    LondonGateway

    London Gateway Making the UK more competitive

    I am delighted by UAE investment in iconic projects and businesses such as the London Gateway, set to be oneo Europes largest port and logistics complexes. Rt Hon David Cameron, Prime Minister, July 2010

  • 7/30/2019 Making the UK More Competitive

    2/8

    2

    London Gateway The vision

    Summary of key bene ts

    Representing 1.5bn o Foreign Direct Investment

    (FDI), DP Worlds London Gateway will be the UKs

    rst 21st century deep-sea container port and

    Europes largest logistics park.

    London Gateway is situated 25 miles east o central

    London. The project will deliver a vital piece o

    national in rastructure which will enhance the UKs

    ability to compete globally.

    Internationally, London Gateway will substantially

    strengthen the UKs ports and logistics o er. It will

    provide much needed capacity or the new

    generation o Ultra Large Container Ships that serve

    the Asia to Europe deep-sea trade routes,

    at world-class levels o productivity.

    Through its excellent location, London Gateway will

    reduce the need or reight transport and take a lead

    role in cutting carbon emissions rom the UK logistics

    chain.

    London Gateway is the single largest job creation

    project in the UK today and will deliver 36,000

    direct and indirect jobs. The UK will bene t through

    signi cant employment and economic growth.

    This document provides an overview o the bene ts

    this project will bring and we hope you nd it

    bene cial and interesting.

    Simon Moore

    Chie Executive

    London Gateway, DP World

    INVESTMENT: Represents in excess o 1.5bn o

    Foreign Direct Investment.

    CATALYST: An economic catalyst or urther Foreign

    Direct Investment.

    EMPLOYMENT: Will provide major new

    employment and skills growth in an area identi ed by

    Government as a priority or regeneration. The total o

    direct and indirect jobs that will be created by LondonGateway is independently estimated at 36,000.

    INFRASTRUCTURE: Provides the UK with much

    needed deep sea container port capacity closer to

    the key areas o consumption within the UK, thus

    reducing national road use. London Gateway will also

    provide rail-connected logistics, urther reducing the

    need or road travel.

    The port and logistics park will set new standards in

    productivity and e ciency.

    ENVIRONMENT: London Gateways award-winning

    environmental strategy underlines our commitment

    to develop and deliver the project in a responsible

    manner. London Gateway won the Lloyds List Global

    Environmental Award 2010.

    CARBON REDUCTION:London Gateway will help

    the UK to reduce greenhouse gases whilst creating

    economic growth.

    London Gateway will take 2,000 heavy goods

    vehicles per day o the UKs road network, the

    equivalent o 148,000 tonnes o CO 2 annually.

  • 7/30/2019 Making the UK More Competitive

    3/8

    3

    DP World Delivering world-class infrastructure to the UK

    Vital infrastructure for the UKs economy

    The UK economy depends on the ree fow o goods

    into and out o our island nation. Throughout history,shipping has played a crucial role in the national

    supply chain. The UK is also a global shipping hub

    a vital transit stage in the movement o goods around

    the world.

    Globalisation and the rise o emerging economies

    are driving considerable increases in container reight

    movements. Since containerisation started in the

    1950s, ships have substantially increased in size.

    Our national port capabilities have ailed to keep pace with events and provide su cient uture capacity o

    the right type in the best location.

    The UK needs more port capacity

    The UK needs extra port capacity to remain

    competitive and to uture-proo its status as a

    world trade hub.

    The UKs ability to berth the latest generation of

    Ultra Large Container Ships (ULCS) is limited anddoes not meet long-term demand projections.

    Length 135m

    Draft

  • 7/30/2019 Making the UK More Competitive

    4/8

    4

    London Gateway Making the UK more ef cient

    Today, the majority o shipping containers enter the

    UK through ports located in the South East. The

    containers are then sent to distribution centres where

    they are unpacked and the goods are sorted be ore

    being transported to shops.

    Distribution centres are o ten located over 100 miles

    away rom the ports in the South East, which means

    every day many thousands o lorry miles are needed

    to transport containers across the country. This

    logistics model is ine cient and we can reduce a

    great deal o transportation currently taking place in

    the UK by building distribution centres next to the port

    at London Gateway. Savings in lorry miles, nancial

    costs and carbon emissions will be signi cant,

    making the UK more e cient, more competitive and

    less congested.

