    HAND OVER REPORT

    DATE 19/9/2012

    SHIFT DAYTIME: 8:00hrs-17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    CONTRACTOR(S): S&R

    WORK SCOPE

    CIVIL: (S&R)

    work done Mobillazation of workers & equipment to the site

    Barricading of construction sitesite clearing & evacuation of waste out of the plant

    WORK SCOPE

    SAFE HOURS

    CIVIL: 15

    TOTAL 120 TOTAL FROM SEPT 19= 120

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 Personnelloading Tipper without wearing hard hat

    2 Tools & equipment were not adequately arranged on site

    ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed

    out before end of the shift .

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    2/77

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    3/77

    HAND OVER REPORT

    DATE 20/9/2012

    SHIFT DAYTIME: 8:00hrs-17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    CONTRACTOR(S): S&R

    WORK SCOPE

    CIVIL: (S&R)

    work done Excavation of the foundation

    waste removal from the site

    SAFE HOURS

    CIVIL: 18

    TOTAL 144 TOTAL FROM SEPT 19= 264

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 Personnel loading Tipper without wearing hard hat

    2 Tools & equipment were not adequately arranged on site

    ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed

    out before end of the shift .

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    4/77

    SHIFT DAY

    TIME: 8:00 - 17hrs

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    5/77

    HAND OVER REPORT

    DATE 21/9/2012

    SHIFT DAYTIME: 8:00 hrs- 17hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    CONTRACTOR(S): S&R

    WORK SCOPE

    CIVIL: (S&R)

    work done continuation of Excavation of the foundation

    waste removal from the siteConstuction of laydawn area & bending of iron rods

    SAFE HOURS

    CIVIL: 16

    TOTAL 128 TOTAL FROM SEPT 19= 392

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 Personnel loading Tipper without wearing hard hat

    2 Tools & equipment were not adequately arranged on site

    ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed

    out before end of the shift .

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    6/77

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    7/77

    HAND OVER REPORT

    DATE 22/9/2012SHIFT DAY

    TIME: 8:00hrs- 17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    CONTRACTOR(S): S&R

    WORK SCOPE

    CIVIL: (S&R)

    work done continuation of Excavation of the foundationwaste removal from the site

    Constuction of laydawn area & bending of iron rods

    SAFE HOURS

    CIVIL: 13

    TOTAL 96 TOTAL FROM SEPT 19= 488

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 Personnel loading Tipper without wearing hard hat

    2 Tools & equipment were not adequately arranged on site

    ACTIONS: All observed unsafe behaviors & conditions were adequately addressed close

    out before end of the shift .

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    8/77

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    9/77

    HAND OVER REPORT

    DATE 23/9/2012

    SHIFT DAYTIME: 8:00hrs-17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    CONTRACTOR(S): S&R

    WORK SCOPE

    CIVIL: (S&R)

    work done Blinding of foundation

    SAFE HOURS

    CIVIL: 9

    TOTAL 72 TOTAL FROM SEPT 19= 560

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 Personnel loading Tipper without wearing hard hat

    2 Tools & equipment were not adequately arranged on site

    ACTIONS: All observed unsafe behaviors & conditions were adequately addressed close

    out before end of the shift .

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    10/77

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    11/77

    HAND OVER REPORT

    DATE 24/9/2012

    SHIFT DAY

    TIME: 8:00hrs-17:00hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    CONTRACTOR(S): S&R

    WORK SCOPE

    CIVIL: (S&R)

    work done Completion of Foundation blinding

    Construction work on laydown area is ongoing

    SAFE HOURS

    CIVIL: 9

    TOTAL 136 TOTAL FROM SEPT 19= 696

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 Personnel loading Tipper without wearing hard hat

    2 Tools & equipment were not adequately arranged on site

    ACTIONS: All observed unsafe behaviors & conditions were adequately addressed close

    out before end of the shift .OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    12/77

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    13/77

    HAND OVER REPORT

    DATE 25/9/2012

    SHIFT DAY

    TIME: 8:00hrs - 17:00 hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    CONTRACTOR(S): S&R

    WORK SCOPE

    CIVIL: (S&R)

    work done Setting of reiforcement

    Evacuation of debrils

    Completion of construction of Ladown Area .

