Provision of Passenger Amenities and facilities, and its improvements at Railway Stations is one of the most important aspect in Railway Services. Passenger Amenities 1. Provision of Electronic Train/Coach Indication/ Passenger Guidance Board is being provided at Lalaguda, Moula Ali, Charlapalli, Ghatkesar, Malkajgiri, Dayanand Nagar, Safilguda, Ramakrishnapuram Gate, Ammuguda, Alwal, Cavalry Barraks, Bolarum, Bolarum Bazar, G Pochampalli, Gowdavalli, Medchal stations under MMTS Phase II project with cost of `4.59 crore. 2. Installation of Electronic Train/ Coach Indication/ Passenger Guidance Board is being done at Ammuguda, Sanatnagar, Firoziguda, Suchitra Centre, Bhudevinagar, Neredmet, Moula Ali Housing Board Colony as a part of MMTS Phase II project with cost of `3.90 crore. 3. Proposed for construction of Toilets at Lallaguda Gate, Safilguda, Ramakistapuram, Ammuguda, Cavalry Barracks, Alwal and Bolarum Bazar with an estimated cost of `4.46 crore. 4. Proposed for Platform extension works at Cherlapalli, Lallaguda, Ramakistapuram, Safilguda, Ammuguda, Alwal, Bolarum Bazar and Dayanand Nagar with an extimated cost of `9 crore. 5. Proposed for development of circulating area at Ammuguda, Cavalry Barracks, Alwal, bolarum Bazar, lallaguda Gate, Safilguda and Ramakistapuram with an extimated cost of `2.38 crore. Station Amenity Amount Status Malkajgiri Toilets `1 lakh Constructed Ghatkesar Platform Works `30 lakh Completed Malkajgiri Platform Works `1.11 crore Completed Borabanda 2 Escalators Hitech City 2 Escalators `6.00 crore Proposed Fatehnagar 2 Escalators Borabanda CCTV Cameras Hitech City CCTV Cameras Bharatnagar CCTV Cameras `1.84 crore Proposed Fatehnagar CCTV Cameras Bharatnagar 2 ATVMs Hitech City 2 ATVMs Borabanda 2 ATVMs Malkajgiri 2 ATVMs `16.5 lakh Installed Ghatkesar ATVM Bolarum ATVM Nature Cure Hospital ATVM Hitech City 2 CoTVMs `13.5 lakh Installed Bharatnagar CoTVM Malkajgiri CIB/TIB `14.14 lakh Provided Moula Ali Adarsh Station `3.60 crore Developed Moula Ali Circulating Area `1.80 crore Developed Bolarum Bazar PF Shelter `3.1 lakh Proposed Dayanand Nagar PF Shelter `3.2 lakh Proposed Hitech City Toilets `0.10 crore In Progress Bharat Nagar Toilets `0.10 crore In Progress Bharat Nagar 2 Lifts `1 crore In Progress Borabanda 2 Lifts `1 crore In Progress Hitech City 2 Lifts `1 crore In Progress LallagudaGate 1 Lift `0.5 crore In Progress 9 Stations Wi-Fi `14 lakh Provided Provision of Stoppage 1.Tr.No.17417/17418 Tirupati-Sainagar Shirdi-Tirupati Weekly Express given stoppage at Malkajgiri 2.Tr.No.18112/18111 Yesvantpur- Tatanagar-Yesvantpur Weekly Express given stoppage at Moula- Ali 3.Tr.No.17229/17230 Thiruvananthapuram Central– Hyderabad-Thiruvananthapuram CentralSabari Express given stoppage at Charlapalli Extension of Service 1. Tr.No.57448 Mahabubnagar–Secunderabad Passenger is extended to Mirzapalli with stoppages at Lallaguda Gate, Malkajgiri, Dayanandnagar, Safilguda, Ramakistapuram Gate, Ammuguda, Cavalry Barracks, Alwal, Bolarum Bazaar, Bolarum, Gundlapochampalli, Gowdavalli, Medchal, Dabilpura, Kuchavaram Halt and Manoharabad stations. Running of Special trains 1. Bolarum to Gadwal 12 special trains 2. Bolarum to Mahabubnagar 1 special train 3. Malkajgiri to Basar 24 special trains 4. Malkajgiri to Nizamabad 10 special trains (Total 47 special Trains) Passenger Train Services Details of Special Trains/ Provision of Stoppages/ Extension of Trains in Malkajgiri Parliamentary Constituency Jurisdiction. RAIL DEVELOPMENTAL WORKS Malkajgiri Parliamentary Constituency Jurisdiction South Central Railway serving the entire state of Telangana, major portion of Andhra Pradesh and considerable portion of Karnataka, Maharastra states and small parts of Tamilnadu and Madhya Pradesh. Malkajgiri Parliamentary Constituency falls under Telangana State. Entire Railway Network of this constituency is being served by South Central Railway. SOUTH CENTRAL RAILWAY Shri Narendra Modi Hon’ble Prime Minister Malkajgiri Parliamentary Constituency

Malkajgiri Parliamentary Constituency Jurisdiction

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Provision of Passenger Amenities and facilities, and its improvements at Railway Stations is one of the most important aspect in Railway Services.

