1 Contract

Contract No/ID : 17. 0000302935 .1100-0034

Equip Contract No : 17. 0000302935 .1100

Contract Description : Panel for HVEP- WHS items Newell Hwy Enforcement site

Contract Commencement Date : 01/03/2018

Period of Contract: 20 weeks

Contractor: EURO CIVIL & MAINTENANCE PTY LTD

Contractor Address: EURO CIVIL & MAINTENANCE PTY LTD, Donaldson Street,

Trading Name:

Trading Name Address:

Estimated Payable ($ Incl GST) : $ 240,625.00

Method of Tendering: Limited (Single Invitation/ Selective/WADs)

• Particulars of any related body corporate (within the meaning of the Corporations Act 2001 of the Commonwealth) in respect of the contractor, or any other private sector entity in which the contractor has an interest, that will be involved in carrying out any of the contractor's obligations under the contract or will receive a benefit under the contract

NA

• A description of any provisions under which the amount payable to the contractor may be varied

No provisions under which the amount payable to the contractor may be varied

• A description of any provisions with respect to the renegotiation of the contract

No provisions with respect to the renegotiation of the contract

• In the case of a contract arising from a tendering process, a summary of the criteria against which the various tenders were assessed

Price, experience, panel contractor

• A description of any provisions under which it is agreed that the contractor is to receive payment for providing operational or maintenance services

NA

Page 1 of 2

E18-0736-AS-7-1-PR0004

Volume 16.2 76

Page 77: Maintenance Works MMaintenance Works Maintenance Works

• The reason why the contract has provisions which exclude or modify application of Part 4 Proportionate liability of the Civil

NA

Page 2 of 2

E18-0736-AS-7-1-PR0004

Volume 16.2 77

Page 78: Maintenance Works MMaintenance Works Maintenance Works

Work Order 17.0000302935.1100-0015

This document is a Work Order issued under your Work-as-Ordered Contract with RMS dated 31/10/2017 for the Installation of Amenities Block and Civil works at Daroobalgie HVIS.

Under this Work Order, you are requested to carry out the work or services described below ('Contracted Work') on the terms of your Work-as-Ordered Contract and this Work Order.

Contracted Work Roads and Maritime sought through an RFQ sent on the 26th of feb 2018 the submission of a lump sum fee estimate for the installation of Amenities block and the concrete of pavement on the approach to the weighbridge at Daroobalgie HVIS Sth bound on the Newell Highway.

The works involve the following:

- Transportation of Amenities to site - Utility surveys - Provision of plant equipment which includes, Excavator, truck with Hiab,

sweeper and bobcat. Installation of Septic pump tanks as per attached designs and specifications at Daroobalgie Nth bound site. Installation of amenities block, exact location to be finalised on site by RMS, indicative location of tanks and block shown on attached design. Excavation for council water supply

- Dumping of unwanted materials Connection of water supply by a licenced plumber. Excavation and dumping of 15 meters of flexible pavement to a depth of 350mm and allowance for dumping costs at both Daroobalgie Nth and Sth.

- Formwork, provision of steel and concreting 13m long by 6 m wide to a depth of 250mm, cross section drawing to be provided at both Daroobalgie Nth and Sth. Line marking of areas around the newly installed concrete pad in addition to the installation a 5mx5m stop sign at both Nth and Sth bound sites pior to the weighbridge.( Current stop marker is faded) Installation of two stop signs with posts Cleaning of the area and make good.

E18-0736-AS-7-1-PR0004

Volume 16.2 78

Page 79: Maintenance Works MMaintenance Works Maintenance Works

Work Order Specific Requirements

Contract Work Order specific requirements Clause/Contract

Document reference and

description

Clause 1 -June 2018 Summary

Date for Completion:

Clause 5.4.3 -Liquidated Not applicable. damages for delay

Amount of liquidated damages for delay in completing by the Date for Completion:

Clause 7.16- 1) Does the Building Code apply to the Contracted Work

Building Code as there is Commonwealth funding (above the minimum thresholds specified in Schedule 1 of the Building Code) for the Contracted Work QI for the project which the Contracted Work forms part of?

Doesn't apply

2) On or after 2 December 2016, has the Contractor or a related entity of the Contractor submitted a response to an expression of interest or tender (howsoever described) for Commonwealth funded Building Work (regardless of whether or not that project was procured by RMS or whether or not the Contractor or the Contractor's related entity were successful)?

No

Clause 7.18 -Aboriginal Participation

The NSW Government No

E18-0736-AS-7-1-PR0004

Volume 16.2 79

Page 80: Maintenance Works MMaintenance Works Maintenance Works

Contract Work Order specific requirements Clause/Contract

Document reference and

description

Policy on Aboriginal Participation in Construction applies:

The Aboriginal Category [insert number] I Not applicable. Participation Project Category is: [delete whichever is inapplicable, see ECM 5.2.6 for

guidance]

The Contractor is Yes, at times specified in the ContracUNo required to submit an Aboriginal Participation [delete whichever is inapplicable] Plan and Aboriginal Participation Reports

The Targeted Project $ [insert amount] (excl GST) / Not Applicable. Spend (TPS) at the date

of this Work Order is: [delet(;l whichever is inapplicable]

Clause 10.2 & Clause 22.3 of G2 -Chain of Responsibility (CoR) Management Plan

A supplement to the Not Required Contractor's CoR Management Plan, to address the chain of responsibilities risks and issues specific to the work or services to be carried out under this Work Order is:.