    SAFE HOURS

    CIVIL: 12

    TOTAL 98 TOTAL FROM SEPT 19= 794

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 1

    1 Obstruction of Access into construction site with debrils evacuated from

    foundation

    ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closeout before end of the shift .

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    14/77

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    15/77

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    16/77

    HAND OVER REPORT

    DATE 26/9/2012

    SHIFT: DAY

    TIME : 8:00-17hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    CONTRACTOR(S): S&R

    WORK SCOPE

    CIVIL: (S&R)

    work done Setting of reinforcement continue

    Evacuation of debris

    Completion of construction of Ladown Area .

    SAFE HOURS

    CIVIL: 12

    TOTAL 98 TOTAL FROM SEPT 19= 892

    Unsafe behavior / unsafe Condition observed : 1

    Obstruction of Access into construction site with debrils evacuated from

    foundation

    ACTIONS: All observed unsafe behaviors & conditions were adequately addressed close

    out before end of the shift .

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    17/77

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    18/77

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    19/77

    HAND OVER REPORT

    DATE 27/9/2012

    SHIFT DAY

    TIME: 18:00hrs -17:00hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    CONTRACTOR(S): S&R

    WORK SCOPE

    CIVIL: (S&R)

    work done Setting of reinforcement continue

    Casting of concrete

    SAFE HOURS

    CIVIL: 17

    TOTAL 136 TOTAL FROM SEPT 19

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 1

    1 Obstruction of access route with mixer machine.

    ACTIONS: All observed unsafe behaviors & conditions were adequately addressed close

    out before end of the shift .OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    20/77

    1028

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    21/77

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    22/77

    HAND OVER REPORT

    DATE 28/9/2012

    SHIFT DAYTIME: 18:00hrs -17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA

    CONTRACTOR(S): S&R

    WORK SCOPE

    CIVIL: (S&R)

    work done 1 Continuation of concrete casting

    2 Excavation of foundation3 Evacuation of debris from the work area

    SAFE HOURS

    CIVIL: 18

    TOTAL 144 TOTAL FRO

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 Working tools were scattered on construction site

    2 Poor housekeeping in Lay down Area

    ACTIONS: Feedback was given to the Site Contractor Safety Officer on both

    He stopped the work briefly and ensured adequate housekeeping i

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    23/77

    GE AREA

    M SEPT 19=1172

    nsafe Conditions

    n the two locations

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    24/77

    HAND OVER REPORT

    DATE 29/9/2012

    SHIFT DAY

    TIME: 18:00hrs -17:00hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. Charity

    WORK SCOPE

    CIVIL: (S&R) Nil

    work done

    CIVIL: P.Charity 1 Preparation of the wall for painting ( sand paper & bru

    2 priming of wall

    3 Painting of wall

    SAFE HOURS

    CIVIL: S&R 0

    CIVIL: p. Charity 28

    TOTAL 28 TOTAL FROM SEPT 19=1200

    ACTIONS: Feedback was given to the Site Contractor Safety Officer on both Unsafe Cond

    He stopped the work briefly and ensured adequate housekeeping in the two l

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    25/77

    hing )

    itions

    ocations

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    26/77

    HAND OVER REPORT

    DATE 30/9/2012

    SHIFT DAYTIME: 18:00hrs -17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. Charity

    WORK SCOPE

    CIVIL: (S&R)

    work done 1 Continuation of concrete casting

    2 Excavation of foundation

    CIVIL: P.Charity 1 Preparation of the wall for painting ( sand p

    2 priming of wall

    3 Painting of wall

    SAFE HOURS

    CIVIL: S&R 96

    CIVIL: p. Charity 54

    TOTAL 150 TOTAL FRO

    ACTIONS:

