7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
1/77
HAND OVER REPORT
DATE 19/9/2012
SHIFT DAYTIME: 8:00hrs-17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
CONTRACTOR(S): S&R
WORK SCOPE
CIVIL: (S&R)
work done Mobillazation of workers & equipment to the site
Barricading of construction sitesite clearing & evacuation of waste out of the plant
WORK SCOPE
SAFE HOURS
CIVIL: 15
TOTAL 120 TOTAL FROM SEPT 19= 120
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 Personnelloading Tipper without wearing hard hat
2 Tools & equipment were not adequately arranged on site
ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed
out before end of the shift .
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
2/77
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
3/77
HAND OVER REPORT
DATE 20/9/2012
SHIFT DAYTIME: 8:00hrs-17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
CONTRACTOR(S): S&R
WORK SCOPE
CIVIL: (S&R)
work done Excavation of the foundation
waste removal from the site
SAFE HOURS
CIVIL: 18
TOTAL 144 TOTAL FROM SEPT 19= 264
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 Personnel loading Tipper without wearing hard hat
2 Tools & equipment were not adequately arranged on site
ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed
out before end of the shift .
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
4/77
SHIFT DAY
TIME: 8:00 - 17hrs
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
5/77
HAND OVER REPORT
DATE 21/9/2012
SHIFT DAYTIME: 8:00 hrs- 17hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
CONTRACTOR(S): S&R
WORK SCOPE
CIVIL: (S&R)
work done continuation of Excavation of the foundation
waste removal from the siteConstuction of laydawn area & bending of iron rods
SAFE HOURS
CIVIL: 16
TOTAL 128 TOTAL FROM SEPT 19= 392
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 Personnel loading Tipper without wearing hard hat
2 Tools & equipment were not adequately arranged on site
ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed
out before end of the shift .
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
6/77
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
7/77
HAND OVER REPORT
DATE 22/9/2012SHIFT DAY
TIME: 8:00hrs- 17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
CONTRACTOR(S): S&R
WORK SCOPE
CIVIL: (S&R)
work done continuation of Excavation of the foundationwaste removal from the site
Constuction of laydawn area & bending of iron rods
SAFE HOURS
CIVIL: 13
TOTAL 96 TOTAL FROM SEPT 19= 488
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 Personnel loading Tipper without wearing hard hat
2 Tools & equipment were not adequately arranged on site
ACTIONS: All observed unsafe behaviors & conditions were adequately addressed close
out before end of the shift .
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
8/77
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
9/77
HAND OVER REPORT
DATE 23/9/2012
SHIFT DAYTIME: 8:00hrs-17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
CONTRACTOR(S): S&R
WORK SCOPE
CIVIL: (S&R)
work done Blinding of foundation
SAFE HOURS
CIVIL: 9
TOTAL 72 TOTAL FROM SEPT 19= 560
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 Personnel loading Tipper without wearing hard hat
2 Tools & equipment were not adequately arranged on site
ACTIONS: All observed unsafe behaviors & conditions were adequately addressed close
out before end of the shift .
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
10/77
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
11/77
HAND OVER REPORT
DATE 24/9/2012
SHIFT DAY
TIME: 8:00hrs-17:00hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
CONTRACTOR(S): S&R
WORK SCOPE
CIVIL: (S&R)
work done Completion of Foundation blinding
Construction work on laydown area is ongoing
SAFE HOURS
CIVIL: 9
TOTAL 136 TOTAL FROM SEPT 19= 696
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 Personnel loading Tipper without wearing hard hat
2 Tools & equipment were not adequately arranged on site
ACTIONS: All observed unsafe behaviors & conditions were adequately addressed close
out before end of the shift .OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
12/77
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
13/77
HAND OVER REPORT
DATE 25/9/2012
SHIFT DAY
TIME: 8:00hrs - 17:00 hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
CONTRACTOR(S): S&R
WORK SCOPE
CIVIL: (S&R)
work done Setting of reiforcement
Evacuation of debrils
Completion of construction of Ladown Area .
SAFE HOURS
CIVIL: 12
TOTAL 98 TOTAL FROM SEPT 19= 794
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 1
1 Obstruction of Access into construction site with debrils evacuated from
foundation
ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closeout before end of the shift .