E18-0736-AS-7-1-PR0004

Volume 16.2 80

Page 81: Maintenance Works MMaintenance Works Maintenance Works

Issued by Roads and Maritime Services by:

Signature of issuing officer

Alex Dubois HV Maintenance and Program Officer

Name and position of issuing officer

Date of issue: 01/03/2018 ---------

E18-0736-AS-7-1-PR0004

Volume 16.2 81

Page 82: Maintenance Works MMaintenance Works Maintenance Works

Euro Civil & Maintenance Pty Ltd Quality is Our Goal

Date February 28, 2018

PO#

Quote# ECMQ00303

Customer ID RMS

-- -

Customer Quote/ProJect Descnpt1on

The works Quote involved the following ; Daroobalgie

1- lnstallatton of toilet cubicle/meeting room and civil works

ABN 76 236 371 088 2- lnstallation concrete pads for weighbridge at Daroobalgie Sth

110 George St. Parramatla NSW2150

(02) 88-49 2633

---- - --

1- Installation of toilet cubicle/meeting room and civil works

Carry out utility surveys and DBYD Hiring of 80 meters of water filled barriers to block entry to site Sth bound Hiring of 120 meters of temporary fencing for excavated areas around the toilet/ change room and concreting lead up pavement

Hire truck with Hiab (crane) for transportation of cubicle from Westmead NSW to Daroobalgie HVIS Hire 5 tone Excavator with auger and rock breaker Auger of piers and trenching of footings for new location of site toilet/ change room Supply Aggregate concrete for piers and footings Supply Galvanized steel chains and install in concreted piers for anchorage of cubicle Hiring of crane to install cubicle over new footing and anchored down. Supply 1 x 3500L Bio Septic tank Supply 1x 1100 L pump station Supply pf 10,000L Collection Well Excavate 25m trench and hole for installation of septic tank in ground Supply 100mm sewerage pipes for installation from cubicle to septic tank & overflow Trench and excavate from septic tank 25m for installation of overllow retention pit Excavate level & compact blinding pad for solid base of rainwater tank Supply 90mm storm water piping and plumb up from cubicle to tank Supply and install electric water pump to cubicle Excavate 1 00m trench to depth of 600mm Supply 1 00m of 1 inch copper pipe Plumb water pipe from water meter to cubicle Supply and install 3.5 kw air-conditioning split system as requested to toilet/meeting room Excavate and formwork for footpath Supply concrete and finish footpath to enter cubicle Supply truck & Dog to remove unwanted materials Supply 9 cubic meter skip bin for removal of rubbish Travel, labor hire, accommodation, fuel and expenses

2- Installation concrete pads for weighbridge at Daroobalgie Sth

Carry out utility surveys and DBYD Excavation of 15 meters of flexible pavement to a depth of 350mm at Sth Bound Formwork 13m long by 6m wide to Nth & Sth Bound for concrete pads Supply re-enforced steel mesh and rio bars times two layers to Sth bound weighbridge sites Supply approx 20 cubic meters of aggregate to each Nth& Sth bound concrete pads = total of 40 cubes Finish concrete and screed to RMS requirements for weighing Engage surveyor to ensure concreting together with weighbridge meet the Cat 1 requirements Supply truck & Dog to remove unwanted materials Supply sweeper to clean site and prep for line marking Line Marking the perimeter of the newly installed concrete to match current weighbridge line marking Paint 5x5 meters stop sign at the Sth bound sites prior to weighbridge Install 2 x stop signs with post before weighbridge Travel, labor hire, accommodation, fuel and expenses

--- --

Special Notes and Instructions

Once Signed please Fax, mail or e-mail 1t to the prnvided address.

[ . -

Subtotal

Discount

Sales Tax Rate

Sales Tax

Total inc GST

Above mfom,at100 1s no1 an 1nvo1CC and only an estimate of $Cf'Vlces/goods described above.

Payment ....;1 be collected 1n poor to prOV!SIOf'I of 5el'VICOs/goods descnbed 1n this quote

Please confirm YDlK acceptance of this quote by sigruog this document

Thank you for your business!

1 Line Total

%

Should you have any enquiries concerning this quote, please contact Barry Haden on 7 738

Donaldson St,

Tel: 7 738 Fax: E-mail: info@

BSB: 112879 Account Number 6 088

Quote

218.750.00

10.00

240,625.00

E18-0736-AS-7-1-PR0004

Volume 16.2 82

Page 83: Maintenance Works MMaintenance Works Maintenance Works

E18-0736-AS-7-1-PR0004

Volume 16.2 83

Page 84: Maintenance Works MMaintenance Works Maintenance Works

I CBF PROJECTS pty ltd

CIVIL BUILDING & FABRICATION

Elouera Crescent Telephone: (02) 4626 8462

Quote Mobile: 4 333

ABN: 78 159 482 210

To: Road and Maritime Services

Date:

Quote#:

March l, 2018

Q305

99 Phillip St

Parramatta NSW 2150

Mob: 6 298 Ph: 883 7 0636 Fax 8849 2522 Project manager: A. Dubois

Salesperson Chahid Chahine

Qty Unit

Email: [email protected]

ABN 76 236 371 088

Job Daroobalgie Inspection station Sth bound

Payment Terms

Unit Price -- Description

Daroobalgle

r -EA

1--- - -I--

-

- I•

-

-

-Establishment

Amenities lnsta nation nt Plant Egl,!_ipme

Hiring of Crane excavated are

for the delivery of Septic tank within th a --- ---

Truck and Dog

+---

for the removal of unwanted materials

at with sweeper to clean site once septi Hiring of Bobe and collection well have been installed

I e

-+-

C

-~-Concrete --

i Supply and lay concrete for base of septic tank

Supply approx 80 cubes of concrete for the weighbrid ge pads

Materials Procure and in stall steel re-enforced bars to concrete

~ ds pply Formwo rk for concrete weighbridge pad and

concrete foot path to amenities building

Temporary fen ce all excavated areas - allowance ha s been made fo r approx 150m

Supply water fil sites are closed days has been

supply thermal

led barriers to ensure Nth and Sth boun off for the entire work period, approx l provisioned

d 4

-...

-

..