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    27/77

    GE AREA &

    aper & brushing )

    M SEPT 19=1350

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    28/77

    HAND OVER REPORT

    DATE 1/10/1900SHIFT DAY

    TIME: 18:00hrs -17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPME

    PAINTING OF NEW TANK ROOM & STRUC

    CONTRACTOR(S): S&R

    P. Charity

    WORK SCOPE

    CIVIL: (S&R) 1 Continuation of concrete casting

    work done 2 Excavation of foundation3 Block laying

    CIVIL: P.Charity 1 priming of wall

    2 Painting of wall

    SAFE HOURS

    CIVIL: S&R 120

    CIVIL: p. Charity 12

    TOTAL 132

    1 Debris removed from excavation yet to b

    ACTIONS: Permit for waste evacuation will be renew on

    immediately waste permit is renewed deris w

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    29/77

    T STORAGE AREA &

    URES

    TOTAL FROM SEPT 19=1482

    e evacuated out of site

    Tuesday morning.

    ill be evacuated out of site

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    30/77

    HAND OVER REPORT

    DATE 10/2/2012SHIFT DAY

    TIME: 18:00hrs -17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. Charity

    WORK SCOPE

    CIVIL: (S&R) 1 Casting of the wall

    work done 2 Excavation of deris from the site3 Block laying

    CIVIL: P.Charity Nil

    SAFE HOURS

    CIVIL: S&R 15

    CIVIL: p. Charity 0

    TOTAL 120 TOTAL FRO

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 21 Improper arrangement of tools on site

    2 poor hous removed from excavation yet to be evacuate

    ACTIONS: The safety officer was given a feed back, he promised to close the t

    on checking back about an hour later the has been closed

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    31/77

    E AREA &

    M SEPT 19=1602 120

    out of site

    o issues immediately

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    32/77

    3-Oct

    HAND OVER REPORT

    DATE 10/3/2012

    SHIFT DAYTIME: 18:00hrs -17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. Charity

    WORK SCOPE

    CIVIL: (S&R) 1 Block laying on the wall

    work done 2 Compaction of the floor

    3 preparation for casting of the concrete

    CIVIL: P.Charity Nil

    SAFE HOURS

    CIVIL: S&R 16

    CIVIL: p. Charity 0

    TOTAL 128 TOTAL FRO

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 3

    1 poor housekeeping ( off cuts woods )2 tools were not properly stored on site

    3 caution tape use for brrication was lowered

    ACTIONS: site safety officer & engineer were informed to immediately ensure

    good housekeeping are maintained on construction site always .

    The team closed up the issues before the end of the shfi.t

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    33/77

    E AREA &

    M SEPT 19=1730

    that

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    34/77

    OCT

    HAND OVER REPORT

    DATE 10/4/2012

    SHIFT DAYTIME: 18:00hrs -17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. Charity

    WORK SCOPE

    CIVIL: (S&R) 1 Continuation of wall casting

    work done 2 Compaction of the floor

    CIVIL: P.Charity Nil

    SAFE HOURS

    CIVIL: S&R 17

    CIVIL: p. Charity 0

    TOTAL 136 TOTAL FRO

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 Access route was obstructed with wooden materials

    2 cement bags scattered on construction site

    ACTIONS: the Carpenter was informed to remove the plant from access route i

    casting crew were informed to always stored used bags of cement t

    The issues were closed up immediately

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    35/77

    E AREA &

    M SEPT 19=1886

    mmediately

    gether

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    36/77

    HAND OVER REPORT

    DATE 10/5/2012

    SHIFT DAY

    TIME: 18:00hrs -17:00hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. Charity

    WORK SCOPE

    CIVIL: (S&R) 1 Building casting form

    work done 2 welding of reinforcement ( Hot work )