    The location or London Gateway is excellent. It not

    only provides opportunities or major retailers to build

    their distribution centres next to the port o entry, it

    is also uniquely situated in the heart o the biggest

    consumer market in Europe. When goods leave the

    distribution centres at London Gateway, they will have

    less distance to travel than existing deep-sea ports in

    order to reach the consumer.

    63% o imports into the UK arrive intoSouth East ports, an area with only 10%

    o the UK warehousing capacity.

    MDS Transmodal

  • 7/30/2019 Making the UK More Competitive

    5/8

    5

    The economic bene ts

    Importantly, much of the employment created at London Gateway will be new net jobs and will not be

    displacement o existing jobs. This is excellent news or UK uture growth.

    Government thinking supports and endorses the case for London Gateway as it embodies major investment in

    an area identi ed as a regeneration priority and it entails carbon emission reductions.

    Beyond the initial 1.5bn FDI, London Gateway will act as a catalyst for substantial further investment by

    enhancing the competitiveness o the UKs economy.

    Employment

    At a challenging time or the

    UK employment market,

    London Gateway provides a

    positive beacon. Substantiallong-term employment will be

    created by the development

    and operation o the port and

    logistics park.

    In addition, with

    complementary policy

    and in rastructure support,

    London Gateway has

    urther potential to beleveraged as a catalyst or

    wider regeneration and

    employment opportunities.

    it is estimated that a total

    of around 36,100 permanent

    jobs (including direct, indirect

    and induced impacts) will

    be supported once the Port

    and Logistics Park are fully operational and every year

    thereafter.

    Source: Ox ord Economics

    Source: Ox ord Economics

    Employment created by London GatewayOperational phase

    Port

    Number

    of jobs

    Logistics parkTotal operational

    Key: Direct Indirect Induced

    London Gateway is going to deliver massive economic benefts or the long term and is an excellent use o theormer oil refnery site; it will provide many thousandso jobs or local people in Thurrock and I welcome DP Worlds investment. This underlines Thurrocks role as a major logistics hub or the UK. Jackie Doyle-Price, Member of Parliament for Thurrock,

    September 2010

  • 7/30/2019 Making the UK More Competitive

    6/8

    6

    The economic bene ts

    Skills

    The days when employment in ports was dominated

    by manual labour have long gone. London Gateway

    will require the application o skills and technology to

    create solutions or the global logistics industry.

    The skills required will include high-end IT and

    management roles together with a broad mix o

    pro essional nancial capability as well as highly-

    trained operatives using world-leading port and

    logistics park technology.

    Contribution to GDPWhen complete, London

    Gateway will contribute

    3.2bn to UK GDP annually.

    Source: Ox ord Economics

    Source: Ox ord Economics

    London Gateways contribution to UK GDPOperational phase

    Port

    million

    Logistics park

    Total operational

    Key: Direct Indirect Induced

    Im delighted to see construction o the port take place and see frst hand the real economic benefts being delivered to South Essex. I hope to ensure that the local

    community makes the most o the opportunities this development presents.

    Stephen Metcalfe, Member of Parliament for South Basildon and East Thurrock, September 2010

  • 7/30/2019 Making the UK More Competitive

    7/8

    7

    We are one o the worlds largest marine terminal

    operators with 30,000 sta , 50 terminals and a urther

    11 under development. Our operations span six

    continents and 31 countries.

    Our Jebel Ali terminal is the sixth largest port in the

    world and is immediately surrounded by over 6,000

    businesses. The management o this port and

    logistics park combination has allowed DP World to

    become global leaders in its eld.

    We will bring all of our experience to bear at

    London Gateway.

    DP World A global service

  • 7/30/2019 Making the UK More Competitive

    8/8

    LondonGateway.com

    or more in ormation about London Gateway please visit

    This innovative development is changing the landscape along theThames in many ways, bringing world-class trading acilities, new jobs and training opportunities. Bob Neill MP, Minister for the Thames Gateway, September 2010

    London Gateway under construction