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
14/77
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
15/77
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
16/77
HAND OVER REPORT
DATE 26/9/2012
SHIFT: DAY
TIME : 8:00-17hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
CONTRACTOR(S): S&R
WORK SCOPE
CIVIL: (S&R)
work done Setting of reinforcement continue
Evacuation of debris
Completion of construction of Ladown Area .
SAFE HOURS
CIVIL: 12
TOTAL 98 TOTAL FROM SEPT 19= 892
Unsafe behavior / unsafe Condition observed : 1
Obstruction of Access into construction site with debrils evacuated from
foundation
ACTIONS: All observed unsafe behaviors & conditions were adequately addressed close
out before end of the shift .
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
17/77
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
18/77
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
19/77
HAND OVER REPORT
DATE 27/9/2012
SHIFT DAY
TIME: 18:00hrs -17:00hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
CONTRACTOR(S): S&R
WORK SCOPE
CIVIL: (S&R)
work done Setting of reinforcement continue
Casting of concrete
SAFE HOURS
CIVIL: 17
TOTAL 136 TOTAL FROM SEPT 19
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 1
1 Obstruction of access route with mixer machine.
ACTIONS: All observed unsafe behaviors & conditions were adequately addressed close
out before end of the shift .OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
20/77
1028
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
21/77
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
22/77
HAND OVER REPORT
DATE 28/9/2012
SHIFT DAYTIME: 18:00hrs -17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA
CONTRACTOR(S): S&R
WORK SCOPE
CIVIL: (S&R)
work done 1 Continuation of concrete casting
2 Excavation of foundation3 Evacuation of debris from the work area
SAFE HOURS
CIVIL: 18
TOTAL 144 TOTAL FRO
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 Working tools were scattered on construction site
2 Poor housekeeping in Lay down Area
ACTIONS: Feedback was given to the Site Contractor Safety Officer on both
He stopped the work briefly and ensured adequate housekeeping i
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
23/77
GE AREA
M SEPT 19=1172
nsafe Conditions
n the two locations
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
24/77
HAND OVER REPORT
DATE 29/9/2012
SHIFT DAY
TIME: 18:00hrs -17:00hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. Charity
WORK SCOPE
CIVIL: (S&R) Nil
work done
CIVIL: P.Charity 1 Preparation of the wall for painting ( sand paper & bru
2 priming of wall
3 Painting of wall
SAFE HOURS
CIVIL: S&R 0
CIVIL: p. Charity 28
TOTAL 28 TOTAL FROM SEPT 19=1200
ACTIONS: Feedback was given to the Site Contractor Safety Officer on both Unsafe Cond
He stopped the work briefly and ensured adequate housekeeping in the two l
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
25/77
hing )
itions
ocations
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
26/77
HAND OVER REPORT
DATE 30/9/2012
SHIFT DAYTIME: 18:00hrs -17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. Charity
WORK SCOPE
CIVIL: (S&R)
work done 1 Continuation of concrete casting
2 Excavation of foundation
CIVIL: P.Charity 1 Preparation of the wall for painting ( sand p
2 priming of wall
3 Painting of wall
SAFE HOURS
CIVIL: S&R 96
CIVIL: p. Charity 54
TOTAL 150 TOTAL FRO
ACTIONS:
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
27/77
GE AREA &
aper & brushing )
M SEPT 19=1350
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
28/77
HAND OVER REPORT
DATE 1/10/1900SHIFT DAY
TIME: 18:00hrs -17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPME
PAINTING OF NEW TANK ROOM & STRUC
CONTRACTOR(S): S&R
P. Charity
WORK SCOPE
CIVIL: (S&R) 1 Continuation of concrete casting
work done 2 Excavation of foundation3 Block laying
CIVIL: P.Charity 1 priming of wall
2 Painting of wall
SAFE HOURS
CIVIL: S&R 120
CIVIL: p. Charity 12
TOTAL 132
1 Debris removed from excavation yet to b
ACTIONS: Permit for waste evacuation will be renew on
immediately waste permit is renewed deris w
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
29/77
T STORAGE AREA &
URES
TOTAL FROM SEPT 19=1482
e evacuated out of site
Tuesday morning.