    3 setting of reinforcement

    CIVIL: P.Charity

    SAFE HOURS

    CIVIL: S&R 136

    CIVIL: p. Charity 12

    TOTAL 148 TOTAL FRO

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 21 the site carpenter was not properly stored his tools has

    2 off cuts wooden materials with nails not stored as requir

    ACTIONS: the Carpenter was given a feed back , ask to stop working and obser

    He maintained good housekeeping before the continuation of his ta

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

    1 Scaffold erection

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    37/77

    E AREA &

    M SEPT 19=2034

    lanned

    ed

    ve housekeeping

    k

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    38/77

    HAND OVER REPORT

    DATE 10/6/2012

    SHIFT DAYTIME: 18:00hrs -17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA &

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. CHARITY

    WORK SCOPE

    CIVIL: (S&R) 1 Building casting form

    work done 2 welding of reinforcement ( Hot work )

    3 setting of reinforcement

    CIVIL: P.Charity 1 Preparation of the structure for painting ( sand paper &

    2 Painting of Tanks , pipes & structures

    3 Painting of MCAS fan exhaust

    SAFE HOURS

    CIVIL: S&R 136

    CIVIL: p. Charity 72

    TOTAL 208 TOTAL FROM SEPT 19=2242

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 poor house keeping in the lay down area

    2 gravel parked in lay down area are not barricaded

    ACTIONS: The site safety officer was informed immediately to ensure adequate

    housekeeping is maintained in the lay down area always.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    39/77

    brushing )

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    40/77

    HAND OVER REPORT

    DATE 10/7/2012

    SHIFT DAYTIME: 8:00hrs -17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. CHARITY

    WORK SCOPE

    CIVIL: (S&R) 1 Compaction of construction site

    work done 2 Setting of the reinforcement bar

    CIVIL: P.Charity

    SAFE HOURS

    CIVIL: S&R 56

    CIVIL: p. Charity 0

    TOTAL 56 TOTAL FROM SEPT 19

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 poor house keeping in the lay down area

    ACTIONS: The site safety officer was informed immediately to ensure adequat

    housekeeping is maintained in the lay down area always.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    41/77

    E AREA &

    2298

    e

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    42/77

    HAND OVER REPORT

    DATE 10/8/2012

    SHIFT DAYTIME: 8:00hrs -17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. CHARITY

    WORK SCOPE

    CIVIL: (S&R) 1 Filling of the site base with hardcore

    work done 2 Welding of the structure base

    CIVIL: P.Charity NIL

    SAFE HOURS

    CIVIL: S&R 114

    CIVIL: p. Charity 0

    TOTAL 114 TOTAL FROM SEPT 19

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 2 personnel not wearing gloves when handling iron rods

    ACTIONS: The personnel were corrected site immediately and safety officer w

    hand gloves for them.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    43/77

    E AREA &

    2412

    asinstructed to provide

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    44/77

    HAND OVER REPORT

    DATE 10/9/2012

    SHIFT DAYTIME: 8:00hrs -17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. CHARITY

    WORK SCOPE

    CIVIL: (S&R) 1 Preparation of the formwork

    work done 2 Casting of the pillar

    CIVIL: P.Charity Nil

    SAFE HOURS

    CIVIL: S&R 96

    CIVIL: p. Charity 0

    TOTAL 96 TOTAL FROM SEPT 19

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 Personnel removed caoution tape around the pile of ha

    area while working there.