,._ __

,--·

signs at both N plastic paint and install 5 x 5 meter stop th and Sth bound sites prior to weighbri dge ! -

~ply 2xstop signs with post and install -· Supply of plum bing materials

+-Installation an d civil work

-DBYD and utilit y survey checks to be carried out I

Install plumbin -q from m.ai. tO Orn~ ·ty ______ -_-_--- -, -,----

Install 3550L se ptic tank are per RFQ Install 11 00L Pu mp station as per RFQ

ollection well as pe!' __ RFQ Install l 0,000L c

I

i J

-

- -

-

-

-

-

Line Total

,_

-

I I

I r---

--~ - •-

-

E18-0736-AS-7-1-PR0004

Volume 16.2 84

Page 85: Maintenance Works MMaintenance Works Maintenance Works

! Excavate and auger blinding pad and footings for

f------ _ +-- [ installation of amenities ___ _ _ _ __________________________ j__ ___ ____ __ _ __ .,__ ______________ i i Install Formwork and install concrete mesh for !

~--r 1 ::~:::~d::,~::n~:~ ;a~ t~-Sth Weighbrid~~ ------+ • i I _______ I

~--- ___ J _______ i Trench for council water supply and connect to amenities I --==-=~~-~~~~==--=-~-f-------------! ! : Install Formwork and concrete footpaths to enter l

. . [ . _.J~_menities __________________________________________ --------L- __ _ _______________________________ ! ~- ____ i i pour and finish concr~~-~o!.!~~te_?_~~ ___ ______ __ __ _ _ L. __ _ ___ ____ ___________________ _ ___ _j ,___ _ _ __! _ l Line marking to new concrete works i

1 1 ----···-· --------·--------······ -- --•------ - ~

!_·. . ~- r. Install thermal plastic paint and install 5 x 5 meter stop ! ; signs to Sth bound sites prior to weighbridge l ____ ·---~ _______ 1,____________________ -----,~-------+------------; l i Install 2 x stop signs with post and install ,-- ---T-- 1U b b- t "th t I ·t :---------+------ ----·--·------; ! .... -~------ se 0 ca WI sweeoer o c eon s1 e

! Remove all unwanted materials and disp --·-- ----- ------- -···----·---

------ ---.-·•·- --------- --

ose of at tip ] i

---.----_-__ -___ -_____ -__ -_-___ -__ -. __ -_._-+_-_ -====-=------- --··-· +-_-__ -_ ---·--$-2-2-2,-50-Q~I Allowances: i -------

, Travel fees and accommodation --

r -·---- ---------- --~·-----,----·--····---------------------- ------------------------- --- - ________ .. _____ ---- - - - - ___ ,__ -- --·- l

~

• • I ----·---·-··--· ------- ·------------------------- --------------- ---- l ---------------~-------·-··--·--------- --- -·- --------------------- ---+----------'

- ·----•-··-"' ···----- --·-+------····· ----·---·---·-·---·-·--------~·~---------•-·-····--·~---··~·-·--·-·-------· ----·--·--· ----+-- J ------- ______ .,___ -----·---- -------· -·--···------ -----·--·-··--·-·-·----- ·-·--------·--·-------- ~ -···-·-············ ---·---- -·······--------------·----···- - ... ·- .. ·--- ·-- - ·--·-··-·- - ·- -···--·--~---- -- ------·-·-------- !

Subtotal 1__ -· __________ _ 222,500.00 G.S.Ti $ 22,250.00

Tota'L$ ____________ 244,750.00

E18-0736-AS-7-1-PR0004

Volume 16.2 85

Page 86: Maintenance Works MMaintenance Works Maintenance Works

OZ CORP CIVIL Quote DATE March 1, 2018

Luxford Road

Quote# 174

ABN: 37 607 800 895 Phone: 2 468

Bill To: Att: Alex Dubois Roads and Maritime Services 110 George Street Parramatta NSW 2150 02 8837 0636

Comments or special instructions: Daroobalgie South Bound HVIS

Description

This Quote is for Daroobalgie Heavy Vehicle Inspection Bay

Scope of works as per RFQ sent on 26/2/2018

- Site establishment

- Provision of barricading site with temporary fencing and warning signage

- Transportation of Amenities to site

- Provision of utility surveys

- Provision of plant equipment which includes, Excavator, truck with Hiab, sweeper and bobcat.

Installation of septic pump tanks as per attached designs and specification at Daroobalgie Sth bound site

- Installation of amenities block, exact location to be finalized on site by RMS, Indicative location of tanks and blocks shown on attached design

- Excavation for council water supply

- Connection of water supply by licensed plumber

- Excavation and dumping of 30 tonnes of flexible pavement to a depth of 350mm Daroobalgie Sth bound screening lane

- Dumping of unwanted materials

- Formwork, provisions of steel and concreting 13m long by 6m wide to a depth of 250mm

- Line marking of areas around newly installed concrete pad in addition to installation a 5mx5m thermal plastic stop sign on ground prior to weighbridge

Cleaning of site and make good

Travel Allowances + incidentals

Accommodation

AMOUNT

TOTAL Ex GST $ 225,000.00 1----------t

TOTAL Inc. GST $ 247,500.00 .._ ______ ___.

If you have any questions concerning this quotation, KnsTu1, 2 468, E-mail: admin@

THANK YOU FOR YOUR BUSINESS!

E18-0736-AS-7-1-PR0004

Volume 16.2 86

Page 87: Maintenance Works MMaintenance Works Maintenance Works

E18-0736-AS-7-1-PR0004

Volume 16.2 87

Page 88: Maintenance Works MMaintenance Works Maintenance Works

FW: daroobalgie sth euroFW: daroobalgie sth euroFrom:From: DUBOIS Alexandre <"/o=rta/ou=exchange administrative group

(fydibohf23spdlt)/cn=recipients/cn=alexandu">To:To: TSS.RMSContracts <[email protected]>Date:Date: Thu, 01 Mar 2018 17:19:27 +1100Attachments:Attachments: IGA_1_3_2018_17_1_25_348.pdf (477.21 kB)

Good afternoon,

Can you please assist in creating the PO for the attached request

Thank you

-----Original Message-----From: [email protected] [mailto:[email protected]]Sent: Thursday, 1 March 2018 5:02 PMTo: DUBOIS AlexandreSubject: daroobalgie sth euro

Scan attached

E18-0736-AS-7-1-PR0004

Volume 16.2 88

Page 89: Maintenance Works MMaintenance Works Maintenance Works

For contract variation only. Please tick as applicable and fill in details below as required.