ill be evacuated out of site
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
30/77
HAND OVER REPORT
DATE 10/2/2012SHIFT DAY
TIME: 18:00hrs -17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. Charity
WORK SCOPE
CIVIL: (S&R) 1 Casting of the wall
work done 2 Excavation of deris from the site3 Block laying
CIVIL: P.Charity Nil
SAFE HOURS
CIVIL: S&R 15
CIVIL: p. Charity 0
TOTAL 120 TOTAL FRO
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 21 Improper arrangement of tools on site
2 poor hous removed from excavation yet to be evacuate
ACTIONS: The safety officer was given a feed back, he promised to close the t
on checking back about an hour later the has been closed
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
31/77
E AREA &
M SEPT 19=1602 120
out of site
o issues immediately
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
32/77
3-Oct
HAND OVER REPORT
DATE 10/3/2012
SHIFT DAYTIME: 18:00hrs -17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. Charity
WORK SCOPE
CIVIL: (S&R) 1 Block laying on the wall
work done 2 Compaction of the floor
3 preparation for casting of the concrete
CIVIL: P.Charity Nil
SAFE HOURS
CIVIL: S&R 16
CIVIL: p. Charity 0
TOTAL 128 TOTAL FRO
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 3
1 poor housekeeping ( off cuts woods )2 tools were not properly stored on site
3 caution tape use for brrication was lowered
ACTIONS: site safety officer & engineer were informed to immediately ensure
good housekeeping are maintained on construction site always .
The team closed up the issues before the end of the shfi.t
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
33/77
E AREA &
M SEPT 19=1730
that
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
34/77
OCT
HAND OVER REPORT
DATE 10/4/2012
SHIFT DAYTIME: 18:00hrs -17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. Charity
WORK SCOPE
CIVIL: (S&R) 1 Continuation of wall casting
work done 2 Compaction of the floor
CIVIL: P.Charity Nil
SAFE HOURS
CIVIL: S&R 17
CIVIL: p. Charity 0
TOTAL 136 TOTAL FRO
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 Access route was obstructed with wooden materials
2 cement bags scattered on construction site
ACTIONS: the Carpenter was informed to remove the plant from access route i
casting crew were informed to always stored used bags of cement t
The issues were closed up immediately
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
35/77
E AREA &
M SEPT 19=1886
mmediately
gether
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
36/77
HAND OVER REPORT
DATE 10/5/2012
SHIFT DAY
TIME: 18:00hrs -17:00hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. Charity
WORK SCOPE
CIVIL: (S&R) 1 Building casting form
work done 2 welding of reinforcement ( Hot work )
3 setting of reinforcement
CIVIL: P.Charity
SAFE HOURS
CIVIL: S&R 136
CIVIL: p. Charity 12
TOTAL 148 TOTAL FRO
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 21 the site carpenter was not properly stored his tools has
2 off cuts wooden materials with nails not stored as requir
ACTIONS: the Carpenter was given a feed back , ask to stop working and obser
He maintained good housekeeping before the continuation of his ta
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
1 Scaffold erection
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
37/77
E AREA &
M SEPT 19=2034
lanned
ed
ve housekeeping
k
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
38/77
HAND OVER REPORT
DATE 10/6/2012
SHIFT DAYTIME: 18:00hrs -17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA &
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. CHARITY
WORK SCOPE
CIVIL: (S&R) 1 Building casting form
work done 2 welding of reinforcement ( Hot work )
3 setting of reinforcement
CIVIL: P.Charity 1 Preparation of the structure for painting ( sand paper &
2 Painting of Tanks , pipes & structures
3 Painting of MCAS fan exhaust
SAFE HOURS
CIVIL: S&R 136
CIVIL: p. Charity 72
TOTAL 208 TOTAL FROM SEPT 19=2242
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 poor house keeping in the lay down area
2 gravel parked in lay down area are not barricaded
ACTIONS: The site safety officer was informed immediately to ensure adequate
housekeeping is maintained in the lay down area always.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
39/77
brushing )
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
40/77
HAND OVER REPORT
DATE 10/7/2012
SHIFT DAYTIME: 8:00hrs -17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. CHARITY
WORK SCOPE
CIVIL: (S&R) 1 Compaction of construction site
work done 2 Setting of the reinforcement bar
CIVIL: P.Charity
SAFE HOURS
CIVIL: S&R 56