    2 The debris in work are is piling up and due for evacuatio

    ACTIONS: The personnel were corrected, and coached immediately on the im

    off work area. The safety officer was also informed.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    45/77

    E AREA &

    2508

    dcore granite in lay down

    .

    portance of cordoning

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    46/77

    HAND OVER REPORT

    DATE 10/10/2012

    SHIFT DAYTIME: 8:00hrs -17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAG

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. CHARITY

    WORK SCOPE

    CIVIL: (S&R) 1 Preparation of the formwork

    work done 2 Movind hardcore granite to foundation area

    3 Block setting.

    CIVIL: P.Charity Nil

    SAFE HOURS

    CIVIL: S&R 96

    CIVIL: p. Charity 0

    TOTAL 96 TOTAL FROM SEPT 19

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 4

    1 Personnel clothes were not neatly arranged in the laydo

    2 No functional first aid box on site

    3 Tools litter the work area, because there are no tool boxe

    4 The debris in work are is piling up and due for evacuation.

    ACTIONS: The contractor safety officer was informed and coached on the impo

    need for 1st aid box , and provision of tool boxes for personnel.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    47/77

    AREA &

    2700

    n area- poor housekeeping

    rtance of housekeeping,

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    48/77

    HAND OVER REPORT

    DATE 10/11/2012

    SHIFT DAYTIME: 8:00hrs -17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA &

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. CHARITY

    WORK SCOPE

    CIVIL: (S&R) 1 Evacuation of debris from work area

    work done 2 Preparation of form work for casting

    3 Filling of foundation area with hardcore

    CIVIL: P.Charity Nil

    SAFE HOURS

    CIVIL: S&R 120

    CIVIL: p. Charity 0

    TOTAL 120 TOTAL FROM SEPT 19=2,820

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 A person walked to site without hard hat

    2 No functional first aid box on site

    ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for

    The person that entered the area without hard hat was confronted & coached im

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    49/77

    is site.

    mediately.

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    50/77

    HAND OVER REPORT

    DATE 10/12/2012

    SHIFT DAYTIME: 8:00hrs -17:00hrs

    PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA &

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. CHARITY

    WORK SCOPE

    CIVIL: (S&R) 1 Removal of formwork mould from casted concrete wall

    work done 2 Filling of foundation area with hardcore

    CIVIL: P.Charity Nil

    SAFE HOURS

    CIVIL: S&R 112

    CIVIL: p. Charity 0

    TOTAL 112 TOTAL FROM SEPT 19=2,932

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 A truck boy was seen at laydown area without wearing safety boot,

    was ofloading granite.

    2 No functional first aid box on site

    ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for

    The truck boy was confronted & coached immediately by contractor safety offic

    OWNER: Richard JagunnaBACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    51/77

    hile the truck

    is site.

    r.

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    52/77

    HAND OVER REPORT

    DATE 10/13/2012

    SHIFT DAY

    TIME: 8:00hrs -19:00hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA &

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. CHARITY

    WORK SCOPE

    CIVIL: (S&R) 1 Preparation of the formwork for fooundation casting

    work done 2 Filling of foundation area with hardcore

    CIVIL: P.Charity 1 Painting of new day tanks room

    SAFE HOURS

    CIVIL: S&R 96

    CIVIL: p. Charity 72

    TOTAL 168 TOTAL FROM SEPT 19=3,100

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 Hand tools litter work area (P. Charity)

    2 No functional first aid box on site ( S&R , P.Charity)

    ACTIONS: The contractor safety officers were asked to provide functional First Aid boxes f

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    53/77

    r their sites.

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    54/77

    HAND OVER REPORT

    DATE 10/14/2012

    SHIFT DAY

    TIME: 8:00hrs -19:00hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA &

    PAINTING OF NEW TANK ROOM & STRUCTURES

    CONTRACTOR(S): S&R

    P. CHARITY

    WORK SCOPE

    CIVIL: (S&R) 1 Casting of floor

    CIVIL: P.Charity 1 Re-spraying & painting of pipes, beams, tank room, and el

    SAFE HOURS

    CIVIL: S&R 232

    CIVIL: p. Charity 70

    TOTAL 302 TOTAL FROM SEPT 19=3,402

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 1

    1 No functional first aid box on site

    ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for

    The truck boy was confronted & coached immediately by contractor safety offic

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    55/77

    ectric motors

    is site.

    r.