New value New date Equip purchase order number OR contract number:

411. Al

NW GOVERNMENT

Transport for NSW

Roads and Maritime Services Contract Creation & Variation

Is this a CM21 contract? 2 Yes El No Request type: El Create new El Amend existing

Contract variation ONLY details

Contract details

Supplier Euro Civil and Maintenance Supplier No.:

Vendor ABN: 26 604 934 698

Does the Contract require V Yes No ERS/RCTI? (PO purposes) Contract title: (Please include CM21 number on Concrete, Civil works on Newell Highway 5th bound WHS issues the title of CM21 contracts)

Effective date: 1 Mar 2018 Expiry date: 30 Jun 2018

Contract type: Council V CM21 Discrete Supply Agreement V Panel

Payment terms: 30 days from the date of invoice Category:

Payment claim under Security & Payment Act (15 day payment term - SOPA)

Financial details

Awarded amount (ex GST): $218 , 750 Initial contract amount:

Contract contingency (if applicable):

Expenditure type: Capex

Total Contract amount $218,750 (Awarded amount + Contingency:

Hierarchical type: Panel

Material Group (UNSPSC product category): 72000000

Variation amount (excluding approved contract value):

WBS code: P.0018688.29 Cost centre: 2935

G/L code: 513140

Agency: J Cluster wide —9000 TfNSW — 1000 V RMS —3000

Purchasing group (Region): Sydney

Notice period (in days) 30 days by default:

Requesting/Requesting Alexandre Dubois officer name:

Internal stakeholder details

Initiator (Business sponsor):

Contract manager: Alexandre Dubois

Procurement owner: Alexandre Dubois

Contractor stakeholder visibility (Team Tab):

Transport Shared Services - Roads and Maritime Services Contract Creation and Variation - Form no. 5399 (June 2017) Page I of 2

E18-0736-AS-7-1-PR0004

Volume 16.2 89

Page 90: Maintenance Works MMaintenance Works Maintenance Works

CLID line item details — Min. requirement of 1 line (* Mandatory fields)

Name Line #1 (max 40 character limit)*

Concrete, Civil works on Newell Highway Sth bound WHS issues

Description*:

Unit of measure*: Each Target quantity*: 1. 0 Price: $218,750

Long text":

Supplier part no.*: Material Group (UNSPSC product category):

Name Line #2 (max 40 character limit)*

Description*:

Unit of measure*: Target quantity*: Price:

Long text*:

Supplier part no.*: Material Group (UNSPSC product category):

Name Line #3 (max 40 character limit)*

Description*:

Unit of measure*: Target quantity*: Price:

Long text*:

Supplier part no.*: Material Group (UNSPSC product category):

To be completed only if any other form of approval documentation not attached such as "Letter of Acceptance"

Requested by: Requester cannot be a Business Partner

Name: Alexandre Dubois

Staff ID: 00965213

Position: Heavy Vehicle Project & Support Officer

Phone No: 02 8837 0636

Signature: ...-----------) Date:

Delegated Approval by: Delegation must cover the total value of the PO Name: Craig Steyn

Staff ID: 00961247 Delegation Level:

4

Position: Manager Heavy Vehicle Pro grams

Phone No: 02 8837 0687

Date: / , -? .._). Signature*: _,.

Guidelines This form must be used for:

• Creation and variation of all types of contracts in Equip for RMS Variation of purchase orders attached to a contract in Equip

All fields are mandatory unless stated "as applicable". Documentation to be attached with the contracts are:

Letter of acceptance Tender assessment report Pricing schedules

The form along with the documentation should be forwarded to [email protected]

For assistance in the completion of these forms please contact TSS.RMSContractsa.transport.nsw.gov.au

Transport Shared Services - Roads and Maritime Services Contract Creation and Variation - Form no. 5399 (June 2017) Page 2 of 2

E18-0736-AS-7-1-PR0004

Volume 16.2 90

Page 91: Maintenance Works MMaintenance Works Maintenance Works

Disclosure of Information

Class 1 Contract

Contract No/ID : 17.0000302935.1100-0034

Equip Contract No : 17.0000302935.1100

Contract Description : Panel for HVEP- WHS items Newell Hwy Enforcement site

Contract Commencement Date : 01/03/2018

Period of Contract: 20 weeks

Contractor: EURO CIVIL & MAINTENANCE PTY LTD

Contractor Address: EURO CIVIL & MAINTENANCE PTY LTD, Donaldson Street,

Trading Name:

Trading Name Address:

Estimated Payable ($ Inc' GST) : $ 240,625.00

Method of Tendering: Limited (Single Invitation / Selective/WADs)

• Particulars of any related body corporate (within the meaning of the Corporations Act 2001 of the Commonwealth) in respect of the contractor, or any other private sector entity in which the contractor has an interest, that will be involved in carrying out any of the contractor's obligations under the contract or will receive a benefit under the contract

NA

• A description of any provisions under which the amount payable to the contractor may be varied

No provisions under which the amount payable to the contractor may be varied

• A description of any provisions with respect to the renegotiation of the contract

No provisions with respect to the renegotiation of the contract

• In the case of a contract arising from a tendering process, a summary of the criteria against which the various tenders were assessed

Price, experience, panel contractor

• A description of any provisions under which it is agreed that the contractor is to receive payment for providing operational or maintenance services

NA

Page 1 of 2

E18-0736-AS-7-1-PR0004

Volume 16.2 91

Page 92: Maintenance Works MMaintenance Works Maintenance Works

• The reason why the contract has provisions which exclude or modify application of Part 4 Proportionate liability of the Civil

NA

Page 2 of 2

E18-0736-AS-7-1-PR0004

Volume 16.2 92

Page 93: Maintenance Works MMaintenance Works Maintenance Works

Work Order 17.0000302935.1100-0015

This document is a Work Order issued under your Work-as-Ordered Contract with RMS dated 31/10/2017 for the Installation of Amenities Block and Civil works at Daroobalgie HVIS.

Under this Work Order, you are requested to carry out the work or services described below (`Contracted Work') on the terms of your Work-as-Ordered Contract and this Work Order.