CIVIL: p. Charity 0
TOTAL 56 TOTAL FROM SEPT 19
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 poor house keeping in the lay down area
ACTIONS: The site safety officer was informed immediately to ensure adequat
housekeeping is maintained in the lay down area always.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
41/77
E AREA &
2298
e
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
42/77
HAND OVER REPORT
DATE 10/8/2012
SHIFT DAYTIME: 8:00hrs -17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. CHARITY
WORK SCOPE
CIVIL: (S&R) 1 Filling of the site base with hardcore
work done 2 Welding of the structure base
CIVIL: P.Charity NIL
SAFE HOURS
CIVIL: S&R 114
CIVIL: p. Charity 0
TOTAL 114 TOTAL FROM SEPT 19
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 2 personnel not wearing gloves when handling iron rods
ACTIONS: The personnel were corrected site immediately and safety officer w
hand gloves for them.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
43/77
E AREA &
2412
asinstructed to provide
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
44/77
HAND OVER REPORT
DATE 10/9/2012
SHIFT DAYTIME: 8:00hrs -17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORA
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. CHARITY
WORK SCOPE
CIVIL: (S&R) 1 Preparation of the formwork
work done 2 Casting of the pillar
CIVIL: P.Charity Nil
SAFE HOURS
CIVIL: S&R 96
CIVIL: p. Charity 0
TOTAL 96 TOTAL FROM SEPT 19
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 Personnel removed caoution tape around the pile of ha
area while working there.
2 The debris in work are is piling up and due for evacuatio
ACTIONS: The personnel were corrected, and coached immediately on the im
off work area. The safety officer was also informed.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
45/77
E AREA &
2508
dcore granite in lay down
.
portance of cordoning
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
46/77
HAND OVER REPORT
DATE 10/10/2012
SHIFT DAYTIME: 8:00hrs -17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAG
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. CHARITY
WORK SCOPE
CIVIL: (S&R) 1 Preparation of the formwork
work done 2 Movind hardcore granite to foundation area
3 Block setting.
CIVIL: P.Charity Nil
SAFE HOURS
CIVIL: S&R 96
CIVIL: p. Charity 0
TOTAL 96 TOTAL FROM SEPT 19
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 4
1 Personnel clothes were not neatly arranged in the laydo
2 No functional first aid box on site
3 Tools litter the work area, because there are no tool boxe
4 The debris in work are is piling up and due for evacuation.
ACTIONS: The contractor safety officer was informed and coached on the impo
need for 1st aid box , and provision of tool boxes for personnel.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
47/77
AREA &
2700
n area- poor housekeeping
rtance of housekeeping,
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
48/77
HAND OVER REPORT
DATE 10/11/2012
SHIFT DAYTIME: 8:00hrs -17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA &
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. CHARITY
WORK SCOPE
CIVIL: (S&R) 1 Evacuation of debris from work area
work done 2 Preparation of form work for casting
3 Filling of foundation area with hardcore
CIVIL: P.Charity Nil
SAFE HOURS
CIVIL: S&R 120
CIVIL: p. Charity 0
TOTAL 120 TOTAL FROM SEPT 19=2,820
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 A person walked to site without hard hat
2 No functional first aid box on site
ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for
The person that entered the area without hard hat was confronted & coached im
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
49/77
is site.
mediately.
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
50/77
HAND OVER REPORT
DATE 10/12/2012
SHIFT DAYTIME: 8:00hrs -17:00hrs
PROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA &
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. CHARITY
WORK SCOPE
CIVIL: (S&R) 1 Removal of formwork mould from casted concrete wall
work done 2 Filling of foundation area with hardcore
CIVIL: P.Charity Nil
SAFE HOURS
CIVIL: S&R 112
CIVIL: p. Charity 0
TOTAL 112 TOTAL FROM SEPT 19=2,932
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 A truck boy was seen at laydown area without wearing safety boot,
was ofloading granite.
2 No functional first aid box on site
ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for
The truck boy was confronted & coached immediately by contractor safety offic
OWNER: Richard JagunnaBACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
51/77
hile the truck
is site.
r.