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    56/77

    HAND OVER REPORT

    DATE 10/15/2012

    SHIFT DAYTIME: 8:00hrs -17:00hrs

    PROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    2.PAINTING OF NEW TANK ROOM & STRUCTURES

    3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT

    & BOILER PANEL RELOCATION)

    CONTRACTOR(S): S&R

    P. CHARITYSAM ELECTRIC

    WORK SCOPE

    CIVIL: (S&R) Setting of block wallClearing of the site

    CIVIL: P.CHARITY Nil

    ELECTRICAL: SAM ELECTRIC Nil

    SAFE HOURS

    CIVIL: S&R 80

    CIVIL: P. Charity 0

    ELECTRICAL: Sam Electric 0

    TOTAL 80 TOTAL FROM SEPT 19= 3,482

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 No functional first aid box on site

    2 Poor housekeeping in laydown area.

    ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for h

    The safety officer was given a feedback about the housekeeping status of his lay

    area, and it was closed out.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    57/77

    E

    is site.

    own

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    58/77

    HAND OVER REPORT

    DATE 10/16/2012

    SHIFT DAYTIME: 8:00hrs -17:00hrs

    PROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    2.PAINTING OF NEW TANK ROOM & STRUCTURES

    3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT

    & BOILER PANEL RELOCATION)

    CONTRACTOR(S): S&R

    P. CHARITYSAM ELECTRIC

    WORK SCOPE

    CIVIL: (S&R) Setting of block wallErection of scaffold

    CIVIL: P.CHARITY Nil

    ELECTRICAL: SAM ELECTRIC Nil

    SAFE HOURS

    CIVIL: S&R 80

    CIVIL: P. Charity 0

    ELECTRICAL: Sam Electric 0

    TOTAL 80 TOTAL FROM SEPT 19= 3,562

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 No functional first aid box on site

    2 Poor housekeeping in laydown area.

    ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for h

    The safety officer was given a feedback about the housekeeping status of his lay

    area, and it was closed out.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    59/77

    E

    is site.

    own

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    60/77

    HAND OVER REPORT

    DATE 10/17/2012

    SHIFT DAY

    TIME: 8:00hrs -17:00hrsPROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    2.PAINTING OF NEW TANK ROOM & STRUCTURES

    3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT

    & BOILER PANEL RELOCATION)

    CONTRACTOR(S): S&R

    P. CHARITYSAM ELECTRIC

    WORK SCOPE

    CIVIL: (S&R) Casting of Ramp

    Completion of scaffold erection

    CIVIL: P.CHARITY Nil

    ELECTRICAL: SAM ELECTRIC Nil

    SAFE HOURS

    CIVIL: S&R 80

    CIVIL: P. Charity 0

    ELECTRICAL: Sam Electric 0

    TOTAL 80 TOTAL FROM SEPT 19= 3,642

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 3

    1 Handtools litter work area

    2 unlabelled jerry can containing diesel placed close to a working concr

    3 No functional first aid box on site

    ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for

    The safety officer was given a feedback about unlabelled jerrycan, and he replac

    the tattered label with a new one

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    61/77

    E

    ete mixer

    is site.

    d

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    62/77

    HAND OVER REPORT

    DATE 10/18/2012

    SHIFT DAYTIME: 8:00hrs -17:00hrs

    PROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    2.PAINTING OF NEW TANK ROOM & STRUCTURES

    3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT

    & BOILER PANEL RELOCATION)

    CONTRACTOR(S): S&R

    P. CHARITYSAM ELECTRIC

    WORK SCOPE

    CIVIL: (S&R) Removal of formwork from castingCasting of RampErection of another scaffold

    General housekeeping

    CIVIL: P.CHARITY Nil

    ELECTRICAL: SAM ELECTRIC Nil

    SAFE HOURS

    CIVIL: S&R 48

    CIVIL: P. Charity 0

    ELECTRICAL: Sam Electric 0

    TOTAL 48 TOTAL FROM SEPT 19= 3,690

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 Some Handtools found on the pavement in work area

    2 No functional first aid box on site

    ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for

    The deadline is 48hrs.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    63/77

    E

    is site.