Contracted Work Roads and Maritime sought through an RFQ sent on the 26" of feb 2018 the submission of a lump sum fee estimate for the installation of Amenities block and the concrete of pavement on the approach to the weighbridge at Daroobalgie HVIS Sth bound on the Newell High way.

The works involve the following:

- Transportation of Amenities to site - Utility surveys - Provision of plant equipment which includes, Excavator, truck with Hiab,

sweeper and bobcat. - Installation of Septic pump tanks as per attached designs and specifications at

Daroobalgie Nth bound site. - Installation of amenities block, exact location to be finalised on site by RMS,

indicative location of tanks and block shown on attached design. - Excavation for council water supply - Dumping of unwanted materials - Connection of water supply by a licenced plumber. - Excavation and dumping of 15 meters of flexible pavement to a depth of

350mm and allowance for dumping costs at both Daroobalgie Nth and Sth. - Formwork, provision of steel and concreting 13m long by 6 m wide to a

depth of 250mm, cross section drawing to be provided at both Daroobalgie Nth and Sth.

- Line marking of areas around the newly installed concrete pad in addition to the installation a 5mx5m stop sign at both Nth and Sth bound sites pior to the weighbridge.( Current stop marker is faded)

- Installation of two stop signs with posts - Cleaning of the area and make good.

E18-0736-AS-7-1-PR0004

Volume 16.2 93

Page 94: Maintenance Works MMaintenance Works Maintenance Works

Work Order Specific Requirements

Contract Clause/Contract

Document reference and

description

Work Order specific requirements

Clause 1 - Summary

Date for Completion:

June 2018

Clause 5.4.3 — Liquidated damages for delay

Amount of liquidated damages for delay in completing by the Date for Completion:

Not applicable.

Clause 7.16 — Building Code

1)

2)

Does the Building Code apply to the Contracted Work as there is Commonwealth funding (above the minimum thresholds specified in Schedule 1 of the Building Code) for the Contracted Work or for the project which the Contracted Work forms part of?

Doesn't apply

On or after 2 December 2016, has the Contractor or a related entity of the Contractor submitted a response to an expression of interest or tender (howsoever described) for Commonwealth funded Building Work (regardless of whether or not that project was procured by RMS or whether or not the Contractor or the Contractor's related entity were successful)?

No

Clause 7.18 — Aboriginal Participation

The NSW Government No

E18-0736-AS-7-1-PR0004

Volume 16.2 94

Page 95: Maintenance Works MMaintenance Works Maintenance Works

Contract Clause/Contract

Document reference and

description

Work Order specific requirements

Policy on Aboriginal Participation in Construction applies:

The Aboriginal Participation Project Category is:

Category [insert number] I Not applicable.

[delete whichever is inapplicable, see ECM 5.2.6 for guidance]

The Contractor is required to submit an Aboriginal Participation Plan and Aboriginal Participation Reports

Yes, at times specified in the Contract/No

[delete whichever is inapplicable]

The Targeted Project Spend (TPS) at the date of this Work Order is:

$ [insert amount] (excl GST) / Not Applicable.

[delete whichever is inapplicable]

' Clause 10.2 & Clause 22.3 of G2 - Chain of Responsibility (CoR) Management Plan

A supplement to the Contractor's CoR Management Plan, to address the chain of responsibilities risks and issues specific to the work or services to be carried out under this Work Order is:.

Not Required

E18-0736-AS-7-1-PR0004

Volume 16.2 95

Page 96: Maintenance Works MMaintenance Works Maintenance Works

Issued by Roads and Maritime Services by:

Signature of issuing officer

Alex Dubois HV Maintenance and Program Officer

Name and position of issuing officer

Date of issue: 01/03/2018

E18-0736-AS-7-1-PR0004

Volume 16.2 96

Page 97: Maintenance Works MMaintenance Works Maintenance Works

Line Total

Euro Civil & Maintenance Pty Ltd Quality is Our Goal

Quote

Date

P06

Quote

Customer ID

February 28, 2018

ECMQ00303

RMS

ABN: 26 604 934 698

Customer:

Quote/Project Description

Roads and Mantime Serinces

Attention. Nesandre Dubois

ABS 76 236 371 068

110 George Si. Parrarnatta NSW 2150

The works Quote involved the following : Daroobalgie

1- Installation of toilet cubicle/meeting room and civil works

2-Installation concrete pads for weighbridge at Daroobalgie Sth

(0218849 2633

1-Installation of toilet cubicle/meeting room and civil works

Carry out utility surveys and DBYD Hiring of 80 meters of water filled barriers to block entry to site Sth bound Hiring of 120 meters of temporary fencing for excavated areas around the toilet / change room and concreting lead up pavement

Hire truck with Hiab (crane) for transportation of cubicle from Westmead NSW to Daroobalgie HVIS Hire 5 tone Excavator with auger and rock breaker Auger of piers and trenching of footings for new location of site toilet / change room Supply Aggregate concrete for piers and footings Supply Galvanized steel chains and install in concreted piers for anchorage of cubicle Hiring of crane to install cubicle over new footing and anchored down. Supply 1 x 3500L Bio Septic tank Supply lx 1100 L pump station Supply pf 10,000L Collection Well Excavate 25m trench and hole for installation of septic tank in ground Supply 100mm sewerage pipes for installation from cubicle to septic tank & overflow Trench and excavate from septic tank 25m for installation of overflow retention pit Excavate level & compact blinding pad for solid base of rainwater tank Supply 90mm storm water piping and plumb up from cubicle to tank Supply and install electric water pump to cubicle Excavate 100m trench to depth of 600mm Supply 100m of 1 inch copper pipe Plumb water pipe from water meter to cubicle Supply and install 3.5 kw air-conditioning split system as requested to toilet/meeting room Excavate and formwork for footpath Supply concrete and finish footpath to enter cubicle Supply truck & Dog to remove unwanted materials Supply 9 cubic meter skip bin for removal of rubbish Travel, labor hire, accommodation, fuel and expenses