Passenger Amenities

1. Provision of Electronic Train/Coach Indication/ Passenger Guidance Board is being provided at Lalaguda, Moula Ali, Charlapalli, Ghatkesar, Malkajgiri, Dayanand Nagar, Safilguda, Ramakrishnapuram Gate, Ammuguda, Alwal, Cavalry Barraks, Bolarum, Bolarum Bazar, G Pochampalli, Gowdavalli, Medchal stations under MMTS Phase II project with cost of ̀ 4.59 crore.

2. Installation of Electronic Train/ Coach Indication/ Passenger Guidance Board is being done at Ammuguda, Sanatnagar, Firoziguda, Suchitra Centre, Bhudevinagar, Neredmet, Moula Ali Housing Board Colony as a part of MMTS Phase II project with cost of ̀ 3.90 crore.

3. Proposed for construction of Toilets at Lallaguda Gate, Safilguda, Ramakistapuram, Ammuguda, Cavalry Barracks, Alwal and Bolarum Bazar with an estimated cost of ̀ 4.46 crore.

4. Proposed for Platform extension works at Cherlapalli, Lallaguda, Ramakistapuram, Safilguda, Ammuguda, Alwal, Bolarum Bazar and Dayanand Nagar with an extimated cost of ̀ 9 crore.

5. Proposed for development of circulating area at Ammuguda, Cavalry Barracks, Alwal, bolarum Bazar, lallaguda Gate, Safilguda and Ramakistapuram with an extimated cost of ̀ 2.38 crore.

Station Amenity Amount Status

Malkajgiri Toilets `1 lakh Constructed

Ghatkesar Platform Works `30 lakh Completed

Malkajgiri Platform Works `1.11 crore Completed

Borabanda 2 Escalators

Hitech City 2 Escalators `6.00 crore Proposed

Fatehnagar 2 Escalators

Borabanda CCTV Cameras

Hitech City CCTV Cameras

Bharatnagar CCTV Cameras `1.84 crore Proposed

Fatehnagar CCTV Cameras

Bharatnagar 2 ATVMs

Hitech City 2 ATVMs

Borabanda 2 ATVMs

Malkajgiri 2 ATVMs `16.5 lakh Installed

Ghatkesar ATVM

Bolarum ATVM

Nature Cure Hospital ATVM

Hitech City 2 CoTVMs `13.5 lakh Installed

Bharatnagar CoTVM

Malkajgiri CIB/TIB `14.14 lakh Provided

Moula Ali Adarsh Station `3.60 crore Developed

Moula Ali Circulating Area `1.80 crore Developed

Bolarum Bazar PF Shelter `3.1 lakh Proposed

Dayanand Nagar PF Shelter `3.2 lakh Proposed

Hitech City Toilets `0.10 crore In Progress

Bharat Nagar Toilets `0.10 crore In Progress

Bharat Nagar 2 Lifts `1 crore In Progress

Borabanda 2 Lifts `1 crore In Progress

Hitech City 2 Lifts `1 crore In Progress

LallagudaGate 1 Lift `0.5 crore In Progress

9 Stations Wi-Fi `14 lakh Provided

Provision of Stoppage

1.Tr.No.17417/17418 Tirupati-Sainagar Shirdi-Tirupati Weekly Express given stoppage at Malkajgiri

2 .Tr.No.18112/18111 Yesvantpur-Tatanagar-Yesvantpur Weekly Express given stoppage at Moula-Ali

3 . T r . N o . 1 7 2 2 9 / 1 7 2 3 0 Thiruvananthapuram Central– Hyderabad-Thiruvananthapuram CentralSabari Express given stoppage at Charlapalli

Extension of Service

1. Tr.No.57448 Mahabubnagar–Secunderabad Passenger is extended to Mirzapalli with stoppages at Lallaguda Gate, Malkajgiri, Dayanandnagar, Safilguda, Ramakistapuram Gate, Ammuguda, Cavalry Barracks, Alwal, Bolarum Bazaar, Bolarum, Gundlapochampalli, Gowdavalli, Medchal, Dabilpura, Kuchavaram Halt and Manoharabad stations.