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
52/77
HAND OVER REPORT
DATE 10/13/2012
SHIFT DAY
TIME: 8:00hrs -19:00hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA &
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. CHARITY
WORK SCOPE
CIVIL: (S&R) 1 Preparation of the formwork for fooundation casting
work done 2 Filling of foundation area with hardcore
CIVIL: P.Charity 1 Painting of new day tanks room
SAFE HOURS
CIVIL: S&R 96
CIVIL: p. Charity 72
TOTAL 168 TOTAL FROM SEPT 19=3,100
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 Hand tools litter work area (P. Charity)
2 No functional first aid box on site ( S&R , P.Charity)
ACTIONS: The contractor safety officers were asked to provide functional First Aid boxes f
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
53/77
r their sites.
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
54/77
HAND OVER REPORT
DATE 10/14/2012
SHIFT DAY
TIME: 8:00hrs -19:00hrsPROJECT (S): CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA &
PAINTING OF NEW TANK ROOM & STRUCTURES
CONTRACTOR(S): S&R
P. CHARITY
WORK SCOPE
CIVIL: (S&R) 1 Casting of floor
CIVIL: P.Charity 1 Re-spraying & painting of pipes, beams, tank room, and el
SAFE HOURS
CIVIL: S&R 232
CIVIL: p. Charity 70
TOTAL 302 TOTAL FROM SEPT 19=3,402
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 1
1 No functional first aid box on site
ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for
The truck boy was confronted & coached immediately by contractor safety offic
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
55/77
ectric motors
is site.
r.
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
56/77
HAND OVER REPORT
DATE 10/15/2012
SHIFT DAYTIME: 8:00hrs -17:00hrs
PROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
2.PAINTING OF NEW TANK ROOM & STRUCTURES
3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT
& BOILER PANEL RELOCATION)
CONTRACTOR(S): S&R
P. CHARITYSAM ELECTRIC
WORK SCOPE
CIVIL: (S&R) Setting of block wallClearing of the site
CIVIL: P.CHARITY Nil
ELECTRICAL: SAM ELECTRIC Nil
SAFE HOURS
CIVIL: S&R 80
CIVIL: P. Charity 0
ELECTRICAL: Sam Electric 0
TOTAL 80 TOTAL FROM SEPT 19= 3,482
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 No functional first aid box on site
2 Poor housekeeping in laydown area.
ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for h
The safety officer was given a feedback about the housekeeping status of his lay
area, and it was closed out.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
57/77
E
is site.
own
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
58/77
HAND OVER REPORT
DATE 10/16/2012
SHIFT DAYTIME: 8:00hrs -17:00hrs
PROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
2.PAINTING OF NEW TANK ROOM & STRUCTURES
3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT
& BOILER PANEL RELOCATION)
CONTRACTOR(S): S&R
P. CHARITYSAM ELECTRIC
WORK SCOPE
CIVIL: (S&R) Setting of block wallErection of scaffold
CIVIL: P.CHARITY Nil
ELECTRICAL: SAM ELECTRIC Nil
SAFE HOURS
CIVIL: S&R 80
CIVIL: P. Charity 0
ELECTRICAL: Sam Electric 0
TOTAL 80 TOTAL FROM SEPT 19= 3,562
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 No functional first aid box on site
2 Poor housekeeping in laydown area.
ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for h
The safety officer was given a feedback about the housekeeping status of his lay
area, and it was closed out.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
59/77
E
is site.
own
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
60/77
HAND OVER REPORT
DATE 10/17/2012
SHIFT DAY
TIME: 8:00hrs -17:00hrsPROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
2.PAINTING OF NEW TANK ROOM & STRUCTURES
3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT
& BOILER PANEL RELOCATION)
CONTRACTOR(S): S&R
P. CHARITYSAM ELECTRIC
WORK SCOPE
CIVIL: (S&R) Casting of Ramp
Completion of scaffold erection
CIVIL: P.CHARITY Nil
ELECTRICAL: SAM ELECTRIC Nil
SAFE HOURS
CIVIL: S&R 80
CIVIL: P. Charity 0
ELECTRICAL: Sam Electric 0
TOTAL 80 TOTAL FROM SEPT 19= 3,642
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 3
1 Handtools litter work area
2 unlabelled jerry can containing diesel placed close to a working concr
3 No functional first aid box on site
ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for
The safety officer was given a feedback about unlabelled jerrycan, and he replac
the tattered label with a new one
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
61/77
E
ete mixer
is site.