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    64/77

    HAND OVER REPORT

    DATE 10/19/2012

    SHIFT DAYTIME: 8:00hrs -17:00hrs

    PROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    2.PAINTING OF NEW TANK ROOM & STRUCTURES

    3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT

    & BOILER PANEL RELOCATION)

    CONTRACTOR(S): S&R

    P. CHARITYSAM ELECTRIC

    WORK SCOPE

    CIVIL: (S&R) Removal of formwork from castingCasting of RampErection of 3rd scaffold

    General housekeeping

    CIVIL: P.CHARITY Nil

    ELECTRICAL: SAM ELECTRIC Nil

    SAFE HOURS

    CIVIL: S&R 48

    CIVIL: P. Charity 0

    ELECTRICAL: Sam Electric 0

    TOTAL 48 TOTAL FROM SEPT 19= 3,738

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 A worker carried planks without wearing cotton hand gloves

    2 No functional first aid box on site

    ACTIONS: The personnel was given a feedback and coached immediately.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    65/77

    E

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    66/77

    HAND OVER REPORT

    DATE 10/20/2012

    SHIFT DAYTIME: 8:00hrs -17:00hrs

    PROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    2.PAINTING OF NEW TANK ROOM & STRUCTURES

    3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT

    & BOILER PANEL RELOCATION)

    CONTRACTOR(S): S&R

    P. CHARITYSAM ELECTRIC

    WORK SCOPE

    CIVIL: (S&R) Nil

    CIVIL: P.CHARITY Apply body filler on pipes, tanks, machine pars and struct

    Painting: Spraying brush work

    ELECTRICAL: SAM ELECTRIC Nil

    SAFE HOURS

    CIVIL: S&R

    CIVIL: P. Charity 54

    ELECTRICAL: Sam Electric 0

    TOTAL 54 TOTAL FROM SEPT 19= 3,792

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 trailing cable and hose from from spraying machine

    2 No functional first aid box on site

    ACTIONS: The personnel was given a feedback and coached immediately.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    67/77

    E

    re

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    68/77

    HAND OVER REPORT

    DATE 10/22/2012

    SHIFT DAYTIME: 8:00hrs -17:00hrs

    PROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    2.PAINTING OF NEW TANK ROOM & STRUCTURES

    3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT

    & BOILER PANEL RELOCATION)

    CONTRACTOR(S): S&R

    P. CHARITYSAM ELECTRIC

    WORK SCOPE

    CIVIL: (S&R) Offloading of stanchion beams to siteWelding/cutting/grinding of stanchion base

    CIVIL: P.CHARITY Nil

    ELECTRICAL: SAM ELECTRIC Nil

    SAFE HOURS

    CIVIL: S&R 48

    CIVIL: P. Charity 0

    ELECTRICAL: Sam Electric 0

    TOTAL 48 TOTAL FROM SEPT 19= 3,840

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 trailing cable from junction box

    2 No functional first aid box on site

    ACTIONS: The safety officer was given a feedback and coached immediately.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    69/77

    E

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    70/77

    HAND OVER REPORT

    DATE 10/23/2012

    SHIFT DAY

    TIME: 8:00hrs -18:00hrsPROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    2.PAINTING OF NEW TANK ROOM & STRUCTURES

    3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT

    & BOILER PANEL RELOCATION)