2- Installation concrete pads for weighbridge at Daroobalgie Sth

Carry out utility surveys and DBYD Excavation of 15 meters of flexible pavement to a depth of 350mm at Sth Bound Formwork13m long by 6m wide to Nth & Sth Bound for concrete pads Supply re-enforced steel mesh and rio bars times two layers to Sth bound weighbridge sites Supply approx 20 cubic meters of aggregate to each Nth& Sth bound concrete pads = total of 40 cubes Finish concrete and screed to RMS requirements for weighing Engage surveyor to ensure concreting together with weighbridge meet the Cat 1 requirements Supply truck & Dog to remove unwanted materials Supply sweeper to clean site and prep for line marking Line Marking the perimeter of the newly installed concrete to match current weighbridge line marking Paint 5x5 meters stop sign at the Sth bound sites prior to weighbridge Install 2 x stop signs with post before weighbridge Travel, labor hire, accommodation, fuel and expenses

Special Notes and Instructions Subtotal 218,750.00

Once Ngned please Fax, mail or e-mail :1 101 owded address. Discount

Sales Tax Rate 10.00

Sales Tax

Total inc GST 240,625.00

Above informaboo is not an Ino0ICO and only an esbmate of stwtces/goods described above.

Payment will be collected in pox to crows., of serwcesigoods descnbsid e Ova quote.

Please confmn your acceptance 01 0:6 quote by swing this document

Thank you for your business!

Should you have any enquiries concerning this quote, please contact Barry Haden on 7 738

Donaldson St,

Tel: 7 738 Fax: E-mail: info@E

BSB: 112879 Account Number : 6 088

E18-0736-AS-7-1-PR0004

Volume 16.2 97

Page 98: Maintenance Works MMaintenance Works Maintenance Works

E18-0736-AS-7-1-PR0004

Volume 16.2 98

Page 99: Maintenance Works MMaintenance Works Maintenance Works

CBF PROJECTS pty ltd CIVIL BUILDING & FABRICATION Quote Elouera Crescent Date: March 1,2018

Telephone: ( 8462 Quote #: Q305 Mobile: 4 333

ABN: 78 159 482 210

To: Road and Maritime Services

Salesperson Chahid Chahine

Qty Unit

99 Phillip St

Parramatta NSW 2150

Mob: 6 298 Ph: 8837 0636 Fax: 8849 2522

Email: [email protected]

ABN 76 236 371 088

Job

Daroobalgie Inspection station Sth bound

Description

Project manager: A. Dubois

Payment Terms

Unit Price Line Total

Daroobalgie

EA Establishment

Amenities Installation Plant Equipment Hiring of Crane for the delivery of Septic tank within the excavated area

Truck and Dog for the removal of unwanted materials

Hiring of Bobcat with sweeper to clean site once septic and collection well have been installed

Concrete

,Supply and lay concrete for base of septic tank

Supply approx 80 cubes of concrete for the weighbridge pads

Materials Procure and install steel re-enforced bars to concrete pads

Supply Formwork for concrete weighbridge pad and concrete footpath to amenities building

Temporary fence all excavated areas - allowance has been made for approx 150m

Supply water filled barriers to ensure Nth and Sth bound sites are closed off for the entire work period, approx 14 days has been provisioned

supply thermal plastic paint and install 5 x 5 meter stop signs at both Nth and Sth bound sites prior to weighbridge

Supply 2 x stop signs with post and install Supply of plumbing materials Installation and civil work DBYD and utility survey checks to be carried out Install plumbing from main to amenity Install 3550L septic tank are per RFQ Install 1100L Pump station as per RFQ

,Install 10,000L collection well as per RFQ

E18-0736-AS-7-1-PR0004

Volume 16.2 99

Page 100: Maintenance Works MMaintenance Works Maintenance Works

!Excavate and auger blinding pad and footings for installation of amenities

Install Formwork and install concrete mesh for weighbridge pads

pour and finish concrete pad to Sth Weighbridge

Trench for council water supply and connect to amenities .1. Install Formwork and concrete footpaths to enter amenities

pour and finish concrete for footpath

Line marking to new concrete works

I 1 signs to Sth bound sites prior to weighbridge I

--1" --j I

Install 2 x stop signs with post and install , 1 1 ____Use bobcat with sweeper to clean site E —

Install thermal thermal plastic paint and install 5 x 5 meter stop

Remove all unwanted materials and dispose of at tip 1

$222,500 Allowances: Travel fees and accommodation Tip fees

I-- -4 L

--- L

-I --1 j

Subtotal $ : 222,500.00 .1

G.S.li- $ 22,250.00 I , Total $ 244,750.00 1

E18-0736-AS-7-1-PR0004

Volume 16.2 100

Page 101: Maintenance Works MMaintenance Works Maintenance Works

Description AMOUNT

This Quote is for Daroobalgie Heavy Vehicle Inspection Bay

Scope of works as per RFQ sent on 26/2/2018

- Site establishment

- Provision of barricading site with temporary fencing and warning signage

- Transportation of Amenities to site

- Provision of utility surveys

- Provision of plant equipment which includes, Excavator, truck with Hiab, sweeper and bobcat. Installation of septic pump tanks as per attached designs and specification at Daroobalgie Sth bound site

- Installation of amenities block, exact location to be finalized on site by RMS, Indicative location of tanks and blocks shown on attached design

- Excavation for council water supply

- Connection of water supply by licensed plumber

- Excavation and dumping of 30 tonnes of flexible pavement to a depth of 350mm Daroobalgie Sth bound screening lane

- Dumping of unwanted materials

- Formwork, provisions of steel and concreting 13m long by 6m wide to a depth of 250mm

- Line marking of areas around newly installed concrete pad in addition to installation a 5mx5m thermal plastic stop sign on ground prior to weighbridge

Cleaning of site and make good

Travel Allowances + incidentals

Accommodation

TOTAL Ex GST

TOTAL Inc. GST

225,000.00

247,500.00

OZ CORP CIVIL Quote

Luxford Road

ABN: 37 607 800 895 Phone: 2 468

DATE March 1, 2018 Quote # 174

Bill To: Aft: Alex Dubois Roads and Maritime Services 110 George Street Parramatta NSW 2150 02 8837 0636

Comments or special instructions: Daroobalgie South Bound HVIS

If you have any questions concerning this quotation, KrisTui, 2 468, E-mail: admin

THANK YOU FOR YOUR BUSINESS!