d
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
62/77
HAND OVER REPORT
DATE 10/18/2012
SHIFT DAYTIME: 8:00hrs -17:00hrs
PROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
2.PAINTING OF NEW TANK ROOM & STRUCTURES
3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT
& BOILER PANEL RELOCATION)
CONTRACTOR(S): S&R
P. CHARITYSAM ELECTRIC
WORK SCOPE
CIVIL: (S&R) Removal of formwork from castingCasting of RampErection of another scaffold
General housekeeping
CIVIL: P.CHARITY Nil
ELECTRICAL: SAM ELECTRIC Nil
SAFE HOURS
CIVIL: S&R 48
CIVIL: P. Charity 0
ELECTRICAL: Sam Electric 0
TOTAL 48 TOTAL FROM SEPT 19= 3,690
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 Some Handtools found on the pavement in work area
2 No functional first aid box on site
ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for
The deadline is 48hrs.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
63/77
E
is site.
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
64/77
HAND OVER REPORT
DATE 10/19/2012
SHIFT DAYTIME: 8:00hrs -17:00hrs
PROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
2.PAINTING OF NEW TANK ROOM & STRUCTURES
3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT
& BOILER PANEL RELOCATION)
CONTRACTOR(S): S&R
P. CHARITYSAM ELECTRIC
WORK SCOPE
CIVIL: (S&R) Removal of formwork from castingCasting of RampErection of 3rd scaffold
General housekeeping
CIVIL: P.CHARITY Nil
ELECTRICAL: SAM ELECTRIC Nil
SAFE HOURS
CIVIL: S&R 48
CIVIL: P. Charity 0
ELECTRICAL: Sam Electric 0
TOTAL 48 TOTAL FROM SEPT 19= 3,738
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 A worker carried planks without wearing cotton hand gloves
2 No functional first aid box on site
ACTIONS: The personnel was given a feedback and coached immediately.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
65/77
E
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
66/77
HAND OVER REPORT
DATE 10/20/2012
SHIFT DAYTIME: 8:00hrs -17:00hrs
PROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
2.PAINTING OF NEW TANK ROOM & STRUCTURES
3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT
& BOILER PANEL RELOCATION)
CONTRACTOR(S): S&R
P. CHARITYSAM ELECTRIC
WORK SCOPE
CIVIL: (S&R) Nil
CIVIL: P.CHARITY Apply body filler on pipes, tanks, machine pars and struct
Painting: Spraying brush work
ELECTRICAL: SAM ELECTRIC Nil
SAFE HOURS
CIVIL: S&R
CIVIL: P. Charity 54
ELECTRICAL: Sam Electric 0
TOTAL 54 TOTAL FROM SEPT 19= 3,792
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 trailing cable and hose from from spraying machine
2 No functional first aid box on site
ACTIONS: The personnel was given a feedback and coached immediately.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
67/77
E
re
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
68/77
HAND OVER REPORT
DATE 10/22/2012
SHIFT DAYTIME: 8:00hrs -17:00hrs
PROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
2.PAINTING OF NEW TANK ROOM & STRUCTURES
3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT
& BOILER PANEL RELOCATION)
CONTRACTOR(S): S&R
P. CHARITYSAM ELECTRIC
WORK SCOPE
CIVIL: (S&R) Offloading of stanchion beams to siteWelding/cutting/grinding of stanchion base
CIVIL: P.CHARITY Nil
ELECTRICAL: SAM ELECTRIC Nil
SAFE HOURS
CIVIL: S&R 48
CIVIL: P. Charity 0
ELECTRICAL: Sam Electric 0
TOTAL 48 TOTAL FROM SEPT 19= 3,840
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 trailing cable from junction box
2 No functional first aid box on site
ACTIONS: The safety officer was given a feedback and coached immediately.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
69/77
E
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
70/77
HAND OVER REPORT