    CONTRACTOR(S): S&R

    P. CHARITYSAM ELECTRIC

    WORK SCOPE

    CIVIL: (S&R) Welding/cutting/grinding of stanchion base

    Erection of stanchion beams using HIAB

    CIVIL: P.CHARITY Nil

    ELECTRICAL: SAM ELECTRIC Nil

    SAFE HOURS

    CIVIL: S&R 64

    CIVIL: P. Charity 0

    ELECTRICAL: Sam Electric 0

    TOTAL 64 TOTAL FROM SEPT 19= 3,904

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 trailing cable from junction box

    2 No functional first aid box on site

    ACTIONS: The safety officer was given a feedback and coached immediately.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    71/77

    E

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    72/77

    HAND OVER REPORT

    DATE 10/24/2012

    SHIFT DAY

    TIME: 8:00hrs -17:00hrsPROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    2.PAINTING OF NEW TANK ROOM & STRUCTURES

    3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT

    & BOILER PANEL RELOCATION)

    CONTRACTOR(S): S&R

    P. CHARITYSAM ELECTRIC

    WORK SCOPE

    CIVIL: (S&R) Closing up of opened section of work area perimeter fenc

    Setting of z poline sheets for roofWelding/cutting & grinding of z poline sheets for accurate

    Housekeeping

    CIVIL: P.CHARITY Nil

    ELECTRICAL: SAM ELECTRIC Nil

    SAFE HOURS

    CIVIL: S&R 58

    CIVIL: P. Charity 0

    ELECTRICAL: Sam Electric 0

    TOTAL 58 TOTAL FROM SEPT 19= 3,962

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 trailing cable from junction box

    2 No functional first aid box on site

    ACTIONS: The safety officer was given a feedback and coached immediately.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    73/77

    E

    e

    size

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    74/77

    HAND OVER REPORT

    DATE 10/25/2012

    SHIFT DAY

    TIME: 8:00hrs -17:00hrsPROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    2.PAINTING OF NEW TANK ROOM & STRUCTURES

    3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT

    & BOILER PANEL RELOCATION)

    CONTRACTOR(S): S&R

    P. CHARITYSAM ELECTRIC

    WORK SCOPE

    CIVIL: (S&R) Continuation of Setting of z poline sheets for roof

    Welding/cutting & grinding of z poline sheets for accurateHousekeeping

    CIVIL: P.CHARITY Nil

    ELECTRICAL: SAM ELECTRIC Nil

    SAFE HOURS

    CIVIL: S&R 72

    CIVIL: P. Charity 0

    ELECTRICAL: Sam Electric 0

    TOTAL 72 TOTAL FROM SEPT 19= 4034

    Near Miss 1

    An uninspected /approved electric welding machine with open guard found on

    Unsafe behavior / unsafe Condition observed : 2

    1 trailing cable from junction box

    2 No functional first aid box on site

    ACTIONS: The safety officer was given a feedback and coached immediately. An MCA shall

    on the near miss.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    75/77

    E

    size

    S&R site

    be conducted

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12

    76/77

    HAND OVER REPORT

    DATE 10/26/2012

    SHIFT DAY

    TIME: 8:00hrs -17:00hrsPROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

    2.PAINTING OF NEW TANK ROOM & STRUCTURES

    3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT

    & BOILER PANEL RELOCATION)

    CONTRACTOR(S): S&R

    P. CHARITYSAM ELECTRIC

    WORK SCOPE

    CIVIL: (S&R)

    CIVIL: P.CHARITY Nil

    ELECTRICAL: SAM ELECTRIC Nil

    SAFE HOURS

    CIVIL: S&R 0

    CIVIL: P. Charity 0

    ELECTRICAL: Sam Electric 0

    TOTAL 0 TOTAL FROM SEPT 19=

    Near Miss Nil

    Unsafe behavior / unsafe Condition observed : 2

    1 trailing cable from junction box

    2 No functional first aid box on site

    ACTIONS: The personnel was given a feedback and coached immediately.

    OWNER: Richard Jagunna

    BACK-UP: Isaac Balogun

  • 7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12