E18-0736-AS-7-1-PR0004

Volume 16.2 101

Page 102: Maintenance Works MMaintenance Works Maintenance Works

E18-0736-AS-7-1-PR0004

Volume 16.2 102

Page 103: Maintenance Works MMaintenance Works Maintenance Works

CW2304176 - 17.0000302935.1100.0034 DaroobalgieCW2304176 - 17.0000302935.1100.0034 DaroobalgieWHS: Approval by Contract Approver was fully approved.WHS: Approval by Contract Approver was fully approved.

From:From: "@customerresources/DefaultNotification" <[email protected]>

To:To: DUBOIS Alexandre <[email protected]>

Date:Date: Tue, 06 Mar 2018 08:58:47 +1100

CW2304176 - 17.0000302935.1100.0034 Daroobalgie WHS: Approval by ContractApprover was fully approved.

Task Title: Approval by Contract Approver

Task Description: Task for TSS review and approval for contract establishment andamendment

You are being sent this email because you are the owner of a task that has been approvedby all people in the approval flow.

This email originated from the Ariba system used by Transport NSW and was originallysent to: [email protected]

System Reference: Click Here to access the system.

E18-0736-AS-7-1-PR0004

Volume 16.2 103

Page 104: Maintenance Works MMaintenance Works Maintenance Works

Fwd: Notification Purchase Order CreationFwd: Notification Purchase Order CreationFrom:From: [email protected]:To: info@Date:Date: Wed, 07 Mar 2018 12:35:14 +1100

Sent from my iPhone

Begin forwarded message:

From:From: DoNotReply <[email protected]>Date:Date: 7 March 2018 at 12:15:23 pm AEDTTo:To: DUBOIS Alexandre <[email protected]>Subject:Subject: Notification Purchase Order CreationNotification Purchase Order Creation

Hello Alexandre Dubois Purchase Order 4200044014 has been created and released for supplier EURO CIVIL &MAINTENANCE PTY LTD ( 0020012410 )

Associated Contract:

Purchase Order: 4200044014 Purchase Order Date:07.MAR.2018

Purchase Order Total Value: 218750.00 AUD Purchase Order Tax Value : 21875.00 AUD Purchase Order Gross Total: 240625.00 AUD Purchase Order Delivery Address:RMS OFFICE OF CHIEF EXECUTIVE, 28 ENNIS ROAD,MILSONS POINT NSW 2061, AUSTRALIA

Line No Item Curr Item Value Item Quantity Item UoM Item Short Text 00010 AUD 218750.00 1.000 AU 17.0000302935.1100.0034Daroobalgie WHS

If the above details are incorrect, please contact TSS Purchase Orders ([email protected]).

You can view the status of your Shopping Cart by logging into Transport Equip.

E18-0736-AS-7-1-PR0004

Volume 16.2 104

Page 105: Maintenance Works MMaintenance Works Maintenance Works

Fwd: Old Daroobalgie survey weighbridgeFwd: Old Daroobalgie survey weighbridgeFrom:From: info <info@To:To: DUBOIS Alexandre <[email protected]>Date:Date: Thu, 12 Apr 2018 08:12:10 +1000Attachments:Attachments: Daroobalgie Old Survey weighbridge SOUTHBOUND.pdf (59.5 kB)

Sent from my Samsung Galaxy smartphone.

-------- Original message --------From: Ronny <[email protected]>Date: 12/4/18 5:53 am (GMT+10:00)To: [email protected]: Old Daroobalgie survey weighbridge

Kind Regards

Ronny Elzahr

Director

Mob: 55 25

Ph: (02) 9620 2133

Email: [email protected]

E18-0736-AS-7-1-PR0004

Volume 16.2 105

Page 106: Maintenance Works MMaintenance Works Maintenance Works

DISHDISH DISH

276.37276.39

276.43

CLCL

CLCL

CL

CLCL

CL

276.42 276.43

276.43276.42

276.42

276.40276.42

276.40

PIT276.52BIN

BIN

LM

LM LM

LM

LM

LM

LM

LM

LM

LM LM

LM

LM

LM LM

LM

LM

LM

LM

LM

LM

276.43

276.44 276.43

276.43

276.42

276.43

276.43

276.43

276.43

276.44 276.38

276.36

276.33

276.29276.24

276.30

276.34

276.42

276.42

276.44

276.42

LP

LPLP

LP

CONCRETED AREA

SHELTER

SHELTER SHELTER

SHELTER

PIT

SITE OFFICE

20.0 6.0

6.0 20.0

20.0

MINIMUM REQUIRED FOR THE APPROACH IS 14M WEIGHBRIDGE AREA MINIMUM REQUIRED FOR THE DEPARTURE IS 14M

20.0 APPROACH DISTANCE

APPROACH GRADE 1DEPARTURE GRADE 1

WEIGHBRIDGE GRADE 1

NEWELL HWYTO FORBES

3.4

4

3.8

5

10.04.2018

DAROOBALGIE

RMS

AHD N/A

WEIGHBRIDGE NEWELL HWY SOUTHBOUNDDAROOBALGIE 2018

M.G.A

JOB No:

DATE:

CLIENT:

CLIENT ADDRESS: JOB ADDRESS:

AMENDMENTS

DATE: DESCRIPTION:

MOB: 0415 55 55 25PO BOX 145 HORSLEY PARK 2175EMAIL: [email protected] SCALE: LEVELS:

NOTES: IF ANY CONSTRUCTION WORK IS PLANNED THE CONCERNED SHOULD UNDERTAKE A FURTHER SURVEY TO DEFINE ANY BOUNDARIES AS NO BOUNDARIES HAVE BEEN DEFINED. ANY POINT CRITICAL TO THE PREPARATION OF PLANS AND/OR CONSTRUCTION SHOULD BE CHECKED BY THE BUILDER/ARCHITECT BEFORE ANY WORK COMMENCING. ALL SERVICES ARE INDICATIVE ONLY. OTHER SERVICES MAY EXIST. ALL TREES ARE APPROXIMATE SIZE AND LOCATION ONLY. DIAL BEFORE YOU DIG SHOULD BE UNDERTAKEN PRIOR TO ANY EXCAVATION WORK ON 1100. PRIOR TO THE COMPLETION OF ANY PLANS AND/OR CONSTRUCTION FURTHER FIELD WORK SHOULD BE UNDERTAKEN.