DATE 10/23/2012
SHIFT DAY
TIME: 8:00hrs -18:00hrsPROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
2.PAINTING OF NEW TANK ROOM & STRUCTURES
3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT
& BOILER PANEL RELOCATION)
CONTRACTOR(S): S&R
P. CHARITYSAM ELECTRIC
WORK SCOPE
CIVIL: (S&R) Welding/cutting/grinding of stanchion base
Erection of stanchion beams using HIAB
CIVIL: P.CHARITY Nil
ELECTRICAL: SAM ELECTRIC Nil
SAFE HOURS
CIVIL: S&R 64
CIVIL: P. Charity 0
ELECTRICAL: Sam Electric 0
TOTAL 64 TOTAL FROM SEPT 19= 3,904
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 trailing cable from junction box
2 No functional first aid box on site
ACTIONS: The safety officer was given a feedback and coached immediately.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
71/77
E
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
72/77
HAND OVER REPORT
DATE 10/24/2012
SHIFT DAY
TIME: 8:00hrs -17:00hrsPROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
2.PAINTING OF NEW TANK ROOM & STRUCTURES
3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT
& BOILER PANEL RELOCATION)
CONTRACTOR(S): S&R
P. CHARITYSAM ELECTRIC
WORK SCOPE
CIVIL: (S&R) Closing up of opened section of work area perimeter fenc
Setting of z poline sheets for roofWelding/cutting & grinding of z poline sheets for accurate
Housekeeping
CIVIL: P.CHARITY Nil
ELECTRICAL: SAM ELECTRIC Nil
SAFE HOURS
CIVIL: S&R 58
CIVIL: P. Charity 0
ELECTRICAL: Sam Electric 0
TOTAL 58 TOTAL FROM SEPT 19= 3,962
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 trailing cable from junction box
2 No functional first aid box on site
ACTIONS: The safety officer was given a feedback and coached immediately.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
73/77
E
e
size
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
74/77
HAND OVER REPORT
DATE 10/25/2012
SHIFT DAY
TIME: 8:00hrs -17:00hrsPROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
2.PAINTING OF NEW TANK ROOM & STRUCTURES
3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT
& BOILER PANEL RELOCATION)
CONTRACTOR(S): S&R
P. CHARITYSAM ELECTRIC
WORK SCOPE
CIVIL: (S&R) Continuation of Setting of z poline sheets for roof
Welding/cutting & grinding of z poline sheets for accurateHousekeeping
CIVIL: P.CHARITY Nil
ELECTRICAL: SAM ELECTRIC Nil
SAFE HOURS
CIVIL: S&R 72
CIVIL: P. Charity 0
ELECTRICAL: Sam Electric 0
TOTAL 72 TOTAL FROM SEPT 19= 4034
Near Miss 1
An uninspected /approved electric welding machine with open guard found on
Unsafe behavior / unsafe Condition observed : 2
1 trailing cable from junction box
2 No functional first aid box on site
ACTIONS: The safety officer was given a feedback and coached immediately. An MCA shall
on the near miss.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
75/77
E
size
S&R site
be conducted
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
76/77
HAND OVER REPORT
DATE 10/26/2012
SHIFT DAY
TIME: 8:00hrs -17:00hrsPROJECT (S): 1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA
2.PAINTING OF NEW TANK ROOM & STRUCTURES
3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SIT
& BOILER PANEL RELOCATION)
CONTRACTOR(S): S&R
P. CHARITYSAM ELECTRIC
WORK SCOPE
CIVIL: (S&R)
CIVIL: P.CHARITY Nil
ELECTRICAL: SAM ELECTRIC Nil
SAFE HOURS
CIVIL: S&R 0
CIVIL: P. Charity 0
ELECTRICAL: Sam Electric 0
TOTAL 0 TOTAL FROM SEPT 19=
Near Miss Nil
Unsafe behavior / unsafe Condition observed : 2
1 trailing cable from junction box
2 No functional first aid box on site
ACTIONS: The personnel was given a feedback and coached immediately.
OWNER: Richard Jagunna
BACK-UP: Isaac Balogun
7/28/2019 Mambilla Equipment Storage Area Safety Report. Oct.19-29.12
77/77