Upload
mayank-jaiswal
View
223
Download
0
Embed Size (px)
Citation preview
8/2/2019 Major Project (2)
1/14
DESIGN OF IRRIGATION CANAL
8/2/2019 Major Project (2)
2/14
DESIGN OF IRRIGATION CANAL
NAME ROLL NO ROLE IN
1.NITIN KUMAR 0672073408 GROUP L
2.RATISH KUMAR 0172073408 AUTOPL
3.HEMANT 0342073408 DESIGN
4.PURUSHOTAM 0562073408 SURVEY
5.HEMANT KUMAR 0192073408 HANDLI
6.PARAMHANS 0022073408 AUTOPL
7.MINHAJ ALAM 0082073408 SURVEY
8.ANKIT KUMAR 0152073408 SURVEY
9.NIRAJ K HANSDA 0052073408 SURVEY
10.AMIT KUMAR 0682073408 SURVEY
11.VIKAS BALIYA 0642073408 SURVEY
12.GAURAV MEENA 0042073408 SURVEY
8/2/2019 Major Project (2)
3/14
DESIGN OF IRRIGATION CANAL
TOPIC:IRRIGATION CANAL DESIGN
Irrigation is defined as the science of artificial application of wateland.
Many procedures have been developed over the years for the hydesign of open channel sections.
Crops require a large amount of water for irrigation, and it is impto calculate water requirements accurately, both to design the sucanal and the pump (if any), and to check that enough water isavailable from the source.
8/2/2019 Major Project (2)
4/14
DESIGN OF IRRIGATION CANAL
Irrigation requirementsReference evapotranspiration (ETo) is the water use of grass (in mm/d)conditions.For most crops, the reference evapotranspiration at mid-season can be treasonable estimate of the peak water requirement.
It is reasonable to assume that 70 per cent of average rainfall is availablenet irrigation requirement (In mm/d ) can be estimated as:
In = ETo - (0.70 x P)where P (mm/d) is the average rainfall.
Additional water has to be supplied to take account of field application with surface irrigation, are typically about 40 per cent, giving an applicaof 0.60.The field irrigation requirement (If) can be estimated as: lf= In = Eto/.60The field irrigation requirement represents the rate (in mm/d) at whichdelivered to the field to prevent the crop suffering a shortage of water.
8/2/2019 Major Project (2)
5/14DESIGN OF IRRIGATION CANAL
To propose a Route for Irrigation canal from Najafgarhs Sewage
Plant to Pandawalan Kalan.
To Provide appropriate water requirements to the existing agricu
Providing better and sufficient quantity of water.
Utilizing the maximum quantity of Sewage water.
Ease in flow of sewage water system.
8/2/2019 Major Project (2)
6/14
DESIGN OF IRRIGATION CANAL
More efficient the treatment plant more will be the water quantity alesser will be the sewer blockage and other sanitation problems.
Providing better alignment and road conditions comparing to curre
Improved growth of crops and better crop production.
Reducing the economic cost.
8/2/2019 Major Project (2)
7/14
DESIGN OF IRRIGATION CANAL
The Irrigation water used by the farmers is not a clean water, an
taken from the Najafgarh Drain, which is a dump yard now contasewerage from different parts of Delhi.
The Water Table of Delhi is very low and decreasing day by da
need to conserve it. As we know Groundwater is the biggest sour
fresh water.
The Level of Groundwater in West Delhi is too Low, and is the
used source of Irrigation Water here.
8/2/2019 Major Project (2)
8/14
DESIGN OF IRRIGATION CANAL
The Project work will Consist of 6 Phases:
o 1st Phase:
Reconnaissance Survey: Route Visit.
Time Spend: 1 Week
o2nd Phase:
Main Survey: By using method of Cross-Sectioning Leve
Time Spend: 4 Weeks
o3rd Phase:
Plotting of Survey Data: By use of Auto-Plotter.
Time Required: 2 Week
8/2/2019 Major Project (2)
9/14
DESIGN OF IRRIGATION CANAL
o4th Phase:Volumetric Calculations.
Time Required: 1 Week(Approx.)
o 5th Phase:
Final Design and Lining.Time Spend: 2 Week
o 6th Phase:
Cost Estimation of Canal Design.
Time Spend: 1 Week
8/2/2019 Major Project (2)
10/14
DESIGN OF IRRIGATION CANAL
CROSS-SECTIONING SURVEY:
Cross Sections are Run at Right angles to the Longitudinal profile
either side of it for the purpose of lateral outline of the ground surfa
They provide the data for estimating quantities of earth work and
purposes.
The distance between 2 consecutive points were taken as 10 m atlater on the distance were increased to 20 m.
3 Readings were taken at every Point , denoted by L C R , which
point , Central Point and Right Point. The Distance taken for L R on
of Central line was 2m.
8/2/2019 Major Project (2)
11/14
DESIGN OF IRRIGATION CANAL
These type of Pipelines are connected to the Pumps which supply con
water to Agriculture Land.
8/2/2019 Major Project (2)
12/14
DESIGN OF IRRIGATION CANAL
1. Regarding aims and objectives 50% work has been completedone month.
2. The survey has been completed.
3. The remaining work will be completed in next few weeks.