E18-0736-AS-7-1-PR0004

Volume 16.2 106

Page 107: Maintenance Works MMaintenance Works Maintenance Works

FW: ECM Claim for payment Daroobalgie SthFW: ECM Claim for payment Daroobalgie SthFrom:From: DUBOIS Alexandre <[email protected]>To:To: TSS Invoices <[email protected]>Date:Date: Thu, 28 Jun 2018 12:13:48 +1000

From: [email protected] [mailto:[email protected]] Sent: Friday, 8 June 2018 12:18 PMTo: DUBOIS AlexandreSubject: ECM Claim for payment Daroobalgie Sth

Hi Alex

Please find Claim for payment attached for the completed works

Kind Regards,

Barry HadenDirector

Donaldson St Bradbury NSW2560 Australia E: [email protected]: +61 7 738

This email is confidential and intended solely for the use of the individual to whom it is addressed.Any views oropinions presented are solelythose of the authorand do not necessarily represent those of ECM. if you are notthe intended recipient, please be advised that forwarding, printing or copying of this emailis strictly prohibited.if you have recieved this email in error please notify our admin on +61 7 738

This email is intended only for the addressee and may contain confidential information. If you receive this email in error pleasedelete it and any attachments and notify the sender immediately by reply email. Transport for NSW takes all care to ensure thatattachments are free from viruses or other defects. Transport for NSW assume no liability for any loss, damage or otherconsequences which may arise from opening or using an attachment.

P Consider the environment. Please don't print this e-mail unless really necessary.

E18-0736-AS-7-1-PR0004

Volume 16.2 107

Page 108: Maintenance Works MMaintenance Works Maintenance Works

Euro Civil & Maintenance Pty Ltd CLAIM FOR PAYMENTQuality is Our Goal

Date

PO #

Claim #

Customer ID

ABN: 26 604 934 698

Subtotal $ 218,750.00

Discount

Sales Tax Rate

Sales Tax

Total inc GST $ 240,625.00

BSB: 112879 Account Number : 6 088

Hiring of 120 meters of temporary fencing for excavated areas around the toilet / change room and concreting lead up pavement

Excavation of 15 meters of flexible pavement to a depth of 350mm at Sth BoundFormwork13m long by 6m wide to Nth & Sth Bound for concrete pads

Line Marking the perimeter of the newly installed concrete to match current weighbridge line markingPaint 5x5 meters stop sign at the Sth bound sites prior to weighbridge

Excavate level & compact blinding pad for solid base of rainwater tank

Hire truck with Hiab (crane) for transportation of cubicle from Westmead NSW to Daroobalgie HVIS

Supply sweeper to clean site and prep for line marking

Supply 9 cubic meter skip bin for removal of rubbish

Carry out utility surveys and DBYD

Print Name Date

Trench and excavate from septic tank 25m for installation of overflow retention pit

Once signed, please Fax, mail or e-mail it to the provided address.

Supply Aggregate concrete for piers and footings

Supply pf 10,000L Collection Well

June 7, 2018

4200044014

ECMI177

RMS

Roads and Maritime Services

Attention: Alexandre Dubois

Customer: Quote/Project Description

The works Claim involved the following : Daroobalgie

Payment will be collected in prior to provision of services/goods described in this quote.

1- Installation of toilet cubicle/meeting room and civil works

Tel: 7 738 Fax: E-mail: info@e

Thank you for your business!

Donaldson St,

Supply 90mm storm water piping and plumb up from cubicle to tank

Signature

Supply 1 x 3500L Bio Septic tank

Carry out utility surveys and DBYD

Should you have any enquiries concerning this Claim, please contact Barry Haden on 7 738

10.00%

Supply Galvanized steel chains and install in concreted piers for anchorage of cubicle

2- Installation concrete pads for weighbridge at Daroobalgie SthABN: 76 236 371 088

110 George St, Parramatta NSW 2150

Special Notes and Instructions

Hiring of crane to install cubicle over new footing and anchored down.

Plumb water pipe from water meter to cubicle Supply and install 3.5 kw air-conditioning split system as requested to toilet/meeting room

Supply truck & Dog to remove unwanted materials

Hiring of 80 meters of water filled barriers to block entry to site Sth bound

Line Total

Hire 5 tone Excavator with auger and rock breaker Auger of piers and trenching of footings for new location of site toilet / change room

Supply 100mm sewerage pipes for installation from cubicle to septic tank & overflow

Excavate and formwork for footpath

Finish concrete and screed to RMS requirements for weighing

Supply and install electric water pump to cubicle

Excavate 25m trench and hole for installation of septic tank in ground

Supply 1x 1100 L pump station

Supply 100m of 1 inch copper pipe

Supply re-enforced steel mesh and rio bars times two layers to Sth bound weighbridge sites

1- Installation of toilet cubicle/meeting room and civil works

2- Installation concrete pads for weighbridge at Daroobalgie Sth

Supply concrete and finish footpath to enter cubicleSupply truck & Dog to remove unwanted materials

Travel, labor hire, accommodation, fuel and expenses

Supply approx 20 cubic meters of aggregate to each Nth& Sth bound concrete pads = total of 40 cubes

Engage surveyor to ensure concreting together with weighbridge meet the Cat 1 requirements

Excavate 100m trench to depth of 600mm

Install 2 x stop signs with post before weighbridge

Travel, labor hire, accommodation, fuel and expenses

E18-0736-AS-7-1-PR0004

Volume 16.2 108