Running of Special trains 1. Bolarum to Gadwal 12 special trains 2. Bolarum to Mahabubnagar 1 special train 3. Malkajgiri to Basar 24 special trains 4. Malkajgiri to Nizamabad 10 special trains (Total 47 special Trains)

Passenger Train Services

Details of Special Trains/ Provision of Stoppages/ Extension of Trains in Malkajgiri Parliamentary Constituency Jurisdiction.

RAIL DEVELOPMENTAL WORKS Malkajgiri Parliamentary Constituency Jurisdiction

South Central Railway serving the entire state of Telangana, major portion

of Andhra Pradesh and considerable portion of Karnataka, Maharastra states and small parts

of Tamilnadu and Madhya Pradesh.

Malkajgiri Parliamentary Constituency falls under Telangana State. Entire

Railway Network of this constituency is being served by

South Central Railway.

SOUTH CENTRALRAILWAY

Shri Narendra ModiHon’ble Prime Minister

Malkajgiri Parliamentary Constituency

RAIL DEVELOPMENTAL WORKS

Malkajgiri Parliamentary Constituency Jurisdiction

Infrastructural Development

New Railway Lines1. Construction of new line under MMTS - Phase II for

a distance of 84 Kms with an estimated cost of `817 crore is under progress

2. Proposed for Extension of MMTS - Phase II upto Yadadri for a distance of 33 Kms with an estimated cost of ̀ 412 crore.

Electrification of Railway LinesIt is proposed for electrification of Manmad – Dhone for a distance of 868 Kms with an estimated cost of `1031 crore.

Capacity enhancement

1. Upgradation of Yard remodeling works are completed in Malkajgiri and Moula ali with the cost of ̀ 95 lakh.

2. Development of loading facilities for handling containers is completed with a cost of ` 25 lakh at Medchal.

3. Development of satellite terminal at Charlapalli station is under progress with the cost of ` 220 crore.

4. Proposed for Conversion of Siding 1 as UP loop (coaching fit) and Siding 2 as goods loop with direct reception and dispatch facilities at Moula Ali with an estimated cost of ̀ 5.73 crore.

Safety is the priority on SCR, to ensure safety of the Rail users, Foot over Bridges (FoBs)/ Road under/over Bridges are constructed / proposed for construction at various stations/ locations in Malkajgiri Parliamentary Constituency Jurisdiction.

Safety – The First Priority

ASSEMBLY SEGMENTS

Proposed FOBsStation Cost in `crore

Moula Ali 1.53

Lallaguda Gate 1.10

Malkajgiri 1.85

Bolarum 1.10

Green Initiatives

1. Towards Environment/conservation measures , Revival of Water bodies is completed in the jurisdiction of Malkajgiri parliamentary Constituency with a cost of ̀ 1.04 lakh.

2. Towards energy saving LED lighting is provided in all stations.

3. 617 kWp Solar Panels at Lallaguda Workshop, 120 kWp Solar panels at EMU Car Shed/Moula-Ali and 20 kWp Solar Panels at Diesel Loco Shed/Moula-Ali are installed.

With a view to strengthen safety at Level Crossing gates and to avoid untoward incidentsand also to provide seamless journey to road traffic, the following Road under/overBridges are constructed/proposed for construction under Malkajgiri Parliamentary constituency.

Road Over / Under Bridges

Road Over Bridges (ROB)

1. Construction of ROB in lieu of LC No.15-T between Secunderabad and Kazipet with the cost of ̀ 42.57 crore.

2. Construction of ROB between Cherlapally and Ghatkesar in lieu of LC No.12 with the cost of `32.20 crore is in progress.

3. Construction of ROB between Gundlapochampalli and Medchal Stations in lieu of Manned LC No.246/A with an estimated cost of ̀ 38 crore is in progress.

Road Under Bridges (RUB)

1. RUB at Lallaguda Gate Station Yard in lieu of LC No.256 is under progress with Sanctioned Cost of `29.10 crore

2. Proposed for construction of RUB in lieu of LC No.254 at Safilguda with an estimated cost of `30.82 crore. Alignment to be finalised by State Govt.

3. Proposed for construction of RUB between Ammuguda and Moula Ali Stations in lieu of LC No.BP-8 with an estimated cost of ` 29.99 crore and Alignment to be finalised by State Govt.

4. Construction of RUB between Ammuguda and Moula Ali Stations in lieu of LC No.BP-11 witn an estimated cost of ̀ 27 crore is in progress.

Medchal

Malkajgiri

Qutbullapur

Kukatpalle

Uppal

Lal Bahadur Nagar

Secunderabad Cantt.

Construction of FoB at Moula-Ali with the cost of `1.61 crore is in progress.